SlideShare a Scribd company logo
1
PRESENTATION ON LAKE
RESTORATION PROJECTS BEING
TAKEN UP BY B.D.A.
BANGALORE DEVELOPMENT AUTHORITY
Bangalore Development Authority
Aims & Objectives:
1. Regulation and Planning of Bangalore Metropolitan Area.
2. BDA has a jurisdictional area of 1046 sq kms.
3. Formation of Residential Layouts and Allotment of Sites at
subsidized rates to the needy people.
4. Taking up the required Infrastructure Facilities in Bangalore city
such as Construction of Flyovers, Road Infrastructure, Construction
of Complexes etc..
5. Construction of Affordable Housing Projects and Allotment of
Houses to the needy people.
6. Environmental Conservation Initiatives Such as Lake Restoration
projects, Enhancing Green Cover, Development of Parks etc.
Present Scenario of Lakes in Bangalore
• Bangalore City alone has got a total no of around 280
to 300 lakes.
• Lakes has lost its identity due to Rapid urbanization.
• Majority of the lakes are filled with sewage.
• Majority of the lakes have undergone encroachment of
the lake areas, cropping up of unauthorized structures
in the lake areas, dumping of garbage etc.
• Absence of proper monitoring and maintenance
system for lakes.
• Absence of a proper funding mechanism for lakes.
4
IMPORTANCE OF LAKE RESTORATION PROJECTS
 Based on Government directions, as an environmental
protection initiative BDA has taken up the conservation and
preservation of Natural water Bodies to their original glory in
and around Bangalore .City.
 For Prevention of Pollution
 To prevent encroachment
To develop the lake as a fresh water storage pond
 For Flood Mitigation
 To Preserve the Lake to its original Glory
To develop the lake as a recreational centre.
 To preserve and recharge the depleting underground water
table.
Methodology followed by BDA
for Project Preparation
 Projects Prepared as Per National Lake Conservation programme
(NLCP), MoEF, New Delhi Guidelines and with a Master plan
concept.
 Sewage Diversion & Treatment Proposals prepared as per
CPHEEO, MoUD, New Delhi Guidelines.
 Remodelling of Inlet/Outlet Channels inline with BBMP SWD
Master Plan proposals.
 Lake boundary identification and Encroachment removal.
 Works Categorized into Core & Non Core Components.
 Works proposed to be taken up in two stages.
5
 Removal of encroachment. & boundary fixing
 Chain link fencing all along the periphery of the lake to check unauthorized
encroachment and dumping of debris & construction waste.
 Deweeding.
 Desilting.
 Formation of peripheral Bunds all along the periphery of the lake
 Construction of Wet lands to remove nutrients from non point source.
 Construction of Sewage Water Diversion channel / pipelines.
 Construction of Silt traps to check the entry of silt.
 Construction of Screen barriers to check the entry of floating objects.
6
Methodology followed by BDA for Lake Restoration Projects
 Construction of RCC Storm Water inlets
 Improvements to the Waste Weir.
 Creation of islands for the re-habitation of birds.
 Landscaping and development of parks and childrens play area.
 Afforestation.
 Lighting all along the periphery of lakes.
 Construction of localized tertiary sewage treatment plants where ever
necessary to maintain the water level in the lake for 365 days
 Supply of excess treated water to down stream lake series through
separate pipeline
7
Methodology followed by BDA for Lake Restoration Projects
Phase IIIPhase IIPhase I
Legend
Primary SWD
Secondary SWD
WaterBodies
BDA Boundary
• Phase I – 13 Lakes
• Phase II – 32 Lakes
• Phase III – 78 Lakes
Location of Lakes
STATUS OF LAKE RESTORATION WORKS TAKEN UP BY B.D.A.
Sl No Phase Category
of work
Total No.
of Works
Total No.
of Works
complete
d
Total No.
of works
under
progress
Total No
of works
for which
Revenue
certificati
on /
eviction
orders
pending
Lake
Area
(A - G)
Encroach
ment
Identified
(A - G)
Encroach
ment
Cleared
(A - G)
1PHASE-1 Compreh
ensive
developm
ent of
Lakes
13 12 1 -- 766 - 33 31 - 16 14 - 27
2PHASE-2 Fencing
works
32 15 17 16 2373-37 57 - 36 04 - 24
Compreh
ensive
developm
ent of
Lakes
- - - - - - -
3PHASE-3 Fencing
works
78 25 6 48 1917-17 187 - 00 44 - 00
Total 123 52 24 64 5057 - 37 276 - 12 63 - 11
10
Sl.No Phase
Total
No. of
Works
Estimated
Cost
In Crs
Expenditure
In Crs
Total No. of
Works
completed
Total
No. of
works
under
progres
s
Tenders
under
process
Revenue
certification
pending
Nos
1
Phase-1
Comprehe
nsive
developme
nt of Lakes 13 90.21 87.51 12 1 - -
2
Phase-2
Fencing
works
Comprehe
nsive
developme
nt of Lakes
32 19.50 3.70 15 17 - 16
- 541.50 - - - - -
3
Phase-3
Fencing
works 78 225 - 25 06 47 48
Total 123 876.21 91.21 52 24 47 64
Details of Revenue Certification, Rehabilitation, Sewage and Lake Feeding
ABSTRACT
Sl No Phase Category
of work
Total No.
of Works
Total No.
of Works
completed
Total No.
of works
under
progress
Total No
of lakes
for which
Revenue
certificatio
n /
eviction
orders
pending
Total No
of Lakes
for which
rehabilitat
ion is
required
Total No
of Lakes
which are
polluted
by sewage
Total No. of
Lakes which
require
feeding of
treated
water
1
PHASE-1 Comprehe
nsive
developme
nt of
Lakes
13 12 1 03 05
(211)
- 03
2
PHASE-2 Fencing
works
32 15 17 16 17
(1031)
26 22
Comprehe
nsive
developme
nt of
Lakes
- - (07) - - - -
3
PHASE-3 Fencing
works
78 25 6 48 35
(1069)
55 37
Total 123 52 24 68 57
(2311)
81 62
B. NARAYANAPURA LAKE:- SEWAGE ENTRY
B. NARAYANAPURA LAKE: ENCROACHMENT IN TANK AREA
KALKERE- RAMPURA LAKE:- GARBAGE DUMPING SEWAGE ENTRY
VIBUTHIPURA LAKE:-
ENCROACHMENT & SEWAGE ENTRY
Chain link fencing to
Lingadeeranahalli Lake (32 Lakes)
Chain link fencing to
Chikkabettahalli Lake
(32 Lakes)
Chain link fencing of Gandhinagara Hosakere
Chain link fencing of Gandhinagara Hosakere
Barbed wire Fencing to Sooli Kere
Completed Projects – Mallathahalli LAKE (13 Lakes)
16Newly Commissioned 5.0 MLD STP near Malathahalli Lake
Sewage entry through SWD
before commissioning of STP
Sewage diverted to STP.
No sewage entry into lake
Lake view after restoration
Lake filled with tertiary treated water
after restoration
Completed Projects – Mallathahalli LAKE
17
Mallathahalli LAKE
18
Ullala Lake
During
After
Before
19
Kommaghatta Lake
During
After
Before
After Restoration
20
Sompura Lake
During
After
Before
21
The following are the issues which had slowed down the progress
of lake restoration works.
• All the lakes are transferred from BBMP / Forest Department to BDA
for further development / maintenance, wherein the majority of the
lakes are encroached, polluted with sewage and garbage dumping.
• Any lake restoration project has to be started with revenue survey of
the lake area, identification of encroachment, demarcation of
encroachment and finally eviction of encroachment which has to be
done by the revenue department, since the proprietary of all the lakes
vests with the revenue department.
•The clearance of encroachment on the lake areas is one of the serious
issues which has slowed down the progress of lake works. In 64 cases the
certification of encroachment, issue of eviction orders are pending which
has to be taken up on priority.
7
• 81 Lakes under BDA control are affected by huge sewage flows, which has to be
connected from the source to the main trunk sewer lines through a conduit which
has to be taken up by BWSSB on priority.
• Since the majority of the lakes in the core areas of the city are encroached, which has
huge no of habitants, wherein rehabilitation of such encroachers has to be taken up on
priority. As a rough estimate 57 lakes contains 2311 No’s of un-authorized habitants
which needs to be rehabilitated. This issue is to be taken up on top priority by the
Urban Deputy Commissioner and The Commissioner Slum Board.
• In majority of the lakes, the Rajakaluves connecting lake to lake to transport the
surplus water are non existant which has led to flooding, loss of property etc. So these
Rajakaluves has to be demarcated on ground, encroachments to be removed and an
earthen section of the Rajakaluve has to be provided for a free flow .
• Lack of adequate financial resources .
• Lack of proper maintenance mechanism.
• Lack of adequate man power .
23
 There should be a more rigorous approach from the revenue
authorities in tackling encroachments and related issues.
 Strict penal actions from the enforcing authorities in tackling
encroachments, dumping of garbage, Entry of sewage into the lakes.
 There should be an integrated sewage network system for the entire
Bangalore Metropolitan area, to be addressed by BWSSB on top
priority.
 The Rehabilitation of the un-authorized habitants on the lake areas
has to be taken up on priority by the Slum Development Board and
the Revenue Authorities.
 The existing lake development authority should be made as a single
nodal agency who can execute, enforce, monitor, maintain all urban
lakes.
 The existing Lake Development Authority should be strengthened
with adequate man power.
 A proper funding mechanism should be developed to provide
adequate funds for execution and maintenance of lake systems.
25

More Related Content

What's hot

Strategic Action Planning for Revival of Bangalore Lakes _ESG
Strategic Action Planning for Revival of Bangalore Lakes _ESGStrategic Action Planning for Revival of Bangalore Lakes _ESG
Strategic Action Planning for Revival of Bangalore Lakes _ESGEkonnect
 
RIVER FRONT DEVELOPMENT
RIVER FRONT DEVELOPMENT RIVER FRONT DEVELOPMENT
RIVER FRONT DEVELOPMENT Praveen Mukati
 
Lake front development at kanelav Godhra
Lake front development at kanelav GodhraLake front development at kanelav Godhra
Lake front development at kanelav Godhraharshilshah546931
 
AFFORADBLE HOUSING SHORTAGE IN INDIA: - A CASE STUDY OF SURAT
AFFORADBLE HOUSING SHORTAGE IN INDIA: - A CASE STUDY OF SURATAFFORADBLE HOUSING SHORTAGE IN INDIA: - A CASE STUDY OF SURAT
AFFORADBLE HOUSING SHORTAGE IN INDIA: - A CASE STUDY OF SURATYash Shah
 
River-Front Revitalisation
River-Front RevitalisationRiver-Front Revitalisation
River-Front RevitalisationVitastaRaina
 
urban design Amritsar the heritage street
urban design Amritsar the heritage streeturban design Amritsar the heritage street
urban design Amritsar the heritage streetPriyanka Sagar
 
River - Front Development with 2 Examples
River - Front Development with 2 ExamplesRiver - Front Development with 2 Examples
River - Front Development with 2 ExamplesRohit Kumar Singh
 
Sabarmati riverfront case study for development of yamuna riverfront agra
Sabarmati riverfront case study for development of yamuna riverfront agraSabarmati riverfront case study for development of yamuna riverfront agra
Sabarmati riverfront case study for development of yamuna riverfront agradeeksha sharma
 
Sabarmati Riverfront Development Project
Sabarmati Riverfront Development ProjectSabarmati Riverfront Development Project
Sabarmati Riverfront Development ProjectFabiha Rahman
 
Storm water drainage problem of Surat city & its solutions due to flood in ri...
Storm water drainage problem of Surat city & its solutions due to flood in ri...Storm water drainage problem of Surat city & its solutions due to flood in ri...
Storm water drainage problem of Surat city & its solutions due to flood in ri...Kishan Bhadiyadra
 
Water Sensitive Urban Design
Water Sensitive Urban DesignWater Sensitive Urban Design
Water Sensitive Urban DesignElisa Sutanudjaja
 
Thesis report Nitish Kumar
Thesis report Nitish KumarThesis report Nitish Kumar
Thesis report Nitish KumarNitish Kumar
 
CARTER ROAD WATERFRONT DEVELOPMENT
CARTER ROAD WATERFRONT DEVELOPMENTCARTER ROAD WATERFRONT DEVELOPMENT
CARTER ROAD WATERFRONT DEVELOPMENTOmkar Nandavadekar
 
Urban design sabarmati
Urban design sabarmatiUrban design sabarmati
Urban design sabarmatiSyam M
 
Sampriti Saha_Master's of Landscape Architecture Thesis
Sampriti Saha_Master's of Landscape Architecture Thesis  Sampriti Saha_Master's of Landscape Architecture Thesis
Sampriti Saha_Master's of Landscape Architecture Thesis Sampriti Saha
 
Riverfront development Case study Hoshangabad Thesis
Riverfront development  Case study Hoshangabad Thesis Riverfront development  Case study Hoshangabad Thesis
Riverfront development Case study Hoshangabad Thesis Praveen Mukati
 

What's hot (20)

Strategic Action Planning for Revival of Bangalore Lakes _ESG
Strategic Action Planning for Revival of Bangalore Lakes _ESGStrategic Action Planning for Revival of Bangalore Lakes _ESG
Strategic Action Planning for Revival of Bangalore Lakes _ESG
 
RIVER FRONT DEVELOPMENT
RIVER FRONT DEVELOPMENT RIVER FRONT DEVELOPMENT
RIVER FRONT DEVELOPMENT
 
Lake front development at kanelav Godhra
Lake front development at kanelav GodhraLake front development at kanelav Godhra
Lake front development at kanelav Godhra
 
Restoration of Urban Blue Acres_Case of Rajokari Village
Restoration of Urban Blue Acres_Case of Rajokari VillageRestoration of Urban Blue Acres_Case of Rajokari Village
Restoration of Urban Blue Acres_Case of Rajokari Village
 
AFFORADBLE HOUSING SHORTAGE IN INDIA: - A CASE STUDY OF SURAT
AFFORADBLE HOUSING SHORTAGE IN INDIA: - A CASE STUDY OF SURATAFFORADBLE HOUSING SHORTAGE IN INDIA: - A CASE STUDY OF SURAT
AFFORADBLE HOUSING SHORTAGE IN INDIA: - A CASE STUDY OF SURAT
 
River-Front Revitalisation
River-Front RevitalisationRiver-Front Revitalisation
River-Front Revitalisation
 
urban design Amritsar the heritage street
urban design Amritsar the heritage streeturban design Amritsar the heritage street
urban design Amritsar the heritage street
 
River - Front Development with 2 Examples
River - Front Development with 2 ExamplesRiver - Front Development with 2 Examples
River - Front Development with 2 Examples
 
Sabarmati riverfront case study for development of yamuna riverfront agra
Sabarmati riverfront case study for development of yamuna riverfront agraSabarmati riverfront case study for development of yamuna riverfront agra
Sabarmati riverfront case study for development of yamuna riverfront agra
 
Sabarmati Riverfront Development Project
Sabarmati Riverfront Development ProjectSabarmati Riverfront Development Project
Sabarmati Riverfront Development Project
 
Storm water drainage problem of Surat city & its solutions due to flood in ri...
Storm water drainage problem of Surat city & its solutions due to flood in ri...Storm water drainage problem of Surat city & its solutions due to flood in ri...
Storm water drainage problem of Surat city & its solutions due to flood in ri...
 
Current Practices by SPA Vijayawada
Current Practices by SPA VijayawadaCurrent Practices by SPA Vijayawada
Current Practices by SPA Vijayawada
 
Water Sensitive Urban Design
Water Sensitive Urban DesignWater Sensitive Urban Design
Water Sensitive Urban Design
 
Thesis report Nitish Kumar
Thesis report Nitish KumarThesis report Nitish Kumar
Thesis report Nitish Kumar
 
Mithi river action plan presentation
Mithi river action plan presentationMithi river action plan presentation
Mithi river action plan presentation
 
CARTER ROAD WATERFRONT DEVELOPMENT
CARTER ROAD WATERFRONT DEVELOPMENTCARTER ROAD WATERFRONT DEVELOPMENT
CARTER ROAD WATERFRONT DEVELOPMENT
 
Urban design sabarmati
Urban design sabarmatiUrban design sabarmati
Urban design sabarmati
 
Cities and Water: Sinks or Sponges?
Cities and Water: Sinks or Sponges?Cities and Water: Sinks or Sponges?
Cities and Water: Sinks or Sponges?
 
Sampriti Saha_Master's of Landscape Architecture Thesis
Sampriti Saha_Master's of Landscape Architecture Thesis  Sampriti Saha_Master's of Landscape Architecture Thesis
Sampriti Saha_Master's of Landscape Architecture Thesis
 
Riverfront development Case study Hoshangabad Thesis
Riverfront development  Case study Hoshangabad Thesis Riverfront development  Case study Hoshangabad Thesis
Riverfront development Case study Hoshangabad Thesis
 

Viewers also liked

Sustainability Reporting
Sustainability ReportingSustainability Reporting
Sustainability ReportingRSM GC
 
Clean Rivers, Clean Lake 8 -- Restoration Issues/Root River Restoration Plan ...
Clean Rivers, Clean Lake 8 -- Restoration Issues/Root River Restoration Plan ...Clean Rivers, Clean Lake 8 -- Restoration Issues/Root River Restoration Plan ...
Clean Rivers, Clean Lake 8 -- Restoration Issues/Root River Restoration Plan ...Sweet Water
 
Prasad Modak Presentation at First Multistakholder Workshop
Prasad Modak Presentation at First Multistakholder Workshop Prasad Modak Presentation at First Multistakholder Workshop
Prasad Modak Presentation at First Multistakholder Workshop Ekonnect Knowledge Foundation
 
Clean Rivers, Clean Lake 8 -- Leveraging Resources -- Robert Monnat
Clean Rivers, Clean Lake 8 -- Leveraging Resources --  Robert MonnatClean Rivers, Clean Lake 8 -- Leveraging Resources --  Robert Monnat
Clean Rivers, Clean Lake 8 -- Leveraging Resources -- Robert MonnatSweet Water
 
Action taken by BWSSB in preventing pollution of Lakes
Action taken by BWSSB in preventing pollution of LakesAction taken by BWSSB in preventing pollution of Lakes
Action taken by BWSSB in preventing pollution of LakesEkonnect Knowledge Foundation
 
Escaping the vicious cycle of forest restoration
Escaping the vicious cycle of forest restoration Escaping the vicious cycle of forest restoration
Escaping the vicious cycle of forest restoration Bioversity International
 
Restoration of the World's Degraded Forest Landscapes
Restoration of the World's Degraded Forest LandscapesRestoration of the World's Degraded Forest Landscapes
Restoration of the World's Degraded Forest LandscapesSIANI
 
Outfall Restoration Projects Before and After Photos July 2015
Outfall Restoration Projects Before and After Photos July 2015Outfall Restoration Projects Before and After Photos July 2015
Outfall Restoration Projects Before and After Photos July 2015Fairfax County
 
Eco-Restoration: Issues and Possibilities in Mandla District
Eco-Restoration: Issues and Possibilities in Mandla DistrictEco-Restoration: Issues and Possibilities in Mandla District
Eco-Restoration: Issues and Possibilities in Mandla DistrictWRI India
 
Lake Privatisation
Lake PrivatisationLake Privatisation
Lake PrivatisationBhargavi Rao
 
Elevating Sustainability Reporting with Advanced Energy and Water Data Collec...
Elevating Sustainability Reporting with Advanced Energy and Water Data Collec...Elevating Sustainability Reporting with Advanced Energy and Water Data Collec...
Elevating Sustainability Reporting with Advanced Energy and Water Data Collec...Urjanet
 
Upland forest restoration and livelihoods in Asia
Upland forest restoration and livelihoods in AsiaUpland forest restoration and livelihoods in Asia
Upland forest restoration and livelihoods in AsiaCIFOR-ICRAF
 
ITTO Guidelines Forest Restoration
ITTO Guidelines Forest RestorationITTO Guidelines Forest Restoration
ITTO Guidelines Forest RestorationGPFLR
 
Illegal Mining At Aravali Range
Illegal  Mining At  Aravali  RangeIllegal  Mining At  Aravali  Range
Illegal Mining At Aravali RangePrashant Mehta
 
Aquatic ecosystems (2)
Aquatic ecosystems (2)Aquatic ecosystems (2)
Aquatic ecosystems (2)yvettjenz
 

Viewers also liked (20)

Sustainability Reporting
Sustainability ReportingSustainability Reporting
Sustainability Reporting
 
Overview on sustainability reporting
Overview on sustainability reportingOverview on sustainability reporting
Overview on sustainability reporting
 
Clean Rivers, Clean Lake 8 -- Restoration Issues/Root River Restoration Plan ...
Clean Rivers, Clean Lake 8 -- Restoration Issues/Root River Restoration Plan ...Clean Rivers, Clean Lake 8 -- Restoration Issues/Root River Restoration Plan ...
Clean Rivers, Clean Lake 8 -- Restoration Issues/Root River Restoration Plan ...
 
Prasad Modak Presentation at First Multistakholder Workshop
Prasad Modak Presentation at First Multistakholder Workshop Prasad Modak Presentation at First Multistakholder Workshop
Prasad Modak Presentation at First Multistakholder Workshop
 
Clean Rivers, Clean Lake 8 -- Leveraging Resources -- Robert Monnat
Clean Rivers, Clean Lake 8 -- Leveraging Resources --  Robert MonnatClean Rivers, Clean Lake 8 -- Leveraging Resources --  Robert Monnat
Clean Rivers, Clean Lake 8 -- Leveraging Resources -- Robert Monnat
 
Action taken by BWSSB in preventing pollution of Lakes
Action taken by BWSSB in preventing pollution of LakesAction taken by BWSSB in preventing pollution of Lakes
Action taken by BWSSB in preventing pollution of Lakes
 
Muskegon Lake Restoration: A Success Story
Muskegon Lake Restoration: A Success StoryMuskegon Lake Restoration: A Success Story
Muskegon Lake Restoration: A Success Story
 
Escaping the vicious cycle of forest restoration
Escaping the vicious cycle of forest restoration Escaping the vicious cycle of forest restoration
Escaping the vicious cycle of forest restoration
 
Restoration of the World's Degraded Forest Landscapes
Restoration of the World's Degraded Forest LandscapesRestoration of the World's Degraded Forest Landscapes
Restoration of the World's Degraded Forest Landscapes
 
Outfall Restoration Projects Before and After Photos July 2015
Outfall Restoration Projects Before and After Photos July 2015Outfall Restoration Projects Before and After Photos July 2015
Outfall Restoration Projects Before and After Photos July 2015
 
Environmental restoration of Banganga
Environmental restoration of BangangaEnvironmental restoration of Banganga
Environmental restoration of Banganga
 
Eco-Restoration: Issues and Possibilities in Mandla District
Eco-Restoration: Issues and Possibilities in Mandla DistrictEco-Restoration: Issues and Possibilities in Mandla District
Eco-Restoration: Issues and Possibilities in Mandla District
 
Lake & Pond Cleaning
Lake & Pond CleaningLake & Pond Cleaning
Lake & Pond Cleaning
 
Lake Privatisation
Lake PrivatisationLake Privatisation
Lake Privatisation
 
Elevating Sustainability Reporting with Advanced Energy and Water Data Collec...
Elevating Sustainability Reporting with Advanced Energy and Water Data Collec...Elevating Sustainability Reporting with Advanced Energy and Water Data Collec...
Elevating Sustainability Reporting with Advanced Energy and Water Data Collec...
 
Upland forest restoration and livelihoods in Asia
Upland forest restoration and livelihoods in AsiaUpland forest restoration and livelihoods in Asia
Upland forest restoration and livelihoods in Asia
 
ITTO Guidelines Forest Restoration
ITTO Guidelines Forest RestorationITTO Guidelines Forest Restoration
ITTO Guidelines Forest Restoration
 
Illegal Mining At Aravali Range
Illegal  Mining At  Aravali  RangeIllegal  Mining At  Aravali  Range
Illegal Mining At Aravali Range
 
Cleaning lakes
Cleaning lakesCleaning lakes
Cleaning lakes
 
Aquatic ecosystems (2)
Aquatic ecosystems (2)Aquatic ecosystems (2)
Aquatic ecosystems (2)
 

Similar to Lake Restoration Projects Being Undertaken by BDA_Bangalore Development Authority

The Northern Collector Water Tunnel Project Report
The Northern Collector Water Tunnel Project ReportThe Northern Collector Water Tunnel Project Report
The Northern Collector Water Tunnel Project ReportThe Star Newspaper
 
Towards A Sustainable Drainage Solution
Towards A Sustainable Drainage SolutionTowards A Sustainable Drainage Solution
Towards A Sustainable Drainage Solutionceal2005
 
Is the PMC a seat of bad governance? The Devnadi case study
Is the PMC a seat of bad governance? The Devnadi case studyIs the PMC a seat of bad governance? The Devnadi case study
Is the PMC a seat of bad governance? The Devnadi case studyAnupam Saraph
 
The Rainbow Drive Story
The Rainbow Drive  StoryThe Rainbow Drive  Story
The Rainbow Drive Storybiomeshubha
 
Strategic Action Planning for Revival of Bangalore Lakes_KSPCB
Strategic Action Planning for Revival of Bangalore Lakes_KSPCBStrategic Action Planning for Revival of Bangalore Lakes_KSPCB
Strategic Action Planning for Revival of Bangalore Lakes_KSPCBEkonnect
 
A Situational Analysis of the Lakes in Bangalore
A Situational Analysis of the Lakes in BangaloreA Situational Analysis of the Lakes in Bangalore
A Situational Analysis of the Lakes in BangaloreUnited Way Bengaluru
 
Writing Sample - Draft EIR
Writing Sample - Draft EIRWriting Sample - Draft EIR
Writing Sample - Draft EIRSharanya Ganesh
 
Woodglen Lake Dredging and Restoration
Woodglen Lake Dredging and RestorationWoodglen Lake Dredging and Restoration
Woodglen Lake Dredging and RestorationFairfax County
 
Critical Study on Kochi Barrage
Critical Study on Kochi BarrageCritical Study on Kochi Barrage
Critical Study on Kochi BarrageIRJET Journal
 
Rabbit Branch at Collingham Drive Stream Restoration Information Meeting - Ju...
Rabbit Branch at Collingham Drive Stream Restoration Information Meeting - Ju...Rabbit Branch at Collingham Drive Stream Restoration Information Meeting - Ju...
Rabbit Branch at Collingham Drive Stream Restoration Information Meeting - Ju...Fairfax County
 
Nottoway Park Stormwater and Water Quality Improvements Phases 1, 2, & 3
Nottoway Park Stormwater and Water Quality Improvements Phases 1, 2, & 3Nottoway Park Stormwater and Water Quality Improvements Phases 1, 2, & 3
Nottoway Park Stormwater and Water Quality Improvements Phases 1, 2, & 3Fairfax County
 
NJFuture Redevelopment Forum 2016 Forbes
NJFuture Redevelopment Forum 2016 ForbesNJFuture Redevelopment Forum 2016 Forbes
NJFuture Redevelopment Forum 2016 ForbesNew Jersey Future
 
Presentation 2015 EN PRK 1055
Presentation 2015 EN PRK 1055Presentation 2015 EN PRK 1055
Presentation 2015 EN PRK 1055Jose Miguel Ruiz
 
Hunting Creek at Fairchild MVCCA-Meeting March 7, 2018
Hunting Creek at Fairchild MVCCA-Meeting March 7, 2018Hunting Creek at Fairchild MVCCA-Meeting March 7, 2018
Hunting Creek at Fairchild MVCCA-Meeting March 7, 2018Fairfax County
 
Paul Spring Branch at Sherwood Hall Stream Restoration Project
Paul Spring Branch at Sherwood Hall Stream Restoration ProjectPaul Spring Branch at Sherwood Hall Stream Restoration Project
Paul Spring Branch at Sherwood Hall Stream Restoration ProjectFairfax County
 
Inter-linking of Rivers
Inter-linking of RiversInter-linking of Rivers
Inter-linking of RiversSwapnil Nakate
 
Mumbai Lakes Restoration
Mumbai Lakes RestorationMumbai Lakes Restoration
Mumbai Lakes RestorationPigtail Pundits
 
2013.dec.1314 318 e-green alleys grant program
2013.dec.1314 318 e-green alleys grant program2013.dec.1314 318 e-green alleys grant program
2013.dec.1314 318 e-green alleys grant programBerwyn Residents
 
4. Two years on the ground identifying problems and fixing them - Carol McCar...
4. Two years on the ground identifying problems and fixing them - Carol McCar...4. Two years on the ground identifying problems and fixing them - Carol McCar...
4. Two years on the ground identifying problems and fixing them - Carol McCar...Environmental Protection Agency, Ireland
 

Similar to Lake Restoration Projects Being Undertaken by BDA_Bangalore Development Authority (20)

The Northern Collector Water Tunnel Project Report
The Northern Collector Water Tunnel Project ReportThe Northern Collector Water Tunnel Project Report
The Northern Collector Water Tunnel Project Report
 
Towards A Sustainable Drainage Solution
Towards A Sustainable Drainage SolutionTowards A Sustainable Drainage Solution
Towards A Sustainable Drainage Solution
 
Is the PMC a seat of bad governance? The Devnadi case study
Is the PMC a seat of bad governance? The Devnadi case studyIs the PMC a seat of bad governance? The Devnadi case study
Is the PMC a seat of bad governance? The Devnadi case study
 
The Rainbow Drive Story
The Rainbow Drive  StoryThe Rainbow Drive  Story
The Rainbow Drive Story
 
Strategic Action Planning for Revival of Bangalore Lakes_KSPCB
Strategic Action Planning for Revival of Bangalore Lakes_KSPCBStrategic Action Planning for Revival of Bangalore Lakes_KSPCB
Strategic Action Planning for Revival of Bangalore Lakes_KSPCB
 
A Situational Analysis of the Lakes in Bangalore
A Situational Analysis of the Lakes in BangaloreA Situational Analysis of the Lakes in Bangalore
A Situational Analysis of the Lakes in Bangalore
 
Writing Sample - Draft EIR
Writing Sample - Draft EIRWriting Sample - Draft EIR
Writing Sample - Draft EIR
 
Woodglen Lake Dredging and Restoration
Woodglen Lake Dredging and RestorationWoodglen Lake Dredging and Restoration
Woodglen Lake Dredging and Restoration
 
Critical Study on Kochi Barrage
Critical Study on Kochi BarrageCritical Study on Kochi Barrage
Critical Study on Kochi Barrage
 
Rabbit Branch at Collingham Drive Stream Restoration Information Meeting - Ju...
Rabbit Branch at Collingham Drive Stream Restoration Information Meeting - Ju...Rabbit Branch at Collingham Drive Stream Restoration Information Meeting - Ju...
Rabbit Branch at Collingham Drive Stream Restoration Information Meeting - Ju...
 
Nottoway Park Stormwater and Water Quality Improvements Phases 1, 2, & 3
Nottoway Park Stormwater and Water Quality Improvements Phases 1, 2, & 3Nottoway Park Stormwater and Water Quality Improvements Phases 1, 2, & 3
Nottoway Park Stormwater and Water Quality Improvements Phases 1, 2, & 3
 
NJFuture Redevelopment Forum 2016 Forbes
NJFuture Redevelopment Forum 2016 ForbesNJFuture Redevelopment Forum 2016 Forbes
NJFuture Redevelopment Forum 2016 Forbes
 
SV Ranganath's Lecture on Water Governance in Bangalore
SV Ranganath's Lecture on Water Governance in BangaloreSV Ranganath's Lecture on Water Governance in Bangalore
SV Ranganath's Lecture on Water Governance in Bangalore
 
Presentation 2015 EN PRK 1055
Presentation 2015 EN PRK 1055Presentation 2015 EN PRK 1055
Presentation 2015 EN PRK 1055
 
Hunting Creek at Fairchild MVCCA-Meeting March 7, 2018
Hunting Creek at Fairchild MVCCA-Meeting March 7, 2018Hunting Creek at Fairchild MVCCA-Meeting March 7, 2018
Hunting Creek at Fairchild MVCCA-Meeting March 7, 2018
 
Paul Spring Branch at Sherwood Hall Stream Restoration Project
Paul Spring Branch at Sherwood Hall Stream Restoration ProjectPaul Spring Branch at Sherwood Hall Stream Restoration Project
Paul Spring Branch at Sherwood Hall Stream Restoration Project
 
Inter-linking of Rivers
Inter-linking of RiversInter-linking of Rivers
Inter-linking of Rivers
 
Mumbai Lakes Restoration
Mumbai Lakes RestorationMumbai Lakes Restoration
Mumbai Lakes Restoration
 
2013.dec.1314 318 e-green alleys grant program
2013.dec.1314 318 e-green alleys grant program2013.dec.1314 318 e-green alleys grant program
2013.dec.1314 318 e-green alleys grant program
 
4. Two years on the ground identifying problems and fixing them - Carol McCar...
4. Two years on the ground identifying problems and fixing them - Carol McCar...4. Two years on the ground identifying problems and fixing them - Carol McCar...
4. Two years on the ground identifying problems and fixing them - Carol McCar...
 

More from Ekonnect Knowledge Foundation

Sustainable & Decenrealized Waste To Resource Managemnt Sotuions
Sustainable & Decenrealized Waste To Resource Managemnt SotuionsSustainable & Decenrealized Waste To Resource Managemnt Sotuions
Sustainable & Decenrealized Waste To Resource Managemnt SotuionsEkonnect Knowledge Foundation
 
Waste Composting Techniques - organic waste convertor model
Waste Composting Techniques - organic waste convertor modelWaste Composting Techniques - organic waste convertor model
Waste Composting Techniques - organic waste convertor modelEkonnect Knowledge Foundation
 
Influence of Urban-Rural Gradient on Wetlands of Bangalore_CiSTUP
Influence of Urban-Rural Gradient on Wetlands of Bangalore_CiSTUPInfluence of Urban-Rural Gradient on Wetlands of Bangalore_CiSTUP
Influence of Urban-Rural Gradient on Wetlands of Bangalore_CiSTUPEkonnect Knowledge Foundation
 
Assessment Derived Conservation Strategies for Lakes in Bangalore
Assessment Derived Conservation Strategies for Lakes in Bangalore Assessment Derived Conservation Strategies for Lakes in Bangalore
Assessment Derived Conservation Strategies for Lakes in Bangalore Ekonnect Knowledge Foundation
 
Strategic Action Planning for Revival of Bangalore Lakes _ESG
Strategic Action Planning for Revival of Bangalore Lakes _ESGStrategic Action Planning for Revival of Bangalore Lakes _ESG
Strategic Action Planning for Revival of Bangalore Lakes _ESGEkonnect Knowledge Foundation
 
E-waste Management Workshop: Dr. Aniruddha Agnihotri
E-waste Management Workshop: Dr. Aniruddha AgnihotriE-waste Management Workshop: Dr. Aniruddha Agnihotri
E-waste Management Workshop: Dr. Aniruddha AgnihotriEkonnect Knowledge Foundation
 

More from Ekonnect Knowledge Foundation (20)

Environmental Data Management and Analytics
Environmental Data Management and AnalyticsEnvironmental Data Management and Analytics
Environmental Data Management and Analytics
 
Waste Segregation
Waste Segregation Waste Segregation
Waste Segregation
 
Waste Management Hierarchy
Waste Management Hierarchy Waste Management Hierarchy
Waste Management Hierarchy
 
Waste Procesing Techniuques - Biomethanation
Waste Procesing Techniuques - Biomethanation Waste Procesing Techniuques - Biomethanation
Waste Procesing Techniuques - Biomethanation
 
Trends in Solid Waste Management
Trends in Solid Waste ManagementTrends in Solid Waste Management
Trends in Solid Waste Management
 
Stree Mukti Sanghatana
Stree Mukti SanghatanaStree Mukti Sanghatana
Stree Mukti Sanghatana
 
Sustainable & Decenrealized Waste To Resource Managemnt Sotuions
Sustainable & Decenrealized Waste To Resource Managemnt SotuionsSustainable & Decenrealized Waste To Resource Managemnt Sotuions
Sustainable & Decenrealized Waste To Resource Managemnt Sotuions
 
Swachh Bharat Survekshan
Swachh Bharat SurvekshanSwachh Bharat Survekshan
Swachh Bharat Survekshan
 
Biomedical Waste Management Rules 2016
Biomedical Waste Management Rules 2016Biomedical Waste Management Rules 2016
Biomedical Waste Management Rules 2016
 
Integrated Solid Waste Management of PMC
Integrated Solid Waste Management of PMCIntegrated Solid Waste Management of PMC
Integrated Solid Waste Management of PMC
 
Overview of waste streams
Overview of waste streamsOverview of waste streams
Overview of waste streams
 
Waste Composting Techniques - organic waste convertor model
Waste Composting Techniques - organic waste convertor modelWaste Composting Techniques - organic waste convertor model
Waste Composting Techniques - organic waste convertor model
 
Creating Your Own Biocomposting Unit
Creating Your Own Biocomposting UnitCreating Your Own Biocomposting Unit
Creating Your Own Biocomposting Unit
 
Influence of Urban-Rural Gradient on Wetlands of Bangalore_CiSTUP
Influence of Urban-Rural Gradient on Wetlands of Bangalore_CiSTUPInfluence of Urban-Rural Gradient on Wetlands of Bangalore_CiSTUP
Influence of Urban-Rural Gradient on Wetlands of Bangalore_CiSTUP
 
Assessment Derived Conservation Strategies for Lakes in Bangalore
Assessment Derived Conservation Strategies for Lakes in Bangalore Assessment Derived Conservation Strategies for Lakes in Bangalore
Assessment Derived Conservation Strategies for Lakes in Bangalore
 
Strategic Action Planning for Revival of Bangalore Lakes _ESG
Strategic Action Planning for Revival of Bangalore Lakes _ESGStrategic Action Planning for Revival of Bangalore Lakes _ESG
Strategic Action Planning for Revival of Bangalore Lakes _ESG
 
Anvaya 3.0 Training Programme Presentation
Anvaya 3.0 Training Programme Presentation Anvaya 3.0 Training Programme Presentation
Anvaya 3.0 Training Programme Presentation
 
E-waste Management Workshop: Dr. Pramod Modak
E-waste Management Workshop: Dr. Pramod ModakE-waste Management Workshop: Dr. Pramod Modak
E-waste Management Workshop: Dr. Pramod Modak
 
E-waste Management Workshop: Dr. Aniruddha Agnihotri
E-waste Management Workshop: Dr. Aniruddha AgnihotriE-waste Management Workshop: Dr. Aniruddha Agnihotri
E-waste Management Workshop: Dr. Aniruddha Agnihotri
 
E-waste Management Workshop: Mr. B.K Soni
E-waste Management Workshop: Mr. B.K SoniE-waste Management Workshop: Mr. B.K Soni
E-waste Management Workshop: Mr. B.K Soni
 

Recently uploaded

"Impact of front-end architecture on development cost", Viktor Turskyi
"Impact of front-end architecture on development cost", Viktor Turskyi"Impact of front-end architecture on development cost", Viktor Turskyi
"Impact of front-end architecture on development cost", Viktor TurskyiFwdays
 
Assuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyesAssuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyesThousandEyes
 
To Graph or Not to Graph Knowledge Graph Architectures and LLMs
To Graph or Not to Graph Knowledge Graph Architectures and LLMsTo Graph or Not to Graph Knowledge Graph Architectures and LLMs
To Graph or Not to Graph Knowledge Graph Architectures and LLMsPaul Groth
 
Behind the Scenes From the Manager's Chair: Decoding the Secrets of Successfu...
Behind the Scenes From the Manager's Chair: Decoding the Secrets of Successfu...Behind the Scenes From the Manager's Chair: Decoding the Secrets of Successfu...
Behind the Scenes From the Manager's Chair: Decoding the Secrets of Successfu...CzechDreamin
 
Measures in SQL (a talk at SF Distributed Systems meetup, 2024-05-22)
Measures in SQL (a talk at SF Distributed Systems meetup, 2024-05-22)Measures in SQL (a talk at SF Distributed Systems meetup, 2024-05-22)
Measures in SQL (a talk at SF Distributed Systems meetup, 2024-05-22)Julian Hyde
 
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...Product School
 
How world-class product teams are winning in the AI era by CEO and Founder, P...
How world-class product teams are winning in the AI era by CEO and Founder, P...How world-class product teams are winning in the AI era by CEO and Founder, P...
How world-class product teams are winning in the AI era by CEO and Founder, P...Product School
 
Knowledge engineering: from people to machines and back
Knowledge engineering: from people to machines and backKnowledge engineering: from people to machines and back
Knowledge engineering: from people to machines and backElena Simperl
 
Free and Effective: Making Flows Publicly Accessible, Yumi Ibrahimzade
Free and Effective: Making Flows Publicly Accessible, Yumi IbrahimzadeFree and Effective: Making Flows Publicly Accessible, Yumi Ibrahimzade
Free and Effective: Making Flows Publicly Accessible, Yumi IbrahimzadeCzechDreamin
 
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...Jeffrey Haguewood
 
AI revolution and Salesforce, Jiří Karpíšek
AI revolution and Salesforce, Jiří KarpíšekAI revolution and Salesforce, Jiří Karpíšek
AI revolution and Salesforce, Jiří KarpíšekCzechDreamin
 
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...Product School
 
IESVE for Early Stage Design and Planning
IESVE for Early Stage Design and PlanningIESVE for Early Stage Design and Planning
IESVE for Early Stage Design and PlanningIES VE
 
IOS-PENTESTING-BEGINNERS-PRACTICAL-GUIDE-.pptx
IOS-PENTESTING-BEGINNERS-PRACTICAL-GUIDE-.pptxIOS-PENTESTING-BEGINNERS-PRACTICAL-GUIDE-.pptx
IOS-PENTESTING-BEGINNERS-PRACTICAL-GUIDE-.pptxAbida Shariff
 
In-Depth Performance Testing Guide for IT Professionals
In-Depth Performance Testing Guide for IT ProfessionalsIn-Depth Performance Testing Guide for IT Professionals
In-Depth Performance Testing Guide for IT ProfessionalsExpeed Software
 
Connector Corner: Automate dynamic content and events by pushing a button
Connector Corner: Automate dynamic content and events by pushing a buttonConnector Corner: Automate dynamic content and events by pushing a button
Connector Corner: Automate dynamic content and events by pushing a buttonDianaGray10
 
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...Product School
 
When stars align: studies in data quality, knowledge graphs, and machine lear...
When stars align: studies in data quality, knowledge graphs, and machine lear...When stars align: studies in data quality, knowledge graphs, and machine lear...
When stars align: studies in data quality, knowledge graphs, and machine lear...Elena Simperl
 
UiPath Test Automation using UiPath Test Suite series, part 2
UiPath Test Automation using UiPath Test Suite series, part 2UiPath Test Automation using UiPath Test Suite series, part 2
UiPath Test Automation using UiPath Test Suite series, part 2DianaGray10
 
IoT Analytics Company Presentation May 2024
IoT Analytics Company Presentation May 2024IoT Analytics Company Presentation May 2024
IoT Analytics Company Presentation May 2024IoTAnalytics
 

Recently uploaded (20)

"Impact of front-end architecture on development cost", Viktor Turskyi
"Impact of front-end architecture on development cost", Viktor Turskyi"Impact of front-end architecture on development cost", Viktor Turskyi
"Impact of front-end architecture on development cost", Viktor Turskyi
 
Assuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyesAssuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyes
 
To Graph or Not to Graph Knowledge Graph Architectures and LLMs
To Graph or Not to Graph Knowledge Graph Architectures and LLMsTo Graph or Not to Graph Knowledge Graph Architectures and LLMs
To Graph or Not to Graph Knowledge Graph Architectures and LLMs
 
Behind the Scenes From the Manager's Chair: Decoding the Secrets of Successfu...
Behind the Scenes From the Manager's Chair: Decoding the Secrets of Successfu...Behind the Scenes From the Manager's Chair: Decoding the Secrets of Successfu...
Behind the Scenes From the Manager's Chair: Decoding the Secrets of Successfu...
 
Measures in SQL (a talk at SF Distributed Systems meetup, 2024-05-22)
Measures in SQL (a talk at SF Distributed Systems meetup, 2024-05-22)Measures in SQL (a talk at SF Distributed Systems meetup, 2024-05-22)
Measures in SQL (a talk at SF Distributed Systems meetup, 2024-05-22)
 
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
 
How world-class product teams are winning in the AI era by CEO and Founder, P...
How world-class product teams are winning in the AI era by CEO and Founder, P...How world-class product teams are winning in the AI era by CEO and Founder, P...
How world-class product teams are winning in the AI era by CEO and Founder, P...
 
Knowledge engineering: from people to machines and back
Knowledge engineering: from people to machines and backKnowledge engineering: from people to machines and back
Knowledge engineering: from people to machines and back
 
Free and Effective: Making Flows Publicly Accessible, Yumi Ibrahimzade
Free and Effective: Making Flows Publicly Accessible, Yumi IbrahimzadeFree and Effective: Making Flows Publicly Accessible, Yumi Ibrahimzade
Free and Effective: Making Flows Publicly Accessible, Yumi Ibrahimzade
 
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
 
AI revolution and Salesforce, Jiří Karpíšek
AI revolution and Salesforce, Jiří KarpíšekAI revolution and Salesforce, Jiří Karpíšek
AI revolution and Salesforce, Jiří Karpíšek
 
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
 
IESVE for Early Stage Design and Planning
IESVE for Early Stage Design and PlanningIESVE for Early Stage Design and Planning
IESVE for Early Stage Design and Planning
 
IOS-PENTESTING-BEGINNERS-PRACTICAL-GUIDE-.pptx
IOS-PENTESTING-BEGINNERS-PRACTICAL-GUIDE-.pptxIOS-PENTESTING-BEGINNERS-PRACTICAL-GUIDE-.pptx
IOS-PENTESTING-BEGINNERS-PRACTICAL-GUIDE-.pptx
 
In-Depth Performance Testing Guide for IT Professionals
In-Depth Performance Testing Guide for IT ProfessionalsIn-Depth Performance Testing Guide for IT Professionals
In-Depth Performance Testing Guide for IT Professionals
 
Connector Corner: Automate dynamic content and events by pushing a button
Connector Corner: Automate dynamic content and events by pushing a buttonConnector Corner: Automate dynamic content and events by pushing a button
Connector Corner: Automate dynamic content and events by pushing a button
 
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
 
When stars align: studies in data quality, knowledge graphs, and machine lear...
When stars align: studies in data quality, knowledge graphs, and machine lear...When stars align: studies in data quality, knowledge graphs, and machine lear...
When stars align: studies in data quality, knowledge graphs, and machine lear...
 
UiPath Test Automation using UiPath Test Suite series, part 2
UiPath Test Automation using UiPath Test Suite series, part 2UiPath Test Automation using UiPath Test Suite series, part 2
UiPath Test Automation using UiPath Test Suite series, part 2
 
IoT Analytics Company Presentation May 2024
IoT Analytics Company Presentation May 2024IoT Analytics Company Presentation May 2024
IoT Analytics Company Presentation May 2024
 

Lake Restoration Projects Being Undertaken by BDA_Bangalore Development Authority

  • 1. 1 PRESENTATION ON LAKE RESTORATION PROJECTS BEING TAKEN UP BY B.D.A. BANGALORE DEVELOPMENT AUTHORITY
  • 2. Bangalore Development Authority Aims & Objectives: 1. Regulation and Planning of Bangalore Metropolitan Area. 2. BDA has a jurisdictional area of 1046 sq kms. 3. Formation of Residential Layouts and Allotment of Sites at subsidized rates to the needy people. 4. Taking up the required Infrastructure Facilities in Bangalore city such as Construction of Flyovers, Road Infrastructure, Construction of Complexes etc.. 5. Construction of Affordable Housing Projects and Allotment of Houses to the needy people. 6. Environmental Conservation Initiatives Such as Lake Restoration projects, Enhancing Green Cover, Development of Parks etc.
  • 3. Present Scenario of Lakes in Bangalore • Bangalore City alone has got a total no of around 280 to 300 lakes. • Lakes has lost its identity due to Rapid urbanization. • Majority of the lakes are filled with sewage. • Majority of the lakes have undergone encroachment of the lake areas, cropping up of unauthorized structures in the lake areas, dumping of garbage etc. • Absence of proper monitoring and maintenance system for lakes. • Absence of a proper funding mechanism for lakes.
  • 4. 4 IMPORTANCE OF LAKE RESTORATION PROJECTS  Based on Government directions, as an environmental protection initiative BDA has taken up the conservation and preservation of Natural water Bodies to their original glory in and around Bangalore .City.  For Prevention of Pollution  To prevent encroachment To develop the lake as a fresh water storage pond  For Flood Mitigation  To Preserve the Lake to its original Glory To develop the lake as a recreational centre.  To preserve and recharge the depleting underground water table.
  • 5. Methodology followed by BDA for Project Preparation  Projects Prepared as Per National Lake Conservation programme (NLCP), MoEF, New Delhi Guidelines and with a Master plan concept.  Sewage Diversion & Treatment Proposals prepared as per CPHEEO, MoUD, New Delhi Guidelines.  Remodelling of Inlet/Outlet Channels inline with BBMP SWD Master Plan proposals.  Lake boundary identification and Encroachment removal.  Works Categorized into Core & Non Core Components.  Works proposed to be taken up in two stages. 5
  • 6.  Removal of encroachment. & boundary fixing  Chain link fencing all along the periphery of the lake to check unauthorized encroachment and dumping of debris & construction waste.  Deweeding.  Desilting.  Formation of peripheral Bunds all along the periphery of the lake  Construction of Wet lands to remove nutrients from non point source.  Construction of Sewage Water Diversion channel / pipelines.  Construction of Silt traps to check the entry of silt.  Construction of Screen barriers to check the entry of floating objects. 6 Methodology followed by BDA for Lake Restoration Projects
  • 7.  Construction of RCC Storm Water inlets  Improvements to the Waste Weir.  Creation of islands for the re-habitation of birds.  Landscaping and development of parks and childrens play area.  Afforestation.  Lighting all along the periphery of lakes.  Construction of localized tertiary sewage treatment plants where ever necessary to maintain the water level in the lake for 365 days  Supply of excess treated water to down stream lake series through separate pipeline 7 Methodology followed by BDA for Lake Restoration Projects
  • 8. Phase IIIPhase IIPhase I Legend Primary SWD Secondary SWD WaterBodies BDA Boundary • Phase I – 13 Lakes • Phase II – 32 Lakes • Phase III – 78 Lakes Location of Lakes
  • 9. STATUS OF LAKE RESTORATION WORKS TAKEN UP BY B.D.A. Sl No Phase Category of work Total No. of Works Total No. of Works complete d Total No. of works under progress Total No of works for which Revenue certificati on / eviction orders pending Lake Area (A - G) Encroach ment Identified (A - G) Encroach ment Cleared (A - G) 1PHASE-1 Compreh ensive developm ent of Lakes 13 12 1 -- 766 - 33 31 - 16 14 - 27 2PHASE-2 Fencing works 32 15 17 16 2373-37 57 - 36 04 - 24 Compreh ensive developm ent of Lakes - - - - - - - 3PHASE-3 Fencing works 78 25 6 48 1917-17 187 - 00 44 - 00 Total 123 52 24 64 5057 - 37 276 - 12 63 - 11
  • 10. 10 Sl.No Phase Total No. of Works Estimated Cost In Crs Expenditure In Crs Total No. of Works completed Total No. of works under progres s Tenders under process Revenue certification pending Nos 1 Phase-1 Comprehe nsive developme nt of Lakes 13 90.21 87.51 12 1 - - 2 Phase-2 Fencing works Comprehe nsive developme nt of Lakes 32 19.50 3.70 15 17 - 16 - 541.50 - - - - - 3 Phase-3 Fencing works 78 225 - 25 06 47 48 Total 123 876.21 91.21 52 24 47 64
  • 11. Details of Revenue Certification, Rehabilitation, Sewage and Lake Feeding ABSTRACT Sl No Phase Category of work Total No. of Works Total No. of Works completed Total No. of works under progress Total No of lakes for which Revenue certificatio n / eviction orders pending Total No of Lakes for which rehabilitat ion is required Total No of Lakes which are polluted by sewage Total No. of Lakes which require feeding of treated water 1 PHASE-1 Comprehe nsive developme nt of Lakes 13 12 1 03 05 (211) - 03 2 PHASE-2 Fencing works 32 15 17 16 17 (1031) 26 22 Comprehe nsive developme nt of Lakes - - (07) - - - - 3 PHASE-3 Fencing works 78 25 6 48 35 (1069) 55 37 Total 123 52 24 68 57 (2311) 81 62
  • 12. B. NARAYANAPURA LAKE:- SEWAGE ENTRY B. NARAYANAPURA LAKE: ENCROACHMENT IN TANK AREA
  • 13. KALKERE- RAMPURA LAKE:- GARBAGE DUMPING SEWAGE ENTRY VIBUTHIPURA LAKE:- ENCROACHMENT & SEWAGE ENTRY
  • 14. Chain link fencing to Lingadeeranahalli Lake (32 Lakes) Chain link fencing to Chikkabettahalli Lake (32 Lakes)
  • 15. Chain link fencing of Gandhinagara Hosakere Chain link fencing of Gandhinagara Hosakere Barbed wire Fencing to Sooli Kere
  • 16. Completed Projects – Mallathahalli LAKE (13 Lakes) 16Newly Commissioned 5.0 MLD STP near Malathahalli Lake
  • 17. Sewage entry through SWD before commissioning of STP Sewage diverted to STP. No sewage entry into lake Lake view after restoration Lake filled with tertiary treated water after restoration Completed Projects – Mallathahalli LAKE 17
  • 22. The following are the issues which had slowed down the progress of lake restoration works. • All the lakes are transferred from BBMP / Forest Department to BDA for further development / maintenance, wherein the majority of the lakes are encroached, polluted with sewage and garbage dumping. • Any lake restoration project has to be started with revenue survey of the lake area, identification of encroachment, demarcation of encroachment and finally eviction of encroachment which has to be done by the revenue department, since the proprietary of all the lakes vests with the revenue department. •The clearance of encroachment on the lake areas is one of the serious issues which has slowed down the progress of lake works. In 64 cases the certification of encroachment, issue of eviction orders are pending which has to be taken up on priority. 7
  • 23. • 81 Lakes under BDA control are affected by huge sewage flows, which has to be connected from the source to the main trunk sewer lines through a conduit which has to be taken up by BWSSB on priority. • Since the majority of the lakes in the core areas of the city are encroached, which has huge no of habitants, wherein rehabilitation of such encroachers has to be taken up on priority. As a rough estimate 57 lakes contains 2311 No’s of un-authorized habitants which needs to be rehabilitated. This issue is to be taken up on top priority by the Urban Deputy Commissioner and The Commissioner Slum Board. • In majority of the lakes, the Rajakaluves connecting lake to lake to transport the surplus water are non existant which has led to flooding, loss of property etc. So these Rajakaluves has to be demarcated on ground, encroachments to be removed and an earthen section of the Rajakaluve has to be provided for a free flow . • Lack of adequate financial resources . • Lack of proper maintenance mechanism. • Lack of adequate man power . 23
  • 24.  There should be a more rigorous approach from the revenue authorities in tackling encroachments and related issues.  Strict penal actions from the enforcing authorities in tackling encroachments, dumping of garbage, Entry of sewage into the lakes.  There should be an integrated sewage network system for the entire Bangalore Metropolitan area, to be addressed by BWSSB on top priority.  The Rehabilitation of the un-authorized habitants on the lake areas has to be taken up on priority by the Slum Development Board and the Revenue Authorities.  The existing lake development authority should be made as a single nodal agency who can execute, enforce, monitor, maintain all urban lakes.  The existing Lake Development Authority should be strengthened with adequate man power.  A proper funding mechanism should be developed to provide adequate funds for execution and maintenance of lake systems.
  • 25. 25

Editor's Notes

  1. Phase I – 13 Lakes Phase II – 32 Lakes Phase III – 78 Lakes