TRANSFORMING EXISTING 220 kV D/C LINE INTO
400 kV S/C LINE (TWIN CONDUCTORS)
CASE STUDY TOWARDS THE ENQUIRY FLOATED BY
RELIANCE INFRASTRUCTURE
SUPREME & CO. PVT. LTD.
P-200, BENARAS ROAD, HOWRAH -711108, WEST BENGAL, INDIA
Phone : +91-033-26516701 TO 05
Fax : +91-033-26516706
Email : sales@supreme.in & info@supreme.in
Website : www.supreme.in
1
WHY UPRATING / UPGRADING
IS REQUIRED ?
Existing and planned infrastructures have made it
extremely difficult to build new transmission line to
meet the electricity demand-supply gap.
It becomes highly pertinent to uprate or upgrade the
already existing line rather than constructing new
transmission line.2
PROCEDURE
System study
Analysis
Design and validation
Implementation
3
SYSTEM STUDY
 Study on existing power transmission system for
selecting the optimum solution.
 Conceptual study for optimal solution regarding
the upgrading of the existing 220 kV double
circuit transmission line corridor.
4
ANALYSIS OF SYSTEM
Identify an optimum alternative to upgrade the
transmission line corridor.
Evaluate the performance of the power
transmission system.
Investigating the capability of existing towers and
foundations to withstand new mechanical
loadings.
Undertake financial analysis for most promising
alternative.
Estimate cost of various alternatives.5
 Possible configurations are indicated towards the preliminary
study conducted over the data available for existing towers [1].
POSSIBLE CONFIGURATIONS
6
Technical
advantages
No new land
acquisition cost
Cost of erection is
minimized
Minimize
environmental
restriction
Reduces cost of
maintenance
Visually aesthetics
Foot print remains
the same*
* If the foundation has to be strengthened, there may be a mere increase in fo7
INCREASING POWER RATING
Power in a circuit is increased by:
 Uprating (increase in current flow).
 Upgrading (increase in voltage level).
 Both upgrading and uprating.
 Surge impedance loading.
8
UPRATING
 Line modification that yields increase in current flow
limits is known as uprating [2].
 Conductors are normally operated below the thermal
rating of the line.
 Current flow is increased to operate the conductor
closer to its thermal limit.
 Reconductoring the line with HTLS conductor is one
of the solutions.
9
HIGH PERFORMANCE
CONDUCTOR
 Carbon fibre core
 High operating temperature
 Ampacity twice as that of ACSR.
 Low sag.
 Higher Aluminium content.
 Resistance comparatively low.
10
HIGH PERFORMANCE
CONDUCTOR FITTINGS
Supreme has developed and
conducted electrical tests on
conductor fittings, specifically
designed for HTLS conductors.
Since HTLS conductors
operate at higher
temperature, they require
special type of clamps and
fittings.
11
LINE UPGRADING
Modifications that allow operation at higher voltage
level.
Results in higher increase in power flow, compared to
uprating.
Percentage voltage drop decreases.
Need to replace substation equipments.
Maintaining the electrical clearance increase as per
the voltage rating by reconfiguring insulator and12
FACTORS TO BE CONSIDERED FOR
LINE UPGRADING
Electrical Clearance.
RoW acquisition (may be required in exceptional
cases).
Civil and structural modifications (may be required).
Mitigation of Corona and Radio Interference Voltage
(RIV).
13
CLEARANCES FOR 400 kV
AC Nominal Voltage 400 kV
Minimum clearance above ground
8.84 m
Minimum live metal clearance
2.6 m
Minimum phase to phase clearance
3.9 m
Angle of shield (maximum)
200
Minimum mid span clearance
9 m
14
METHODS ADOPTED FOR
UPGRADING
Insulated Crossarms
Inter Phase Spacers
Intermediate Structures
Change of Conductor and Earthwire
15
PRINCIPLE OF AN
INSULATOR
 Freedom of movement provided
to the conductor determines the
clearance required for the line
[3].
 Clearance should be provided
for both inward and outward
swing of the conductor.
 For a suspension insulator,
freedom of movement is very
high and hence more clearance
will be required.
16
INSULATED CROSSARM
 Insulated crossarms are polymer
insulators that directly fixed to the
tower [4].
 This eliminates the use of metallic
crossarm.
 With the freedom of movement
restricted, the conductors swing
will be reduced significantly.
 This reduces the required live -
metal clearance level and thus
making the line compact.
17
INTER PHASE SPACERS
 Inter Phase Spacers are used to
maintain phase to phase
clearance even under high wind
condition.
 This reduces short circuit
problems encountered in many
high voltage lines.
 Composite insulators which has
high strength to weight ratio are
mainly used as inter phase
spacer.18
INTERMEDIATE STRUCTURE
If an intermediate structure is
needed after final analysis, we
could opt the use of monopoles.
Monopoles will require lesser foot
print when compared with a lattice
tower.
Foot print can be restricted as per
the availability of space
19
DISCONNECTION OF EXISTING LINK
DURING UPGRADING
Line shutdown is required for
making the erection works.
Temporary towers, supported by
guy wires without civil foundations,
can be installed in parallel with
existing line.
Line will be disconnected only at
the time of by-passing.
Power outage will only be in the20
Conductor type ACSR
Code name Moose
Diameter 31.77 mm
Area 597 sq mm
Weight 2.004 kg/m
UTS 16438 kgf
CONDUCTOR DETAILS
21
CORONA INCEPTION VALUE
The voltage gradient necessary to produce corona at the
conductor surface is given by,
𝐸0 = 30 ∗ 𝑚 1 +
0.301
𝑟
where
r : radius of the conductor and
m : surface irregularity factor
For example, consider Moose conductor with radius 1.5885
cm and surface irregularity factor, m= 0.80
We get, E0 = 30.76 kV/cm.
Beyond or near this value, the conductor has corona effect.
22
CALCULATION FOR CONDUCTOR
SURFACE GRADIENT:
The conductor surface gradient is calculated from the following
equation [5]:
E = (V/√3)*(b/(r*ln ((a/Re)*2h/ √(4h2+a2))))
where
E : conductor surface voltage gradient (kV/cm)
V : line voltage (kV)
b : factor for multiple conductors
r : radius of conductor (cm)
R : outside radius of bundle (cm)
Re : equivalent radius of bundle conductor (cm)
S : distance between component conductor centers (cm)
a : phase spacing (cm)
h : height of conductor above ground (cm)
n : number of component conductors in bundle
23
FOR SINGLE CONDUCTOR FOR TWIN CONDUCTOR
Number of Conductors in Bundle: 1 Number of Conductors in Bundle: 2
Rated Voltage: 400 kV Rated Voltage: 400 kV
Phase Spacing: 390 cm Phase Spacing: 390 cm
Height of Conductor above Ground: 884 cm Height of Conductor above Ground: 884 cm
Voltage Gradient E = 26.5316 kV/cm Voltage Gradient E = 20.4383 kV/cm
Distance between Component Conductors:
Conductors: 45 cm
R =22.5000 cm
Re = 8.0246 cm
β = 0.5318
RESULTS OF CORONA CALCULATION
24
SAG-TENSION CALCULATION
SPAN: 335 m; WIND ZONE: 3; TERRAIN CATEGORY: 1
LOADING CONDITION SAG (m) TENSION (kgf)
Initial Condition 7.664 2983.640
48° C Full Wind 5.805 3939.268
48° C 28% Wind 8.192 2791.232
48° C No Wind 8.613 2654.896
85° C Full Wind 6.585 3472.508
85° C 28% Wind 9.517 2402.742
85° C No Wind 10.039 2277.604
25
RESULTS FROM TECHNICAL AND
FINANCIAL EVALUATION
Costs are substantially reduced when compared with
the costs of a new 400 kV OHL.
No land or right of way acquisition is necessary for
project implementation compared with the new line
solution.
Minimum environmental impact.
26
REFERENCES
1. D. Marginean, E. Mateescu, H.S. Wechsler, G.
Florea, C. Matea, “Transforming Existing 220 kV
Double Circuit Line into 400 kV Single Circuit Line
in Romania”, IEEE- 2011.
2. Manual on Transmission Line, CBIP, 2014.
3. EPRI Transmission Line Reference Book—115-345
kV Compact Line Design, “The Blue Book”, 2008.
4. K. Papailiou, F. Schmuck, “Silicone Composite
Insulators: Materials, Design, Applications”,
Springer, 2012.
5. Cigre Green Book on Overhead Lines, 2014.
27
THANK YOU
SUPREME & CO. PVT. LTD.
P-200, BENARAS ROAD, HOWRAH -711108, WEST BENGAL, INDIA
Phone : +91-033-26516701 TO 05
Fax : +91-033-26516706
Email : sales@supreme.in & info@supreme.in
Website : www.supreme.in
28

More Related Content

What's hot

Mechanical Design of Transmission Line (In context of Nepal)
Mechanical Design of Transmission Line (In context of Nepal)Mechanical Design of Transmission Line (In context of Nepal)
Mechanical Design of Transmission Line (In context of Nepal)
Kathmandu Univesity
 
Substation overview
Substation overviewSubstation overview
Substation overview
BHAGWAN PRASAD
 
Principles of Cable Sizing
Principles of Cable SizingPrinciples of Cable Sizing
Principles of Cable Sizing
Leonardo ENERGY
 
UNIT - 04 POWER INSTALLATIONS
UNIT - 04 POWER INSTALLATIONSUNIT - 04 POWER INSTALLATIONS
UNIT - 04 POWER INSTALLATIONS
PremanandDesai
 
Electrical testing
Electrical testingElectrical testing
Electrical testing
Aarjun Singh Panesar
 
Construction EHV Transmission Line
Construction EHV Transmission LineConstruction EHV Transmission Line
Construction EHV Transmission Line
SURESH GOPAL
 
Mitsubishi - substation insulation coordination studies-sparacino
Mitsubishi - substation insulation coordination studies-sparacinoMitsubishi - substation insulation coordination studies-sparacino
Mitsubishi - substation insulation coordination studies-sparacino
Gilberto Mejía
 
Le.h insulation coordination - Digsilent
Le.h insulation coordination - DigsilentLe.h insulation coordination - Digsilent
Le.h insulation coordination - Digsilent
Gilberto Mejía
 
Electrical Systems Safety
Electrical Systems SafetyElectrical Systems Safety
Electrical Systems SafetyTalia Carbis
 
The sheath voltage_limiter
The sheath voltage_limiterThe sheath voltage_limiter
The sheath voltage_limiter
Gilberto Mejía
 
UNIT - 02 SERVICE MAIN
UNIT - 02 SERVICE MAINUNIT - 02 SERVICE MAIN
UNIT - 02 SERVICE MAIN
PremanandDesai
 
Problems in overhead transmission line
Problems in overhead transmission lineProblems in overhead transmission line
Problems in overhead transmission line
Dr. Bibhu Prasad Ganthia
 
Chapter 3 transmission line performance
Chapter 3  transmission line performanceChapter 3  transmission line performance
Chapter 3 transmission line performance
firaoltemesgen1
 
High voltage transmission
High voltage transmissionHigh voltage transmission
High voltage transmission
SHIVLAL MOHAL
 
Perfiles
PerfilesPerfiles
EHV AC
EHV ACEHV AC
EHV AC
Rana Gill
 
Substation grounding grid design using Alternative Transients Program-ATP and...
Substation grounding grid design using Alternative Transients Program-ATP and...Substation grounding grid design using Alternative Transients Program-ATP and...
Substation grounding grid design using Alternative Transients Program-ATP and...
Jose Dariel Arcila
 
Transmission Line
Transmission LineTransmission Line
Transmission Line
PRITAM DEBNATH
 

What's hot (20)

Mechanical Design of Transmission Line (In context of Nepal)
Mechanical Design of Transmission Line (In context of Nepal)Mechanical Design of Transmission Line (In context of Nepal)
Mechanical Design of Transmission Line (In context of Nepal)
 
Ehv ac transmission line
Ehv ac transmission lineEhv ac transmission line
Ehv ac transmission line
 
Substation overview
Substation overviewSubstation overview
Substation overview
 
Principles of Cable Sizing
Principles of Cable SizingPrinciples of Cable Sizing
Principles of Cable Sizing
 
UNIT - 04 POWER INSTALLATIONS
UNIT - 04 POWER INSTALLATIONSUNIT - 04 POWER INSTALLATIONS
UNIT - 04 POWER INSTALLATIONS
 
Lec transmission line
Lec transmission lineLec transmission line
Lec transmission line
 
Electrical testing
Electrical testingElectrical testing
Electrical testing
 
Construction EHV Transmission Line
Construction EHV Transmission LineConstruction EHV Transmission Line
Construction EHV Transmission Line
 
Mitsubishi - substation insulation coordination studies-sparacino
Mitsubishi - substation insulation coordination studies-sparacinoMitsubishi - substation insulation coordination studies-sparacino
Mitsubishi - substation insulation coordination studies-sparacino
 
Le.h insulation coordination - Digsilent
Le.h insulation coordination - DigsilentLe.h insulation coordination - Digsilent
Le.h insulation coordination - Digsilent
 
Electrical Systems Safety
Electrical Systems SafetyElectrical Systems Safety
Electrical Systems Safety
 
The sheath voltage_limiter
The sheath voltage_limiterThe sheath voltage_limiter
The sheath voltage_limiter
 
UNIT - 02 SERVICE MAIN
UNIT - 02 SERVICE MAINUNIT - 02 SERVICE MAIN
UNIT - 02 SERVICE MAIN
 
Problems in overhead transmission line
Problems in overhead transmission lineProblems in overhead transmission line
Problems in overhead transmission line
 
Chapter 3 transmission line performance
Chapter 3  transmission line performanceChapter 3  transmission line performance
Chapter 3 transmission line performance
 
High voltage transmission
High voltage transmissionHigh voltage transmission
High voltage transmission
 
Perfiles
PerfilesPerfiles
Perfiles
 
EHV AC
EHV ACEHV AC
EHV AC
 
Substation grounding grid design using Alternative Transients Program-ATP and...
Substation grounding grid design using Alternative Transients Program-ATP and...Substation grounding grid design using Alternative Transients Program-ATP and...
Substation grounding grid design using Alternative Transients Program-ATP and...
 
Transmission Line
Transmission LineTransmission Line
Transmission Line
 

Viewers also liked

ABT a complete report and a case study
ABT a complete report and a case studyABT a complete report and a case study
ABT a complete report and a case studyWaseem Hashmat
 
Training report on 400 kV GSS
Training report on 400 kV GSSTraining report on 400 kV GSS
Training report on 400 kV GSS
Puneet Manghani
 
Power grid corporation of india ltd
Power grid corporation of india ltdPower grid corporation of india ltd
Power grid corporation of india ltd
Tanay Roy, CFA
 
Performance of 400 kv line insulators under pollution.
Performance of 400 kv line insulators under pollution.Performance of 400 kv line insulators under pollution.
Performance of 400 kv line insulators under pollution.
Ankit Sisodiya
 
Micro-Grid Power: Working Intelligently and Working Together
Micro-Grid Power: Working Intelligently and Working TogetherMicro-Grid Power: Working Intelligently and Working Together
Micro-Grid Power: Working Intelligently and Working Together
Brian Lucke
 
ABT-UI & Deviation Settlement Mechanism (DSM)
ABT-UI & Deviation Settlement Mechanism (DSM)ABT-UI & Deviation Settlement Mechanism (DSM)
ABT-UI & Deviation Settlement Mechanism (DSM)
shyamies11
 
Smart Microgrids: Overview and Outlook
Smart Microgrids: Overview and OutlookSmart Microgrids: Overview and Outlook
Smart Microgrids: Overview and Outlook
Wilfried Elmenreich
 
SF6 circuit breaker
SF6 circuit breakerSF6 circuit breaker
SF6 circuit breaker
Purshottam Suman
 
Visit to 400 kV substation, Hadala
Visit to 400 kV substation, HadalaVisit to 400 kV substation, Hadala
Visit to 400 kV substation, Hadala
Nandan Desai
 
SF6 CIRCUIT BREAKER
SF6 CIRCUIT BREAKERSF6 CIRCUIT BREAKER
SF6 CIRCUIT BREAKER
sssspp
 
1.substation layouts
1.substation  layouts1.substation  layouts
1.substation layouts
ayyadurai SHANMUGAM
 
Solar water pumping_solution
Solar water pumping_solutionSolar water pumping_solution
Solar water pumping_solution
Harish Agarwal
 
SF6 Circuit breaker by Khalid, NIT Warangal 2014 Batch
SF6 Circuit breaker by Khalid, NIT Warangal 2014 BatchSF6 Circuit breaker by Khalid, NIT Warangal 2014 Batch
SF6 Circuit breaker by Khalid, NIT Warangal 2014 Batch
Khalid Khan
 
Generator protection by bhushan kumbhalkar
Generator protection by bhushan kumbhalkarGenerator protection by bhushan kumbhalkar
Generator protection by bhushan kumbhalkar
Bhushan Kumbhalkar
 
Powergrid Corporation India Limited industrial training
Powergrid Corporation India Limited industrial trainingPowergrid Corporation India Limited industrial training
Powergrid Corporation India Limited industrial training
Akriti Gupta
 
Microgrid Presentation
Microgrid PresentationMicrogrid Presentation
Microgrid Presentation
Shahab Khan
 
protection of transmission lines[distance relay protection scheme]
protection of transmission lines[distance relay protection scheme]protection of transmission lines[distance relay protection scheme]
protection of transmission lines[distance relay protection scheme]moiz89
 

Viewers also liked (20)

Cerc slideshow
Cerc slideshowCerc slideshow
Cerc slideshow
 
ABT a complete report and a case study
ABT a complete report and a case studyABT a complete report and a case study
ABT a complete report and a case study
 
Sf6 gas properties
Sf6 gas propertiesSf6 gas properties
Sf6 gas properties
 
Training report on 400 kV GSS
Training report on 400 kV GSSTraining report on 400 kV GSS
Training report on 400 kV GSS
 
Power grid corporation of india ltd
Power grid corporation of india ltdPower grid corporation of india ltd
Power grid corporation of india ltd
 
Performance of 400 kv line insulators under pollution.
Performance of 400 kv line insulators under pollution.Performance of 400 kv line insulators under pollution.
Performance of 400 kv line insulators under pollution.
 
Micro-Grid Power: Working Intelligently and Working Together
Micro-Grid Power: Working Intelligently and Working TogetherMicro-Grid Power: Working Intelligently and Working Together
Micro-Grid Power: Working Intelligently and Working Together
 
ABT-UI & Deviation Settlement Mechanism (DSM)
ABT-UI & Deviation Settlement Mechanism (DSM)ABT-UI & Deviation Settlement Mechanism (DSM)
ABT-UI & Deviation Settlement Mechanism (DSM)
 
Smart Microgrids: Overview and Outlook
Smart Microgrids: Overview and OutlookSmart Microgrids: Overview and Outlook
Smart Microgrids: Overview and Outlook
 
SF6 circuit breaker
SF6 circuit breakerSF6 circuit breaker
SF6 circuit breaker
 
Visit to 400 kV substation, Hadala
Visit to 400 kV substation, HadalaVisit to 400 kV substation, Hadala
Visit to 400 kV substation, Hadala
 
SF6 CIRCUIT BREAKER
SF6 CIRCUIT BREAKERSF6 CIRCUIT BREAKER
SF6 CIRCUIT BREAKER
 
1.substation layouts
1.substation  layouts1.substation  layouts
1.substation layouts
 
Solar water pumping_solution
Solar water pumping_solutionSolar water pumping_solution
Solar water pumping_solution
 
SF6 Circuit breaker by Khalid, NIT Warangal 2014 Batch
SF6 Circuit breaker by Khalid, NIT Warangal 2014 BatchSF6 Circuit breaker by Khalid, NIT Warangal 2014 Batch
SF6 Circuit breaker by Khalid, NIT Warangal 2014 Batch
 
Generator protection by bhushan kumbhalkar
Generator protection by bhushan kumbhalkarGenerator protection by bhushan kumbhalkar
Generator protection by bhushan kumbhalkar
 
Microgrid
MicrogridMicrogrid
Microgrid
 
Powergrid Corporation India Limited industrial training
Powergrid Corporation India Limited industrial trainingPowergrid Corporation India Limited industrial training
Powergrid Corporation India Limited industrial training
 
Microgrid Presentation
Microgrid PresentationMicrogrid Presentation
Microgrid Presentation
 
protection of transmission lines[distance relay protection scheme]
protection of transmission lines[distance relay protection scheme]protection of transmission lines[distance relay protection scheme]
protection of transmission lines[distance relay protection scheme]
 

Similar to Line upgrade

Wireless Power Transfer Project
Wireless Power Transfer  ProjectWireless Power Transfer  Project
Wireless Power Transfer Project
sagnikchoudhury
 
WIRELESS POWER TRANSMISSION Project
WIRELESS POWER TRANSMISSION ProjectWIRELESS POWER TRANSMISSION Project
WIRELESS POWER TRANSMISSION Project
sagnikchoudhury
 
System Studies on interaction of HTS cables with power grids
System Studies on interaction of HTS cables with power gridsSystem Studies on interaction of HTS cables with power grids
System Studies on interaction of HTS cables with power grids
Dutch Power
 
Transmission Line presentation______.ppt
Transmission Line presentation______.pptTransmission Line presentation______.ppt
Transmission Line presentation______.ppt
ssuserc3b807
 
CHAPTER 2 Design of Building Electrical Systems (2).pptx.pptx
CHAPTER 2 Design of Building Electrical Systems (2).pptx.pptxCHAPTER 2 Design of Building Electrical Systems (2).pptx.pptx
CHAPTER 2 Design of Building Electrical Systems (2).pptx.pptx
LiewChiaPing
 
Micro-alloyed copper overhead line conductors - PowerGrid International Augus...
Micro-alloyed copper overhead line conductors - PowerGrid International Augus...Micro-alloyed copper overhead line conductors - PowerGrid International Augus...
Micro-alloyed copper overhead line conductors - PowerGrid International Augus...
Leonardo ENERGY
 
ELECTRICAL POWER TRANSMISSION-3.pptx
ELECTRICAL POWER TRANSMISSION-3.pptxELECTRICAL POWER TRANSMISSION-3.pptx
ELECTRICAL POWER TRANSMISSION-3.pptx
amitpandey509058
 
Busduct___Busbar.pptx
Busduct___Busbar.pptxBusduct___Busbar.pptx
Busduct___Busbar.pptx
pramod719257
 
transmission line
transmission line transmission line
transmission line
singh1515
 
Darkawi_et_al_CEIDP_2012_VF_IEEE
Darkawi_et_al_CEIDP_2012_VF_IEEEDarkawi_et_al_CEIDP_2012_VF_IEEE
Darkawi_et_al_CEIDP_2012_VF_IEEEAbdallah Darkawi
 
High Voltage Direct Current(Hvdc) transmission
High Voltage Direct Current(Hvdc) transmissionHigh Voltage Direct Current(Hvdc) transmission
High Voltage Direct Current(Hvdc) transmission
University of Gujrat, Pakistan
 
Cooper Power Connectors - MV-HV Specifiers Guide 5kV-35kV
Cooper Power Connectors - MV-HV Specifiers Guide 5kV-35kVCooper Power Connectors - MV-HV Specifiers Guide 5kV-35kV
Cooper Power Connectors - MV-HV Specifiers Guide 5kV-35kV
Thorne & Derrick International
 
HIGH VOLTAGE DIRECT CURRENT TRANSMISSION.pdf
HIGH VOLTAGE DIRECT CURRENT TRANSMISSION.pdfHIGH VOLTAGE DIRECT CURRENT TRANSMISSION.pdf
HIGH VOLTAGE DIRECT CURRENT TRANSMISSION.pdf
EMERSON EDUARDO RODRIGUES
 
Concept of energy transmission & distribution
Concept of energy transmission & distribution Concept of energy transmission & distribution
Concept of energy transmission & distribution
ZunAib Ali
 
Nexans high-voltage.pdf
Nexans high-voltage.pdfNexans high-voltage.pdf
Nexans high-voltage.pdf
prse
 
Thermal power plant working
Thermal power plant workingThermal power plant working
Thermal power plant working
Sandeep Jamdar
 
Effect of the Cable Capacitance of Long Control Cables on the Actuation of Co...
Effect of the Cable Capacitance of Long Control Cables on the Actuation of Co...Effect of the Cable Capacitance of Long Control Cables on the Actuation of Co...
Effect of the Cable Capacitance of Long Control Cables on the Actuation of Co...
Cengiz TANYERI
 
THD ANALYSIS OF LFAC TRANSMISSION SYSTEM
THD ANALYSIS OF LFAC TRANSMISSION SYSTEMTHD ANALYSIS OF LFAC TRANSMISSION SYSTEM
THD ANALYSIS OF LFAC TRANSMISSION SYSTEM
ijiert bestjournal
 
Eaton-Product-Aid
Eaton-Product-AidEaton-Product-Aid
Eaton-Product-AidJoe Galuska
 

Similar to Line upgrade (20)

Wireless Power Transfer Project
Wireless Power Transfer  ProjectWireless Power Transfer  Project
Wireless Power Transfer Project
 
WIRELESS POWER TRANSMISSION Project
WIRELESS POWER TRANSMISSION ProjectWIRELESS POWER TRANSMISSION Project
WIRELESS POWER TRANSMISSION Project
 
System Studies on interaction of HTS cables with power grids
System Studies on interaction of HTS cables with power gridsSystem Studies on interaction of HTS cables with power grids
System Studies on interaction of HTS cables with power grids
 
Transmission Line presentation______.ppt
Transmission Line presentation______.pptTransmission Line presentation______.ppt
Transmission Line presentation______.ppt
 
CHAPTER 2 Design of Building Electrical Systems (2).pptx.pptx
CHAPTER 2 Design of Building Electrical Systems (2).pptx.pptxCHAPTER 2 Design of Building Electrical Systems (2).pptx.pptx
CHAPTER 2 Design of Building Electrical Systems (2).pptx.pptx
 
Micro-alloyed copper overhead line conductors - PowerGrid International Augus...
Micro-alloyed copper overhead line conductors - PowerGrid International Augus...Micro-alloyed copper overhead line conductors - PowerGrid International Augus...
Micro-alloyed copper overhead line conductors - PowerGrid International Augus...
 
ELECTRICAL POWER TRANSMISSION-3.pptx
ELECTRICAL POWER TRANSMISSION-3.pptxELECTRICAL POWER TRANSMISSION-3.pptx
ELECTRICAL POWER TRANSMISSION-3.pptx
 
Busduct___Busbar.pptx
Busduct___Busbar.pptxBusduct___Busbar.pptx
Busduct___Busbar.pptx
 
transmission line
transmission line transmission line
transmission line
 
Darkawi_et_al_CEIDP_2012_VF_IEEE
Darkawi_et_al_CEIDP_2012_VF_IEEEDarkawi_et_al_CEIDP_2012_VF_IEEE
Darkawi_et_al_CEIDP_2012_VF_IEEE
 
High Voltage Direct Current(Hvdc) transmission
High Voltage Direct Current(Hvdc) transmissionHigh Voltage Direct Current(Hvdc) transmission
High Voltage Direct Current(Hvdc) transmission
 
Cooper Power Connectors - MV-HV Specifiers Guide 5kV-35kV
Cooper Power Connectors - MV-HV Specifiers Guide 5kV-35kVCooper Power Connectors - MV-HV Specifiers Guide 5kV-35kV
Cooper Power Connectors - MV-HV Specifiers Guide 5kV-35kV
 
HIGH VOLTAGE DIRECT CURRENT TRANSMISSION.pdf
HIGH VOLTAGE DIRECT CURRENT TRANSMISSION.pdfHIGH VOLTAGE DIRECT CURRENT TRANSMISSION.pdf
HIGH VOLTAGE DIRECT CURRENT TRANSMISSION.pdf
 
Concept of energy transmission & distribution
Concept of energy transmission & distribution Concept of energy transmission & distribution
Concept of energy transmission & distribution
 
Nexans high-voltage.pdf
Nexans high-voltage.pdfNexans high-voltage.pdf
Nexans high-voltage.pdf
 
Eee 465 ppt 1
Eee 465 ppt 1Eee 465 ppt 1
Eee 465 ppt 1
 
Thermal power plant working
Thermal power plant workingThermal power plant working
Thermal power plant working
 
Effect of the Cable Capacitance of Long Control Cables on the Actuation of Co...
Effect of the Cable Capacitance of Long Control Cables on the Actuation of Co...Effect of the Cable Capacitance of Long Control Cables on the Actuation of Co...
Effect of the Cable Capacitance of Long Control Cables on the Actuation of Co...
 
THD ANALYSIS OF LFAC TRANSMISSION SYSTEM
THD ANALYSIS OF LFAC TRANSMISSION SYSTEMTHD ANALYSIS OF LFAC TRANSMISSION SYSTEM
THD ANALYSIS OF LFAC TRANSMISSION SYSTEM
 
Eaton-Product-Aid
Eaton-Product-AidEaton-Product-Aid
Eaton-Product-Aid
 

More from Harish Agarwal

Aerial fibre optics
Aerial fibre opticsAerial fibre optics
Aerial fibre optics
Harish Agarwal
 
Line upgrade
Line upgradeLine upgrade
Line upgrade
Harish Agarwal
 
Monopole
MonopoleMonopole
Monopole
Harish Agarwal
 
Koshika cause & impact kolkata meetings 16.01.18
Koshika cause & impact kolkata meetings 16.01.18Koshika cause & impact kolkata meetings 16.01.18
Koshika cause & impact kolkata meetings 16.01.18
Harish Agarwal
 
Covered conductor
Covered conductorCovered conductor
Covered conductor
Harish Agarwal
 
Line upgrade
Line upgradeLine upgrade
Line upgrade
Harish Agarwal
 
Fittings for lv abc
Fittings for lv abcFittings for lv abc
Fittings for lv abc
Harish Agarwal
 
Covered conductor
Covered conductorCovered conductor
Covered conductor
Harish Agarwal
 
Harish aggarwal
Harish aggarwalHarish aggarwal
Harish aggarwal
Harish Agarwal
 
Case study sterlite deadend grip
Case study  sterlite deadend gripCase study  sterlite deadend grip
Case study sterlite deadend grip
Harish Agarwal
 
Hpc new
Hpc newHpc new
Innovative solution for line uprating
Innovative solution for line upratingInnovative solution for line uprating
Innovative solution for line uprating
Harish Agarwal
 
Pole type structures
Pole type structuresPole type structures
Pole type structures
Harish Agarwal
 
Innovative solution for line uprating
Innovative solution for line upratingInnovative solution for line uprating
Innovative solution for line uprating
Harish Agarwal
 
Effect of GST in solar industry
Effect of GST in solar industryEffect of GST in solar industry
Effect of GST in solar industry
Harish Agarwal
 
Development and testing of ipc
Development and testing of ipcDevelopment and testing of ipc
Development and testing of ipc
Harish Agarwal
 
INTER PHASE SPACERS
INTER PHASE SPACERS INTER PHASE SPACERS
INTER PHASE SPACERS
Harish Agarwal
 

More from Harish Agarwal (17)

Aerial fibre optics
Aerial fibre opticsAerial fibre optics
Aerial fibre optics
 
Line upgrade
Line upgradeLine upgrade
Line upgrade
 
Monopole
MonopoleMonopole
Monopole
 
Koshika cause & impact kolkata meetings 16.01.18
Koshika cause & impact kolkata meetings 16.01.18Koshika cause & impact kolkata meetings 16.01.18
Koshika cause & impact kolkata meetings 16.01.18
 
Covered conductor
Covered conductorCovered conductor
Covered conductor
 
Line upgrade
Line upgradeLine upgrade
Line upgrade
 
Fittings for lv abc
Fittings for lv abcFittings for lv abc
Fittings for lv abc
 
Covered conductor
Covered conductorCovered conductor
Covered conductor
 
Harish aggarwal
Harish aggarwalHarish aggarwal
Harish aggarwal
 
Case study sterlite deadend grip
Case study  sterlite deadend gripCase study  sterlite deadend grip
Case study sterlite deadend grip
 
Hpc new
Hpc newHpc new
Hpc new
 
Innovative solution for line uprating
Innovative solution for line upratingInnovative solution for line uprating
Innovative solution for line uprating
 
Pole type structures
Pole type structuresPole type structures
Pole type structures
 
Innovative solution for line uprating
Innovative solution for line upratingInnovative solution for line uprating
Innovative solution for line uprating
 
Effect of GST in solar industry
Effect of GST in solar industryEffect of GST in solar industry
Effect of GST in solar industry
 
Development and testing of ipc
Development and testing of ipcDevelopment and testing of ipc
Development and testing of ipc
 
INTER PHASE SPACERS
INTER PHASE SPACERS INTER PHASE SPACERS
INTER PHASE SPACERS
 

Recently uploaded

amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
marketing317746
 
The-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic managementThe-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic management
Bojamma2
 
Unveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdfUnveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdf
Sam H
 
Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for Entrepreneurs
Ben Wann
 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
agatadrynko
 
Cracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxCracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptx
Workforce Group
 
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdfSearch Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Arihant Webtech Pvt. Ltd
 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
tjcomstrang
 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
RajPriye
 
Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111
zoyaansari11365
 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
dylandmeas
 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
seoforlegalpillers
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
LR1709MUSIC
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
Operational Excellence Consulting
 
VAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and RequirementsVAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and Requirements
uae taxgpt
 
The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...
balatucanapplelovely
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
Lital Barkan
 
5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer
ofm712785
 
What are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdfWhat are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdf
HumanResourceDimensi1
 
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
BBPMedia1
 

Recently uploaded (20)

amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
 
The-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic managementThe-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic management
 
Unveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdfUnveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdf
 
Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for Entrepreneurs
 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
 
Cracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxCracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptx
 
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdfSearch Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
 
Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111
 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
 
VAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and RequirementsVAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and Requirements
 
The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
 
5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer
 
What are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdfWhat are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdf
 
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
 

Line upgrade

  • 1. TRANSFORMING EXISTING 220 kV D/C LINE INTO 400 kV S/C LINE (TWIN CONDUCTORS) CASE STUDY TOWARDS THE ENQUIRY FLOATED BY RELIANCE INFRASTRUCTURE SUPREME & CO. PVT. LTD. P-200, BENARAS ROAD, HOWRAH -711108, WEST BENGAL, INDIA Phone : +91-033-26516701 TO 05 Fax : +91-033-26516706 Email : sales@supreme.in & info@supreme.in Website : www.supreme.in 1
  • 2. WHY UPRATING / UPGRADING IS REQUIRED ? Existing and planned infrastructures have made it extremely difficult to build new transmission line to meet the electricity demand-supply gap. It becomes highly pertinent to uprate or upgrade the already existing line rather than constructing new transmission line.2
  • 4. SYSTEM STUDY  Study on existing power transmission system for selecting the optimum solution.  Conceptual study for optimal solution regarding the upgrading of the existing 220 kV double circuit transmission line corridor. 4
  • 5. ANALYSIS OF SYSTEM Identify an optimum alternative to upgrade the transmission line corridor. Evaluate the performance of the power transmission system. Investigating the capability of existing towers and foundations to withstand new mechanical loadings. Undertake financial analysis for most promising alternative. Estimate cost of various alternatives.5
  • 6.  Possible configurations are indicated towards the preliminary study conducted over the data available for existing towers [1]. POSSIBLE CONFIGURATIONS 6
  • 7. Technical advantages No new land acquisition cost Cost of erection is minimized Minimize environmental restriction Reduces cost of maintenance Visually aesthetics Foot print remains the same* * If the foundation has to be strengthened, there may be a mere increase in fo7
  • 8. INCREASING POWER RATING Power in a circuit is increased by:  Uprating (increase in current flow).  Upgrading (increase in voltage level).  Both upgrading and uprating.  Surge impedance loading. 8
  • 9. UPRATING  Line modification that yields increase in current flow limits is known as uprating [2].  Conductors are normally operated below the thermal rating of the line.  Current flow is increased to operate the conductor closer to its thermal limit.  Reconductoring the line with HTLS conductor is one of the solutions. 9
  • 10. HIGH PERFORMANCE CONDUCTOR  Carbon fibre core  High operating temperature  Ampacity twice as that of ACSR.  Low sag.  Higher Aluminium content.  Resistance comparatively low. 10
  • 11. HIGH PERFORMANCE CONDUCTOR FITTINGS Supreme has developed and conducted electrical tests on conductor fittings, specifically designed for HTLS conductors. Since HTLS conductors operate at higher temperature, they require special type of clamps and fittings. 11
  • 12. LINE UPGRADING Modifications that allow operation at higher voltage level. Results in higher increase in power flow, compared to uprating. Percentage voltage drop decreases. Need to replace substation equipments. Maintaining the electrical clearance increase as per the voltage rating by reconfiguring insulator and12
  • 13. FACTORS TO BE CONSIDERED FOR LINE UPGRADING Electrical Clearance. RoW acquisition (may be required in exceptional cases). Civil and structural modifications (may be required). Mitigation of Corona and Radio Interference Voltage (RIV). 13
  • 14. CLEARANCES FOR 400 kV AC Nominal Voltage 400 kV Minimum clearance above ground 8.84 m Minimum live metal clearance 2.6 m Minimum phase to phase clearance 3.9 m Angle of shield (maximum) 200 Minimum mid span clearance 9 m 14
  • 15. METHODS ADOPTED FOR UPGRADING Insulated Crossarms Inter Phase Spacers Intermediate Structures Change of Conductor and Earthwire 15
  • 16. PRINCIPLE OF AN INSULATOR  Freedom of movement provided to the conductor determines the clearance required for the line [3].  Clearance should be provided for both inward and outward swing of the conductor.  For a suspension insulator, freedom of movement is very high and hence more clearance will be required. 16
  • 17. INSULATED CROSSARM  Insulated crossarms are polymer insulators that directly fixed to the tower [4].  This eliminates the use of metallic crossarm.  With the freedom of movement restricted, the conductors swing will be reduced significantly.  This reduces the required live - metal clearance level and thus making the line compact. 17
  • 18. INTER PHASE SPACERS  Inter Phase Spacers are used to maintain phase to phase clearance even under high wind condition.  This reduces short circuit problems encountered in many high voltage lines.  Composite insulators which has high strength to weight ratio are mainly used as inter phase spacer.18
  • 19. INTERMEDIATE STRUCTURE If an intermediate structure is needed after final analysis, we could opt the use of monopoles. Monopoles will require lesser foot print when compared with a lattice tower. Foot print can be restricted as per the availability of space 19
  • 20. DISCONNECTION OF EXISTING LINK DURING UPGRADING Line shutdown is required for making the erection works. Temporary towers, supported by guy wires without civil foundations, can be installed in parallel with existing line. Line will be disconnected only at the time of by-passing. Power outage will only be in the20
  • 21. Conductor type ACSR Code name Moose Diameter 31.77 mm Area 597 sq mm Weight 2.004 kg/m UTS 16438 kgf CONDUCTOR DETAILS 21
  • 22. CORONA INCEPTION VALUE The voltage gradient necessary to produce corona at the conductor surface is given by, 𝐸0 = 30 ∗ 𝑚 1 + 0.301 𝑟 where r : radius of the conductor and m : surface irregularity factor For example, consider Moose conductor with radius 1.5885 cm and surface irregularity factor, m= 0.80 We get, E0 = 30.76 kV/cm. Beyond or near this value, the conductor has corona effect. 22
  • 23. CALCULATION FOR CONDUCTOR SURFACE GRADIENT: The conductor surface gradient is calculated from the following equation [5]: E = (V/√3)*(b/(r*ln ((a/Re)*2h/ √(4h2+a2)))) where E : conductor surface voltage gradient (kV/cm) V : line voltage (kV) b : factor for multiple conductors r : radius of conductor (cm) R : outside radius of bundle (cm) Re : equivalent radius of bundle conductor (cm) S : distance between component conductor centers (cm) a : phase spacing (cm) h : height of conductor above ground (cm) n : number of component conductors in bundle 23
  • 24. FOR SINGLE CONDUCTOR FOR TWIN CONDUCTOR Number of Conductors in Bundle: 1 Number of Conductors in Bundle: 2 Rated Voltage: 400 kV Rated Voltage: 400 kV Phase Spacing: 390 cm Phase Spacing: 390 cm Height of Conductor above Ground: 884 cm Height of Conductor above Ground: 884 cm Voltage Gradient E = 26.5316 kV/cm Voltage Gradient E = 20.4383 kV/cm Distance between Component Conductors: Conductors: 45 cm R =22.5000 cm Re = 8.0246 cm β = 0.5318 RESULTS OF CORONA CALCULATION 24
  • 25. SAG-TENSION CALCULATION SPAN: 335 m; WIND ZONE: 3; TERRAIN CATEGORY: 1 LOADING CONDITION SAG (m) TENSION (kgf) Initial Condition 7.664 2983.640 48° C Full Wind 5.805 3939.268 48° C 28% Wind 8.192 2791.232 48° C No Wind 8.613 2654.896 85° C Full Wind 6.585 3472.508 85° C 28% Wind 9.517 2402.742 85° C No Wind 10.039 2277.604 25
  • 26. RESULTS FROM TECHNICAL AND FINANCIAL EVALUATION Costs are substantially reduced when compared with the costs of a new 400 kV OHL. No land or right of way acquisition is necessary for project implementation compared with the new line solution. Minimum environmental impact. 26
  • 27. REFERENCES 1. D. Marginean, E. Mateescu, H.S. Wechsler, G. Florea, C. Matea, “Transforming Existing 220 kV Double Circuit Line into 400 kV Single Circuit Line in Romania”, IEEE- 2011. 2. Manual on Transmission Line, CBIP, 2014. 3. EPRI Transmission Line Reference Book—115-345 kV Compact Line Design, “The Blue Book”, 2008. 4. K. Papailiou, F. Schmuck, “Silicone Composite Insulators: Materials, Design, Applications”, Springer, 2012. 5. Cigre Green Book on Overhead Lines, 2014. 27
  • 28. THANK YOU SUPREME & CO. PVT. LTD. P-200, BENARAS ROAD, HOWRAH -711108, WEST BENGAL, INDIA Phone : +91-033-26516701 TO 05 Fax : +91-033-26516706 Email : sales@supreme.in & info@supreme.in Website : www.supreme.in 28