Many structures exist on the 47.8 acre complex and are planned to remain. The master plan will look at strategic planning, including land use & development planning for the best use and integration within the surrounding area.
Massey Complex Master Plan Briefing Oct. 2017Fairfax County
The Massey Building, Massey Annex, and adjacent small house are scheduled for demolition. A new master planning effort will include assessment of priority county uses for the site, including future criminal justice, public safety and human services’ needs, as well as City of Fairfax and George Mason University interest in the site.
Fairfax County Judicial (Massey) Complex Master Plan 12/10/20Fairfax County
Many structures exist on the 47.8 acre complex and are planned to remain. The master plan looked at strategic land use and development planning for the best use and integration within the surrounding area.
Franconia Gov. Center and Kingstowne Reg. Library Land Use Meeting Sept 21, 2020Fairfax County
This project will locate in one facility: Franconia Police Station, District Supervisor's Office, Kingstowne Regional Library, Active Adult Center and a child care center.
Reston Town Center North Community Update May 31, 2017Fairfax County
On May 31, 2017, at the Lake Anne Elementary School, Hunter Mill District Supervisor Cathy Hudgins hosted a community meeting to provide an update on the Reston Town Center North Development Project. For more information on this project, visit www.fairfaxcounty.gov/dpwes/restontowncenternorth
Massey Complex Master Plan Briefing Oct. 2017Fairfax County
The Massey Building, Massey Annex, and adjacent small house are scheduled for demolition. A new master planning effort will include assessment of priority county uses for the site, including future criminal justice, public safety and human services’ needs, as well as City of Fairfax and George Mason University interest in the site.
Fairfax County Judicial (Massey) Complex Master Plan 12/10/20Fairfax County
Many structures exist on the 47.8 acre complex and are planned to remain. The master plan looked at strategic land use and development planning for the best use and integration within the surrounding area.
Franconia Gov. Center and Kingstowne Reg. Library Land Use Meeting Sept 21, 2020Fairfax County
This project will locate in one facility: Franconia Police Station, District Supervisor's Office, Kingstowne Regional Library, Active Adult Center and a child care center.
Reston Town Center North Community Update May 31, 2017Fairfax County
On May 31, 2017, at the Lake Anne Elementary School, Hunter Mill District Supervisor Cathy Hudgins hosted a community meeting to provide an update on the Reston Town Center North Development Project. For more information on this project, visit www.fairfaxcounty.gov/dpwes/restontowncenternorth
Chichester Lane at Lismore Lane Walkway extended a five-foot wide concrete walkway 91 linear feet. The improvements include construction of sidewalk, adjusting an existing sanitary manhole to grade, and applying topsoil, seed and matting to disturbed areas.
In this presentation you'll get a preview of the public-private funding strategies for RiverFirst. Included are demographic maps of the RiverFirst area, key themes for implementation, findings about perception and approach to implementation, and broad Priority Project funding projections.
Donjek Inc. of St. Paul, Minnesota, completed the Finance Strategy research and analysis and prepared these Initial Findings.
Executive Summary: Schematic Design, Finance Strategy and Next StepsRiverFirst Initiative
Where are we going and how are we going to pay for it? These questions are tackled - in summary - in the following document. This executive summary is the companion to two additional presentations made by the RiverFirst team. Check out the schematic design and funding strategy presentations uploaded May 2 for more detail.
Slideshow: RiverFirst Design and Implementation Plan (presented Sept 2011)RiverFirst Initiative
RiverFirst riverfront parks development proposal implementation plan slideshow, presented by HRA finance consultants and TLS/KVA, September 2011 in Minneapolis.
Congress Parkway Construction Overview, January 2010Daniel X. O'Neil
Congress Parkway improvement project
Michigan Avenue to Wells Street.
Includes history, background, project goals & scope, as well as schedule and public outreach tactics
Project posters describing some of the projects completed under the MAPC's Sustainable Communities Regional Planning Grant. The posters were displayed at the final meeting of the Sustainable Communities Consortium on May 21, 2014, Boston, Massachusetts.
Chichester Lane at Lismore Lane Walkway extended a five-foot wide concrete walkway 91 linear feet. The improvements include construction of sidewalk, adjusting an existing sanitary manhole to grade, and applying topsoil, seed and matting to disturbed areas.
In this presentation you'll get a preview of the public-private funding strategies for RiverFirst. Included are demographic maps of the RiverFirst area, key themes for implementation, findings about perception and approach to implementation, and broad Priority Project funding projections.
Donjek Inc. of St. Paul, Minnesota, completed the Finance Strategy research and analysis and prepared these Initial Findings.
Executive Summary: Schematic Design, Finance Strategy and Next StepsRiverFirst Initiative
Where are we going and how are we going to pay for it? These questions are tackled - in summary - in the following document. This executive summary is the companion to two additional presentations made by the RiverFirst team. Check out the schematic design and funding strategy presentations uploaded May 2 for more detail.
Slideshow: RiverFirst Design and Implementation Plan (presented Sept 2011)RiverFirst Initiative
RiverFirst riverfront parks development proposal implementation plan slideshow, presented by HRA finance consultants and TLS/KVA, September 2011 in Minneapolis.
Congress Parkway Construction Overview, January 2010Daniel X. O'Neil
Congress Parkway improvement project
Michigan Avenue to Wells Street.
Includes history, background, project goals & scope, as well as schedule and public outreach tactics
Project posters describing some of the projects completed under the MAPC's Sustainable Communities Regional Planning Grant. The posters were displayed at the final meeting of the Sustainable Communities Consortium on May 21, 2014, Boston, Massachusetts.
This slideshow was presented the Broadview Heights City Council on May 24, 2021. For more information, please visit https://www.countyplanning.us/projects/broadview-heights-master-plan/
Land Use Planning PUP 301 Introduction to Urban PlanningD.docxsmile790243
Land Use Planning
PUP 301: Introduction to Urban Planning
Dr. Joochul Kim,
Dr. Lauren Allsopp
Larry Kirch, AICP
Director of Development Services
City of Apache Junction
October 26, 2016
Today’s Overview
•Introduction - Previous involvement in Land Use
Plans
•Levy Chapter 8 – The Comprehensive Plan
• Levy Chapter 9 – Implementation Tools
•Comprehensive Planning Frameworks
•The Ideal Plan: Sustainable, Resiliency, Aging
Communities, Planning and Health
Introduction - Previous Land
Use/Comprehensive/General Plans
Experience
• Treasure Coast Regional Planning Commission, Stuart, FL – Regional Planner
• Regional Policy Plan
• Osceola County, Florida, Kissimmee, FL – Planner II
• Intergovernmental Coordination Element
• Recreation and Open Space Element
• Lake County, Florida, Tavares, FL – Director of Comprehensive Planning
• Comprehensive Plan Coordinator – County and 9 client cities
• City of La Crosse, WI – Director of Planning and Development
• Confluence, The La Crosse Comprehensive Plan
Levy Chapter 8 - The Comprehensive Plan
• 8 Elements
• Health,
• Public Safety,
• Circulation,
• Provision of Services and Facilities,
• Fiscal Health,
• Economic goals,
• Environmental Protection,
• Redistributive goals
• Process
1. Research,
2. Community goals and objectives,
3. Plan formulation,
4. Plan implementation,
5. Review and revision
Levy Chapter 8 – The Comprehensive Plan
Levy Chapter 9 – The Tools of Land Use Planning
1. Research – Data Collection - (US Census, Economic Census), Inventories, Analysis,
Synthesize into a report – GIS
2. Goals and Objectives – aspirations, community visioning, surveys, committee(s), public
meetings, hearings, interactive sites, charrettes
3. Plan Formulation – Scenarios (no growth, rapid growth, infill and redevelopment,
FLUM, other maps)
4. Plan Implementation (Levy Chapter 9 – zoning ordinance, city budget, capital
improvements budget, subdivision regulations, design review, heritage preservation
ordinances, State and Federal regs (wetlands, EIS)
5. Review and Revision Annual report to Council, 5-year evaluation reports, update every
10 years – best to follow US Decennial Census
6. Follow on Plans – (aka “A Plan to Plan”) Small Area Plans, Corridor Plans, Downtown
Plans, Waterfront Plans, Neighborhood Plans, Annexation and Growth Area Plans
7. Amendments during 10 years - process
Comprehensive Plan Frameworks - Oregon, Hawaii
Florida Growth Management Act – 1980s
• State Comprehensive Plan – Adopted in State Statute (25 Elements)
• Comprehensive Regional Policy Plans ( a la Treasure Coast RPC – 25
Elements)
• Education, Children, Families, The Elderly, Housing, Health, Public Safety, Water
Resources, Coastal and Marine Resources, Natural Systems and Recreational Lands,
Air Quality, Energy, Hazardous and Nonhazardous Materials and Waste, Mining,
Property Rights, Land Use, Public Facilities, Cultural and Historical Resources,
Trans ...
Merrifield Nursery Emergency Gravity Sewer ReplacementFairfax County
During a routine Closed-Circuit Television (CCTV) Camera inspection by Wastewater Collection Division (WCD), it was found that 45 linear feet of 8-inch asbestos reinforced concrete pipe (RCP) between MH-292 to MH-291 was within imminent danger of failing. The bottom of the RCP was missing within the 45 linear feet of repair and the pipe was on the verge of surcharging. After an immediate pre-construction meeting with Merrifield Nursery, it was agreed to work from 6pm-10am everyday of the week to avoid disruption and potentially placing patrons at risk during the biggest time of the year for Merrifield Garden Center. The contractor mobilized to the site and began the 20-foot excavation to replace 45 linear feet of broken gravity sewer. The project started on March 14th, 2022 and was substantially complete on March 23, 2022.
The Sully Basins Stormwater Pond Retrofits project was substantially completed on April 19, 2022. The project is located within the Cub Run watershed. The project consisted of repair and enhancement of multiple stormwater basins, 0326DP, 0964DP and 1484DP. The project also included construction of new stone cascades, stone weir basin structures and the construction of wetlands with high and low marsh areas. The project will facilitate improved sediment removal and improve downstream water quality using forebays and micro pools. Aquatic and natural habitat were also added within the three basins.
Clarks Crossing Road Improvements 05-13-22Fairfax County
The Clarks Crossing Road Pedestrian Access Improvement project improved the pedestrian and bicycle access along Clarks Crossing Road and was substantially completed on March 23, 2022.
This project completed the missing link between the existing sidewalk at Brookside Lane and the previously constructed sidewalk along Clarks Crossing Road. The scope of this project included construction of asphalt sidewalk, curb ramps, curb and gutter, drainage improvements along Brookside Lane and asphalt mill/overlay on Clarks Crossing and Brookside Lane.
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxFairfax County
Future wastewater flows in northern Fairfax County exceed existing system capacity
Treatment capacity is available in Noman M. Cole Jr. Pollution Control Plant in Lorton, VA
New pipes and pumps are needed to move future flows to treatment plant
NEXT STEPS
Field investigations / surveys
Finalize alignments and pump station layout
Use of open cut excavation
Use of trenchless methods
Easement acquisition needed
Develop traffic control plans
Description:
The project consists of a new, 23,000 square feet, two-story, four-bay fire station facility and associated improvements to the 3.3-acre site including storm water detention, landscaping and parking. The scope also included the demolition of the existing fire station, and a temporary fire station to house the Fire and Rescue Department during construction of the new facility. The key elements of the overall project include:
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationFairfax County
Scotts Run @ Old Meadow Road Stream Restoration was substantially completed on March 30, 2022. The Scotts Run project consisted of restoring, enhancement, and stabilizing of approximately 2,930 linear feet of eroding stream using Natural Channel Design criteria. This project included two phases: Phase I was funded by proffers from a private development and Phase II was County funded. Also included was the removal of invasive non-native plants and the installation of new plantings to stabilize the stream and floodplain.
Riverwood Community Meeting - 04-14-2022- Presentation.pptxFairfax County
The new 4-inch ductile iron force main will serve the surrounding community for the foreseeable future. Replacement of the force main will:
Reduce the level and frequency of maintenance required to keep the force main operating.
Prevent costly emergency repairs.
Provide residents with safe, reliable utility infrastructure.
Enhance the quality of life for residents.
Reduce risks to public health and the environment.
Burke Centre VRE Connector Phase IV project was substantially completed on March 7, 2022. This project enhanced the access to mass transit by creating a more direct connection from the VRE Station to the residential areas west of Premier Court. This project also connects the Oak Bluff community to the Virginia Rail Express (VRE) Burke Station and provides a multi-use shared pedestrian and bicycle trail for outdoor recreation.
Long Branch Public Meeting - FINAL - 04-11-2022Fairfax County
Overarching Project Goals:
-Achieve Long Branch Central TMDL waste load reduction requirements.
-Provide long-term stability and have low maintenance.
-Improve water quality within the Long Branch Central Watershed.
-Improve habitat and environmental health (ecological lift).
Objectives: Share our project understanding with the council and seek input on the unique opportunities and housing goals for this site that could help guide
our master planning process.
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptxFairfax County
4,800 linear feet of stream will be restored using Natural Channel Design methodologies
Pollutant reduction
1,439 lbs/total phosphorus
3,400 lbs/total nitrogen
462.1 tons of total suspended sediment
Protection of private property and public infrastructure
Increased ecological diversity with native vegetation
DEQ has awarded a SLAF grant to this project for these environmental benefits
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT Fairfax County
The Lake Barton Dredging, Restoration, and Riser Modification project was substantially completed on December 29, 2021. The project is located within the Pohick Creek watershed. The project consisted of dredging and removal of approximately 19,100 cubic yards of sediment to restore the sediment trapping capacity and improve water quality. The project also included construction of new sediment forebays, in-lake haul roads, and riser modifications (new mid-level sluice gate and cold-water intake) to facilitate future maintenance, stabilize the shoreline, and improve downstream water quality. Fish habitat was also added within the lake.
Reston Arts Community Center Feasibility - Wrap UpFairfax County
This is the last of 5 engagement meetings. We are excited to report back what we heard from you – your preferences, priorities, questions, hopes, concerns. The information we received will be used to inform the space allocations and cost estimating for discussion of the proffer by Fairfax County.
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Fairfax County
Benefits of Consolidated Facility
Building and Site Efficiencies
Operational Efficiencies
Addresses Space Deficiencies
Addresses Renovations and Capital Renewal Requirements
for WCD
Provides for a Centrally Located Site that Accommodates Program
Consolidates Integrated Services on One Centrally Located Site
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Fairfax County
This is the 4th of 5 engagement meetings. We are excited to hear from you – your preferences, priorities, questions, hopes, concerns. The information we receive today will be used to inform the space allocations and cost estimating for discussion of the proffer by Fairfax County.
Oak Marr Pump Station Rehabilitation – Construction ProjectFairfax County
Neighborhood was built in the 1980s, and the sewer infrastructure has been in operation since.
Aged pump station equipment – pumps, valves, fans, concrete, etc.
This aging equipment has the potential of causing:
Sanitary Sewer Overflows (SSO)
Sewer back-ups into homes
Environmental damages
Maintenance problems
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Fairfax County
Identify and evaluate house flooding and public safety concerns
Improve drainage conditions to convey 100-year storm if feasible
Reduce and treat stormwater runoff at the source
Improve water quality and stream protection
Use resilient & functional designs
Make improvements compatible with characteristics of neighborhood
Partner with community to develop sound, cost effective solutions that can be collaboratively implemented and maintained
Build on lessons learned to help improve site development process for infill development
Reston Arts Center Feasibility - Focus Group Visual ArtsFairfax County
These community outreach meetings are being conducted to understand community needs for a proposed arts venue in the Reston Town Center.
The proposed arts center would be a result of a proffer from Boston Properties in the next phase of Reston Town Center development (Block J).
The proffer would provide for an approximately 60,000 gross square foot facility to house a stage suitable for large-scale music and dance performances, as well as other arts-related amenities.
Presentation by Jared Jageler, David Adler, Noelia Duchovny, and Evan Herrnstadt, analysts in CBO’s Microeconomic Studies and Health Analysis Divisions, at the Association of Environmental and Resource Economists Summer Conference.
Jennifer Schaus and Associates hosts a complimentary webinar series on The FAR in 2024. Join the webinars on Wednesdays and Fridays at noon, eastern.
Recordings are on YouTube and the company website.
https://www.youtube.com/@jenniferschaus/videos
Jennifer Schaus and Associates hosts a complimentary webinar series on The FAR in 2024. Join the webinars on Wednesdays and Fridays at noon, eastern.
Recordings are on YouTube and the company website.
https://www.youtube.com/@jenniferschaus/videos
Understanding the Challenges of Street ChildrenSERUDS INDIA
By raising awareness, providing support, advocating for change, and offering assistance to children in need, individuals can play a crucial role in improving the lives of street children and helping them realize their full potential
Donate Us
https://serudsindia.org/how-individuals-can-support-street-children-in-india/
#donatefororphan, #donateforhomelesschildren, #childeducation, #ngochildeducation, #donateforeducation, #donationforchildeducation, #sponsorforpoorchild, #sponsororphanage #sponsororphanchild, #donation, #education, #charity, #educationforchild, #seruds, #kurnool, #joyhome
Russian anarchist and anti-war movement in the third year of full-scale warAntti Rautiainen
Anarchist group ANA Regensburg hosted my online-presentation on 16th of May 2024, in which I discussed tactics of anti-war activism in Russia, and reasons why the anti-war movement has not been able to make an impact to change the course of events yet. Cases of anarchists repressed for anti-war activities are presented, as well as strategies of support for political prisoners, and modest successes in supporting their struggles.
Thumbnail picture is by MediaZona, you may read their report on anti-war arson attacks in Russia here: https://en.zona.media/article/2022/10/13/burn-map
Links:
Autonomous Action
http://Avtonom.org
Anarchist Black Cross Moscow
http://Avtonom.org/abc
Solidarity Zone
https://t.me/solidarity_zone
Memorial
https://memopzk.org/, https://t.me/pzk_memorial
OVD-Info
https://en.ovdinfo.org/antiwar-ovd-info-guide
RosUznik
https://rosuznik.org/
Uznik Online
http://uznikonline.tilda.ws/
Russian Reader
https://therussianreader.com/
ABC Irkutsk
https://abc38.noblogs.org/
Send mail to prisoners from abroad:
http://Prisonmail.online
YouTube: https://youtu.be/c5nSOdU48O8
Spotify: https://podcasters.spotify.com/pod/show/libertarianlifecoach/episodes/Russian-anarchist-and-anti-war-movement-in-the-third-year-of-full-scale-war-e2k8ai4
What is the point of small housing associations.pptxPaul Smith
Given the small scale of housing associations and their relative high cost per home what is the point of them and how do we justify their continued existance
1. A Fairfax County, VA, publication
Department of Public Works and Environmental Services
Working for You!
Massey Complex Master Plan Briefing
What is happening at the Massey Complex
January 10, 2019 DPWES Capital Facilities Building Design & Construction
2. DPWES Capital Facilities Building Design & Construction
Massey Complex Briefing
Site Map – Assigned to Providence District
2
3. Massey Complex Briefing
DPWES Capital Facilities Building Design & Construction
Scope and Framework
The Master Plan Framework and Scope of Work will include:
– Coordination with the surrounding community including the City and GMU
– Site Infrastructure Analysis
– Integration of the historic structures into a vibrant urban community
– A coordinated long-term plan to meet the needs for multiple stakeholders
– Will provide the County an opportunity to synthesize and effectively facilitate a
discussion of trade-offs, challenges, and opportunities
– Possible Public Private Development Opportunities
– A budget roadmap for future funding
3
Many structures exist on the 47.8 acre
complex and are planned to remain. The
master plan will look at strategic planning,
including land use & development planning
for the best use and integration within the
surrounding area.
5. Massey Complex Briefing
DPWES Capital Facilities Building Design & Construction
Master Plan Priorities
5
The Land Use Redevelopment Team* has identified four priorities for the Massey
Complex Master Plan:
• Sustain a judicial complex that is safe and secure for visitors and
employees.
• Create a welcoming and accessible complex, designed to efficiently facilitate
access and interaction with county-wide judicial and public safety functions
that is compatible with the surrounding community and its context.
• Respect the integrity of on-site historic resources and enhance the public’s
experience of these assets.
• Identify opportunities for public private partnerships to create
complementary secondary uses through strategic planning and site design.
*Land Use Redevelopment Team: Bruce White, Chief Judge; Bob Blakley, Major, Police; Jason Houtz, Juvenile Detention
Services; Beth Teare, County Attorney’s Office; Gerarda Culipher, Chief Deputy, Clerk of Circuit Court; Denise James,
Planning Division, DPZ; Laura Arseneau, Cultural Resources, DPZ; John King, Transportation Planner, DOT; Mark Sites,
Lt Col, Office of the Sheriff; Brooke Hardin, City of Fairfax
6. Massey Complex Briefing
DPWES Capital Facilities Building Design & Construction
Tasks Completed & Next Steps
6
• Phase I – Develop Master Plan Mission Statement / Goals
• Held first stakeholder work session on October 4th – attended by over 50
on site stakeholders
• Phase II – Developing the Master Plan Vision
• Macro Program Analysis
• Historic Analysis including a Historic Resource Survey
• Mobility Analysis
• Urban Design Analysis
• Market Study
• Zoning Study
• Stakeholder Work Session
• Public / Community Work Session – February 28, 2019
7. Massey Complex Briefing
DPWES Capital Facilities Building Design & Construction
Additional Information
• Project web page:
– https://www.fairfaxcounty.gov/publicworks/capital-
projects/massey-complex-master-plan-project
• Massey Complex Master Planning: