Contents
 Data, Information and System
 Information – a critical resource
 Data and Information
 Types and Characteristics of useful Information
 System
 Information System (IS)
 Components of an IS
 Types of IS
 Interrelationship among systems
 Management Information System (MIS)
 Broader Definitions and concepts
 Output of MIS
 Functional View
 Impact of MIS
 MIS Planning and Development
 MIS Development outlook
 Pointers for MIS Design
 MIS Planning
 Software Development Life Cycle
 Software Development Methodologies: Approaches
Information is critical
The information we have
is not what we want,
The information we want
is not the information we need,
The information we need
is not available.
Information is a Resource
 It is scarce
 It has a cost
 It has alternative uses
 There is an opportunity cost factor
involved if one does not process
information
Why need Information?
To ensure effective and
efficient decision - leading
to prosperity of the
Organization.
Data and Information
Data vs. Information
 Data
 A “given,” or fact; a number, a statement, or an image
 Represents something (quantities, actions and objects) in the real
world
 The raw materials in the production of information
 Information
 Data that have meaning within a context
 Data that has been processed into a form that is meaningful to the
recipient and is of real or perceived value in the current or in the
prospective actions or decisions of the recipient.
Data Manipulation
Example: customer survey
 Reading through data collected from a customer survey with questions
in various categories would be time-consuming and not very helpful.
 When manipulated, the surveys may provide useful information.
Types and classification of Information
Information classification
Action v/s no-action
Recurring v/s non recurring
Internal v/s external
Planning Information: standards, norms, specifications
Control information – reporting the status of an activity thru feedback mechanism
Knowledge information – library reports, research studies
Characteristics of Useful Information
Information Presentation (An Art)
Data may be collected in the best possible way and processed
analytically, however, if not presented properly, it may
fail to communicate any value to recipient.
Communication of Information is affected by the methods
of transmission, the manner of information handling and
the limitations & constraints of recipients.
The methods used to improve communication are:
a) Summarization: Too much information causes noise and
distortion i.e confusion, misunderstanding and missing of
purpose. Summarization suppresses the noise and
distortion.
b) Message routing: The principal here is to distribute
information to all those who are accountable for the
subsequent actions in any manner. This is achieved by
sending the copies of the reports or documents to all the
concerned people or users.
System
System: A set of components that work together to
achieve a common goal. Computer-based Information
Systems take data as raw material, process it, and
produce information as output.
Components of an Information System
Corporate
Headquarters
Finance Production
Marketing
and Sales
Corporate
Databases
Mainframe
Divisional
Databases
Local Area Network:
PCs with Local Databases
Salesforce
Notebooks
Regional
Office
Work-
stations Plant Minicomputers
Telecommunications
Link
Divisional
Minicomputers
with Divisional
Databases
A Networked Information System:
Three-Tier Architecture
Types of Information Systems
Types of Information Systems
 Operational-level systems support operational managers
by keeping track of the elementary activities and
transactions of the organization, such as sales, receipts,
cash deposits, payroll, credit decisions, and the flow of
materials in a factory.
 Management-level systems serve the monitoring,
controlling, decision-making, and administrative activities
of middle managers. The principal question addressed by
such systems is this: Are things working well?
 Strategic-level systems help senior management tackle
and address strategic issues and long-term trends, both in
the firm and in the external environment.
Types of Information Systems
Transaction Processing System
Transaction Processing Systems (TPS):Transaction Processing Systems (TPS):
 Basic business systems that serve the operational levelBasic business systems that serve the operational level
 A computerized system that performs and records the dailyA computerized system that performs and records the daily
routine transactions necessary to the conduct of theroutine transactions necessary to the conduct of the
businessbusiness
Management Information System
 Serve middle management
 Structured and semi-structured decisions
 Provide reports on firm’s current performance, based
on data from TPS
 Past and Present Data
 Internal Orientation
 Provide answers to routine questions with predefined
procedure for answering them
 Typically have little analytic capability
Decision Support System
 Serve middle management
 Support non-routine decision making
 E.g. What is impact on production schedule if
December sales doubled?
 Often use external information as well as
information from TPS and MIS
 Processing is interactive in nature
 Output in form of Decision analysis
 Example: Contract Cost Analysis
Executive Support Systems
 Support senior management – Strategic Level
 Address non-routine decisions requiring judgment,
evaluation, and insight
 Incorporate data about external events (e.g. new tax laws
or competitors) as well as summarized information from
internal MIS and DSS
 User "seductive" interfaces; Users' time is a premium
 What if capabilities abound
 Input in form of Aggregate data
 Processing is interactive and output in form of projections
 Examples
 ESS that provides minute-to-minute view of firm’s financial
performance as measured by working capital, accounts receivable,
accounts payable, cash flow, and inventory.
 5-year operating plan
Interrelationship Among Systems
The various types of systems in the organization have interdependencies. TPS are major producers of information
that is required by many other systems in the firm, which, in turn, produce information for other systems. These
different types of systems are loosely coupled in most business firms, but increasingly firms are using new
technologies to integrate information that resides in many different systems.
Contents
 Data, Information and System
 Information – a critical resource
 Data and Information
 Types and Characteristics of useful Information
 System
 Information System (IS)
 Components of an IS
 Types of IS
 Interrelationship among systems
 Management Information System (MIS)
 Broader Definitions and concepts
 Output of MIS
 Functional View
 Impact of MIS
 MIS Planning and Development
 MIS Development outlook
 Pointers for MIS Design
 MIS Planning
 Software Development Life Cycle
 Software Development Methodologies: Approaches
MIS - Definition and Concept
Right Information
To the right person
At the right place
At the right time
In the right form
At the right cost
The three sub-components
Management, Information and System
- together bring out the focus clearly & effectively.
System emphasizing a fair degree of integration and a holistic view;
Information stressing on processed data in the context in which it is
used by end users;
Management focusing on the ultimate use of such information
systems for managerial decision making.
MIS – Definition and Concept
A management information system (MIS) is system of
collecting, processing, storing, disseminating and utilizing
data in the form of information needed to carry out the
functions of management.
Today, the term is used broadly in a number of contexts and
includes (but is not limited to):
 Decision support systems,
 Resource and people management applications,
 Enterprise Resource Planning (ERP),
 Supply Chain Management (SCM),
 Customer Relationship Management (CRM),
 project management and database retrieval applications.
Difference between management information
systems and information systems
The terms MIS and IS are often confused. IS may include systems
that are not intended for decision making. In effect, MIS must
not only indicate how things are going, but why they are not
going as well as planned where that is the case
 Information system applied to management context is called MIS.
IS can be applied to any area of business while MIS is applicable
for managerial decision-making.
 IS means use of hardware and software for any business. MIS can
be used in any form - even manual reports, which aid decision-
making
 MIS is used to analyze other information systems applied in
operational activities in the organization.
 MIS summarize and report on the company’s basic operations.
The basic transaction data from TPS are compressed and reported
Outputs of MIS
 Scheduled reports
 Produced periodically, or on schedule (daily,
weekly, monthly)
 Key Indicator Report
 Summarizes the previous day’s critical
activities
 Demand Report
 Gives certain report at manager's request
 Exception Report
 Automatically produced when a situation is
unusual or requires management action
MIS – Functional View
How MIS Obtain Data from TPS:How MIS Obtain Data from TPS:
How MIS Obtain their Data from the Organization’s TPS:
In the system illustrated by this diagram, three TPS supply
summarized transaction data to the MIS reporting system at the
end of the time period. Managers gain access to the organizational
data through the MIS, which provides them with the appropriate
reports.
Sample MIS Report
This report, showing summarized annual sales data, was produced by the MIS in previous slide
Impact of MIS
 Management of marketing, finance, production and personnel becomes
more efficient, the tracking and monitoring becomes easy
 Helps in understanding of business itself, MIS begins with definition of data
and its attributes – uses data dictionary and brings common understanding
of terms and terminology in organization
 MIS calls for systemization of business operations – leads to streamlining
of operations, brings discipline in its operations everyone is required to
follow
 Since the goals of MIS are driven from organization goals, it helps
indirectly pulling everyone in organization towards corporate goals by
providing relevant information to the people in organization
 MIS helps to monitor results and performances
 MIS provides alerts, in some cases daily, to managers at each level of the
organization, on all deviations between results and pre-established
objectives and budgets.
 IT enabled MIS is partly responsible for the PARADIGM shift (A change, a
new model,) from support to contributing to an organizations profitability
Contents
 Data, Information and System
 Information – a critical resource
 Data and Information
 Types and Characteristics of useful Information
 System
 Information System (IS)
 Components of an IS
 Types of IS
 Interrelationship among systems
 Management Information System (MIS)
 Broader Definitions and concepts
 Output of MIS
 Functional View
 Impact of MIS
 MIS Planning and Development
 MIS Development outlook
 Pointers for MIS design
 MIS Planning
 Software Development Life Cycle
 Software Development Methodologies: Approaches
MIS Development Outlook
Corporate
Strategy
Ethics/
Privacy
MIS
Strategy
and Plan
Internal
Systems
Development
Outsourced
Systems
Development
Implementation
Internal
Systems
Operations
Outsourced
Systems
Operations
Infrastructure
Security
Corporate
Strategy
Ethics/
Privacy
Pointers for MIS Design
 To take care for data problems (bias and error) by high level validations,
checking and controlling the procedures.
 Due regard to the communication theory of transmitting the information
from the source to the destination.
 Handling of noise and distortion by summarization and message routing
 Ensuring that no information is suppressed or over emphasized
 To provide specific attention to quality parameters – Utility, Satisfaction,
Error and Bias
 By controlling inputs to the MIS on the factors of impartiality, validity, reliability,
consistency and age
 Should make a distinction between the different kinds of information for
the purpose of communication. Say an action, a decision oriented
information should be distinguished from a non action/knowledge-oriented
information.
 To recognize some aspects of human capabilities as a decision maker.
Capabilities differ from manager to manager and the designer should
skillfully deal with them.
 It should meet the needs of the total organization.
 Recognizing that the information may be misused if it falls into wrong
hands, the MIS design should have the features of filtering, blocking,
suppressions, and delayed delivery.

Mis i unit

  • 1.
  • 2.
    Contents  Data, Informationand System  Information – a critical resource  Data and Information  Types and Characteristics of useful Information  System  Information System (IS)  Components of an IS  Types of IS  Interrelationship among systems  Management Information System (MIS)  Broader Definitions and concepts  Output of MIS  Functional View  Impact of MIS  MIS Planning and Development  MIS Development outlook  Pointers for MIS Design  MIS Planning  Software Development Life Cycle  Software Development Methodologies: Approaches
  • 3.
    Information is critical Theinformation we have is not what we want, The information we want is not the information we need, The information we need is not available.
  • 4.
    Information is aResource  It is scarce  It has a cost  It has alternative uses  There is an opportunity cost factor involved if one does not process information
  • 5.
    Why need Information? Toensure effective and efficient decision - leading to prosperity of the Organization.
  • 6.
    Data and Information Datavs. Information  Data  A “given,” or fact; a number, a statement, or an image  Represents something (quantities, actions and objects) in the real world  The raw materials in the production of information  Information  Data that have meaning within a context  Data that has been processed into a form that is meaningful to the recipient and is of real or perceived value in the current or in the prospective actions or decisions of the recipient. Data Manipulation Example: customer survey  Reading through data collected from a customer survey with questions in various categories would be time-consuming and not very helpful.  When manipulated, the surveys may provide useful information.
  • 7.
    Types and classificationof Information Information classification Action v/s no-action Recurring v/s non recurring Internal v/s external Planning Information: standards, norms, specifications Control information – reporting the status of an activity thru feedback mechanism Knowledge information – library reports, research studies
  • 8.
  • 9.
    Information Presentation (AnArt) Data may be collected in the best possible way and processed analytically, however, if not presented properly, it may fail to communicate any value to recipient. Communication of Information is affected by the methods of transmission, the manner of information handling and the limitations & constraints of recipients. The methods used to improve communication are: a) Summarization: Too much information causes noise and distortion i.e confusion, misunderstanding and missing of purpose. Summarization suppresses the noise and distortion. b) Message routing: The principal here is to distribute information to all those who are accountable for the subsequent actions in any manner. This is achieved by sending the copies of the reports or documents to all the concerned people or users.
  • 10.
    System System: A setof components that work together to achieve a common goal. Computer-based Information Systems take data as raw material, process it, and produce information as output.
  • 11.
    Components of anInformation System
  • 12.
    Corporate Headquarters Finance Production Marketing and Sales Corporate Databases Mainframe Divisional Databases LocalArea Network: PCs with Local Databases Salesforce Notebooks Regional Office Work- stations Plant Minicomputers Telecommunications Link Divisional Minicomputers with Divisional Databases A Networked Information System: Three-Tier Architecture
  • 13.
  • 14.
    Types of InformationSystems  Operational-level systems support operational managers by keeping track of the elementary activities and transactions of the organization, such as sales, receipts, cash deposits, payroll, credit decisions, and the flow of materials in a factory.  Management-level systems serve the monitoring, controlling, decision-making, and administrative activities of middle managers. The principal question addressed by such systems is this: Are things working well?  Strategic-level systems help senior management tackle and address strategic issues and long-term trends, both in the firm and in the external environment.
  • 15.
  • 16.
    Transaction Processing System TransactionProcessing Systems (TPS):Transaction Processing Systems (TPS):  Basic business systems that serve the operational levelBasic business systems that serve the operational level  A computerized system that performs and records the dailyA computerized system that performs and records the daily routine transactions necessary to the conduct of theroutine transactions necessary to the conduct of the businessbusiness
  • 17.
    Management Information System Serve middle management  Structured and semi-structured decisions  Provide reports on firm’s current performance, based on data from TPS  Past and Present Data  Internal Orientation  Provide answers to routine questions with predefined procedure for answering them  Typically have little analytic capability
  • 18.
    Decision Support System Serve middle management  Support non-routine decision making  E.g. What is impact on production schedule if December sales doubled?  Often use external information as well as information from TPS and MIS  Processing is interactive in nature  Output in form of Decision analysis  Example: Contract Cost Analysis
  • 19.
    Executive Support Systems Support senior management – Strategic Level  Address non-routine decisions requiring judgment, evaluation, and insight  Incorporate data about external events (e.g. new tax laws or competitors) as well as summarized information from internal MIS and DSS  User "seductive" interfaces; Users' time is a premium  What if capabilities abound  Input in form of Aggregate data  Processing is interactive and output in form of projections  Examples  ESS that provides minute-to-minute view of firm’s financial performance as measured by working capital, accounts receivable, accounts payable, cash flow, and inventory.  5-year operating plan
  • 20.
    Interrelationship Among Systems Thevarious types of systems in the organization have interdependencies. TPS are major producers of information that is required by many other systems in the firm, which, in turn, produce information for other systems. These different types of systems are loosely coupled in most business firms, but increasingly firms are using new technologies to integrate information that resides in many different systems.
  • 21.
    Contents  Data, Informationand System  Information – a critical resource  Data and Information  Types and Characteristics of useful Information  System  Information System (IS)  Components of an IS  Types of IS  Interrelationship among systems  Management Information System (MIS)  Broader Definitions and concepts  Output of MIS  Functional View  Impact of MIS  MIS Planning and Development  MIS Development outlook  Pointers for MIS Design  MIS Planning  Software Development Life Cycle  Software Development Methodologies: Approaches
  • 22.
    MIS - Definitionand Concept Right Information To the right person At the right place At the right time In the right form At the right cost The three sub-components Management, Information and System - together bring out the focus clearly & effectively. System emphasizing a fair degree of integration and a holistic view; Information stressing on processed data in the context in which it is used by end users; Management focusing on the ultimate use of such information systems for managerial decision making.
  • 23.
    MIS – Definitionand Concept A management information system (MIS) is system of collecting, processing, storing, disseminating and utilizing data in the form of information needed to carry out the functions of management. Today, the term is used broadly in a number of contexts and includes (but is not limited to):  Decision support systems,  Resource and people management applications,  Enterprise Resource Planning (ERP),  Supply Chain Management (SCM),  Customer Relationship Management (CRM),  project management and database retrieval applications.
  • 24.
    Difference between managementinformation systems and information systems The terms MIS and IS are often confused. IS may include systems that are not intended for decision making. In effect, MIS must not only indicate how things are going, but why they are not going as well as planned where that is the case  Information system applied to management context is called MIS. IS can be applied to any area of business while MIS is applicable for managerial decision-making.  IS means use of hardware and software for any business. MIS can be used in any form - even manual reports, which aid decision- making  MIS is used to analyze other information systems applied in operational activities in the organization.  MIS summarize and report on the company’s basic operations. The basic transaction data from TPS are compressed and reported
  • 25.
    Outputs of MIS Scheduled reports  Produced periodically, or on schedule (daily, weekly, monthly)  Key Indicator Report  Summarizes the previous day’s critical activities  Demand Report  Gives certain report at manager's request  Exception Report  Automatically produced when a situation is unusual or requires management action
  • 26.
  • 27.
    How MIS ObtainData from TPS:How MIS Obtain Data from TPS: How MIS Obtain their Data from the Organization’s TPS: In the system illustrated by this diagram, three TPS supply summarized transaction data to the MIS reporting system at the end of the time period. Managers gain access to the organizational data through the MIS, which provides them with the appropriate reports.
  • 28.
    Sample MIS Report Thisreport, showing summarized annual sales data, was produced by the MIS in previous slide
  • 29.
    Impact of MIS Management of marketing, finance, production and personnel becomes more efficient, the tracking and monitoring becomes easy  Helps in understanding of business itself, MIS begins with definition of data and its attributes – uses data dictionary and brings common understanding of terms and terminology in organization  MIS calls for systemization of business operations – leads to streamlining of operations, brings discipline in its operations everyone is required to follow  Since the goals of MIS are driven from organization goals, it helps indirectly pulling everyone in organization towards corporate goals by providing relevant information to the people in organization  MIS helps to monitor results and performances  MIS provides alerts, in some cases daily, to managers at each level of the organization, on all deviations between results and pre-established objectives and budgets.  IT enabled MIS is partly responsible for the PARADIGM shift (A change, a new model,) from support to contributing to an organizations profitability
  • 30.
    Contents  Data, Informationand System  Information – a critical resource  Data and Information  Types and Characteristics of useful Information  System  Information System (IS)  Components of an IS  Types of IS  Interrelationship among systems  Management Information System (MIS)  Broader Definitions and concepts  Output of MIS  Functional View  Impact of MIS  MIS Planning and Development  MIS Development outlook  Pointers for MIS design  MIS Planning  Software Development Life Cycle  Software Development Methodologies: Approaches
  • 31.
    MIS Development Outlook Corporate Strategy Ethics/ Privacy MIS Strategy andPlan Internal Systems Development Outsourced Systems Development Implementation Internal Systems Operations Outsourced Systems Operations Infrastructure Security Corporate Strategy Ethics/ Privacy
  • 32.
    Pointers for MISDesign  To take care for data problems (bias and error) by high level validations, checking and controlling the procedures.  Due regard to the communication theory of transmitting the information from the source to the destination.  Handling of noise and distortion by summarization and message routing  Ensuring that no information is suppressed or over emphasized  To provide specific attention to quality parameters – Utility, Satisfaction, Error and Bias  By controlling inputs to the MIS on the factors of impartiality, validity, reliability, consistency and age  Should make a distinction between the different kinds of information for the purpose of communication. Say an action, a decision oriented information should be distinguished from a non action/knowledge-oriented information.  To recognize some aspects of human capabilities as a decision maker. Capabilities differ from manager to manager and the designer should skillfully deal with them.  It should meet the needs of the total organization.  Recognizing that the information may be misused if it falls into wrong hands, the MIS design should have the features of filtering, blocking, suppressions, and delayed delivery.

Editor's Notes

  • #9 Other important attributes: Appropriateness of Form: The level of details, tabular v/s graphical, and quantitative v/s qualitative form, are selected in accordance with the situation.
  • #15  Operational Level: The principal purpose of systems at this level is to answer routine questions and to track the flow of transactions through the organization. How many parts are in inventory? Examples of operational-level systems include a system to record bank deposits from automatic teller machines or one that tracks the number of hours worked each day by employees on a factory floor. Management Level systems provide periodic reports rather than instant information on operations. These systems often answer “what-if” questions: What would be the impact on production schedules if we were to double sales in the month of December . Strategic Level Systems: Their principal concern is matching changes in the external environment with existing organizational capability. What will employment levels be in five years? What are the long-term industry cost trends, and where does our firm fit in? What products should we be making in five years?
  • #24 Typically, MIS are oriented almost exclusively to internal, not environmental or external, events.  Generally, they depend on underlying transaction processing systems for their data.