SlideShare a Scribd company logo
1 of 17
Download to read offline
ISBT|RAIL|METRO 
“TRANSPORTATION AND TEMPORAL” 
GUIDE: 
SANTOSH AULUCK 
BASHAUBI DAS GUPTA 
STUDIO CO-ORDINATOR 
M.L. BAHRI 
AnushprasinghA/2155/2009 | Prashant kumarA/2160/2009 | SnehalataA/2150/2009
ARTERIAL ROADS. (60M AND ABOVE) 
SUB-ARTERIAL RD.(45M WIDE) 
ROADS (35 M WIDE) 
INNER STREET /ROADS METRO LINE (BLUE) RAILWAY LINE 
STREET AND LINKAGE PATTERN PRECINCT LEVEL ANAND VIHAR | SOURCE : EICHER AND DELHI ROAD MAPTRANSPORTATION SYSTEM OF DELHI INCLUDES BUSESAUTO-RICKSHAWSTAXISCYCLE-RICKSHAWSRAILWAYMETRO 
1 .Buses continue to be the most popular means of transportation for intra-city travel. 
The following pie chart shows the catering of various modes for commuting transport in Delhi 
2. Delhi transportation is heavily depend upon road network ,therefore high congestion occurs at most of the main junctions 
BUSES, 60 
PRIVATE VEHICLE 30 
OTHER 
10 
READING 
ANALYSIS 
1.Delhi and NCR lose nearly 42 CRORE (420 MILLION) MAN-HOURS every month while commuting between home and office through public transport, due to the traffic congestion. 
2.Therefore ,serious efforts are underway for other mode of transport projects like metro,to encourage usage of public transport in the city as a result, load on road network can became less 
CONNECTIVITY VIA ROAD : 
From : 
Saraikale khan 
30 min (12.2 km) by road 
Ghaziabad railway station 
45 min (14.2 km) 
NDLS 
35 min (11.1 km) 
Kashmiri gate 
35 min (11 km) 
karkardooma 
Nirmanvihar 
Preetvihar 
Anandviharkaushambioverview
ANAND VIHAR ISBT DELHI AKA SWAMI VIVEKANAND ISBT 
ADMINISTRATIVE CONTROL: DELHI TRANSPORT CORPORATION 
AREA : 99500 sqm 
CURRENT INTERSTATE OPERATING ROUTES: 51 
CURRENT NO. OF DESTINATIONS : 88 
INTERSTATE CONNCETIVITY : 5 STATES 
PUNJAB, HARYANA, JAMMU & KASHMIR, UTTAR PRADESH, UTTARAKHAND AND RAJASTHAN 
I.S.B.T. ANAND VIHAR 
The total area available is 9.2 hectares. It has a frontage of about 500m along the main Ghazipur road. Main entry to ISBT is from Road No. AH-56. The present ISBT is functional in the name of Vivekanand Inter State Bus Terminal, Anand Vihar, East DelhiFacilities 
•Drinking water taps and coolers 
•Separate toilet facilities of Ladies and Gents 
•First Aid facilities for 24 hours 
•Police Post, Bank and Post Office 
•Sitting chairs lights and fans facility on every platform with the automatic generate system. 
•Cloak Room, Porter, PCO/STD/ISD, Parking and Taxi Scooter Tonga Stand. 
•Cabins for distribution of tickets. 
•Office Accommodation to the transporters 
•Public Addresses System 
•Shops/counters/trolleys have been allotted for all general items such as tee, juice, fruits, eatables, Newspapers, magazines etc. 
FUTURE PROSPECTSIn the proposed plans for Anand Vihar transit hub the main spine which connects all three together is foot over bridge. The shown capacity at various points is as follows METRO ENTRY/EXIT1 : 2000 people approx. per hour2: 2000 people approx. per hour MAIN ENTRY/EXIT 3400 person approx. per hourI.S.B.T TO METRO /RAILWAY3000 people approx. per hourISBT TO RAILWAY3500 people approx. per hourLooking at these figures in proposed plans we can get the rough idea of the no. of people using pedestrian axis at ISBT 
anandviharisbt
ROADWAYS… 
Delhi Transport Corporation(DTC) operates the world's largest fleet of CNG-powered buses. 
•Delhi city is considered to have the highest road density 
•Have a connection to NH 24 
•Inter state and Intra state bus facilities available 
•One of the important transport hub after Kashmere Gate ISBT and Sarai Kale Khan ISBT 
ISSUES: ANALYSIS 
•500mstretch between the entry point ofAnand ViharInterstate Bus Terminus (ISBT) and the railway station on Chaudhary CharanSinghMargis a bottleneck 
•More than half of the carriageway is occupied -Roadways buses 
•problem is compounded by Gramin Sewas parked randomly to attract passengers and the hawkers dotting the area. 
•little-used, footbridge in the area 
•UP Roadways bus terminus -petrol pump, which caters to more than 100 vehicles in an hour 
•Three-wheelers are parked on this stretch to pick up passengers coming from the railway station 
•drivers prefer to park on road and, that too, haphazardly. 
•petrol pump, which has a contract with long-distance bus operators, can cater to only five buses at a time, so the rest line up on the road. 
•It takes about 30 minutes to cross the stretch during the peak hoursFUTURE REQUIREMENT ? There is a requirement for 11,000 public transport buses in Delhi and, as per an agreement between DTC and DIMTS, both are mandated to run 5,500 buses each in the city. While DTC currently operates around 5,000 buses, DIMTS has only 1,157 cluster buses, or 4,343 less than the required 5,500 as per the commitment. 
In accordance with decision taken by Ministry of Urban Development in consultation with Delhi Development Authority and Govt. of Delhi, Anand Vihar became functional with effect from March, 1996. Inter State as well as local bus services are being operated from here. Day to day functioning is managed under the control of general Manager who is subordinated by Deputy General Manager, Accounts Officer, Executive Engineer and other staff including the Engineering financial and administrative. Besides one estate manager is posted for each ISBT to look after the functioning of his respective ISBT. 
READING: 
anandviharisbt
UPRSTC 
bus stand 
Pacific mall 
AnandviharI.S.B.T. 
Anandviharrailway terminal 
ENTRY 
EXIT 
Anandviharmetro1. A large number of buses came from anandviharto patpardganj area.Busstop is not sufficient to cater the present no. of passengers. 2. Area near bus stops are encroached by hawkers and informal stalls,makesmovement difficult for buses and passengersThe shade created by metro track over the bus stop on gazipurroad, creates a comfortable hubfor people on the divider hence,themajority of people go there and wait for buses. Bus movement Bus stop 
buses -movement
Two Wheeler25% 
Auto12% 
Taxi0% 
Car/Jeep37% 
Bus6% 
Truck2% Tractor0% Slow Vehicles18% Source: Traffic Survey by P K Engineers(FROM UTTIPEC WEBSITE) Date: 05 April 2010 COMPOSITION OF TRAFFIC AT ANAND VIHAR JUNCTION (in absolute numbers) 
1 
2 
3 
4 
5 
6 
FROM DILSHAD GARDEN 
FROM 
IP EXTENTION 
FROM GHAZIABAD 
TO 
GHAZIABAD 
TO 
DILSHAD GARDEN 
TO 
IP EXTENTION 
BUSES 
19 
20 
15 
10 
13 
11 
4 WHEELERS 
66 
160 
110 
35 
52 
40 
2 WHEELERS 
61 
110 
140 
35 
71 
41 
AUTORICKSHAWS 
32 
55 
30 
45 
46 
48 
RICKSHAWS / CYCLES 
9 
20 
25 
40 
11 
26 
TRUCKS 
11 
10 
5 
5 
4 
7 
TEMPOS 
8 
10 
10 
5 
7 
6 
Origin-Destination Count –by Mode 
( FOR 15 min Duration) At 12:00 pm 
STUDY AREA : 
ANAD VIHAR JUNCTION 
0 
20 
40 
6080 
100 
120 
140 
160 
180FROM DILSHAD GARDEN 
FROM PATPARGANJFROM GHAZIABADTO GHAZIABAD 
TO DILSHAD GARDEN 
TO PATPARGANJ 
present situation
HIGH CAPACITY VEHICLE MOVEMENT NON MOTORISED TRAFFIC PEAK HOURPEAK HOUR 
present situation –factual data
METRO… 
RAILWAYS… 
ADMINISTRATIVE CONTROL :DELHI DIVISION OF THE 
NORTHERN RAILWAY ZONE 
OPENED: 19 DECEMBER 2009 
PLATFORMS: 3 (PHASE-I) PHASE 2 IN CONSTRUCTION 
AREA: SPREAD OVER 42 HECTARES 
STATION CODE : ANVTANAND VIHAR METRO STATIONADMINISTRATIVE CONTROL : DELHI METRO RAIL CORPORATIONBRANCH LINE : BLUEUNDER PHASE III, ANAND VIHAR WILL BECOME AN INTERCHANGE STATION WITH THE INNER RING ROAD LINE. FROM HERE, PASSENGERS WILL FIND EASIER CONNECTION TO OTHER LINES AS WELL AS PLACES SUCH AS YAMUNA VIHAR AND MUKUNDPUR WHICH CURRENTLY DO NOT HAVE METRO ACCESS. 
•Density of passengers travel by local train/ EMU’s is very high. 
•Maximum of number of passengers (mainly office goers and college students) travel by train between Ghaziabad and Delhi (as it has a good connectivity and also a cheaper mode of transport) . 
•So many number of people interchange their mode of transport at Anand Vihar. ANAND VIHAR RAILWAY TERMINAL 
ANAND VIHAR LOCAL RAILWAY STATIONREADING : 
•developed to decongest the New Delhi Railway Station, Delhi Junction (Old Delhi) and Hazrat Nizamuddin Railway Station. 
•helped to relieve congestion on roads into New Delhi, reducing the load of a million people daily entering the city. 
•the rail over bridge at Anand Vihar is planned as the current structure is not capable for handling the traffic. ANALYSISPhase 2 Development 
•number of platforms will be increased to 7 in total 
•terminal will have a capacity to handle over 3 lakh passengers and as many as 270 trains daily. 
•linking of this terminal with the original Anand Vihar station. 
WHEN METRO COMPLETES ITS PHASE 3 DEVELOPMENT , CORRIDOR 1 : 56KM WILL BECOME THE LONGEST LINE . THE MAJOR STATIONS WILL BEYAMUNA VIHAR -MUKUNDPUR : MUKUNDPUR -ROUJOURI GARDEN (INTERCHANGE STATION) -DHAULA KHUAN -ANAND VIHAR (INTERCHANGE STATION) -YAMUNA VIHARNO. OF TRAINS PER DAY S M T W T F S 22 29 28 29 22 31 28anandviharmetro and railways
AnandviharI.S.B.T. Anandviharrailway terminal 
ENTRY 
EXIT 
At present it is the only Catchment area which provides entry/exit to the people coming from halt line, terminal and metro 
Free space near metro used as parking of vehiclesDirect access to bus and auto from the exit of metro stationPACIFIC MALL12 
3 
rail and metro movement
AnandviharI.S.B.T. Multiple functions at bay areaLike shops,ticketing,waitingetc leads the space to excessive crowdThe pedestrian routes created by bythe people is only occupied during the local train timngsAs this in an intersection point ,the place is very chaotic due to the presence of hawkers, pedestrians, and vehicles etc 
Busy routesLess busy routesLeast busy routes12 
3 
2117 
2142 
21741904Pedestrian count at anandviharjunction (12 hr) source : uttipec2010pedestrian movement
Auto stand 
Rickshaw standAuto movementRickshaw movement123 
4 
5 
1 
2345stands
overall proposal
PLANS SHOWING CONNECTIONS AT VARIOUS LEVELSG12-1-2overall proposal
Evolution of AnandViharRailway Terminus 
To reduce the passenger pressure at the existing stations, the requirement of additional major passenger terminals was identified by theNorthern Railways. The East-bound trains from Delhihad to cross the bridge overRiver Yamunaas all the three major stations are located on the other side of the river. Thus, the area of AnandViharwas selected in the trans-Yamuna region to construct a mega-railway terminal. 
•In Recent Years, since NoidaSector 62 became the DTC Bus Stop, hundreds of commuters who earlier used to go to AnandViharISBT to commute further to travel to west and south Delhi were shifted to NoidaSector 62 due to which they are connected to DND flyway. 
•It has decreased the intensity of people at AnandViharISBT and Metro. 
Present (2014) 
Development 
AnandViharRailway Station Phase-II is under construction which will be having 7 number of platforms including the existing 3 platforms in the Phase-I of the project. AnandViharHalt (ANVR) will also be integrated with ANVT according to the proposed design. HISTORY AND EVOLUTIONOctober 2000Only AnandViharISBT and local AnandViharRailway Station (ANVR / Halt) exists. October 2006Clearance of the site for construction of AnandViharTerminal Phase 1. January 2008AnandViharMetro station and Railway Terminal’s Phase 1 construction started. January 2010Both metro station and Terminal were in function. In recent years AnanadViharhas evolved as a major transit hub in Delhi NCR . And it is still evolving (as a Multi-Modal Transit Hub) itself to be more efficient in future. history and evolution
MORNING 6AM –11AMNOON 11AM –5PM 
DAILY TIME CYCLES 
Daily time cycle has a major interchange differences during morning and evening due to office people and college students. Rest of the day the activity of the people is continuous and uniform throughout the whole day 
•less number of people interchange from local train to any other means as there are less number of trains during this duration lap. 
•interchange of transport happens maximum happens between metro, bus, railway terminal. FROM ANVR TO METRO, BUS ETC. 
FROM AUTO TO METRO, BUS ETC. FROM METRO TO BUS, AUTO ETC. 
FROM BUS TO METRO. 
TO ANVT (COLLECTIVELY FROM ALL) . DECREASING INTENSITY OF PEOPLEFROM METRO TO BUS ETC. FROM BUS TO METRO, ETC. 
FROM AUTO TO METRO, BUS ETC. TO ANVT (COLLECTIVELY FROM ALL) . DECREASING INTENSITY OF PEOPLE 
•huge number of passengers interchange from local train to either mode of transport i.e. bus or metro because people towards Delhi from Ghaziabad to go to office/college. 
•other main mode of transportation from Ghaziabad side to Delhi is sharing auto. then people are usually disperse to buses and metros. daily time cycles
EVENING 5PM –7:30PMNIGHT 7:30PM –ONWARDSDAILY TIME CYCLES 
•less number of passengers travel by local trains and hence, less involvement of local railways 
•interchange of transport happens only between metro/bus /railway station. 
•people interchange from metro/bus/railway terminal to local train to get back their home. 
•interchange between other modes is uniform. TO METRO FROM AUTO, BUS ETC. TO ISBT FROM AUTO, METRO ETC. 
FROM AUTO TO METRO, BUS ETC. TO ANVT FROM METRO, BUS ETC. 
DECREASING INTENSITY OF PEOPLETO ANVR FROM METRO, BUS ETC. TO AUTO FROM METRO, BUS ETC. FROM METRO TO AUTO, BUS ETC. TO METRO FROM AUTO, BUS ETC. 
TO ANVT FROM METRO, BUS ETC. DECREASING INTENSITY OF PEOPLEdaily time cycles
ANAND VIHAR RAILWAY TERMINAL 
•Since the train schedule is well planned, the frequency of people on Railway terminalduring train arrivals and departures is uniform throughout and continuous 24 hours. 
•Density is not very high at any time of the day 
ANAND VIHAR ISBT AKA SWAMI VIVEKANAND ISBT 
•Caters to many local and distant passengers during the whole day. 
•It is a main transit point for distant passengers as number of state / depot buses are available and also for local / daily passengersas DTC has provided with number of buses connecting people to almost to every place within Delhi / NCR. 
ANAND VIHAR LOCAL RAILWAY STATION 
•Density of passengers travel by local train/ EMU’s is very high. 
•Maximum of number of passengers (mainly office goers and college students) travel by train between Ghaziabad and Delhi (as it has a good connectivity and also a cheaper mode of transport) . 
•So many number of people interchange their mode of transport at Anand Vihar. 
CONTINUITY / CHANGES 
With daily changing time cycle, there is still a continuity in everyday routineMetroBusTrainANAND VIHAR METRO STATIONMetro Station is always filled with lots of passengers due to the reasons – 
•Metro station has so many users as this is the main junction / transitpoint for those people who commute between Delhi and Ghaziabad (UP). 
•Frequency of metroservice is after every 2-5 min. due to whichmaximum people opt for metro. 
•This makes the place always happening except during closing hours. continuity and changes

More Related Content

What's hot

Bus terminal+commercial complex+isbt+india ppt show
Bus terminal+commercial complex+isbt+india ppt showBus terminal+commercial complex+isbt+india ppt show
Bus terminal+commercial complex+isbt+india ppt show
kiranightly
 
Bus Terminal-Bachelor thesis project 2006
Bus Terminal-Bachelor thesis project 2006 Bus Terminal-Bachelor thesis project 2006
Bus Terminal-Bachelor thesis project 2006
Hassan Raza
 

What's hot (20)

karunamoyee metro station thesis B.Arch
karunamoyee metro station thesis B.Archkarunamoyee metro station thesis B.Arch
karunamoyee metro station thesis B.Arch
 
CHENNAI MOFUSSIL BUS TERMINUS_a case study
CHENNAI MOFUSSIL BUS TERMINUS_a case studyCHENNAI MOFUSSIL BUS TERMINUS_a case study
CHENNAI MOFUSSIL BUS TERMINUS_a case study
 
Transit hub
Transit hub Transit hub
Transit hub
 
Chennai mofussil bus terminal case study
Chennai mofussil bus terminal case studyChennai mofussil bus terminal case study
Chennai mofussil bus terminal case study
 
Ananad vihar
Ananad viharAnanad vihar
Ananad vihar
 
Mattuthavani bus terminal case study
Mattuthavani bus terminal  case studyMattuthavani bus terminal  case study
Mattuthavani bus terminal case study
 
Bus terminal+commercial complex+isbt+india ppt show
Bus terminal+commercial complex+isbt+india ppt showBus terminal+commercial complex+isbt+india ppt show
Bus terminal+commercial complex+isbt+india ppt show
 
Inter state bus terminal - Litrature study
Inter state bus terminal - Litrature studyInter state bus terminal - Litrature study
Inter state bus terminal - Litrature study
 
Literature case study - ARTIC
Literature case study - ARTICLiterature case study - ARTIC
Literature case study - ARTIC
 
Literature study- koyembedu chennai
Literature study- koyembedu chennaiLiterature study- koyembedu chennai
Literature study- koyembedu chennai
 
CMRL - Urban Design Analysis
CMRL - Urban Design AnalysisCMRL - Urban Design Analysis
CMRL - Urban Design Analysis
 
Bus Terminal-Bachelor thesis project 2006
Bus Terminal-Bachelor thesis project 2006 Bus Terminal-Bachelor thesis project 2006
Bus Terminal-Bachelor thesis project 2006
 
Bus Terminal Pre Design Study.pdf
Bus Terminal Pre Design Study.pdfBus Terminal Pre Design Study.pdf
Bus Terminal Pre Design Study.pdf
 
Inter state bus terminal - Library Study & Case Study
Inter state bus terminal - Library Study & Case StudyInter state bus terminal - Library Study & Case Study
Inter state bus terminal - Library Study & Case Study
 
casestudy.pptx
casestudy.pptxcasestudy.pptx
casestudy.pptx
 
Ad bus terminal chennai
Ad bus terminal chennaiAd bus terminal chennai
Ad bus terminal chennai
 
case study of netaji metro station
case study of netaji metro station case study of netaji metro station
case study of netaji metro station
 
Chennai Mofussil Bus Terminal
Chennai Mofussil Bus TerminalChennai Mofussil Bus Terminal
Chennai Mofussil Bus Terminal
 
TOD in India
TOD in IndiaTOD in India
TOD in India
 
Urban Design-Literature study St. Marks Road, Bangalore
Urban Design-Literature study St. Marks Road, BangaloreUrban Design-Literature study St. Marks Road, Bangalore
Urban Design-Literature study St. Marks Road, Bangalore
 

Similar to Transportation analysis at anand vihar

296689698-ISBT-Jaipur-pptx.pptx
296689698-ISBT-Jaipur-pptx.pptx296689698-ISBT-Jaipur-pptx.pptx
296689698-ISBT-Jaipur-pptx.pptx
RudranshTank
 

Similar to Transportation analysis at anand vihar (20)

UJJAIN DEVELOPMENT PLAN (Transportation Proposals)
UJJAIN DEVELOPMENT PLAN (Transportation Proposals) UJJAIN DEVELOPMENT PLAN (Transportation Proposals)
UJJAIN DEVELOPMENT PLAN (Transportation Proposals)
 
Indian Railways ppt.
Indian Railways ppt.Indian Railways ppt.
Indian Railways ppt.
 
Modern transportation in india
Modern transportation in indiaModern transportation in india
Modern transportation in india
 
Surat BRTS - Abhijit Lokre
Surat BRTS - Abhijit LokreSurat BRTS - Abhijit Lokre
Surat BRTS - Abhijit Lokre
 
296689698-ISBT-Jaipur-pptx.pptx
296689698-ISBT-Jaipur-pptx.pptx296689698-ISBT-Jaipur-pptx.pptx
296689698-ISBT-Jaipur-pptx.pptx
 
DESIGN STANDARDS FOR PLANNING A BUS TERMINUS
DESIGN STANDARDS FOR PLANNING A BUS TERMINUSDESIGN STANDARDS FOR PLANNING A BUS TERMINUS
DESIGN STANDARDS FOR PLANNING A BUS TERMINUS
 
Trichy ppt
Trichy pptTrichy ppt
Trichy ppt
 
Sealdah railway platform aminities
Sealdah railway platform aminitiesSealdah railway platform aminities
Sealdah railway platform aminities
 
SEM 1 PRESENTATION
SEM 1 PRESENTATIONSEM 1 PRESENTATION
SEM 1 PRESENTATION
 
Metro islamabad rawalpindi
Metro islamabad rawalpindiMetro islamabad rawalpindi
Metro islamabad rawalpindi
 
BB-part 2.pptx
BB-part 2.pptxBB-part 2.pptx
BB-part 2.pptx
 
ahmedabad BRTS study
ahmedabad BRTS studyahmedabad BRTS study
ahmedabad BRTS study
 
Trasnportation system of mumbai
Trasnportation system of  mumbaiTrasnportation system of  mumbai
Trasnportation system of mumbai
 
JMRC PRESENTATION
JMRC PRESENTATIONJMRC PRESENTATION
JMRC PRESENTATION
 
Bangalore Metro Project
Bangalore Metro ProjectBangalore Metro Project
Bangalore Metro Project
 
Brts
BrtsBrts
Brts
 
Chennai metro rail
Chennai metro railChennai metro rail
Chennai metro rail
 
Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 201...
Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 201...Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 201...
Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 201...
 
Vihar Inauguration
Vihar InaugurationVihar Inauguration
Vihar Inauguration
 
Lifelines of national economy
Lifelines of national economyLifelines of national economy
Lifelines of national economy
 

Recently uploaded

如何办理田纳西大学毕业证(UTK毕业证)成绩单原版一比一
如何办理田纳西大学毕业证(UTK毕业证)成绩单原版一比一如何办理田纳西大学毕业证(UTK毕业证)成绩单原版一比一
如何办理田纳西大学毕业证(UTK毕业证)成绩单原版一比一
fhjlokjhi
 
一比一原版(CCA毕业证书)加利福尼亚艺术学院毕业证成绩单原件一模一样
一比一原版(CCA毕业证书)加利福尼亚艺术学院毕业证成绩单原件一模一样一比一原版(CCA毕业证书)加利福尼亚艺术学院毕业证成绩单原件一模一样
一比一原版(CCA毕业证书)加利福尼亚艺术学院毕业证成绩单原件一模一样
zovambe
 
如何办理英国埃塞克斯大学毕业证(Essex毕业证书)毕业证成绩单原版一比一
如何办理英国埃塞克斯大学毕业证(Essex毕业证书)毕业证成绩单原版一比一如何办理英国埃塞克斯大学毕业证(Essex毕业证书)毕业证成绩单原版一比一
如何办理英国埃塞克斯大学毕业证(Essex毕业证书)毕业证成绩单原版一比一
avy6anjnd
 
mechanical vibrations pebbles.pptbbbbbbbbx
mechanical vibrations pebbles.pptbbbbbbbbxmechanical vibrations pebbles.pptbbbbbbbbx
mechanical vibrations pebbles.pptbbbbbbbbx
joshuaclack73
 
Illustrative History and Influence of Board Games - Thesis.pptx
Illustrative History and Influence of Board Games - Thesis.pptxIllustrative History and Influence of Board Games - Thesis.pptx
Illustrative History and Influence of Board Games - Thesis.pptx
HenriSandoval
 
原版定做(ncl学位证书)英国纽卡斯尔大学毕业证文凭学历证书-国外学历学位认证
原版定做(ncl学位证书)英国纽卡斯尔大学毕业证文凭学历证书-国外学历学位认证原版定做(ncl学位证书)英国纽卡斯尔大学毕业证文凭学历证书-国外学历学位认证
原版定做(ncl学位证书)英国纽卡斯尔大学毕业证文凭学历证书-国外学历学位认证
eehzz
 
一比一原版西安大略大学毕业证(UWO毕业证)成绩单原件一模一样
一比一原版西安大略大学毕业证(UWO毕业证)成绩单原件一模一样一比一原版西安大略大学毕业证(UWO毕业证)成绩单原件一模一样
一比一原版西安大略大学毕业证(UWO毕业证)成绩单原件一模一样
wsppdmt
 
在线定制(UBC毕业证书)英属哥伦比亚大学毕业证成绩单留信学历认证原版一比一
在线定制(UBC毕业证书)英属哥伦比亚大学毕业证成绩单留信学历认证原版一比一在线定制(UBC毕业证书)英属哥伦比亚大学毕业证成绩单留信学历认证原版一比一
在线定制(UBC毕业证书)英属哥伦比亚大学毕业证成绩单留信学历认证原版一比一
qh1ao5mm
 
如何办理美国华盛顿大学毕业证(UW毕业证书)毕业证成绩单原版一比一
如何办理美国华盛顿大学毕业证(UW毕业证书)毕业证成绩单原版一比一如何办理美国华盛顿大学毕业证(UW毕业证书)毕业证成绩单原版一比一
如何办理美国华盛顿大学毕业证(UW毕业证书)毕业证成绩单原版一比一
avy6anjnd
 
如何办理(爱大毕业证书)爱丁堡大学毕业证成绩单留信学历认证真实可查
如何办理(爱大毕业证书)爱丁堡大学毕业证成绩单留信学历认证真实可查如何办理(爱大毕业证书)爱丁堡大学毕业证成绩单留信学历认证真实可查
如何办理(爱大毕业证书)爱丁堡大学毕业证成绩单留信学历认证真实可查
huxs9sacp
 
Obat Penggugur Kandungan Di Apotek Klinik Banyuwangi +6287776558899
Obat Penggugur Kandungan Di Apotek Klinik Banyuwangi +6287776558899Obat Penggugur Kandungan Di Apotek Klinik Banyuwangi +6287776558899
Obat Penggugur Kandungan Di Apotek Klinik Banyuwangi +6287776558899
Cara Menggugurkan Kandungan 087776558899
 
一比一原版(Deakin毕业证书)迪肯大学毕业证成绩单留信学历认证
一比一原版(Deakin毕业证书)迪肯大学毕业证成绩单留信学历认证一比一原版(Deakin毕业证书)迪肯大学毕业证成绩单留信学历认证
一比一原版(Deakin毕业证书)迪肯大学毕业证成绩单留信学历认证
62qaf0hi
 

Recently uploaded (20)

Is Your Mercedes Benz Trunk Refusing To Close Here's What Might Be Wrong
Is Your Mercedes Benz Trunk Refusing To Close Here's What Might Be WrongIs Your Mercedes Benz Trunk Refusing To Close Here's What Might Be Wrong
Is Your Mercedes Benz Trunk Refusing To Close Here's What Might Be Wrong
 
如何办理田纳西大学毕业证(UTK毕业证)成绩单原版一比一
如何办理田纳西大学毕业证(UTK毕业证)成绩单原版一比一如何办理田纳西大学毕业证(UTK毕业证)成绩单原版一比一
如何办理田纳西大学毕业证(UTK毕业证)成绩单原版一比一
 
EV Charging Resources and Technical Assistance for Rural Communities and Trib...
EV Charging Resources and Technical Assistance for Rural Communities and Trib...EV Charging Resources and Technical Assistance for Rural Communities and Trib...
EV Charging Resources and Technical Assistance for Rural Communities and Trib...
 
一比一原版(CCA毕业证书)加利福尼亚艺术学院毕业证成绩单原件一模一样
一比一原版(CCA毕业证书)加利福尼亚艺术学院毕业证成绩单原件一模一样一比一原版(CCA毕业证书)加利福尼亚艺术学院毕业证成绩单原件一模一样
一比一原版(CCA毕业证书)加利福尼亚艺术学院毕业证成绩单原件一模一样
 
如何办理英国埃塞克斯大学毕业证(Essex毕业证书)毕业证成绩单原版一比一
如何办理英国埃塞克斯大学毕业证(Essex毕业证书)毕业证成绩单原版一比一如何办理英国埃塞克斯大学毕业证(Essex毕业证书)毕业证成绩单原版一比一
如何办理英国埃塞克斯大学毕业证(Essex毕业证书)毕业证成绩单原版一比一
 
John deere 7200r 7230R 7260R Problems Repair Manual
John deere 7200r 7230R 7260R Problems Repair ManualJohn deere 7200r 7230R 7260R Problems Repair Manual
John deere 7200r 7230R 7260R Problems Repair Manual
 
Why Is The Glow Plug Light Flashing In My VW & What Does It Indicate
Why Is The Glow Plug Light Flashing In My VW & What Does It IndicateWhy Is The Glow Plug Light Flashing In My VW & What Does It Indicate
Why Is The Glow Plug Light Flashing In My VW & What Does It Indicate
 
Is Your Volvo XC90 Displaying Anti-Skid Service Required Alert Here's Why
Is Your Volvo XC90 Displaying Anti-Skid Service Required Alert Here's WhyIs Your Volvo XC90 Displaying Anti-Skid Service Required Alert Here's Why
Is Your Volvo XC90 Displaying Anti-Skid Service Required Alert Here's Why
 
mechanical vibrations pebbles.pptbbbbbbbbx
mechanical vibrations pebbles.pptbbbbbbbbxmechanical vibrations pebbles.pptbbbbbbbbx
mechanical vibrations pebbles.pptbbbbbbbbx
 
Illustrative History and Influence of Board Games - Thesis.pptx
Illustrative History and Influence of Board Games - Thesis.pptxIllustrative History and Influence of Board Games - Thesis.pptx
Illustrative History and Influence of Board Games - Thesis.pptx
 
原版定做(ncl学位证书)英国纽卡斯尔大学毕业证文凭学历证书-国外学历学位认证
原版定做(ncl学位证书)英国纽卡斯尔大学毕业证文凭学历证书-国外学历学位认证原版定做(ncl学位证书)英国纽卡斯尔大学毕业证文凭学历证书-国外学历学位认证
原版定做(ncl学位证书)英国纽卡斯尔大学毕业证文凭学历证书-国外学历学位认证
 
一比一原版西安大略大学毕业证(UWO毕业证)成绩单原件一模一样
一比一原版西安大略大学毕业证(UWO毕业证)成绩单原件一模一样一比一原版西安大略大学毕业证(UWO毕业证)成绩单原件一模一样
一比一原版西安大略大学毕业证(UWO毕业证)成绩单原件一模一样
 
在线定制(UBC毕业证书)英属哥伦比亚大学毕业证成绩单留信学历认证原版一比一
在线定制(UBC毕业证书)英属哥伦比亚大学毕业证成绩单留信学历认证原版一比一在线定制(UBC毕业证书)英属哥伦比亚大学毕业证成绩单留信学历认证原版一比一
在线定制(UBC毕业证书)英属哥伦比亚大学毕业证成绩单留信学历认证原版一比一
 
What Does It Mean When Mercedes Says 'ESP Inoperative See Owner's Manual'
What Does It Mean When Mercedes Says 'ESP Inoperative See Owner's Manual'What Does It Mean When Mercedes Says 'ESP Inoperative See Owner's Manual'
What Does It Mean When Mercedes Says 'ESP Inoperative See Owner's Manual'
 
01552_14_01306_8.0_EPS_CMP_SW_VC2_Notebook.doc
01552_14_01306_8.0_EPS_CMP_SW_VC2_Notebook.doc01552_14_01306_8.0_EPS_CMP_SW_VC2_Notebook.doc
01552_14_01306_8.0_EPS_CMP_SW_VC2_Notebook.doc
 
如何办理美国华盛顿大学毕业证(UW毕业证书)毕业证成绩单原版一比一
如何办理美国华盛顿大学毕业证(UW毕业证书)毕业证成绩单原版一比一如何办理美国华盛顿大学毕业证(UW毕业证书)毕业证成绩单原版一比一
如何办理美国华盛顿大学毕业证(UW毕业证书)毕业证成绩单原版一比一
 
如何办理(爱大毕业证书)爱丁堡大学毕业证成绩单留信学历认证真实可查
如何办理(爱大毕业证书)爱丁堡大学毕业证成绩单留信学历认证真实可查如何办理(爱大毕业证书)爱丁堡大学毕业证成绩单留信学历认证真实可查
如何办理(爱大毕业证书)爱丁堡大学毕业证成绩单留信学历认证真实可查
 
Obat Penggugur Kandungan Di Apotek Klinik Banyuwangi +6287776558899
Obat Penggugur Kandungan Di Apotek Klinik Banyuwangi +6287776558899Obat Penggugur Kandungan Di Apotek Klinik Banyuwangi +6287776558899
Obat Penggugur Kandungan Di Apotek Klinik Banyuwangi +6287776558899
 
一比一原版(Deakin毕业证书)迪肯大学毕业证成绩单留信学历认证
一比一原版(Deakin毕业证书)迪肯大学毕业证成绩单留信学历认证一比一原版(Deakin毕业证书)迪肯大学毕业证成绩单留信学历认证
一比一原版(Deakin毕业证书)迪肯大学毕业证成绩单留信学历认证
 
JOHN DEERE 7200R 7215R 7230R 7260R 7280R TECHNICAL SERVICE PDF MANUAL 2680PGS...
JOHN DEERE 7200R 7215R 7230R 7260R 7280R TECHNICAL SERVICE PDF MANUAL 2680PGS...JOHN DEERE 7200R 7215R 7230R 7260R 7280R TECHNICAL SERVICE PDF MANUAL 2680PGS...
JOHN DEERE 7200R 7215R 7230R 7260R 7280R TECHNICAL SERVICE PDF MANUAL 2680PGS...
 

Transportation analysis at anand vihar

  • 1. ISBT|RAIL|METRO “TRANSPORTATION AND TEMPORAL” GUIDE: SANTOSH AULUCK BASHAUBI DAS GUPTA STUDIO CO-ORDINATOR M.L. BAHRI AnushprasinghA/2155/2009 | Prashant kumarA/2160/2009 | SnehalataA/2150/2009
  • 2. ARTERIAL ROADS. (60M AND ABOVE) SUB-ARTERIAL RD.(45M WIDE) ROADS (35 M WIDE) INNER STREET /ROADS METRO LINE (BLUE) RAILWAY LINE STREET AND LINKAGE PATTERN PRECINCT LEVEL ANAND VIHAR | SOURCE : EICHER AND DELHI ROAD MAPTRANSPORTATION SYSTEM OF DELHI INCLUDES BUSESAUTO-RICKSHAWSTAXISCYCLE-RICKSHAWSRAILWAYMETRO 1 .Buses continue to be the most popular means of transportation for intra-city travel. The following pie chart shows the catering of various modes for commuting transport in Delhi 2. Delhi transportation is heavily depend upon road network ,therefore high congestion occurs at most of the main junctions BUSES, 60 PRIVATE VEHICLE 30 OTHER 10 READING ANALYSIS 1.Delhi and NCR lose nearly 42 CRORE (420 MILLION) MAN-HOURS every month while commuting between home and office through public transport, due to the traffic congestion. 2.Therefore ,serious efforts are underway for other mode of transport projects like metro,to encourage usage of public transport in the city as a result, load on road network can became less CONNECTIVITY VIA ROAD : From : Saraikale khan 30 min (12.2 km) by road Ghaziabad railway station 45 min (14.2 km) NDLS 35 min (11.1 km) Kashmiri gate 35 min (11 km) karkardooma Nirmanvihar Preetvihar Anandviharkaushambioverview
  • 3. ANAND VIHAR ISBT DELHI AKA SWAMI VIVEKANAND ISBT ADMINISTRATIVE CONTROL: DELHI TRANSPORT CORPORATION AREA : 99500 sqm CURRENT INTERSTATE OPERATING ROUTES: 51 CURRENT NO. OF DESTINATIONS : 88 INTERSTATE CONNCETIVITY : 5 STATES PUNJAB, HARYANA, JAMMU & KASHMIR, UTTAR PRADESH, UTTARAKHAND AND RAJASTHAN I.S.B.T. ANAND VIHAR The total area available is 9.2 hectares. It has a frontage of about 500m along the main Ghazipur road. Main entry to ISBT is from Road No. AH-56. The present ISBT is functional in the name of Vivekanand Inter State Bus Terminal, Anand Vihar, East DelhiFacilities •Drinking water taps and coolers •Separate toilet facilities of Ladies and Gents •First Aid facilities for 24 hours •Police Post, Bank and Post Office •Sitting chairs lights and fans facility on every platform with the automatic generate system. •Cloak Room, Porter, PCO/STD/ISD, Parking and Taxi Scooter Tonga Stand. •Cabins for distribution of tickets. •Office Accommodation to the transporters •Public Addresses System •Shops/counters/trolleys have been allotted for all general items such as tee, juice, fruits, eatables, Newspapers, magazines etc. FUTURE PROSPECTSIn the proposed plans for Anand Vihar transit hub the main spine which connects all three together is foot over bridge. The shown capacity at various points is as follows METRO ENTRY/EXIT1 : 2000 people approx. per hour2: 2000 people approx. per hour MAIN ENTRY/EXIT 3400 person approx. per hourI.S.B.T TO METRO /RAILWAY3000 people approx. per hourISBT TO RAILWAY3500 people approx. per hourLooking at these figures in proposed plans we can get the rough idea of the no. of people using pedestrian axis at ISBT anandviharisbt
  • 4. ROADWAYS… Delhi Transport Corporation(DTC) operates the world's largest fleet of CNG-powered buses. •Delhi city is considered to have the highest road density •Have a connection to NH 24 •Inter state and Intra state bus facilities available •One of the important transport hub after Kashmere Gate ISBT and Sarai Kale Khan ISBT ISSUES: ANALYSIS •500mstretch between the entry point ofAnand ViharInterstate Bus Terminus (ISBT) and the railway station on Chaudhary CharanSinghMargis a bottleneck •More than half of the carriageway is occupied -Roadways buses •problem is compounded by Gramin Sewas parked randomly to attract passengers and the hawkers dotting the area. •little-used, footbridge in the area •UP Roadways bus terminus -petrol pump, which caters to more than 100 vehicles in an hour •Three-wheelers are parked on this stretch to pick up passengers coming from the railway station •drivers prefer to park on road and, that too, haphazardly. •petrol pump, which has a contract with long-distance bus operators, can cater to only five buses at a time, so the rest line up on the road. •It takes about 30 minutes to cross the stretch during the peak hoursFUTURE REQUIREMENT ? There is a requirement for 11,000 public transport buses in Delhi and, as per an agreement between DTC and DIMTS, both are mandated to run 5,500 buses each in the city. While DTC currently operates around 5,000 buses, DIMTS has only 1,157 cluster buses, or 4,343 less than the required 5,500 as per the commitment. In accordance with decision taken by Ministry of Urban Development in consultation with Delhi Development Authority and Govt. of Delhi, Anand Vihar became functional with effect from March, 1996. Inter State as well as local bus services are being operated from here. Day to day functioning is managed under the control of general Manager who is subordinated by Deputy General Manager, Accounts Officer, Executive Engineer and other staff including the Engineering financial and administrative. Besides one estate manager is posted for each ISBT to look after the functioning of his respective ISBT. READING: anandviharisbt
  • 5. UPRSTC bus stand Pacific mall AnandviharI.S.B.T. Anandviharrailway terminal ENTRY EXIT Anandviharmetro1. A large number of buses came from anandviharto patpardganj area.Busstop is not sufficient to cater the present no. of passengers. 2. Area near bus stops are encroached by hawkers and informal stalls,makesmovement difficult for buses and passengersThe shade created by metro track over the bus stop on gazipurroad, creates a comfortable hubfor people on the divider hence,themajority of people go there and wait for buses. Bus movement Bus stop buses -movement
  • 6. Two Wheeler25% Auto12% Taxi0% Car/Jeep37% Bus6% Truck2% Tractor0% Slow Vehicles18% Source: Traffic Survey by P K Engineers(FROM UTTIPEC WEBSITE) Date: 05 April 2010 COMPOSITION OF TRAFFIC AT ANAND VIHAR JUNCTION (in absolute numbers) 1 2 3 4 5 6 FROM DILSHAD GARDEN FROM IP EXTENTION FROM GHAZIABAD TO GHAZIABAD TO DILSHAD GARDEN TO IP EXTENTION BUSES 19 20 15 10 13 11 4 WHEELERS 66 160 110 35 52 40 2 WHEELERS 61 110 140 35 71 41 AUTORICKSHAWS 32 55 30 45 46 48 RICKSHAWS / CYCLES 9 20 25 40 11 26 TRUCKS 11 10 5 5 4 7 TEMPOS 8 10 10 5 7 6 Origin-Destination Count –by Mode ( FOR 15 min Duration) At 12:00 pm STUDY AREA : ANAD VIHAR JUNCTION 0 20 40 6080 100 120 140 160 180FROM DILSHAD GARDEN FROM PATPARGANJFROM GHAZIABADTO GHAZIABAD TO DILSHAD GARDEN TO PATPARGANJ present situation
  • 7. HIGH CAPACITY VEHICLE MOVEMENT NON MOTORISED TRAFFIC PEAK HOURPEAK HOUR present situation –factual data
  • 8. METRO… RAILWAYS… ADMINISTRATIVE CONTROL :DELHI DIVISION OF THE NORTHERN RAILWAY ZONE OPENED: 19 DECEMBER 2009 PLATFORMS: 3 (PHASE-I) PHASE 2 IN CONSTRUCTION AREA: SPREAD OVER 42 HECTARES STATION CODE : ANVTANAND VIHAR METRO STATIONADMINISTRATIVE CONTROL : DELHI METRO RAIL CORPORATIONBRANCH LINE : BLUEUNDER PHASE III, ANAND VIHAR WILL BECOME AN INTERCHANGE STATION WITH THE INNER RING ROAD LINE. FROM HERE, PASSENGERS WILL FIND EASIER CONNECTION TO OTHER LINES AS WELL AS PLACES SUCH AS YAMUNA VIHAR AND MUKUNDPUR WHICH CURRENTLY DO NOT HAVE METRO ACCESS. •Density of passengers travel by local train/ EMU’s is very high. •Maximum of number of passengers (mainly office goers and college students) travel by train between Ghaziabad and Delhi (as it has a good connectivity and also a cheaper mode of transport) . •So many number of people interchange their mode of transport at Anand Vihar. ANAND VIHAR RAILWAY TERMINAL ANAND VIHAR LOCAL RAILWAY STATIONREADING : •developed to decongest the New Delhi Railway Station, Delhi Junction (Old Delhi) and Hazrat Nizamuddin Railway Station. •helped to relieve congestion on roads into New Delhi, reducing the load of a million people daily entering the city. •the rail over bridge at Anand Vihar is planned as the current structure is not capable for handling the traffic. ANALYSISPhase 2 Development •number of platforms will be increased to 7 in total •terminal will have a capacity to handle over 3 lakh passengers and as many as 270 trains daily. •linking of this terminal with the original Anand Vihar station. WHEN METRO COMPLETES ITS PHASE 3 DEVELOPMENT , CORRIDOR 1 : 56KM WILL BECOME THE LONGEST LINE . THE MAJOR STATIONS WILL BEYAMUNA VIHAR -MUKUNDPUR : MUKUNDPUR -ROUJOURI GARDEN (INTERCHANGE STATION) -DHAULA KHUAN -ANAND VIHAR (INTERCHANGE STATION) -YAMUNA VIHARNO. OF TRAINS PER DAY S M T W T F S 22 29 28 29 22 31 28anandviharmetro and railways
  • 9. AnandviharI.S.B.T. Anandviharrailway terminal ENTRY EXIT At present it is the only Catchment area which provides entry/exit to the people coming from halt line, terminal and metro Free space near metro used as parking of vehiclesDirect access to bus and auto from the exit of metro stationPACIFIC MALL12 3 rail and metro movement
  • 10. AnandviharI.S.B.T. Multiple functions at bay areaLike shops,ticketing,waitingetc leads the space to excessive crowdThe pedestrian routes created by bythe people is only occupied during the local train timngsAs this in an intersection point ,the place is very chaotic due to the presence of hawkers, pedestrians, and vehicles etc Busy routesLess busy routesLeast busy routes12 3 2117 2142 21741904Pedestrian count at anandviharjunction (12 hr) source : uttipec2010pedestrian movement
  • 11. Auto stand Rickshaw standAuto movementRickshaw movement123 4 5 1 2345stands
  • 13. PLANS SHOWING CONNECTIONS AT VARIOUS LEVELSG12-1-2overall proposal
  • 14. Evolution of AnandViharRailway Terminus To reduce the passenger pressure at the existing stations, the requirement of additional major passenger terminals was identified by theNorthern Railways. The East-bound trains from Delhihad to cross the bridge overRiver Yamunaas all the three major stations are located on the other side of the river. Thus, the area of AnandViharwas selected in the trans-Yamuna region to construct a mega-railway terminal. •In Recent Years, since NoidaSector 62 became the DTC Bus Stop, hundreds of commuters who earlier used to go to AnandViharISBT to commute further to travel to west and south Delhi were shifted to NoidaSector 62 due to which they are connected to DND flyway. •It has decreased the intensity of people at AnandViharISBT and Metro. Present (2014) Development AnandViharRailway Station Phase-II is under construction which will be having 7 number of platforms including the existing 3 platforms in the Phase-I of the project. AnandViharHalt (ANVR) will also be integrated with ANVT according to the proposed design. HISTORY AND EVOLUTIONOctober 2000Only AnandViharISBT and local AnandViharRailway Station (ANVR / Halt) exists. October 2006Clearance of the site for construction of AnandViharTerminal Phase 1. January 2008AnandViharMetro station and Railway Terminal’s Phase 1 construction started. January 2010Both metro station and Terminal were in function. In recent years AnanadViharhas evolved as a major transit hub in Delhi NCR . And it is still evolving (as a Multi-Modal Transit Hub) itself to be more efficient in future. history and evolution
  • 15. MORNING 6AM –11AMNOON 11AM –5PM DAILY TIME CYCLES Daily time cycle has a major interchange differences during morning and evening due to office people and college students. Rest of the day the activity of the people is continuous and uniform throughout the whole day •less number of people interchange from local train to any other means as there are less number of trains during this duration lap. •interchange of transport happens maximum happens between metro, bus, railway terminal. FROM ANVR TO METRO, BUS ETC. FROM AUTO TO METRO, BUS ETC. FROM METRO TO BUS, AUTO ETC. FROM BUS TO METRO. TO ANVT (COLLECTIVELY FROM ALL) . DECREASING INTENSITY OF PEOPLEFROM METRO TO BUS ETC. FROM BUS TO METRO, ETC. FROM AUTO TO METRO, BUS ETC. TO ANVT (COLLECTIVELY FROM ALL) . DECREASING INTENSITY OF PEOPLE •huge number of passengers interchange from local train to either mode of transport i.e. bus or metro because people towards Delhi from Ghaziabad to go to office/college. •other main mode of transportation from Ghaziabad side to Delhi is sharing auto. then people are usually disperse to buses and metros. daily time cycles
  • 16. EVENING 5PM –7:30PMNIGHT 7:30PM –ONWARDSDAILY TIME CYCLES •less number of passengers travel by local trains and hence, less involvement of local railways •interchange of transport happens only between metro/bus /railway station. •people interchange from metro/bus/railway terminal to local train to get back their home. •interchange between other modes is uniform. TO METRO FROM AUTO, BUS ETC. TO ISBT FROM AUTO, METRO ETC. FROM AUTO TO METRO, BUS ETC. TO ANVT FROM METRO, BUS ETC. DECREASING INTENSITY OF PEOPLETO ANVR FROM METRO, BUS ETC. TO AUTO FROM METRO, BUS ETC. FROM METRO TO AUTO, BUS ETC. TO METRO FROM AUTO, BUS ETC. TO ANVT FROM METRO, BUS ETC. DECREASING INTENSITY OF PEOPLEdaily time cycles
  • 17. ANAND VIHAR RAILWAY TERMINAL •Since the train schedule is well planned, the frequency of people on Railway terminalduring train arrivals and departures is uniform throughout and continuous 24 hours. •Density is not very high at any time of the day ANAND VIHAR ISBT AKA SWAMI VIVEKANAND ISBT •Caters to many local and distant passengers during the whole day. •It is a main transit point for distant passengers as number of state / depot buses are available and also for local / daily passengersas DTC has provided with number of buses connecting people to almost to every place within Delhi / NCR. ANAND VIHAR LOCAL RAILWAY STATION •Density of passengers travel by local train/ EMU’s is very high. •Maximum of number of passengers (mainly office goers and college students) travel by train between Ghaziabad and Delhi (as it has a good connectivity and also a cheaper mode of transport) . •So many number of people interchange their mode of transport at Anand Vihar. CONTINUITY / CHANGES With daily changing time cycle, there is still a continuity in everyday routineMetroBusTrainANAND VIHAR METRO STATIONMetro Station is always filled with lots of passengers due to the reasons – •Metro station has so many users as this is the main junction / transitpoint for those people who commute between Delhi and Ghaziabad (UP). •Frequency of metroservice is after every 2-5 min. due to whichmaximum people opt for metro. •This makes the place always happening except during closing hours. continuity and changes