The document summarizes the implementation of the Management Foundation Compliancy project. It outlines an 18 process implementation plan led by appointed coordinators using the DMAIC (Define, Measure, Analyze, Improve, Control) method. Each process will be implemented over a number of weeks with defined activities for each stage of DMAIC and regular reporting to process owners, with the goal of completing implementation for all processes by October 1st.
Today, manufacturing companies face increasing competition due to raw material cost and other factors like employees and resources. Therefore companies must concentrate on strategies to improve their level to come best in the market. Companies must try for continuous improvement in quality, efficiency and cost reduction. Copy the link given below and paste it in new browser window to get more information on Statistical Control:- http://www.transtutors.com/homework-help/statistics/statistical-control.aspx
Odoo Experience 2018 - How a Feedback Loop Helps to Fine-Tune Your Manufactu...ElínAnna Jónasdóttir
This talk is addressed to Odoo's customers that want to use the application "Quality". We will cover how you can get feedback from your quality application to improve your manufacturing processes in general. During the presentation, we will see how we can trigger quality checks and how we can deal with quality alerts. The talk will consist of a demo of the quality application and how it can in general improve your manufacturing processes by reducing the scrap orders, providing better quality goods delivered to your clients, and check the quality of the goods you receive from your suppliers.
EVMS with Technical Performance MeasuresGlen Alleman
Assessing the general health of the program to establish early warning system for unexpected problems starts by integrating Earned Value metrics and Technical Performance Measures for key program deliverables.
This webinar was hosted by McKonly & Asbury Partner, Michael Hoffner and Senior Managers, Josh Bantz and Samuel BowerCraft.
The webinar reviewed he new Trust Services Criteria that will be effective for SOC 2 and SOC 3 reports issued after December 15, 2018. The emphasis of this webinar was on evaluating the changes to the criteria, impacts on the report, and processes and procedures for transitioning from the 2016 Criteria to the 2017 Criteria. The presenters looked in-depth at how clients should map their controls from the 2016 Trust Services Criteria to the 2017 Trust Services Criteria including challenges with the new criteria.
Episode 24 : Project Quality Management
Include the processes required to ensure that the project will satisfy the needs for which it was undertaken
Include all activities of the overall management function that determine the quality policy, objectives and responsibilities and implements them by means such as quality planning, quality assurance, quality control, and quality improvement, within the quality system
Today, manufacturing companies face increasing competition due to raw material cost and other factors like employees and resources. Therefore companies must concentrate on strategies to improve their level to come best in the market. Companies must try for continuous improvement in quality, efficiency and cost reduction. Copy the link given below and paste it in new browser window to get more information on Statistical Control:- http://www.transtutors.com/homework-help/statistics/statistical-control.aspx
Odoo Experience 2018 - How a Feedback Loop Helps to Fine-Tune Your Manufactu...ElínAnna Jónasdóttir
This talk is addressed to Odoo's customers that want to use the application "Quality". We will cover how you can get feedback from your quality application to improve your manufacturing processes in general. During the presentation, we will see how we can trigger quality checks and how we can deal with quality alerts. The talk will consist of a demo of the quality application and how it can in general improve your manufacturing processes by reducing the scrap orders, providing better quality goods delivered to your clients, and check the quality of the goods you receive from your suppliers.
EVMS with Technical Performance MeasuresGlen Alleman
Assessing the general health of the program to establish early warning system for unexpected problems starts by integrating Earned Value metrics and Technical Performance Measures for key program deliverables.
This webinar was hosted by McKonly & Asbury Partner, Michael Hoffner and Senior Managers, Josh Bantz and Samuel BowerCraft.
The webinar reviewed he new Trust Services Criteria that will be effective for SOC 2 and SOC 3 reports issued after December 15, 2018. The emphasis of this webinar was on evaluating the changes to the criteria, impacts on the report, and processes and procedures for transitioning from the 2016 Criteria to the 2017 Criteria. The presenters looked in-depth at how clients should map their controls from the 2016 Trust Services Criteria to the 2017 Trust Services Criteria including challenges with the new criteria.
Episode 24 : Project Quality Management
Include the processes required to ensure that the project will satisfy the needs for which it was undertaken
Include all activities of the overall management function that determine the quality policy, objectives and responsibilities and implements them by means such as quality planning, quality assurance, quality control, and quality improvement, within the quality system
An easy and friendly way to create insight on the use of your Quality System or Management Model.
- company wide coverage
- results in 4 weeks
- good start for improvement
A presentation on the continuous improvement tool of total quality management, i.e. PDCA- Plan,Do,Check,Act. Covers the basics of PDCA to give an idea on it's need, use, methodology etc. The presentation will help the beginners gain knowledge about the PDCA cycle and will cover their basic needs on it.
Detailed concepts of the Plan Do Check Act Process – Critical to achieving an...ASQ Buffalo NY
The PDCA process has been the most widely used process and management system improvement methodology world-wide and the foundation of virtually every ISO standard developed.
PDCA (plan–do–check–act) is an iterative four-step management method used in business for the control and continuous improvement of processes and products. When used and managed properly, this process can go a long way in ensuring you meet your organizational goals.
Quality management ensures that an organization, product or service is consistent. Quality management is focused not only on product and service quality, but also on the means to achieve it. Quality management, therefore, uses quality assurance and control of processes as well as products to achieve more consistent quality.
Project Quality Management includes the processes and activities of the performing organization that determines quality policies, objectives, and responsibilities so that the project will satisfy the needs for which it was undertaken
Project Quality Management includes the processes and activities of the performing organization that determines quality policies, objectives, and responsibilities so that the project will satisfy the needs for which it was undertaken
Similar to Management Foundation implementation introduction 2014 (public) (20)
Hoe verander je een cultuur?
Welke aanpak hanteer je?
Welke voorwaarden horen daarbij?
Hoe bereik je succes?
Hoe meet je succes?
Leergang 'Veranderen in de Keten' bij Logica
Voor het interne opleidingsprogramma bj Logica (genaamd Pacemaker) heb ik de Happiness@Work(shop) ontwikkeld.
Deze workshop heb ik opgezet met ondersteuning van Happinesscoach Onno Hamburger van http://www.gelukkigwerken.nl/ .
In Augustus 2008 zijn een aantal waterschappen bij elkaar geweest om
ervaringen te delen op het gebied van Mobility.
Delfland presenteerde daarbij de evaluatie van de inzet van Smartphones.
---------------------------------------------------------------------------------
Dit bericht kan informatie bevatten die niet voor u is bestemd. Indien u niet de geadresseerde bent of dit bericht abusievelijk aan u is toegezonden, wordt u verzocht dat aan de afzender te melden en het bericht te verwijderen. De Staat aanvaardt geen aansprakelijkheid voor schade, van welke aard ook, die verband houdt met risico's verbonden aan het elektronisch verzenden van berichten.
This message may contain information that is not intended for you. If you are not the addressee or if this message was sent to you by mistake, you are requested to inform the sender and delete the message. The State accepts no liability for damage of any kind resulting from the risks inherent in the electronic transmission of messages.---------------------------------------------------------------------------------
Na een maand werd duidelijk dat de voortgang minimaal was. Samen met het management is besproken hoe we voortgang konden creeeren.
In de praktijk heeft iedereen het druk met de operatie en ontbreekt (ook bij het management) de sense of urgency die nodig is om de verandering succesvol uit te voeren.
Na een fusie van twee ICT diensten, moest de nieuwe organisatie beheerprocessen uniform uit gaan voeren. In deze transitie, is mij gevraagd het (uniform) procesmatig werken te ondersteunen.
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...BBPMedia1
Marvin neemt je in deze presentatie mee in de voordelen van non-endemic advertising op retail media netwerken. Hij brengt ook de uitdagingen in beeld die de markt op dit moment heeft op het gebied van retail media voor niet-leveranciers.
Retail media wordt gezien als het nieuwe advertising-medium en ook mediabureaus richten massaal retail media-afdelingen op. Merken die niet in de betreffende winkel liggen staan ook nog niet in de rij om op de retail media netwerken te adverteren. Marvin belicht de uitdagingen die er zijn om echt aansluiting te vinden op die markt van non-endemic advertising.
Kseniya Leshchenko: Shared development support service model as the way to ma...Lviv Startup Club
Kseniya Leshchenko: Shared development support service model as the way to make small projects with small budgets profitable for the company (UA)
Kyiv PMDay 2024 Summer
Website – www.pmday.org
Youtube – https://www.youtube.com/startuplviv
FB – https://www.facebook.com/pmdayconference
[Note: This is a partial preview. To download this presentation, visit:
https://www.oeconsulting.com.sg/training-presentations]
Sustainability has become an increasingly critical topic as the world recognizes the need to protect our planet and its resources for future generations. Sustainability means meeting our current needs without compromising the ability of future generations to meet theirs. It involves long-term planning and consideration of the consequences of our actions. The goal is to create strategies that ensure the long-term viability of People, Planet, and Profit.
Leading companies such as Nike, Toyota, and Siemens are prioritizing sustainable innovation in their business models, setting an example for others to follow. In this Sustainability training presentation, you will learn key concepts, principles, and practices of sustainability applicable across industries. This training aims to create awareness and educate employees, senior executives, consultants, and other key stakeholders, including investors, policymakers, and supply chain partners, on the importance and implementation of sustainability.
LEARNING OBJECTIVES
1. Develop a comprehensive understanding of the fundamental principles and concepts that form the foundation of sustainability within corporate environments.
2. Explore the sustainability implementation model, focusing on effective measures and reporting strategies to track and communicate sustainability efforts.
3. Identify and define best practices and critical success factors essential for achieving sustainability goals within organizations.
CONTENTS
1. Introduction and Key Concepts of Sustainability
2. Principles and Practices of Sustainability
3. Measures and Reporting in Sustainability
4. Sustainability Implementation & Best Practices
To download the complete presentation, visit: https://www.oeconsulting.com.sg/training-presentations
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s DholeraAvirahi City Dholera
The Tata Group, a titan of Indian industry, is making waves with its advanced talks with Taiwanese chipmakers Powerchip Semiconductor Manufacturing Corporation (PSMC) and UMC Group. The goal? Establishing a cutting-edge semiconductor fabrication unit (fab) in Dholera, Gujarat. This isn’t just any project; it’s a potential game changer for India’s chipmaking aspirations and a boon for investors seeking promising residential projects in dholera sir.
Visit : https://www.avirahi.com/blog/tata-group-dials-taiwan-for-its-chipmaking-ambition-in-gujarats-dholera/
What are the main advantages of using HR recruiter services.pdfHumanResourceDimensi1
HR recruiter services offer top talents to companies according to their specific needs. They handle all recruitment tasks from job posting to onboarding and help companies concentrate on their business growth. With their expertise and years of experience, they streamline the hiring process and save time and resources for the company.
Business Valuation Principles for EntrepreneursBen Wann
This insightful presentation is designed to equip entrepreneurs with the essential knowledge and tools needed to accurately value their businesses. Understanding business valuation is crucial for making informed decisions, whether you're seeking investment, planning to sell, or simply want to gauge your company's worth.
VAT Registration Outlined In UAE: Benefits and Requirementsuae taxgpt
Vat Registration is a legal obligation for businesses meeting the threshold requirement, helping companies avoid fines and ramifications. Contact now!
https://viralsocialtrends.com/vat-registration-outlined-in-uae/
Discover the innovative and creative projects that highlight my journey throu...dylandmeas
Discover the innovative and creative projects that highlight my journey through Full Sail University. Below, you’ll find a collection of my work showcasing my skills and expertise in digital marketing, event planning, and media production.
2. Overall summary
2013 transformation 2014 implementation
made possible by YOU
Reconnaissance is
the start, the audit is
the end
18 processes
planned for
further
implementation
DMAIC method used
for implementation
2
March 18th the Management Foundation
Compliancy Report was presented to the NL
Board
4. MF Implementation
Management Foundation
Compliancy
• 18 processes need further
implementation
• Implementation led by
appointed Coordinator
(Subject-matter expert)
• Facilitated by MF
Implementation team
• Process owner in charge
4
Process / Policy MF compliancy Deviation
Proces 1 0%
Proces 2 37%
Proces 3 45%
Proces 4 47%
Proces 5 49%
Proces 6 50%
Proces 7 52%
Proces 8 52%
Proces 9 54%
Proces 10 54%
Proces 11 54%
Proces 12 54%
Proces 13 54%
Proces 14 56%
Proces 15 56%
Proces 16 56%
Proces 17 56%
Proces 18 59%
Proces 19 66%
Proces 20 66%
Proces 21 66%
Proces 22 68%
Proces 23 81%
Proces 24 81%
Proces 25 82%
Proces 26 84%
Proces 27 91%
Proces 28 96%
Proces 29 96%
Implement
Audit
5. • Appointed coordinator executes implementation
• Coordinator and MF implementation team plan activities
• Coordinator reports to process owner
• After reporting the process is ready to be audited
• Every week a new process starts implementing
• On October 1st (week 40) all processes will be
implemented
Implementation strategy
5
Define Measure Analyze Improve Control Report Audit
6. Implementation structure
In order to make the implementation suitable and realistic, the following
implementation structure is implemented
• The process owner (NL Board):
• Remains in charge
• Delegates to coordinator
• The implementation team:
• Starts up the implementation
• Facilitates where necessary
• The process coordinator:
• Is a subject-matter expert
• Executes the implementation
• Reports to the process owner
• The Auditor pool performs audits according to the implementation plan
6
7. Define the problem
• The most important phase of the DMAIC process is the description of
the problem
• We’ll use the interviews that were conducted amongst process owners
(NL Board members) to make a start.
• The Coordinator will be important in verifying the found issues. He/she
may even add new issues if necessary.
• A first definition document is created, wherein the process coordinator
states what should be improved
7
8. Measure main parameters
• Make measurable key parameters
• Knowledge is power if you know what you are measuring
• Making important parameters of a measurable process is not always
easy, but evident for reporting results
• The reported result is the difference between measured parameters at
the beginning and end of the improvement
• The Coordinator describes the parameters based on the Definition
document
• These parameters are measured over the complete period of the
project to assure a report with proven results.
8
9. Analyze the data
• The next step in the improvement process is the analysis of the data
• For this, simple statistical operations such as average can be used
• In the MF implementation project this might consist of the number of
verified documents, trained members, used templates, corrected
documents
• The Coordinator (and several functionals) analyze available
information in the process
• The available information is used to verify the definition document and
execute the measurement of parameters
• At the end of this phase, an action plan describes (roughly) how the
improvement will be implemented
9
10. Improve the process
• Here comes the improving of the process
• The analysis of data has probably helped in finding the right buttons
• In this phase, the expert opinion is very important
• If you only draw conclusions on the basis of measured data, there´s a
big chance causal connection with the performance won´t be found
• The Coordinator and functionals refine the improvement plan
• The process coordinator and functionals describe what actions are
taken, parameters are measured and when reports are delivered to
the process owner
• The process coordinator monitors the improvements and coordinates
activities of the functionals
10
11. Control the parameters
(That influence the process)
• It is extremely important to close the loop and to keep checking
whether the process remains under control
• By continuing to monitor key parameters you will prevent the process
running out- of-control again
• Parameters are discussed with the process owner
• The process owner decides how parameters (measured in this
project) are embedded in daily operations
11
12. Report
• At CGI reporting lines follow accountability, therefor the Coordinator
reports to the process owner
• The Coordinator reports findings, improvements and measured results
to the process owner
• The process owner adopts responsibility for the continues monitoring
and improvement of the process
• After reporting, the Coordinator is relieved of his duties in the MF
Implementation project.
12