SlideShare a Scribd company logo
KONTRUKSI PORTAL TIDAK
SIMETRIS
KELOMPOK II
MUHAMMAD FADLI
MUHAMMAD JAMIL
MEKANIKA TEKNIK III
PORTAL TIGA SENDI (TIDAK SIMETRIS)
A Kolom miring sebelah, memikul muatan
terpusat vertikal dan horisontal.
Diketahui : Konstruksi seperti
tergambar.
L=10m, h=5m, a=2m, b=2m, c=6m, d=2m,
e=3m. P1 = 5 ton, P2 = 2 ton.
Diminta : Hitung dan gambarkan M, D dan
N pada seluruh bentang
PENYELESAIAN
a. Reaksi Perletakan.
∑MB = 0,
RAV . L— RAH . 0 — P1 . c + P2 . e= 0
RAV = P1 . c/L — P2 . e/L = 5 . 6/10 — 2 . 3/10 = 3 — 0,6
RAV = + 2,4 ton (keatas).
∑MA = 0,
RBV . L + P 1 . (a + b) + P2 . e = 0
RBV = P1 . (a+b)/L + P2 . e/L = 5 . (2 + 2)/10 + 2 . 3/10 = 2 + 0,6
RBV = + 2,6 ton (keatas).
∑H = 0,
RAH+ P2 = 0
RAH = P2 = + 2 ton (kekiri).
Kontrol :
∑V = 0,
RAV + RBV — P1 = 0
2,4 + 2,6 - 5 = 0 (memenuhi).
b. Gaya lintang.
α = arc tan (h/a) = arc tan (5/2) = 68° 11' 55“
DA-C = + RAH sin a + RAV cos a
= 2 . sin(68°11'55") + 2,4 . cos(68°11'55")
= + 1,857 + 0,891
= + 2,748 (ton).
DC-E = + RAV = + 2,4 (ton).
DE-D = + RAV —P1 = 2,4 - 5 = -2,6 (ton)
= -RBV.
DD-F = -RAH
= -2 (ton).
c. Momen.
MA = 0
Mc = ± RAH . h + RAV . a
= 2 . 5 + 2,4 . 2 = + 14,8 (t.m').
ME = RAH . h + RAV. (a + b)
=2 . 5 +2,4 . (2 +2) =+ 19,6 (t.m').
MD = RAH . h + RAV . L — P1 . c
= 2 . 5 + 2,4 . 10 — 5. 6 = + 4 (t.m').
Atau,
MD = ± P2 . d = + 2 .2 = + 4 (t.m').
MF =RAH. e + RAV .L — P1 . c = 2 . 3 + 2,4 . 10 — 5. 6 = 0
MB = 0
d. Gaya Normal.
a = 68° 11' 55"
NA-C= + RAH COS a ± RAv sin a
= 2 . cos(68°11 '55") — 2,4 . sin(68°11 '55") = + 0,743-2,228
= — 1,485 ton (tekan).
NC-D= + RAH = + 2 ton (tarik).
NB-D= — RBV = — 2,6 ton (tekan).
B. Kolom tinggi sebelah, memikul
muatan terpusat vertikal dan
horisontal.
Diketahui :Konstruksi seperti tergambar.
L= 10 m, hi =5 m, h2 = 6 m, a = 4 m, b = 6
m, c = 2m, d = 4 m. P1= 5 ton, P2 = 2 ton.
Diminta : Hitung dan gambarkan M, D dan
N pada seluruh bentang!
PENYELESAIAN
a. Reaksi Perletakan.
∑H = 0,
RAH + P2 = 0
RAH = + P2 = + 2 ton (kekiri).
∑MB = 0,
RAV. L — RAH . (12 — hi) — P1 . b + P2 . d = 0
RAV = P1. b/L + RAH . (h2 — 111)/L — P2 . d/L (ton).
= 5 . 6/10 + 2 . (6 — 5)/10 — 2 . 4/10
= 3 +0,2-0,8 RAV
= + 2,4 ton (keatas).
∑MA = 0,
RBV . L + P1. a + P2 . (hi — C) = 0
RBV = P1 . a/L + P2 . (hi — c)/L
=5 . 4/10 + 2 . (5 — 2)/10 = 2 + 0,6 RBV
= + 2,6 ton (keatas).
Kontrol :
∑V = 0,
RAY + RBV — P1 =0
2,4 + 2,6 — 5 = 0 .....(memenuhi).
b. Gaya lintang.
DA-C = + RAH = + 2 ton.
DC-E = + RAV = ± 2,4 ton.
DE-D = + RAV — P1 = ± 2,4 — 5 = — 2,6 ton. DD-F = — RAH = — 2 ton,
atau
DD-F = — P2 = — 2 ton.
c. Momen.
MA = 0
Mc =+R.h=+2.5=+10t.m'.
ME = + RAV . a + RAH h + 2,4 . 4 + 2 . 5
= 19,6 t.m'.
MD = + RAV .L + RAH .h — P1.b
=2,4 .10+2 .5-5 .6
= 24 + 10 — 30
MD =+ 4 t.m'.
Atau,
MD =+P2. c=+2 . 2 =+4 t.m'.
MF = + RAV . L + RAH . (hi — c) — P1 . b (t.m') (dari kiri)
= + 2,4 . 10+2 . (5 — 2) — 5 . 6
= 24 + 6 — 30
MF = 0
MB = 0
d. Gaya Normal.
NA-C = RAV = -2,4 ton (tekan).
NC-D = + RAH = + 2 ton (tarik).
NB-D = — RBV = -2,6 ton (tekan).
Kontruksi portal tak simetris
Kontruksi portal tak simetris

More Related Content

What's hot

Analisa struktur metode slope deflection
Analisa struktur metode slope deflectionAnalisa struktur metode slope deflection
Analisa struktur metode slope deflection
rahmawan luqman
 
Analisa matriks
Analisa matriksAnalisa matriks
Analisa matriks
Saedi Saputra Siagian
 
PERHITUNGAN TULANGAN LONGITUDINAL BALOK BETON BERTULANG RANGKAP
PERHITUNGAN TULANGAN LONGITUDINAL BALOK BETON BERTULANG RANGKAPPERHITUNGAN TULANGAN LONGITUDINAL BALOK BETON BERTULANG RANGKAP
PERHITUNGAN TULANGAN LONGITUDINAL BALOK BETON BERTULANG RANGKAP
Sumarno Feriyal
 
Alinemen vertikal-teks1
Alinemen vertikal-teks1Alinemen vertikal-teks1
Alinemen vertikal-teks1
WSKT
 
Sni 1727 2013 tata cara pembebanan untuk rumah dan gedung
Sni 1727 2013 tata cara pembebanan untuk rumah dan gedungSni 1727 2013 tata cara pembebanan untuk rumah dan gedung
Sni 1727 2013 tata cara pembebanan untuk rumah dan gedung
WSKT
 
Cara menghitung alinyemen horizontal
Cara menghitung alinyemen horizontalCara menghitung alinyemen horizontal
Cara menghitung alinyemen horizontal
Julia Maidar
 
Perencanaan Kolom
Perencanaan KolomPerencanaan Kolom
Perencanaan Kolom
Iqbal Pratama
 
Contoh penyelesaian soal uas beton ii
Contoh penyelesaian soal uas beton iiContoh penyelesaian soal uas beton ii
Contoh penyelesaian soal uas beton ii
Harry Calbara
 
menghitung Momen Ultimate baja komposit
menghitung Momen Ultimate baja kompositmenghitung Momen Ultimate baja komposit
menghitung Momen Ultimate baja komposit
Shaleh Afif Hasibuan
 
Balok gerber
Balok gerberBalok gerber
Balok gerber
Dony Saputra
 
Modul 4-balok menganjur diatas dua perletakan
Modul 4-balok menganjur diatas dua perletakanModul 4-balok menganjur diatas dua perletakan
Modul 4-balok menganjur diatas dua perletakan
MOSES HADUN
 
Daya dukung pondasi dengan analisis terzaghi
Daya dukung pondasi dengan analisis terzaghiDaya dukung pondasi dengan analisis terzaghi
Daya dukung pondasi dengan analisis terzaghi
Ayu Fatimah Zahra
 
4 portal-dan-pelengkung-tiga-sendi
4 portal-dan-pelengkung-tiga-sendi4 portal-dan-pelengkung-tiga-sendi
4 portal-dan-pelengkung-tiga-sendi
IgorTherik
 
contoh kerjaan struktur beton bertulang 2
contoh kerjaan struktur beton bertulang 2contoh kerjaan struktur beton bertulang 2
contoh kerjaan struktur beton bertulang 2
Aryo Bimantoro
 
Pelebaran perkerasan pada tikungan kelas 1
Pelebaran perkerasan pada tikungan kelas 1Pelebaran perkerasan pada tikungan kelas 1
Pelebaran perkerasan pada tikungan kelas 1
Bayu Janasuputra
 
Modul 4 sesi 1 batang tekan
Modul 4  sesi 1 batang tekanModul 4  sesi 1 batang tekan
Modul 4 sesi 1 batang tekan
Indah Rosa
 
Laporan tugas struktur baja
Laporan tugas struktur bajaLaporan tugas struktur baja
Laporan tugas struktur baja
tanchul
 
Tugas III Mekanika Tanah I
Tugas III Mekanika Tanah ITugas III Mekanika Tanah I
Tugas III Mekanika Tanah IZul Anwar
 
MEKANIKA REKAYASA 3 (METODE DALIL 3 MOMEN DAN METODE CROSS)
MEKANIKA REKAYASA 3 (METODE DALIL 3 MOMEN DAN METODE CROSS)MEKANIKA REKAYASA 3 (METODE DALIL 3 MOMEN DAN METODE CROSS)
MEKANIKA REKAYASA 3 (METODE DALIL 3 MOMEN DAN METODE CROSS)
Sumarno Feriyal
 

What's hot (20)

Analisa struktur metode slope deflection
Analisa struktur metode slope deflectionAnalisa struktur metode slope deflection
Analisa struktur metode slope deflection
 
Analisa matriks
Analisa matriksAnalisa matriks
Analisa matriks
 
PERHITUNGAN TULANGAN LONGITUDINAL BALOK BETON BERTULANG RANGKAP
PERHITUNGAN TULANGAN LONGITUDINAL BALOK BETON BERTULANG RANGKAPPERHITUNGAN TULANGAN LONGITUDINAL BALOK BETON BERTULANG RANGKAP
PERHITUNGAN TULANGAN LONGITUDINAL BALOK BETON BERTULANG RANGKAP
 
Alinemen vertikal-teks1
Alinemen vertikal-teks1Alinemen vertikal-teks1
Alinemen vertikal-teks1
 
Sni 1727 2013 tata cara pembebanan untuk rumah dan gedung
Sni 1727 2013 tata cara pembebanan untuk rumah dan gedungSni 1727 2013 tata cara pembebanan untuk rumah dan gedung
Sni 1727 2013 tata cara pembebanan untuk rumah dan gedung
 
Cara menghitung alinyemen horizontal
Cara menghitung alinyemen horizontalCara menghitung alinyemen horizontal
Cara menghitung alinyemen horizontal
 
Perencanaan Kolom
Perencanaan KolomPerencanaan Kolom
Perencanaan Kolom
 
Contoh penyelesaian soal uas beton ii
Contoh penyelesaian soal uas beton iiContoh penyelesaian soal uas beton ii
Contoh penyelesaian soal uas beton ii
 
menghitung Momen Ultimate baja komposit
menghitung Momen Ultimate baja kompositmenghitung Momen Ultimate baja komposit
menghitung Momen Ultimate baja komposit
 
Balok gerber
Balok gerberBalok gerber
Balok gerber
 
Modul 4-balok menganjur diatas dua perletakan
Modul 4-balok menganjur diatas dua perletakanModul 4-balok menganjur diatas dua perletakan
Modul 4-balok menganjur diatas dua perletakan
 
Daya dukung pondasi dengan analisis terzaghi
Daya dukung pondasi dengan analisis terzaghiDaya dukung pondasi dengan analisis terzaghi
Daya dukung pondasi dengan analisis terzaghi
 
4 portal-dan-pelengkung-tiga-sendi
4 portal-dan-pelengkung-tiga-sendi4 portal-dan-pelengkung-tiga-sendi
4 portal-dan-pelengkung-tiga-sendi
 
contoh kerjaan struktur beton bertulang 2
contoh kerjaan struktur beton bertulang 2contoh kerjaan struktur beton bertulang 2
contoh kerjaan struktur beton bertulang 2
 
Pelebaran perkerasan pada tikungan kelas 1
Pelebaran perkerasan pada tikungan kelas 1Pelebaran perkerasan pada tikungan kelas 1
Pelebaran perkerasan pada tikungan kelas 1
 
Modul 4 sesi 1 batang tekan
Modul 4  sesi 1 batang tekanModul 4  sesi 1 batang tekan
Modul 4 sesi 1 batang tekan
 
Laporan tugas struktur baja
Laporan tugas struktur bajaLaporan tugas struktur baja
Laporan tugas struktur baja
 
9 contoh desain turap
9 contoh desain turap9 contoh desain turap
9 contoh desain turap
 
Tugas III Mekanika Tanah I
Tugas III Mekanika Tanah ITugas III Mekanika Tanah I
Tugas III Mekanika Tanah I
 
MEKANIKA REKAYASA 3 (METODE DALIL 3 MOMEN DAN METODE CROSS)
MEKANIKA REKAYASA 3 (METODE DALIL 3 MOMEN DAN METODE CROSS)MEKANIKA REKAYASA 3 (METODE DALIL 3 MOMEN DAN METODE CROSS)
MEKANIKA REKAYASA 3 (METODE DALIL 3 MOMEN DAN METODE CROSS)
 

Viewers also liked

Portal 3 sendi
Portal 3 sendiPortal 3 sendi
Portal 3 sendi
Tanjungpura Universuty
 
pelengkung tiga sendi mekanika teknik
pelengkung tiga sendi mekanika teknikpelengkung tiga sendi mekanika teknik
pelengkung tiga sendi mekanika teknik
Syarif Hidayat
 
1 kuliah-pertama-statika
1 kuliah-pertama-statika1 kuliah-pertama-statika
1 kuliah-pertama-statika
sentupz
 
titik buhul dan cremona
titik buhul dan cremonatitik buhul dan cremona
titik buhul dan cremona
Wahh Yudi
 
Buku ajar-analisa-struktur-i
Buku ajar-analisa-struktur-iBuku ajar-analisa-struktur-i
Buku ajar-analisa-struktur-i
Komunitas Teknik Sipil & Arsitek
 
Handout mer iv d iii
Handout mer iv d iiiHandout mer iv d iii
Handout mer iv d iii
Junaida Wally
 
239735282 52373940-buku-ajar-analisa-struktur-ii
239735282 52373940-buku-ajar-analisa-struktur-ii239735282 52373940-buku-ajar-analisa-struktur-ii
239735282 52373940-buku-ajar-analisa-struktur-ii
Haqie Sipil
 
Modul mekanika teknik 1
Modul mekanika teknik 1Modul mekanika teknik 1
Modul mekanika teknik 1Ibrahim Husain
 

Viewers also liked (9)

Portal 3 sendi
Portal 3 sendiPortal 3 sendi
Portal 3 sendi
 
pelengkung tiga sendi mekanika teknik
pelengkung tiga sendi mekanika teknikpelengkung tiga sendi mekanika teknik
pelengkung tiga sendi mekanika teknik
 
Rangka batang-cremona
Rangka batang-cremonaRangka batang-cremona
Rangka batang-cremona
 
1 kuliah-pertama-statika
1 kuliah-pertama-statika1 kuliah-pertama-statika
1 kuliah-pertama-statika
 
titik buhul dan cremona
titik buhul dan cremonatitik buhul dan cremona
titik buhul dan cremona
 
Buku ajar-analisa-struktur-i
Buku ajar-analisa-struktur-iBuku ajar-analisa-struktur-i
Buku ajar-analisa-struktur-i
 
Handout mer iv d iii
Handout mer iv d iiiHandout mer iv d iii
Handout mer iv d iii
 
239735282 52373940-buku-ajar-analisa-struktur-ii
239735282 52373940-buku-ajar-analisa-struktur-ii239735282 52373940-buku-ajar-analisa-struktur-ii
239735282 52373940-buku-ajar-analisa-struktur-ii
 
Modul mekanika teknik 1
Modul mekanika teknik 1Modul mekanika teknik 1
Modul mekanika teknik 1
 

Similar to Kontruksi portal tak simetris

Modul 7-bangunan portal 2
Modul 7-bangunan portal 2Modul 7-bangunan portal 2
Modul 7-bangunan portal 2
MOSES HADUN
 
Modul 4-balok menganjur diatas dua perletakan
Modul 4-balok menganjur diatas dua perletakanModul 4-balok menganjur diatas dua perletakan
Modul 4-balok menganjur diatas dua perletakan
MOSES HADUN
 
Modul 3-balok diatas dua perletakan
Modul 3-balok diatas dua perletakanModul 3-balok diatas dua perletakan
Modul 3-balok diatas dua perletakan
MOSES HADUN
 
Solutions_Manual_to_accompany_Applied_Nu.pdf
Solutions_Manual_to_accompany_Applied_Nu.pdfSolutions_Manual_to_accompany_Applied_Nu.pdf
Solutions_Manual_to_accompany_Applied_Nu.pdf
WaleedHussain30
 
Modul 8-bangunan portal dengan rasuk gerber
Modul 8-bangunan portal dengan rasuk gerberModul 8-bangunan portal dengan rasuk gerber
Modul 8-bangunan portal dengan rasuk gerber
MOSES HADUN
 
Calculo de-reacciones
Calculo de-reaccionesCalculo de-reacciones
Calculo de-reacciones
Darwing Castillo Leiva
 
Ch11s
Ch11sCh11s
Topic 2 kft 131
Topic 2 kft 131Topic 2 kft 131
Topic 2 kft 131
Nor Qurratu'aini Abdullah
 
3 formulario para_vigas_y_porticos
3 formulario para_vigas_y_porticos3 formulario para_vigas_y_porticos
3 formulario para_vigas_y_porticos
Antonio J. Valdivia Rueda
 
Shi20396 ch16
Shi20396 ch16Shi20396 ch16
Shi20396 ch16
Paralafakyou Mens
 
Ch07p
Ch07pCh07p
radar plotting- multiple targets
radar plotting- multiple targetsradar plotting- multiple targets
radar plotting- multiple targets
Philip Jarrell Cofreros Fernandez
 
Ch09p
Ch09pCh09p
Moment Distribution Method.ppt
Moment Distribution Method.pptMoment Distribution Method.ppt
Moment Distribution Method.ppt
VigneshVenkatasubram2
 
Ch15p
Ch15pCh15p
'Documents.mx dynamics solucionario-riley.pdf'
'Documents.mx dynamics solucionario-riley.pdf''Documents.mx dynamics solucionario-riley.pdf'
'Documents.mx dynamics solucionario-riley.pdf'
jhameschiqui
 
Marija Dimitrijević Ćirić "Matter Fields in SO(2,3)⋆ Model of Noncommutative ...
Marija Dimitrijević Ćirić "Matter Fields in SO(2,3)⋆ Model of Noncommutative ...Marija Dimitrijević Ćirić "Matter Fields in SO(2,3)⋆ Model of Noncommutative ...
Marija Dimitrijević Ćirić "Matter Fields in SO(2,3)⋆ Model of Noncommutative ...
SEENET-MTP
 
Capítulo 16 embreagens
Capítulo 16   embreagensCapítulo 16   embreagens
Capítulo 16 embreagens
Jhayson Carvalho
 
New approch towards support desugn
New approch towards support desugnNew approch towards support desugn
New approch towards support desugn
DGMS, Ministry of Labour & Employment, New Delhi
 
Example Probs in structural beam analysis
Example Probs in structural beam analysisExample Probs in structural beam analysis
Example Probs in structural beam analysis
gobirdc
 

Similar to Kontruksi portal tak simetris (20)

Modul 7-bangunan portal 2
Modul 7-bangunan portal 2Modul 7-bangunan portal 2
Modul 7-bangunan portal 2
 
Modul 4-balok menganjur diatas dua perletakan
Modul 4-balok menganjur diatas dua perletakanModul 4-balok menganjur diatas dua perletakan
Modul 4-balok menganjur diatas dua perletakan
 
Modul 3-balok diatas dua perletakan
Modul 3-balok diatas dua perletakanModul 3-balok diatas dua perletakan
Modul 3-balok diatas dua perletakan
 
Solutions_Manual_to_accompany_Applied_Nu.pdf
Solutions_Manual_to_accompany_Applied_Nu.pdfSolutions_Manual_to_accompany_Applied_Nu.pdf
Solutions_Manual_to_accompany_Applied_Nu.pdf
 
Modul 8-bangunan portal dengan rasuk gerber
Modul 8-bangunan portal dengan rasuk gerberModul 8-bangunan portal dengan rasuk gerber
Modul 8-bangunan portal dengan rasuk gerber
 
Calculo de-reacciones
Calculo de-reaccionesCalculo de-reacciones
Calculo de-reacciones
 
Ch11s
Ch11sCh11s
Ch11s
 
Topic 2 kft 131
Topic 2 kft 131Topic 2 kft 131
Topic 2 kft 131
 
3 formulario para_vigas_y_porticos
3 formulario para_vigas_y_porticos3 formulario para_vigas_y_porticos
3 formulario para_vigas_y_porticos
 
Shi20396 ch16
Shi20396 ch16Shi20396 ch16
Shi20396 ch16
 
Ch07p
Ch07pCh07p
Ch07p
 
radar plotting- multiple targets
radar plotting- multiple targetsradar plotting- multiple targets
radar plotting- multiple targets
 
Ch09p
Ch09pCh09p
Ch09p
 
Moment Distribution Method.ppt
Moment Distribution Method.pptMoment Distribution Method.ppt
Moment Distribution Method.ppt
 
Ch15p
Ch15pCh15p
Ch15p
 
'Documents.mx dynamics solucionario-riley.pdf'
'Documents.mx dynamics solucionario-riley.pdf''Documents.mx dynamics solucionario-riley.pdf'
'Documents.mx dynamics solucionario-riley.pdf'
 
Marija Dimitrijević Ćirić "Matter Fields in SO(2,3)⋆ Model of Noncommutative ...
Marija Dimitrijević Ćirić "Matter Fields in SO(2,3)⋆ Model of Noncommutative ...Marija Dimitrijević Ćirić "Matter Fields in SO(2,3)⋆ Model of Noncommutative ...
Marija Dimitrijević Ćirić "Matter Fields in SO(2,3)⋆ Model of Noncommutative ...
 
Capítulo 16 embreagens
Capítulo 16   embreagensCapítulo 16   embreagens
Capítulo 16 embreagens
 
New approch towards support desugn
New approch towards support desugnNew approch towards support desugn
New approch towards support desugn
 
Example Probs in structural beam analysis
Example Probs in structural beam analysisExample Probs in structural beam analysis
Example Probs in structural beam analysis
 

Recently uploaded

BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
MIGUELANGEL966976
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
rpskprasana
 
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball playEric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
enizeyimana36
 
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMSA SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
IJNSA Journal
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
Madan Karki
 
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdfIron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
RadiNasr
 
basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
NidhalKahouli2
 
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
University of Maribor
 
Recycled Concrete Aggregate in Construction Part II
Recycled Concrete Aggregate in Construction Part IIRecycled Concrete Aggregate in Construction Part II
Recycled Concrete Aggregate in Construction Part II
Aditya Rajan Patra
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
nooriasukmaningtyas
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
Madan Karki
 
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
JamalHussainArman
 
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.pptUnit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
KrishnaveniKrishnara1
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Sinan KOZAK
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
171ticu
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
SUTEJAS
 
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have oneISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
Las Vegas Warehouse
 
Casting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdfCasting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdf
zubairahmad848137
 
New techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdfNew techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdf
wisnuprabawa3
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
camseq
 

Recently uploaded (20)

BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
 
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball playEric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
 
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMSA SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
 
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdfIron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
 
basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
 
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
 
Recycled Concrete Aggregate in Construction Part II
Recycled Concrete Aggregate in Construction Part IIRecycled Concrete Aggregate in Construction Part II
Recycled Concrete Aggregate in Construction Part II
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
 
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
 
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.pptUnit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
 
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have oneISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
 
Casting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdfCasting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdf
 
New techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdfNew techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdf
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
 

Kontruksi portal tak simetris

  • 1. KONTRUKSI PORTAL TIDAK SIMETRIS KELOMPOK II MUHAMMAD FADLI MUHAMMAD JAMIL MEKANIKA TEKNIK III
  • 2. PORTAL TIGA SENDI (TIDAK SIMETRIS) A Kolom miring sebelah, memikul muatan terpusat vertikal dan horisontal. Diketahui : Konstruksi seperti tergambar. L=10m, h=5m, a=2m, b=2m, c=6m, d=2m, e=3m. P1 = 5 ton, P2 = 2 ton. Diminta : Hitung dan gambarkan M, D dan N pada seluruh bentang
  • 3. PENYELESAIAN a. Reaksi Perletakan. ∑MB = 0, RAV . L— RAH . 0 — P1 . c + P2 . e= 0 RAV = P1 . c/L — P2 . e/L = 5 . 6/10 — 2 . 3/10 = 3 — 0,6 RAV = + 2,4 ton (keatas). ∑MA = 0, RBV . L + P 1 . (a + b) + P2 . e = 0 RBV = P1 . (a+b)/L + P2 . e/L = 5 . (2 + 2)/10 + 2 . 3/10 = 2 + 0,6 RBV = + 2,6 ton (keatas). ∑H = 0, RAH+ P2 = 0 RAH = P2 = + 2 ton (kekiri). Kontrol : ∑V = 0, RAV + RBV — P1 = 0 2,4 + 2,6 - 5 = 0 (memenuhi).
  • 4. b. Gaya lintang. α = arc tan (h/a) = arc tan (5/2) = 68° 11' 55“ DA-C = + RAH sin a + RAV cos a = 2 . sin(68°11'55") + 2,4 . cos(68°11'55") = + 1,857 + 0,891 = + 2,748 (ton). DC-E = + RAV = + 2,4 (ton). DE-D = + RAV —P1 = 2,4 - 5 = -2,6 (ton) = -RBV. DD-F = -RAH = -2 (ton).
  • 5. c. Momen. MA = 0 Mc = ± RAH . h + RAV . a = 2 . 5 + 2,4 . 2 = + 14,8 (t.m'). ME = RAH . h + RAV. (a + b) =2 . 5 +2,4 . (2 +2) =+ 19,6 (t.m'). MD = RAH . h + RAV . L — P1 . c = 2 . 5 + 2,4 . 10 — 5. 6 = + 4 (t.m'). Atau, MD = ± P2 . d = + 2 .2 = + 4 (t.m'). MF =RAH. e + RAV .L — P1 . c = 2 . 3 + 2,4 . 10 — 5. 6 = 0 MB = 0 d. Gaya Normal. a = 68° 11' 55" NA-C= + RAH COS a ± RAv sin a = 2 . cos(68°11 '55") — 2,4 . sin(68°11 '55") = + 0,743-2,228 = — 1,485 ton (tekan). NC-D= + RAH = + 2 ton (tarik). NB-D= — RBV = — 2,6 ton (tekan).
  • 6.
  • 7. B. Kolom tinggi sebelah, memikul muatan terpusat vertikal dan horisontal. Diketahui :Konstruksi seperti tergambar. L= 10 m, hi =5 m, h2 = 6 m, a = 4 m, b = 6 m, c = 2m, d = 4 m. P1= 5 ton, P2 = 2 ton. Diminta : Hitung dan gambarkan M, D dan N pada seluruh bentang!
  • 8. PENYELESAIAN a. Reaksi Perletakan. ∑H = 0, RAH + P2 = 0 RAH = + P2 = + 2 ton (kekiri). ∑MB = 0, RAV. L — RAH . (12 — hi) — P1 . b + P2 . d = 0 RAV = P1. b/L + RAH . (h2 — 111)/L — P2 . d/L (ton). = 5 . 6/10 + 2 . (6 — 5)/10 — 2 . 4/10 = 3 +0,2-0,8 RAV = + 2,4 ton (keatas). ∑MA = 0, RBV . L + P1. a + P2 . (hi — C) = 0 RBV = P1 . a/L + P2 . (hi — c)/L =5 . 4/10 + 2 . (5 — 2)/10 = 2 + 0,6 RBV = + 2,6 ton (keatas).
  • 9. Kontrol : ∑V = 0, RAY + RBV — P1 =0 2,4 + 2,6 — 5 = 0 .....(memenuhi). b. Gaya lintang. DA-C = + RAH = + 2 ton. DC-E = + RAV = ± 2,4 ton. DE-D = + RAV — P1 = ± 2,4 — 5 = — 2,6 ton. DD-F = — RAH = — 2 ton, atau DD-F = — P2 = — 2 ton. c. Momen. MA = 0 Mc =+R.h=+2.5=+10t.m'. ME = + RAV . a + RAH h + 2,4 . 4 + 2 . 5 = 19,6 t.m'. MD = + RAV .L + RAH .h — P1.b =2,4 .10+2 .5-5 .6 = 24 + 10 — 30 MD =+ 4 t.m'. Atau, MD =+P2. c=+2 . 2 =+4 t.m'. MF = + RAV . L + RAH . (hi — c) — P1 . b (t.m') (dari kiri) = + 2,4 . 10+2 . (5 — 2) — 5 . 6 = 24 + 6 — 30 MF = 0 MB = 0
  • 10. d. Gaya Normal. NA-C = RAV = -2,4 ton (tekan). NC-D = + RAH = + 2 ton (tarik). NB-D = — RBV = -2,6 ton (tekan).