CITY OF ALAMO HEIGHTS
COMMUNITY DEVELOPMENT SERVICES DEPARTMENT
CITY COUNCIL AGENDA MEMORANDUM
TO: Mayor and City Council Members
FROM: Lety Hernandez, Director of Community Development Services
SUBJECT: Case No. 908F – 330 Argo Ave
Request of Elizabeth Haynes of Elizabeth Haynes Architect, applicant, representing
Andrew Holzmann, owner, for the significance review of the existing main structure and
compatibility review of the proposed design located at 330 Argo Ave in order to
demolish 100% of the existing residence and construct a new single-family residence
with detached garage under Demolition Review Ordinance No. 1860 (April 12, 2010).
DATE: December 11, 2023
BACKGROUND INFORMATION
The property is zoned SF-B (Single-Family District B) and is located on the south side of the
street between Imlay St and Arbutus St. The applicant is seeking to demolish the existing single-
family residence and construct a new two-story residence with detached garage.
POLICY ANALYSIS
Lot Coverage / Floor Area Ratio Existing Proposed
Lot Area 7,500 7,500
Main House 1st
Floor* 1,159.5 2,144
Main House 2nd
Floor 0 833
Main House – Loft
Garage/Carport – 1st
Floor* 400 578
Garage – 2nd
Floor
Front Porch* 25 0
Side Porch* 0 159
Rear Porch*
Breezeway*
Shed*
Total Square Footage 1,584.5 sq ft 3,718 sq ft
Lot Coverage* (max 40%) 1,559.5 sq ft / 21% 2,881 sq ft / 38%
FAR (max .47 with bonus) 1,534.5 sq ft / .21 3,559 sq ft / .47
Bonuses Utilized
+2 – One-story detached garage
 Main Structure
o Height – 27ft 4-3/8-inches (max 28ft allowed)
o Siding – Metal Panel and Stucco
o Roof – Standing Seam Metal
 Accessory Structure
o Height – 13ft 10-1/4-inches (max 20ft allowed without bonus)
o Siding – Metal Panel and Stucco
o Roof – Standing Seam Metal
 Chapter 5 – Buildings and Building Regulation, Article IX. – Demolition
Demolition shall mean any intentional or unintentional act of dismantling, pulling down,
destroying, removing, razing or moving a structure or any structural portion thereof, or
commencing the work of moving or of total or substantial destruction of a structure or portion
thereof. For the purposes of demolition review as described in article IX, demolition is defined
quantitatively as:
(1) Removal or encapsulation of more than twenty-five (25) percent of the framed structure of
exterior walls facing public streets, or a street-facing elevation if the tract of land is
landlocked; or,
(2) Removal or encapsulation of more than fifty (50) percent of the framed structure of all
exterior walls and/or roofs.
Exception: Minor repair and routine maintenance.
Significant structure shall mean any structure or portion thereof that in whole or in part meets one
(1) or more criteria in section 5-134(h), and has been so determined by the city council.
Section 5-134(h): The architectural review board shall consider the following criteria when
determining the significance, as defined in this chapter, of existing structures:
(1) Was the structure designed by a noted architect?
(2) Has the structure been listed as having historic significance by any local, regional,
state or historic agency or society?
(3) Does the structure exhibit characteristics of a distinct architectural style?
(4) Does the structure belong to a distinctive set of buildings, such as a single structure
belonging to a row of similar structures?
(5) Is the structure a significant part of the fabric of the community due to its age, unique
architecture, historical significance or physical placement?
Compatibility shall mean harmony with the existing neighborhood, site configurations,
development patterns, and the character of the development envelope found within the adjacent
and immediate block area, as demonstrated in the demolition review application, including roof
pitch, scale, massing, garage and driveway location and setbacks. Adjacent and immediate block
area shall include but not be limited to all properties along:
(1) The specific block where the project is proposed;
(2) The block to each side of the project's block; and
(3) The blocks directly across the street of the three (3) blocks identified above.
Block shall mean a length of street right-of-way along one (1) side of the street from one (1)
intersection to the next adjoining intersection.
The project is currently completing the plan review process and any revisions and/or newly
discovered variances would need to be addressed prior to issuance of a building permit.
The Architectural Review Board considered the request at their November 21, 2023 meeting. The
motion to declare the existing main structure as not significant recommending approval of the
demolition as requested and proposed design as compatible did not receive the four (4)
affirmative votes as required per Section 2-48 of the City’s Code of Ordinances. – AYE (3)
(Gaines, Gottsman, Hagendorf), NAY (2) (Armes, White)
FISCAL IMPACT
No projected fiscal impact from this project has been calculated.
ATTACHMENTS
Attachment A – Web Packet
Attachment B – Response Cards
__________________________
Lety Hernandez
Director
___________________________
Buddy Kuhn
City Manager
Attachment A
Attachment A
Attachment A
Attachment A
Attachment A
Attachment A
Attachment A
Attachment A
Attachment A
Attachment A
Attachment A
Attachment B
Attachment B
Attachment B
1
Lety Hernandez
Subject: FW: Questions Regarding Application for 330 Argo Ave
From: Alicia Fogg <>
Sent: Wednesday, November 15, 2023 6:22 PM
To: Lety Hernandez <lhernandez@alamoheightstx.gov>
Subject: Re: Questions Regarding Application for 330 Argo Ave
Yes, please submit my comments to the board. To be clear, I oppose the project as it is currently designed.
Alicia
From: Lety Hernandez <lhernandez@alamoheightstx.gov>
Sent: Wednesday, November 15, 2023 3:36:11 PM
To: Alicia Fogg < >
Subject: RE: Questions Regarding Application for 330 Argo Ave
Ms. Fogg,
Thank you for contacting our office regarding the proposed project. Would you like for me to share your comments with the
board on your behalf?
Unfortunately, I am not aware of the reason why they are choosing to relocate the driveway or if the electrical pole is remaining in
the existing location. Your concerns can be answered on the day of the meeting. With regards to the tree removals, it is my
understanding that a 28” DBH Pecan and an 18” DBH Mesquite are being removed for this project.
Please let me know what you decide with regards to your comments so that I can ensure we forward them in time for their
review. I apologize for the delay in response.
Thank you,
Lety Hernandez
From: Alicia Fogg < >
Sent: Thursday, November 9, 2023 4:00 PM
To: Lety Hernandez <lhernandez@alamoheightstx.gov>
Subject: Questions Regarding Application for 330 Argo Ave
Hi Ms Hernandez,
I have recently received the notification for the property located at 330 Argo Ave.
I had a few questions regarding the design.
Overall I am for the redevelopment of the property, however, I strongly disagree with the assertion in the architect's letter that
the style of the house reflects the character of the neighborhood. Yes they are replacing a stucco cottage with a large stucco
and timber house that is very much a modern house. There is only one other modern style house on Argo Ave, which is not
located on the 300 block of Argo Ave. The house proposed is located in the middle of the cottage district, it is neither a cottage
nor anywhere close to an attempt to meet the overall design style of the neighborhood.
Some general questions, why are they moving the driveway from the east side of the property to the west? What will happen to
the current electrical pole that is located there? Are any of the trees staying on the property or are they all going to be removed
as part of the demolition?
Attachment B
2
Sincerely,
Alicia Fogg
316 Argo Ave
Attachment B

More Related Content

Similar to Item # 4 - 330 Argo Ave. ARB Case # 908F

Item # 5 - 540 Lamont Ave.
Item # 5 - 540 Lamont Ave.Item # 5 - 540 Lamont Ave.
Item # 5 - 540 Lamont Ave.
ahcitycouncil
 
Item # 4 - 117 Claywell (Significance & Compatibility review)
Item # 4 - 117 Claywell (Significance & Compatibility review)Item # 4 - 117 Claywell (Significance & Compatibility review)
Item # 4 - 117 Claywell (Significance & Compatibility review)
ahcitycouncil
 
Item # 6 --- 333 Ogden Lane Sign. Review
Item # 6 --- 333 Ogden Lane Sign. ReviewItem # 6 --- 333 Ogden Lane Sign. Review
Item # 6 --- 333 Ogden Lane Sign. Review
ahcitycouncil
 
Item # 6 - 333 Ogden Lane Significance Review
Item # 6 - 333 Ogden Lane Significance ReviewItem # 6 - 333 Ogden Lane Significance Review
Item # 6 - 333 Ogden Lane Significance Review
ahcitycouncil
 
Item # 5 - 301 Encino Significance & Compatibility
Item # 5 - 301 Encino Significance & CompatibilityItem # 5 - 301 Encino Significance & Compatibility
Item # 5 - 301 Encino Significance & Compatibility
ahcitycouncil
 
Item # 5 - 222 Claiborne Way
Item # 5 - 222 Claiborne WayItem # 5 - 222 Claiborne Way
Item # 5 - 222 Claiborne Way
ahcitycouncil
 
Item # 5 - 233 Harrison Ave. Sig. Review
Item # 5 - 233 Harrison Ave. Sig. ReviewItem # 5 - 233 Harrison Ave. Sig. Review
Item # 5 - 233 Harrison Ave. Sig. Review
ahcitycouncil
 
Item # 5 - 233 Harrison Ave. Sig. Review
Item # 5 - 233 Harrison Ave. Sig. ReviewItem # 5 - 233 Harrison Ave. Sig. Review
Item # 5 - 233 Harrison Ave. Sig. Review
ahcitycouncil
 
Item # 4 - 240 Corona (Significance & Compatibility Review)
Item # 4 - 240 Corona (Significance & Compatibility Review)Item # 4 - 240 Corona (Significance & Compatibility Review)
Item # 4 - 240 Corona (Significance & Compatibility Review)
ahcitycouncil
 
Item # 5 - 117 Claywell (Significance & Compatibility Review)
Item # 5 - 117 Claywell (Significance & Compatibility Review)Item # 5 - 117 Claywell (Significance & Compatibility Review)
Item # 5 - 117 Claywell (Significance & Compatibility Review)
ahcitycouncil
 
Item # 4 232 Castano (Significance & Compatibility)
Item # 4   232 Castano (Significance & Compatibility)Item # 4   232 Castano (Significance & Compatibility)
Item # 4 232 Castano (Significance & Compatibility)
ahcitycouncil
 
Item # 4 - 117 Claywell (Significance & Compatibility Review)
Item # 4 - 117 Claywell (Significance & Compatibility Review)Item # 4 - 117 Claywell (Significance & Compatibility Review)
Item # 4 - 117 Claywell (Significance & Compatibility Review)
ahcitycouncil
 
Item # 7 224 W. Elmview
Item # 7  224 W.  ElmviewItem # 7  224 W.  Elmview
Item # 7 224 W. Elmview
ahcitycouncil
 
Item # 4 - 337 Ogden
Item # 4  - 337 OgdenItem # 4  - 337 Ogden
Item # 4 - 337 Ogden
ahcitycouncil
 
Item # 4 - 730 Corona
Item # 4 - 730 CoronaItem # 4 - 730 Corona
Item # 4 - 730 Corona
ahcitycouncil
 
Item # 7 - 510 College
Item # 7 - 510 CollegeItem # 7 - 510 College
Item # 7 - 510 College
ahcitycouncil
 
Item # 4 -- 525 Argo Avenue ARB Case 926F
Item # 4 -- 525 Argo Avenue ARB Case 926FItem # 4 -- 525 Argo Avenue ARB Case 926F
Item # 4 -- 525 Argo Avenue ARB Case 926F
ahcitycouncil
 
Item # 5 301 College (Compatibility)
Item # 5   301 College (Compatibility)Item # 5   301 College (Compatibility)
Item # 5 301 College (Compatibility)
ahcitycouncil
 
Item # 8 337 Ogden
Item # 8  337 OgdenItem # 8  337 Ogden
Item # 8 337 Ogden
ahcitycouncil
 
Item # 9 - 227 Rosemary (Compatibility Review)
Item # 9 - 227 Rosemary (Compatibility Review)Item # 9 - 227 Rosemary (Compatibility Review)
Item # 9 - 227 Rosemary (Compatibility Review)
ahcitycouncil
 

Similar to Item # 4 - 330 Argo Ave. ARB Case # 908F (20)

Item # 5 - 540 Lamont Ave.
Item # 5 - 540 Lamont Ave.Item # 5 - 540 Lamont Ave.
Item # 5 - 540 Lamont Ave.
 
Item # 4 - 117 Claywell (Significance & Compatibility review)
Item # 4 - 117 Claywell (Significance & Compatibility review)Item # 4 - 117 Claywell (Significance & Compatibility review)
Item # 4 - 117 Claywell (Significance & Compatibility review)
 
Item # 6 --- 333 Ogden Lane Sign. Review
Item # 6 --- 333 Ogden Lane Sign. ReviewItem # 6 --- 333 Ogden Lane Sign. Review
Item # 6 --- 333 Ogden Lane Sign. Review
 
Item # 6 - 333 Ogden Lane Significance Review
Item # 6 - 333 Ogden Lane Significance ReviewItem # 6 - 333 Ogden Lane Significance Review
Item # 6 - 333 Ogden Lane Significance Review
 
Item # 5 - 301 Encino Significance & Compatibility
Item # 5 - 301 Encino Significance & CompatibilityItem # 5 - 301 Encino Significance & Compatibility
Item # 5 - 301 Encino Significance & Compatibility
 
Item # 5 - 222 Claiborne Way
Item # 5 - 222 Claiborne WayItem # 5 - 222 Claiborne Way
Item # 5 - 222 Claiborne Way
 
Item # 5 - 233 Harrison Ave. Sig. Review
Item # 5 - 233 Harrison Ave. Sig. ReviewItem # 5 - 233 Harrison Ave. Sig. Review
Item # 5 - 233 Harrison Ave. Sig. Review
 
Item # 5 - 233 Harrison Ave. Sig. Review
Item # 5 - 233 Harrison Ave. Sig. ReviewItem # 5 - 233 Harrison Ave. Sig. Review
Item # 5 - 233 Harrison Ave. Sig. Review
 
Item # 4 - 240 Corona (Significance & Compatibility Review)
Item # 4 - 240 Corona (Significance & Compatibility Review)Item # 4 - 240 Corona (Significance & Compatibility Review)
Item # 4 - 240 Corona (Significance & Compatibility Review)
 
Item # 5 - 117 Claywell (Significance & Compatibility Review)
Item # 5 - 117 Claywell (Significance & Compatibility Review)Item # 5 - 117 Claywell (Significance & Compatibility Review)
Item # 5 - 117 Claywell (Significance & Compatibility Review)
 
Item # 4 232 Castano (Significance & Compatibility)
Item # 4   232 Castano (Significance & Compatibility)Item # 4   232 Castano (Significance & Compatibility)
Item # 4 232 Castano (Significance & Compatibility)
 
Item # 4 - 117 Claywell (Significance & Compatibility Review)
Item # 4 - 117 Claywell (Significance & Compatibility Review)Item # 4 - 117 Claywell (Significance & Compatibility Review)
Item # 4 - 117 Claywell (Significance & Compatibility Review)
 
Item # 7 224 W. Elmview
Item # 7  224 W.  ElmviewItem # 7  224 W.  Elmview
Item # 7 224 W. Elmview
 
Item # 4 - 337 Ogden
Item # 4  - 337 OgdenItem # 4  - 337 Ogden
Item # 4 - 337 Ogden
 
Item # 4 - 730 Corona
Item # 4 - 730 CoronaItem # 4 - 730 Corona
Item # 4 - 730 Corona
 
Item # 7 - 510 College
Item # 7 - 510 CollegeItem # 7 - 510 College
Item # 7 - 510 College
 
Item # 4 -- 525 Argo Avenue ARB Case 926F
Item # 4 -- 525 Argo Avenue ARB Case 926FItem # 4 -- 525 Argo Avenue ARB Case 926F
Item # 4 -- 525 Argo Avenue ARB Case 926F
 
Item # 5 301 College (Compatibility)
Item # 5   301 College (Compatibility)Item # 5   301 College (Compatibility)
Item # 5 301 College (Compatibility)
 
Item # 8 337 Ogden
Item # 8  337 OgdenItem # 8  337 Ogden
Item # 8 337 Ogden
 
Item # 9 - 227 Rosemary (Compatibility Review)
Item # 9 - 227 Rosemary (Compatibility Review)Item # 9 - 227 Rosemary (Compatibility Review)
Item # 9 - 227 Rosemary (Compatibility Review)
 

More from ahcitycouncil

PPT Item # 9 - 2024 Street Maintenance Program(SMP) Amendment
PPT Item # 9 - 2024 Street Maintenance Program(SMP) AmendmentPPT Item # 9 - 2024 Street Maintenance Program(SMP) Amendment
PPT Item # 9 - 2024 Street Maintenance Program(SMP) Amendment
ahcitycouncil
 
PPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way StopPPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way Stop
ahcitycouncil
 
PPT Item # 7 - BB Inspection Services Agmt
PPT Item # 7 - BB Inspection Services AgmtPPT Item # 7 - BB Inspection Services Agmt
PPT Item # 7 - BB Inspection Services Agmt
ahcitycouncil
 
PPT Item # 6 - 7001 Broadway ARB Case # 933F
PPT Item # 6 - 7001 Broadway ARB Case # 933FPPT Item # 6 - 7001 Broadway ARB Case # 933F
PPT Item # 6 - 7001 Broadway ARB Case # 933F
ahcitycouncil
 
PPT Item # 5 - 5330 Broadway ARB Case # 930F
PPT Item # 5 - 5330 Broadway ARB Case # 930FPPT Item # 5 - 5330 Broadway ARB Case # 930F
PPT Item # 5 - 5330 Broadway ARB Case # 930F
ahcitycouncil
 
PPT Item # 4 - 525 Argo Avenue ARB Case # 926F
PPT Item # 4 - 525 Argo Avenue ARB Case # 926FPPT Item # 4 - 525 Argo Avenue ARB Case # 926F
PPT Item # 4 - 525 Argo Avenue ARB Case # 926F
ahcitycouncil
 
PPT Item # 2 -- Announcements Powerpoint
PPT Item # 2 -- Announcements PowerpointPPT Item # 2 -- Announcements Powerpoint
PPT Item # 2 -- Announcements Powerpoint
ahcitycouncil
 
Item # 1a -- May 13, 2024 City Council Meeting Minutes
Item # 1a -- May 13, 2024 City Council Meeting MinutesItem # 1a -- May 13, 2024 City Council Meeting Minutes
Item # 1a -- May 13, 2024 City Council Meeting Minutes
ahcitycouncil
 
Item # 5 - 5330 Broadway ARB Case # 930F
Item # 5 - 5330 Broadway ARB Case # 930FItem # 5 - 5330 Broadway ARB Case # 930F
Item # 5 - 5330 Broadway ARB Case # 930F
ahcitycouncil
 
Item # 6 - 7001 Broadway Significance Review
Item # 6 - 7001 Broadway Significance ReviewItem # 6 - 7001 Broadway Significance Review
Item # 6 - 7001 Broadway Significance Review
ahcitycouncil
 
Item # 7 - BB Inspection Services Agreement
Item # 7 - BB Inspection Services AgreementItem # 7 - BB Inspection Services Agreement
Item # 7 - BB Inspection Services Agreement
ahcitycouncil
 
Item # 8 -- Tuxedo Columbine 3--way Stop
Item # 8 -- Tuxedo Columbine 3--way StopItem # 8 -- Tuxedo Columbine 3--way Stop
Item # 8 -- Tuxedo Columbine 3--way Stop
ahcitycouncil
 
Item # 9 - 2024 Street Maintenance Plan (SMP) Amdmnt
Item # 9 - 2024 Street Maintenance Plan (SMP) AmdmntItem # 9 - 2024 Street Maintenance Plan (SMP) Amdmnt
Item # 9 - 2024 Street Maintenance Plan (SMP) Amdmnt
ahcitycouncil
 
PPT Item # 5 -- Announcements Powerpoint
PPT Item # 5 -- Announcements PowerpointPPT Item # 5 -- Announcements Powerpoint
PPT Item # 5 -- Announcements Powerpoint
ahcitycouncil
 
PPT Item # 9 2ndQTR Financial & Inv. Report
PPT Item # 9 2ndQTR Financial & Inv. ReportPPT Item # 9 2ndQTR Financial & Inv. Report
PPT Item # 9 2ndQTR Financial & Inv. Report
ahcitycouncil
 
Item # 9- 2nd Qtr Financial & Inv. Report
Item # 9- 2nd Qtr Financial & Inv. ReportItem # 9- 2nd Qtr Financial & Inv. Report
Item # 9- 2nd Qtr Financial & Inv. Report
ahcitycouncil
 
PPT Item # 7&8 6900 Broadway P&Z Case # 438
PPT Item # 7&8 6900 Broadway P&Z Case # 438PPT Item # 7&8 6900 Broadway P&Z Case # 438
PPT Item # 7&8 6900 Broadway P&Z Case # 438
ahcitycouncil
 
Item # 7-8 - 6900 Broadway P&Z Case # 438
Item # 7-8 - 6900 Broadway P&Z Case # 438Item # 7-8 - 6900 Broadway P&Z Case # 438
Item # 7-8 - 6900 Broadway P&Z Case # 438
ahcitycouncil
 
Item ## 4a -- April 29, 2024 CCM Minutes
Item ## 4a -- April 29, 2024 CCM MinutesItem ## 4a -- April 29, 2024 CCM Minutes
Item ## 4a -- April 29, 2024 CCM Minutes
ahcitycouncil
 
PPT Item # 8 - Annual Comprehensive Financial Report FY23
PPT Item # 8 - Annual Comprehensive Financial Report FY23PPT Item # 8 - Annual Comprehensive Financial Report FY23
PPT Item # 8 - Annual Comprehensive Financial Report FY23
ahcitycouncil
 

More from ahcitycouncil (20)

PPT Item # 9 - 2024 Street Maintenance Program(SMP) Amendment
PPT Item # 9 - 2024 Street Maintenance Program(SMP) AmendmentPPT Item # 9 - 2024 Street Maintenance Program(SMP) Amendment
PPT Item # 9 - 2024 Street Maintenance Program(SMP) Amendment
 
PPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way StopPPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way Stop
 
PPT Item # 7 - BB Inspection Services Agmt
PPT Item # 7 - BB Inspection Services AgmtPPT Item # 7 - BB Inspection Services Agmt
PPT Item # 7 - BB Inspection Services Agmt
 
PPT Item # 6 - 7001 Broadway ARB Case # 933F
PPT Item # 6 - 7001 Broadway ARB Case # 933FPPT Item # 6 - 7001 Broadway ARB Case # 933F
PPT Item # 6 - 7001 Broadway ARB Case # 933F
 
PPT Item # 5 - 5330 Broadway ARB Case # 930F
PPT Item # 5 - 5330 Broadway ARB Case # 930FPPT Item # 5 - 5330 Broadway ARB Case # 930F
PPT Item # 5 - 5330 Broadway ARB Case # 930F
 
PPT Item # 4 - 525 Argo Avenue ARB Case # 926F
PPT Item # 4 - 525 Argo Avenue ARB Case # 926FPPT Item # 4 - 525 Argo Avenue ARB Case # 926F
PPT Item # 4 - 525 Argo Avenue ARB Case # 926F
 
PPT Item # 2 -- Announcements Powerpoint
PPT Item # 2 -- Announcements PowerpointPPT Item # 2 -- Announcements Powerpoint
PPT Item # 2 -- Announcements Powerpoint
 
Item # 1a -- May 13, 2024 City Council Meeting Minutes
Item # 1a -- May 13, 2024 City Council Meeting MinutesItem # 1a -- May 13, 2024 City Council Meeting Minutes
Item # 1a -- May 13, 2024 City Council Meeting Minutes
 
Item # 5 - 5330 Broadway ARB Case # 930F
Item # 5 - 5330 Broadway ARB Case # 930FItem # 5 - 5330 Broadway ARB Case # 930F
Item # 5 - 5330 Broadway ARB Case # 930F
 
Item # 6 - 7001 Broadway Significance Review
Item # 6 - 7001 Broadway Significance ReviewItem # 6 - 7001 Broadway Significance Review
Item # 6 - 7001 Broadway Significance Review
 
Item # 7 - BB Inspection Services Agreement
Item # 7 - BB Inspection Services AgreementItem # 7 - BB Inspection Services Agreement
Item # 7 - BB Inspection Services Agreement
 
Item # 8 -- Tuxedo Columbine 3--way Stop
Item # 8 -- Tuxedo Columbine 3--way StopItem # 8 -- Tuxedo Columbine 3--way Stop
Item # 8 -- Tuxedo Columbine 3--way Stop
 
Item # 9 - 2024 Street Maintenance Plan (SMP) Amdmnt
Item # 9 - 2024 Street Maintenance Plan (SMP) AmdmntItem # 9 - 2024 Street Maintenance Plan (SMP) Amdmnt
Item # 9 - 2024 Street Maintenance Plan (SMP) Amdmnt
 
PPT Item # 5 -- Announcements Powerpoint
PPT Item # 5 -- Announcements PowerpointPPT Item # 5 -- Announcements Powerpoint
PPT Item # 5 -- Announcements Powerpoint
 
PPT Item # 9 2ndQTR Financial & Inv. Report
PPT Item # 9 2ndQTR Financial & Inv. ReportPPT Item # 9 2ndQTR Financial & Inv. Report
PPT Item # 9 2ndQTR Financial & Inv. Report
 
Item # 9- 2nd Qtr Financial & Inv. Report
Item # 9- 2nd Qtr Financial & Inv. ReportItem # 9- 2nd Qtr Financial & Inv. Report
Item # 9- 2nd Qtr Financial & Inv. Report
 
PPT Item # 7&8 6900 Broadway P&Z Case # 438
PPT Item # 7&8 6900 Broadway P&Z Case # 438PPT Item # 7&8 6900 Broadway P&Z Case # 438
PPT Item # 7&8 6900 Broadway P&Z Case # 438
 
Item # 7-8 - 6900 Broadway P&Z Case # 438
Item # 7-8 - 6900 Broadway P&Z Case # 438Item # 7-8 - 6900 Broadway P&Z Case # 438
Item # 7-8 - 6900 Broadway P&Z Case # 438
 
Item ## 4a -- April 29, 2024 CCM Minutes
Item ## 4a -- April 29, 2024 CCM MinutesItem ## 4a -- April 29, 2024 CCM Minutes
Item ## 4a -- April 29, 2024 CCM Minutes
 
PPT Item # 8 - Annual Comprehensive Financial Report FY23
PPT Item # 8 - Annual Comprehensive Financial Report FY23PPT Item # 8 - Annual Comprehensive Financial Report FY23
PPT Item # 8 - Annual Comprehensive Financial Report FY23
 

Recently uploaded

A proposed request for information on LIHTC
A proposed request for information on LIHTCA proposed request for information on LIHTC
A proposed request for information on LIHTC
Roger Valdez
 
Transit-Oriented Development Study Working Group Meeting
Transit-Oriented Development Study Working Group MeetingTransit-Oriented Development Study Working Group Meeting
Transit-Oriented Development Study Working Group Meeting
Cuyahoga County Planning Commission
 
Get Government Grants and Assistance Program
Get Government Grants and Assistance ProgramGet Government Grants and Assistance Program
Get Government Grants and Assistance Program
Get Government Grants
 
State crafting: Changes and challenges for managing the public finances
State crafting: Changes and challenges for managing the public financesState crafting: Changes and challenges for managing the public finances
State crafting: Changes and challenges for managing the public finances
ResolutionFoundation
 
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptxPD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
RIDPRO11
 
Monitoring Health for the SDGs - Global Health Statistics 2024 - WHO
Monitoring Health for the SDGs - Global Health Statistics 2024 - WHOMonitoring Health for the SDGs - Global Health Statistics 2024 - WHO
Monitoring Health for the SDGs - Global Health Statistics 2024 - WHO
Christina Parmionova
 
2024: The FAR - Federal Acquisition Regulations, Part 37
2024: The FAR - Federal Acquisition Regulations, Part 372024: The FAR - Federal Acquisition Regulations, Part 37
2024: The FAR - Federal Acquisition Regulations, Part 37
JSchaus & Associates
 
Government Service OPSI Playbook FINAL.pdf
Government Service OPSI Playbook FINAL.pdfGovernment Service OPSI Playbook FINAL.pdf
Government Service OPSI Playbook FINAL.pdf
MoffatNyamadzawo2
 
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
850fcj96
 
Opinions on EVs: Metro Atlanta Speaks 2023
Opinions on EVs: Metro Atlanta Speaks 2023Opinions on EVs: Metro Atlanta Speaks 2023
Opinions on EVs: Metro Atlanta Speaks 2023
ARCResearch
 
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
850fcj96
 
kupon sample qurban masjid indonesia terbaru.pptx
kupon sample qurban masjid indonesia terbaru.pptxkupon sample qurban masjid indonesia terbaru.pptx
kupon sample qurban masjid indonesia terbaru.pptx
viderakai
 
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdfPNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
ClaudioTebaldi2
 
CBO’s Outlook for U.S. Fertility Rates: 2024 to 2054
CBO’s Outlook for U.S. Fertility Rates: 2024 to 2054CBO’s Outlook for U.S. Fertility Rates: 2024 to 2054
CBO’s Outlook for U.S. Fertility Rates: 2024 to 2054
Congressional Budget Office
 
Understanding the Challenges of Street Children
Understanding the Challenges of Street ChildrenUnderstanding the Challenges of Street Children
Understanding the Challenges of Street Children
SERUDS INDIA
 
ZGB - The Role of Generative AI in Government transformation.pdf
ZGB - The Role of Generative AI in Government transformation.pdfZGB - The Role of Generative AI in Government transformation.pdf
ZGB - The Role of Generative AI in Government transformation.pdf
Saeed Al Dhaheri
 
Uniform Guidance 3.0 - The New 2 CFR 200
Uniform Guidance 3.0 - The New 2 CFR 200Uniform Guidance 3.0 - The New 2 CFR 200
Uniform Guidance 3.0 - The New 2 CFR 200
GrantManagementInsti
 
NHAI_Under_Implementation_01-05-2024.pdf
NHAI_Under_Implementation_01-05-2024.pdfNHAI_Under_Implementation_01-05-2024.pdf
NHAI_Under_Implementation_01-05-2024.pdf
AjayVejendla3
 
Donate to charity during this holiday season
Donate to charity during this holiday seasonDonate to charity during this holiday season
Donate to charity during this holiday season
SERUDS INDIA
 
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Congressional Budget Office
 

Recently uploaded (20)

A proposed request for information on LIHTC
A proposed request for information on LIHTCA proposed request for information on LIHTC
A proposed request for information on LIHTC
 
Transit-Oriented Development Study Working Group Meeting
Transit-Oriented Development Study Working Group MeetingTransit-Oriented Development Study Working Group Meeting
Transit-Oriented Development Study Working Group Meeting
 
Get Government Grants and Assistance Program
Get Government Grants and Assistance ProgramGet Government Grants and Assistance Program
Get Government Grants and Assistance Program
 
State crafting: Changes and challenges for managing the public finances
State crafting: Changes and challenges for managing the public financesState crafting: Changes and challenges for managing the public finances
State crafting: Changes and challenges for managing the public finances
 
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptxPD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
 
Monitoring Health for the SDGs - Global Health Statistics 2024 - WHO
Monitoring Health for the SDGs - Global Health Statistics 2024 - WHOMonitoring Health for the SDGs - Global Health Statistics 2024 - WHO
Monitoring Health for the SDGs - Global Health Statistics 2024 - WHO
 
2024: The FAR - Federal Acquisition Regulations, Part 37
2024: The FAR - Federal Acquisition Regulations, Part 372024: The FAR - Federal Acquisition Regulations, Part 37
2024: The FAR - Federal Acquisition Regulations, Part 37
 
Government Service OPSI Playbook FINAL.pdf
Government Service OPSI Playbook FINAL.pdfGovernment Service OPSI Playbook FINAL.pdf
Government Service OPSI Playbook FINAL.pdf
 
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
 
Opinions on EVs: Metro Atlanta Speaks 2023
Opinions on EVs: Metro Atlanta Speaks 2023Opinions on EVs: Metro Atlanta Speaks 2023
Opinions on EVs: Metro Atlanta Speaks 2023
 
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
 
kupon sample qurban masjid indonesia terbaru.pptx
kupon sample qurban masjid indonesia terbaru.pptxkupon sample qurban masjid indonesia terbaru.pptx
kupon sample qurban masjid indonesia terbaru.pptx
 
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdfPNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
 
CBO’s Outlook for U.S. Fertility Rates: 2024 to 2054
CBO’s Outlook for U.S. Fertility Rates: 2024 to 2054CBO’s Outlook for U.S. Fertility Rates: 2024 to 2054
CBO’s Outlook for U.S. Fertility Rates: 2024 to 2054
 
Understanding the Challenges of Street Children
Understanding the Challenges of Street ChildrenUnderstanding the Challenges of Street Children
Understanding the Challenges of Street Children
 
ZGB - The Role of Generative AI in Government transformation.pdf
ZGB - The Role of Generative AI in Government transformation.pdfZGB - The Role of Generative AI in Government transformation.pdf
ZGB - The Role of Generative AI in Government transformation.pdf
 
Uniform Guidance 3.0 - The New 2 CFR 200
Uniform Guidance 3.0 - The New 2 CFR 200Uniform Guidance 3.0 - The New 2 CFR 200
Uniform Guidance 3.0 - The New 2 CFR 200
 
NHAI_Under_Implementation_01-05-2024.pdf
NHAI_Under_Implementation_01-05-2024.pdfNHAI_Under_Implementation_01-05-2024.pdf
NHAI_Under_Implementation_01-05-2024.pdf
 
Donate to charity during this holiday season
Donate to charity during this holiday seasonDonate to charity during this holiday season
Donate to charity during this holiday season
 
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
 

Item # 4 - 330 Argo Ave. ARB Case # 908F

  • 1. CITY OF ALAMO HEIGHTS COMMUNITY DEVELOPMENT SERVICES DEPARTMENT CITY COUNCIL AGENDA MEMORANDUM TO: Mayor and City Council Members FROM: Lety Hernandez, Director of Community Development Services SUBJECT: Case No. 908F – 330 Argo Ave Request of Elizabeth Haynes of Elizabeth Haynes Architect, applicant, representing Andrew Holzmann, owner, for the significance review of the existing main structure and compatibility review of the proposed design located at 330 Argo Ave in order to demolish 100% of the existing residence and construct a new single-family residence with detached garage under Demolition Review Ordinance No. 1860 (April 12, 2010). DATE: December 11, 2023 BACKGROUND INFORMATION The property is zoned SF-B (Single-Family District B) and is located on the south side of the street between Imlay St and Arbutus St. The applicant is seeking to demolish the existing single- family residence and construct a new two-story residence with detached garage.
  • 2. POLICY ANALYSIS Lot Coverage / Floor Area Ratio Existing Proposed Lot Area 7,500 7,500 Main House 1st Floor* 1,159.5 2,144 Main House 2nd Floor 0 833 Main House – Loft Garage/Carport – 1st Floor* 400 578 Garage – 2nd Floor Front Porch* 25 0 Side Porch* 0 159 Rear Porch* Breezeway* Shed* Total Square Footage 1,584.5 sq ft 3,718 sq ft Lot Coverage* (max 40%) 1,559.5 sq ft / 21% 2,881 sq ft / 38% FAR (max .47 with bonus) 1,534.5 sq ft / .21 3,559 sq ft / .47 Bonuses Utilized +2 – One-story detached garage  Main Structure o Height – 27ft 4-3/8-inches (max 28ft allowed) o Siding – Metal Panel and Stucco o Roof – Standing Seam Metal  Accessory Structure o Height – 13ft 10-1/4-inches (max 20ft allowed without bonus) o Siding – Metal Panel and Stucco o Roof – Standing Seam Metal  Chapter 5 – Buildings and Building Regulation, Article IX. – Demolition Demolition shall mean any intentional or unintentional act of dismantling, pulling down, destroying, removing, razing or moving a structure or any structural portion thereof, or commencing the work of moving or of total or substantial destruction of a structure or portion thereof. For the purposes of demolition review as described in article IX, demolition is defined quantitatively as: (1) Removal or encapsulation of more than twenty-five (25) percent of the framed structure of exterior walls facing public streets, or a street-facing elevation if the tract of land is landlocked; or, (2) Removal or encapsulation of more than fifty (50) percent of the framed structure of all exterior walls and/or roofs. Exception: Minor repair and routine maintenance. Significant structure shall mean any structure or portion thereof that in whole or in part meets one (1) or more criteria in section 5-134(h), and has been so determined by the city council. Section 5-134(h): The architectural review board shall consider the following criteria when determining the significance, as defined in this chapter, of existing structures: (1) Was the structure designed by a noted architect?
  • 3. (2) Has the structure been listed as having historic significance by any local, regional, state or historic agency or society? (3) Does the structure exhibit characteristics of a distinct architectural style? (4) Does the structure belong to a distinctive set of buildings, such as a single structure belonging to a row of similar structures? (5) Is the structure a significant part of the fabric of the community due to its age, unique architecture, historical significance or physical placement? Compatibility shall mean harmony with the existing neighborhood, site configurations, development patterns, and the character of the development envelope found within the adjacent and immediate block area, as demonstrated in the demolition review application, including roof pitch, scale, massing, garage and driveway location and setbacks. Adjacent and immediate block area shall include but not be limited to all properties along: (1) The specific block where the project is proposed; (2) The block to each side of the project's block; and (3) The blocks directly across the street of the three (3) blocks identified above. Block shall mean a length of street right-of-way along one (1) side of the street from one (1) intersection to the next adjoining intersection. The project is currently completing the plan review process and any revisions and/or newly discovered variances would need to be addressed prior to issuance of a building permit. The Architectural Review Board considered the request at their November 21, 2023 meeting. The motion to declare the existing main structure as not significant recommending approval of the demolition as requested and proposed design as compatible did not receive the four (4) affirmative votes as required per Section 2-48 of the City’s Code of Ordinances. – AYE (3) (Gaines, Gottsman, Hagendorf), NAY (2) (Armes, White) FISCAL IMPACT No projected fiscal impact from this project has been calculated. ATTACHMENTS Attachment A – Web Packet Attachment B – Response Cards __________________________ Lety Hernandez Director ___________________________ Buddy Kuhn City Manager
  • 18. 1 Lety Hernandez Subject: FW: Questions Regarding Application for 330 Argo Ave From: Alicia Fogg <> Sent: Wednesday, November 15, 2023 6:22 PM To: Lety Hernandez <lhernandez@alamoheightstx.gov> Subject: Re: Questions Regarding Application for 330 Argo Ave Yes, please submit my comments to the board. To be clear, I oppose the project as it is currently designed. Alicia From: Lety Hernandez <lhernandez@alamoheightstx.gov> Sent: Wednesday, November 15, 2023 3:36:11 PM To: Alicia Fogg < > Subject: RE: Questions Regarding Application for 330 Argo Ave Ms. Fogg, Thank you for contacting our office regarding the proposed project. Would you like for me to share your comments with the board on your behalf? Unfortunately, I am not aware of the reason why they are choosing to relocate the driveway or if the electrical pole is remaining in the existing location. Your concerns can be answered on the day of the meeting. With regards to the tree removals, it is my understanding that a 28” DBH Pecan and an 18” DBH Mesquite are being removed for this project. Please let me know what you decide with regards to your comments so that I can ensure we forward them in time for their review. I apologize for the delay in response. Thank you, Lety Hernandez From: Alicia Fogg < > Sent: Thursday, November 9, 2023 4:00 PM To: Lety Hernandez <lhernandez@alamoheightstx.gov> Subject: Questions Regarding Application for 330 Argo Ave Hi Ms Hernandez, I have recently received the notification for the property located at 330 Argo Ave. I had a few questions regarding the design. Overall I am for the redevelopment of the property, however, I strongly disagree with the assertion in the architect's letter that the style of the house reflects the character of the neighborhood. Yes they are replacing a stucco cottage with a large stucco and timber house that is very much a modern house. There is only one other modern style house on Argo Ave, which is not located on the 300 block of Argo Ave. The house proposed is located in the middle of the cottage district, it is neither a cottage nor anywhere close to an attempt to meet the overall design style of the neighborhood. Some general questions, why are they moving the driveway from the east side of the property to the west? What will happen to the current electrical pole that is located there? Are any of the trees staying on the property or are they all going to be removed as part of the demolition? Attachment B