This project will locate in one facility: Franconia Police Station, District Supervisor's Office, Kingstowne Regional Library, Active Adult Center and a child care center.
Application under Sects. 15.2-2204 and 15.2-2232 of the Code of Virginia to consider the proposal by the Department of Public Works and Environmental Services, Capital Facilities, Building Design Branch, to develop a new community center located at 9518 Richmond Highway. Tax Map: 107-4 ((1)) 34 and 107-4 ((5)) 4. Area IV.
Fairfax County Judicial (Massey) Complex Master Plan 12/10/20Fairfax County
Many structures exist on the 47.8 acre complex and are planned to remain. The master plan looked at strategic land use and development planning for the best use and integration within the surrounding area.
Lorton Community Center and Library Steering Committee Meeting, Dec. 9, 2021Fairfax County
Community Center & Library
Phase 1a Construction - Complete
Phase 1b Construction - Substantial Completion - Late Spring 2022
Phase 2 Construction - Late Summer 2022
Application under Sects. 15.2-2204 and 15.2-2232 of the Code of Virginia to consider the proposal by the Department of Public Works and Environmental Services, Capital Facilities, Building Design Branch, to develop a new community center located at 9518 Richmond Highway. Tax Map: 107-4 ((1)) 34 and 107-4 ((5)) 4. Area IV.
Fairfax County Judicial (Massey) Complex Master Plan 12/10/20Fairfax County
Many structures exist on the 47.8 acre complex and are planned to remain. The master plan looked at strategic land use and development planning for the best use and integration within the surrounding area.
Lorton Community Center and Library Steering Committee Meeting, Dec. 9, 2021Fairfax County
Community Center & Library
Phase 1a Construction - Complete
Phase 1b Construction - Substantial Completion - Late Spring 2022
Phase 2 Construction - Late Summer 2022
9th Lorton Community Center Steering Committee Meeting 2-11-2019Fairfax County
Design Development complete. – 35%
Value Engineering - Complete
Start of Construction Document Phase (~40% Complete)
Zoning – Special Exception and 2232 Submitted in October 2018
Massey Complex Briefing - ARB Jan. 10, 2019Fairfax County
Many structures exist on the 47.8 acre complex and are planned to remain. The master plan will look at strategic planning, including land use & development planning for the best use and integration within the surrounding area.
The project consists of a new 18,000 square feet, two-story, five-bay fire station facility and associated improvements to the 1.2-acre site including storm water detention, landscaping and parking. The scope also included the demolition of the existing fire station, and a temporary fire station to house the Fire and Rescue Department during construction of the new facility. The key elements of the overall project include:
Apparatus Bays, Control Room, and Offices
Kitchen, Dayroom, and Dining Room
Bunk Rooms
Showers and Locker Rooms
Exercise room
Ready Gear Room
Landscaping, and Site Lighting
Massey Complex Master Plan Briefing Oct. 2017Fairfax County
The Massey Building, Massey Annex, and adjacent small house are scheduled for demolition. A new master planning effort will include assessment of priority county uses for the site, including future criminal justice, public safety and human services’ needs, as well as City of Fairfax and George Mason University interest in the site.
The Oakton Community Park Phase 2A project consisted of a new reinforced concrete roundabout, concrete and asphalt sidewalks, curb ramps, concrete medians, and curb and gutter. The scope of work also included storm drainage, site improvements, asphalt restoration, pavement markings and other associated work.
North Beauregard Street at North Chambliss Street Spot ImprovementFairfax County
North Beauregard Street at North Chambliss Street Spot Improvement project was substantially completed on October 10, 2021. The scope of this project was the construction of pedestrian access spot improvement at the intersection of North Beauregard Street and North Chambliss Street. The improvement consists of modifying the existing island at North Beauregard Street to reduce the pedestrian crossing distance and install pedestrian flashing beacon. The project also includes the Landmark’s shopping Plaza access improvements.
9th Lorton Community Center Steering Committee Meeting 2-11-2019Fairfax County
Design Development complete. – 35%
Value Engineering - Complete
Start of Construction Document Phase (~40% Complete)
Zoning – Special Exception and 2232 Submitted in October 2018
Massey Complex Briefing - ARB Jan. 10, 2019Fairfax County
Many structures exist on the 47.8 acre complex and are planned to remain. The master plan will look at strategic planning, including land use & development planning for the best use and integration within the surrounding area.
The project consists of a new 18,000 square feet, two-story, five-bay fire station facility and associated improvements to the 1.2-acre site including storm water detention, landscaping and parking. The scope also included the demolition of the existing fire station, and a temporary fire station to house the Fire and Rescue Department during construction of the new facility. The key elements of the overall project include:
Apparatus Bays, Control Room, and Offices
Kitchen, Dayroom, and Dining Room
Bunk Rooms
Showers and Locker Rooms
Exercise room
Ready Gear Room
Landscaping, and Site Lighting
Massey Complex Master Plan Briefing Oct. 2017Fairfax County
The Massey Building, Massey Annex, and adjacent small house are scheduled for demolition. A new master planning effort will include assessment of priority county uses for the site, including future criminal justice, public safety and human services’ needs, as well as City of Fairfax and George Mason University interest in the site.
The Oakton Community Park Phase 2A project consisted of a new reinforced concrete roundabout, concrete and asphalt sidewalks, curb ramps, concrete medians, and curb and gutter. The scope of work also included storm drainage, site improvements, asphalt restoration, pavement markings and other associated work.
North Beauregard Street at North Chambliss Street Spot ImprovementFairfax County
North Beauregard Street at North Chambliss Street Spot Improvement project was substantially completed on October 10, 2021. The scope of this project was the construction of pedestrian access spot improvement at the intersection of North Beauregard Street and North Chambliss Street. The improvement consists of modifying the existing island at North Beauregard Street to reduce the pedestrian crossing distance and install pedestrian flashing beacon. The project also includes the Landmark’s shopping Plaza access improvements.
information about CORPORATE HOUSING TYPES, Who Uses Corporate Housing, INTELLIGENT BUILDING features, SERVICES & UTILITIES OF CORPORATE HOUSING, case study:Marine Drive, Kochi, THE ROLE OF THE CORPORATE SPACE DESIGN OFFICER , CORPORATE OFFICE POLICY PRINCIPLES etc.
What is Regulation 19? OPDC's draft Local Plan, pre-consultation event.Alexandra Dobson
As the OPDC draft Local Plan moves in to the next phase of planning legislation, we held a presentation evening, ahead of the consultation, to explain what this stage involves.
OPDC second revised draft Local Plan consultation - Design & EnvironmentAlexandra Dobson
OPDC’s second revised draft (Regulation 19) Local Plan was approved for public consultation by the OPDC Board on 12 June 2018.
The public consultation on the second revised draft Local Plan and supporting studies runs from 14 June until midnight on 30 July 2018.
This presentation was from one of OPDC's consultation events during the consultation period to give you the opportunity to speak to OPDC officers and find out more about the amendments to the revised draft Local Plan.
ASCE-OC Sustainability Tour presentation on June 26, 2015, by Dave Webb, P.E., Director of Public Works for the City of Newport Beach on this LEED Gold certified project.
5 Reasons Owners Specify Project-Wide Data Management - Webinar, March 2016Aconex
In this webinar, Chris Bunker of the UK’s Wellcome Trust and Mike Evans of Cambashi Research discussed why owners are increasingly adopting project-wide technology platforms for their projects. We also featured a live demo of Aconex to show how cross-organizational information management can streamline processes from design coordination to approval cycles and handover.
Merrifield Nursery Emergency Gravity Sewer ReplacementFairfax County
During a routine Closed-Circuit Television (CCTV) Camera inspection by Wastewater Collection Division (WCD), it was found that 45 linear feet of 8-inch asbestos reinforced concrete pipe (RCP) between MH-292 to MH-291 was within imminent danger of failing. The bottom of the RCP was missing within the 45 linear feet of repair and the pipe was on the verge of surcharging. After an immediate pre-construction meeting with Merrifield Nursery, it was agreed to work from 6pm-10am everyday of the week to avoid disruption and potentially placing patrons at risk during the biggest time of the year for Merrifield Garden Center. The contractor mobilized to the site and began the 20-foot excavation to replace 45 linear feet of broken gravity sewer. The project started on March 14th, 2022 and was substantially complete on March 23, 2022.
The Sully Basins Stormwater Pond Retrofits project was substantially completed on April 19, 2022. The project is located within the Cub Run watershed. The project consisted of repair and enhancement of multiple stormwater basins, 0326DP, 0964DP and 1484DP. The project also included construction of new stone cascades, stone weir basin structures and the construction of wetlands with high and low marsh areas. The project will facilitate improved sediment removal and improve downstream water quality using forebays and micro pools. Aquatic and natural habitat were also added within the three basins.
Clarks Crossing Road Improvements 05-13-22Fairfax County
The Clarks Crossing Road Pedestrian Access Improvement project improved the pedestrian and bicycle access along Clarks Crossing Road and was substantially completed on March 23, 2022.
This project completed the missing link between the existing sidewalk at Brookside Lane and the previously constructed sidewalk along Clarks Crossing Road. The scope of this project included construction of asphalt sidewalk, curb ramps, curb and gutter, drainage improvements along Brookside Lane and asphalt mill/overlay on Clarks Crossing and Brookside Lane.
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxFairfax County
Future wastewater flows in northern Fairfax County exceed existing system capacity
Treatment capacity is available in Noman M. Cole Jr. Pollution Control Plant in Lorton, VA
New pipes and pumps are needed to move future flows to treatment plant
NEXT STEPS
Field investigations / surveys
Finalize alignments and pump station layout
Use of open cut excavation
Use of trenchless methods
Easement acquisition needed
Develop traffic control plans
Description:
The project consists of a new, 23,000 square feet, two-story, four-bay fire station facility and associated improvements to the 3.3-acre site including storm water detention, landscaping and parking. The scope also included the demolition of the existing fire station, and a temporary fire station to house the Fire and Rescue Department during construction of the new facility. The key elements of the overall project include:
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationFairfax County
Scotts Run @ Old Meadow Road Stream Restoration was substantially completed on March 30, 2022. The Scotts Run project consisted of restoring, enhancement, and stabilizing of approximately 2,930 linear feet of eroding stream using Natural Channel Design criteria. This project included two phases: Phase I was funded by proffers from a private development and Phase II was County funded. Also included was the removal of invasive non-native plants and the installation of new plantings to stabilize the stream and floodplain.
Riverwood Community Meeting - 04-14-2022- Presentation.pptxFairfax County
The new 4-inch ductile iron force main will serve the surrounding community for the foreseeable future. Replacement of the force main will:
Reduce the level and frequency of maintenance required to keep the force main operating.
Prevent costly emergency repairs.
Provide residents with safe, reliable utility infrastructure.
Enhance the quality of life for residents.
Reduce risks to public health and the environment.
Burke Centre VRE Connector Phase IV project was substantially completed on March 7, 2022. This project enhanced the access to mass transit by creating a more direct connection from the VRE Station to the residential areas west of Premier Court. This project also connects the Oak Bluff community to the Virginia Rail Express (VRE) Burke Station and provides a multi-use shared pedestrian and bicycle trail for outdoor recreation.
Long Branch Public Meeting - FINAL - 04-11-2022Fairfax County
Overarching Project Goals:
-Achieve Long Branch Central TMDL waste load reduction requirements.
-Provide long-term stability and have low maintenance.
-Improve water quality within the Long Branch Central Watershed.
-Improve habitat and environmental health (ecological lift).
Objectives: Share our project understanding with the council and seek input on the unique opportunities and housing goals for this site that could help guide
our master planning process.
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptxFairfax County
4,800 linear feet of stream will be restored using Natural Channel Design methodologies
Pollutant reduction
1,439 lbs/total phosphorus
3,400 lbs/total nitrogen
462.1 tons of total suspended sediment
Protection of private property and public infrastructure
Increased ecological diversity with native vegetation
DEQ has awarded a SLAF grant to this project for these environmental benefits
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT Fairfax County
The Lake Barton Dredging, Restoration, and Riser Modification project was substantially completed on December 29, 2021. The project is located within the Pohick Creek watershed. The project consisted of dredging and removal of approximately 19,100 cubic yards of sediment to restore the sediment trapping capacity and improve water quality. The project also included construction of new sediment forebays, in-lake haul roads, and riser modifications (new mid-level sluice gate and cold-water intake) to facilitate future maintenance, stabilize the shoreline, and improve downstream water quality. Fish habitat was also added within the lake.
Reston Arts Community Center Feasibility - Wrap UpFairfax County
This is the last of 5 engagement meetings. We are excited to report back what we heard from you – your preferences, priorities, questions, hopes, concerns. The information we received will be used to inform the space allocations and cost estimating for discussion of the proffer by Fairfax County.
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Fairfax County
Benefits of Consolidated Facility
Building and Site Efficiencies
Operational Efficiencies
Addresses Space Deficiencies
Addresses Renovations and Capital Renewal Requirements
for WCD
Provides for a Centrally Located Site that Accommodates Program
Consolidates Integrated Services on One Centrally Located Site
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Fairfax County
This is the 4th of 5 engagement meetings. We are excited to hear from you – your preferences, priorities, questions, hopes, concerns. The information we receive today will be used to inform the space allocations and cost estimating for discussion of the proffer by Fairfax County.
Oak Marr Pump Station Rehabilitation – Construction ProjectFairfax County
Neighborhood was built in the 1980s, and the sewer infrastructure has been in operation since.
Aged pump station equipment – pumps, valves, fans, concrete, etc.
This aging equipment has the potential of causing:
Sanitary Sewer Overflows (SSO)
Sewer back-ups into homes
Environmental damages
Maintenance problems
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Fairfax County
Identify and evaluate house flooding and public safety concerns
Improve drainage conditions to convey 100-year storm if feasible
Reduce and treat stormwater runoff at the source
Improve water quality and stream protection
Use resilient & functional designs
Make improvements compatible with characteristics of neighborhood
Partner with community to develop sound, cost effective solutions that can be collaboratively implemented and maintained
Build on lessons learned to help improve site development process for infill development
Reston Arts Center Feasibility - Focus Group Visual ArtsFairfax County
These community outreach meetings are being conducted to understand community needs for a proposed arts venue in the Reston Town Center.
The proposed arts center would be a result of a proffer from Boston Properties in the next phase of Reston Town Center development (Block J).
The proffer would provide for an approximately 60,000 gross square foot facility to house a stage suitable for large-scale music and dance performances, as well as other arts-related amenities.
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSEDuvanRamosGarzon1
AIRCRAFT GENERAL
The Single Aisle is the most advanced family aircraft in service today, with fly-by-wire flight controls.
The A318, A319, A320 and A321 are twin-engine subsonic medium range aircraft.
The family offers a choice of engines
Saudi Arabia stands as a titan in the global energy landscape, renowned for its abundant oil and gas resources. It's the largest exporter of petroleum and holds some of the world's most significant reserves. Let's delve into the top 10 oil and gas projects shaping Saudi Arabia's energy future in 2024.
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...Amil Baba Dawood bangali
Contact with Dawood Bhai Just call on +92322-6382012 and we'll help you. We'll solve all your problems within 12 to 24 hours and with 101% guarantee and with astrology systematic. If you want to take any personal or professional advice then also you can call us on +92322-6382012 , ONLINE LOVE PROBLEM & Other all types of Daily Life Problem's.Then CALL or WHATSAPP us on +92322-6382012 and Get all these problems solutions here by Amil Baba DAWOOD BANGALI
#vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore#blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #blackmagicforlove #blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #Amilbabainuk #amilbabainspain #amilbabaindubai #Amilbabainnorway #amilbabainkrachi #amilbabainlahore #amilbabaingujranwalan #amilbabainislamabad
Vaccine management system project report documentation..pdfKamal Acharya
The Division of Vaccine and Immunization is facing increasing difficulty monitoring vaccines and other commodities distribution once they have been distributed from the national stores. With the introduction of new vaccines, more challenges have been anticipated with this additions posing serious threat to the already over strained vaccine supply chain system in Kenya.
Student information management system project report ii.pdfKamal Acharya
Our project explains about the student management. This project mainly explains the various actions related to student details. This project shows some ease in adding, editing and deleting the student details. It also provides a less time consuming process for viewing, adding, editing and deleting the marks of the students.
Quality defects in TMT Bars, Possible causes and Potential Solutions.PrashantGoswami42
Maintaining high-quality standards in the production of TMT bars is crucial for ensuring structural integrity in construction. Addressing common defects through careful monitoring, standardized processes, and advanced technology can significantly improve the quality of TMT bars. Continuous training and adherence to quality control measures will also play a pivotal role in minimizing these defects.
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxR&R Consult
CFD analysis is incredibly effective at solving mysteries and improving the performance of complex systems!
Here's a great example: At a large natural gas-fired power plant, where they use waste heat to generate steam and energy, they were puzzled that their boiler wasn't producing as much steam as expected.
R&R and Tetra Engineering Group Inc. were asked to solve the issue with reduced steam production.
An inspection had shown that a significant amount of hot flue gas was bypassing the boiler tubes, where the heat was supposed to be transferred.
R&R Consult conducted a CFD analysis, which revealed that 6.3% of the flue gas was bypassing the boiler tubes without transferring heat. The analysis also showed that the flue gas was instead being directed along the sides of the boiler and between the modules that were supposed to capture the heat. This was the cause of the reduced performance.
Based on our results, Tetra Engineering installed covering plates to reduce the bypass flow. This improved the boiler's performance and increased electricity production.
It is always satisfying when we can help solve complex challenges like this. Do your systems also need a check-up or optimization? Give us a call!
Work done in cooperation with James Malloy and David Moelling from Tetra Engineering.
More examples of our work https://www.r-r-consult.dk/en/cases-en/
Automobile Management System Project Report.pdfKamal Acharya
The proposed project is developed to manage the automobile in the automobile dealer company. The main module in this project is login, automobile management, customer management, sales, complaints and reports. The first module is the login. The automobile showroom owner should login to the project for usage. The username and password are verified and if it is correct, next form opens. If the username and password are not correct, it shows the error message.
When a customer search for a automobile, if the automobile is available, they will be taken to a page that shows the details of the automobile including automobile name, automobile ID, quantity, price etc. “Automobile Management System” is useful for maintaining automobiles, customers effectively and hence helps for establishing good relation between customer and automobile organization. It contains various customized modules for effectively maintaining automobiles and stock information accurately and safely.
When the automobile is sold to the customer, stock will be reduced automatically. When a new purchase is made, stock will be increased automatically. While selecting automobiles for sale, the proposed software will automatically check for total number of available stock of that particular item, if the total stock of that particular item is less than 5, software will notify the user to purchase the particular item.
Also when the user tries to sale items which are not in stock, the system will prompt the user that the stock is not enough. Customers of this system can search for a automobile; can purchase a automobile easily by selecting fast. On the other hand the stock of automobiles can be maintained perfectly by the automobile shop manager overcoming the drawbacks of existing system.
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfKamal Acharya
The College Bus Management system is completely developed by Visual Basic .NET Version. The application is connect with most secured database language MS SQL Server. The application is develop by using best combination of front-end and back-end languages. The application is totally design like flat user interface. This flat user interface is more attractive user interface in 2017. The application is gives more important to the system functionality. The application is to manage the student’s details, driver’s details, bus details, bus route details, bus fees details and more. The application has only one unit for admin. The admin can manage the entire application. The admin can login into the application by using username and password of the admin. The application is develop for big and small colleges. It is more user friendly for non-computer person. Even they can easily learn how to manage the application within hours. The application is more secure by the admin. The system will give an effective output for the VB.Net and SQL Server given as input to the system. The compiled java program given as input to the system, after scanning the program will generate different reports. The application generates the report for users. The admin can view and download the report of the data. The application deliver the excel format reports. Because, excel formatted reports is very easy to understand the income and expense of the college bus. This application is mainly develop for windows operating system users. In 2017, 73% of people enterprises are using windows operating system. So the application will easily install for all the windows operating system users. The application-developed size is very low. The application consumes very low space in disk. Therefore, the user can allocate very minimum local disk space for this application.
Welcome to WIPAC Monthly the magazine brought to you by the LinkedIn Group Water Industry Process Automation & Control.
In this month's edition, along with this month's industry news to celebrate the 13 years since the group was created we have articles including
A case study of the used of Advanced Process Control at the Wastewater Treatment works at Lleida in Spain
A look back on an article on smart wastewater networks in order to see how the industry has measured up in the interim around the adoption of Digital Transformation in the Water Industry.
Water Industry Process Automation and Control Monthly - May 2024.pdf
Franconia Gov. Center and Kingstowne Reg. Library Land Use Meeting Sept 21, 2020
1. Building Design and Construction
Division
Franconia Governmental Center
Kingstowne Regional Library
Lee District Land Use Committee Presentation
September 21, 2020
A Consolidated Facility to Include:
Lee District Supervisor’s Office
Franconia Police Station
Kingstowne Regional Library
Kingstowne Active Adult Center
Franconia Museum
Community Meeting Space
New Childcare Center
2. Building Design and Construction Division
Community Oriented Mission
2
• Our mission is to strengthen the well-being of individuals and
communities in the Kingstowne area.
• Provide access for people of all ages and abilities to a variety of
county-based resources and services.
• Provide a safe structured environment where everyone can
engage with the community and prosper.
• Convenience by co-location of services for access in a central
location.
• Create spaces to gather in public areas and community rooms.
3. Building Design and Construction Division
Existing Facilities
3
Building: 25,800 sf
Built in 1992 with various upgrades
• Includes Supervisor Office, Police Station
and Franconia Museum
• Building systems have outlived life span
• Layout does not support police operations
Site: 3.25 acres
• Building sits in middle of lot, limited parking
• Fuel island within secure perimeter
Franconia Governmental Center
6121 Franconia Road, Alexandria
Kingstowne Library
6500 Landsdowne Centre, Alexandria
Kingstowne Center for
Active Adults
6488 Landsdowne Centre, Alexandria
• Approx. 15,000 sf in lease space
• One large meeting room
• One conference room
• Approx. 4,000 sf in lease space
4. Building Design and Construction Division
New Site
4
Site Information:
• Bounded by Beulah Street, Silver Lake
Boulevard and Interparcel Road.
• 1.5 miles from existing police station and
library and AAC; Vacant
• Rezoning action required. Parcel 8B is 6.6
acres and has split zoning of PDH-8 and
PMR. Will be rezoned to PDH-8. Parcel 8A
is 0.1 acres and zoned PDH-8.
Benefits of this site:
• Co-location of county services
• Police, supervisor, library and AAC can
stay in place. Eliminates challenges of
occupied facilities during construction
• Maintains high level of safety and security
at current Police Station.
• No expense for temporary facilities.
Parcel 8B
6. Building Design and Construction Division
Proposed Building Design - First Floor
6
Public
Entrance
Police
Entrance
Childcare
10,000 sf
Public
Garage
AAC
8,000 sf
Conf. Rms
& Shared
10,900 sf
Police
13,800 sf
Secure
Garage
BOS
4,200
sf
7. Building Design and Construction Division
Proposed Building Design - Second Floor
7
Library
30,000 sf
Public
Garage
Police
12,900 sf
Secure
Garage
8. Building Design and Construction Division
Who we will be – Regional Library
8
Growing from Community Library to a Regional Library.
• Additional open hours on Wednesday nights,
Thursday mornings, and Sundays.
• Extended Hours to public meeting rooms
• More materials, space and seating for
customers
• Four group study rooms
• Teen zone with gaming station
• Spacious and bright children’s area
9. Building Design and Construction Division
Who we will be – Regional Library Plan
9
10. Building Design and Construction Division
Who we will be – Active Adult Center
10
Active Adult Center:
• Will serve as a safe environment for active
adults to engage with the pleasant
community around them.
• Create an environment that will allow older
adults to promote health and participate in
activities that meet their interests and
capabilities.
• Will have easy access from drop-off area
• Offers outdoor front sitting area.
11. Building Design and Construction Division
Who we will be – Active Adult Center
11
The Active Adult space will be available
for county residents to participate in:
• Fitness and exercise programs.
• Educational programs in 3
classrooms of varying sizes.
• Meal service in bright new dining
room.
• Gatherings in open community
lounge.
• Senior activities in multi-purpose
room.
12. Building Design and Construction Division
Who we will be - Child Care NEW!
12
• The ESRSP brings together families, communities, schools and the
county to build an equitable, coordinated and comprehensive
system that ensures young children in Fairfax County are ready to
be successful in kindergarten and beyond.
• One of the key strategies of ESRSP is to increase the supply, access
and affordability of quality early childhood programs.
Early Childhood Program
• In partnership with the community, schools and county, the Office
for Children coordinates the implementation of the Fairfax County
Equitable School Readiness Strategic Plan (ESRSP)
13. Building Design and Construction Division
Who we will be - Child Care
13
The Kingstowne Early Childhood Program will provide:
Opportunities for multi-
generational activities in
coordination with the
Active Adult center.
Affordable, high quality, full-
time early childhood services
for 78 children ages birth to
five, including children whose
families live with moderate
incomes. Direct Access to outdoor
play areas.
14. Building Design and Construction Division
Who we will be - Franconia P.D. & Lee Distr. Supervisor Off.
14
Police operations and services will remain unchanged.
• The co-location will enhance communication and provide
opportunities for the police and community to interact.
Lee District Supervisor Office operations and services will
remain unchanged.
15. Building Design and Construction Division
Who we will be – Museum & Community Rooms
15
• Three public meeting rooms on 1st
floor, 500 sf or 50 people each.
• Two can be combined into one large
meeting room for 100 people.
• Large screen displays and podiums
• Two additional meeting rooms within
library will be scheduled by the
library
Franconia Museum Community Meeting Rooms
• The Museum in the new
location is centrally located in
the lobby will get great
exposure and visibility.
16. Building Design and Construction Division
Who we will be – Community Rooms & Museum
16
Meeting Room Dividable Meeting
Room
Franconia
Museum
17. Building Design and Construction Division
Who we will be – Structured Parking
17
• 182 parking spaces including
electric vehicle charging
stations.
• Direct interior access to
building.
• 172 spaces for secure police parking
Public Garage Police Garage
18. Building Design and Construction Division
Traffic Study
18
Traffic Study Status:
• Scoping meeting with VDOT and FCDOT
• The study evaluates the following:
• Trip generation
• Intersection operational analysis – AM/PM/Saturday
• Turn lane warrant analysis
• Pedestrian and bicycle infrastructure review
• Finalizing the future conditions analysis
• Preliminary results indicate that future operations with the site will remain
consistent with expected future operations without the site.
19. Building Design and Construction Division
Site Traffic Patterns
19
POLICE TRAFFIC
FUEL TRAFFIC
PUBLIC TRAFFIC
PUBLIC PEDESTRIAN
TRAFFIC
20. Building Design and Construction Division
Stormwater Management
20
• Proposed design provides water quality
enhancement by using four bioretention
facilities and one underground Contech
StormFilter system.
• Existing offsite dry pond located nearby
only provides stormwater quantity
control and provides no water quality
enhancement under current regulations.
Underground Contech
StormFilter system
OFF SITE DRY POND
BIO1
BIO2
BIO3
BIO4
21. Building Design and Construction Division 21
Bioretention Facilities:
Shallow landscaped depression which
incorporates many of the pollutant
removal mechanisms that operate in
forested ecosystems.
Stormwater Management
Contech StormFilters:
Underground stormwater treatment
device that traps particulates and absorbs
pollutants from stormwater runoff such as
suspended solids, hydrocarbons,
nutrients, metals, and other pollutants.
22. Building Design and Construction Division
Natural Landscaping
22
• Native Plants, No
Invasive Species
• Less Turf grass and
Chemical Inputs
• Improve Soils
• Retain Rainwater on
Site
23. Building Design and Construction Division
Sustainability
23
Co-located facility benefits :
• Reduced energy consumption and
operational costs
• Reduced building and site footprint
• Promotes walkability
LEED Gold Certification Goal
• High-efficiency mechanical systems
• Highly efficient building envelope
• Potential vegetative (green) roof system
• Use of recycled and locally-
manufactured products, and no- or
low-VOC products
• Low flow plumbing fixtures
• All LED energy-efficient lighting with
daylighting controls
• Enhanced energy and water use
monitoring
Additional sustainability features:
• Electric vehicle charging stations and
photovoltaic-ready infrastructure
• Inclusion of public outdoor areas including
walking paths, plaza & benches
24. Building Design and Construction Division
Proposed Building Design – Main Entrance
24
25. Building Design and Construction Division 25
Proposed Building Design – Main Entry with Outdoor Area
26. Building Design and Construction Division
Proposed Building Design – Library & Playground
26
27. Building Design and Construction Division
Proposed Building Design – Police from Beulah Street
27
28. Building Design and Construction Division
Project Funding and Schedule
28
Funding:
• FY 2015 Public Safety Bond $23,000,000 for Franconia Police
Station BOS Office and Museum
• Proposed FY 2020 Library Bond $34,000 for Library and
Referendum Active Adult Center construction
Next Steps:
• Fall 2020-Spring 2022: Develop the design, permitting, and
rezoning
• Spring 2022: Bidding process and begin
construction
• Summer 2022 - Fall 2024: Construction
29. Building Design and Construction Division
Proposed Building Design – Aerial View
29
Editor's Notes
Can you please explain what you mean by “turn lane warrant analysis”? This analysis takes the traffic volumes for the site driveways and compares them to VDOT thresholds at which turn lanes or turn lane tapers need to be provided.
Can you please explain what it means to “finalize the future conditions analysis”? As we are still awaiting approval from FCDOT/VDOT on the traffic count methodology, and since the scope was expanded by VDOT to include Saturday analysis, we are able to prepare the preliminary analysis sent previously. These results may change slightly if VDOT or FCDOT have comments on the traffic count methodology. We also need to have full buy-in from them on the Saturday traffic data as this was more complicated than I’m sure they expected when they requested it.
When is the traffic study going to be performed? We are preparing the study currently.
Can you please explain what you mean by “turn lane warrant analysis”? This analysis takes the traffic volumes for the site driveways and compares them to VDOT thresholds at which turn lanes or turn lane tapers need to be provided.
Can you please explain what it means to “finalize the future conditions analysis”? As we are still awaiting approval from FCDOT/VDOT on the traffic count methodology, and since the scope was expanded by VDOT to include Saturday analysis, we are able to prepare the preliminary analysis sent previously. These results may change slightly if VDOT or FCDOT have comments on the traffic count methodology. We also need to have full buy-in from them on the Saturday traffic data as this was more complicated than I’m sure they expected when they requested it.
When is the traffic study going to be performed? We are preparing the study currently.