SlideShare a Scribd company logo
© CGI Group Inc.
Management Foundation
Implementation introduction
Richard den Dulk
April 2014
Version Public
Overall summary
2013 transformation 2014 implementation
made possible by YOU
Reconnaissance is
the start, the audit is
the end
18 processes
planned for
further
implementation
DMAIC method used
for implementation
2
March 18th the Management Foundation
Compliancy Report was presented to the NL
Board
Contents
MF Implementation
Implementation Strategy
Implementation structure
Define
Measure
Analyze
Improve
Control
Report
Next action
3
MF Implementation
Management Foundation
Compliancy
• 18 processes need further
implementation
• Implementation led by
appointed Coordinator
(Subject-matter expert)
• Facilitated by MF
Implementation team
• Process owner in charge
4
Process / Policy MF compliancy Deviation
Proces 1 0%
Proces 2 37%
Proces 3 45%
Proces 4 47%
Proces 5 49%
Proces 6 50%
Proces 7 52%
Proces 8 52%
Proces 9 54%
Proces 10 54%
Proces 11 54%
Proces 12 54%
Proces 13 54%
Proces 14 56%
Proces 15 56%
Proces 16 56%
Proces 17 56%
Proces 18 59%
Proces 19 66%
Proces 20 66%
Proces 21 66%
Proces 22 68%
Proces 23 81%
Proces 24 81%
Proces 25 82%
Proces 26 84%
Proces 27 91%
Proces 28 96%
Proces 29 96%
Implement
Audit
• Appointed coordinator executes implementation
• Coordinator and MF implementation team plan activities
• Coordinator reports to process owner
• After reporting the process is ready to be audited
• Every week a new process starts implementing
• On October 1st (week 40) all processes will be
implemented
Implementation strategy
5
Define Measure Analyze Improve Control Report Audit
Implementation structure
In order to make the implementation suitable and realistic, the following
implementation structure is implemented
• The process owner (NL Board):
• Remains in charge
• Delegates to coordinator
• The implementation team:
• Starts up the implementation
• Facilitates where necessary
• The process coordinator:
• Is a subject-matter expert
• Executes the implementation
• Reports to the process owner
• The Auditor pool performs audits according to the implementation plan
6
Define the problem
• The most important phase of the DMAIC process is the description of
the problem
• We’ll use the interviews that were conducted amongst process owners
(NL Board members) to make a start.
• The Coordinator will be important in verifying the found issues. He/she
may even add new issues if necessary.
• A first definition document is created, wherein the process coordinator
states what should be improved
7
Measure main parameters
• Make measurable key parameters
• Knowledge is power if you know what you are measuring
• Making important parameters of a measurable process is not always
easy, but evident for reporting results
• The reported result is the difference between measured parameters at
the beginning and end of the improvement
• The Coordinator describes the parameters based on the Definition
document
• These parameters are measured over the complete period of the
project to assure a report with proven results.
8
Analyze the data
• The next step in the improvement process is the analysis of the data
• For this, simple statistical operations such as average can be used
• In the MF implementation project this might consist of the number of
verified documents, trained members, used templates, corrected
documents
• The Coordinator (and several functionals) analyze available
information in the process
• The available information is used to verify the definition document and
execute the measurement of parameters
• At the end of this phase, an action plan describes (roughly) how the
improvement will be implemented
9
Improve the process
• Here comes the improving of the process
• The analysis of data has probably helped in finding the right buttons
• In this phase, the expert opinion is very important
• If you only draw conclusions on the basis of measured data, there´s a
big chance causal connection with the performance won´t be found
• The Coordinator and functionals refine the improvement plan
• The process coordinator and functionals describe what actions are
taken, parameters are measured and when reports are delivered to
the process owner
• The process coordinator monitors the improvements and coordinates
activities of the functionals
10
Control the parameters
(That influence the process)
• It is extremely important to close the loop and to keep checking
whether the process remains under control
• By continuing to monitor key parameters you will prevent the process
running out- of-control again
• Parameters are discussed with the process owner
• The process owner decides how parameters (measured in this
project) are embedded in daily operations
11
Report
• At CGI reporting lines follow accountability, therefor the Coordinator
reports to the process owner
• The Coordinator reports findings, improvements and measured results
to the process owner
• The process owner adopts responsibility for the continues monitoring
and improvement of the process
• After reporting, the Coordinator is relieved of his duties in the MF
Implementation project.
12
Next action
13
Plan assignment verification with Process owner,
Coordinator and Quality management consultant
Our commitment to you
We approach every engagement with one
objective in mind: to help clients succeed

More Related Content

What's hot

Financial controls management protiviti governance portal
Financial controls management protiviti governance portalFinancial controls management protiviti governance portal
Financial controls management protiviti governance portal
SARVJEET KAUSHAL
 
05.2 auditing procedure application controls
05.2 auditing procedure   application controls05.2 auditing procedure   application controls
05.2 auditing procedure application controlsMulyadi Yusuf
 
Project Quality Management
 Project Quality Management Project Quality Management
Project Quality ManagementSerdar Temiz
 
Statistical Control | Statistics
Statistical Control | StatisticsStatistical Control | Statistics
Statistical Control | Statistics
Transweb Global Inc
 
Operations reviews
Operations reviewsOperations reviews
Project quality management
Project quality managementProject quality management
Project quality management
Mohammad Ashraf Khan, PMP
 
Project Matrix and Measuring S/W
Project Matrix and Measuring S/WProject Matrix and Measuring S/W
Project Matrix and Measuring S/W
Akash Maheshwari
 
Timesheet management software
Timesheet management softwareTimesheet management software
Timesheet management software
ProductDossier Solutions India Pvt Ltd
 
Monitor risks
Monitor risks Monitor risks
Monitor risks
Shereef Sabri
 
Project quality management (1)
Project quality management (1)Project quality management (1)
Project quality management (1)
CQU
 
Service Transition Lead
Service Transition LeadService Transition Lead
Service Transition LeadRadu Ionita
 
Odoo Experience 2018 - How a Feedback Loop Helps to Fine-Tune Your Manufactu...
Odoo Experience 2018 -  How a Feedback Loop Helps to Fine-Tune Your Manufactu...Odoo Experience 2018 -  How a Feedback Loop Helps to Fine-Tune Your Manufactu...
Odoo Experience 2018 - How a Feedback Loop Helps to Fine-Tune Your Manufactu...
ElínAnna Jónasdóttir
 
EVMS with Technical Performance Measures
EVMS with Technical Performance MeasuresEVMS with Technical Performance Measures
EVMS with Technical Performance Measures
Glen Alleman
 
Navigating the new Trust Services Criteria
Navigating the new Trust Services CriteriaNavigating the new Trust Services Criteria
Navigating the new Trust Services Criteria
McKonly & Asbury, LLP
 
Project Cost Management
Project Cost ManagementProject Cost Management
Project Cost ManagementSerdar Temiz
 
Episode 24 : Project Quality Management
Episode 24 :  Project Quality ManagementEpisode 24 :  Project Quality Management
Episode 24 : Project Quality Management
SAJJAD KHUDHUR ABBAS
 
PMP Training - 08 project quality management
PMP Training - 08 project quality managementPMP Training - 08 project quality management
PMP Training - 08 project quality managementejlp12
 
Cost Masterclass
Cost MasterclassCost Masterclass
Cost Masterclass
Jeffrey Cheah
 

What's hot (20)

Financial controls management protiviti governance portal
Financial controls management protiviti governance portalFinancial controls management protiviti governance portal
Financial controls management protiviti governance portal
 
05.2 auditing procedure application controls
05.2 auditing procedure   application controls05.2 auditing procedure   application controls
05.2 auditing procedure application controls
 
Project Quality Management
 Project Quality Management Project Quality Management
Project Quality Management
 
Statistical Control | Statistics
Statistical Control | StatisticsStatistical Control | Statistics
Statistical Control | Statistics
 
Operations reviews
Operations reviewsOperations reviews
Operations reviews
 
Project quality management
Project quality managementProject quality management
Project quality management
 
Project Matrix and Measuring S/W
Project Matrix and Measuring S/WProject Matrix and Measuring S/W
Project Matrix and Measuring S/W
 
Timesheet management software
Timesheet management softwareTimesheet management software
Timesheet management software
 
Monitor risks
Monitor risks Monitor risks
Monitor risks
 
Project quality management (1)
Project quality management (1)Project quality management (1)
Project quality management (1)
 
Service Transition Lead
Service Transition LeadService Transition Lead
Service Transition Lead
 
Resource1 nou
Resource1 nouResource1 nou
Resource1 nou
 
Odoo Experience 2018 - How a Feedback Loop Helps to Fine-Tune Your Manufactu...
Odoo Experience 2018 -  How a Feedback Loop Helps to Fine-Tune Your Manufactu...Odoo Experience 2018 -  How a Feedback Loop Helps to Fine-Tune Your Manufactu...
Odoo Experience 2018 - How a Feedback Loop Helps to Fine-Tune Your Manufactu...
 
EVMS with Technical Performance Measures
EVMS with Technical Performance MeasuresEVMS with Technical Performance Measures
EVMS with Technical Performance Measures
 
Navigating the new Trust Services Criteria
Navigating the new Trust Services CriteriaNavigating the new Trust Services Criteria
Navigating the new Trust Services Criteria
 
Project Cost Management
Project Cost ManagementProject Cost Management
Project Cost Management
 
Episode 24 : Project Quality Management
Episode 24 :  Project Quality ManagementEpisode 24 :  Project Quality Management
Episode 24 : Project Quality Management
 
PMP Training - 08 project quality management
PMP Training - 08 project quality managementPMP Training - 08 project quality management
PMP Training - 08 project quality management
 
T410 iso 19011
T410 iso 19011T410 iso 19011
T410 iso 19011
 
Cost Masterclass
Cost MasterclassCost Masterclass
Cost Masterclass
 

Viewers also liked

Story analysis
Story analysisStory analysis
Story analysis
tyrachuck12
 
Short Story Analysis
Short Story AnalysisShort Story Analysis
Short Story AnalysisMelisa Olguin
 
Short story literary analysis criteria
Short story literary analysis criteriaShort story literary analysis criteria
Short story literary analysis criteriaspinheiro79
 
Short Story Analysis Form
Short Story Analysis FormShort Story Analysis Form
Short Story Analysis Form
Heather2217
 
How to analyze a short story
How to analyze a short storyHow to analyze a short story
How to analyze a short story
Ely CM
 
Short Story Analysis
Short Story AnalysisShort Story Analysis
Short Story Analysis
MsdeSouza
 

Viewers also liked (6)

Story analysis
Story analysisStory analysis
Story analysis
 
Short Story Analysis
Short Story AnalysisShort Story Analysis
Short Story Analysis
 
Short story literary analysis criteria
Short story literary analysis criteriaShort story literary analysis criteria
Short story literary analysis criteria
 
Short Story Analysis Form
Short Story Analysis FormShort Story Analysis Form
Short Story Analysis Form
 
How to analyze a short story
How to analyze a short storyHow to analyze a short story
How to analyze a short story
 
Short Story Analysis
Short Story AnalysisShort Story Analysis
Short Story Analysis
 

Similar to Management Foundation implementation introduction 2014 (public)

Compliance check 1.1 2014
Compliance check 1.1 2014Compliance check 1.1 2014
Compliance check 1.1 2014
Richard den Dulk
 
Chapter 6.pdf
Chapter 6.pdfChapter 6.pdf
Chapter 6.pdf
ssuser8cd298
 
13 project control & closing management
13 project control & closing management13 project control & closing management
13 project control & closing management
Dhamo daran
 
Business Process Reengineering | Case studies
Business Process Reengineering | Case studiesBusiness Process Reengineering | Case studies
Business Process Reengineering | Case studies
Sumit Sanyal
 
Risk managementforsponsors barnes
Risk managementforsponsors barnesRisk managementforsponsors barnes
Risk managementforsponsors barnes
captsumit
 
Progress, Effectiveness, and Gaps Monitoring and Evaluation Tool
Progress, Effectiveness, and Gaps Monitoring and Evaluation ToolProgress, Effectiveness, and Gaps Monitoring and Evaluation Tool
Progress, Effectiveness, and Gaps Monitoring and Evaluation Tool
NAP Global Network
 
M&E of development projects and role of imed dr taibur
M&E of development projects and role of imed dr taiburM&E of development projects and role of imed dr taibur
M&E of development projects and role of imed dr taibur
Dr. Md. Taibur Rahman
 
Project Management Control
Project Management ControlProject Management Control
Project Management Control
ahmad bassiouny
 
Six sigma.ppt
Six sigma.pptSix sigma.ppt
Six sigma.ppt
sumit686096
 
Layered process audit
Layered process audit Layered process audit
Layered process audit
The Apprentiice
 
PDCA Cycle
PDCA CyclePDCA Cycle
PDCA Cycle
Vardhan Shah
 
Project auditing
Project auditingProject auditing
Project auditing
Libra chudry
 
Project Management Ch 14.ppt
Project Management Ch 14.pptProject Management Ch 14.ppt
Project Management Ch 14.ppt
UjalaBatool7
 
Standard_Work_Presentation_1703112688.pdf
Standard_Work_Presentation_1703112688.pdfStandard_Work_Presentation_1703112688.pdf
Standard_Work_Presentation_1703112688.pdf
BrunoTrovalim
 
Itil process framework__rowe(40)
Itil process framework__rowe(40)Itil process framework__rowe(40)
Itil process framework__rowe(40)
Gregory Rowe, LSS, ITIL
 
Detailed concepts of the Plan Do Check Act Process – Critical to achieving an...
Detailed concepts of the Plan Do Check Act Process – Critical to achieving an...Detailed concepts of the Plan Do Check Act Process – Critical to achieving an...
Detailed concepts of the Plan Do Check Act Process – Critical to achieving an...
ASQ Buffalo NY
 
Software Process Improvement.ppt
Software Process Improvement.pptSoftware Process Improvement.ppt
Software Process Improvement.ppt
NadarDinesh
 
Bpm lifecycle ppt
Bpm lifecycle pptBpm lifecycle ppt
Bpm lifecycle ppt
Kushal Malhan
 
Product quality management
Product quality managementProduct quality management
Product quality management
Sunil Meena
 

Similar to Management Foundation implementation introduction 2014 (public) (20)

Compliance check 1.1 2014
Compliance check 1.1 2014Compliance check 1.1 2014
Compliance check 1.1 2014
 
Chapter 6.pdf
Chapter 6.pdfChapter 6.pdf
Chapter 6.pdf
 
13 project control & closing management
13 project control & closing management13 project control & closing management
13 project control & closing management
 
Business Process Reengineering | Case studies
Business Process Reengineering | Case studiesBusiness Process Reengineering | Case studies
Business Process Reengineering | Case studies
 
Risk managementforsponsors barnes
Risk managementforsponsors barnesRisk managementforsponsors barnes
Risk managementforsponsors barnes
 
Progress, Effectiveness, and Gaps Monitoring and Evaluation Tool
Progress, Effectiveness, and Gaps Monitoring and Evaluation ToolProgress, Effectiveness, and Gaps Monitoring and Evaluation Tool
Progress, Effectiveness, and Gaps Monitoring and Evaluation Tool
 
M&E of development projects and role of imed dr taibur
M&E of development projects and role of imed dr taiburM&E of development projects and role of imed dr taibur
M&E of development projects and role of imed dr taibur
 
Project Management Control
Project Management ControlProject Management Control
Project Management Control
 
Six sigma.ppt
Six sigma.pptSix sigma.ppt
Six sigma.ppt
 
Tqm
TqmTqm
Tqm
 
Layered process audit
Layered process audit Layered process audit
Layered process audit
 
PDCA Cycle
PDCA CyclePDCA Cycle
PDCA Cycle
 
Project auditing
Project auditingProject auditing
Project auditing
 
Project Management Ch 14.ppt
Project Management Ch 14.pptProject Management Ch 14.ppt
Project Management Ch 14.ppt
 
Standard_Work_Presentation_1703112688.pdf
Standard_Work_Presentation_1703112688.pdfStandard_Work_Presentation_1703112688.pdf
Standard_Work_Presentation_1703112688.pdf
 
Itil process framework__rowe(40)
Itil process framework__rowe(40)Itil process framework__rowe(40)
Itil process framework__rowe(40)
 
Detailed concepts of the Plan Do Check Act Process – Critical to achieving an...
Detailed concepts of the Plan Do Check Act Process – Critical to achieving an...Detailed concepts of the Plan Do Check Act Process – Critical to achieving an...
Detailed concepts of the Plan Do Check Act Process – Critical to achieving an...
 
Software Process Improvement.ppt
Software Process Improvement.pptSoftware Process Improvement.ppt
Software Process Improvement.ppt
 
Bpm lifecycle ppt
Bpm lifecycle pptBpm lifecycle ppt
Bpm lifecycle ppt
 
Product quality management
Product quality managementProduct quality management
Product quality management
 

More from Richard den Dulk

Fun session xmas background public
Fun session xmas background publicFun session xmas background public
Fun session xmas background public
Richard den Dulk
 
Incident management hoe doe je dat (grote letters)
Incident management hoe doe je dat (grote letters)Incident management hoe doe je dat (grote letters)
Incident management hoe doe je dat (grote letters)
Richard den Dulk
 
Incident management in 5 minuten (grote letters)
Incident management in 5 minuten (grote letters)Incident management in 5 minuten (grote letters)
Incident management in 5 minuten (grote letters)Richard den Dulk
 
Bedrijfscultuur veranderen
Bedrijfscultuur veranderenBedrijfscultuur veranderen
Bedrijfscultuur veranderen
Richard den Dulk
 
Happiness@work(shop)
Happiness@work(shop)Happiness@work(shop)
Happiness@work(shop)
Richard den Dulk
 
Workshop Procesmatig werken vs FTE's
Workshop Procesmatig werken vs FTE'sWorkshop Procesmatig werken vs FTE's
Workshop Procesmatig werken vs FTE's
Richard den Dulk
 
Afstemming Klantwens Naar Dienst
Afstemming Klantwens Naar DienstAfstemming Klantwens Naar Dienst
Afstemming Klantwens Naar Dienst
Richard den Dulk
 
Mini congres Smartphones
Mini congres SmartphonesMini congres Smartphones
Mini congres Smartphones
Richard den Dulk
 
Excellente dienstverlening gefaseerd invoeren
Excellente dienstverlening gefaseerd invoerenExcellente dienstverlening gefaseerd invoeren
Excellente dienstverlening gefaseerd invoeren
Richard den Dulk
 
Workshop configuration management
Workshop configuration managementWorkshop configuration management
Workshop configuration management
Richard den Dulk
 
(vervolg) Uniforme beheer processen
(vervolg) Uniforme beheer processen(vervolg) Uniforme beheer processen
(vervolg) Uniforme beheer processen
Richard den Dulk
 
inrichting uniforme beheerprocessen
inrichting uniforme beheerprocesseninrichting uniforme beheerprocessen
inrichting uniforme beheerprocessen
Richard den Dulk
 

More from Richard den Dulk (12)

Fun session xmas background public
Fun session xmas background publicFun session xmas background public
Fun session xmas background public
 
Incident management hoe doe je dat (grote letters)
Incident management hoe doe je dat (grote letters)Incident management hoe doe je dat (grote letters)
Incident management hoe doe je dat (grote letters)
 
Incident management in 5 minuten (grote letters)
Incident management in 5 minuten (grote letters)Incident management in 5 minuten (grote letters)
Incident management in 5 minuten (grote letters)
 
Bedrijfscultuur veranderen
Bedrijfscultuur veranderenBedrijfscultuur veranderen
Bedrijfscultuur veranderen
 
Happiness@work(shop)
Happiness@work(shop)Happiness@work(shop)
Happiness@work(shop)
 
Workshop Procesmatig werken vs FTE's
Workshop Procesmatig werken vs FTE'sWorkshop Procesmatig werken vs FTE's
Workshop Procesmatig werken vs FTE's
 
Afstemming Klantwens Naar Dienst
Afstemming Klantwens Naar DienstAfstemming Klantwens Naar Dienst
Afstemming Klantwens Naar Dienst
 
Mini congres Smartphones
Mini congres SmartphonesMini congres Smartphones
Mini congres Smartphones
 
Excellente dienstverlening gefaseerd invoeren
Excellente dienstverlening gefaseerd invoerenExcellente dienstverlening gefaseerd invoeren
Excellente dienstverlening gefaseerd invoeren
 
Workshop configuration management
Workshop configuration managementWorkshop configuration management
Workshop configuration management
 
(vervolg) Uniforme beheer processen
(vervolg) Uniforme beheer processen(vervolg) Uniforme beheer processen
(vervolg) Uniforme beheer processen
 
inrichting uniforme beheerprocessen
inrichting uniforme beheerprocesseninrichting uniforme beheerprocessen
inrichting uniforme beheerprocessen
 

Recently uploaded

The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...
balatucanapplelovely
 
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
BBPMedia1
 
Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...
Lviv Startup Club
 
The-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic managementThe-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic management
Bojamma2
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
Operational Excellence Consulting
 
Brand Analysis for an artist named Struan
Brand Analysis for an artist named StruanBrand Analysis for an artist named Struan
Brand Analysis for an artist named Struan
sarahvanessa51503
 
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s DholeraTata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Avirahi City Dholera
 
What are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdfWhat are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdf
HumanResourceDimensi1
 
Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for Entrepreneurs
Ben Wann
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
LR1709MUSIC
 
VAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and RequirementsVAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and Requirements
uae taxgpt
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
creerey
 
The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...
awaisafdar
 
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdfikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
agatadrynko
 
BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdf
DerekIwanaka1
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
dylandmeas
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
Adam Smith
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Lviv Startup Club
 
anas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanas about venice for grade 6f about venice
anas about venice for grade 6f about venice
anasabutalha2013
 
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptxCADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
fakeloginn69
 

Recently uploaded (20)

The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...
 
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
 
Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...
 
The-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic managementThe-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic management
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
 
Brand Analysis for an artist named Struan
Brand Analysis for an artist named StruanBrand Analysis for an artist named Struan
Brand Analysis for an artist named Struan
 
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s DholeraTata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
 
What are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdfWhat are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdf
 
Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for Entrepreneurs
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
 
VAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and RequirementsVAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and Requirements
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
 
The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...
 
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdfikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
 
BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdf
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
 
anas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanas about venice for grade 6f about venice
anas about venice for grade 6f about venice
 
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptxCADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
 

Management Foundation implementation introduction 2014 (public)

  • 1. © CGI Group Inc. Management Foundation Implementation introduction Richard den Dulk April 2014 Version Public
  • 2. Overall summary 2013 transformation 2014 implementation made possible by YOU Reconnaissance is the start, the audit is the end 18 processes planned for further implementation DMAIC method used for implementation 2 March 18th the Management Foundation Compliancy Report was presented to the NL Board
  • 3. Contents MF Implementation Implementation Strategy Implementation structure Define Measure Analyze Improve Control Report Next action 3
  • 4. MF Implementation Management Foundation Compliancy • 18 processes need further implementation • Implementation led by appointed Coordinator (Subject-matter expert) • Facilitated by MF Implementation team • Process owner in charge 4 Process / Policy MF compliancy Deviation Proces 1 0% Proces 2 37% Proces 3 45% Proces 4 47% Proces 5 49% Proces 6 50% Proces 7 52% Proces 8 52% Proces 9 54% Proces 10 54% Proces 11 54% Proces 12 54% Proces 13 54% Proces 14 56% Proces 15 56% Proces 16 56% Proces 17 56% Proces 18 59% Proces 19 66% Proces 20 66% Proces 21 66% Proces 22 68% Proces 23 81% Proces 24 81% Proces 25 82% Proces 26 84% Proces 27 91% Proces 28 96% Proces 29 96% Implement Audit
  • 5. • Appointed coordinator executes implementation • Coordinator and MF implementation team plan activities • Coordinator reports to process owner • After reporting the process is ready to be audited • Every week a new process starts implementing • On October 1st (week 40) all processes will be implemented Implementation strategy 5 Define Measure Analyze Improve Control Report Audit
  • 6. Implementation structure In order to make the implementation suitable and realistic, the following implementation structure is implemented • The process owner (NL Board): • Remains in charge • Delegates to coordinator • The implementation team: • Starts up the implementation • Facilitates where necessary • The process coordinator: • Is a subject-matter expert • Executes the implementation • Reports to the process owner • The Auditor pool performs audits according to the implementation plan 6
  • 7. Define the problem • The most important phase of the DMAIC process is the description of the problem • We’ll use the interviews that were conducted amongst process owners (NL Board members) to make a start. • The Coordinator will be important in verifying the found issues. He/she may even add new issues if necessary. • A first definition document is created, wherein the process coordinator states what should be improved 7
  • 8. Measure main parameters • Make measurable key parameters • Knowledge is power if you know what you are measuring • Making important parameters of a measurable process is not always easy, but evident for reporting results • The reported result is the difference between measured parameters at the beginning and end of the improvement • The Coordinator describes the parameters based on the Definition document • These parameters are measured over the complete period of the project to assure a report with proven results. 8
  • 9. Analyze the data • The next step in the improvement process is the analysis of the data • For this, simple statistical operations such as average can be used • In the MF implementation project this might consist of the number of verified documents, trained members, used templates, corrected documents • The Coordinator (and several functionals) analyze available information in the process • The available information is used to verify the definition document and execute the measurement of parameters • At the end of this phase, an action plan describes (roughly) how the improvement will be implemented 9
  • 10. Improve the process • Here comes the improving of the process • The analysis of data has probably helped in finding the right buttons • In this phase, the expert opinion is very important • If you only draw conclusions on the basis of measured data, there´s a big chance causal connection with the performance won´t be found • The Coordinator and functionals refine the improvement plan • The process coordinator and functionals describe what actions are taken, parameters are measured and when reports are delivered to the process owner • The process coordinator monitors the improvements and coordinates activities of the functionals 10
  • 11. Control the parameters (That influence the process) • It is extremely important to close the loop and to keep checking whether the process remains under control • By continuing to monitor key parameters you will prevent the process running out- of-control again • Parameters are discussed with the process owner • The process owner decides how parameters (measured in this project) are embedded in daily operations 11
  • 12. Report • At CGI reporting lines follow accountability, therefor the Coordinator reports to the process owner • The Coordinator reports findings, improvements and measured results to the process owner • The process owner adopts responsibility for the continues monitoring and improvement of the process • After reporting, the Coordinator is relieved of his duties in the MF Implementation project. 12
  • 13. Next action 13 Plan assignment verification with Process owner, Coordinator and Quality management consultant
  • 14. Our commitment to you We approach every engagement with one objective in mind: to help clients succeed