Kochi Metro Rail

}
Group Members:
Aiman
Deepti
Gajalakshmi
Imran
Raghuraman
Suryadev Maity
Introduction
Introduction
1.81 million (2001 census)
Growth Rate: 1.4% Per annum
Introduction
Comfortable
Reliable

Energy

Safer
{
Vision
Our vision is to be a world-class metro rail
system that enhances the quality of life for
the citizens of Kochi

Mission

Strategic Goals

{

To provide a reliable, safe, efficient, viable
and customer friendly rapid transit system
for the greater Kochi area that is
environmentally sustainable

Operational Goals
Project Profile
Route Length (between dead ends) 25.612 Km

Number of Stations 23
Total estimated cost (without taxes)- Rs 3733 crores
Completion cost (by Year 2016)

(i) including escalation and Central taxes only Rs. 4910 Crores
(ii) including escalation, Central and State taxes Rs. 5146 Crores
Capacity/train :

600 passengers (initial)

Financial Indices
a) FIRR
b) EIRR
Fare

3.04%
14.2%
:

Rs 12/- to Rs 30/
Project Time & Cost
The Central Government: contribution of 1,002.23 crore (US$182.41
million).The Kerala Government: contribution of 1,772.23 crore
(US$322.55 million) & 2,174 crore (US$395.67 million) will be raised
as loan from Japan International Cooperation Agency (JICA)

Total cost

{ 5,181.79 crore (US$943.09 million)

Surcharge : 250 Crore annually
Taxes and duties: 616 crores
Construction
Station Locations

Coach design and basic parameters

Project plan

Selection of Technology
Passenger Safety Features
Planning and Design Criteria for Stations
Operation Philosophy
Make the MRT System more attractive and economical
Tickets are expected to be priced between 10 and 30

Train Operation Plan
Traffic Demand
Kochi metrorail project

Kochi metrorail project

  • 1.
    { Kochi Metro Rail } GroupMembers: Aiman Deepti Gajalakshmi Imran Raghuraman Suryadev Maity
  • 2.
  • 3.
    Introduction 1.81 million (2001census) Growth Rate: 1.4% Per annum
  • 4.
  • 5.
  • 6.
    Vision Our vision isto be a world-class metro rail system that enhances the quality of life for the citizens of Kochi Mission Strategic Goals { To provide a reliable, safe, efficient, viable and customer friendly rapid transit system for the greater Kochi area that is environmentally sustainable Operational Goals
  • 7.
    Project Profile Route Length(between dead ends) 25.612 Km Number of Stations 23 Total estimated cost (without taxes)- Rs 3733 crores Completion cost (by Year 2016) (i) including escalation and Central taxes only Rs. 4910 Crores (ii) including escalation, Central and State taxes Rs. 5146 Crores Capacity/train : 600 passengers (initial) Financial Indices a) FIRR b) EIRR Fare 3.04% 14.2% : Rs 12/- to Rs 30/
  • 8.
    Project Time &Cost The Central Government: contribution of 1,002.23 crore (US$182.41 million).The Kerala Government: contribution of 1,772.23 crore (US$322.55 million) & 2,174 crore (US$395.67 million) will be raised as loan from Japan International Cooperation Agency (JICA) Total cost { 5,181.79 crore (US$943.09 million) Surcharge : 250 Crore annually Taxes and duties: 616 crores
  • 9.
    Construction Station Locations Coach designand basic parameters Project plan Selection of Technology Passenger Safety Features Planning and Design Criteria for Stations
  • 11.
    Operation Philosophy Make theMRT System more attractive and economical Tickets are expected to be priced between 10 and 30 Train Operation Plan Traffic Demand