District of Columbia Public Schools | 1200 First Street, NE | Washington, DC 20002 | T 202.442.4800 | F 202.442.5517 | www.k12.dc.us
Murch ES SIT
March 14, 2016
Agenda
DCPS | OCOO
2
 Murch Building Project
 Review of Comments and Concerns
 Layout Review
 Review of Updated Renderings
 Schedule
 Swing Space Update
 Layout Review
 Schedule
Design Concerns We Heard from the SIT/Community
DCPS | OCOO
3
We will go thru the concerns we heard from the SIT, Community, Teachers, Staff to date
 Cafeteria / Commons
 Gym Issues
 Media Center
 Site and Parking
 Classrooms
Design Concerns We Heard from the SIT/Community
DCPS | OCOO
4
Cafeteria/Commons
 Cafeteria cannot accommodate 3 lunch periods.
 No storage or bathrooms near Cafeteria
 Loss of PK/K Commons Space
 Concerns with the distance from loading to cafeteria
 Concerns with the flow of the building (kitchen off main entrance)
Review of Cafeteria
Current Proposed Design
DCPS | OCOO
5
• Seats in Cafeteria: 256
– 3 lunch periods will
work
• Seats in Commons: 48
• Total: 304
• Dining: 3246 sq.ft
• Commons: 898 sq.ft
Additional Items Included
• Bathrooms
• Storage
• PK/K Commons space
in design
• Kitchen adjacent to
loading
• Kitchen is no longer at
main entry
Review of Cafeteria
Square Footages
DCPS | OCOO
6
*Ed spec denotes 2,000 SF for PK/K collaborative space. This space is not necessary for meeting the
instructional requirement of the early childhood students
Ed Spec
October 2015
Design
Original VE
Design
Current
Design
Cafeteria/Dining
Space
3,650 3,757 2,380 3,246
PK/K
Collaborative
Space
2,000* 1,632 1,046 898
Design Concerns We Heard from the SIT/Community
DCPS | OCOO
7
Gym
 Bathrooms near the gym
 Can’t fit the entire school in the gym
 Access/Egress from gym
Review of Gym Level
Current Proposed Design
DCPS | OCOO
8
• Seats: 757 adults
• 4,885 sq ft
• Two gym classes can occur at same
time
• Bathrooms (single stall) accessible
from gym
• Access and egress to gym meets code
and outside access by stair
• Elevator access to gym
Review of Gym
Square Footages
DCPS | OCOO
9
Ed Spec
October 2015
Design
Original VE
Design
Current
Design
Gym 6,500* 5,286 4,898 4,885
Stage 1,000 966 824 791
*Goal of the gymnasium is to hold two gym periods; this square
footage includes the bleacher area
Design Concerns We Heard from the SIT/Community
DCPS | OCOO
10
Media Center
 Reduction in size of the media center
Review of Media Center
Current Proposed Design
DCPS | OCOO
11
• Total SF: 4,960
Key Elements
• Maker Space
• Informal Reading Areas
• Teaching Area for a full
class with a SmartBoard
• Bathrooms inside the
media center.
• Entrance off the lobby.
Review of Media Center – Square Footages
DCPS | OCOO
12
Ed Spec
October 2015
Design
Original VE
Design
Current
Design
Media Center 5,000 4,960 3,860 4,960
Design Concerns We Heard from the SIT/Community
DCPS | OCOO
13
Classroom concerns
 Reduction in class sizes
 Reduction in the number of collaborative spaces
Classroom Summary
DCPS | OCOO
14
Ed Spec
# of
CRs
Current
Design # of
CRs
Ed Spec
Sq ft
+/- %
allowable
by Ed Spec
Current Design
Sq ft
PK 4 4 1,125 10% 1,072 (average)
K 5 5 1,125 10% 1,062 (average)
1st 5 5 900 15% 767 (average)
2nd 5 5 900 15% 770 (average)
3rd 4 4 900 15% 761 (average)
4th 4 4 900 10% 864 (average)
5th 4 4 900 10% 893 (average)
Collaborative /
Resource
Spaces
- - 3,736* - 3,447 (total)
*Square footage amount shown here includes resource rooms and what was shown as collaborative spaces in October 2015 design
Design Concerns We Heard from the SIT/Community
DCPS | OCOO
15
Site/Parking
 Reduction in play space
 PK/K Areas
 Modifications to gym design
 Concerns about inappropriate activities in the parking area after hours
 Safety concerns with loading entrance off Reno
Review of Layout
Current Proposed Design – Preferred Site Layout
DCPS | OCOO
16
Review of Layout
Current Proposed Design – Potential Site Layout
DCPS | OCOO
17
Review of Layout
Current Proposed Design
DCPS | OCOO
18
Review of Layout
Current Proposed Design
DCPS | OCOO
19
Review of Updated Renderings
View from Playspace – Study 1
DCPS | OCOO
20
Review of Updated Renderings
View from Playspace – Study 2
DCPS | OCOO
21
Review of Updated Renderings
View from Reno Road – Study 1
DCPS | OCOO
22
Green/Living Wall Screen with Graphic Metal Gate
Review of Updated Renderings
View from Reno Road – Study 2
DCPS | OCOO
23
Green/Living Wall Screen with Wood Gate
Concerns Still Under Evaluation
DCPS | OCOO
24
 Curb-Cut with loading off Reno. There are ongoing discussions
with DDOT.
 There are 3 food deliveries a week and DCPS will work with the vendor
to ensure deliveries are not during pick-up or drop-off times.
 Parking to meet zoning requirements and needs of the staff
Current Murch Building Schedule
DCPS | OCOO
25
Building Permit & Regulatory Review Dates
CFA/HPO: Submit by 4/7/16 for 4/21/16 meeting
Public Space Committee: Submit by 3/18/16 for 4/14/16 meeting
Demolition/Abatement for Existing Building: Submit by 6/15/16 with approved third party
reviews intended to expedite DCRA approval timeline.
Foundation to Grade for Building Addition: Submit by 7/30/16 with approved third party reviews
intended to expedite DCRA approval timeline.
Mobilization and Packing/Moving: June 2016
Begin Demolition and Abatement of Existing Building: July 2016
Begin Construction of Addition: Early Fall 2016
Complete Construction: August 2018
Review of Swing Space Layout
DCPS | OCOO
26
Swing Space Highlights & Schedule
DCPS | OCOO
27
Swing Space Highlights
Classroom Sizes: ~800 SF
Bathrooms in PK/K Classrooms
Multi-User Bathrooms for Grades 1-5
Full Cooking Kitchen Trailer
Security Cameras & PA System throughout the complex.
SmartBoards in Classrooms
Wireless Access Points in all academic areas.
Covered walkways
Swing Space Schedule
UDC Board Meeting: Tentatively scheduled for 3/22; DCPS will confirm
UDC Swing Design Complete: Mid-March
Trailers: MCN has put a deposit for trailer delivery
Obtain Swing Design Permits: May
Begin Site Preparation/Site Utilities at UDC: Late May/June
Deliver Swing Trailers to UDC: June
Complete Swing Space Construction: August
Next Steps
DCPS | OCOO
28
 Schedule site visit at UDC & Lafayette
 SIT call with DCPS: TBD; will be before Community meeting
 Next Community Meeting: March 24th
 Envelope Group @ 6PM
 Community Meeting @ 7PM
 Meet with CFA for staff level work sessions to ensure we gain approval of
concept at April meeting
 Work with sister agencies (DOEE, DCRA, DDOT) to shorten permit review
timelines
 Develop drawings to levels to submit for permit – includes structural,
electrical, plumbing, mechanical, architectural, etc.
 Next SIT Meeting: April 11th

Murch School SIT Meeting Presentation (March 14, 2016)

  • 1.
    District of ColumbiaPublic Schools | 1200 First Street, NE | Washington, DC 20002 | T 202.442.4800 | F 202.442.5517 | www.k12.dc.us Murch ES SIT March 14, 2016
  • 2.
    Agenda DCPS | OCOO 2 Murch Building Project  Review of Comments and Concerns  Layout Review  Review of Updated Renderings  Schedule  Swing Space Update  Layout Review  Schedule
  • 3.
    Design Concerns WeHeard from the SIT/Community DCPS | OCOO 3 We will go thru the concerns we heard from the SIT, Community, Teachers, Staff to date  Cafeteria / Commons  Gym Issues  Media Center  Site and Parking  Classrooms
  • 4.
    Design Concerns WeHeard from the SIT/Community DCPS | OCOO 4 Cafeteria/Commons  Cafeteria cannot accommodate 3 lunch periods.  No storage or bathrooms near Cafeteria  Loss of PK/K Commons Space  Concerns with the distance from loading to cafeteria  Concerns with the flow of the building (kitchen off main entrance)
  • 5.
    Review of Cafeteria CurrentProposed Design DCPS | OCOO 5 • Seats in Cafeteria: 256 – 3 lunch periods will work • Seats in Commons: 48 • Total: 304 • Dining: 3246 sq.ft • Commons: 898 sq.ft Additional Items Included • Bathrooms • Storage • PK/K Commons space in design • Kitchen adjacent to loading • Kitchen is no longer at main entry
  • 6.
    Review of Cafeteria SquareFootages DCPS | OCOO 6 *Ed spec denotes 2,000 SF for PK/K collaborative space. This space is not necessary for meeting the instructional requirement of the early childhood students Ed Spec October 2015 Design Original VE Design Current Design Cafeteria/Dining Space 3,650 3,757 2,380 3,246 PK/K Collaborative Space 2,000* 1,632 1,046 898
  • 7.
    Design Concerns WeHeard from the SIT/Community DCPS | OCOO 7 Gym  Bathrooms near the gym  Can’t fit the entire school in the gym  Access/Egress from gym
  • 8.
    Review of GymLevel Current Proposed Design DCPS | OCOO 8 • Seats: 757 adults • 4,885 sq ft • Two gym classes can occur at same time • Bathrooms (single stall) accessible from gym • Access and egress to gym meets code and outside access by stair • Elevator access to gym
  • 9.
    Review of Gym SquareFootages DCPS | OCOO 9 Ed Spec October 2015 Design Original VE Design Current Design Gym 6,500* 5,286 4,898 4,885 Stage 1,000 966 824 791 *Goal of the gymnasium is to hold two gym periods; this square footage includes the bleacher area
  • 10.
    Design Concerns WeHeard from the SIT/Community DCPS | OCOO 10 Media Center  Reduction in size of the media center
  • 11.
    Review of MediaCenter Current Proposed Design DCPS | OCOO 11 • Total SF: 4,960 Key Elements • Maker Space • Informal Reading Areas • Teaching Area for a full class with a SmartBoard • Bathrooms inside the media center. • Entrance off the lobby.
  • 12.
    Review of MediaCenter – Square Footages DCPS | OCOO 12 Ed Spec October 2015 Design Original VE Design Current Design Media Center 5,000 4,960 3,860 4,960
  • 13.
    Design Concerns WeHeard from the SIT/Community DCPS | OCOO 13 Classroom concerns  Reduction in class sizes  Reduction in the number of collaborative spaces
  • 14.
    Classroom Summary DCPS |OCOO 14 Ed Spec # of CRs Current Design # of CRs Ed Spec Sq ft +/- % allowable by Ed Spec Current Design Sq ft PK 4 4 1,125 10% 1,072 (average) K 5 5 1,125 10% 1,062 (average) 1st 5 5 900 15% 767 (average) 2nd 5 5 900 15% 770 (average) 3rd 4 4 900 15% 761 (average) 4th 4 4 900 10% 864 (average) 5th 4 4 900 10% 893 (average) Collaborative / Resource Spaces - - 3,736* - 3,447 (total) *Square footage amount shown here includes resource rooms and what was shown as collaborative spaces in October 2015 design
  • 15.
    Design Concerns WeHeard from the SIT/Community DCPS | OCOO 15 Site/Parking  Reduction in play space  PK/K Areas  Modifications to gym design  Concerns about inappropriate activities in the parking area after hours  Safety concerns with loading entrance off Reno
  • 16.
    Review of Layout CurrentProposed Design – Preferred Site Layout DCPS | OCOO 16
  • 17.
    Review of Layout CurrentProposed Design – Potential Site Layout DCPS | OCOO 17
  • 18.
    Review of Layout CurrentProposed Design DCPS | OCOO 18
  • 19.
    Review of Layout CurrentProposed Design DCPS | OCOO 19
  • 20.
    Review of UpdatedRenderings View from Playspace – Study 1 DCPS | OCOO 20
  • 21.
    Review of UpdatedRenderings View from Playspace – Study 2 DCPS | OCOO 21
  • 22.
    Review of UpdatedRenderings View from Reno Road – Study 1 DCPS | OCOO 22 Green/Living Wall Screen with Graphic Metal Gate
  • 23.
    Review of UpdatedRenderings View from Reno Road – Study 2 DCPS | OCOO 23 Green/Living Wall Screen with Wood Gate
  • 24.
    Concerns Still UnderEvaluation DCPS | OCOO 24  Curb-Cut with loading off Reno. There are ongoing discussions with DDOT.  There are 3 food deliveries a week and DCPS will work with the vendor to ensure deliveries are not during pick-up or drop-off times.  Parking to meet zoning requirements and needs of the staff
  • 25.
    Current Murch BuildingSchedule DCPS | OCOO 25 Building Permit & Regulatory Review Dates CFA/HPO: Submit by 4/7/16 for 4/21/16 meeting Public Space Committee: Submit by 3/18/16 for 4/14/16 meeting Demolition/Abatement for Existing Building: Submit by 6/15/16 with approved third party reviews intended to expedite DCRA approval timeline. Foundation to Grade for Building Addition: Submit by 7/30/16 with approved third party reviews intended to expedite DCRA approval timeline. Mobilization and Packing/Moving: June 2016 Begin Demolition and Abatement of Existing Building: July 2016 Begin Construction of Addition: Early Fall 2016 Complete Construction: August 2018
  • 26.
    Review of SwingSpace Layout DCPS | OCOO 26
  • 27.
    Swing Space Highlights& Schedule DCPS | OCOO 27 Swing Space Highlights Classroom Sizes: ~800 SF Bathrooms in PK/K Classrooms Multi-User Bathrooms for Grades 1-5 Full Cooking Kitchen Trailer Security Cameras & PA System throughout the complex. SmartBoards in Classrooms Wireless Access Points in all academic areas. Covered walkways Swing Space Schedule UDC Board Meeting: Tentatively scheduled for 3/22; DCPS will confirm UDC Swing Design Complete: Mid-March Trailers: MCN has put a deposit for trailer delivery Obtain Swing Design Permits: May Begin Site Preparation/Site Utilities at UDC: Late May/June Deliver Swing Trailers to UDC: June Complete Swing Space Construction: August
  • 28.
    Next Steps DCPS |OCOO 28  Schedule site visit at UDC & Lafayette  SIT call with DCPS: TBD; will be before Community meeting  Next Community Meeting: March 24th  Envelope Group @ 6PM  Community Meeting @ 7PM  Meet with CFA for staff level work sessions to ensure we gain approval of concept at April meeting  Work with sister agencies (DOEE, DCRA, DDOT) to shorten permit review timelines  Develop drawings to levels to submit for permit – includes structural, electrical, plumbing, mechanical, architectural, etc.  Next SIT Meeting: April 11th