SlideShare a Scribd company logo
CITY OF ALAMO HEIGHTS
COMMUNITY DEVELOPMENT SERVICES DEPARTMENT
CITY COUNCIL AGENDA MEMORANDUM
TO: Mayor and City Council Members
FROM: Lety Hernandez, Director of Community Development Services
SUBJECT: Case No. 898 F – 270 E Oakview Pl
Request of Matt Christian of M.W. Christian Builders, applicant, representing Diane
Kolar, owner, for the significance review of the existing main structure and compatibility
review of the proposed design located at 270 E Oakview Pl in order to demolish 100% of
the existing residence and construct a new single-family residence with attached garage
under Demolition Review Ordinance No. 1860 (April 12, 2010).
DATE: July 24, 2023
BACKGROUND INFORMATION
The property is zoned SF-A (Single-Family District A) and is located on the south side of E.
Oakview Pl, between Vanderhoeven Dr. and N New Braunfels. The applicant is seeking to
demolish the existing single-family residence and construct a new residence with attached garage.
The owner requested demolition of the existing main structure and construction of new single-
family residence and was approved by the Architectural Review Board at their August 18, 2020
meeting followed by City Council approval on September 14, 2020 but did not complete the plan
review process and obtain a permit within the required time period.
POLICY ANALYSIS
Lot Coverage / Floor Area Ratio Existing Proposed
Lot Area 9,150 9,150
Main House 1st
Floor* 2,000 1,556
Main House 2nd
Floor 0 1,503
Main House – Loft
Garage/Carport – 1st
Floor* 252 513
Garage – 2nd
Floor
Front Porch* 36.70 55
Side Porch*
Rear Porch* 466 321
Breezeway*
Shed* 76.50 0
Total Square Footage 2,831.20 sq ft 3,948 sq ft
Lot Coverage* (max 40%) 2,831 sq ft / 30.94% 2,445 sq ft / 26.72%
FAR (max .47 with bonus) 2,328.50 sq ft / .254 3,572 sq ft / .390
Bonuses Utilized
+2 – Side or rear street/alley access
 Main Structure
o Height – 28ft 2-5/8-inches (max 33ft allowed)
o Siding – Stucco with Stone Veneer Columns
o Roof – Asphalt Shingle and TPO
 Chapter 5 – Buildings and Building Regulation, Article IX. – Demolition
Demolition shall mean any intentional or unintentional act of dismantling, pulling down,
destroying, removing, razing or moving a structure or any structural portion thereof, or
commencing the work of moving or of total or substantial destruction of a structure or portion
thereof. For the purposes of demolition review as described in article IX, demolition is defined
quantitatively as:
(1) Removal or encapsulation of more than twenty-five (25) percent of the framed structure of
exterior walls facing public streets, or a street-facing elevation if the tract of land is
landlocked; or,
(2) Removal or encapsulation of more than fifty (50) percent of the framed structure of all
exterior walls and/or roofs.
Exception: Minor repair and routine maintenance.
Significant structure shall mean any structure or portion thereof that in whole or in part meets one
(1) or more criteria in section 5-134(h), and has been so determined by the city council.
Section 5-134(h): The architectural review board shall consider the following criteria when
determining the significance, as defined in this chapter, of existing structures:
(1) Was the structure designed by a noted architect?
(2) Has the structure been listed as having historic significance by any local, regional,
state or historic agency or society?
(3) Does the structure exhibit characteristics of a distinct architectural style?
(4) Does the structure belong to a distinctive set of buildings, such as a single structure
belonging to a row of similar structures?
(5) Is the structure a significant part of the fabric of the community due to its age, unique
architecture, historical significance or physical placement?
Compatibility shall mean harmony with the existing neighborhood, site configurations,
development patterns, and the character of the development envelope found within the adjacent
and immediate block area, as demonstrated in the demolition review application, including roof
pitch, scale, massing, garage and driveway location and setbacks. Adjacent and immediate block
area shall include but not be limited to all properties along:
(1) The specific block where the project is proposed;
(2) The block to each side of the project's block; and
(3) The blocks directly across the street of the three (3) blocks identified above.
Block shall mean a length of street right-of-way along one (1) side of the street from one (1)
intersection to the next adjoining intersection.
A portion of this property is located within the City’s 100-yr floodway but the proposed
improvements are located outside of the flood area as illustrated on the proposed site plan (Sheet
A101). The project would not be required to obtain a Floodplain Development Permit.
The Architectural Review Board conducted both significance and compatibility reviews at their
July 18, 2023 meeting. The board voted unanimously to declare the existing main structure as not
significant and recommend approval of the proposed design as compatible.
FISCAL IMPACT
No projected fiscal impact from this project has been calculated.
ATTACHMENTS
Attachment A – Web Packet
Attachment B – Response Cards
__________________________
Lety Hernandez
Director
___________________________
Buddy Kuhn
City Manager
Attachment A
Attachment A
Attachment A
Attachment A
Attachment A
Attachment A
Attachment A
Attachment A
Attachment A
Attachment A
Attachment A
Attachment B
Attachment B

More Related Content

Similar to Item # 6 - 270 E. Oakview Place

Item # 6 --- 333 Ogden Lane Sign. Review
Item # 6 --- 333 Ogden Lane Sign. ReviewItem # 6 --- 333 Ogden Lane Sign. Review
Item # 6 --- 333 Ogden Lane Sign. Review
ahcitycouncil
 
Item # 6 - 333 Ogden Lane Significance Review
Item # 6 - 333 Ogden Lane Significance ReviewItem # 6 - 333 Ogden Lane Significance Review
Item # 6 - 333 Ogden Lane Significance Review
ahcitycouncil
 
Item # 5 - 301 Encino Significance & Compatibility
Item # 5 - 301 Encino Significance & CompatibilityItem # 5 - 301 Encino Significance & Compatibility
Item # 5 - 301 Encino Significance & Compatibility
ahcitycouncil
 
Item # 4 - 117 Claywell (Significance & Compatibility Review)
Item # 4 - 117 Claywell (Significance & Compatibility Review)Item # 4 - 117 Claywell (Significance & Compatibility Review)
Item # 4 - 117 Claywell (Significance & Compatibility Review)
ahcitycouncil
 
Item # 4 - 330 Argo Ave. ARB Case # 908F
Item # 4 - 330 Argo Ave. ARB Case # 908FItem # 4 - 330 Argo Ave. ARB Case # 908F
Item # 4 - 330 Argo Ave. ARB Case # 908F
ahcitycouncil
 
Item # 4 232 Castano (Significance & Compatibility)
Item # 4   232 Castano (Significance & Compatibility)Item # 4   232 Castano (Significance & Compatibility)
Item # 4 232 Castano (Significance & Compatibility)
ahcitycouncil
 
Item # 5 - 233 Harrison Ave. Sig. Review
Item # 5 - 233 Harrison Ave. Sig. ReviewItem # 5 - 233 Harrison Ave. Sig. Review
Item # 5 - 233 Harrison Ave. Sig. Review
ahcitycouncil
 
Item # 5 - 233 Harrison Ave. Sig. Review
Item # 5 - 233 Harrison Ave. Sig. ReviewItem # 5 - 233 Harrison Ave. Sig. Review
Item # 5 - 233 Harrison Ave. Sig. Review
ahcitycouncil
 
Item # 4 - 337 Ogden
Item # 4  - 337 OgdenItem # 4  - 337 Ogden
Item # 4 - 337 Ogden
ahcitycouncil
 
Item # 4 - 730 Corona
Item # 4 - 730 CoronaItem # 4 - 730 Corona
Item # 4 - 730 Corona
ahcitycouncil
 
Item # 5 - 315 Argo Ave.
Item # 5 - 315 Argo Ave.Item # 5 - 315 Argo Ave.
Item # 5 - 315 Argo Ave.
ahcitycouncil
 
Item # 1 - 525 Argo
Item # 1 - 525 ArgoItem # 1 - 525 Argo
Item # 1 - 525 Argo
ahcitycouncil
 
Item # 5 301 College (Compatibility)
Item # 5   301 College (Compatibility)Item # 5   301 College (Compatibility)
Item # 5 301 College (Compatibility)
ahcitycouncil
 
Item # 5 - 5330 Broadway ARB Case # 930F
Item # 5 - 5330 Broadway ARB Case # 930FItem # 5 - 5330 Broadway ARB Case # 930F
Item # 5 - 5330 Broadway ARB Case # 930F
ahcitycouncil
 
Item # 6 - 730 Corona Ave.
Item # 6 - 730 Corona Ave.Item # 6 - 730 Corona Ave.
Item # 6 - 730 Corona Ave.
ahcitycouncil
 
Item # 4 - 260 Retama (Compatibility Only)
Item # 4 - 260 Retama (Compatibility Only)Item # 4 - 260 Retama (Compatibility Only)
Item # 4 - 260 Retama (Compatibility Only)
ahcitycouncil
 
Item # 7 - 218 E. Edgewood
Item # 7 - 218 E. EdgewoodItem # 7 - 218 E. Edgewood
Item # 7 - 218 E. Edgewood
ahcitycouncil
 
Item #6 ppt 301 ogden
Item #6   ppt 301 ogdenItem #6   ppt 301 ogden
Item #6 ppt 301 ogden
Marian Vargas Mendoza
 
Item # 4 -- 525 Argo Avenue ARB Case 926F
Item # 4 -- 525 Argo Avenue ARB Case 926FItem # 4 -- 525 Argo Avenue ARB Case 926F
Item # 4 -- 525 Argo Avenue ARB Case 926F
ahcitycouncil
 
Item # 8 - 203 E. Edgewood
Item # 8 - 203 E. EdgewoodItem # 8 - 203 E. Edgewood
Item # 8 - 203 E. Edgewood
ahcitycouncil
 

Similar to Item # 6 - 270 E. Oakview Place (20)

Item # 6 --- 333 Ogden Lane Sign. Review
Item # 6 --- 333 Ogden Lane Sign. ReviewItem # 6 --- 333 Ogden Lane Sign. Review
Item # 6 --- 333 Ogden Lane Sign. Review
 
Item # 6 - 333 Ogden Lane Significance Review
Item # 6 - 333 Ogden Lane Significance ReviewItem # 6 - 333 Ogden Lane Significance Review
Item # 6 - 333 Ogden Lane Significance Review
 
Item # 5 - 301 Encino Significance & Compatibility
Item # 5 - 301 Encino Significance & CompatibilityItem # 5 - 301 Encino Significance & Compatibility
Item # 5 - 301 Encino Significance & Compatibility
 
Item # 4 - 117 Claywell (Significance & Compatibility Review)
Item # 4 - 117 Claywell (Significance & Compatibility Review)Item # 4 - 117 Claywell (Significance & Compatibility Review)
Item # 4 - 117 Claywell (Significance & Compatibility Review)
 
Item # 4 - 330 Argo Ave. ARB Case # 908F
Item # 4 - 330 Argo Ave. ARB Case # 908FItem # 4 - 330 Argo Ave. ARB Case # 908F
Item # 4 - 330 Argo Ave. ARB Case # 908F
 
Item # 4 232 Castano (Significance & Compatibility)
Item # 4   232 Castano (Significance & Compatibility)Item # 4   232 Castano (Significance & Compatibility)
Item # 4 232 Castano (Significance & Compatibility)
 
Item # 5 - 233 Harrison Ave. Sig. Review
Item # 5 - 233 Harrison Ave. Sig. ReviewItem # 5 - 233 Harrison Ave. Sig. Review
Item # 5 - 233 Harrison Ave. Sig. Review
 
Item # 5 - 233 Harrison Ave. Sig. Review
Item # 5 - 233 Harrison Ave. Sig. ReviewItem # 5 - 233 Harrison Ave. Sig. Review
Item # 5 - 233 Harrison Ave. Sig. Review
 
Item # 4 - 337 Ogden
Item # 4  - 337 OgdenItem # 4  - 337 Ogden
Item # 4 - 337 Ogden
 
Item # 4 - 730 Corona
Item # 4 - 730 CoronaItem # 4 - 730 Corona
Item # 4 - 730 Corona
 
Item # 5 - 315 Argo Ave.
Item # 5 - 315 Argo Ave.Item # 5 - 315 Argo Ave.
Item # 5 - 315 Argo Ave.
 
Item # 1 - 525 Argo
Item # 1 - 525 ArgoItem # 1 - 525 Argo
Item # 1 - 525 Argo
 
Item # 5 301 College (Compatibility)
Item # 5   301 College (Compatibility)Item # 5   301 College (Compatibility)
Item # 5 301 College (Compatibility)
 
Item # 5 - 5330 Broadway ARB Case # 930F
Item # 5 - 5330 Broadway ARB Case # 930FItem # 5 - 5330 Broadway ARB Case # 930F
Item # 5 - 5330 Broadway ARB Case # 930F
 
Item # 6 - 730 Corona Ave.
Item # 6 - 730 Corona Ave.Item # 6 - 730 Corona Ave.
Item # 6 - 730 Corona Ave.
 
Item # 4 - 260 Retama (Compatibility Only)
Item # 4 - 260 Retama (Compatibility Only)Item # 4 - 260 Retama (Compatibility Only)
Item # 4 - 260 Retama (Compatibility Only)
 
Item # 7 - 218 E. Edgewood
Item # 7 - 218 E. EdgewoodItem # 7 - 218 E. Edgewood
Item # 7 - 218 E. Edgewood
 
Item #6 ppt 301 ogden
Item #6   ppt 301 ogdenItem #6   ppt 301 ogden
Item #6 ppt 301 ogden
 
Item # 4 -- 525 Argo Avenue ARB Case 926F
Item # 4 -- 525 Argo Avenue ARB Case 926FItem # 4 -- 525 Argo Avenue ARB Case 926F
Item # 4 -- 525 Argo Avenue ARB Case 926F
 
Item # 8 - 203 E. Edgewood
Item # 8 - 203 E. EdgewoodItem # 8 - 203 E. Edgewood
Item # 8 - 203 E. Edgewood
 

More from ahcitycouncil

PPT Item # 9 - 2024 Street Maintenance Program(SMP) Amendment
PPT Item # 9 - 2024 Street Maintenance Program(SMP) AmendmentPPT Item # 9 - 2024 Street Maintenance Program(SMP) Amendment
PPT Item # 9 - 2024 Street Maintenance Program(SMP) Amendment
ahcitycouncil
 
PPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way StopPPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way Stop
ahcitycouncil
 
PPT Item # 7 - BB Inspection Services Agmt
PPT Item # 7 - BB Inspection Services AgmtPPT Item # 7 - BB Inspection Services Agmt
PPT Item # 7 - BB Inspection Services Agmt
ahcitycouncil
 
PPT Item # 6 - 7001 Broadway ARB Case # 933F
PPT Item # 6 - 7001 Broadway ARB Case # 933FPPT Item # 6 - 7001 Broadway ARB Case # 933F
PPT Item # 6 - 7001 Broadway ARB Case # 933F
ahcitycouncil
 
PPT Item # 5 - 5330 Broadway ARB Case # 930F
PPT Item # 5 - 5330 Broadway ARB Case # 930FPPT Item # 5 - 5330 Broadway ARB Case # 930F
PPT Item # 5 - 5330 Broadway ARB Case # 930F
ahcitycouncil
 
PPT Item # 4 - 525 Argo Avenue ARB Case # 926F
PPT Item # 4 - 525 Argo Avenue ARB Case # 926FPPT Item # 4 - 525 Argo Avenue ARB Case # 926F
PPT Item # 4 - 525 Argo Avenue ARB Case # 926F
ahcitycouncil
 
PPT Item # 2 -- Announcements Powerpoint
PPT Item # 2 -- Announcements PowerpointPPT Item # 2 -- Announcements Powerpoint
PPT Item # 2 -- Announcements Powerpoint
ahcitycouncil
 
Item # 1a -- May 13, 2024 City Council Meeting Minutes
Item # 1a -- May 13, 2024 City Council Meeting MinutesItem # 1a -- May 13, 2024 City Council Meeting Minutes
Item # 1a -- May 13, 2024 City Council Meeting Minutes
ahcitycouncil
 
Item # 6 - 7001 Broadway Significance Review
Item # 6 - 7001 Broadway Significance ReviewItem # 6 - 7001 Broadway Significance Review
Item # 6 - 7001 Broadway Significance Review
ahcitycouncil
 
Item # 7 - BB Inspection Services Agreement
Item # 7 - BB Inspection Services AgreementItem # 7 - BB Inspection Services Agreement
Item # 7 - BB Inspection Services Agreement
ahcitycouncil
 
Item # 8 -- Tuxedo Columbine 3--way Stop
Item # 8 -- Tuxedo Columbine 3--way StopItem # 8 -- Tuxedo Columbine 3--way Stop
Item # 8 -- Tuxedo Columbine 3--way Stop
ahcitycouncil
 
Item # 9 - 2024 Street Maintenance Plan (SMP) Amdmnt
Item # 9 - 2024 Street Maintenance Plan (SMP) AmdmntItem # 9 - 2024 Street Maintenance Plan (SMP) Amdmnt
Item # 9 - 2024 Street Maintenance Plan (SMP) Amdmnt
ahcitycouncil
 
PPT Item # 5 -- Announcements Powerpoint
PPT Item # 5 -- Announcements PowerpointPPT Item # 5 -- Announcements Powerpoint
PPT Item # 5 -- Announcements Powerpoint
ahcitycouncil
 
PPT Item # 9 2ndQTR Financial & Inv. Report
PPT Item # 9 2ndQTR Financial & Inv. ReportPPT Item # 9 2ndQTR Financial & Inv. Report
PPT Item # 9 2ndQTR Financial & Inv. Report
ahcitycouncil
 
Item # 9- 2nd Qtr Financial & Inv. Report
Item # 9- 2nd Qtr Financial & Inv. ReportItem # 9- 2nd Qtr Financial & Inv. Report
Item # 9- 2nd Qtr Financial & Inv. Report
ahcitycouncil
 
PPT Item # 7&8 6900 Broadway P&Z Case # 438
PPT Item # 7&8 6900 Broadway P&Z Case # 438PPT Item # 7&8 6900 Broadway P&Z Case # 438
PPT Item # 7&8 6900 Broadway P&Z Case # 438
ahcitycouncil
 
Item # 7-8 - 6900 Broadway P&Z Case # 438
Item # 7-8 - 6900 Broadway P&Z Case # 438Item # 7-8 - 6900 Broadway P&Z Case # 438
Item # 7-8 - 6900 Broadway P&Z Case # 438
ahcitycouncil
 
Item ## 4a -- April 29, 2024 CCM Minutes
Item ## 4a -- April 29, 2024 CCM MinutesItem ## 4a -- April 29, 2024 CCM Minutes
Item ## 4a -- April 29, 2024 CCM Minutes
ahcitycouncil
 
PPT Item # 8 - Annual Comprehensive Financial Report FY23
PPT Item # 8 - Annual Comprehensive Financial Report FY23PPT Item # 8 - Annual Comprehensive Financial Report FY23
PPT Item # 8 - Annual Comprehensive Financial Report FY23
ahcitycouncil
 
Item # 8 - FY23 Annual Comprehensive Financial Report
Item # 8 - FY23 Annual Comprehensive Financial ReportItem # 8 - FY23 Annual Comprehensive Financial Report
Item # 8 - FY23 Annual Comprehensive Financial Report
ahcitycouncil
 

More from ahcitycouncil (20)

PPT Item # 9 - 2024 Street Maintenance Program(SMP) Amendment
PPT Item # 9 - 2024 Street Maintenance Program(SMP) AmendmentPPT Item # 9 - 2024 Street Maintenance Program(SMP) Amendment
PPT Item # 9 - 2024 Street Maintenance Program(SMP) Amendment
 
PPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way StopPPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way Stop
 
PPT Item # 7 - BB Inspection Services Agmt
PPT Item # 7 - BB Inspection Services AgmtPPT Item # 7 - BB Inspection Services Agmt
PPT Item # 7 - BB Inspection Services Agmt
 
PPT Item # 6 - 7001 Broadway ARB Case # 933F
PPT Item # 6 - 7001 Broadway ARB Case # 933FPPT Item # 6 - 7001 Broadway ARB Case # 933F
PPT Item # 6 - 7001 Broadway ARB Case # 933F
 
PPT Item # 5 - 5330 Broadway ARB Case # 930F
PPT Item # 5 - 5330 Broadway ARB Case # 930FPPT Item # 5 - 5330 Broadway ARB Case # 930F
PPT Item # 5 - 5330 Broadway ARB Case # 930F
 
PPT Item # 4 - 525 Argo Avenue ARB Case # 926F
PPT Item # 4 - 525 Argo Avenue ARB Case # 926FPPT Item # 4 - 525 Argo Avenue ARB Case # 926F
PPT Item # 4 - 525 Argo Avenue ARB Case # 926F
 
PPT Item # 2 -- Announcements Powerpoint
PPT Item # 2 -- Announcements PowerpointPPT Item # 2 -- Announcements Powerpoint
PPT Item # 2 -- Announcements Powerpoint
 
Item # 1a -- May 13, 2024 City Council Meeting Minutes
Item # 1a -- May 13, 2024 City Council Meeting MinutesItem # 1a -- May 13, 2024 City Council Meeting Minutes
Item # 1a -- May 13, 2024 City Council Meeting Minutes
 
Item # 6 - 7001 Broadway Significance Review
Item # 6 - 7001 Broadway Significance ReviewItem # 6 - 7001 Broadway Significance Review
Item # 6 - 7001 Broadway Significance Review
 
Item # 7 - BB Inspection Services Agreement
Item # 7 - BB Inspection Services AgreementItem # 7 - BB Inspection Services Agreement
Item # 7 - BB Inspection Services Agreement
 
Item # 8 -- Tuxedo Columbine 3--way Stop
Item # 8 -- Tuxedo Columbine 3--way StopItem # 8 -- Tuxedo Columbine 3--way Stop
Item # 8 -- Tuxedo Columbine 3--way Stop
 
Item # 9 - 2024 Street Maintenance Plan (SMP) Amdmnt
Item # 9 - 2024 Street Maintenance Plan (SMP) AmdmntItem # 9 - 2024 Street Maintenance Plan (SMP) Amdmnt
Item # 9 - 2024 Street Maintenance Plan (SMP) Amdmnt
 
PPT Item # 5 -- Announcements Powerpoint
PPT Item # 5 -- Announcements PowerpointPPT Item # 5 -- Announcements Powerpoint
PPT Item # 5 -- Announcements Powerpoint
 
PPT Item # 9 2ndQTR Financial & Inv. Report
PPT Item # 9 2ndQTR Financial & Inv. ReportPPT Item # 9 2ndQTR Financial & Inv. Report
PPT Item # 9 2ndQTR Financial & Inv. Report
 
Item # 9- 2nd Qtr Financial & Inv. Report
Item # 9- 2nd Qtr Financial & Inv. ReportItem # 9- 2nd Qtr Financial & Inv. Report
Item # 9- 2nd Qtr Financial & Inv. Report
 
PPT Item # 7&8 6900 Broadway P&Z Case # 438
PPT Item # 7&8 6900 Broadway P&Z Case # 438PPT Item # 7&8 6900 Broadway P&Z Case # 438
PPT Item # 7&8 6900 Broadway P&Z Case # 438
 
Item # 7-8 - 6900 Broadway P&Z Case # 438
Item # 7-8 - 6900 Broadway P&Z Case # 438Item # 7-8 - 6900 Broadway P&Z Case # 438
Item # 7-8 - 6900 Broadway P&Z Case # 438
 
Item ## 4a -- April 29, 2024 CCM Minutes
Item ## 4a -- April 29, 2024 CCM MinutesItem ## 4a -- April 29, 2024 CCM Minutes
Item ## 4a -- April 29, 2024 CCM Minutes
 
PPT Item # 8 - Annual Comprehensive Financial Report FY23
PPT Item # 8 - Annual Comprehensive Financial Report FY23PPT Item # 8 - Annual Comprehensive Financial Report FY23
PPT Item # 8 - Annual Comprehensive Financial Report FY23
 
Item # 8 - FY23 Annual Comprehensive Financial Report
Item # 8 - FY23 Annual Comprehensive Financial ReportItem # 8 - FY23 Annual Comprehensive Financial Report
Item # 8 - FY23 Annual Comprehensive Financial Report
 

Recently uploaded

MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptxMHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
ILC- UK
 
Get Government Grants and Assistance Program
Get Government Grants and Assistance ProgramGet Government Grants and Assistance Program
Get Government Grants and Assistance Program
Get Government Grants
 
PACT launching workshop presentation-Final.pdf
PACT launching workshop presentation-Final.pdfPACT launching workshop presentation-Final.pdf
PACT launching workshop presentation-Final.pdf
Mohammed325561
 
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
850fcj96
 
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
850fcj96
 
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
ukyewh
 
The Role of a Process Server in real estate
The Role of a Process Server in real estateThe Role of a Process Server in real estate
The Role of a Process Server in real estate
oklahomajudicialproc1
 
ZGB - The Role of Generative AI in Government transformation.pdf
ZGB - The Role of Generative AI in Government transformation.pdfZGB - The Role of Generative AI in Government transformation.pdf
ZGB - The Role of Generative AI in Government transformation.pdf
Saeed Al Dhaheri
 
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptxPD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
RIDPRO11
 
Russian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale warRussian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale war
Antti Rautiainen
 
2024: The FAR - Federal Acquisition Regulations, Part 37
2024: The FAR - Federal Acquisition Regulations, Part 372024: The FAR - Federal Acquisition Regulations, Part 37
2024: The FAR - Federal Acquisition Regulations, Part 37
JSchaus & Associates
 
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Congressional Budget Office
 
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
ehbuaw
 
Many ways to support street children.pptx
Many ways to support street children.pptxMany ways to support street children.pptx
Many ways to support street children.pptx
SERUDS INDIA
 
Up the Ratios Bylaws - a Comprehensive Process of Our Organization
Up the Ratios Bylaws - a Comprehensive Process of Our OrganizationUp the Ratios Bylaws - a Comprehensive Process of Our Organization
Up the Ratios Bylaws - a Comprehensive Process of Our Organization
uptheratios
 
一比一原版(WSU毕业证)西悉尼大学毕业证成绩单
一比一原版(WSU毕业证)西悉尼大学毕业证成绩单一比一原版(WSU毕业证)西悉尼大学毕业证成绩单
一比一原版(WSU毕业证)西悉尼大学毕业证成绩单
evkovas
 
Counting Class for Micro Observers 2024.pptx
Counting Class for Micro Observers 2024.pptxCounting Class for Micro Observers 2024.pptx
Counting Class for Micro Observers 2024.pptx
Revenue Department Kerala State
 
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
ehbuaw
 
2024: The FAR - Federal Acquisition Regulations, Part 36
2024: The FAR - Federal Acquisition Regulations, Part 362024: The FAR - Federal Acquisition Regulations, Part 36
2024: The FAR - Federal Acquisition Regulations, Part 36
JSchaus & Associates
 
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
ehbuaw
 

Recently uploaded (20)

MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptxMHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
 
Get Government Grants and Assistance Program
Get Government Grants and Assistance ProgramGet Government Grants and Assistance Program
Get Government Grants and Assistance Program
 
PACT launching workshop presentation-Final.pdf
PACT launching workshop presentation-Final.pdfPACT launching workshop presentation-Final.pdf
PACT launching workshop presentation-Final.pdf
 
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
 
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
 
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
 
The Role of a Process Server in real estate
The Role of a Process Server in real estateThe Role of a Process Server in real estate
The Role of a Process Server in real estate
 
ZGB - The Role of Generative AI in Government transformation.pdf
ZGB - The Role of Generative AI in Government transformation.pdfZGB - The Role of Generative AI in Government transformation.pdf
ZGB - The Role of Generative AI in Government transformation.pdf
 
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptxPD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
 
Russian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale warRussian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale war
 
2024: The FAR - Federal Acquisition Regulations, Part 37
2024: The FAR - Federal Acquisition Regulations, Part 372024: The FAR - Federal Acquisition Regulations, Part 37
2024: The FAR - Federal Acquisition Regulations, Part 37
 
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
 
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
 
Many ways to support street children.pptx
Many ways to support street children.pptxMany ways to support street children.pptx
Many ways to support street children.pptx
 
Up the Ratios Bylaws - a Comprehensive Process of Our Organization
Up the Ratios Bylaws - a Comprehensive Process of Our OrganizationUp the Ratios Bylaws - a Comprehensive Process of Our Organization
Up the Ratios Bylaws - a Comprehensive Process of Our Organization
 
一比一原版(WSU毕业证)西悉尼大学毕业证成绩单
一比一原版(WSU毕业证)西悉尼大学毕业证成绩单一比一原版(WSU毕业证)西悉尼大学毕业证成绩单
一比一原版(WSU毕业证)西悉尼大学毕业证成绩单
 
Counting Class for Micro Observers 2024.pptx
Counting Class for Micro Observers 2024.pptxCounting Class for Micro Observers 2024.pptx
Counting Class for Micro Observers 2024.pptx
 
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
 
2024: The FAR - Federal Acquisition Regulations, Part 36
2024: The FAR - Federal Acquisition Regulations, Part 362024: The FAR - Federal Acquisition Regulations, Part 36
2024: The FAR - Federal Acquisition Regulations, Part 36
 
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
 

Item # 6 - 270 E. Oakview Place

  • 1. CITY OF ALAMO HEIGHTS COMMUNITY DEVELOPMENT SERVICES DEPARTMENT CITY COUNCIL AGENDA MEMORANDUM TO: Mayor and City Council Members FROM: Lety Hernandez, Director of Community Development Services SUBJECT: Case No. 898 F – 270 E Oakview Pl Request of Matt Christian of M.W. Christian Builders, applicant, representing Diane Kolar, owner, for the significance review of the existing main structure and compatibility review of the proposed design located at 270 E Oakview Pl in order to demolish 100% of the existing residence and construct a new single-family residence with attached garage under Demolition Review Ordinance No. 1860 (April 12, 2010). DATE: July 24, 2023 BACKGROUND INFORMATION The property is zoned SF-A (Single-Family District A) and is located on the south side of E. Oakview Pl, between Vanderhoeven Dr. and N New Braunfels. The applicant is seeking to demolish the existing single-family residence and construct a new residence with attached garage. The owner requested demolition of the existing main structure and construction of new single- family residence and was approved by the Architectural Review Board at their August 18, 2020 meeting followed by City Council approval on September 14, 2020 but did not complete the plan review process and obtain a permit within the required time period.
  • 2. POLICY ANALYSIS Lot Coverage / Floor Area Ratio Existing Proposed Lot Area 9,150 9,150 Main House 1st Floor* 2,000 1,556 Main House 2nd Floor 0 1,503 Main House – Loft Garage/Carport – 1st Floor* 252 513 Garage – 2nd Floor Front Porch* 36.70 55 Side Porch* Rear Porch* 466 321 Breezeway* Shed* 76.50 0 Total Square Footage 2,831.20 sq ft 3,948 sq ft Lot Coverage* (max 40%) 2,831 sq ft / 30.94% 2,445 sq ft / 26.72% FAR (max .47 with bonus) 2,328.50 sq ft / .254 3,572 sq ft / .390 Bonuses Utilized +2 – Side or rear street/alley access  Main Structure o Height – 28ft 2-5/8-inches (max 33ft allowed) o Siding – Stucco with Stone Veneer Columns o Roof – Asphalt Shingle and TPO  Chapter 5 – Buildings and Building Regulation, Article IX. – Demolition Demolition shall mean any intentional or unintentional act of dismantling, pulling down, destroying, removing, razing or moving a structure or any structural portion thereof, or commencing the work of moving or of total or substantial destruction of a structure or portion thereof. For the purposes of demolition review as described in article IX, demolition is defined quantitatively as: (1) Removal or encapsulation of more than twenty-five (25) percent of the framed structure of exterior walls facing public streets, or a street-facing elevation if the tract of land is landlocked; or, (2) Removal or encapsulation of more than fifty (50) percent of the framed structure of all exterior walls and/or roofs. Exception: Minor repair and routine maintenance. Significant structure shall mean any structure or portion thereof that in whole or in part meets one (1) or more criteria in section 5-134(h), and has been so determined by the city council. Section 5-134(h): The architectural review board shall consider the following criteria when determining the significance, as defined in this chapter, of existing structures: (1) Was the structure designed by a noted architect? (2) Has the structure been listed as having historic significance by any local, regional, state or historic agency or society? (3) Does the structure exhibit characteristics of a distinct architectural style? (4) Does the structure belong to a distinctive set of buildings, such as a single structure belonging to a row of similar structures?
  • 3. (5) Is the structure a significant part of the fabric of the community due to its age, unique architecture, historical significance or physical placement? Compatibility shall mean harmony with the existing neighborhood, site configurations, development patterns, and the character of the development envelope found within the adjacent and immediate block area, as demonstrated in the demolition review application, including roof pitch, scale, massing, garage and driveway location and setbacks. Adjacent and immediate block area shall include but not be limited to all properties along: (1) The specific block where the project is proposed; (2) The block to each side of the project's block; and (3) The blocks directly across the street of the three (3) blocks identified above. Block shall mean a length of street right-of-way along one (1) side of the street from one (1) intersection to the next adjoining intersection. A portion of this property is located within the City’s 100-yr floodway but the proposed improvements are located outside of the flood area as illustrated on the proposed site plan (Sheet A101). The project would not be required to obtain a Floodplain Development Permit. The Architectural Review Board conducted both significance and compatibility reviews at their July 18, 2023 meeting. The board voted unanimously to declare the existing main structure as not significant and recommend approval of the proposed design as compatible. FISCAL IMPACT No projected fiscal impact from this project has been calculated. ATTACHMENTS Attachment A – Web Packet Attachment B – Response Cards __________________________ Lety Hernandez Director ___________________________ Buddy Kuhn City Manager