Page 1 of 4
Personnel Particulars
Name : SABITH SYED MOHAMMED
Position : Mechanical Engineer
Nationality : Indian
Date of Birth : 27 February 1989
Passport Number : K 2266115
Language Proficiency : English, Hindi, Malayalam, Tamil & Arabic
Total Year of Experience : 3+ Years
Mobile : +91-9809753916
Email : sabithms7@gmail.com
Education
BE: MECHANICAL: H.M.S Institute of Engineering, Tumkur. Karnataka, India
Higher Secondary: I.C.A.English Higher Secondary School, Vadakkekad, Kerala, India
SSLC: I.C.A.English Higher Secondary School, Vadakkekad, Kerala, India
Professional Qualification
NEBOSH, International General Certificate in Occupational Safety and Health
(UK)
IOSH Managing Safety (UK)
First Aid (USA)
Fire Safety (UK)
ASNT Level II Certificate in,
RT (Radiographic Test)
UT (Ultrasonic Test)
MT (Magnetic Particle Test)
PT (Penetrant Test)
Certificate in Post Engineering Specialization Course of Oil Field Engineering & Quality
Control From Induscan Petroleum Institute Nilambur, Kerala with the following subjects
Construction Drawings such as P&ID, Piping Isometrics, Equipment, Structural, GAD.
Familiar with Material Inspection, dimensional check and documentation as per
Construction Materials Standards such as ASTM / ASME SA 106, SA 515, SA 516, SA
105, SA 312, SA 240, SA 234 etc and with ANSI standards of B 36.10, B16.5, B 16.9 etc.
Thorough knowledge in Welding Standards of ASME Section IX and API 1104. Familiar
with Welding Procedure Qualification, Welder Qualification, P numbers, Selection of
Electrodes, Weld Visual Inspection etc.
Page 2 of 4
Good knowledge in Radiographic Interpretation of weld joints, Ultrasonic Inspection,
Magnetic Particle Inspection and Penetrant Test, Reporting and Documentation.
Fabrication of Piping, Structure, Pressure vessels and other Equipments, documentation of
History Sheet, Test Pack Clearing etc.
Confident to handle the construction and quality control activities as specified in the
Drawings and applicable standards and specifications.
Computer Proficiency
Primavera P6
Windows 98/NT/2000/XP/vista/windows 7/ windows 8
MS Office
AutoCAD
Solid Edge
Career Outline
Saipem/Sajar – Rumaila-IRAQ (Nov 2013 to Jan 2016)
Piping Engineer (Mechanical)
SHELL GAS
WITH EPC CONTRACTOR ENI SAIPEM
PROJECTS: 1. Inlet Booster Compressor (NGL Rumailah)
2. Zubair Rental Compressor (Hammar Mishrif & Rafidiyah)
3. Umm Qasr NGL / LPG Rehabilitation – Brown Field Project
4. Majnoon Oil Field
∑ Implementing technical tasks assigned related to design, verification or study activities
∑ Verifying all produced documents (internal or sub-contracted) like design reports,
technical specifications and drawings
∑ Conducting analysis of project technical documents to validate consistency between
budget, resources and means allocated for the work completion & targets
∑ Liaising with project specialists, designers & draftsman for technical activities performed
inside & outside company
∑ Performing the activities and ensuring compliance with the QA/QC, HSE requirements &
contractual obligations
∑ Involved in estimating quantities or validating estimations done by other specialist of the
team
Page 3 of 4
∑ Supervising actual progress inclusive of designing & construction for discipline
activities; control of man-hours
∑ Attending internal review activities and providing technical support to procurement, sub-
contractor for construction activities
∑ Foreseeing technical/financial/delay risk
∑ Performing Piping Tie-in during plant shutdowns
∑ Handling on-site engineering adjustments during construction
∑ Developing equipment layout as per process requirements defined on PFD or P & ID in
accordance with engineering practices i.e. developing single line structure to lay piping
distribution & equipment elevation
∑ Executing & coordinating for project engineering documents & construction activities
and reviewing design documents, prepared internally or by vendors
∑ Focus on enabling the Asset Team to meet the Company’s Business objectives and
further promote improvement in Production and Cost performance.
∑ Administering sub-contracted engineering work packages; defining the scope of work,
milestones and documentation deliverables
∑ Controlling quality, costs & timing of sub-contracted activities and ensuring compliance
with project scheduling, goals & contract requirements
∑ Providing assistance to the vendor team for UM-QASR power plant.
∑ Coordination with SHELL for visual inspection on UM-QASR power plant.
∑ Coordination with client engineering division and providing updates of on-going project
activities.
∑ Checking feasibility based on the actual site conditions.
∑ Coordination with instrumentation, structural and equipment engineering teams.
∑ Verification of piping isometric drawings with equipment and piping layouts.
Saipem – Dubai (Feb 2013 to Nov 2013)
Tendering & Estimation Engineer (Mechanical)
WITH EPC CONTRACTOR ENI SAIPEM
∑ Study the project scope of works, clients' requirement, BOQ, project milestones, and
specification from the ,
∑ Initial review and summarizing of the ITT package for making Preliminary schedule for
Internal review.
Page 4 of 4
∑ Estimation of Resources Like manpower (In Man hour, man Month) and equipment’s,
Tools, Tackles, Consumables, etc. Required for Bidding the Projects.
∑ Estimation of Project Scope of work for from BOQ, MTO, RFQ and work further on that.
∑ Preparation of Project Management Documents (e.g. S-Curve, Weightages, Case Flow,
Histogram, Line Diagram, etc.) for as per Client/Consultant Requirements.
∑ Preparation of Technical Tender Documents for the Submission in Technical Bid.
∑ Preparation of prime cost estimates for EPC tenders in accordance with client
requirements for Commercial Submission.
∑ Prepares cost comparison sheets for all supply & Sub-contractor items.
∑ Interface with other departments as required.
∑ Ensuring timely delivery of the tender documents.
∑ Dealing with ongoing clarifications/Query prior to submission the Technical &
Commercial Tender.
∑ Attending the Pre-Bidding Site Visit and Internal Kick-Off Meeting.
∑ Handing over and giving all required input to Operation team after awarding of Contract.
∑ Making Budgetary Cost Estimation for Projects.
∑ Cost Monitoring by tracking construction activity planned VS actual, reporting and
documenting.
∑ Estimate Resources like manpower (in Man hour, Man month), Tools tackles and
Equipment required for the projects.
∑ Monitoring of S Curve Charts to track Construction Activities
∑ Preparing Erection Scheme for Erection of Heavy Equipment’s.
∑ Attending Meeting with Clients, Consultant & Sub Contractors
Project Handle
Estimation of MEP works for;
∑ BP_150MW Early Power Plant
∑ Exxon_DS-6 Wet Crude Treatment system (W3QR-40-M130)
∑ Exxon Crude Phase II- EPC (W3QR-40-M127)
∑ Exxon Facility Upgrade (W3QR-40-M107)
∑ Umm Qasr NGL / LPG Rehabilitation – Brown Field Project
∑ Zubair Rental Compressor (Hammar Mishrif & Rafidiyah)
∑ Inlet Booster Compressor (NGL Rumailah)

Mechanical Engg_CV

  • 1.
    Page 1 of4 Personnel Particulars Name : SABITH SYED MOHAMMED Position : Mechanical Engineer Nationality : Indian Date of Birth : 27 February 1989 Passport Number : K 2266115 Language Proficiency : English, Hindi, Malayalam, Tamil & Arabic Total Year of Experience : 3+ Years Mobile : +91-9809753916 Email : sabithms7@gmail.com Education BE: MECHANICAL: H.M.S Institute of Engineering, Tumkur. Karnataka, India Higher Secondary: I.C.A.English Higher Secondary School, Vadakkekad, Kerala, India SSLC: I.C.A.English Higher Secondary School, Vadakkekad, Kerala, India Professional Qualification NEBOSH, International General Certificate in Occupational Safety and Health (UK) IOSH Managing Safety (UK) First Aid (USA) Fire Safety (UK) ASNT Level II Certificate in, RT (Radiographic Test) UT (Ultrasonic Test) MT (Magnetic Particle Test) PT (Penetrant Test) Certificate in Post Engineering Specialization Course of Oil Field Engineering & Quality Control From Induscan Petroleum Institute Nilambur, Kerala with the following subjects Construction Drawings such as P&ID, Piping Isometrics, Equipment, Structural, GAD. Familiar with Material Inspection, dimensional check and documentation as per Construction Materials Standards such as ASTM / ASME SA 106, SA 515, SA 516, SA 105, SA 312, SA 240, SA 234 etc and with ANSI standards of B 36.10, B16.5, B 16.9 etc. Thorough knowledge in Welding Standards of ASME Section IX and API 1104. Familiar with Welding Procedure Qualification, Welder Qualification, P numbers, Selection of Electrodes, Weld Visual Inspection etc.
  • 2.
    Page 2 of4 Good knowledge in Radiographic Interpretation of weld joints, Ultrasonic Inspection, Magnetic Particle Inspection and Penetrant Test, Reporting and Documentation. Fabrication of Piping, Structure, Pressure vessels and other Equipments, documentation of History Sheet, Test Pack Clearing etc. Confident to handle the construction and quality control activities as specified in the Drawings and applicable standards and specifications. Computer Proficiency Primavera P6 Windows 98/NT/2000/XP/vista/windows 7/ windows 8 MS Office AutoCAD Solid Edge Career Outline Saipem/Sajar – Rumaila-IRAQ (Nov 2013 to Jan 2016) Piping Engineer (Mechanical) SHELL GAS WITH EPC CONTRACTOR ENI SAIPEM PROJECTS: 1. Inlet Booster Compressor (NGL Rumailah) 2. Zubair Rental Compressor (Hammar Mishrif & Rafidiyah) 3. Umm Qasr NGL / LPG Rehabilitation – Brown Field Project 4. Majnoon Oil Field ∑ Implementing technical tasks assigned related to design, verification or study activities ∑ Verifying all produced documents (internal or sub-contracted) like design reports, technical specifications and drawings ∑ Conducting analysis of project technical documents to validate consistency between budget, resources and means allocated for the work completion & targets ∑ Liaising with project specialists, designers & draftsman for technical activities performed inside & outside company ∑ Performing the activities and ensuring compliance with the QA/QC, HSE requirements & contractual obligations ∑ Involved in estimating quantities or validating estimations done by other specialist of the team
  • 3.
    Page 3 of4 ∑ Supervising actual progress inclusive of designing & construction for discipline activities; control of man-hours ∑ Attending internal review activities and providing technical support to procurement, sub- contractor for construction activities ∑ Foreseeing technical/financial/delay risk ∑ Performing Piping Tie-in during plant shutdowns ∑ Handling on-site engineering adjustments during construction ∑ Developing equipment layout as per process requirements defined on PFD or P & ID in accordance with engineering practices i.e. developing single line structure to lay piping distribution & equipment elevation ∑ Executing & coordinating for project engineering documents & construction activities and reviewing design documents, prepared internally or by vendors ∑ Focus on enabling the Asset Team to meet the Company’s Business objectives and further promote improvement in Production and Cost performance. ∑ Administering sub-contracted engineering work packages; defining the scope of work, milestones and documentation deliverables ∑ Controlling quality, costs & timing of sub-contracted activities and ensuring compliance with project scheduling, goals & contract requirements ∑ Providing assistance to the vendor team for UM-QASR power plant. ∑ Coordination with SHELL for visual inspection on UM-QASR power plant. ∑ Coordination with client engineering division and providing updates of on-going project activities. ∑ Checking feasibility based on the actual site conditions. ∑ Coordination with instrumentation, structural and equipment engineering teams. ∑ Verification of piping isometric drawings with equipment and piping layouts. Saipem – Dubai (Feb 2013 to Nov 2013) Tendering & Estimation Engineer (Mechanical) WITH EPC CONTRACTOR ENI SAIPEM ∑ Study the project scope of works, clients' requirement, BOQ, project milestones, and specification from the , ∑ Initial review and summarizing of the ITT package for making Preliminary schedule for Internal review.
  • 4.
    Page 4 of4 ∑ Estimation of Resources Like manpower (In Man hour, man Month) and equipment’s, Tools, Tackles, Consumables, etc. Required for Bidding the Projects. ∑ Estimation of Project Scope of work for from BOQ, MTO, RFQ and work further on that. ∑ Preparation of Project Management Documents (e.g. S-Curve, Weightages, Case Flow, Histogram, Line Diagram, etc.) for as per Client/Consultant Requirements. ∑ Preparation of Technical Tender Documents for the Submission in Technical Bid. ∑ Preparation of prime cost estimates for EPC tenders in accordance with client requirements for Commercial Submission. ∑ Prepares cost comparison sheets for all supply & Sub-contractor items. ∑ Interface with other departments as required. ∑ Ensuring timely delivery of the tender documents. ∑ Dealing with ongoing clarifications/Query prior to submission the Technical & Commercial Tender. ∑ Attending the Pre-Bidding Site Visit and Internal Kick-Off Meeting. ∑ Handing over and giving all required input to Operation team after awarding of Contract. ∑ Making Budgetary Cost Estimation for Projects. ∑ Cost Monitoring by tracking construction activity planned VS actual, reporting and documenting. ∑ Estimate Resources like manpower (in Man hour, Man month), Tools tackles and Equipment required for the projects. ∑ Monitoring of S Curve Charts to track Construction Activities ∑ Preparing Erection Scheme for Erection of Heavy Equipment’s. ∑ Attending Meeting with Clients, Consultant & Sub Contractors Project Handle Estimation of MEP works for; ∑ BP_150MW Early Power Plant ∑ Exxon_DS-6 Wet Crude Treatment system (W3QR-40-M130) ∑ Exxon Crude Phase II- EPC (W3QR-40-M127) ∑ Exxon Facility Upgrade (W3QR-40-M107) ∑ Umm Qasr NGL / LPG Rehabilitation – Brown Field Project ∑ Zubair Rental Compressor (Hammar Mishrif & Rafidiyah) ∑ Inlet Booster Compressor (NGL Rumailah)