Key Skills 
 
Profile Summary
♦ Co-ordination and decision on Engineering and construction issues with customer,
engineering team, subcontractors and other contractor staff;
♦ Prime contact with the Customer and secure engineering, procurement and
construction services from third party;
♦ Manage Project, process and utility packages, mechanical equipment and
instrumentation/electrical equipment from concept through to installation,
commissioning and handover.
♦ Skilled in evaluation of Techno- Commercial Bids for process package and
equipment(mechanical, instrumentation and electrical) items ,check for the design
conformance required & set by the customer, project documentation and the local
regulation;
♦ Proficient in Preparation and submission of stakeholders reports at various stages
of the project e.g Cost report/budget;
♦ Ensures that resources and workloads are balanced, ensuring that project is
appropriately planned, prioritized and executed.
♦ Preparation of Project Execution Master Plan;
♦ Resource planning/ optimization;
♦ Manage schedules and coordinates the construction activities with other
appropriate areas.
♦ Preparation of project major (engineering/procurement and construction) issue log
report for management;
♦ Resolution of site issues related to engineering, procurement and ensure timely
delivery of material to construction site;
♦ Ensures that contractors follows the SOW, Company standards and procedures and
maintain appropriate crew operator qualification standards;
♦ Controls updation of construction action plans and communicate with construction
team and other subcontractor to prioritize affected activity.
♦ Identifies and implements process and procedure changes related to customer- and
Company-generated processes that result in increased efficiencies.
♦ Preparation and monitor equipment mobilization and demobilization plan;
♦ Feed back to claims department during the preparation of claims for extra works;
♦ Monitoring progress to maintain schedules and budgets;
♦ Evaluate, organise and prioritise the activies within a schedule;
♦ Feedback to tenders and proposal department during bidding and estimation for
new projects ;
♦ Developing the scope of work, and help in developing schedules, and budgets for
the assigned project elements;
♦ Interaction and coordination with multidisciplinary team of engineers and specialist
to check and review the package and collect feedback;
♦ Monitor timely generation and submission of project deliverables for client’s
review and approval;
♦ To assist in pre-award techno-commercial package preparation, review of offers
and approval for contracting or procurement;
♦ Coordination with multi-disciplinary Engineering team, Monitor all Vendor Data
and deliverables, arrange Inter Discipline Check (IDC) and monitor Comments
 
 
 
 
 
 
 
 
 
 
 
 
SIDHARTH SUNNY
ACCOMPLISHED PROJECT ENGINEER
QUALIFICATION- BACHELORE OF CHEMICAL ENGINEERING
Offering nearly 8 years’ rich experience, including 7+ years of international experience
Specialisation in end-to-end execution of EPCC Projects from Initiation till Final Handover to client.
Including Bid Proposal/estimation, Engineering Coordination, Scheduling & Cost Control, Supervise Pre-
Commissioning and Commissioning of Green field & Brown field projects in diverse sectors such as Oil &
Gas, Manufacturing, Power and Water Treatment Plant
Targeting assignments in Project Management with a leading organisation
+77775033887/+77073864043                                                                    sunnysid2006@gmail.com
Engineering/Project Management
Resource Management
Client and Vendor relations
Effective Negotiation
Field / Site Engineering Support
Process Improvement
Task Scheduling
Budget Management
Change Management
Soft Skills
 
 
 
 
 
 
 
 
 
 
 
 
   
 
Resolution Sheet (CRS);
♦ Involved in review of Process Flow Diagrams, Piping & Instrumentation Diagrams,
design Philosophy, simulation reports and all process reports & philosophies;
♦ Review of Cause & Effect matrix, checking for validation and establishing
acceptance criteria;
♦ Review of process parameters and design with simulation software Hysis 6.2;
♦ Finalisation of automation and SCADA scope and resolve the interfacing issues in
between units and control room;
♦ Review of 3D Model and highlight the clashes in design to the subcontractor;
♦ Engineering supports to the Pre-commissioning and Commissioning team;
♦ Conduct meetings on commissioning coordination with start-up team and client’s
representative;
♦ Perform the tasks of developing commissioning plans, schedules, project start-up,
and other field work;
♦ Hands on experience in inter-departmental coordination & supervision of various
pre-commissioning & commissioning activities along with Process Equipment
Licenser, conducting inspections and walk-downs, systems handover from
construction to commissioning eventually to owner after performance testing, etc.
♦ To Check the functionality Test of the Equipment;
♦ To monitor loop check, equipment check-out and process commissioning during
pre-commissioning and commissioning of plant;
♦ Preparation of the As-built mark ups on the P&IDs and the Isometric drawings
based on the modifications or changes carried out during the erection of the process
equipment & piping;
♦ Sound understanding of various Design Guides, Engineering Departmental
Procedure (EDP) and International Codes & Standards
(ASME/ANSI/IEC/GOST/Snip) and HSE Standards
♦ Team player with strong planning, interpersonal, analytical & negotiation skills;
self-directed and able to work independently & as part of team
♦ Exceptionally respectful and appreciative of diverse cultures and viewpoints
 
 Career Timeline
 
Technical Skills
Simulation-CHEMCAD-5.2,Hysis 6.2
Planning- Primavera 6
Engineering-AutoCad-2007,
3D Modeling- Nevisworks 6
Other-MS-OFFICE-2008/2010, MS-POWERPOINT.
Project Management- Completed 35 Hrs PMP® Credential Classes.
Appling for 2016 PMP® Certification
11 Months 3.4 years 3.5 years
2008 - 2009
Essar Engineering
Services Ltd,
Mumbai, GET/Ast.
Manager
2009 - 2013
JSC KazStroyService,
Kazkhstan
Process Engineer
Since 2013
JSC KazStroyService,
Kazakhstan,
Project Engineer
Analytical
Collaborator
Communicator
Motivator
Planner
 Work Experience
Since Feb’13
Feb’13 – Jan’14
June’09 – Feb’13
Aug’08 – June’09
Projects Executed
OGCC JSC KazStroy Service, Kazakhstan
Project- EPCC Project- Integrated Four Pump Station on Caspian Pipeline, Capacity
of each pump station- 54,000 to 57,860 m3/hr
Client- Caspian Pipeline Consortium, Kazakhstan
OGCC JSC KazStroy Service, Kazakhstan
Project- EPCC Project- Pumping Station NO.8 on Kazakhstan-China pipeline- 68,000
Nm3/hr
Client- Kazakhstan-China Pipeline, Kazakhstan
OGCC JSC KazStroy Service, Kazakhstan
Project- EPCC Project for Complex Gas Treatment Unit- 60,000 Nm3/hr
Client- KazakhOil Aktobe- Kazakhstan Entity of “Luk Oil” Russia
Essar Engineering Services LTD (Hydrocarbon Division), Mumbai, India
Project- Essar Oil Refinery Expansion Project from 10.2 to 20 MMTPA
Client- Essar Oil Refinery
Key Assignments:
♦ Development & Review of Process Engineering documentation of Gas Treatment
Plant Project – Kazakh Oil Aktobe,Kazakhstan;
♦ Engineering Coordination with Engineering Contractor- Exterran USA;
♦ Participation in HAZOP of Complex Gas Treatment Plant design document;
♦ Pre-Commissioning and Commissioning of Gas Treatment Plant;
♦ Value Engineering Activities at Kazhoil Aktobe “Complex Gas Treatment Plant”,PS-
08 Pump Station Project, CPC Pump Station Project in Kazakhstan;
♦ Factory acceptance test of Compressors and pumps at various locations in
Kazakhstan, India (such as Areal 4 stage Compressors, AirCom Compressors &
Mycom Single stage Compressors);
♦ Factory Acceptance Test of Diesel Generators;
♦ Inspections of Pressure Vessels, LPG Bullets, Drain tanks and Pressure filters
♦ Work on different Process Packages, Gas Analyzers (AMETEK), Water Treatment
and Sewage Treatment packages (from stage of request preparation till
commissioning support; package cost approx. $ 60 Million) with international
manufactures (such as Belleli, Exterran- Broken Arrow (USA), Grudfos, Mitaco,
AMETEK, Siemens, Emerson process so on)
Role:
♦ Collection of Feed Data, preparation of Process design Basis;
♦ Selection of appropriate equipment and capacity required to suit the process
requirement;
♦ Prepare Heat and Mass balance;
♦ Preparation of Process flow diagram and run simulation;
♦ Managing Designing, documenting & sustaining all physical aspects of project by
timely generation drawings and BOMs
♦ Managing techno-commercial matters such as enquiry study, vendor selection &
finalization, preparation of schedule for development and obtaining first sample &
final part approval
♦ Implementing Value Analysis and Value Engineering initiatives to achieve
standardization and reduce costs
♦ Leading complete cycle of the project management from stage of requirement
gathering(Initiation) till final Handover
♦ Participating in and managing FAT (Factory acceptance test) & SAT (Site acceptance
test) activities
♦ Providing support in Root Cause Analysis of quality issues; providing low cost
solution to problems
♦ Evaluating possible design solutions to improve cost, quality and performance
♦ Managing productivity issues, scope change and critical conflict areas; initiating
corrective action as necessary
♦ Monitoring project HS&E aspects, including adherence to statutory obligations and
Title: Expansion of Essar Oil Refinery;
Client: Essar Oil Refinery;
Value: $650 million;
Scope:Process Engineering deliverable,
Project Controls & Coordination
Title: EPCC Project Construction of
Complex Gas Treatment Plant;
Client: Luk Oil Overseas- Kazkahstan
entity “Kazakh Oil Aktobe”;
Value: $310 million;
Scope: Process Engineering, Engineering
Coordination, Site Execution, Pre-
Commissioning and Commissioning
Title: EPCC Project-Construction of Pump
Station No. 08, Karagandha, Kazakhstan;
Client: Kazakhstan-China pipeline
Consortium, Kazakhstan
Value: $65 Million;
Scope: Client Interfacing, Engineering
deliverable review, Interdisciplinary
Coordination, Project Execution,
construction supervision, commissioning
and handover 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 Trainings Attended
Jun’06
  Papers Published /
Engineering Project
Personal Details
internal procedures; ensuring adherence with safety requirements by participated
actively in HAZOP meetings conducted by Safety Engineer
Significant Achievements:
♦ Excellent track record of independently managing projects of:
o Complex Gas Treatment Plant Project(Responsible Process Engineer)
o NPS-08 Pump Station Project (Responsible Project Engineer for Process and
utility packages)
o CPC Pump Station Project (as Project Engineer for complete project)
♦ Created a claim of $50 million due to design and scope changes;
♦ Overcame several challenges, during completion of projects, such as:
o Removal of design conflicts related to scope & sharing of technical inputs
o Coordination of approx. 15 EPC contractors within time frame with day to day
interface track records for different Projects in Kazakhstan
o Working in multi-lingual culture Chinese, Russian, English for number of projects
in Kazakhstan
♦ Modified existing design of Substation leading to better performance
♦ Saved costs by taking innovative design approaches such as:
o Minimized the requirement of explosion proof equipment by implementing
process engineering logic without deviating from Engineering standards,
especially in pipe rack or remote areas where location of equipment not much
matters
o Considered the latest technology provider (compact and advance version and cost
effective solution) vendor in procurement technical bid with client confidence to
make low maintenance, less space long life of equipment.
♦ Controlled costs through accurate forecasting of requirement for manpower, tools &
machinery, as per project requirements
♦ Executed projects as per the target set for budgeted cost & timeline through strict
follow-up
♦ Worked in close coordination with the Consultant, Client & Main Contractor
♦ Enabled smooth handover of project through tracking of as Built Documents
Organization: Solaris Chemtech Ltd(BILT), Karwar, Karnataka, India
Scope: Training in Process equipment design requirement and operation of Caustic Soda
Production plant.
1st Prize in All India Paper Presentation “Hybrid Vehicles” in year 2006
Engineering Project- Recycling Of Waste Engine Oil by Vacuum Distillation technique
Date of Birth: 23rd Aug 1985
Current Address: Koktem#1, Dom#7, Flat#21B, Timryezeva Shashkina, Almaty,
Kazakhstan
Permanent Address: C/o. Mr. Yatendra Gupta, Moti Mill Compound,G.T Road, Aligarh,
Uttar Pradesh, India
Languages Known: English and Russian
Passport Details: No. Z2257473; Validity: 19/06/2023
 
Title: Polyethylene Plant, Kazakhstan;
Client: Kazakhstan Petrochemical
Industries
Scope: Bid Support
Title: EPCC Project-Construction of Four
Pump Stations, Atyrau District,
Kazakhstan;
Client: Caspian pipeline Consortium,
Kazakhstan
Value: $650 Million;
Scope: Client Interfacing, Engieering
deliverable review, Interdisciplinary
Coordination, Project Execution,
construction supervision, commissioning

CV-Sidharth Sunny Project Engineer

  • 1.
      Key Skills    Profile Summary ♦Co-ordination and decision on Engineering and construction issues with customer, engineering team, subcontractors and other contractor staff; ♦ Prime contact with the Customer and secure engineering, procurement and construction services from third party; ♦ Manage Project, process and utility packages, mechanical equipment and instrumentation/electrical equipment from concept through to installation, commissioning and handover. ♦ Skilled in evaluation of Techno- Commercial Bids for process package and equipment(mechanical, instrumentation and electrical) items ,check for the design conformance required & set by the customer, project documentation and the local regulation; ♦ Proficient in Preparation and submission of stakeholders reports at various stages of the project e.g Cost report/budget; ♦ Ensures that resources and workloads are balanced, ensuring that project is appropriately planned, prioritized and executed. ♦ Preparation of Project Execution Master Plan; ♦ Resource planning/ optimization; ♦ Manage schedules and coordinates the construction activities with other appropriate areas. ♦ Preparation of project major (engineering/procurement and construction) issue log report for management; ♦ Resolution of site issues related to engineering, procurement and ensure timely delivery of material to construction site; ♦ Ensures that contractors follows the SOW, Company standards and procedures and maintain appropriate crew operator qualification standards; ♦ Controls updation of construction action plans and communicate with construction team and other subcontractor to prioritize affected activity. ♦ Identifies and implements process and procedure changes related to customer- and Company-generated processes that result in increased efficiencies. ♦ Preparation and monitor equipment mobilization and demobilization plan; ♦ Feed back to claims department during the preparation of claims for extra works; ♦ Monitoring progress to maintain schedules and budgets; ♦ Evaluate, organise and prioritise the activies within a schedule; ♦ Feedback to tenders and proposal department during bidding and estimation for new projects ; ♦ Developing the scope of work, and help in developing schedules, and budgets for the assigned project elements; ♦ Interaction and coordination with multidisciplinary team of engineers and specialist to check and review the package and collect feedback; ♦ Monitor timely generation and submission of project deliverables for client’s review and approval; ♦ To assist in pre-award techno-commercial package preparation, review of offers and approval for contracting or procurement; ♦ Coordination with multi-disciplinary Engineering team, Monitor all Vendor Data and deliverables, arrange Inter Discipline Check (IDC) and monitor Comments                         SIDHARTH SUNNY ACCOMPLISHED PROJECT ENGINEER QUALIFICATION- BACHELORE OF CHEMICAL ENGINEERING Offering nearly 8 years’ rich experience, including 7+ years of international experience Specialisation in end-to-end execution of EPCC Projects from Initiation till Final Handover to client. Including Bid Proposal/estimation, Engineering Coordination, Scheduling & Cost Control, Supervise Pre- Commissioning and Commissioning of Green field & Brown field projects in diverse sectors such as Oil & Gas, Manufacturing, Power and Water Treatment Plant Targeting assignments in Project Management with a leading organisation +77775033887/+77073864043                                                                    sunnysid2006@gmail.com Engineering/Project Management Resource Management Client and Vendor relations Effective Negotiation Field / Site Engineering Support Process Improvement Task Scheduling Budget Management Change Management
  • 2.
    Soft Skills                               ResolutionSheet (CRS); ♦ Involved in review of Process Flow Diagrams, Piping & Instrumentation Diagrams, design Philosophy, simulation reports and all process reports & philosophies; ♦ Review of Cause & Effect matrix, checking for validation and establishing acceptance criteria; ♦ Review of process parameters and design with simulation software Hysis 6.2; ♦ Finalisation of automation and SCADA scope and resolve the interfacing issues in between units and control room; ♦ Review of 3D Model and highlight the clashes in design to the subcontractor; ♦ Engineering supports to the Pre-commissioning and Commissioning team; ♦ Conduct meetings on commissioning coordination with start-up team and client’s representative; ♦ Perform the tasks of developing commissioning plans, schedules, project start-up, and other field work; ♦ Hands on experience in inter-departmental coordination & supervision of various pre-commissioning & commissioning activities along with Process Equipment Licenser, conducting inspections and walk-downs, systems handover from construction to commissioning eventually to owner after performance testing, etc. ♦ To Check the functionality Test of the Equipment; ♦ To monitor loop check, equipment check-out and process commissioning during pre-commissioning and commissioning of plant; ♦ Preparation of the As-built mark ups on the P&IDs and the Isometric drawings based on the modifications or changes carried out during the erection of the process equipment & piping; ♦ Sound understanding of various Design Guides, Engineering Departmental Procedure (EDP) and International Codes & Standards (ASME/ANSI/IEC/GOST/Snip) and HSE Standards ♦ Team player with strong planning, interpersonal, analytical & negotiation skills; self-directed and able to work independently & as part of team ♦ Exceptionally respectful and appreciative of diverse cultures and viewpoints    Career Timeline   Technical Skills Simulation-CHEMCAD-5.2,Hysis 6.2 Planning- Primavera 6 Engineering-AutoCad-2007, 3D Modeling- Nevisworks 6 Other-MS-OFFICE-2008/2010, MS-POWERPOINT. Project Management- Completed 35 Hrs PMP® Credential Classes. Appling for 2016 PMP® Certification 11 Months 3.4 years 3.5 years 2008 - 2009 Essar Engineering Services Ltd, Mumbai, GET/Ast. Manager 2009 - 2013 JSC KazStroyService, Kazkhstan Process Engineer Since 2013 JSC KazStroyService, Kazakhstan, Project Engineer Analytical Collaborator Communicator Motivator Planner
  • 3.
     Work Experience Since Feb’13 Feb’13– Jan’14 June’09 – Feb’13 Aug’08 – June’09 Projects Executed OGCC JSC KazStroy Service, Kazakhstan Project- EPCC Project- Integrated Four Pump Station on Caspian Pipeline, Capacity of each pump station- 54,000 to 57,860 m3/hr Client- Caspian Pipeline Consortium, Kazakhstan OGCC JSC KazStroy Service, Kazakhstan Project- EPCC Project- Pumping Station NO.8 on Kazakhstan-China pipeline- 68,000 Nm3/hr Client- Kazakhstan-China Pipeline, Kazakhstan OGCC JSC KazStroy Service, Kazakhstan Project- EPCC Project for Complex Gas Treatment Unit- 60,000 Nm3/hr Client- KazakhOil Aktobe- Kazakhstan Entity of “Luk Oil” Russia Essar Engineering Services LTD (Hydrocarbon Division), Mumbai, India Project- Essar Oil Refinery Expansion Project from 10.2 to 20 MMTPA Client- Essar Oil Refinery Key Assignments: ♦ Development & Review of Process Engineering documentation of Gas Treatment Plant Project – Kazakh Oil Aktobe,Kazakhstan; ♦ Engineering Coordination with Engineering Contractor- Exterran USA; ♦ Participation in HAZOP of Complex Gas Treatment Plant design document; ♦ Pre-Commissioning and Commissioning of Gas Treatment Plant; ♦ Value Engineering Activities at Kazhoil Aktobe “Complex Gas Treatment Plant”,PS- 08 Pump Station Project, CPC Pump Station Project in Kazakhstan; ♦ Factory acceptance test of Compressors and pumps at various locations in Kazakhstan, India (such as Areal 4 stage Compressors, AirCom Compressors & Mycom Single stage Compressors); ♦ Factory Acceptance Test of Diesel Generators; ♦ Inspections of Pressure Vessels, LPG Bullets, Drain tanks and Pressure filters ♦ Work on different Process Packages, Gas Analyzers (AMETEK), Water Treatment and Sewage Treatment packages (from stage of request preparation till commissioning support; package cost approx. $ 60 Million) with international manufactures (such as Belleli, Exterran- Broken Arrow (USA), Grudfos, Mitaco, AMETEK, Siemens, Emerson process so on) Role: ♦ Collection of Feed Data, preparation of Process design Basis; ♦ Selection of appropriate equipment and capacity required to suit the process requirement; ♦ Prepare Heat and Mass balance; ♦ Preparation of Process flow diagram and run simulation; ♦ Managing Designing, documenting & sustaining all physical aspects of project by timely generation drawings and BOMs ♦ Managing techno-commercial matters such as enquiry study, vendor selection & finalization, preparation of schedule for development and obtaining first sample & final part approval ♦ Implementing Value Analysis and Value Engineering initiatives to achieve standardization and reduce costs ♦ Leading complete cycle of the project management from stage of requirement gathering(Initiation) till final Handover ♦ Participating in and managing FAT (Factory acceptance test) & SAT (Site acceptance test) activities ♦ Providing support in Root Cause Analysis of quality issues; providing low cost solution to problems ♦ Evaluating possible design solutions to improve cost, quality and performance ♦ Managing productivity issues, scope change and critical conflict areas; initiating corrective action as necessary ♦ Monitoring project HS&E aspects, including adherence to statutory obligations and Title: Expansion of Essar Oil Refinery; Client: Essar Oil Refinery; Value: $650 million; Scope:Process Engineering deliverable, Project Controls & Coordination Title: EPCC Project Construction of Complex Gas Treatment Plant; Client: Luk Oil Overseas- Kazkahstan entity “Kazakh Oil Aktobe”; Value: $310 million; Scope: Process Engineering, Engineering Coordination, Site Execution, Pre- Commissioning and Commissioning Title: EPCC Project-Construction of Pump Station No. 08, Karagandha, Kazakhstan; Client: Kazakhstan-China pipeline Consortium, Kazakhstan Value: $65 Million; Scope: Client Interfacing, Engineering deliverable review, Interdisciplinary Coordination, Project Execution, construction supervision, commissioning and handover 
  • 4.
                                         Trainings Attended Jun’06   PapersPublished / Engineering Project Personal Details internal procedures; ensuring adherence with safety requirements by participated actively in HAZOP meetings conducted by Safety Engineer Significant Achievements: ♦ Excellent track record of independently managing projects of: o Complex Gas Treatment Plant Project(Responsible Process Engineer) o NPS-08 Pump Station Project (Responsible Project Engineer for Process and utility packages) o CPC Pump Station Project (as Project Engineer for complete project) ♦ Created a claim of $50 million due to design and scope changes; ♦ Overcame several challenges, during completion of projects, such as: o Removal of design conflicts related to scope & sharing of technical inputs o Coordination of approx. 15 EPC contractors within time frame with day to day interface track records for different Projects in Kazakhstan o Working in multi-lingual culture Chinese, Russian, English for number of projects in Kazakhstan ♦ Modified existing design of Substation leading to better performance ♦ Saved costs by taking innovative design approaches such as: o Minimized the requirement of explosion proof equipment by implementing process engineering logic without deviating from Engineering standards, especially in pipe rack or remote areas where location of equipment not much matters o Considered the latest technology provider (compact and advance version and cost effective solution) vendor in procurement technical bid with client confidence to make low maintenance, less space long life of equipment. ♦ Controlled costs through accurate forecasting of requirement for manpower, tools & machinery, as per project requirements ♦ Executed projects as per the target set for budgeted cost & timeline through strict follow-up ♦ Worked in close coordination with the Consultant, Client & Main Contractor ♦ Enabled smooth handover of project through tracking of as Built Documents Organization: Solaris Chemtech Ltd(BILT), Karwar, Karnataka, India Scope: Training in Process equipment design requirement and operation of Caustic Soda Production plant. 1st Prize in All India Paper Presentation “Hybrid Vehicles” in year 2006 Engineering Project- Recycling Of Waste Engine Oil by Vacuum Distillation technique Date of Birth: 23rd Aug 1985 Current Address: Koktem#1, Dom#7, Flat#21B, Timryezeva Shashkina, Almaty, Kazakhstan Permanent Address: C/o. Mr. Yatendra Gupta, Moti Mill Compound,G.T Road, Aligarh, Uttar Pradesh, India Languages Known: English and Russian Passport Details: No. Z2257473; Validity: 19/06/2023   Title: Polyethylene Plant, Kazakhstan; Client: Kazakhstan Petrochemical Industries Scope: Bid Support Title: EPCC Project-Construction of Four Pump Stations, Atyrau District, Kazakhstan; Client: Caspian pipeline Consortium, Kazakhstan Value: $650 Million; Scope: Client Interfacing, Engieering deliverable review, Interdisciplinary Coordination, Project Execution, construction supervision, commissioning