SAIYYED SIR saiyyed73@gmail.com
SESSION: 02 LONG WALL AND SHORT WALL METHOD
Example:
1. Find out quantities of following items of work (See fig. No. 1)
i. Superstructure Brick work
Wall thick-0.3 m
Procedure:
1. To get length of long wall or short wall, calculate first the center line length of
individual walls.
Example: Refer above diagram for detail
Center to center distance of long wall = Length of wall + ½ width of left side wall +
½ width of right side wall
= 5.0 m + ½ x 0.3 + ½ x 0.3
= 5.3 m
Center to center distance of short wall = Length of wall + ½ width of left side wall +
½ width of right side wall
= 5.0 m + ½ x 0.3 + ½ x 0.3
= 5.3 m
2. Then the length of wall, (out to out) calculated after adding half breadth at each side
or end to its center line length. (This is applicable for long wall only)
SAIYYED SIR saiyyed73@gmail.com
Example:
Length of long wall = c/c distance of long wall + ½ width at each side
= 5.3 + ½ x 0.3 + ½ x 0.3
= 5.6 m
3. Thus length of short wall measured (in-to-in) calculated after deducting half breadth
of each side or end to its center line length. (This is applicable for short wall only)
Example:
Length of short wall = c/c distance of short wall - ½ width at each side
= 5.3 - ½ x 0.3 - ½ x 0.3
= 5.0 m
4. These lengths are multiplied by breadth and depth to get quantities of individual item
of work.
Example:
Measurement sheet:
Sr.no.
Work description Unit No’s Length Width Height/Depth Quantity Total
Quantity
1.0 Superstructure
Brick work
long wall M3 2 5.6 0.3 2.75 9.24
17.49short wall M3 2 5.0 0.3 2.75 8.25
Deduction
i. Door M3 1 1.2 0.3 2.1 0.756
2.196ii. Window M3 4 1.2 0.3 1.0 1.44
15.294

More Related Content

What's hot

Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works  Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works ALI HYDER GADHI
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concreteUdisha15
 
BUILDING ESTIMATION (Details Estimate For G+2 Storied Building presentation ...
BUILDING ESTIMATION (Details Estimate For G+2  Storied Building presentation ...BUILDING ESTIMATION (Details Estimate For G+2  Storied Building presentation ...
BUILDING ESTIMATION (Details Estimate For G+2 Storied Building presentation ...Manoranjan Roy
 
Creep and shrinkage
Creep and shrinkageCreep and shrinkage
Creep and shrinkageAsad Rehman
 
Design of industrial roof truss
Design of industrial roof truss Design of industrial roof truss
Design of industrial roof truss Sudhir Gayake
 
Concrete Honeycombs
Concrete Honeycombs Concrete Honeycombs
Concrete Honeycombs Dimuthuchat
 
PRESTRESSED CONCRETE STRUCTURES
PRESTRESSED CONCRETE STRUCTURESPRESTRESSED CONCRETE STRUCTURES
PRESTRESSED CONCRETE STRUCTURESTarun kumar
 
Shrinkage of concrete
Shrinkage of concreteShrinkage of concrete
Shrinkage of concretePramod GK
 
prestressed concrete
prestressed concreteprestressed concrete
prestressed concreteParag Pal
 
Shrinkage and creep
Shrinkage and creepShrinkage and creep
Shrinkage and creepJ C
 
Design of RCC Lintel
Design of RCC LintelDesign of RCC Lintel
Design of RCC LintelArun Kurali
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concreteRajesh Burde
 
CONCRETE MIX DESIGN AS PER IS 10262:2009
 CONCRETE MIX DESIGN AS PER IS 10262:2009  CONCRETE MIX DESIGN AS PER IS 10262:2009
CONCRETE MIX DESIGN AS PER IS 10262:2009 Avinash Kumar Gupta
 
EstimationandCosting.ppt
EstimationandCosting.pptEstimationandCosting.ppt
EstimationandCosting.pptBALAMURUGANR53
 
SEMI DESTRUCTIVE Test On Concrete _by Imran B K
SEMI DESTRUCTIVE  Test On Concrete _by Imran B KSEMI DESTRUCTIVE  Test On Concrete _by Imran B K
SEMI DESTRUCTIVE Test On Concrete _by Imran B KBk Imran
 
Flat slab design
Flat slab designFlat slab design
Flat slab designMoussa Rili
 
Penetration Test for Bitumen
Penetration Test for BitumenPenetration Test for Bitumen
Penetration Test for BitumenShweta Sagar
 

What's hot (20)

Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works  Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works
 
Approximate estimate
Approximate estimateApproximate estimate
Approximate estimate
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concrete
 
BUILDING ESTIMATION (Details Estimate For G+2 Storied Building presentation ...
BUILDING ESTIMATION (Details Estimate For G+2  Storied Building presentation ...BUILDING ESTIMATION (Details Estimate For G+2  Storied Building presentation ...
BUILDING ESTIMATION (Details Estimate For G+2 Storied Building presentation ...
 
Creep and shrinkage
Creep and shrinkageCreep and shrinkage
Creep and shrinkage
 
Design of industrial roof truss
Design of industrial roof truss Design of industrial roof truss
Design of industrial roof truss
 
Concrete Honeycombs
Concrete Honeycombs Concrete Honeycombs
Concrete Honeycombs
 
PRESTRESSED CONCRETE STRUCTURES
PRESTRESSED CONCRETE STRUCTURESPRESTRESSED CONCRETE STRUCTURES
PRESTRESSED CONCRETE STRUCTURES
 
Special Concretes
Special Concretes Special Concretes
Special Concretes
 
Shrinkage of concrete
Shrinkage of concreteShrinkage of concrete
Shrinkage of concrete
 
prestressed concrete
prestressed concreteprestressed concrete
prestressed concrete
 
Shrinkage and creep
Shrinkage and creepShrinkage and creep
Shrinkage and creep
 
Design of RCC Lintel
Design of RCC LintelDesign of RCC Lintel
Design of RCC Lintel
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concrete
 
Pile foundations
Pile foundationsPile foundations
Pile foundations
 
CONCRETE MIX DESIGN AS PER IS 10262:2009
 CONCRETE MIX DESIGN AS PER IS 10262:2009  CONCRETE MIX DESIGN AS PER IS 10262:2009
CONCRETE MIX DESIGN AS PER IS 10262:2009
 
EstimationandCosting.ppt
EstimationandCosting.pptEstimationandCosting.ppt
EstimationandCosting.ppt
 
SEMI DESTRUCTIVE Test On Concrete _by Imran B K
SEMI DESTRUCTIVE  Test On Concrete _by Imran B KSEMI DESTRUCTIVE  Test On Concrete _by Imran B K
SEMI DESTRUCTIVE Test On Concrete _by Imran B K
 
Flat slab design
Flat slab designFlat slab design
Flat slab design
 
Penetration Test for Bitumen
Penetration Test for BitumenPenetration Test for Bitumen
Penetration Test for Bitumen
 

Similar to Long wall and short wall method 2

Pgche centreline presentation
Pgche centreline presentationPgche centreline presentation
Pgche centreline presentationAnthonyward
 
E.C.V detail estimate By centre line and Long wall short wall method
E.C.V detail estimate By centre line and Long wall short wall methodE.C.V detail estimate By centre line and Long wall short wall method
E.C.V detail estimate By centre line and Long wall short wall methodYusuf Challawala
 
Lec.3 General rules in quantitative survey. Quantity measuring. Rate analysis
Lec.3  General rules in quantitative survey. Quantity measuring. Rate analysisLec.3  General rules in quantitative survey. Quantity measuring. Rate analysis
Lec.3 General rules in quantitative survey. Quantity measuring. Rate analysisMuthanna Abbu
 
Quantity notes pdf
Quantity notes pdfQuantity notes pdf
Quantity notes pdfSaqib Imran
 
Glass Fiber Reinforced Gypsum Panel use in Building Construction
Glass Fiber Reinforced Gypsum Panel use in Building ConstructionGlass Fiber Reinforced Gypsum Panel use in Building Construction
Glass Fiber Reinforced Gypsum Panel use in Building ConstructionGRD Journals
 
ECONOMICS%20FOR%20ENGINEERS%20%5BHM-EE601%5D_removed.pdf
ECONOMICS%20FOR%20ENGINEERS%20%5BHM-EE601%5D_removed.pdfECONOMICS%20FOR%20ENGINEERS%20%5BHM-EE601%5D_removed.pdf
ECONOMICS%20FOR%20ENGINEERS%20%5BHM-EE601%5D_removed.pdfSURAJITDASBAURI
 
Methods of Taking out Quantities Estimating Costing and Valuation
Methods of Taking out Quantities Estimating Costing and ValuationMethods of Taking out Quantities Estimating Costing and Valuation
Methods of Taking out Quantities Estimating Costing and ValuationPadmasinh Patil
 
Building Structure Project 2 Group report
Building Structure Project 2 Group reportBuilding Structure Project 2 Group report
Building Structure Project 2 Group reportsuzzanekan
 
Cost estimation of a Building
Cost  estimation of a BuildingCost  estimation of a Building
Cost estimation of a BuildingARAVINDBORRA1
 
1. UNIT -I ESTIMATION OF BUILDINGS.pdf
1. UNIT -I ESTIMATION OF BUILDINGS.pdf1. UNIT -I ESTIMATION OF BUILDINGS.pdf
1. UNIT -I ESTIMATION OF BUILDINGS.pdfAnuPriya323
 
Design of concrete structure 2 project-Loay Qabaha &Basel Salame
Design of concrete structure 2 project-Loay Qabaha &Basel SalameDesign of concrete structure 2 project-Loay Qabaha &Basel Salame
Design of concrete structure 2 project-Loay Qabaha &Basel SalameLoay Qabaha
 
ADAPT Ví dụ giải phóng chuyển vị- crack mitigation_example
ADAPT Ví dụ giải phóng chuyển vị- crack mitigation_exampleADAPT Ví dụ giải phóng chuyển vị- crack mitigation_example
ADAPT Ví dụ giải phóng chuyển vị- crack mitigation_exampleNguyen Ton Viet
 
estimation,its types and methods
estimation,its types and methodsestimation,its types and methods
estimation,its types and methodsgayu pandian
 
New Microsoft PowerPoint Presentation.pptx
New Microsoft PowerPoint Presentation.pptxNew Microsoft PowerPoint Presentation.pptx
New Microsoft PowerPoint Presentation.pptxRajeshKumar25548
 
Ce1402 estimationandquantitysurveying (1)
Ce1402 estimationandquantitysurveying (1)Ce1402 estimationandquantitysurveying (1)
Ce1402 estimationandquantitysurveying (1)hlksd
 

Similar to Long wall and short wall method 2 (20)

Long wall and short wall method 3
Long wall and short wall method 3Long wall and short wall method 3
Long wall and short wall method 3
 
Long wall and short wall method 1
Long wall and short wall method 1Long wall and short wall method 1
Long wall and short wall method 1
 
Seminar
SeminarSeminar
Seminar
 
Pgche centreline presentation
Pgche centreline presentationPgche centreline presentation
Pgche centreline presentation
 
EC Unit 002 new (1).pdf
EC  Unit 002 new (1).pdfEC  Unit 002 new (1).pdf
EC Unit 002 new (1).pdf
 
E.C.V detail estimate By centre line and Long wall short wall method
E.C.V detail estimate By centre line and Long wall short wall methodE.C.V detail estimate By centre line and Long wall short wall method
E.C.V detail estimate By centre line and Long wall short wall method
 
Lec.3 General rules in quantitative survey. Quantity measuring. Rate analysis
Lec.3  General rules in quantitative survey. Quantity measuring. Rate analysisLec.3  General rules in quantitative survey. Quantity measuring. Rate analysis
Lec.3 General rules in quantitative survey. Quantity measuring. Rate analysis
 
Quantity notes pdf
Quantity notes pdfQuantity notes pdf
Quantity notes pdf
 
ppt.pptx
ppt.pptxppt.pptx
ppt.pptx
 
Glass Fiber Reinforced Gypsum Panel use in Building Construction
Glass Fiber Reinforced Gypsum Panel use in Building ConstructionGlass Fiber Reinforced Gypsum Panel use in Building Construction
Glass Fiber Reinforced Gypsum Panel use in Building Construction
 
ECONOMICS%20FOR%20ENGINEERS%20%5BHM-EE601%5D_removed.pdf
ECONOMICS%20FOR%20ENGINEERS%20%5BHM-EE601%5D_removed.pdfECONOMICS%20FOR%20ENGINEERS%20%5BHM-EE601%5D_removed.pdf
ECONOMICS%20FOR%20ENGINEERS%20%5BHM-EE601%5D_removed.pdf
 
Methods of Taking out Quantities Estimating Costing and Valuation
Methods of Taking out Quantities Estimating Costing and ValuationMethods of Taking out Quantities Estimating Costing and Valuation
Methods of Taking out Quantities Estimating Costing and Valuation
 
Building Structure Project 2 Group report
Building Structure Project 2 Group reportBuilding Structure Project 2 Group report
Building Structure Project 2 Group report
 
Cost estimation of a Building
Cost  estimation of a BuildingCost  estimation of a Building
Cost estimation of a Building
 
1. UNIT -I ESTIMATION OF BUILDINGS.pdf
1. UNIT -I ESTIMATION OF BUILDINGS.pdf1. UNIT -I ESTIMATION OF BUILDINGS.pdf
1. UNIT -I ESTIMATION OF BUILDINGS.pdf
 
Design of concrete structure 2 project-Loay Qabaha &Basel Salame
Design of concrete structure 2 project-Loay Qabaha &Basel SalameDesign of concrete structure 2 project-Loay Qabaha &Basel Salame
Design of concrete structure 2 project-Loay Qabaha &Basel Salame
 
ADAPT Ví dụ giải phóng chuyển vị- crack mitigation_example
ADAPT Ví dụ giải phóng chuyển vị- crack mitigation_exampleADAPT Ví dụ giải phóng chuyển vị- crack mitigation_example
ADAPT Ví dụ giải phóng chuyển vị- crack mitigation_example
 
estimation,its types and methods
estimation,its types and methodsestimation,its types and methods
estimation,its types and methods
 
New Microsoft PowerPoint Presentation.pptx
New Microsoft PowerPoint Presentation.pptxNew Microsoft PowerPoint Presentation.pptx
New Microsoft PowerPoint Presentation.pptx
 
Ce1402 estimationandquantitysurveying (1)
Ce1402 estimationandquantitysurveying (1)Ce1402 estimationandquantitysurveying (1)
Ce1402 estimationandquantitysurveying (1)
 

Recently uploaded

Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZTE
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 

Recently uploaded (20)

Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 

Long wall and short wall method 2

  • 1. SAIYYED SIR saiyyed73@gmail.com SESSION: 02 LONG WALL AND SHORT WALL METHOD Example: 1. Find out quantities of following items of work (See fig. No. 1) i. Superstructure Brick work Wall thick-0.3 m Procedure: 1. To get length of long wall or short wall, calculate first the center line length of individual walls. Example: Refer above diagram for detail Center to center distance of long wall = Length of wall + ½ width of left side wall + ½ width of right side wall = 5.0 m + ½ x 0.3 + ½ x 0.3 = 5.3 m Center to center distance of short wall = Length of wall + ½ width of left side wall + ½ width of right side wall = 5.0 m + ½ x 0.3 + ½ x 0.3 = 5.3 m 2. Then the length of wall, (out to out) calculated after adding half breadth at each side or end to its center line length. (This is applicable for long wall only)
  • 2. SAIYYED SIR saiyyed73@gmail.com Example: Length of long wall = c/c distance of long wall + ½ width at each side = 5.3 + ½ x 0.3 + ½ x 0.3 = 5.6 m 3. Thus length of short wall measured (in-to-in) calculated after deducting half breadth of each side or end to its center line length. (This is applicable for short wall only) Example: Length of short wall = c/c distance of short wall - ½ width at each side = 5.3 - ½ x 0.3 - ½ x 0.3 = 5.0 m 4. These lengths are multiplied by breadth and depth to get quantities of individual item of work. Example: Measurement sheet: Sr.no. Work description Unit No’s Length Width Height/Depth Quantity Total Quantity 1.0 Superstructure Brick work long wall M3 2 5.6 0.3 2.75 9.24 17.49short wall M3 2 5.0 0.3 2.75 8.25 Deduction i. Door M3 1 1.2 0.3 2.1 0.756 2.196ii. Window M3 4 1.2 0.3 1.0 1.44 15.294