Example:
3. Find out quantities of following items of work
i. Excavation work ii. UCR work iii. BRICK WORK
Step 1:
Calculate the centre line length of the wall, and then multiply it with the breadth and depth
of the wall to find out quantity.
= 5.3 x 4 + 4.3 x 3 = 21.2 + 12.9 m = 34.1 m
22
Saiyyed73@gmail.com
Measurement sheet:
Sr.no.
Work description Unit No’s Length Width Height/Depth Quantity Total
Quantity
1.0 UCR work (W-0.6m)
M3 1 34.1 0.6 0.3 6.14
2.0 UCR work (W-0.5m)
M3 1 34.1 0.5 0.3 5.12
3.0 Brick Work (W-0.3m)
M3 1 34.1 0.3 3.5 35.81

Center line method 4

  • 1.
    Saiyyed73@gmail.com SESSION: 04 CENTRELINE METHOD Example: 3. Find out quantities of following items of work i. Excavation work ii. UCR work iii. BRICK WORK Step 1: Calculate the centre line length of the wall, and then multiply it with the breadth and depth of the wall to find out quantity. = 5.3 x 4 + 4.3 x 3 = 21.2 + 12.9 m = 34.1 m 22
  • 2.
    Saiyyed73@gmail.com Measurement sheet: Sr.no. Work descriptionUnit No’s Length Width Height/Depth Quantity Total Quantity 1.0 UCR work (W-0.6m) M3 1 34.1 0.6 0.3 6.14 2.0 UCR work (W-0.5m) M3 1 34.1 0.5 0.3 5.12 3.0 Brick Work (W-0.3m) M3 1 34.1 0.3 3.5 35.81