SESSION: 05 LONG WALL AND SHORT WALL METHOD
Saiyyed73@gmail.com
Example:
Find out quantities of following items of work
i. PCC ii. UCR work iii. Brick Work
Step 1: To calculate center to center distance between walls
C/C Long wall = 7 + 0.15 + 0.15 = 7.3 m
C/C Short wall = 3 + 0.15 + 0.15 = 3.3 m
7m x 3m
FLOOR PLAN 0.9m
1.2m
Measurement sheet:
Sr.no.
Work description Unit No’s Length Width Height/
Depth
Quantity Total
Quantity
i. PCC Work (B-1.2m)
Length of long wall= c/c distance + ½ width of each sides
Length of long wall= 7.3 + ½ x 1.2 + ½ x 1.2 =8.5 m
Length of short wall= c/c distance - ½ width of each sides
Length of short wall= 3.3 - ½ x 1.2 - ½ x 1.2 =2.1 m
M3 2 8.5 1.2 0.2 4.08 5.088
M3 2 2.1 1.2 0.2 1.01
ii. UCR work (B-0.9m)
7.3 m
7.3 m
3.3 m 3.3 m
2.75m
0.5m
0.2m
0.3m
Saiyyed73@gmail.com
Length of long wall= c/c distance + ½ width of each sides
Length of long wall= 7.3 + ½ x 0.9 + ½ x 0.9 =8.2m
Length of short wall= c/c distance - ½ width of each sides
Length of short wall= 3.3 - ½ x 0.9 - ½ x 0.9 =2.4 m
M3 2 8.2 0.9 0.5 7.38 9.54
M3 2 2.4 0.9 0.5 2.16
iii. Brick Work (B-0.3m)
Length of long wall= c/c distance + ½ width of each sides
Length of long wall= 7.3 + ½ x 0.3 + ½ x 0.3 =7.6 m
Length of short wall= c/c distance - ½ width of each sides
Length of short wall= 3.3 - ½ x 0.3 - ½ x 0.3 =3.0 m
M3 2 7.6 0.3 2.75 12.54 17.49
M3 2 3.0 0.3 2.75 4.95

More Related Content

What's hot

Estimation introduction - Estimation, Costing and Valuation (ECV)
Estimation introduction - Estimation, Costing and Valuation (ECV)Estimation introduction - Estimation, Costing and Valuation (ECV)
Estimation introduction - Estimation, Costing and Valuation (ECV)
Shanmugasundaram N
 
Slab site report
Slab site reportSlab site report
Slab site report
skmunazzar
 
SPECIFICATION AND ESTIMATION
SPECIFICATION AND ESTIMATIONSPECIFICATION AND ESTIMATION
SPECIFICATION AND ESTIMATION
Ar Naveen Naveen
 
Chapter 10 wall finishes ( plastering,pointing & painting)
Chapter 10 wall finishes ( plastering,pointing & painting)Chapter 10 wall finishes ( plastering,pointing & painting)
Chapter 10 wall finishes ( plastering,pointing & painting)
KHUSHBU SHAH
 
Chapter 7 building construction
Chapter 7 building constructionChapter 7 building construction
Chapter 7 building construction
KHUSHBU SHAH
 
Damp Proof Course
Damp Proof Course Damp Proof Course
Damp Proof Course
Kezar Ali. Shah
 
Damp proof course
Damp proof courseDamp proof course
Damp proof course
Aglaia Connect
 
Long wall and short wall method 4
Long wall and short wall method 4Long wall and short wall method 4
Long wall and short wall method 4
SAIYYED AKABARALI MOHAMMAD
 
Water proofing in buildings
Water proofing in buildingsWater proofing in buildings
Water proofing in buildings
padamatikona swapnika
 
Center line method 1
Center line method 1Center line method 1
Center line method 1
SAIYYED AKABARALI MOHAMMAD
 
Ferrocement
FerrocementFerrocement
Ferrocement
Simran Aggarwal
 
Stone Masonry BUILDING CONSTRUCTION
Stone Masonry BUILDING CONSTRUCTIONStone Masonry BUILDING CONSTRUCTION
Stone Masonry BUILDING CONSTRUCTIONRavindra Patnayaka
 
Types of estimates
Types of estimatesTypes of estimates
Types of estimates
Simarpreet Singh
 
Estimation and Costing
Estimation and Costing Estimation and Costing
Estimation and Costing
Vijay325
 
E.C.V detail estimate By centre line and Long wall short wall method
E.C.V detail estimate By centre line and Long wall short wall methodE.C.V detail estimate By centre line and Long wall short wall method
E.C.V detail estimate By centre line and Long wall short wall method
Yusuf Challawala
 
Masonry
MasonryMasonry
Concrete block
Concrete blockConcrete block
Concrete block
Kamrul Hasan Sagar
 
Lacing, battening
Lacing, battening Lacing, battening
Lacing, battening
Yash Patel
 

What's hot (20)

Estimation introduction - Estimation, Costing and Valuation (ECV)
Estimation introduction - Estimation, Costing and Valuation (ECV)Estimation introduction - Estimation, Costing and Valuation (ECV)
Estimation introduction - Estimation, Costing and Valuation (ECV)
 
Slab site report
Slab site reportSlab site report
Slab site report
 
SPECIFICATION AND ESTIMATION
SPECIFICATION AND ESTIMATIONSPECIFICATION AND ESTIMATION
SPECIFICATION AND ESTIMATION
 
Chapter 10 wall finishes ( plastering,pointing & painting)
Chapter 10 wall finishes ( plastering,pointing & painting)Chapter 10 wall finishes ( plastering,pointing & painting)
Chapter 10 wall finishes ( plastering,pointing & painting)
 
Chapter 7 building construction
Chapter 7 building constructionChapter 7 building construction
Chapter 7 building construction
 
Damp Proof Course
Damp Proof Course Damp Proof Course
Damp Proof Course
 
Damp proof course
Damp proof courseDamp proof course
Damp proof course
 
Long wall and short wall method 4
Long wall and short wall method 4Long wall and short wall method 4
Long wall and short wall method 4
 
Water proofing in buildings
Water proofing in buildingsWater proofing in buildings
Water proofing in buildings
 
Project
ProjectProject
Project
 
Center line method 1
Center line method 1Center line method 1
Center line method 1
 
Ferrocement
FerrocementFerrocement
Ferrocement
 
Stone Masonry BUILDING CONSTRUCTION
Stone Masonry BUILDING CONSTRUCTIONStone Masonry BUILDING CONSTRUCTION
Stone Masonry BUILDING CONSTRUCTION
 
Types of estimates
Types of estimatesTypes of estimates
Types of estimates
 
Estimation and Costing
Estimation and Costing Estimation and Costing
Estimation and Costing
 
E.C.V detail estimate By centre line and Long wall short wall method
E.C.V detail estimate By centre line and Long wall short wall methodE.C.V detail estimate By centre line and Long wall short wall method
E.C.V detail estimate By centre line and Long wall short wall method
 
Masonry
MasonryMasonry
Masonry
 
Concrete block
Concrete blockConcrete block
Concrete block
 
Lacing, battening
Lacing, battening Lacing, battening
Lacing, battening
 
Steel trusses
Steel trussesSteel trusses
Steel trusses
 

Similar to Long wall and short wall method 5

Long wall and short wall method 1
Long wall and short wall method 1Long wall and short wall method 1
Long wall and short wall method 1
SAIYYED AKABARALI MOHAMMAD
 
Center line method 6
Center line method 6Center line method 6
Center line method 6
SAIYYED AKABARALI MOHAMMAD
 
materi kuliah it pln perhitungan plat balok
materi kuliah it pln perhitungan plat balokmateri kuliah it pln perhitungan plat balok
materi kuliah it pln perhitungan plat balok
IlhamPutera2
 
270 .pdf
270 .pdf270 .pdf
270 .pdf
Optional3
 
1. UNIT -I ESTIMATION OF BUILDINGS.pdf
1. UNIT -I ESTIMATION OF BUILDINGS.pdf1. UNIT -I ESTIMATION OF BUILDINGS.pdf
1. UNIT -I ESTIMATION OF BUILDINGS.pdf
AnuPriya323
 
Deduction of opening , Number of bars and Bar Bending Scheduling
Deduction of opening , Number of bars and Bar Bending SchedulingDeduction of opening , Number of bars and Bar Bending Scheduling
Deduction of opening , Number of bars and Bar Bending Scheduling
Yash Patel
 
Building Structure Project 2 Group report
Building Structure Project 2 Group reportBuilding Structure Project 2 Group report
Building Structure Project 2 Group report
suzzanekan
 
Double Storeyed Building Estimation and Costing by Nafisa Nazneen Choudhury (...
Double Storeyed Building Estimation and Costing by Nafisa Nazneen Choudhury (...Double Storeyed Building Estimation and Costing by Nafisa Nazneen Choudhury (...
Double Storeyed Building Estimation and Costing by Nafisa Nazneen Choudhury (...
Nafisa Nazneen Choudhury
 
EC Unit 002 new (1).pdf
EC  Unit 002 new (1).pdfEC  Unit 002 new (1).pdf
EC Unit 002 new (1).pdf
mohsin mohammad
 
IRJET - Design and Analysis of Residential Institute Building
IRJET - Design and Analysis of Residential Institute BuildingIRJET - Design and Analysis of Residential Institute Building
IRJET - Design and Analysis of Residential Institute Building
IRJET Journal
 
final internship ppt.pptx
final internship ppt.pptxfinal internship ppt.pptx
final internship ppt.pptx
KiranKr32
 
civil_engg_thesis_F inal presentation_mirzaShasan
civil_engg_thesis_F inal presentation_mirzaShasancivil_engg_thesis_F inal presentation_mirzaShasan
civil_engg_thesis_F inal presentation_mirzaShasan
Engr Mirza S Hasan
 
Chap-5-T-Girder Example-1.pdf
Chap-5-T-Girder Example-1.pdfChap-5-T-Girder Example-1.pdf
Chap-5-T-Girder Example-1.pdf
AberaMamoJaleta
 
Building Structures Report (Group and Individual)
Building Structures Report (Group and Individual)Building Structures Report (Group and Individual)
Building Structures Report (Group and Individual)
Patch Yuen
 
BATCH 4 PPT.pptx
BATCH 4 PPT.pptxBATCH 4 PPT.pptx
BATCH 4 PPT.pptx
RagulKumar34
 
Jury Presenatation.pptx
Jury Presenatation.pptxJury Presenatation.pptx
Jury Presenatation.pptx
AmokBajracharya2
 
New Microsoft PowerPoint Presentation.pptx
New Microsoft PowerPoint Presentation.pptxNew Microsoft PowerPoint Presentation.pptx
New Microsoft PowerPoint Presentation.pptx
RajeshKumar25548
 
Pgche centreline presentation
Pgche centreline presentationPgche centreline presentation
Pgche centreline presentationAnthonyward
 
Mmup questionnaire 2
Mmup questionnaire 2Mmup questionnaire 2
Mmup questionnaire 2
Omar Selim
 

Similar to Long wall and short wall method 5 (20)

Long wall and short wall method 1
Long wall and short wall method 1Long wall and short wall method 1
Long wall and short wall method 1
 
Center line method 6
Center line method 6Center line method 6
Center line method 6
 
materi kuliah it pln perhitungan plat balok
materi kuliah it pln perhitungan plat balokmateri kuliah it pln perhitungan plat balok
materi kuliah it pln perhitungan plat balok
 
270 .pdf
270 .pdf270 .pdf
270 .pdf
 
1. UNIT -I ESTIMATION OF BUILDINGS.pdf
1. UNIT -I ESTIMATION OF BUILDINGS.pdf1. UNIT -I ESTIMATION OF BUILDINGS.pdf
1. UNIT -I ESTIMATION OF BUILDINGS.pdf
 
Deduction of opening , Number of bars and Bar Bending Scheduling
Deduction of opening , Number of bars and Bar Bending SchedulingDeduction of opening , Number of bars and Bar Bending Scheduling
Deduction of opening , Number of bars and Bar Bending Scheduling
 
Building Structure Project 2 Group report
Building Structure Project 2 Group reportBuilding Structure Project 2 Group report
Building Structure Project 2 Group report
 
Double Storeyed Building Estimation and Costing by Nafisa Nazneen Choudhury (...
Double Storeyed Building Estimation and Costing by Nafisa Nazneen Choudhury (...Double Storeyed Building Estimation and Costing by Nafisa Nazneen Choudhury (...
Double Storeyed Building Estimation and Costing by Nafisa Nazneen Choudhury (...
 
EC Unit 002 new (1).pdf
EC  Unit 002 new (1).pdfEC  Unit 002 new (1).pdf
EC Unit 002 new (1).pdf
 
IRJET - Design and Analysis of Residential Institute Building
IRJET - Design and Analysis of Residential Institute BuildingIRJET - Design and Analysis of Residential Institute Building
IRJET - Design and Analysis of Residential Institute Building
 
final internship ppt.pptx
final internship ppt.pptxfinal internship ppt.pptx
final internship ppt.pptx
 
civil_engg_thesis_F inal presentation_mirzaShasan
civil_engg_thesis_F inal presentation_mirzaShasancivil_engg_thesis_F inal presentation_mirzaShasan
civil_engg_thesis_F inal presentation_mirzaShasan
 
Chap-5-T-Girder Example-1.pdf
Chap-5-T-Girder Example-1.pdfChap-5-T-Girder Example-1.pdf
Chap-5-T-Girder Example-1.pdf
 
Unit i
Unit iUnit i
Unit i
 
Building Structures Report (Group and Individual)
Building Structures Report (Group and Individual)Building Structures Report (Group and Individual)
Building Structures Report (Group and Individual)
 
BATCH 4 PPT.pptx
BATCH 4 PPT.pptxBATCH 4 PPT.pptx
BATCH 4 PPT.pptx
 
Jury Presenatation.pptx
Jury Presenatation.pptxJury Presenatation.pptx
Jury Presenatation.pptx
 
New Microsoft PowerPoint Presentation.pptx
New Microsoft PowerPoint Presentation.pptxNew Microsoft PowerPoint Presentation.pptx
New Microsoft PowerPoint Presentation.pptx
 
Pgche centreline presentation
Pgche centreline presentationPgche centreline presentation
Pgche centreline presentation
 
Mmup questionnaire 2
Mmup questionnaire 2Mmup questionnaire 2
Mmup questionnaire 2
 

More from SAIYYED AKABARALI MOHAMMAD

Safety lec2
Safety lec2Safety lec2
Safety lec1
Safety lec1Safety lec1
Estimate quantities of concrete from footings
Estimate quantities of concrete from footingsEstimate quantities of concrete from footings
Estimate quantities of concrete from footings
SAIYYED AKABARALI MOHAMMAD
 
Defects in plastering
Defects in plasteringDefects in plastering
Defects in plastering
SAIYYED AKABARALI MOHAMMAD
 
Types of plaster
Types of plasterTypes of plaster
Types of plaster
SAIYYED AKABARALI MOHAMMAD
 
Lime plastering
Lime plasteringLime plastering
National education policy 2020
National education policy 2020National education policy 2020
National education policy 2020
SAIYYED AKABARALI MOHAMMAD
 
Center line method 5
Center line method 5Center line method 5
Center line method 5
SAIYYED AKABARALI MOHAMMAD
 
Center line method 3
Center line method 3Center line method 3
Center line method 3
SAIYYED AKABARALI MOHAMMAD
 
Center line method 2
Center line method 2Center line method 2
Center line method 2
SAIYYED AKABARALI MOHAMMAD
 
ROCK & STONE
ROCK & STONEROCK & STONE
Future construction industry
Future construction industryFuture construction industry
Future construction industry
SAIYYED AKABARALI MOHAMMAD
 

More from SAIYYED AKABARALI MOHAMMAD (13)

Safety lec2
Safety lec2Safety lec2
Safety lec2
 
Safety lec1
Safety lec1Safety lec1
Safety lec1
 
Estimate quantities of concrete from footings
Estimate quantities of concrete from footingsEstimate quantities of concrete from footings
Estimate quantities of concrete from footings
 
Defects in plastering
Defects in plasteringDefects in plastering
Defects in plastering
 
Types of plaster
Types of plasterTypes of plaster
Types of plaster
 
Lime plastering
Lime plasteringLime plastering
Lime plastering
 
National education policy 2020
National education policy 2020National education policy 2020
National education policy 2020
 
Brick
BrickBrick
Brick
 
Center line method 5
Center line method 5Center line method 5
Center line method 5
 
Center line method 3
Center line method 3Center line method 3
Center line method 3
 
Center line method 2
Center line method 2Center line method 2
Center line method 2
 
ROCK & STONE
ROCK & STONEROCK & STONE
ROCK & STONE
 
Future construction industry
Future construction industryFuture construction industry
Future construction industry
 

Recently uploaded

Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
ChristineTorrepenida1
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
manasideore6
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
Basic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparelBasic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparel
top1002
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
SUTEJAS
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
Aditya Rajan Patra
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
Kerry Sado
 
Water billing management system project report.pdf
Water billing management system project report.pdfWater billing management system project report.pdf
Water billing management system project report.pdf
Kamal Acharya
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Soumen Santra
 
Steel & Timber Design according to British Standard
Steel & Timber Design according to British StandardSteel & Timber Design according to British Standard
Steel & Timber Design according to British Standard
AkolbilaEmmanuel1
 

Recently uploaded (20)

Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
Basic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparelBasic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparel
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
 
Water billing management system project report.pdf
Water billing management system project report.pdfWater billing management system project report.pdf
Water billing management system project report.pdf
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
 
Steel & Timber Design according to British Standard
Steel & Timber Design according to British StandardSteel & Timber Design according to British Standard
Steel & Timber Design according to British Standard
 

Long wall and short wall method 5

  • 1. Saiyyed73@gmail.com SESSION: 05 LONG WALL AND SHORT WALL METHOD
  • 2. Saiyyed73@gmail.com Example: Find out quantities of following items of work i. PCC ii. UCR work iii. Brick Work Step 1: To calculate center to center distance between walls C/C Long wall = 7 + 0.15 + 0.15 = 7.3 m C/C Short wall = 3 + 0.15 + 0.15 = 3.3 m 7m x 3m FLOOR PLAN 0.9m 1.2m Measurement sheet: Sr.no. Work description Unit No’s Length Width Height/ Depth Quantity Total Quantity i. PCC Work (B-1.2m) Length of long wall= c/c distance + ½ width of each sides Length of long wall= 7.3 + ½ x 1.2 + ½ x 1.2 =8.5 m Length of short wall= c/c distance - ½ width of each sides Length of short wall= 3.3 - ½ x 1.2 - ½ x 1.2 =2.1 m M3 2 8.5 1.2 0.2 4.08 5.088 M3 2 2.1 1.2 0.2 1.01 ii. UCR work (B-0.9m) 7.3 m 7.3 m 3.3 m 3.3 m 2.75m 0.5m 0.2m 0.3m
  • 3. Saiyyed73@gmail.com Length of long wall= c/c distance + ½ width of each sides Length of long wall= 7.3 + ½ x 0.9 + ½ x 0.9 =8.2m Length of short wall= c/c distance - ½ width of each sides Length of short wall= 3.3 - ½ x 0.9 - ½ x 0.9 =2.4 m M3 2 8.2 0.9 0.5 7.38 9.54 M3 2 2.4 0.9 0.5 2.16 iii. Brick Work (B-0.3m) Length of long wall= c/c distance + ½ width of each sides Length of long wall= 7.3 + ½ x 0.3 + ½ x 0.3 =7.6 m Length of short wall= c/c distance - ½ width of each sides Length of short wall= 3.3 - ½ x 0.3 - ½ x 0.3 =3.0 m M3 2 7.6 0.3 2.75 12.54 17.49 M3 2 3.0 0.3 2.75 4.95