ABOUT THE SUBSTATION
 The substation at Hadala (Rajkot), Gujarat is a 400 kV distribution substation.
 It receives power at 400 kV from Adani Thermal power plant via Varsana, from Mundra
TPP via Chorania (Limbdi) and via Jetpur and from Varsana SS.
 It sends power at two voltage levels – 220 kV and 132 kV to Morbi, Nyara (Rajkot),
Tappar, Gondal etc.
 The substation is connected as a ring system as
Chorania
(Limbdi)
Amreli
Jetpur
Hadala
(Rajkot)
(Continue… )
(cont.)
 The substation is having two main bus and one transfer bus for both 400 kV side and
220 kV side.
 There are in total 6 lines of 400 kV level, 8+ lines of 220 kV and some lines of 132 kV
level.
 It’s a record that there has been no accidents in this substation since last 2000+ days.
Equipments in substation
 Lightening arresters
 Wave trap
 Current Transformer (C.T.)
 Potential Transformer (P.T.)
 Line isolator with Earthing switch
 SF6 Circuit breaker with starting
resistance
 Bus isolator
 3 phase reactor
(cont.)
Equipments in substation
 Power transformers
 Cables trench & tray
 Fire fighting facility
LIGHTENING ARRESTER
 The lightening arresters (L.A.) are used to ground
the high voltage impulse falling on line during
lightening.
 L.A. of all the lines connected to a bus are
connected in parallel in order to ensure the proper
grounding of surge as well as to increase its life.
 The L.A. core is made up of Zinc Oxide (ZnO2). It
acts as a non-linear resistance i.e. it offers a very
high resistance during normal conditions and offers
low resistance to the surge voltages.
 A ring type structure is attached to L.A. in order to
reduce the corona effect.
WAVE TRAP
 A wave trap is used on those transmission
lines which are equipped with PLCC (Power
Line Carrier Communication).
 As the communication signal frequency is
much different from line frequency and also
the voltage level is too low, it is quite
necessary to separate the power signal and
communication signal.
 This task is performed by a wave trap which
simply consists of L-C series and parallel
filters.
INSTRUMENT TRANFORMERS
 The instrument transformers are:
1. Current Transformers (C.T.) – Used to
measure phase current.
2. Potential Transformers (P.T.) – Used to
measure phase to neutral voltage.
 In this substation at some places CVT
(Capacitive Voltage Transformers) are
used which does function of PT as well as
assisting the Wave Trap.
C.T. P.T.
LINE/BUS ISOLATORS
Centre Break
Isolator
Double Break
Isolator
Pantograph type bus isolators
LINE/BUS ISOLATORS
 The line isolators are used to isolate the line (after the operation of opening C.B.)
under maintenance from the healthy system which otherwise may get resulted in L-
G fault.
 The bus isolators are used to isolate the bus under maintenance.
 In this substation normally line isolators were centre break type isolators while the
bus isolators were either double break type OR pantograph type isolators.
 The disc type structure at the tips of centre break type isolator is to reduce the
corona loss while they are open.
(cont.)
CIRCUIT BREAKERS
 In this substation almost all the circuit
breakers are SF6 type circuit breakers.
 There is a switchable series resistance along
with the C.B. as shown here. It is inserted
while closing the circuit breakers for a short
time.
 This resistor, hence, limits the charging
current of the line’s stray capacitance.
3 PHASE REACTOR
 The shunt reactors are used to absorb the excess of
reactive power in the transmission lines.
 In this substation as long transmission lines are
terminating in, their stray capacitance inject reactive
power to absorb which, the reactor is installed here.
 The installed reactor is capable to reduce the line
voltage by as much as 5 kV.
 In this substation, power lines coming from wind
power station is also terminating. Since, there are
large variations in the power production, their reactive
power demand is also varying. Hence the reactor here
is a switchable reactor.
POWER TRANSFORMER
 This substation has two type of power transformers:
1) 400 kV  220 kV and
2) 220 kV  132 kV
 The cooling system employed is forced air – forced oil.
 The cooling systems of transformers are automatically
controlled. Once the temperature reaches 70 C, the
cooling system starts and as temperature reaches 60  C,
the systems switches OFF.
 The supply to the cooling system is given from the
substation supply transformer.
400 kV transformer
220 kV to 132 kV transformer
CABLES TRENCH & TRAY
 The cables that collect the communication signals from
instrument transformers, circuit breakers, isolators,
wave traps etc. are made to run in cable trench
towards the control room.
 The place where all the cables are collected is called
cable tray.
FIRE FIGHTING FACILITY
 As oil is used as coolant and body insulator, there are possibilities of fire in case of
short circuits.
 Fire fighting facility available in two ways in this substation.
 One way is that at some particular distance gaseous fire extinguishing cylinders
are kept.
 Another is that a water pipe runs everywhere in substation. In case of fire, it
sprinkles the water in surrounding area in fine molecular form in order to stop
propagation of fire.
CONTROL ROOM & RELAY ROOM
• The control room has various control panels which shows the information like
incoming power, outgoing power, frequency, time common to all substations, status
of various lines (healthy, faulted, under outage or maintenance), status of various
protective instruments like isolators, circuit breakers; temperatures of various
instruments, working tap of transformers etc.
• The DAS (Data Acquisition System) is used to accumulate the data received from
various sources.
• The relay room is separate from the control room. All relays used here are numerical
and are either from Siemens OR ABB .
• The protection system is so fast that it can detect a fault within 30 ms and hence the
circuit breaker can be operated within as less as 80 ms.
• For 400 kV side C.B., one time auto reclosure is allowed in order to clear the
temporary faults automatically.
Control Room Relay Room
BATTERY ROOM
 The control panels and relays of the substation require DC supply of 220 V.
 This DC supply is made with the help of battery bank reserve normally kept in a
separate room called Battery room.
 The batteries used in this substation are Nickel-Cadmium (Ni-Cd) batteries. These
batteries are used due to their advantages like low maintenance, longer life (15-25
years) etc.
 Each cell is of 2 V and 6Ah capacity.
 The battery room and the battery chargers are shown in next slide.
BATTERY ROOM & ITS CHARGERS
Battery Room Battery Chargers
Visit to 400 kV substation, Hadala

More Related Content

What's hot

Substation Training presentation
Substation Training presentationSubstation Training presentation
Substation Training presentation
Kamal Mittal
 
Switchyard
SwitchyardSwitchyard
Switchyard
I.E.T. lucknow
 
132 33kv substation
132 33kv substation132 33kv substation
132 33kv substation
ManishKushwaha97
 
Training report on substation presentation
Training report on substation presentationTraining report on substation presentation
Training report on substation presentation
Kanahiya Lal
 
220 kv Sub-station Summer Training ppt
220 kv Sub-station Summer Training ppt220 kv Sub-station Summer Training ppt
220 kv Sub-station Summer Training ppt
Shubham Patel
 
Industrial summer training on 220 kv substation ppt
Industrial summer training on 220 kv substation pptIndustrial summer training on 220 kv substation ppt
Industrial summer training on 220 kv substation ppt
Ashutosh Srivastava
 
Switchgear Equipment in a Substation
Switchgear Equipment in a SubstationSwitchgear Equipment in a Substation
Switchgear Equipment in a Substation
Md. Atiqur Rahman
 
ppt on summer training on uppcl
ppt on summer training on uppclppt on summer training on uppcl
ppt on summer training on uppcl
Sunny Daksh
 
REPORT ON 33/11KV SUBSTATION
REPORT ON 33/11KV SUBSTATION REPORT ON 33/11KV SUBSTATION
REPORT ON 33/11KV SUBSTATION
Ravi Phadtare
 
Sub station training ppt
Sub station training pptSub station training ppt
Sub station training ppt
sitesh95074
 
Report on industrial summer training on 220 kv substation
Report  on industrial summer training on 220 kv substationReport  on industrial summer training on 220 kv substation
Report on industrial summer training on 220 kv substation
Ashutosh Srivastava
 
33/11 kV substation (u.p.p.c.l.)
33/11 kV substation (u.p.p.c.l.)33/11 kV substation (u.p.p.c.l.)
33/11 kV substation (u.p.p.c.l.)Prateek Agarwal
 
PPt on 220 kV substation
PPt on 220 kV substationPPt on 220 kV substation
PPt on 220 kV substationIshank Ranjan
 
Electrical SUBSTATION ppt
Electrical SUBSTATION pptElectrical SUBSTATION ppt
Electrical SUBSTATION ppt
TanvirkabirShishir
 
Uttar pradesh power corparation ltd. training report
Uttar pradesh power corparation ltd. training reportUttar pradesh power corparation ltd. training report
Uttar pradesh power corparation ltd. training report19saurabh89
 
Powergrid Corporation India Limited industrial training
Powergrid Corporation India Limited industrial trainingPowergrid Corporation India Limited industrial training
Powergrid Corporation India Limited industrial training
Akriti Gupta
 
substation 220 kv
substation 220 kv substation 220 kv
substation 220 kv
student
 
Ppt on 132 kv gss by ashok khoja
Ppt on  132 kv gss  by ashok khojaPpt on  132 kv gss  by ashok khoja
Ppt on 132 kv gss by ashok khojaASHOK KHOJA
 
Summer Internship Report -By Rahul Mehra
Summer Internship Report -By Rahul MehraSummer Internship Report -By Rahul Mehra
Summer Internship Report -By Rahul Mehra
Rahul Mehra
 

What's hot (20)

Substation Training presentation
Substation Training presentationSubstation Training presentation
Substation Training presentation
 
Switchyard
SwitchyardSwitchyard
Switchyard
 
132 33kv substation
132 33kv substation132 33kv substation
132 33kv substation
 
Training report on substation presentation
Training report on substation presentationTraining report on substation presentation
Training report on substation presentation
 
220 kv Sub-station Summer Training ppt
220 kv Sub-station Summer Training ppt220 kv Sub-station Summer Training ppt
220 kv Sub-station Summer Training ppt
 
Industrial summer training on 220 kv substation ppt
Industrial summer training on 220 kv substation pptIndustrial summer training on 220 kv substation ppt
Industrial summer training on 220 kv substation ppt
 
Switchgear Equipment in a Substation
Switchgear Equipment in a SubstationSwitchgear Equipment in a Substation
Switchgear Equipment in a Substation
 
ppt on summer training on uppcl
ppt on summer training on uppclppt on summer training on uppcl
ppt on summer training on uppcl
 
REPORT ON 33/11KV SUBSTATION
REPORT ON 33/11KV SUBSTATION REPORT ON 33/11KV SUBSTATION
REPORT ON 33/11KV SUBSTATION
 
Sub station training ppt
Sub station training pptSub station training ppt
Sub station training ppt
 
132 kv
132 kv132 kv
132 kv
 
Report on industrial summer training on 220 kv substation
Report  on industrial summer training on 220 kv substationReport  on industrial summer training on 220 kv substation
Report on industrial summer training on 220 kv substation
 
33/11 kV substation (u.p.p.c.l.)
33/11 kV substation (u.p.p.c.l.)33/11 kV substation (u.p.p.c.l.)
33/11 kV substation (u.p.p.c.l.)
 
PPt on 220 kV substation
PPt on 220 kV substationPPt on 220 kV substation
PPt on 220 kV substation
 
Electrical SUBSTATION ppt
Electrical SUBSTATION pptElectrical SUBSTATION ppt
Electrical SUBSTATION ppt
 
Uttar pradesh power corparation ltd. training report
Uttar pradesh power corparation ltd. training reportUttar pradesh power corparation ltd. training report
Uttar pradesh power corparation ltd. training report
 
Powergrid Corporation India Limited industrial training
Powergrid Corporation India Limited industrial trainingPowergrid Corporation India Limited industrial training
Powergrid Corporation India Limited industrial training
 
substation 220 kv
substation 220 kv substation 220 kv
substation 220 kv
 
Ppt on 132 kv gss by ashok khoja
Ppt on  132 kv gss  by ashok khojaPpt on  132 kv gss  by ashok khoja
Ppt on 132 kv gss by ashok khoja
 
Summer Internship Report -By Rahul Mehra
Summer Internship Report -By Rahul MehraSummer Internship Report -By Rahul Mehra
Summer Internship Report -By Rahul Mehra
 

Similar to Visit to 400 kV substation, Hadala

Sharavati receiving station
Sharavati  receiving stationSharavati  receiving station
Sharavati receiving station
H.C.Naveen Kumar
 
industrialsummertrainingon220kvsubstationppt-170413134021.pdf
industrialsummertrainingon220kvsubstationppt-170413134021.pdfindustrialsummertrainingon220kvsubstationppt-170413134021.pdf
industrialsummertrainingon220kvsubstationppt-170413134021.pdf
Devesh54
 
Rajasthan Rajya Vidyut Prasaran Nigam.pptx
Rajasthan Rajya Vidyut Prasaran Nigam.pptxRajasthan Rajya Vidyut Prasaran Nigam.pptx
Rajasthan Rajya Vidyut Prasaran Nigam.pptx
sohaib268827
 
WBSETCL Subhash Gram 220KV Substation Training Report
WBSETCL Subhash Gram 220KV Substation Training ReportWBSETCL Subhash Gram 220KV Substation Training Report
WBSETCL Subhash Gram 220KV Substation Training Report
Arijit Basu
 
400 KV GSS HEERAPURA, JAIPUR
400 KV GSS HEERAPURA, JAIPUR400 KV GSS HEERAPURA, JAIPUR
400 KV GSS HEERAPURA, JAIPUR
sahid raja khan
 
Madan mohan malaviya
Madan mohan malaviyaMadan mohan malaviya
Madan mohan malaviya
Anuj Bansal
 
Uttar pradesh power corporation limited
Uttar pradesh power corporation limitedUttar pradesh power corporation limited
Uttar pradesh power corporation limited
VSRAGHU
 
industrial-training-at-howrah-220-kv-substation.pptx
industrial-training-at-howrah-220-kv-substation.pptxindustrial-training-at-howrah-220-kv-substation.pptx
industrial-training-at-howrah-220-kv-substation.pptx
ShubhoDas5
 
Ashwani kumar
Ashwani kumarAshwani kumar
Ashwani kumar
Ashwani Kumar
 
400 kv Heerapura gss ppt by ishan pdf
400 kv Heerapura gss ppt by ishan pdf 400 kv Heerapura gss ppt by ishan pdf
400 kv Heerapura gss ppt by ishan pdf
Ishan Khandelwal
 
fdocuments.in_presentation-on-substation-220-kv.pptx
fdocuments.in_presentation-on-substation-220-kv.pptxfdocuments.in_presentation-on-substation-220-kv.pptx
fdocuments.in_presentation-on-substation-220-kv.pptx
AkshaiSai2
 
Gss ppt by kanhaiya
Gss ppt  by kanhaiyaGss ppt  by kanhaiya
Gss ppt by kanhaiya
imkanhaiyalal
 
Report on 220kv substation at Jassure
Report on 220kv substation at JassureReport on 220kv substation at Jassure
Report on 220kv substation at Jassure
Shuvam Pathania
 
PPT ON 33/11KV SUBSTATION
PPT ON 33/11KV SUBSTATIONPPT ON 33/11KV SUBSTATION
PPT ON 33/11KV SUBSTATION
Ravi Phadtare
 
rough.pptx
rough.pptxrough.pptx
rough.pptx
virat217995
 
132kV GSS ppt
132kV GSS ppt132kV GSS ppt
132kV GSS ppt
Abhishek Dosaya
 
pptravi-191011011024 (1).pdf
pptravi-191011011024 (1).pdfpptravi-191011011024 (1).pdf
pptravi-191011011024 (1).pdf
Hariomgupta90
 
Indian grid system
Indian grid systemIndian grid system
Indian grid system
PRANAY GUPTA
 
Ppt on 400 kv gss raiser Bikaner- Yatendra Parashar
Ppt on 400 kv gss raiser Bikaner- Yatendra ParasharPpt on 400 kv gss raiser Bikaner- Yatendra Parashar
Ppt on 400 kv gss raiser Bikaner- Yatendra Parashar
Yatendra Parashar
 
sub subsation seminar ppt.pptx
sub subsation seminar ppt.pptxsub subsation seminar ppt.pptx
sub subsation seminar ppt.pptx
fallinhay
 

Similar to Visit to 400 kV substation, Hadala (20)

Sharavati receiving station
Sharavati  receiving stationSharavati  receiving station
Sharavati receiving station
 
industrialsummertrainingon220kvsubstationppt-170413134021.pdf
industrialsummertrainingon220kvsubstationppt-170413134021.pdfindustrialsummertrainingon220kvsubstationppt-170413134021.pdf
industrialsummertrainingon220kvsubstationppt-170413134021.pdf
 
Rajasthan Rajya Vidyut Prasaran Nigam.pptx
Rajasthan Rajya Vidyut Prasaran Nigam.pptxRajasthan Rajya Vidyut Prasaran Nigam.pptx
Rajasthan Rajya Vidyut Prasaran Nigam.pptx
 
WBSETCL Subhash Gram 220KV Substation Training Report
WBSETCL Subhash Gram 220KV Substation Training ReportWBSETCL Subhash Gram 220KV Substation Training Report
WBSETCL Subhash Gram 220KV Substation Training Report
 
400 KV GSS HEERAPURA, JAIPUR
400 KV GSS HEERAPURA, JAIPUR400 KV GSS HEERAPURA, JAIPUR
400 KV GSS HEERAPURA, JAIPUR
 
Madan mohan malaviya
Madan mohan malaviyaMadan mohan malaviya
Madan mohan malaviya
 
Uttar pradesh power corporation limited
Uttar pradesh power corporation limitedUttar pradesh power corporation limited
Uttar pradesh power corporation limited
 
industrial-training-at-howrah-220-kv-substation.pptx
industrial-training-at-howrah-220-kv-substation.pptxindustrial-training-at-howrah-220-kv-substation.pptx
industrial-training-at-howrah-220-kv-substation.pptx
 
Ashwani kumar
Ashwani kumarAshwani kumar
Ashwani kumar
 
400 kv Heerapura gss ppt by ishan pdf
400 kv Heerapura gss ppt by ishan pdf 400 kv Heerapura gss ppt by ishan pdf
400 kv Heerapura gss ppt by ishan pdf
 
fdocuments.in_presentation-on-substation-220-kv.pptx
fdocuments.in_presentation-on-substation-220-kv.pptxfdocuments.in_presentation-on-substation-220-kv.pptx
fdocuments.in_presentation-on-substation-220-kv.pptx
 
Gss ppt by kanhaiya
Gss ppt  by kanhaiyaGss ppt  by kanhaiya
Gss ppt by kanhaiya
 
Report on 220kv substation at Jassure
Report on 220kv substation at JassureReport on 220kv substation at Jassure
Report on 220kv substation at Jassure
 
PPT ON 33/11KV SUBSTATION
PPT ON 33/11KV SUBSTATIONPPT ON 33/11KV SUBSTATION
PPT ON 33/11KV SUBSTATION
 
rough.pptx
rough.pptxrough.pptx
rough.pptx
 
132kV GSS ppt
132kV GSS ppt132kV GSS ppt
132kV GSS ppt
 
pptravi-191011011024 (1).pdf
pptravi-191011011024 (1).pdfpptravi-191011011024 (1).pdf
pptravi-191011011024 (1).pdf
 
Indian grid system
Indian grid systemIndian grid system
Indian grid system
 
Ppt on 400 kv gss raiser Bikaner- Yatendra Parashar
Ppt on 400 kv gss raiser Bikaner- Yatendra ParasharPpt on 400 kv gss raiser Bikaner- Yatendra Parashar
Ppt on 400 kv gss raiser Bikaner- Yatendra Parashar
 
sub subsation seminar ppt.pptx
sub subsation seminar ppt.pptxsub subsation seminar ppt.pptx
sub subsation seminar ppt.pptx
 

Recently uploaded

哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
insn4465
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Soumen Santra
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
ChristineTorrepenida1
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
Madan Karki
 
basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
NidhalKahouli2
 
Fundamentals of Induction Motor Drives.pptx
Fundamentals of Induction Motor Drives.pptxFundamentals of Induction Motor Drives.pptx
Fundamentals of Induction Motor Drives.pptx
manasideore6
 
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
dxobcob
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
Dr Ramhari Poudyal
 
Swimming pool mechanical components design.pptx
Swimming pool  mechanical components design.pptxSwimming pool  mechanical components design.pptx
Swimming pool mechanical components design.pptx
yokeleetan1
 
原版制作(unimelb毕业证书)墨尔本大学毕业证Offer一模一样
原版制作(unimelb毕业证书)墨尔本大学毕业证Offer一模一样原版制作(unimelb毕业证书)墨尔本大学毕业证Offer一模一样
原版制作(unimelb毕业证书)墨尔本大学毕业证Offer一模一样
obonagu
 
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
Mukeshwaran Balu
 
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理
zwunae
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
Kerry Sado
 
Building Electrical System Design & Installation
Building Electrical System Design & InstallationBuilding Electrical System Design & Installation
Building Electrical System Design & Installation
symbo111
 
bank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdfbank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdf
Divyam548318
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
WENKENLI1
 
Self-Control of Emotions by Slidesgo.pptx
Self-Control of Emotions by Slidesgo.pptxSelf-Control of Emotions by Slidesgo.pptx
Self-Control of Emotions by Slidesgo.pptx
iemerc2024
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
sieving analysis and results interpretation
sieving analysis and results interpretationsieving analysis and results interpretation
sieving analysis and results interpretation
ssuser36d3051
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 

Recently uploaded (20)

哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
 
basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
 
Fundamentals of Induction Motor Drives.pptx
Fundamentals of Induction Motor Drives.pptxFundamentals of Induction Motor Drives.pptx
Fundamentals of Induction Motor Drives.pptx
 
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
 
Swimming pool mechanical components design.pptx
Swimming pool  mechanical components design.pptxSwimming pool  mechanical components design.pptx
Swimming pool mechanical components design.pptx
 
原版制作(unimelb毕业证书)墨尔本大学毕业证Offer一模一样
原版制作(unimelb毕业证书)墨尔本大学毕业证Offer一模一样原版制作(unimelb毕业证书)墨尔本大学毕业证Offer一模一样
原版制作(unimelb毕业证书)墨尔本大学毕业证Offer一模一样
 
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
 
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
 
Building Electrical System Design & Installation
Building Electrical System Design & InstallationBuilding Electrical System Design & Installation
Building Electrical System Design & Installation
 
bank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdfbank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdf
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
 
Self-Control of Emotions by Slidesgo.pptx
Self-Control of Emotions by Slidesgo.pptxSelf-Control of Emotions by Slidesgo.pptx
Self-Control of Emotions by Slidesgo.pptx
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
sieving analysis and results interpretation
sieving analysis and results interpretationsieving analysis and results interpretation
sieving analysis and results interpretation
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 

Visit to 400 kV substation, Hadala

  • 1. Visit to 400 kV substation Created by - NANDAN DESAI
  • 2. Location : Hadala, Rajkot, Gujarat
  • 3. Location : Hadala, Rajkot, Gujarat
  • 4. ABOUT THE SUBSTATION  The substation at Hadala (Rajkot), Gujarat is a 400 kV distribution substation.  It receives power at 400 kV from Adani Thermal power plant via Varsana, from Mundra TPP via Chorania (Limbdi) and via Jetpur and from Varsana SS.  It sends power at two voltage levels – 220 kV and 132 kV to Morbi, Nyara (Rajkot), Tappar, Gondal etc.  The substation is connected as a ring system as Chorania (Limbdi) Amreli Jetpur Hadala (Rajkot) (Continue… )
  • 5. (cont.)  The substation is having two main bus and one transfer bus for both 400 kV side and 220 kV side.  There are in total 6 lines of 400 kV level, 8+ lines of 220 kV and some lines of 132 kV level.  It’s a record that there has been no accidents in this substation since last 2000+ days.
  • 6. Equipments in substation  Lightening arresters  Wave trap  Current Transformer (C.T.)  Potential Transformer (P.T.)  Line isolator with Earthing switch  SF6 Circuit breaker with starting resistance  Bus isolator  3 phase reactor (cont.)
  • 7. Equipments in substation  Power transformers  Cables trench & tray  Fire fighting facility
  • 8. LIGHTENING ARRESTER  The lightening arresters (L.A.) are used to ground the high voltage impulse falling on line during lightening.  L.A. of all the lines connected to a bus are connected in parallel in order to ensure the proper grounding of surge as well as to increase its life.  The L.A. core is made up of Zinc Oxide (ZnO2). It acts as a non-linear resistance i.e. it offers a very high resistance during normal conditions and offers low resistance to the surge voltages.  A ring type structure is attached to L.A. in order to reduce the corona effect.
  • 9. WAVE TRAP  A wave trap is used on those transmission lines which are equipped with PLCC (Power Line Carrier Communication).  As the communication signal frequency is much different from line frequency and also the voltage level is too low, it is quite necessary to separate the power signal and communication signal.  This task is performed by a wave trap which simply consists of L-C series and parallel filters.
  • 10. INSTRUMENT TRANFORMERS  The instrument transformers are: 1. Current Transformers (C.T.) – Used to measure phase current. 2. Potential Transformers (P.T.) – Used to measure phase to neutral voltage.  In this substation at some places CVT (Capacitive Voltage Transformers) are used which does function of PT as well as assisting the Wave Trap. C.T. P.T.
  • 11. LINE/BUS ISOLATORS Centre Break Isolator Double Break Isolator Pantograph type bus isolators
  • 12. LINE/BUS ISOLATORS  The line isolators are used to isolate the line (after the operation of opening C.B.) under maintenance from the healthy system which otherwise may get resulted in L- G fault.  The bus isolators are used to isolate the bus under maintenance.  In this substation normally line isolators were centre break type isolators while the bus isolators were either double break type OR pantograph type isolators.  The disc type structure at the tips of centre break type isolator is to reduce the corona loss while they are open. (cont.)
  • 13. CIRCUIT BREAKERS  In this substation almost all the circuit breakers are SF6 type circuit breakers.  There is a switchable series resistance along with the C.B. as shown here. It is inserted while closing the circuit breakers for a short time.  This resistor, hence, limits the charging current of the line’s stray capacitance.
  • 14. 3 PHASE REACTOR  The shunt reactors are used to absorb the excess of reactive power in the transmission lines.  In this substation as long transmission lines are terminating in, their stray capacitance inject reactive power to absorb which, the reactor is installed here.  The installed reactor is capable to reduce the line voltage by as much as 5 kV.  In this substation, power lines coming from wind power station is also terminating. Since, there are large variations in the power production, their reactive power demand is also varying. Hence the reactor here is a switchable reactor.
  • 15. POWER TRANSFORMER  This substation has two type of power transformers: 1) 400 kV  220 kV and 2) 220 kV  132 kV  The cooling system employed is forced air – forced oil.  The cooling systems of transformers are automatically controlled. Once the temperature reaches 70 C, the cooling system starts and as temperature reaches 60  C, the systems switches OFF.  The supply to the cooling system is given from the substation supply transformer. 400 kV transformer 220 kV to 132 kV transformer
  • 16. CABLES TRENCH & TRAY  The cables that collect the communication signals from instrument transformers, circuit breakers, isolators, wave traps etc. are made to run in cable trench towards the control room.  The place where all the cables are collected is called cable tray.
  • 17. FIRE FIGHTING FACILITY  As oil is used as coolant and body insulator, there are possibilities of fire in case of short circuits.  Fire fighting facility available in two ways in this substation.  One way is that at some particular distance gaseous fire extinguishing cylinders are kept.  Another is that a water pipe runs everywhere in substation. In case of fire, it sprinkles the water in surrounding area in fine molecular form in order to stop propagation of fire.
  • 18. CONTROL ROOM & RELAY ROOM • The control room has various control panels which shows the information like incoming power, outgoing power, frequency, time common to all substations, status of various lines (healthy, faulted, under outage or maintenance), status of various protective instruments like isolators, circuit breakers; temperatures of various instruments, working tap of transformers etc. • The DAS (Data Acquisition System) is used to accumulate the data received from various sources. • The relay room is separate from the control room. All relays used here are numerical and are either from Siemens OR ABB . • The protection system is so fast that it can detect a fault within 30 ms and hence the circuit breaker can be operated within as less as 80 ms. • For 400 kV side C.B., one time auto reclosure is allowed in order to clear the temporary faults automatically.
  • 20. BATTERY ROOM  The control panels and relays of the substation require DC supply of 220 V.  This DC supply is made with the help of battery bank reserve normally kept in a separate room called Battery room.  The batteries used in this substation are Nickel-Cadmium (Ni-Cd) batteries. These batteries are used due to their advantages like low maintenance, longer life (15-25 years) etc.  Each cell is of 2 V and 6Ah capacity.  The battery room and the battery chargers are shown in next slide.
  • 21. BATTERY ROOM & ITS CHARGERS Battery Room Battery Chargers