SlideShare a Scribd company logo
Presentation
on
Master Plan Project Report
for
Remodeling of Storm Water Drains
in Entire BBMP Area, Bengaluru
STUP Consultants Pvt. Ltd.
Bruhath Bengaluru Mahanagara Palike
Salient Features
 Bruhath Bengaluru Mahanagara Palike (BBMP) Area - 710 Sq.Km.
(Core Area - 225 Sq.Km.,
Peripheral Area - 485 Sq. Km.)
 Total Water Shed / Catchment Area - 1016. 50 Sq.km.
 Total Length of SWD in BBMP Area – 840 Km.
(Core Area – 240 Km.,
Peripheral Area - 600 Km.)
(Primary Drain Length – 415 Km. &
Secondary Drain Length – 425 Km.)
Master Plan Project Study Area
 Core Area
 East Zone
 West Zone
 South Zone
 Bommanahalli
 Yelahanka
 Dasarahalli
 Mahadevapura
 Rajarajeshwarinagara
Study Area Map
Reasons for flooding
 Change in land use pattern
 Flow obstruction due to construction of RCC hume pipe culverts
 Inappropriate design approach, construction methodology for structures
and maintenance procedures adopted in newly formed layouts
 Development of land in tank bed areas and below drain HFL
 Modification of original drain alignment during formation of layouts
 Non existence of service roads on either side for laying service lines and
routine maintenance.
 Indiscriminate dumping of debris and solid wastes into drains
 Dense vegetation growth
 Encroachment / Modification of original drain alignment
 Lack of access for routine maintenance
 Services lines laid inside and across drains
 Blockage of inlet/outlet location of water bodies
 Water bodies not functioning as retention basins
 Sewer lines laid inside and across storm water drains
 Sewage flow in storm water drains
 Inadequate vent size railway culverts at 60 locations
Site Appreciation
Site Appreciation
Development of land in tank
bed areas & Below drain HFL
DH369, Near Hegganahalli -
Dasarahalli
DH233, Near Bagalagunte,
Dasarahalli
Utility Cables lines laid across SWD at culvert locations is obstruction flow of water
MD 264, Near Ramamurthynagara,
Mahadevapura
BH551, Near Arkere,
Bommnahalli
BH579, Near MICO Factory, Hosur Road
Site Appreciation
Garbage dumped inside SWD
MD 349, Near Marathalli, ORR -
Mahadevapura
Dasarahalli Zone
Near Hongasandra, Bommanahalli
DH332, Kalika Nagara, Dasarahalli
DH 211,211A & B, Near Lageere Main Road,
Dasarahalli
Inadequate Vent Size Culverts
Reasons for flooding
 Lakes
 Reduction in number of lakes
 Blockage due to vegetation growth, dumping of debris at
inlet/outlet location of water bodies
 Water bodies not functioning as retention basins
 Reduction in holding capacity due to reduction in lake areas,
severe siltation and entry of sewage etc
 Non existence of regulatory gate arrangement to regulate
flood discharge
 Non existence of interconnectivity between water bodies due
to encroachment / modification of original alignment.
 Drain diversion/bypass arrangement made to all water bodies
Condition of Water Bodies in BBMP Area
Chikka Beguru Kere, Bommanahalli Zone Dodda Kalsandra Kere, Bommanahalli Zone
Karihobanahalli Kere, Dasarahalli Zone
Nelakdhirenahalli Kere, Dasarahalli Zone
This has led to
 Reduction in open spaces
 Reduced time of concentration
 Reduction in holding capacity of lakes.
 Limited land availability for construction of detention
ponds
 Reduced space available for improving the drains
 More flooding
 Deterioration in public health & environmental
sanitation conditions.
 Increased cost expenditure etc.
Master Plan for
Remodelling of Storm Water Drains
in Eight Zones of BBMP Area
Project Objectives
 To minimise flood runoff.
 To ensure free flow of storm water and to minimize flooding in
critical flood prone areas.
 To improve the health and environmental sanitation conditions in
the surrounding vicinity of SWDs and Water bodies.
 To protect the existing waterways and water bodies from
environmental degradation.
 To improve ground water level by holding rain water in water bodies.
 To provide alternate water source in case of emergencies by rain
water harvesting.
Salient Details of Major & Minor
Water Shed Catchment Areas
Sl.
No.
Zone
Total Water Shed
Catchment Area
(Ha.)
No. of Major
Water Shed
Catchment
Areas
No. of Minor
Water Shed
Catchment
Areas
Total Drain
Length
(Km.)
1 East Zone 10,937 8 134
2252 West Zone 6,366 4 87
3 South Zone 5,553 4 69
4 Rajarajeshwarinagara Zone 15,365 9 118 138.15
5 Dasarahalli Zone 9,505 7 94 92.81
6 Yelahanka Zone 14,235 9 129 104.91
7 Mahadevapura Zone 23,371 11 236 164.24
8 Bommanahalli Zone 16,317 16 300 115.15
Total 101,650 68 1167 840.26
Map showing Storm Water Drains in BBMP area
Summary of Project Findings
• Drain reach is in natural condition at many places
• Original alignment modified at certain reaches
• Drain walls & culverts constructed by earst while CMC authorities
are, inadequate vent way not as per standard designs and also in
dilapidated condition in many places
• Drain width drastically reduced at many places and buildings
constructed butting to the drain wall
• Due to change in land use the culverts constructed by earst while
CMC authorities are not matching to the present field requirement.
• Due to non existence of sewerage system, large quantity of raw
sewage flow is observed in open drains.
• The inlet/outlet weir of water bodies is in dilapidated condition and
completely chocked
• Inadequate maintenance is evident
Master Plan Proposals
Rain Gauging Station, Data Generation, Flood control & Monitoring Station
Development of Water Bodies as Holding Ponds
Typical Section of RCC Box Culvert in Place of Pipe Culvert
Typical Section of Bridge with Pile arrangement
Typical Section of slab culvert
Intl. Airport Road, Sahakaranagara
Typical drain cross section
with RCC Retaining wall and Service Corridor
Sewer Line Sewer Line
Property
Boundary Property
Boundary
Property
Boundary Property
Boundary
Typical drain cross section with Earthen embankment,
stone revetment with CC lining and Service Corridor over embankment
Sewer Line Sewer Line
Beautification along side Major Storm water Drains
in Core Area
Sl .No. Name of the Zone
Amount
(Rs. In Crores)
1 East
654.222 West
3 South
4 Bommanahalli 665.14
5 Yelahanka 655.26
6 Dasarahalli 508.99
7 Mahadevapura 914.91
8 Rajrarajeshwarinagara 759.73
Total Estimated Cost 4,158.25
Say 4,160.00
Estimated Cost of SWD Master Plan Project
(As per 2010-11 Price Level)
MASTER PLAN PROJECT COST ALLOCATION
604.36, 16%614.45, 16%
605.32, 16%
470.20, 12% 845.19, 22%
701.82, 18%
ESTIMATED COST FOR STRUCTURAL WORKS FOR
DIFFERENT ZONES OF BBMP UNDER SWD MASTER
PLAN PROJECT TOTAL COST = 3,841.34 CRORES
Core Area (W +
E+ S)
Bommanahalli
Zone
Yelahanka Zone
Dasarahalli Zone
Mahadevpura
Zone
Rajarajeshwarina
gar Zone
49.86, 16%
50.69, 16%
49.94, 16%
38.79, 12%
69.73, 22% 57.90, 18%
ESTIMATED COST FOR NON STRUCTURAL WORKS
FOR DIFFERENT ZONES OF BBMP UNDER SWD
MASTER PLAN PROJECT
TOTAL COST = 316.91 CRORES
Core Area (W +
E+ S)
Bommanahalli
Zone
Yelahanka Zone
Dasarahalli Zone
Mahadevpura
Zone
Rajarajeshwarinag
ar Zone
654.22, 16%665.14, 16%
655.26, 16%
508.99, 12%
914.91, 22%
759.73, 18%
TOTAL ESTIMATED COST FOR STRUCTURAL & NON
STRUCTURAL WORKS FOR DIFFERENT ZONES OF
BBMP UNDER SWD MASTER PLAN PROJECT
TOTAL COST = 4,158.25 CRORES
Core Area (W +
E+ S)
Bommanahalli
Zone
Yelahanka Zone
Dasarahalli Zone
Mahadevpura
Zone
Rajarajeshwarinag
ar Zone
2,569.30,
62%
14.49, 0%
266.08, 6%
749.57, 18% 185.00, 5%
373.80, 9%
ESTIMATED COST FOR DIFFERENT WORKS UNDER
SWD MASTER PLAN PROJECT
TOTAL COST = 4,158.25 CRORES
Carrying Capacity
Improvement
Rehabilitation /
Strengthening
Culverts / Bridges
Allied Drain Works
Decentralized
STP's
Non Structural
Works
Work Programme For Implementation of Storm Water Drain Proposals of Master Plan
Project
Sl. Project Estimated Gestation Stage - 1 Stage - 2 Stage - 3 Stage - 1 Stage - 2 Stage - 3
No. Component Cost (1 Year) (3 Years) (3 Years) (3 Years) 1
st
Year 2
nd
Year 3
rd
Year 1
st
Year 2
nd
Year 3
rd
Year 1
st
Year 2
nd
Year 3
rd
Year
(Rs. Crores) % Amount % Amount % Amount % Amount % Amount % Amount % Amount % Amount % Amount % Amount % Amount % Amount % Amount
1.0 Improvement to Carrying
Capacity:
1.1 Desilting & deepening 121.34 5% 6.07 50% 60.67 30% 36.40 15% 18.20 60% 36.40 20% 12.13 20% 12.13 50% 18.20 30% 10.92 20% 7.28 50% 9.10 30% 5.46 20% 3.64
1.2 Widening
a. Earthen bund 238.59 0% 0.00 20% 47.72 40% 95.43 40% 95.43 50% 23.86 25% 11.93 25% 11.93 50% 47.72 30% 28.63 20% 19.09 50% 47.72 30% 28.63 20% 19.09
b. RCC independent walls 559.62 5% 27.98 40% 223.85 30% 167.89 25% 139.90 50% 111.92 30% 67.15 20% 44.77 50% 83.94 30% 50.37 20% 33.58 50% 69.95 30% 41.97 20% 27.98
c. RCC "U" shaped walls 971.62 5% 48.58 40% 388.65 30% 291.49 25% 242.90 50% 194.32 30% 116.59 20% 77.73 50% 145.74 30% 87.45 20% 58.30 50% 121.45 30% 72.87 20% 48.58
d. CRS / SSM masonry
walls
230.12 5% 11.51 40% 92.05 30% 69.04 25% 57.53 50% 46.02 30% 27.61 20% 18.41 50% 34.52 30% 20.71 20% 13.81 50% 28.77 30% 17.26 20% 11.51
e. RCC box drain 369.27 5% 18.46 40% 147.71 30% 110.78 25% 92.32 50% 73.85 30% 44.31 20% 29.54 50% 55.39 30% 33.23 20% 22.16 50% 46.16 30% 27.70 20% 18.46
1.3 Bed protection 78.75 5% 3.94 20% 15.75 50% 39.37 25% 19.69 30% 4.72 50% 7.87 20% 3.15 30% 11.81 50% 19.69 20% 7.87 30% 5.91 50% 9.84 20% 3.94
Sub Total 2569.30 116.54 976.39 810.40 665.98 491.11 287.61 197.66 397.32 250.99 162.08 329.05 203.73 133.20
2.0 Rehabilitation and
Strengthening:
CRS / SSM Wall
Reconstruction
12.90 10% 1.29 50% 6.45 30% 3.87 10% 1.29 50% 3.23 30% 1.94 20% 1.29 50% 1.94 30% 1.16 20% 0.77 50% 0.65 30% 0.39 20% 0.26
CRS / SSM Wall
Restoration
1.59
10% 0.16 50% 0.79 30% 0.48 10% 0.16 50% 0.40 30% 0.24 20% 0.16 50% 0.24 30% 0.14 20% 0.10 50% 0.08 30% 0.05 20% 0.03
Sub Total 14.49 1.45 7.24 4.35 1.45 3.62 2.17 1.45 2.17 1.30 0.87 0.72 0.43 0.29
3.0 Culverts and Bridges:
3.1 Utility supports & bridges 5.75 15% 0.86 50% 2.88 20% 1.15 15% 0.86 60% 1.73 25% 0.72 15% 0.43 60% 0.69 25% 0.29 15% 0.17 60% 0.52 25% 0.22 15% 0.13
3.2 Remodeling 244.45 15% 36.67 50% 122.22 20% 48.89 15% 36.67 60% 73.33 25% 30.56 15% 18.33 60% 29.33 25% 12.22 15% 7.33 60% 22.00 25% 9.17 15% 5.50
3.3 Rehabilitation 7.22 15% 1.08 50% 3.61 20% 1.44 15% 1.08 60% 2.16 25% 0.90 15% 0.54 60% 0.87 25% 0.36 15% 0.22 60% 0.65 25% 0.27 15% 0.16
3.4 Railway Culverts 8.67 15% 1.30 50% 4.33 20% 1.73 15% 1.30 60% 2.60 25% 1.08 15% 0.65 60% 1.04 25% 0.43 15% 0.26 60% 0.78 25% 0.32 15% 0.19
Sub Total 266.08 39.91 133.04 53.22 39.91 79.82 33.26 19.96 31.93 13.30 7.98 23.95 9.98 5.99
4.0 Allied Works:
4.1 Boundary stones 1.16 40% 0.47 60% 0.70 0% 0.00 0% 0.00 60% 0.42 20% 0.14 20% 0.14 50% 0.00 30% 0.00 20% 0.00 50% 0.00 30% 0.00 20% 0.00
4.2 Drains in low lying areas 224.69 15% 33.70 60% 134.81 15% 33.70 10% 22.47 60% 80.89 25% 33.70 15% 20.22 60% 20.22 25% 8.43 15% 5.06 60% 13.48 25% 5.62 15% 3.37
4.3 Service roads 187.44 0% 0.00 20% 37.49 30% 56.23 50% 93.72 20% 7.50 30% 11.25 50% 18.74 20% 11.25 30% 16.87 50% 28.12 20% 18.74 30% 28.12 50% 46.86
4.4 Fencing 89.39 0% 0.00 20% 17.88 30% 26.82 50% 44.69 20% 3.58 30% 5.36 50% 8.94 20% 5.36 30% 8.04 50% 13.41 20% 8.94 30% 13.41 50% 22.35
4.5 Detention ponds 16.43 0% 0.00 20% 3.29 50% 8.22 30% 4.93 40% 1.31 30% 0.99 30% 0.99 40% 3.29 30% 2.46 30% 2.46 40% 1.97 30% 1.48 30% 1.48
4.6 Retarding basins 8.46 5% 0.42 40% 3.38 30% 2.54 25% 2.12 50% 1.69 30% 1.02 20% 0.68 50% 1.27 30% 0.76 20% 0.51 50% 1.06 30% 0.63 20% 0.42
4.7 Development of water
bodies
96.40 10% 9.64 30% 28.92 40% 38.56 20% 19.28 30% 8.68 50% 14.46 20% 5.78 30% 11.57 50% 19.28 20% 7.71 30% 5.78 50% 9.64 20% 3.86
4.8 Silt traps 11.68 5% 0.58 50% 5.84 30% 3.50 15% 1.75 60% 3.50 20% 1.17 20% 1.17 50% 1.75 30% 1.05 20% 0.70 50% 0.88 30% 0.53 20% 0.35
4.9 Desilting ramps 5.24 0% 0.00 20% 1.05 30% 1.57 50% 2.62 20% 0.21 30% 0.31 50% 0.52 20% 0.31 30% 0.47 50% 0.79 20% 0.52 30% 0.79 50% 1.31
4.10 Inlet / out weirs 17.57 5% 0.88 50% 8.78 30% 5.27 15% 2.64 60% 5.27 20% 1.76 20% 1.76 50% 2.64 30% 1.58 20% 1.05 50% 1.32 30% 0.79 20% 0.53
4.11 Rain gauge stations 0.45 40% 0.18 60% 0.27 0% 0.00 0% 0.00 60% 0.16 20% 0.05 20% 0.05 50% 0.00 30% 0.00 20% 0.00 50% 0.00 30% 0.00 20% 0.00
4.12 Shifting of sewers 69.47 5% 3.47 50% 34.73 30% 20.84 15% 10.42 60% 20.84 20% 6.95 20% 6.95 50% 10.42 30% 6.25 20% 4.17 50% 5.21 30% 3.13 20% 2.08
4.13 Desilting equipments 18.00 25% 4.50 50% 9.00 25% 4.50 0% 0.00 60% 5.40 20% 1.80 20% 1.80 50% 2.25 30% 1.35 20% 0.90 50% 0.00 30% 0.00 20% 0.00
4.14 Vehicles for vigilance
squad
3.20 10% 0.32 50% 1.60 25% 0.80 15% 0.48 60% 0.96 20% 0.32 20% 0.32 50% 0.40 30% 0.24 20% 0.16 50% 0.24 30% 0.14 20% 0.10
Sub Total 749.57 54.17 287.74 202.55 205.11 140.41 79.27 68.06 70.73 66.79 65.03 58.14 64.27 82.70
5.0 Sewage Treatment
Plants:
Decentralized STP's 185.00 10% 18.50 30% 55.50 40% 74.00 20% 37.00 25% 13.88 60% 33.30 15% 8.33 25% 18.50 60% 44.40 15% 11.10 25% 9.25 60% 22.20 15% 5.55
Sub Total 185.00 18.50 55.50 74.00 37.00 13.88 33.30 8.33 18.50 44.40 11.10 9.25 22.20 5.55
Total Structural = 3784.45 230.56 1459.92 1144.51 949.45 728.84 435.62 295.45 520.65 376.79 247.06 421.12 300.61 227.72
6.0 Non Structural Works:
6.1 DPR and PMC 38.41 100% 38.41 0% 0.00 0% 0.00 0% 0.00 0% 0.00 0% 0.00 0% 0.00 0% 0.00 0% 0.00 0% 0.00 0% 0.00 0% 0.00 0% 0.00
6.2 Rehabilitation and
resettlement
76.83 40% 30.73 60% 46.10 0% 0.00 0% 0.00 60% 27.66 20% 9.22 20% 9.22 50% 0.00 30% 0.00 20% 0.00 50% 0.00 30% 0.00 20% 0.00
6.3 Shifting of other services 56.89 5% 2.84 50% 28.44 30% 17.07 15% 8.53 60% 17.07 20% 5.69 20% 5.69 50% 8.53 30% 5.12 20% 3.41 50% 4.27 30% 2.56 20% 1.71
6.4 Development of green belt 9.60 0% 0.00 20% 1.92 30% 2.88 50% 4.80 20% 0.38 30% 0.58 50% 0.96 20% 0.58 30% 0.86 50% 1.44 20% 0.96 30% 1.44 50% 2.40
6.5 WCE + Admin. 192.07 10% 19.21 30% 57.62 30% 57.62 30% 57.62 25% 14.41 35% 20.17 40% 23.05 25% 14.41 35% 20.17 40% 23.05 25% 14.41 35% 20.17 40% 23.05
Total Non Structural = 373.80 91.20 134.08 77.57 70.96 59.51 35.65 38.92 23.51 26.15 27.90 19.63 24.17 27.16
Total of SWD = 4158.25 321.76 1594.00 1222.08 1020.41 788.35 471.27 334.37 544.17 402.95 274.97 440.75 324.78 254.88
PROJECT PHASING AND INVESTMENT PLAN
PROJECT INVESTMENT PLAN FOR TOTAL MASTER PLAN
PROJECT FOR STRUCTURAL WORKS
TOTAL COST Rs. 3784.45 CRORES
233.87
736.21
436.77
295.49
522.71
376.52
244.36
419.84
297.33
221.35
0.00
100.00
200.00
300.00
400.00
500.00
600.00
700.00
800.00
1st
Year
2nd
Year
3rd
Year
4th
Year
5th
Year
6th
Year
7th
Year
8th
Year
9th
Year
10th
Year
Project Year
EstimatedCost(Rs.Crores)
TOTAL PROJECT INVESTMENT PLAN FOR MASTER PLAN
TOTAL COST Rs. 4158.25 CRORES
248.50
321.50
439.47
272.27
402.67
546.22
334.41
472.42
795.72
325.07
0.00
100.00
200.00
300.00
400.00
500.00
600.00
700.00
800.00
900.00
1st
Year
2nd
Year
3rd
Year
4th
Year
5th
Year
6th
Year
7th
Year
8th
Year
9th
Year
10th
Year
Project Year
EstimatedCost(Rs.Crores)
PROJECT INVESTMENT PLAN FOR TOTAL MASTER PLAN
PROJECT FOR NON STRUCTURAL WORKS
TOTAL COST Rs. 373.80 CRORES
91.20
59.51
35.65
38.92
23.51 26.15
27.90
19.63 24.17
27.16
0.00
10.00
20.00
30.00
40.00
50.00
60.00
70.00
80.00
90.00
100.00
1st
Year
2nd
Year
3rd
Year
4th
Year
5th
Year
6th
Year
7th
Year
8th
Year
9th
Year
10th
Year
Project Year
EstimatedCost(Rs.Crores)
PROJECT INVESTMENT PLAN FOR DIFFERENT WORKS
FOR MASTER PLAN PROJECT
TOTAL COST Rs. 4158.25 CRORES
2569.24
14.49
266.08
749.64
185.00 373.80
0.00
500.00
1000.00
1500.00
2000.00
2500.00
3000.00
Carrying
Capacity
Improvement
Rehabilitation/
Strengthening
Culverts/
Bridges
AlliedDrain
Works
Decentralized
STP's
NonStructural
Works
Type of Work
EstimatedCost(Rs.Crores)
Benefits from Implementation
 Provision of a properly designed drainage system for a
reasonably acceptable return period would ensure reduction in
flood incidences which in turn reduces flood damages and traffic
hold ups.
 Provision and properly maintained drainage system with controls
on sewage connections and solid waste dumping will enhance
the Environmental quality in the form of reduced pollution of
water bodies and ground water.
 Provision and proper maintenance of facilities like detention
ponds and retention basins will not only attenuate the peak run-
offs but also provide recharge of ground water which will improve
ground water table.
 Provision and proper maintenance of localized sewage treatment
plants and using the treated sewage will reduce the stress on
fresh water sources.
 Availability of treated sewage will enable more greenery and fresh
water lake developed assists reduction in climate change.
Thank you

More Related Content

What's hot

Lavasa, india's first planned hill city
Lavasa, india's first planned hill cityLavasa, india's first planned hill city
Lavasa, india's first planned hill city
Soumitra Smart
 
Detailed understanding of the Chennai Master Plan
Detailed understanding of the Chennai Master PlanDetailed understanding of the Chennai Master Plan
Detailed understanding of the Chennai Master Plan
Ar. M. Senthil [ senthilmani ]
 
Development plan case study (nagpur & lasvegas)
Development plan  case study (nagpur & lasvegas)Development plan  case study (nagpur & lasvegas)
Development plan case study (nagpur & lasvegas)
ABHI PATEL
 
Water Sensitive Urban Design
Water Sensitive Urban DesignWater Sensitive Urban Design
Water Sensitive Urban DesignElisa Sutanudjaja
 
Evolution of planning legislation in india
Evolution of planning legislation in india Evolution of planning legislation in india
Evolution of planning legislation in india
Parth Sadaria
 
Area Appreciation Studio - 2021 - SPAD M.Plan
Area Appreciation Studio - 2021 - SPAD M.PlanArea Appreciation Studio - 2021 - SPAD M.Plan
Area Appreciation Studio - 2021 - SPAD M.Plan
Lakshman R
 
RIBBON DEVELOPMENT
RIBBON DEVELOPMENTRIBBON DEVELOPMENT
RIBBON DEVELOPMENT
Eminent Planners
 
Housing case study(KAFCO housing,Aranya lowcost housing, TARA housing)
Housing case study(KAFCO housing,Aranya lowcost housing, TARA housing)Housing case study(KAFCO housing,Aranya lowcost housing, TARA housing)
Housing case study(KAFCO housing,Aranya lowcost housing, TARA housing)
Sumaiya Islam
 
Storm water drainage problem of Surat city & its solutions due to flood in ri...
Storm water drainage problem of Surat city & its solutions due to flood in ri...Storm water drainage problem of Surat city & its solutions due to flood in ri...
Storm water drainage problem of Surat city & its solutions due to flood in ri...
Kishan Bhadiyadra
 
Iwm case studies (standard)
Iwm case studies (standard)Iwm case studies (standard)
Iwm case studies (standard)
biometrust
 
Town planning schemes
Town planning schemesTown planning schemes
Town planning schemes
SakshiGadakh
 
Master Plan Project Report on Remodeling of Storm Water Drains_BBMP
Master Plan Project Report on Remodeling of Storm Water Drains_BBMP Master Plan Project Report on Remodeling of Storm Water Drains_BBMP
Master Plan Project Report on Remodeling of Storm Water Drains_BBMP Ekonnect
 
Area Planning of part of old Anand city, Gujarat
Area Planning of part of old Anand city, GujaratArea Planning of part of old Anand city, Gujarat
Area Planning of part of old Anand city, Gujarat
HILLFORT
 
Regional plan
Regional plan Regional plan
Regional plan
Abhishek Kanwar
 
1.1 Town Planning Introduction
1.1 Town Planning Introduction1.1 Town Planning Introduction
1.1 Town Planning Introduction
Sachin PatiL
 
Sponge Cities related to CEWP
Sponge Cities related to CEWPSponge Cities related to CEWP
Sponge Cities related to CEWP
Maa- ja metsätalousministeriö
 
Masters thesis - Urban renewal of Historic core- Case of Varanasi (Ongoing).pdf
Masters thesis - Urban renewal of Historic core- Case of Varanasi (Ongoing).pdfMasters thesis - Urban renewal of Historic core- Case of Varanasi (Ongoing).pdf
Masters thesis - Urban renewal of Historic core- Case of Varanasi (Ongoing).pdf
Deep Gupta
 
Land use and zoning of mysore
Land use and zoning of mysoreLand use and zoning of mysore
Land use and zoning of mysore
Jithu Radhakrishnan
 
Riverfront development Case study Hoshangabad Thesis
Riverfront development  Case study Hoshangabad Thesis Riverfront development  Case study Hoshangabad Thesis
Riverfront development Case study Hoshangabad Thesis
Praveen Mukati
 

What's hot (20)

Lavasa, india's first planned hill city
Lavasa, india's first planned hill cityLavasa, india's first planned hill city
Lavasa, india's first planned hill city
 
Detailed understanding of the Chennai Master Plan
Detailed understanding of the Chennai Master PlanDetailed understanding of the Chennai Master Plan
Detailed understanding of the Chennai Master Plan
 
Development plan case study (nagpur & lasvegas)
Development plan  case study (nagpur & lasvegas)Development plan  case study (nagpur & lasvegas)
Development plan case study (nagpur & lasvegas)
 
Water Sensitive Urban Design
Water Sensitive Urban DesignWater Sensitive Urban Design
Water Sensitive Urban Design
 
Evolution of planning legislation in india
Evolution of planning legislation in india Evolution of planning legislation in india
Evolution of planning legislation in india
 
Area Appreciation Studio - 2021 - SPAD M.Plan
Area Appreciation Studio - 2021 - SPAD M.PlanArea Appreciation Studio - 2021 - SPAD M.Plan
Area Appreciation Studio - 2021 - SPAD M.Plan
 
RIBBON DEVELOPMENT
RIBBON DEVELOPMENTRIBBON DEVELOPMENT
RIBBON DEVELOPMENT
 
Housing case study(KAFCO housing,Aranya lowcost housing, TARA housing)
Housing case study(KAFCO housing,Aranya lowcost housing, TARA housing)Housing case study(KAFCO housing,Aranya lowcost housing, TARA housing)
Housing case study(KAFCO housing,Aranya lowcost housing, TARA housing)
 
Storm water drainage problem of Surat city & its solutions due to flood in ri...
Storm water drainage problem of Surat city & its solutions due to flood in ri...Storm water drainage problem of Surat city & its solutions due to flood in ri...
Storm water drainage problem of Surat city & its solutions due to flood in ri...
 
Iwm case studies (standard)
Iwm case studies (standard)Iwm case studies (standard)
Iwm case studies (standard)
 
Town planning schemes
Town planning schemesTown planning schemes
Town planning schemes
 
Master Plan Project Report on Remodeling of Storm Water Drains_BBMP
Master Plan Project Report on Remodeling of Storm Water Drains_BBMP Master Plan Project Report on Remodeling of Storm Water Drains_BBMP
Master Plan Project Report on Remodeling of Storm Water Drains_BBMP
 
Area Planning of part of old Anand city, Gujarat
Area Planning of part of old Anand city, GujaratArea Planning of part of old Anand city, Gujarat
Area Planning of part of old Anand city, Gujarat
 
Naya raipur
Naya raipur Naya raipur
Naya raipur
 
Regional plan
Regional plan Regional plan
Regional plan
 
1.1 Town Planning Introduction
1.1 Town Planning Introduction1.1 Town Planning Introduction
1.1 Town Planning Introduction
 
Sponge Cities related to CEWP
Sponge Cities related to CEWPSponge Cities related to CEWP
Sponge Cities related to CEWP
 
Masters thesis - Urban renewal of Historic core- Case of Varanasi (Ongoing).pdf
Masters thesis - Urban renewal of Historic core- Case of Varanasi (Ongoing).pdfMasters thesis - Urban renewal of Historic core- Case of Varanasi (Ongoing).pdf
Masters thesis - Urban renewal of Historic core- Case of Varanasi (Ongoing).pdf
 
Land use and zoning of mysore
Land use and zoning of mysoreLand use and zoning of mysore
Land use and zoning of mysore
 
Riverfront development Case study Hoshangabad Thesis
Riverfront development  Case study Hoshangabad Thesis Riverfront development  Case study Hoshangabad Thesis
Riverfront development Case study Hoshangabad Thesis
 

Viewers also liked

Sustainability Reporting
Sustainability ReportingSustainability Reporting
Sustainability Reporting
RSM GC
 
Overview on sustainability reporting
Overview on sustainability reportingOverview on sustainability reporting
Overview on sustainability reporting
Ekonnect Knowledge Foundation
 
Prasad Modak Presentation at First Multistakholder Workshop
Prasad Modak Presentation at First Multistakholder Workshop Prasad Modak Presentation at First Multistakholder Workshop
Prasad Modak Presentation at First Multistakholder Workshop
Ekonnect Knowledge Foundation
 
Action taken by BWSSB in preventing pollution of Lakes
Action taken by BWSSB in preventing pollution of LakesAction taken by BWSSB in preventing pollution of Lakes
Action taken by BWSSB in preventing pollution of Lakes
Ekonnect Knowledge Foundation
 
Lake Restoration Projects Being Undertaken by BDA_Bangalore Development Autho...
Lake Restoration Projects Being Undertaken by BDA_Bangalore Development Autho...Lake Restoration Projects Being Undertaken by BDA_Bangalore Development Autho...
Lake Restoration Projects Being Undertaken by BDA_Bangalore Development Autho...
Ekonnect Knowledge Foundation
 
Elevating Sustainability Reporting with Advanced Energy and Water Data Collec...
Elevating Sustainability Reporting with Advanced Energy and Water Data Collec...Elevating Sustainability Reporting with Advanced Energy and Water Data Collec...
Elevating Sustainability Reporting with Advanced Energy and Water Data Collec...
Urjanet
 
Integrated Sustainability Reporting
Integrated Sustainability ReportingIntegrated Sustainability Reporting
Integrated Sustainability Reporting
Next Generation Consultants: Reana Rossouw
 
An introduction to sustainability reporting
An introduction to sustainability reportingAn introduction to sustainability reporting
An introduction to sustainability reporting
PReConsultants
 
Sustainability Report Template
Sustainability Report TemplateSustainability Report Template
Sustainability Report Template
Demand Metric
 

Viewers also liked (9)

Sustainability Reporting
Sustainability ReportingSustainability Reporting
Sustainability Reporting
 
Overview on sustainability reporting
Overview on sustainability reportingOverview on sustainability reporting
Overview on sustainability reporting
 
Prasad Modak Presentation at First Multistakholder Workshop
Prasad Modak Presentation at First Multistakholder Workshop Prasad Modak Presentation at First Multistakholder Workshop
Prasad Modak Presentation at First Multistakholder Workshop
 
Action taken by BWSSB in preventing pollution of Lakes
Action taken by BWSSB in preventing pollution of LakesAction taken by BWSSB in preventing pollution of Lakes
Action taken by BWSSB in preventing pollution of Lakes
 
Lake Restoration Projects Being Undertaken by BDA_Bangalore Development Autho...
Lake Restoration Projects Being Undertaken by BDA_Bangalore Development Autho...Lake Restoration Projects Being Undertaken by BDA_Bangalore Development Autho...
Lake Restoration Projects Being Undertaken by BDA_Bangalore Development Autho...
 
Elevating Sustainability Reporting with Advanced Energy and Water Data Collec...
Elevating Sustainability Reporting with Advanced Energy and Water Data Collec...Elevating Sustainability Reporting with Advanced Energy and Water Data Collec...
Elevating Sustainability Reporting with Advanced Energy and Water Data Collec...
 
Integrated Sustainability Reporting
Integrated Sustainability ReportingIntegrated Sustainability Reporting
Integrated Sustainability Reporting
 
An introduction to sustainability reporting
An introduction to sustainability reportingAn introduction to sustainability reporting
An introduction to sustainability reporting
 
Sustainability Report Template
Sustainability Report TemplateSustainability Report Template
Sustainability Report Template
 

Similar to Master Plan Project Report on Remodeling of Storm Water Drains_BBMP

An Effort towards Water Security:Gujarat Experience_Mahesh Singh, GoG_Indovat...
An Effort towards Water Security:Gujarat Experience_Mahesh Singh, GoG_Indovat...An Effort towards Water Security:Gujarat Experience_Mahesh Singh, GoG_Indovat...
An Effort towards Water Security:Gujarat Experience_Mahesh Singh, GoG_Indovat...
India Water Portal
 
Design water supply scheme
Design water supply schemeDesign water supply scheme
Design water supply scheme
Aby Mundackal
 
Water resources in Bangalore_Ramasesha_2013
Water resources in Bangalore_Ramasesha_2013Water resources in Bangalore_Ramasesha_2013
Water resources in Bangalore_Ramasesha_2013
India Water Portal
 
Saltwater Intrusion on the Main Rivers under the Impact of Climate Change, Ng...
Saltwater Intrusion on the Main Rivers under the Impact of Climate Change, Ng...Saltwater Intrusion on the Main Rivers under the Impact of Climate Change, Ng...
Saltwater Intrusion on the Main Rivers under the Impact of Climate Change, Ng...
Hanna Stahlberg
 
Mahesvaran CN - UEI Day 2 - Kochi Jan18
Mahesvaran CN - UEI Day 2 - Kochi Jan18Mahesvaran CN - UEI Day 2 - Kochi Jan18
Mahesvaran CN - UEI Day 2 - Kochi Jan18
India UK Water Centre (IUKWC)
 
Jaipur_water supply service.pdf
Jaipur_water supply service.pdfJaipur_water supply service.pdf
Jaipur_water supply service.pdf
AKASHICWORLD
 
measures to counteract urban floods
measures to counteract urban floodsmeasures to counteract urban floods
measures to counteract urban floods
dontknow288849
 
Ground Water Quality Assessment using Geo Spatial Technology in Part of Lower...
Ground Water Quality Assessment using Geo Spatial Technology in Part of Lower...Ground Water Quality Assessment using Geo Spatial Technology in Part of Lower...
Ground Water Quality Assessment using Geo Spatial Technology in Part of Lower...
IRJET Journal
 
Understanding Saul Kere
Understanding Saul KereUnderstanding Saul Kere
Understanding Saul Kere
biometrust
 
design.pptx
design.pptxdesign.pptx
design.pptx
SantoshKapse9
 
PPT Estimate.pptx
PPT Estimate.pptxPPT Estimate.pptx
PPT Estimate.pptx
SantoshKapse9
 
Presentation_for_Road.pptx
Presentation_for_Road.pptxPresentation_for_Road.pptx
Presentation_for_Road.pptx
SantoshKapse9
 
EQUITABLE Water Supply PROJECT for Pune City
EQUITABLE Water  Supply PROJECT for Pune CityEQUITABLE Water  Supply PROJECT for Pune City
EQUITABLE Water Supply PROJECT for Pune City
pmcpune
 
IRJET- Hydraulic and Structural Design of Water Treatment Plant
IRJET- Hydraulic and Structural Design of Water Treatment PlantIRJET- Hydraulic and Structural Design of Water Treatment Plant
IRJET- Hydraulic and Structural Design of Water Treatment Plant
IRJET Journal
 
Water Use Analysis & Water Intensity Comparison
Water Use Analysis & Water Intensity ComparisonWater Use Analysis & Water Intensity Comparison
Water Use Analysis & Water Intensity ComparisonAshwin Dhanasekar
 
Watershed management and development
Watershed management and developmentWatershed management and development
Watershed management and development
ChethanKShanthkumar
 
Ijetcas14 589
Ijetcas14 589Ijetcas14 589
Ijetcas14 589
Iasir Journals
 
EXPERIMENTAL INVESTIGATION OF FLOODING PROBLEM- A CASE STUDY ON ARUNAVATI RIV...
EXPERIMENTAL INVESTIGATION OF FLOODING PROBLEM- A CASE STUDY ON ARUNAVATI RIV...EXPERIMENTAL INVESTIGATION OF FLOODING PROBLEM- A CASE STUDY ON ARUNAVATI RIV...
EXPERIMENTAL INVESTIGATION OF FLOODING PROBLEM- A CASE STUDY ON ARUNAVATI RIV...
IAEME Publication
 
Modelling of a Coastal Aquifer using FEFLOW
Modelling of a Coastal Aquifer using FEFLOWModelling of a Coastal Aquifer using FEFLOW
Modelling of a Coastal Aquifer using FEFLOWC. P. Kumar
 

Similar to Master Plan Project Report on Remodeling of Storm Water Drains_BBMP (20)

An Effort towards Water Security:Gujarat Experience_Mahesh Singh, GoG_Indovat...
An Effort towards Water Security:Gujarat Experience_Mahesh Singh, GoG_Indovat...An Effort towards Water Security:Gujarat Experience_Mahesh Singh, GoG_Indovat...
An Effort towards Water Security:Gujarat Experience_Mahesh Singh, GoG_Indovat...
 
Design water supply scheme
Design water supply schemeDesign water supply scheme
Design water supply scheme
 
Kerala sw
Kerala swKerala sw
Kerala sw
 
Water resources in Bangalore_Ramasesha_2013
Water resources in Bangalore_Ramasesha_2013Water resources in Bangalore_Ramasesha_2013
Water resources in Bangalore_Ramasesha_2013
 
Saltwater Intrusion on the Main Rivers under the Impact of Climate Change, Ng...
Saltwater Intrusion on the Main Rivers under the Impact of Climate Change, Ng...Saltwater Intrusion on the Main Rivers under the Impact of Climate Change, Ng...
Saltwater Intrusion on the Main Rivers under the Impact of Climate Change, Ng...
 
Mahesvaran CN - UEI Day 2 - Kochi Jan18
Mahesvaran CN - UEI Day 2 - Kochi Jan18Mahesvaran CN - UEI Day 2 - Kochi Jan18
Mahesvaran CN - UEI Day 2 - Kochi Jan18
 
Jaipur_water supply service.pdf
Jaipur_water supply service.pdfJaipur_water supply service.pdf
Jaipur_water supply service.pdf
 
measures to counteract urban floods
measures to counteract urban floodsmeasures to counteract urban floods
measures to counteract urban floods
 
Ground Water Quality Assessment using Geo Spatial Technology in Part of Lower...
Ground Water Quality Assessment using Geo Spatial Technology in Part of Lower...Ground Water Quality Assessment using Geo Spatial Technology in Part of Lower...
Ground Water Quality Assessment using Geo Spatial Technology in Part of Lower...
 
Understanding Saul Kere
Understanding Saul KereUnderstanding Saul Kere
Understanding Saul Kere
 
design.pptx
design.pptxdesign.pptx
design.pptx
 
PPT Estimate.pptx
PPT Estimate.pptxPPT Estimate.pptx
PPT Estimate.pptx
 
Presentation_for_Road.pptx
Presentation_for_Road.pptxPresentation_for_Road.pptx
Presentation_for_Road.pptx
 
EQUITABLE Water Supply PROJECT for Pune City
EQUITABLE Water  Supply PROJECT for Pune CityEQUITABLE Water  Supply PROJECT for Pune City
EQUITABLE Water Supply PROJECT for Pune City
 
IRJET- Hydraulic and Structural Design of Water Treatment Plant
IRJET- Hydraulic and Structural Design of Water Treatment PlantIRJET- Hydraulic and Structural Design of Water Treatment Plant
IRJET- Hydraulic and Structural Design of Water Treatment Plant
 
Water Use Analysis & Water Intensity Comparison
Water Use Analysis & Water Intensity ComparisonWater Use Analysis & Water Intensity Comparison
Water Use Analysis & Water Intensity Comparison
 
Watershed management and development
Watershed management and developmentWatershed management and development
Watershed management and development
 
Ijetcas14 589
Ijetcas14 589Ijetcas14 589
Ijetcas14 589
 
EXPERIMENTAL INVESTIGATION OF FLOODING PROBLEM- A CASE STUDY ON ARUNAVATI RIV...
EXPERIMENTAL INVESTIGATION OF FLOODING PROBLEM- A CASE STUDY ON ARUNAVATI RIV...EXPERIMENTAL INVESTIGATION OF FLOODING PROBLEM- A CASE STUDY ON ARUNAVATI RIV...
EXPERIMENTAL INVESTIGATION OF FLOODING PROBLEM- A CASE STUDY ON ARUNAVATI RIV...
 
Modelling of a Coastal Aquifer using FEFLOW
Modelling of a Coastal Aquifer using FEFLOWModelling of a Coastal Aquifer using FEFLOW
Modelling of a Coastal Aquifer using FEFLOW
 

More from Ekonnect Knowledge Foundation

Environmental Data Management and Analytics
Environmental Data Management and AnalyticsEnvironmental Data Management and Analytics
Environmental Data Management and Analytics
Ekonnect Knowledge Foundation
 
Waste Segregation
Waste Segregation Waste Segregation
Waste Segregation
Ekonnect Knowledge Foundation
 
Waste Management Hierarchy
Waste Management Hierarchy Waste Management Hierarchy
Waste Management Hierarchy
Ekonnect Knowledge Foundation
 
Waste Procesing Techniuques - Biomethanation
Waste Procesing Techniuques - Biomethanation Waste Procesing Techniuques - Biomethanation
Waste Procesing Techniuques - Biomethanation
Ekonnect Knowledge Foundation
 
Trends in Solid Waste Management
Trends in Solid Waste ManagementTrends in Solid Waste Management
Trends in Solid Waste Management
Ekonnect Knowledge Foundation
 
Stree Mukti Sanghatana
Stree Mukti SanghatanaStree Mukti Sanghatana
Stree Mukti Sanghatana
Ekonnect Knowledge Foundation
 
Sustainable & Decenrealized Waste To Resource Managemnt Sotuions
Sustainable & Decenrealized Waste To Resource Managemnt SotuionsSustainable & Decenrealized Waste To Resource Managemnt Sotuions
Sustainable & Decenrealized Waste To Resource Managemnt Sotuions
Ekonnect Knowledge Foundation
 
Swachh Bharat Survekshan
Swachh Bharat SurvekshanSwachh Bharat Survekshan
Swachh Bharat Survekshan
Ekonnect Knowledge Foundation
 
Biomedical Waste Management Rules 2016
Biomedical Waste Management Rules 2016Biomedical Waste Management Rules 2016
Biomedical Waste Management Rules 2016
Ekonnect Knowledge Foundation
 
Integrated Solid Waste Management of PMC
Integrated Solid Waste Management of PMCIntegrated Solid Waste Management of PMC
Integrated Solid Waste Management of PMC
Ekonnect Knowledge Foundation
 
Overview of waste streams
Overview of waste streamsOverview of waste streams
Overview of waste streams
Ekonnect Knowledge Foundation
 
Waste Composting Techniques - organic waste convertor model
Waste Composting Techniques - organic waste convertor modelWaste Composting Techniques - organic waste convertor model
Waste Composting Techniques - organic waste convertor model
Ekonnect Knowledge Foundation
 
Creating Your Own Biocomposting Unit
Creating Your Own Biocomposting UnitCreating Your Own Biocomposting Unit
Creating Your Own Biocomposting Unit
Ekonnect Knowledge Foundation
 
Influence of Urban-Rural Gradient on Wetlands of Bangalore_CiSTUP
Influence of Urban-Rural Gradient on Wetlands of Bangalore_CiSTUPInfluence of Urban-Rural Gradient on Wetlands of Bangalore_CiSTUP
Influence of Urban-Rural Gradient on Wetlands of Bangalore_CiSTUP
Ekonnect Knowledge Foundation
 
Assessment Derived Conservation Strategies for Lakes in Bangalore
Assessment Derived Conservation Strategies for Lakes in Bangalore Assessment Derived Conservation Strategies for Lakes in Bangalore
Assessment Derived Conservation Strategies for Lakes in Bangalore
Ekonnect Knowledge Foundation
 
Strategic Action Planning for Revival of Bangalore Lakes _ESG
Strategic Action Planning for Revival of Bangalore Lakes _ESGStrategic Action Planning for Revival of Bangalore Lakes _ESG
Strategic Action Planning for Revival of Bangalore Lakes _ESG
Ekonnect Knowledge Foundation
 
Anvaya 3.0 Training Programme Presentation
Anvaya 3.0 Training Programme Presentation Anvaya 3.0 Training Programme Presentation
Anvaya 3.0 Training Programme Presentation
Ekonnect Knowledge Foundation
 
E-waste Management Workshop: Dr. Pramod Modak
E-waste Management Workshop: Dr. Pramod ModakE-waste Management Workshop: Dr. Pramod Modak
E-waste Management Workshop: Dr. Pramod Modak
Ekonnect Knowledge Foundation
 
E-waste Management Workshop: Dr. Aniruddha Agnihotri
E-waste Management Workshop: Dr. Aniruddha AgnihotriE-waste Management Workshop: Dr. Aniruddha Agnihotri
E-waste Management Workshop: Dr. Aniruddha Agnihotri
Ekonnect Knowledge Foundation
 
E-waste Management Workshop: Mr. B.K Soni
E-waste Management Workshop: Mr. B.K SoniE-waste Management Workshop: Mr. B.K Soni
E-waste Management Workshop: Mr. B.K Soni
Ekonnect Knowledge Foundation
 

More from Ekonnect Knowledge Foundation (20)

Environmental Data Management and Analytics
Environmental Data Management and AnalyticsEnvironmental Data Management and Analytics
Environmental Data Management and Analytics
 
Waste Segregation
Waste Segregation Waste Segregation
Waste Segregation
 
Waste Management Hierarchy
Waste Management Hierarchy Waste Management Hierarchy
Waste Management Hierarchy
 
Waste Procesing Techniuques - Biomethanation
Waste Procesing Techniuques - Biomethanation Waste Procesing Techniuques - Biomethanation
Waste Procesing Techniuques - Biomethanation
 
Trends in Solid Waste Management
Trends in Solid Waste ManagementTrends in Solid Waste Management
Trends in Solid Waste Management
 
Stree Mukti Sanghatana
Stree Mukti SanghatanaStree Mukti Sanghatana
Stree Mukti Sanghatana
 
Sustainable & Decenrealized Waste To Resource Managemnt Sotuions
Sustainable & Decenrealized Waste To Resource Managemnt SotuionsSustainable & Decenrealized Waste To Resource Managemnt Sotuions
Sustainable & Decenrealized Waste To Resource Managemnt Sotuions
 
Swachh Bharat Survekshan
Swachh Bharat SurvekshanSwachh Bharat Survekshan
Swachh Bharat Survekshan
 
Biomedical Waste Management Rules 2016
Biomedical Waste Management Rules 2016Biomedical Waste Management Rules 2016
Biomedical Waste Management Rules 2016
 
Integrated Solid Waste Management of PMC
Integrated Solid Waste Management of PMCIntegrated Solid Waste Management of PMC
Integrated Solid Waste Management of PMC
 
Overview of waste streams
Overview of waste streamsOverview of waste streams
Overview of waste streams
 
Waste Composting Techniques - organic waste convertor model
Waste Composting Techniques - organic waste convertor modelWaste Composting Techniques - organic waste convertor model
Waste Composting Techniques - organic waste convertor model
 
Creating Your Own Biocomposting Unit
Creating Your Own Biocomposting UnitCreating Your Own Biocomposting Unit
Creating Your Own Biocomposting Unit
 
Influence of Urban-Rural Gradient on Wetlands of Bangalore_CiSTUP
Influence of Urban-Rural Gradient on Wetlands of Bangalore_CiSTUPInfluence of Urban-Rural Gradient on Wetlands of Bangalore_CiSTUP
Influence of Urban-Rural Gradient on Wetlands of Bangalore_CiSTUP
 
Assessment Derived Conservation Strategies for Lakes in Bangalore
Assessment Derived Conservation Strategies for Lakes in Bangalore Assessment Derived Conservation Strategies for Lakes in Bangalore
Assessment Derived Conservation Strategies for Lakes in Bangalore
 
Strategic Action Planning for Revival of Bangalore Lakes _ESG
Strategic Action Planning for Revival of Bangalore Lakes _ESGStrategic Action Planning for Revival of Bangalore Lakes _ESG
Strategic Action Planning for Revival of Bangalore Lakes _ESG
 
Anvaya 3.0 Training Programme Presentation
Anvaya 3.0 Training Programme Presentation Anvaya 3.0 Training Programme Presentation
Anvaya 3.0 Training Programme Presentation
 
E-waste Management Workshop: Dr. Pramod Modak
E-waste Management Workshop: Dr. Pramod ModakE-waste Management Workshop: Dr. Pramod Modak
E-waste Management Workshop: Dr. Pramod Modak
 
E-waste Management Workshop: Dr. Aniruddha Agnihotri
E-waste Management Workshop: Dr. Aniruddha AgnihotriE-waste Management Workshop: Dr. Aniruddha Agnihotri
E-waste Management Workshop: Dr. Aniruddha Agnihotri
 
E-waste Management Workshop: Mr. B.K Soni
E-waste Management Workshop: Mr. B.K SoniE-waste Management Workshop: Mr. B.K Soni
E-waste Management Workshop: Mr. B.K Soni
 

Recently uploaded

The Future of Platform Engineering
The Future of Platform EngineeringThe Future of Platform Engineering
The Future of Platform Engineering
Jemma Hussein Allen
 
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdfFIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance
 
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
Neo4j
 
Secstrike : Reverse Engineering & Pwnable tools for CTF.pptx
Secstrike : Reverse Engineering & Pwnable tools for CTF.pptxSecstrike : Reverse Engineering & Pwnable tools for CTF.pptx
Secstrike : Reverse Engineering & Pwnable tools for CTF.pptx
nkrafacyberclub
 
Communications Mining Series - Zero to Hero - Session 1
Communications Mining Series - Zero to Hero - Session 1Communications Mining Series - Zero to Hero - Session 1
Communications Mining Series - Zero to Hero - Session 1
DianaGray10
 
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdfFIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance
 
National Security Agency - NSA mobile device best practices
National Security Agency - NSA mobile device best practicesNational Security Agency - NSA mobile device best practices
National Security Agency - NSA mobile device best practices
Quotidiano Piemontese
 
Microsoft - Power Platform_G.Aspiotis.pdf
Microsoft - Power Platform_G.Aspiotis.pdfMicrosoft - Power Platform_G.Aspiotis.pdf
Microsoft - Power Platform_G.Aspiotis.pdf
Uni Systems S.M.S.A.
 
Uni Systems Copilot event_05062024_C.Vlachos.pdf
Uni Systems Copilot event_05062024_C.Vlachos.pdfUni Systems Copilot event_05062024_C.Vlachos.pdf
Uni Systems Copilot event_05062024_C.Vlachos.pdf
Uni Systems S.M.S.A.
 
SAP Sapphire 2024 - ASUG301 building better apps with SAP Fiori.pdf
SAP Sapphire 2024 - ASUG301 building better apps with SAP Fiori.pdfSAP Sapphire 2024 - ASUG301 building better apps with SAP Fiori.pdf
SAP Sapphire 2024 - ASUG301 building better apps with SAP Fiori.pdf
Peter Spielvogel
 
Epistemic Interaction - tuning interfaces to provide information for AI support
Epistemic Interaction - tuning interfaces to provide information for AI supportEpistemic Interaction - tuning interfaces to provide information for AI support
Epistemic Interaction - tuning interfaces to provide information for AI support
Alan Dix
 
Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...
Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...
Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...
James Anderson
 
Free Complete Python - A step towards Data Science
Free Complete Python - A step towards Data ScienceFree Complete Python - A step towards Data Science
Free Complete Python - A step towards Data Science
RinaMondal9
 
The Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and SalesThe Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and Sales
Laura Byrne
 
Generative AI Deep Dive: Advancing from Proof of Concept to Production
Generative AI Deep Dive: Advancing from Proof of Concept to ProductionGenerative AI Deep Dive: Advancing from Proof of Concept to Production
Generative AI Deep Dive: Advancing from Proof of Concept to Production
Aggregage
 
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
BookNet Canada
 
20240605 QFM017 Machine Intelligence Reading List May 2024
20240605 QFM017 Machine Intelligence Reading List May 202420240605 QFM017 Machine Intelligence Reading List May 2024
20240605 QFM017 Machine Intelligence Reading List May 2024
Matthew Sinclair
 
GridMate - End to end testing is a critical piece to ensure quality and avoid...
GridMate - End to end testing is a critical piece to ensure quality and avoid...GridMate - End to end testing is a critical piece to ensure quality and avoid...
GridMate - End to end testing is a critical piece to ensure quality and avoid...
ThomasParaiso2
 
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
James Anderson
 
FIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance Osaka Seminar: Overview.pdfFIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance
 

Recently uploaded (20)

The Future of Platform Engineering
The Future of Platform EngineeringThe Future of Platform Engineering
The Future of Platform Engineering
 
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdfFIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
 
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
 
Secstrike : Reverse Engineering & Pwnable tools for CTF.pptx
Secstrike : Reverse Engineering & Pwnable tools for CTF.pptxSecstrike : Reverse Engineering & Pwnable tools for CTF.pptx
Secstrike : Reverse Engineering & Pwnable tools for CTF.pptx
 
Communications Mining Series - Zero to Hero - Session 1
Communications Mining Series - Zero to Hero - Session 1Communications Mining Series - Zero to Hero - Session 1
Communications Mining Series - Zero to Hero - Session 1
 
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdfFIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
 
National Security Agency - NSA mobile device best practices
National Security Agency - NSA mobile device best practicesNational Security Agency - NSA mobile device best practices
National Security Agency - NSA mobile device best practices
 
Microsoft - Power Platform_G.Aspiotis.pdf
Microsoft - Power Platform_G.Aspiotis.pdfMicrosoft - Power Platform_G.Aspiotis.pdf
Microsoft - Power Platform_G.Aspiotis.pdf
 
Uni Systems Copilot event_05062024_C.Vlachos.pdf
Uni Systems Copilot event_05062024_C.Vlachos.pdfUni Systems Copilot event_05062024_C.Vlachos.pdf
Uni Systems Copilot event_05062024_C.Vlachos.pdf
 
SAP Sapphire 2024 - ASUG301 building better apps with SAP Fiori.pdf
SAP Sapphire 2024 - ASUG301 building better apps with SAP Fiori.pdfSAP Sapphire 2024 - ASUG301 building better apps with SAP Fiori.pdf
SAP Sapphire 2024 - ASUG301 building better apps with SAP Fiori.pdf
 
Epistemic Interaction - tuning interfaces to provide information for AI support
Epistemic Interaction - tuning interfaces to provide information for AI supportEpistemic Interaction - tuning interfaces to provide information for AI support
Epistemic Interaction - tuning interfaces to provide information for AI support
 
Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...
Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...
Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...
 
Free Complete Python - A step towards Data Science
Free Complete Python - A step towards Data ScienceFree Complete Python - A step towards Data Science
Free Complete Python - A step towards Data Science
 
The Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and SalesThe Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and Sales
 
Generative AI Deep Dive: Advancing from Proof of Concept to Production
Generative AI Deep Dive: Advancing from Proof of Concept to ProductionGenerative AI Deep Dive: Advancing from Proof of Concept to Production
Generative AI Deep Dive: Advancing from Proof of Concept to Production
 
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
 
20240605 QFM017 Machine Intelligence Reading List May 2024
20240605 QFM017 Machine Intelligence Reading List May 202420240605 QFM017 Machine Intelligence Reading List May 2024
20240605 QFM017 Machine Intelligence Reading List May 2024
 
GridMate - End to end testing is a critical piece to ensure quality and avoid...
GridMate - End to end testing is a critical piece to ensure quality and avoid...GridMate - End to end testing is a critical piece to ensure quality and avoid...
GridMate - End to end testing is a critical piece to ensure quality and avoid...
 
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
 
FIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance Osaka Seminar: Overview.pdfFIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance Osaka Seminar: Overview.pdf
 

Master Plan Project Report on Remodeling of Storm Water Drains_BBMP

  • 1. Presentation on Master Plan Project Report for Remodeling of Storm Water Drains in Entire BBMP Area, Bengaluru STUP Consultants Pvt. Ltd. Bruhath Bengaluru Mahanagara Palike
  • 2. Salient Features  Bruhath Bengaluru Mahanagara Palike (BBMP) Area - 710 Sq.Km. (Core Area - 225 Sq.Km., Peripheral Area - 485 Sq. Km.)  Total Water Shed / Catchment Area - 1016. 50 Sq.km.  Total Length of SWD in BBMP Area – 840 Km. (Core Area – 240 Km., Peripheral Area - 600 Km.) (Primary Drain Length – 415 Km. & Secondary Drain Length – 425 Km.)
  • 3. Master Plan Project Study Area  Core Area  East Zone  West Zone  South Zone  Bommanahalli  Yelahanka  Dasarahalli  Mahadevapura  Rajarajeshwarinagara Study Area Map
  • 4. Reasons for flooding  Change in land use pattern  Flow obstruction due to construction of RCC hume pipe culverts  Inappropriate design approach, construction methodology for structures and maintenance procedures adopted in newly formed layouts  Development of land in tank bed areas and below drain HFL  Modification of original drain alignment during formation of layouts  Non existence of service roads on either side for laying service lines and routine maintenance.  Indiscriminate dumping of debris and solid wastes into drains  Dense vegetation growth  Encroachment / Modification of original drain alignment  Lack of access for routine maintenance  Services lines laid inside and across drains  Blockage of inlet/outlet location of water bodies  Water bodies not functioning as retention basins  Sewer lines laid inside and across storm water drains  Sewage flow in storm water drains  Inadequate vent size railway culverts at 60 locations
  • 6. Site Appreciation Development of land in tank bed areas & Below drain HFL DH369, Near Hegganahalli - Dasarahalli DH233, Near Bagalagunte, Dasarahalli
  • 7. Utility Cables lines laid across SWD at culvert locations is obstruction flow of water MD 264, Near Ramamurthynagara, Mahadevapura BH551, Near Arkere, Bommnahalli BH579, Near MICO Factory, Hosur Road
  • 8. Site Appreciation Garbage dumped inside SWD MD 349, Near Marathalli, ORR - Mahadevapura Dasarahalli Zone Near Hongasandra, Bommanahalli
  • 9. DH332, Kalika Nagara, Dasarahalli DH 211,211A & B, Near Lageere Main Road, Dasarahalli Inadequate Vent Size Culverts
  • 10. Reasons for flooding  Lakes  Reduction in number of lakes  Blockage due to vegetation growth, dumping of debris at inlet/outlet location of water bodies  Water bodies not functioning as retention basins  Reduction in holding capacity due to reduction in lake areas, severe siltation and entry of sewage etc  Non existence of regulatory gate arrangement to regulate flood discharge  Non existence of interconnectivity between water bodies due to encroachment / modification of original alignment.  Drain diversion/bypass arrangement made to all water bodies
  • 11. Condition of Water Bodies in BBMP Area Chikka Beguru Kere, Bommanahalli Zone Dodda Kalsandra Kere, Bommanahalli Zone Karihobanahalli Kere, Dasarahalli Zone Nelakdhirenahalli Kere, Dasarahalli Zone
  • 12. This has led to  Reduction in open spaces  Reduced time of concentration  Reduction in holding capacity of lakes.  Limited land availability for construction of detention ponds  Reduced space available for improving the drains  More flooding  Deterioration in public health & environmental sanitation conditions.  Increased cost expenditure etc.
  • 13. Master Plan for Remodelling of Storm Water Drains in Eight Zones of BBMP Area
  • 14. Project Objectives  To minimise flood runoff.  To ensure free flow of storm water and to minimize flooding in critical flood prone areas.  To improve the health and environmental sanitation conditions in the surrounding vicinity of SWDs and Water bodies.  To protect the existing waterways and water bodies from environmental degradation.  To improve ground water level by holding rain water in water bodies.  To provide alternate water source in case of emergencies by rain water harvesting.
  • 15. Salient Details of Major & Minor Water Shed Catchment Areas Sl. No. Zone Total Water Shed Catchment Area (Ha.) No. of Major Water Shed Catchment Areas No. of Minor Water Shed Catchment Areas Total Drain Length (Km.) 1 East Zone 10,937 8 134 2252 West Zone 6,366 4 87 3 South Zone 5,553 4 69 4 Rajarajeshwarinagara Zone 15,365 9 118 138.15 5 Dasarahalli Zone 9,505 7 94 92.81 6 Yelahanka Zone 14,235 9 129 104.91 7 Mahadevapura Zone 23,371 11 236 164.24 8 Bommanahalli Zone 16,317 16 300 115.15 Total 101,650 68 1167 840.26
  • 16. Map showing Storm Water Drains in BBMP area
  • 17. Summary of Project Findings • Drain reach is in natural condition at many places • Original alignment modified at certain reaches • Drain walls & culverts constructed by earst while CMC authorities are, inadequate vent way not as per standard designs and also in dilapidated condition in many places • Drain width drastically reduced at many places and buildings constructed butting to the drain wall • Due to change in land use the culverts constructed by earst while CMC authorities are not matching to the present field requirement. • Due to non existence of sewerage system, large quantity of raw sewage flow is observed in open drains. • The inlet/outlet weir of water bodies is in dilapidated condition and completely chocked • Inadequate maintenance is evident
  • 19.
  • 20. Rain Gauging Station, Data Generation, Flood control & Monitoring Station
  • 21. Development of Water Bodies as Holding Ponds
  • 22. Typical Section of RCC Box Culvert in Place of Pipe Culvert
  • 23. Typical Section of Bridge with Pile arrangement Typical Section of slab culvert Intl. Airport Road, Sahakaranagara
  • 24. Typical drain cross section with RCC Retaining wall and Service Corridor Sewer Line Sewer Line Property Boundary Property Boundary Property Boundary Property Boundary Typical drain cross section with Earthen embankment, stone revetment with CC lining and Service Corridor over embankment Sewer Line Sewer Line
  • 25. Beautification along side Major Storm water Drains in Core Area
  • 26. Sl .No. Name of the Zone Amount (Rs. In Crores) 1 East 654.222 West 3 South 4 Bommanahalli 665.14 5 Yelahanka 655.26 6 Dasarahalli 508.99 7 Mahadevapura 914.91 8 Rajrarajeshwarinagara 759.73 Total Estimated Cost 4,158.25 Say 4,160.00 Estimated Cost of SWD Master Plan Project (As per 2010-11 Price Level)
  • 27. MASTER PLAN PROJECT COST ALLOCATION 604.36, 16%614.45, 16% 605.32, 16% 470.20, 12% 845.19, 22% 701.82, 18% ESTIMATED COST FOR STRUCTURAL WORKS FOR DIFFERENT ZONES OF BBMP UNDER SWD MASTER PLAN PROJECT TOTAL COST = 3,841.34 CRORES Core Area (W + E+ S) Bommanahalli Zone Yelahanka Zone Dasarahalli Zone Mahadevpura Zone Rajarajeshwarina gar Zone 49.86, 16% 50.69, 16% 49.94, 16% 38.79, 12% 69.73, 22% 57.90, 18% ESTIMATED COST FOR NON STRUCTURAL WORKS FOR DIFFERENT ZONES OF BBMP UNDER SWD MASTER PLAN PROJECT TOTAL COST = 316.91 CRORES Core Area (W + E+ S) Bommanahalli Zone Yelahanka Zone Dasarahalli Zone Mahadevpura Zone Rajarajeshwarinag ar Zone 654.22, 16%665.14, 16% 655.26, 16% 508.99, 12% 914.91, 22% 759.73, 18% TOTAL ESTIMATED COST FOR STRUCTURAL & NON STRUCTURAL WORKS FOR DIFFERENT ZONES OF BBMP UNDER SWD MASTER PLAN PROJECT TOTAL COST = 4,158.25 CRORES Core Area (W + E+ S) Bommanahalli Zone Yelahanka Zone Dasarahalli Zone Mahadevpura Zone Rajarajeshwarinag ar Zone 2,569.30, 62% 14.49, 0% 266.08, 6% 749.57, 18% 185.00, 5% 373.80, 9% ESTIMATED COST FOR DIFFERENT WORKS UNDER SWD MASTER PLAN PROJECT TOTAL COST = 4,158.25 CRORES Carrying Capacity Improvement Rehabilitation / Strengthening Culverts / Bridges Allied Drain Works Decentralized STP's Non Structural Works
  • 28. Work Programme For Implementation of Storm Water Drain Proposals of Master Plan Project Sl. Project Estimated Gestation Stage - 1 Stage - 2 Stage - 3 Stage - 1 Stage - 2 Stage - 3 No. Component Cost (1 Year) (3 Years) (3 Years) (3 Years) 1 st Year 2 nd Year 3 rd Year 1 st Year 2 nd Year 3 rd Year 1 st Year 2 nd Year 3 rd Year (Rs. Crores) % Amount % Amount % Amount % Amount % Amount % Amount % Amount % Amount % Amount % Amount % Amount % Amount % Amount 1.0 Improvement to Carrying Capacity: 1.1 Desilting & deepening 121.34 5% 6.07 50% 60.67 30% 36.40 15% 18.20 60% 36.40 20% 12.13 20% 12.13 50% 18.20 30% 10.92 20% 7.28 50% 9.10 30% 5.46 20% 3.64 1.2 Widening a. Earthen bund 238.59 0% 0.00 20% 47.72 40% 95.43 40% 95.43 50% 23.86 25% 11.93 25% 11.93 50% 47.72 30% 28.63 20% 19.09 50% 47.72 30% 28.63 20% 19.09 b. RCC independent walls 559.62 5% 27.98 40% 223.85 30% 167.89 25% 139.90 50% 111.92 30% 67.15 20% 44.77 50% 83.94 30% 50.37 20% 33.58 50% 69.95 30% 41.97 20% 27.98 c. RCC "U" shaped walls 971.62 5% 48.58 40% 388.65 30% 291.49 25% 242.90 50% 194.32 30% 116.59 20% 77.73 50% 145.74 30% 87.45 20% 58.30 50% 121.45 30% 72.87 20% 48.58 d. CRS / SSM masonry walls 230.12 5% 11.51 40% 92.05 30% 69.04 25% 57.53 50% 46.02 30% 27.61 20% 18.41 50% 34.52 30% 20.71 20% 13.81 50% 28.77 30% 17.26 20% 11.51 e. RCC box drain 369.27 5% 18.46 40% 147.71 30% 110.78 25% 92.32 50% 73.85 30% 44.31 20% 29.54 50% 55.39 30% 33.23 20% 22.16 50% 46.16 30% 27.70 20% 18.46 1.3 Bed protection 78.75 5% 3.94 20% 15.75 50% 39.37 25% 19.69 30% 4.72 50% 7.87 20% 3.15 30% 11.81 50% 19.69 20% 7.87 30% 5.91 50% 9.84 20% 3.94 Sub Total 2569.30 116.54 976.39 810.40 665.98 491.11 287.61 197.66 397.32 250.99 162.08 329.05 203.73 133.20 2.0 Rehabilitation and Strengthening: CRS / SSM Wall Reconstruction 12.90 10% 1.29 50% 6.45 30% 3.87 10% 1.29 50% 3.23 30% 1.94 20% 1.29 50% 1.94 30% 1.16 20% 0.77 50% 0.65 30% 0.39 20% 0.26 CRS / SSM Wall Restoration 1.59 10% 0.16 50% 0.79 30% 0.48 10% 0.16 50% 0.40 30% 0.24 20% 0.16 50% 0.24 30% 0.14 20% 0.10 50% 0.08 30% 0.05 20% 0.03 Sub Total 14.49 1.45 7.24 4.35 1.45 3.62 2.17 1.45 2.17 1.30 0.87 0.72 0.43 0.29 3.0 Culverts and Bridges: 3.1 Utility supports & bridges 5.75 15% 0.86 50% 2.88 20% 1.15 15% 0.86 60% 1.73 25% 0.72 15% 0.43 60% 0.69 25% 0.29 15% 0.17 60% 0.52 25% 0.22 15% 0.13 3.2 Remodeling 244.45 15% 36.67 50% 122.22 20% 48.89 15% 36.67 60% 73.33 25% 30.56 15% 18.33 60% 29.33 25% 12.22 15% 7.33 60% 22.00 25% 9.17 15% 5.50 3.3 Rehabilitation 7.22 15% 1.08 50% 3.61 20% 1.44 15% 1.08 60% 2.16 25% 0.90 15% 0.54 60% 0.87 25% 0.36 15% 0.22 60% 0.65 25% 0.27 15% 0.16 3.4 Railway Culverts 8.67 15% 1.30 50% 4.33 20% 1.73 15% 1.30 60% 2.60 25% 1.08 15% 0.65 60% 1.04 25% 0.43 15% 0.26 60% 0.78 25% 0.32 15% 0.19 Sub Total 266.08 39.91 133.04 53.22 39.91 79.82 33.26 19.96 31.93 13.30 7.98 23.95 9.98 5.99 4.0 Allied Works: 4.1 Boundary stones 1.16 40% 0.47 60% 0.70 0% 0.00 0% 0.00 60% 0.42 20% 0.14 20% 0.14 50% 0.00 30% 0.00 20% 0.00 50% 0.00 30% 0.00 20% 0.00 4.2 Drains in low lying areas 224.69 15% 33.70 60% 134.81 15% 33.70 10% 22.47 60% 80.89 25% 33.70 15% 20.22 60% 20.22 25% 8.43 15% 5.06 60% 13.48 25% 5.62 15% 3.37 4.3 Service roads 187.44 0% 0.00 20% 37.49 30% 56.23 50% 93.72 20% 7.50 30% 11.25 50% 18.74 20% 11.25 30% 16.87 50% 28.12 20% 18.74 30% 28.12 50% 46.86 4.4 Fencing 89.39 0% 0.00 20% 17.88 30% 26.82 50% 44.69 20% 3.58 30% 5.36 50% 8.94 20% 5.36 30% 8.04 50% 13.41 20% 8.94 30% 13.41 50% 22.35 4.5 Detention ponds 16.43 0% 0.00 20% 3.29 50% 8.22 30% 4.93 40% 1.31 30% 0.99 30% 0.99 40% 3.29 30% 2.46 30% 2.46 40% 1.97 30% 1.48 30% 1.48 4.6 Retarding basins 8.46 5% 0.42 40% 3.38 30% 2.54 25% 2.12 50% 1.69 30% 1.02 20% 0.68 50% 1.27 30% 0.76 20% 0.51 50% 1.06 30% 0.63 20% 0.42 4.7 Development of water bodies 96.40 10% 9.64 30% 28.92 40% 38.56 20% 19.28 30% 8.68 50% 14.46 20% 5.78 30% 11.57 50% 19.28 20% 7.71 30% 5.78 50% 9.64 20% 3.86 4.8 Silt traps 11.68 5% 0.58 50% 5.84 30% 3.50 15% 1.75 60% 3.50 20% 1.17 20% 1.17 50% 1.75 30% 1.05 20% 0.70 50% 0.88 30% 0.53 20% 0.35 4.9 Desilting ramps 5.24 0% 0.00 20% 1.05 30% 1.57 50% 2.62 20% 0.21 30% 0.31 50% 0.52 20% 0.31 30% 0.47 50% 0.79 20% 0.52 30% 0.79 50% 1.31 4.10 Inlet / out weirs 17.57 5% 0.88 50% 8.78 30% 5.27 15% 2.64 60% 5.27 20% 1.76 20% 1.76 50% 2.64 30% 1.58 20% 1.05 50% 1.32 30% 0.79 20% 0.53 4.11 Rain gauge stations 0.45 40% 0.18 60% 0.27 0% 0.00 0% 0.00 60% 0.16 20% 0.05 20% 0.05 50% 0.00 30% 0.00 20% 0.00 50% 0.00 30% 0.00 20% 0.00 4.12 Shifting of sewers 69.47 5% 3.47 50% 34.73 30% 20.84 15% 10.42 60% 20.84 20% 6.95 20% 6.95 50% 10.42 30% 6.25 20% 4.17 50% 5.21 30% 3.13 20% 2.08 4.13 Desilting equipments 18.00 25% 4.50 50% 9.00 25% 4.50 0% 0.00 60% 5.40 20% 1.80 20% 1.80 50% 2.25 30% 1.35 20% 0.90 50% 0.00 30% 0.00 20% 0.00 4.14 Vehicles for vigilance squad 3.20 10% 0.32 50% 1.60 25% 0.80 15% 0.48 60% 0.96 20% 0.32 20% 0.32 50% 0.40 30% 0.24 20% 0.16 50% 0.24 30% 0.14 20% 0.10 Sub Total 749.57 54.17 287.74 202.55 205.11 140.41 79.27 68.06 70.73 66.79 65.03 58.14 64.27 82.70 5.0 Sewage Treatment Plants: Decentralized STP's 185.00 10% 18.50 30% 55.50 40% 74.00 20% 37.00 25% 13.88 60% 33.30 15% 8.33 25% 18.50 60% 44.40 15% 11.10 25% 9.25 60% 22.20 15% 5.55 Sub Total 185.00 18.50 55.50 74.00 37.00 13.88 33.30 8.33 18.50 44.40 11.10 9.25 22.20 5.55 Total Structural = 3784.45 230.56 1459.92 1144.51 949.45 728.84 435.62 295.45 520.65 376.79 247.06 421.12 300.61 227.72 6.0 Non Structural Works: 6.1 DPR and PMC 38.41 100% 38.41 0% 0.00 0% 0.00 0% 0.00 0% 0.00 0% 0.00 0% 0.00 0% 0.00 0% 0.00 0% 0.00 0% 0.00 0% 0.00 0% 0.00 6.2 Rehabilitation and resettlement 76.83 40% 30.73 60% 46.10 0% 0.00 0% 0.00 60% 27.66 20% 9.22 20% 9.22 50% 0.00 30% 0.00 20% 0.00 50% 0.00 30% 0.00 20% 0.00 6.3 Shifting of other services 56.89 5% 2.84 50% 28.44 30% 17.07 15% 8.53 60% 17.07 20% 5.69 20% 5.69 50% 8.53 30% 5.12 20% 3.41 50% 4.27 30% 2.56 20% 1.71 6.4 Development of green belt 9.60 0% 0.00 20% 1.92 30% 2.88 50% 4.80 20% 0.38 30% 0.58 50% 0.96 20% 0.58 30% 0.86 50% 1.44 20% 0.96 30% 1.44 50% 2.40 6.5 WCE + Admin. 192.07 10% 19.21 30% 57.62 30% 57.62 30% 57.62 25% 14.41 35% 20.17 40% 23.05 25% 14.41 35% 20.17 40% 23.05 25% 14.41 35% 20.17 40% 23.05 Total Non Structural = 373.80 91.20 134.08 77.57 70.96 59.51 35.65 38.92 23.51 26.15 27.90 19.63 24.17 27.16 Total of SWD = 4158.25 321.76 1594.00 1222.08 1020.41 788.35 471.27 334.37 544.17 402.95 274.97 440.75 324.78 254.88
  • 29. PROJECT PHASING AND INVESTMENT PLAN PROJECT INVESTMENT PLAN FOR TOTAL MASTER PLAN PROJECT FOR STRUCTURAL WORKS TOTAL COST Rs. 3784.45 CRORES 233.87 736.21 436.77 295.49 522.71 376.52 244.36 419.84 297.33 221.35 0.00 100.00 200.00 300.00 400.00 500.00 600.00 700.00 800.00 1st Year 2nd Year 3rd Year 4th Year 5th Year 6th Year 7th Year 8th Year 9th Year 10th Year Project Year EstimatedCost(Rs.Crores) TOTAL PROJECT INVESTMENT PLAN FOR MASTER PLAN TOTAL COST Rs. 4158.25 CRORES 248.50 321.50 439.47 272.27 402.67 546.22 334.41 472.42 795.72 325.07 0.00 100.00 200.00 300.00 400.00 500.00 600.00 700.00 800.00 900.00 1st Year 2nd Year 3rd Year 4th Year 5th Year 6th Year 7th Year 8th Year 9th Year 10th Year Project Year EstimatedCost(Rs.Crores) PROJECT INVESTMENT PLAN FOR TOTAL MASTER PLAN PROJECT FOR NON STRUCTURAL WORKS TOTAL COST Rs. 373.80 CRORES 91.20 59.51 35.65 38.92 23.51 26.15 27.90 19.63 24.17 27.16 0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 90.00 100.00 1st Year 2nd Year 3rd Year 4th Year 5th Year 6th Year 7th Year 8th Year 9th Year 10th Year Project Year EstimatedCost(Rs.Crores) PROJECT INVESTMENT PLAN FOR DIFFERENT WORKS FOR MASTER PLAN PROJECT TOTAL COST Rs. 4158.25 CRORES 2569.24 14.49 266.08 749.64 185.00 373.80 0.00 500.00 1000.00 1500.00 2000.00 2500.00 3000.00 Carrying Capacity Improvement Rehabilitation/ Strengthening Culverts/ Bridges AlliedDrain Works Decentralized STP's NonStructural Works Type of Work EstimatedCost(Rs.Crores)
  • 30. Benefits from Implementation  Provision of a properly designed drainage system for a reasonably acceptable return period would ensure reduction in flood incidences which in turn reduces flood damages and traffic hold ups.  Provision and properly maintained drainage system with controls on sewage connections and solid waste dumping will enhance the Environmental quality in the form of reduced pollution of water bodies and ground water.  Provision and proper maintenance of facilities like detention ponds and retention basins will not only attenuate the peak run- offs but also provide recharge of ground water which will improve ground water table.  Provision and proper maintenance of localized sewage treatment plants and using the treated sewage will reduce the stress on fresh water sources.  Availability of treated sewage will enable more greenery and fresh water lake developed assists reduction in climate change.