EPCM Scope of Work
Chemical Manufacturing Plant
Engineering • Procurement •
Construction Management
What is EPCM?
• EPCM = Engineering, Procurement &
Construction Management
• Owner appoints EPCM consultant as project
manager
• Construction & supply contracts awarded by
Owner
• EPCM manages cost, schedule, quality &
safety
EPCM Project Lifecycle
Project Kickoff Feasibility / DPR Basic Engineering
Detailed Engineering Procurement
Construction
Management
Commissioning &
Handover
Engineering Scope
• Process Engineering (PFD, P&ID, HMB)
• Mechanical & Equipment Engineering
• Piping & Plant Layout
• Civil & Structural Engineering
• Electrical, Instrumentation & Control
• HSE & Statutory Compliance
Process Engineering Flow
Design Basis Process Simulations PFD Development
Heat & Material
Balance
P&ID Development HAZOP Study
Procurement Scope
• Procurement strategy & long-lead items
• RFQ preparation & vendor pre-qualification
• Technical bid evaluation (TBE)
• Vendor drawing & document review
• Inspection, expediting & logistics support
Procurement Flow
Identify Long Lead
Items
Prepare RFQ Technical Evaluation
Commercial
Evaluation (Owner)
Purchase Order
Manufacturing &
Inspection
Delivery to Site
Construction Management Scope
• Construction planning & scheduling
• Contractor coordination
• Site supervision & quality control
• HSE management at site
• Progress monitoring & reporting
Construction Management Flow
Contractor
Mobilization
Civil Construction Mechanical Erection
Piping Installation
Electrical &
Instrumentation
Mechanical
Completion
Commissioning & Start-up
• Pre-commissioning checks
• Loop checking & calibration
• Dry & wet commissioning
• Performance guarantee testing
• Training & final handover
Key EPCM Deliverables
• Engineering drawings & specifications
• Approved vendor documents
• Construction schedules & reports
• As-built drawings & data books
• Commissioning & handover documents
End of Presentation
EPCM – Chemical Manufacturing
Plant

EPCM PowerPoint presentations Scope.pptx

  • 1.
    EPCM Scope ofWork Chemical Manufacturing Plant Engineering • Procurement • Construction Management
  • 2.
    What is EPCM? •EPCM = Engineering, Procurement & Construction Management • Owner appoints EPCM consultant as project manager • Construction & supply contracts awarded by Owner • EPCM manages cost, schedule, quality & safety
  • 3.
    EPCM Project Lifecycle ProjectKickoff Feasibility / DPR Basic Engineering Detailed Engineering Procurement Construction Management Commissioning & Handover
  • 4.
    Engineering Scope • ProcessEngineering (PFD, P&ID, HMB) • Mechanical & Equipment Engineering • Piping & Plant Layout • Civil & Structural Engineering • Electrical, Instrumentation & Control • HSE & Statutory Compliance
  • 5.
    Process Engineering Flow DesignBasis Process Simulations PFD Development Heat & Material Balance P&ID Development HAZOP Study
  • 6.
    Procurement Scope • Procurementstrategy & long-lead items • RFQ preparation & vendor pre-qualification • Technical bid evaluation (TBE) • Vendor drawing & document review • Inspection, expediting & logistics support
  • 7.
    Procurement Flow Identify LongLead Items Prepare RFQ Technical Evaluation Commercial Evaluation (Owner) Purchase Order Manufacturing & Inspection Delivery to Site
  • 8.
    Construction Management Scope •Construction planning & scheduling • Contractor coordination • Site supervision & quality control • HSE management at site • Progress monitoring & reporting
  • 9.
    Construction Management Flow Contractor Mobilization CivilConstruction Mechanical Erection Piping Installation Electrical & Instrumentation Mechanical Completion
  • 10.
    Commissioning & Start-up •Pre-commissioning checks • Loop checking & calibration • Dry & wet commissioning • Performance guarantee testing • Training & final handover
  • 11.
    Key EPCM Deliverables •Engineering drawings & specifications • Approved vendor documents • Construction schedules & reports • As-built drawings & data books • Commissioning & handover documents
  • 12.
    End of Presentation EPCM– Chemical Manufacturing Plant