CITY OF ALAMO HEIGHTS
COMMUNITY DEVELOPMENT SERVICES DEPARTMENT
CITY COUNCIL AGENDA MEMORANDUM
TO: Mayor and City Council Members
FROM: Lety Hernandez, Director of Community Development Services
SUBJECT: Case No. 892 F – 321 Argo Ave
Request of Jonathan Rodriguez of Vision Design Build, applicant, representing Alexa and
Sam Simpson, owners, for the significance review of the existing main structure and
compatibility review of the proposed design located at 321 Argo in order to demolish
32% of the existing street-facing elevation, and 89% of the existing roof in order to
remodel and add a 2nd story addition to the existing single-family residence under
Demolition Review Ordinance No. 1860 (April 12, 2010).
DATE: February 13, 2023
BACKGROUND INFORMATION
The property is zoned SF-B (Single-Family District B) and is located on the north side of Argo
Ave, between Imlay St and Arbutus St. The applicant is seeking to add a 2nd
story addition to the
existing main structure.
The proposed project was reviewed by the Board of Adjustment on January 04, 2023. The board
voted unanimously to approve a 10ft 6-inch height looming encroachment variance on the west
side of the main structure.
POLICY ANALYSIS
Lot Coverage / Floor Area Ratio Existing Proposed
Lot Area 7,500 7,500
Main House 1st
Floor* 1,860 1,563
Main House 2nd
Floor 255 1,522
Main House – Loft
Garage/Carport – 1st
Floor* 412 412
Garage – 2nd
Floor
Front Porch* 168 168
Side Porch* 48 20
Rear Porch* 192 192
Breezeway*
Other*
Total Square Footage 2,935 sq ft 3,877 sq ft
Lot Coverage* (max 40%) 2,680 sq ft / 35.73% 2,355 sq ft / 31.40%
FAR (max .50 with bonus) 2,527 sq ft / .34 3,497 sq ft / .47
Bonuses Utilized
+4 – Preservation of main structure
+2 – One-story garage
 Main Structure
o Height – 28ft 3-inches (max 30ft allowed with minimum 3ft pier and beam foundation
bonus)
o Siding – Hardie Board
o Roof – Galvalume Metal Roof
 Chapter 5 – Buildings and Building Regulation, Article IX. – Demolition
Demolition shall mean any intentional or unintentional act of dismantling, pulling down,
destroying, removing, razing or moving a structure or any structural portion thereof, or
commencing the work of moving or of total or substantial destruction of a structure or portion
thereof. For the purposes of demolition review as described in article IX, demolition is defined
quantitatively as:
(1) Removal or encapsulation of more than twenty-five (25) percent of the framed structure of
exterior walls facing public streets, or a street-facing elevation if the tract of land is
landlocked; or,
(2) Removal or encapsulation of more than fifty (50) percent of the framed structure of all
exterior walls and/or roofs.
Exception: Minor repair and routine maintenance.
Significant structure shall mean any structure or portion thereof that in whole or in part meets one
(1) or more criteria in section 5-134(h), and has been so determined by the city council.
Section 5-134(h): The architectural review board shall consider the following criteria when
determining the significance, as defined in this chapter, of existing structures:
(1) Was the structure designed by a noted architect?
(2) Has the structure been listed as having historic significance by any local, regional,
state or historic agency or society?
(3) Does the structure exhibit characteristics of a distinct architectural style?
(4) Does the structure belong to a distinctive set of buildings, such as a single structure
belonging to a row of similar structures?
(5) Is the structure a significant part of the fabric of the community due to its age, unique
architecture, historical significance or physical placement?
Compatibility shall mean harmony with the existing neighborhood, site configurations,
development patterns, and the character of the development envelope found within the adjacent
and immediate block area, as demonstrated in the demolition review application, including roof
pitch, scale, massing, garage and driveway location and setbacks. Adjacent and immediate block
area shall include but not be limited to all properties along:
(1) The specific block where the project is proposed;
(2) The block to each side of the project's block; and
(3) The blocks directly across the street of the three (3) blocks identified above.
Block shall mean a length of street right-of-way along one (1) side of the street from one (1)
intersection to the next adjoining intersection.
Staff found no historical or architectural significance to the existing main structure. On January
17, 2023, the Architectural Review Board considered the request and voted unanimously to
declare the existing main structure as not significant and recommended approval of the design as
compatible.
FISCAL IMPACT
No projected fiscal impact from this project has been calculated.
ATTACHMENTS
Attachment A – Web Packet
Attachment B – Response Cards
__________________________
Lety Hernandez
Director
__________________________
Buddy Kuhn
City Manager
CITY OF ALAMO HEIGHTS
COMMUNITY DEVELOPMENT SERVICES DEPARTMENT
6116 BROADWAY
SAN ANTONIO, TX 78209
210-826-0516
Architectural Review Board Meeting
Tuesday, January 17, 2023 – 5:30 P.M.
Take notice that a Regular Architectural Review Board meeting of the City of Alamo Heights will be held
on Tuesday, January 17, 2023 at 5:30pm in the City Council Chamber, located at 6116 Broadway St,
San Antonio, Texas, 78209, to consider and act upon any lawful subjects which may come before it.
INSTRUCTIONS FOR TELECONFERENCE: Members of the public may also participate via audio
by dialing 1-346-248-7799 and entering access number 868 0184 5240#. If you would like to speak on
a particular item, when the item is considered, press *9 to “raise your hand”. Citizens will have three
(3) minutes to share their comments. The meeting will be recorded.
The City cannot guarantee participation by phone due to unforeseen technical difficulties or provide
prior notice if they occur; therefore, the City urges your in-person attendance if you require
participation.
Case No. 892 F – 321 Argo Ave
Request of Jonathan Rodriguez of Vision Design Build, applicant, representing Alexa and Sam Simpson,
owners, for the significance review of the existing main structure and compatibility review of the
proposed design located at 321 Argo in order to demolish 32% of the existing street-facing elevation, and
89% of the existing roof in order to remodel and add a 2nd
story addition to the existing single-family
residence under Demolition Review Ordinance No. 1860 (April 12, 2010).
Chapter 5 of Code of Ordinances (Buildings and Building Regulations) requires City Council to consider the
ARB’s recommendation for all demolition/final design review applications. Please check the ARB posted
results on the City’s website after the ARB meeting to confirm any future meeting dates.
Plans are available for public viewing on the City’s website, with the exception of floor plans,
(http://www.alamoheightstx.gov/departments/planning-and-development-services/public-notices/)
and at the Community Development Services Department located at 6116 Broadway St, 2nd
floor.
You may also contact Eron Spencer (espencer@alamoheightstx.gov) or Lety Hernandez
(lhernandez@alamoheightstx.gov) by email or our office at (210) 826-0516 for additional
information regarding this case.
Attachment A
Attachment A
Attachment A
N
00
05'
00"
W
o
150.00'
S
00
05'
00"
E
o
150.00'
N 89 55' 00" W
o
50.00'
N 89 55' 00" W
o
50.00'
5'
SETBACK
10'
SETBACK
25' SETBACK
3' SETBACK
4'-2"
2'-7"
4'-1"
10'-0"
11'-7"
SITE PLAN
SCALE: 1/8" = 1'-0"
EXISTING CHIMNEY
TO BE REMOVED
EXISTING WOOD DECK
TO BE CONCRETE
INFILL TO NEW
BATHROOM
FIRST FLOOR PLAN
SCALE: 1/4" = 1'-0"
LIVING ROOM
TO REMAIN
COVERED PORCH
TO BE REPAIR
DINING ROOM
TO REMAIN
KITCHEN
TO REMAIN
BEDROOM #1
TO REMAIN
STAIR HALL
TO REMAIN
BEDROOM #2
TO REMAIN
GUEST BATHROOM
TO REMODEL
EXISTING FIREPLACE
TO BE DEMOLISHED
HEAD
CONTROL
NEW COVERED PATIO
NEW CONCRETE
12'-4"
14'-4"
NEW LINEN NEW VANITY
NEW COLUMN TO REPAIR EXISTING
NEW COMPOSITE DECKING ON
EXISTING REPAIRED FRAMING
42" WALL WITH
36" GLASS ON TOP
ROOM AND CLOEST
TO BE DEMOLISHED
EXISTING MAIN FLOOR 1860 SQ. FT.
AREA TO BE DEMOLISHED 297 SQ. FT.
297 / 1860 = 15%
Site Calculations
Existing (SF)
Lot Coverage
Main House footprint
7500
1860
Proposed (SF)
7500
1563
Front Porch 168 168
Side Porch 1 48 20
Side Porch 2
Rear Porch 192 (wood) 192 (concrete)
Garage 412 412
Lot Area
Floor Area Ratio
2680
Total Lot Coverage 2680
Main House: 1st Floor
7500
1860
7500
1563
255 1522
Garage 1st Floor 412 412
Total (total FAR/lot area)
2517
Lot Area
Main House: 2nd Floor
/
7500
3497
/
7500
Total FAR 33% 46%
SHEET
A1
1 OF 2
DATE: 12.13.2022
San
Antonio,
Texas
78209
SIMPSON
RESIDENCE
Attachment A
6'-1"
FIRST FLOOR BELOW
PROPERTY
LINE
13'-3" 2'-4" 18'-5"
34'-0"
11'-4"
6'-9"
7'-5"
10'-0"
15'-10"
14'-11"
4'-7"
5'-4"
3'-5"
12'-4"
13'-5"
16'-1" 18'-3"
34'-4"
14'-0" 4'-5" 13'-11"
4'-0" 4'-9"
4'-9"
BED ROOM #3
WOOD FLOORING
PLAYROOM ROOM #3
WOOD FLOORING
HALL #2
WOOD FLOORING
BED ROOM #2
WOOD FLOORING
DRESSING ROOM
WOOD FLOORING
MASTER ROOM
WOOD FLOORING
EXISTING SECOND
FLOOR TO REMAIN
BATHROOM #2
TILE FLOORING
LINEN
8'-9"
8'-4" 5'-8" 5'-2" 5'-2"
4'-0"
MASTER BATH
TILE FLOORING
SECOND FLOOR PLAN
SCALE: 1/4" = 1'-0"
2'-8"
4'-0"
3'-2"
7'-8"
3'-0"
3'-2"
11"
54'-0"
4
/
12
SLOPE
2'-0"
O.H.
2'-8"
H.O.
EXISTING 2ND STORY ROOF STRUCTURE TO
REMAIN EXISTING ROOF MATERIAL TO BE REPLACE
EXISTING FIRST FLOOR ROOF
STRUCTURE TO REMAIN EXISTING
ROOF MATERIAL TO BE REPLACE
4 / 12 SLOPE
4 / 12 SLOPE
4 / 12 SLOPE
4 / 12 SLOPE
1'-0"
OVERHANG
EXISTING ROOF PLAN
SCALE: 3/16" = 1'-0"
EXISTING ROOF 2441 SQ. FT.
AREA ENCAPSULATED/DEMOLISHED BY ADDITION 2156 SQ. FT.
2156 / 2441 = 89%
EXISTING ROOF STRUCTURE TO
BE DEMOLISHED PER DESIGNS
NEW ROOF PLAN
SCALE: 3/16" = 1'-0"
EXISTING ROOF AND STRUCTURE TO
BE DEMOLISHED PER DESIGNS
SHEET
A2
1 OF 2
DATE: 12.13.2022
San
Antonio,
Texas
78209
SIMPSON
RESIDENCE
Attachment A
9'-3"
EXISTING
EXISTING FIN. GRADE
FIN. FLOOR
EXISTING 1ST
FLOOR TOP PLATE
EXISTING SIDE ELEVATION
SCALE: 1/4" = 1'-0"
EXISTING
FIN. FLOOR
EXISTING 1ST
FLOOR TOP PLATE
SECOND LEVEL
FINISH FLOOR
SECOND LEVEL
TOP OF PLATE
PROPERTY
LINE
EXISTING
EXISTING FIN. GRADE
FIN. FLOOR
FRONT ELEVATION
SCALE: 1/4" = 1'-0"
EXISTING BACK ELEVATION
SCALE: 1/4" = 1'-0"
NEW METAL ROOFING
REMOVED EXISTING
EXISTING SIDE ELEVATION
SCALE: 1/4" = 1'-0"
DASHED LINE INDICATES NEW
PROPOSED CONSTRUCTION
EXISTING ADDITION
TO BE DEMOLISHED
PORTION OF EXISTING TO BE
DEMOLISHED TO ACCOMMODATE
NEW SECOND FLOOR ADDITION
PORTION OF EXISTING
TO BE DEMOLISHED
PROPERTY
LINE
PORTION OF EXISTING TO BE
DEMOLISHED TO ACCOMMODATE
NEW SECOND FLOOR ADDITION
PORTION OF EXISTING TO BE
DEMOLISHED TO ACCOMMODATE
NEW SECOND FLOOR ADDITION
COLUMNS TO BE REMOVED
AND REPLACE TO REPAIR
EXISTING COVERED PORCH
DASHED LINE INDICATES NEW
PROPOSED CONSTRUCTION
PORTION OF EXISTING TO BE
DEMOLISHED TO ACCOMMODATE
NEW SECOND FLOOR ADDITION
DEMO EXISTING FIREPLACE
AND CHIMNEY
DASHED LINE INDICATES NEW
PROPOSED CONSTRUCTION
FRONT ELEVATION
TOTAL FRONT FACE FACADE AREA 739 SQ. FT.
AREA ENCAPSULATED/DEMOLISHED BY ADDITION 224 SQ. FT.
224 / 739 = 32%
LEFT SIDE ELEVATION
TOTAL LEFT SIDE FACE FACADE AREA 862 SQ. FT.
AREA ENCAPSULATED/DEMOLISHED BY ADDITION 103 SQ. FT.
103 / 862 = 12%
BACK ELEVATION
TOTAL BACK FACE FACADE AREA 695 SQ. FT.
AREA ENCAPSULATED/DEMOLISHED BY ADDITION 350 SQ. FT.
350 / 695 = 50%
LEFT SIDE ELEVATION
TOTAL LEFT SIDE FACE FACADE AREA 1066 SQ. FT.
AREA ENCAPSULATED/DEMOLISHED BY ADDITION 398 SQ. FT.
398 / 1066 = 50%
SHEET
A3
1 OF 2
DATE: 12.13.2022
San
Antonio,
Texas
78209
SIMPSON
RESIDENCE
Attachment A
EXISTING CHIMNEY
TO BE REMOVED
PROPERTY
LINE
EXISTING ROOF
LINE FIRST FLOOR
LINE OF LOOMING
STANDARD
NEW METAL ROOFING
12'-3"
2
1
EXISTING
EXISTING FIN. GRADE
FIN. FLOOR
9'-3"
EXISTING 1ST
FLOOR TOP PLATE
1'-6"
SECOND LEVEL
FINISH FLOOR
9'-0"
SECOND LEVEL
TOP OF PLATE
28'-7
1
4
"
LINE OF LOOMING STANDARD
IN COMPLIANCE
NEW METAL ROOFING
12
4
FRONT ELEVATION
SCALE: 1/4" = 1'-0"
3'-0"
1'-0"
EXISTING
EXIST. FIN. GRADE
FIN. FLOOR
EXISTING 1ST
FLOOR TOP PLATE
SECOND LEVEL
FINISH FLOOR
SECOND LEVEL
TOP OF PLATE
NEW METAL ROOFING
REMOVED EXISTING
NEW METAL ROOFING
REMOVED EXISTING
NEW METAL
NEW METAL ROOFING
SIDE ELEVATION
SCALE: 1/4" = 1'-0"
6'-1"
EXISTING
FIN. FLOOR
EXISTING 1ST
FLOOR TOP PLATE
SECOND LEVEL
FINISH FLOOR
SECOND LEVEL
TOP OF PLATE
PROPERTY
LINE
2
1
9'-3"
1'-6"
9'-0"
LINE OF LOOMING
STANDARD
NEW METAL ROOFING
REAR ELEVATION
SCALE: 1/4" = 1'-0"
DASHED LINE INDICATES NEW
PROPOSED CONSTRUCTION
TO REMAIN
ROOFING
28'-3"
LINE OF GRADE
HEIGHT
AT
AVG.
GRADE
SIDE ELEVATION
SCALE: 1/4" = 1'-0"
HEIGHT OF PIER AND BEAM FOUNDATION
SHEET
A4
1 OF 2
DATE: 12.13.2022
San
Antonio,
Texas
78209
SIMPSON
RESIDENCE
Attachment A
Attachment B
1
Lety Hernandez
Subject: FW: Case No. 892F re: Sam and Alexa SImpson
-----Original Message-----
From: Eric Braseth < >
Sent: Sunday, January 8, 2023 4:50 PM
To: Lety Hernandez <lhernandez@alamoheightstx.gov>
Subject: Case No. 892F re: Sam and Alexa SImpson
Hello,
I wanted to send an email as I will not be available for the review on January 17th, 2023.
I have reviewed the design plans and changes for the Simpson residence and I do support the project and have reviewed the
project plans.
Thank you!
Eric Braseth
352-318-4363
335 Argo Ave, Alamo Heights, TX 78209
Please be cautious
**This email is not from your organization, please verify the Sender's Name matches the From Email Address!**
________________________________
Attachment B

More Related Content

Similar to Item # 3 - 321 Argo

Item # 4 - 301 Lamont Ave. ARB Case # 913F
Item # 4 - 301 Lamont Ave. ARB Case # 913FItem # 4 - 301 Lamont Ave. ARB Case # 913F
Item # 4 - 301 Lamont Ave. ARB Case # 913F
ahcitycouncil
 
Item # 4 - 730 Corona
Item # 4 - 730 CoronaItem # 4 - 730 Corona
Item # 4 - 730 Corona
ahcitycouncil
 
Item # 4 - 337 Ogden
Item # 4  - 337 OgdenItem # 4  - 337 Ogden
Item # 4 - 337 Ogden
ahcitycouncil
 
Item # 4 - 117 Claywell (Significance & Compatibility review)
Item # 4 - 117 Claywell (Significance & Compatibility review)Item # 4 - 117 Claywell (Significance & Compatibility review)
Item # 4 - 117 Claywell (Significance & Compatibility review)
ahcitycouncil
 
Item # 4 - 240 Corona (Significance & Compatibility Review)
Item # 4 - 240 Corona (Significance & Compatibility Review)Item # 4 - 240 Corona (Significance & Compatibility Review)
Item # 4 - 240 Corona (Significance & Compatibility Review)
ahcitycouncil
 
Item # 6 - 255 Claywell Drive (Significance)
Item # 6 - 255 Claywell Drive (Significance)Item # 6 - 255 Claywell Drive (Significance)
Item # 6 - 255 Claywell Drive (Significance)
ahcitycouncil
 
Item # 4 - 117 Claywell (Significance & Compatibility Review)
Item # 4 - 117 Claywell (Significance & Compatibility Review)Item # 4 - 117 Claywell (Significance & Compatibility Review)
Item # 4 - 117 Claywell (Significance & Compatibility Review)
ahcitycouncil
 
Item # 5 - 233 Harrison Ave. Sig. Review
Item # 5 - 233 Harrison Ave. Sig. ReviewItem # 5 - 233 Harrison Ave. Sig. Review
Item # 5 - 233 Harrison Ave. Sig. Review
ahcitycouncil
 
Item # 5 - 117 Claywell (Significance & Compatibility Review)
Item # 5 - 117 Claywell (Significance & Compatibility Review)Item # 5 - 117 Claywell (Significance & Compatibility Review)
Item # 5 - 117 Claywell (Significance & Compatibility Review)
ahcitycouncil
 
Item # 5 - 233 Harrison Ave. Sig. Review
Item # 5 - 233 Harrison Ave. Sig. ReviewItem # 5 - 233 Harrison Ave. Sig. Review
Item # 5 - 233 Harrison Ave. Sig. Review
ahcitycouncil
 
Item # 4 - 820 Cambridge Compatibility
Item # 4 - 820 Cambridge Compatibility Item # 4 - 820 Cambridge Compatibility
Item # 4 - 820 Cambridge Compatibility
ahcitycouncil
 
Item # 4 232 Castano (Significance & Compatibility)
Item # 4   232 Castano (Significance & Compatibility)Item # 4   232 Castano (Significance & Compatibility)
Item # 4 232 Castano (Significance & Compatibility)
ahcitycouncil
 
Item # 7 - 218 E. Edgewood
Item # 7 - 218 E. EdgewoodItem # 7 - 218 E. Edgewood
Item # 7 - 218 E. Edgewood
ahcitycouncil
 
Item # 1 - 525 Argo
Item # 1 - 525 ArgoItem # 1 - 525 Argo
Item # 1 - 525 Argo
ahcitycouncil
 
Item # 6 - 820 Cambridge Oval
Item # 6 - 820 Cambridge OvalItem # 6 - 820 Cambridge Oval
Item # 6 - 820 Cambridge Oval
ahcitycouncil
 
Item # 6 - 730 Corona Ave.
Item # 6 - 730 Corona Ave.Item # 6 - 730 Corona Ave.
Item # 6 - 730 Corona Ave.
ahcitycouncil
 
Item # 5 - 315 Argo Ave.
Item # 5 - 315 Argo Ave.Item # 5 - 315 Argo Ave.
Item # 5 - 315 Argo Ave.
ahcitycouncil
 
Item # 5 - 5330 Broadway ARB Case # 930F
Item # 5 - 5330 Broadway ARB Case # 930FItem # 5 - 5330 Broadway ARB Case # 930F
Item # 5 - 5330 Broadway ARB Case # 930F
ahcitycouncil
 
Item # 9 - 227 Rosemary (Compatibility Review)
Item # 9 - 227 Rosemary (Compatibility Review)Item # 9 - 227 Rosemary (Compatibility Review)
Item # 9 - 227 Rosemary (Compatibility Review)
ahcitycouncil
 
Item # 7 - 317 Normandy (Significance Review)
Item # 7 - 317 Normandy (Significance Review)Item # 7 - 317 Normandy (Significance Review)
Item # 7 - 317 Normandy (Significance Review)
ahcitycouncil
 

Similar to Item # 3 - 321 Argo (20)

Item # 4 - 301 Lamont Ave. ARB Case # 913F
Item # 4 - 301 Lamont Ave. ARB Case # 913FItem # 4 - 301 Lamont Ave. ARB Case # 913F
Item # 4 - 301 Lamont Ave. ARB Case # 913F
 
Item # 4 - 730 Corona
Item # 4 - 730 CoronaItem # 4 - 730 Corona
Item # 4 - 730 Corona
 
Item # 4 - 337 Ogden
Item # 4  - 337 OgdenItem # 4  - 337 Ogden
Item # 4 - 337 Ogden
 
Item # 4 - 117 Claywell (Significance & Compatibility review)
Item # 4 - 117 Claywell (Significance & Compatibility review)Item # 4 - 117 Claywell (Significance & Compatibility review)
Item # 4 - 117 Claywell (Significance & Compatibility review)
 
Item # 4 - 240 Corona (Significance & Compatibility Review)
Item # 4 - 240 Corona (Significance & Compatibility Review)Item # 4 - 240 Corona (Significance & Compatibility Review)
Item # 4 - 240 Corona (Significance & Compatibility Review)
 
Item # 6 - 255 Claywell Drive (Significance)
Item # 6 - 255 Claywell Drive (Significance)Item # 6 - 255 Claywell Drive (Significance)
Item # 6 - 255 Claywell Drive (Significance)
 
Item # 4 - 117 Claywell (Significance & Compatibility Review)
Item # 4 - 117 Claywell (Significance & Compatibility Review)Item # 4 - 117 Claywell (Significance & Compatibility Review)
Item # 4 - 117 Claywell (Significance & Compatibility Review)
 
Item # 5 - 233 Harrison Ave. Sig. Review
Item # 5 - 233 Harrison Ave. Sig. ReviewItem # 5 - 233 Harrison Ave. Sig. Review
Item # 5 - 233 Harrison Ave. Sig. Review
 
Item # 5 - 117 Claywell (Significance & Compatibility Review)
Item # 5 - 117 Claywell (Significance & Compatibility Review)Item # 5 - 117 Claywell (Significance & Compatibility Review)
Item # 5 - 117 Claywell (Significance & Compatibility Review)
 
Item # 5 - 233 Harrison Ave. Sig. Review
Item # 5 - 233 Harrison Ave. Sig. ReviewItem # 5 - 233 Harrison Ave. Sig. Review
Item # 5 - 233 Harrison Ave. Sig. Review
 
Item # 4 - 820 Cambridge Compatibility
Item # 4 - 820 Cambridge Compatibility Item # 4 - 820 Cambridge Compatibility
Item # 4 - 820 Cambridge Compatibility
 
Item # 4 232 Castano (Significance & Compatibility)
Item # 4   232 Castano (Significance & Compatibility)Item # 4   232 Castano (Significance & Compatibility)
Item # 4 232 Castano (Significance & Compatibility)
 
Item # 7 - 218 E. Edgewood
Item # 7 - 218 E. EdgewoodItem # 7 - 218 E. Edgewood
Item # 7 - 218 E. Edgewood
 
Item # 1 - 525 Argo
Item # 1 - 525 ArgoItem # 1 - 525 Argo
Item # 1 - 525 Argo
 
Item # 6 - 820 Cambridge Oval
Item # 6 - 820 Cambridge OvalItem # 6 - 820 Cambridge Oval
Item # 6 - 820 Cambridge Oval
 
Item # 6 - 730 Corona Ave.
Item # 6 - 730 Corona Ave.Item # 6 - 730 Corona Ave.
Item # 6 - 730 Corona Ave.
 
Item # 5 - 315 Argo Ave.
Item # 5 - 315 Argo Ave.Item # 5 - 315 Argo Ave.
Item # 5 - 315 Argo Ave.
 
Item # 5 - 5330 Broadway ARB Case # 930F
Item # 5 - 5330 Broadway ARB Case # 930FItem # 5 - 5330 Broadway ARB Case # 930F
Item # 5 - 5330 Broadway ARB Case # 930F
 
Item # 9 - 227 Rosemary (Compatibility Review)
Item # 9 - 227 Rosemary (Compatibility Review)Item # 9 - 227 Rosemary (Compatibility Review)
Item # 9 - 227 Rosemary (Compatibility Review)
 
Item # 7 - 317 Normandy (Significance Review)
Item # 7 - 317 Normandy (Significance Review)Item # 7 - 317 Normandy (Significance Review)
Item # 7 - 317 Normandy (Significance Review)
 

More from ahcitycouncil

PPT Item # 9 - 2024 Street Maintenance Program(SMP) Amendment
PPT Item # 9 - 2024 Street Maintenance Program(SMP) AmendmentPPT Item # 9 - 2024 Street Maintenance Program(SMP) Amendment
PPT Item # 9 - 2024 Street Maintenance Program(SMP) Amendment
ahcitycouncil
 
PPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way StopPPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way Stop
ahcitycouncil
 
PPT Item # 7 - BB Inspection Services Agmt
PPT Item # 7 - BB Inspection Services AgmtPPT Item # 7 - BB Inspection Services Agmt
PPT Item # 7 - BB Inspection Services Agmt
ahcitycouncil
 
PPT Item # 6 - 7001 Broadway ARB Case # 933F
PPT Item # 6 - 7001 Broadway ARB Case # 933FPPT Item # 6 - 7001 Broadway ARB Case # 933F
PPT Item # 6 - 7001 Broadway ARB Case # 933F
ahcitycouncil
 
PPT Item # 5 - 5330 Broadway ARB Case # 930F
PPT Item # 5 - 5330 Broadway ARB Case # 930FPPT Item # 5 - 5330 Broadway ARB Case # 930F
PPT Item # 5 - 5330 Broadway ARB Case # 930F
ahcitycouncil
 
PPT Item # 4 - 525 Argo Avenue ARB Case # 926F
PPT Item # 4 - 525 Argo Avenue ARB Case # 926FPPT Item # 4 - 525 Argo Avenue ARB Case # 926F
PPT Item # 4 - 525 Argo Avenue ARB Case # 926F
ahcitycouncil
 
PPT Item # 2 -- Announcements Powerpoint
PPT Item # 2 -- Announcements PowerpointPPT Item # 2 -- Announcements Powerpoint
PPT Item # 2 -- Announcements Powerpoint
ahcitycouncil
 
Item # 1a -- May 13, 2024 City Council Meeting Minutes
Item # 1a -- May 13, 2024 City Council Meeting MinutesItem # 1a -- May 13, 2024 City Council Meeting Minutes
Item # 1a -- May 13, 2024 City Council Meeting Minutes
ahcitycouncil
 
Item # 4 -- 525 Argo Avenue ARB Case 926F
Item # 4 -- 525 Argo Avenue ARB Case 926FItem # 4 -- 525 Argo Avenue ARB Case 926F
Item # 4 -- 525 Argo Avenue ARB Case 926F
ahcitycouncil
 
Item # 6 - 7001 Broadway Significance Review
Item # 6 - 7001 Broadway Significance ReviewItem # 6 - 7001 Broadway Significance Review
Item # 6 - 7001 Broadway Significance Review
ahcitycouncil
 
Item # 7 - BB Inspection Services Agreement
Item # 7 - BB Inspection Services AgreementItem # 7 - BB Inspection Services Agreement
Item # 7 - BB Inspection Services Agreement
ahcitycouncil
 
Item # 8 -- Tuxedo Columbine 3--way Stop
Item # 8 -- Tuxedo Columbine 3--way StopItem # 8 -- Tuxedo Columbine 3--way Stop
Item # 8 -- Tuxedo Columbine 3--way Stop
ahcitycouncil
 
Item # 9 - 2024 Street Maintenance Plan (SMP) Amdmnt
Item # 9 - 2024 Street Maintenance Plan (SMP) AmdmntItem # 9 - 2024 Street Maintenance Plan (SMP) Amdmnt
Item # 9 - 2024 Street Maintenance Plan (SMP) Amdmnt
ahcitycouncil
 
PPT Item # 5 -- Announcements Powerpoint
PPT Item # 5 -- Announcements PowerpointPPT Item # 5 -- Announcements Powerpoint
PPT Item # 5 -- Announcements Powerpoint
ahcitycouncil
 
PPT Item # 9 2ndQTR Financial & Inv. Report
PPT Item # 9 2ndQTR Financial & Inv. ReportPPT Item # 9 2ndQTR Financial & Inv. Report
PPT Item # 9 2ndQTR Financial & Inv. Report
ahcitycouncil
 
Item # 9- 2nd Qtr Financial & Inv. Report
Item # 9- 2nd Qtr Financial & Inv. ReportItem # 9- 2nd Qtr Financial & Inv. Report
Item # 9- 2nd Qtr Financial & Inv. Report
ahcitycouncil
 
PPT Item # 7&8 6900 Broadway P&Z Case # 438
PPT Item # 7&8 6900 Broadway P&Z Case # 438PPT Item # 7&8 6900 Broadway P&Z Case # 438
PPT Item # 7&8 6900 Broadway P&Z Case # 438
ahcitycouncil
 
Item # 7-8 - 6900 Broadway P&Z Case # 438
Item # 7-8 - 6900 Broadway P&Z Case # 438Item # 7-8 - 6900 Broadway P&Z Case # 438
Item # 7-8 - 6900 Broadway P&Z Case # 438
ahcitycouncil
 
Item ## 4a -- April 29, 2024 CCM Minutes
Item ## 4a -- April 29, 2024 CCM MinutesItem ## 4a -- April 29, 2024 CCM Minutes
Item ## 4a -- April 29, 2024 CCM Minutes
ahcitycouncil
 
PPT Item # 8 - Annual Comprehensive Financial Report FY23
PPT Item # 8 - Annual Comprehensive Financial Report FY23PPT Item # 8 - Annual Comprehensive Financial Report FY23
PPT Item # 8 - Annual Comprehensive Financial Report FY23
ahcitycouncil
 

More from ahcitycouncil (20)

PPT Item # 9 - 2024 Street Maintenance Program(SMP) Amendment
PPT Item # 9 - 2024 Street Maintenance Program(SMP) AmendmentPPT Item # 9 - 2024 Street Maintenance Program(SMP) Amendment
PPT Item # 9 - 2024 Street Maintenance Program(SMP) Amendment
 
PPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way StopPPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way Stop
 
PPT Item # 7 - BB Inspection Services Agmt
PPT Item # 7 - BB Inspection Services AgmtPPT Item # 7 - BB Inspection Services Agmt
PPT Item # 7 - BB Inspection Services Agmt
 
PPT Item # 6 - 7001 Broadway ARB Case # 933F
PPT Item # 6 - 7001 Broadway ARB Case # 933FPPT Item # 6 - 7001 Broadway ARB Case # 933F
PPT Item # 6 - 7001 Broadway ARB Case # 933F
 
PPT Item # 5 - 5330 Broadway ARB Case # 930F
PPT Item # 5 - 5330 Broadway ARB Case # 930FPPT Item # 5 - 5330 Broadway ARB Case # 930F
PPT Item # 5 - 5330 Broadway ARB Case # 930F
 
PPT Item # 4 - 525 Argo Avenue ARB Case # 926F
PPT Item # 4 - 525 Argo Avenue ARB Case # 926FPPT Item # 4 - 525 Argo Avenue ARB Case # 926F
PPT Item # 4 - 525 Argo Avenue ARB Case # 926F
 
PPT Item # 2 -- Announcements Powerpoint
PPT Item # 2 -- Announcements PowerpointPPT Item # 2 -- Announcements Powerpoint
PPT Item # 2 -- Announcements Powerpoint
 
Item # 1a -- May 13, 2024 City Council Meeting Minutes
Item # 1a -- May 13, 2024 City Council Meeting MinutesItem # 1a -- May 13, 2024 City Council Meeting Minutes
Item # 1a -- May 13, 2024 City Council Meeting Minutes
 
Item # 4 -- 525 Argo Avenue ARB Case 926F
Item # 4 -- 525 Argo Avenue ARB Case 926FItem # 4 -- 525 Argo Avenue ARB Case 926F
Item # 4 -- 525 Argo Avenue ARB Case 926F
 
Item # 6 - 7001 Broadway Significance Review
Item # 6 - 7001 Broadway Significance ReviewItem # 6 - 7001 Broadway Significance Review
Item # 6 - 7001 Broadway Significance Review
 
Item # 7 - BB Inspection Services Agreement
Item # 7 - BB Inspection Services AgreementItem # 7 - BB Inspection Services Agreement
Item # 7 - BB Inspection Services Agreement
 
Item # 8 -- Tuxedo Columbine 3--way Stop
Item # 8 -- Tuxedo Columbine 3--way StopItem # 8 -- Tuxedo Columbine 3--way Stop
Item # 8 -- Tuxedo Columbine 3--way Stop
 
Item # 9 - 2024 Street Maintenance Plan (SMP) Amdmnt
Item # 9 - 2024 Street Maintenance Plan (SMP) AmdmntItem # 9 - 2024 Street Maintenance Plan (SMP) Amdmnt
Item # 9 - 2024 Street Maintenance Plan (SMP) Amdmnt
 
PPT Item # 5 -- Announcements Powerpoint
PPT Item # 5 -- Announcements PowerpointPPT Item # 5 -- Announcements Powerpoint
PPT Item # 5 -- Announcements Powerpoint
 
PPT Item # 9 2ndQTR Financial & Inv. Report
PPT Item # 9 2ndQTR Financial & Inv. ReportPPT Item # 9 2ndQTR Financial & Inv. Report
PPT Item # 9 2ndQTR Financial & Inv. Report
 
Item # 9- 2nd Qtr Financial & Inv. Report
Item # 9- 2nd Qtr Financial & Inv. ReportItem # 9- 2nd Qtr Financial & Inv. Report
Item # 9- 2nd Qtr Financial & Inv. Report
 
PPT Item # 7&8 6900 Broadway P&Z Case # 438
PPT Item # 7&8 6900 Broadway P&Z Case # 438PPT Item # 7&8 6900 Broadway P&Z Case # 438
PPT Item # 7&8 6900 Broadway P&Z Case # 438
 
Item # 7-8 - 6900 Broadway P&Z Case # 438
Item # 7-8 - 6900 Broadway P&Z Case # 438Item # 7-8 - 6900 Broadway P&Z Case # 438
Item # 7-8 - 6900 Broadway P&Z Case # 438
 
Item ## 4a -- April 29, 2024 CCM Minutes
Item ## 4a -- April 29, 2024 CCM MinutesItem ## 4a -- April 29, 2024 CCM Minutes
Item ## 4a -- April 29, 2024 CCM Minutes
 
PPT Item # 8 - Annual Comprehensive Financial Report FY23
PPT Item # 8 - Annual Comprehensive Financial Report FY23PPT Item # 8 - Annual Comprehensive Financial Report FY23
PPT Item # 8 - Annual Comprehensive Financial Report FY23
 

Recently uploaded

Opinions on EVs: Metro Atlanta Speaks 2023
Opinions on EVs: Metro Atlanta Speaks 2023Opinions on EVs: Metro Atlanta Speaks 2023
Opinions on EVs: Metro Atlanta Speaks 2023
ARCResearch
 
A proposed request for information on LIHTC
A proposed request for information on LIHTCA proposed request for information on LIHTC
A proposed request for information on LIHTC
Roger Valdez
 
NHAI_Under_Implementation_01-05-2024.pdf
NHAI_Under_Implementation_01-05-2024.pdfNHAI_Under_Implementation_01-05-2024.pdf
NHAI_Under_Implementation_01-05-2024.pdf
AjayVejendla3
 
Uniform Guidance 3.0 - The New 2 CFR 200
Uniform Guidance 3.0 - The New 2 CFR 200Uniform Guidance 3.0 - The New 2 CFR 200
Uniform Guidance 3.0 - The New 2 CFR 200
GrantManagementInsti
 
2024: The FAR - Federal Acquisition Regulations, Part 38
2024: The FAR - Federal Acquisition Regulations, Part 382024: The FAR - Federal Acquisition Regulations, Part 38
2024: The FAR - Federal Acquisition Regulations, Part 38
JSchaus & Associates
 
Transit-Oriented Development Study Working Group Meeting
Transit-Oriented Development Study Working Group MeetingTransit-Oriented Development Study Working Group Meeting
Transit-Oriented Development Study Working Group Meeting
Cuyahoga County Planning Commission
 
Understanding the Challenges of Street Children
Understanding the Challenges of Street ChildrenUnderstanding the Challenges of Street Children
Understanding the Challenges of Street Children
SERUDS INDIA
 
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Congressional Budget Office
 
Government Service OPSI Playbook FINAL.pdf
Government Service OPSI Playbook FINAL.pdfGovernment Service OPSI Playbook FINAL.pdf
Government Service OPSI Playbook FINAL.pdf
MoffatNyamadzawo2
 
Donate to charity during this holiday season
Donate to charity during this holiday seasonDonate to charity during this holiday season
Donate to charity during this holiday season
SERUDS INDIA
 
2024: The FAR - Federal Acquisition Regulations, Part 37
2024: The FAR - Federal Acquisition Regulations, Part 372024: The FAR - Federal Acquisition Regulations, Part 37
2024: The FAR - Federal Acquisition Regulations, Part 37
JSchaus & Associates
 
State crafting: Changes and challenges for managing the public finances
State crafting: Changes and challenges for managing the public financesState crafting: Changes and challenges for managing the public finances
State crafting: Changes and challenges for managing the public finances
ResolutionFoundation
 
Monitoring Health for the SDGs - Global Health Statistics 2024 - WHO
Monitoring Health for the SDGs - Global Health Statistics 2024 - WHOMonitoring Health for the SDGs - Global Health Statistics 2024 - WHO
Monitoring Health for the SDGs - Global Health Statistics 2024 - WHO
Christina Parmionova
 
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdfPNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
ClaudioTebaldi2
 
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptxPD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
RIDPRO11
 
kupon sample qurban masjid indonesia terbaru.pptx
kupon sample qurban masjid indonesia terbaru.pptxkupon sample qurban masjid indonesia terbaru.pptx
kupon sample qurban masjid indonesia terbaru.pptx
viderakai
 
ZGB - The Role of Generative AI in Government transformation.pdf
ZGB - The Role of Generative AI in Government transformation.pdfZGB - The Role of Generative AI in Government transformation.pdf
ZGB - The Role of Generative AI in Government transformation.pdf
Saeed Al Dhaheri
 
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
850fcj96
 
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
850fcj96
 
Get Government Grants and Assistance Program
Get Government Grants and Assistance ProgramGet Government Grants and Assistance Program
Get Government Grants and Assistance Program
Get Government Grants
 

Recently uploaded (20)

Opinions on EVs: Metro Atlanta Speaks 2023
Opinions on EVs: Metro Atlanta Speaks 2023Opinions on EVs: Metro Atlanta Speaks 2023
Opinions on EVs: Metro Atlanta Speaks 2023
 
A proposed request for information on LIHTC
A proposed request for information on LIHTCA proposed request for information on LIHTC
A proposed request for information on LIHTC
 
NHAI_Under_Implementation_01-05-2024.pdf
NHAI_Under_Implementation_01-05-2024.pdfNHAI_Under_Implementation_01-05-2024.pdf
NHAI_Under_Implementation_01-05-2024.pdf
 
Uniform Guidance 3.0 - The New 2 CFR 200
Uniform Guidance 3.0 - The New 2 CFR 200Uniform Guidance 3.0 - The New 2 CFR 200
Uniform Guidance 3.0 - The New 2 CFR 200
 
2024: The FAR - Federal Acquisition Regulations, Part 38
2024: The FAR - Federal Acquisition Regulations, Part 382024: The FAR - Federal Acquisition Regulations, Part 38
2024: The FAR - Federal Acquisition Regulations, Part 38
 
Transit-Oriented Development Study Working Group Meeting
Transit-Oriented Development Study Working Group MeetingTransit-Oriented Development Study Working Group Meeting
Transit-Oriented Development Study Working Group Meeting
 
Understanding the Challenges of Street Children
Understanding the Challenges of Street ChildrenUnderstanding the Challenges of Street Children
Understanding the Challenges of Street Children
 
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
 
Government Service OPSI Playbook FINAL.pdf
Government Service OPSI Playbook FINAL.pdfGovernment Service OPSI Playbook FINAL.pdf
Government Service OPSI Playbook FINAL.pdf
 
Donate to charity during this holiday season
Donate to charity during this holiday seasonDonate to charity during this holiday season
Donate to charity during this holiday season
 
2024: The FAR - Federal Acquisition Regulations, Part 37
2024: The FAR - Federal Acquisition Regulations, Part 372024: The FAR - Federal Acquisition Regulations, Part 37
2024: The FAR - Federal Acquisition Regulations, Part 37
 
State crafting: Changes and challenges for managing the public finances
State crafting: Changes and challenges for managing the public financesState crafting: Changes and challenges for managing the public finances
State crafting: Changes and challenges for managing the public finances
 
Monitoring Health for the SDGs - Global Health Statistics 2024 - WHO
Monitoring Health for the SDGs - Global Health Statistics 2024 - WHOMonitoring Health for the SDGs - Global Health Statistics 2024 - WHO
Monitoring Health for the SDGs - Global Health Statistics 2024 - WHO
 
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdfPNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
 
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptxPD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
 
kupon sample qurban masjid indonesia terbaru.pptx
kupon sample qurban masjid indonesia terbaru.pptxkupon sample qurban masjid indonesia terbaru.pptx
kupon sample qurban masjid indonesia terbaru.pptx
 
ZGB - The Role of Generative AI in Government transformation.pdf
ZGB - The Role of Generative AI in Government transformation.pdfZGB - The Role of Generative AI in Government transformation.pdf
ZGB - The Role of Generative AI in Government transformation.pdf
 
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
 
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
 
Get Government Grants and Assistance Program
Get Government Grants and Assistance ProgramGet Government Grants and Assistance Program
Get Government Grants and Assistance Program
 

Item # 3 - 321 Argo

  • 1. CITY OF ALAMO HEIGHTS COMMUNITY DEVELOPMENT SERVICES DEPARTMENT CITY COUNCIL AGENDA MEMORANDUM TO: Mayor and City Council Members FROM: Lety Hernandez, Director of Community Development Services SUBJECT: Case No. 892 F – 321 Argo Ave Request of Jonathan Rodriguez of Vision Design Build, applicant, representing Alexa and Sam Simpson, owners, for the significance review of the existing main structure and compatibility review of the proposed design located at 321 Argo in order to demolish 32% of the existing street-facing elevation, and 89% of the existing roof in order to remodel and add a 2nd story addition to the existing single-family residence under Demolition Review Ordinance No. 1860 (April 12, 2010). DATE: February 13, 2023 BACKGROUND INFORMATION The property is zoned SF-B (Single-Family District B) and is located on the north side of Argo Ave, between Imlay St and Arbutus St. The applicant is seeking to add a 2nd story addition to the existing main structure. The proposed project was reviewed by the Board of Adjustment on January 04, 2023. The board voted unanimously to approve a 10ft 6-inch height looming encroachment variance on the west side of the main structure.
  • 2. POLICY ANALYSIS Lot Coverage / Floor Area Ratio Existing Proposed Lot Area 7,500 7,500 Main House 1st Floor* 1,860 1,563 Main House 2nd Floor 255 1,522 Main House – Loft Garage/Carport – 1st Floor* 412 412 Garage – 2nd Floor Front Porch* 168 168 Side Porch* 48 20 Rear Porch* 192 192 Breezeway* Other* Total Square Footage 2,935 sq ft 3,877 sq ft Lot Coverage* (max 40%) 2,680 sq ft / 35.73% 2,355 sq ft / 31.40% FAR (max .50 with bonus) 2,527 sq ft / .34 3,497 sq ft / .47 Bonuses Utilized +4 – Preservation of main structure +2 – One-story garage  Main Structure o Height – 28ft 3-inches (max 30ft allowed with minimum 3ft pier and beam foundation bonus) o Siding – Hardie Board o Roof – Galvalume Metal Roof  Chapter 5 – Buildings and Building Regulation, Article IX. – Demolition Demolition shall mean any intentional or unintentional act of dismantling, pulling down, destroying, removing, razing or moving a structure or any structural portion thereof, or commencing the work of moving or of total or substantial destruction of a structure or portion thereof. For the purposes of demolition review as described in article IX, demolition is defined quantitatively as: (1) Removal or encapsulation of more than twenty-five (25) percent of the framed structure of exterior walls facing public streets, or a street-facing elevation if the tract of land is landlocked; or, (2) Removal or encapsulation of more than fifty (50) percent of the framed structure of all exterior walls and/or roofs. Exception: Minor repair and routine maintenance. Significant structure shall mean any structure or portion thereof that in whole or in part meets one (1) or more criteria in section 5-134(h), and has been so determined by the city council. Section 5-134(h): The architectural review board shall consider the following criteria when determining the significance, as defined in this chapter, of existing structures: (1) Was the structure designed by a noted architect? (2) Has the structure been listed as having historic significance by any local, regional, state or historic agency or society?
  • 3. (3) Does the structure exhibit characteristics of a distinct architectural style? (4) Does the structure belong to a distinctive set of buildings, such as a single structure belonging to a row of similar structures? (5) Is the structure a significant part of the fabric of the community due to its age, unique architecture, historical significance or physical placement? Compatibility shall mean harmony with the existing neighborhood, site configurations, development patterns, and the character of the development envelope found within the adjacent and immediate block area, as demonstrated in the demolition review application, including roof pitch, scale, massing, garage and driveway location and setbacks. Adjacent and immediate block area shall include but not be limited to all properties along: (1) The specific block where the project is proposed; (2) The block to each side of the project's block; and (3) The blocks directly across the street of the three (3) blocks identified above. Block shall mean a length of street right-of-way along one (1) side of the street from one (1) intersection to the next adjoining intersection. Staff found no historical or architectural significance to the existing main structure. On January 17, 2023, the Architectural Review Board considered the request and voted unanimously to declare the existing main structure as not significant and recommended approval of the design as compatible. FISCAL IMPACT No projected fiscal impact from this project has been calculated. ATTACHMENTS Attachment A – Web Packet Attachment B – Response Cards __________________________ Lety Hernandez Director __________________________ Buddy Kuhn City Manager
  • 4. CITY OF ALAMO HEIGHTS COMMUNITY DEVELOPMENT SERVICES DEPARTMENT 6116 BROADWAY SAN ANTONIO, TX 78209 210-826-0516 Architectural Review Board Meeting Tuesday, January 17, 2023 – 5:30 P.M. Take notice that a Regular Architectural Review Board meeting of the City of Alamo Heights will be held on Tuesday, January 17, 2023 at 5:30pm in the City Council Chamber, located at 6116 Broadway St, San Antonio, Texas, 78209, to consider and act upon any lawful subjects which may come before it. INSTRUCTIONS FOR TELECONFERENCE: Members of the public may also participate via audio by dialing 1-346-248-7799 and entering access number 868 0184 5240#. If you would like to speak on a particular item, when the item is considered, press *9 to “raise your hand”. Citizens will have three (3) minutes to share their comments. The meeting will be recorded. The City cannot guarantee participation by phone due to unforeseen technical difficulties or provide prior notice if they occur; therefore, the City urges your in-person attendance if you require participation. Case No. 892 F – 321 Argo Ave Request of Jonathan Rodriguez of Vision Design Build, applicant, representing Alexa and Sam Simpson, owners, for the significance review of the existing main structure and compatibility review of the proposed design located at 321 Argo in order to demolish 32% of the existing street-facing elevation, and 89% of the existing roof in order to remodel and add a 2nd story addition to the existing single-family residence under Demolition Review Ordinance No. 1860 (April 12, 2010). Chapter 5 of Code of Ordinances (Buildings and Building Regulations) requires City Council to consider the ARB’s recommendation for all demolition/final design review applications. Please check the ARB posted results on the City’s website after the ARB meeting to confirm any future meeting dates. Plans are available for public viewing on the City’s website, with the exception of floor plans, (http://www.alamoheightstx.gov/departments/planning-and-development-services/public-notices/) and at the Community Development Services Department located at 6116 Broadway St, 2nd floor. You may also contact Eron Spencer (espencer@alamoheightstx.gov) or Lety Hernandez (lhernandez@alamoheightstx.gov) by email or our office at (210) 826-0516 for additional information regarding this case. Attachment A
  • 7. N 00 05' 00" W o 150.00' S 00 05' 00" E o 150.00' N 89 55' 00" W o 50.00' N 89 55' 00" W o 50.00' 5' SETBACK 10' SETBACK 25' SETBACK 3' SETBACK 4'-2" 2'-7" 4'-1" 10'-0" 11'-7" SITE PLAN SCALE: 1/8" = 1'-0" EXISTING CHIMNEY TO BE REMOVED EXISTING WOOD DECK TO BE CONCRETE INFILL TO NEW BATHROOM FIRST FLOOR PLAN SCALE: 1/4" = 1'-0" LIVING ROOM TO REMAIN COVERED PORCH TO BE REPAIR DINING ROOM TO REMAIN KITCHEN TO REMAIN BEDROOM #1 TO REMAIN STAIR HALL TO REMAIN BEDROOM #2 TO REMAIN GUEST BATHROOM TO REMODEL EXISTING FIREPLACE TO BE DEMOLISHED HEAD CONTROL NEW COVERED PATIO NEW CONCRETE 12'-4" 14'-4" NEW LINEN NEW VANITY NEW COLUMN TO REPAIR EXISTING NEW COMPOSITE DECKING ON EXISTING REPAIRED FRAMING 42" WALL WITH 36" GLASS ON TOP ROOM AND CLOEST TO BE DEMOLISHED EXISTING MAIN FLOOR 1860 SQ. FT. AREA TO BE DEMOLISHED 297 SQ. FT. 297 / 1860 = 15% Site Calculations Existing (SF) Lot Coverage Main House footprint 7500 1860 Proposed (SF) 7500 1563 Front Porch 168 168 Side Porch 1 48 20 Side Porch 2 Rear Porch 192 (wood) 192 (concrete) Garage 412 412 Lot Area Floor Area Ratio 2680 Total Lot Coverage 2680 Main House: 1st Floor 7500 1860 7500 1563 255 1522 Garage 1st Floor 412 412 Total (total FAR/lot area) 2517 Lot Area Main House: 2nd Floor / 7500 3497 / 7500 Total FAR 33% 46% SHEET A1 1 OF 2 DATE: 12.13.2022 San Antonio, Texas 78209 SIMPSON RESIDENCE Attachment A
  • 8. 6'-1" FIRST FLOOR BELOW PROPERTY LINE 13'-3" 2'-4" 18'-5" 34'-0" 11'-4" 6'-9" 7'-5" 10'-0" 15'-10" 14'-11" 4'-7" 5'-4" 3'-5" 12'-4" 13'-5" 16'-1" 18'-3" 34'-4" 14'-0" 4'-5" 13'-11" 4'-0" 4'-9" 4'-9" BED ROOM #3 WOOD FLOORING PLAYROOM ROOM #3 WOOD FLOORING HALL #2 WOOD FLOORING BED ROOM #2 WOOD FLOORING DRESSING ROOM WOOD FLOORING MASTER ROOM WOOD FLOORING EXISTING SECOND FLOOR TO REMAIN BATHROOM #2 TILE FLOORING LINEN 8'-9" 8'-4" 5'-8" 5'-2" 5'-2" 4'-0" MASTER BATH TILE FLOORING SECOND FLOOR PLAN SCALE: 1/4" = 1'-0" 2'-8" 4'-0" 3'-2" 7'-8" 3'-0" 3'-2" 11" 54'-0" 4 / 12 SLOPE 2'-0" O.H. 2'-8" H.O. EXISTING 2ND STORY ROOF STRUCTURE TO REMAIN EXISTING ROOF MATERIAL TO BE REPLACE EXISTING FIRST FLOOR ROOF STRUCTURE TO REMAIN EXISTING ROOF MATERIAL TO BE REPLACE 4 / 12 SLOPE 4 / 12 SLOPE 4 / 12 SLOPE 4 / 12 SLOPE 1'-0" OVERHANG EXISTING ROOF PLAN SCALE: 3/16" = 1'-0" EXISTING ROOF 2441 SQ. FT. AREA ENCAPSULATED/DEMOLISHED BY ADDITION 2156 SQ. FT. 2156 / 2441 = 89% EXISTING ROOF STRUCTURE TO BE DEMOLISHED PER DESIGNS NEW ROOF PLAN SCALE: 3/16" = 1'-0" EXISTING ROOF AND STRUCTURE TO BE DEMOLISHED PER DESIGNS SHEET A2 1 OF 2 DATE: 12.13.2022 San Antonio, Texas 78209 SIMPSON RESIDENCE Attachment A
  • 9. 9'-3" EXISTING EXISTING FIN. GRADE FIN. FLOOR EXISTING 1ST FLOOR TOP PLATE EXISTING SIDE ELEVATION SCALE: 1/4" = 1'-0" EXISTING FIN. FLOOR EXISTING 1ST FLOOR TOP PLATE SECOND LEVEL FINISH FLOOR SECOND LEVEL TOP OF PLATE PROPERTY LINE EXISTING EXISTING FIN. GRADE FIN. FLOOR FRONT ELEVATION SCALE: 1/4" = 1'-0" EXISTING BACK ELEVATION SCALE: 1/4" = 1'-0" NEW METAL ROOFING REMOVED EXISTING EXISTING SIDE ELEVATION SCALE: 1/4" = 1'-0" DASHED LINE INDICATES NEW PROPOSED CONSTRUCTION EXISTING ADDITION TO BE DEMOLISHED PORTION OF EXISTING TO BE DEMOLISHED TO ACCOMMODATE NEW SECOND FLOOR ADDITION PORTION OF EXISTING TO BE DEMOLISHED PROPERTY LINE PORTION OF EXISTING TO BE DEMOLISHED TO ACCOMMODATE NEW SECOND FLOOR ADDITION PORTION OF EXISTING TO BE DEMOLISHED TO ACCOMMODATE NEW SECOND FLOOR ADDITION COLUMNS TO BE REMOVED AND REPLACE TO REPAIR EXISTING COVERED PORCH DASHED LINE INDICATES NEW PROPOSED CONSTRUCTION PORTION OF EXISTING TO BE DEMOLISHED TO ACCOMMODATE NEW SECOND FLOOR ADDITION DEMO EXISTING FIREPLACE AND CHIMNEY DASHED LINE INDICATES NEW PROPOSED CONSTRUCTION FRONT ELEVATION TOTAL FRONT FACE FACADE AREA 739 SQ. FT. AREA ENCAPSULATED/DEMOLISHED BY ADDITION 224 SQ. FT. 224 / 739 = 32% LEFT SIDE ELEVATION TOTAL LEFT SIDE FACE FACADE AREA 862 SQ. FT. AREA ENCAPSULATED/DEMOLISHED BY ADDITION 103 SQ. FT. 103 / 862 = 12% BACK ELEVATION TOTAL BACK FACE FACADE AREA 695 SQ. FT. AREA ENCAPSULATED/DEMOLISHED BY ADDITION 350 SQ. FT. 350 / 695 = 50% LEFT SIDE ELEVATION TOTAL LEFT SIDE FACE FACADE AREA 1066 SQ. FT. AREA ENCAPSULATED/DEMOLISHED BY ADDITION 398 SQ. FT. 398 / 1066 = 50% SHEET A3 1 OF 2 DATE: 12.13.2022 San Antonio, Texas 78209 SIMPSON RESIDENCE Attachment A
  • 10. EXISTING CHIMNEY TO BE REMOVED PROPERTY LINE EXISTING ROOF LINE FIRST FLOOR LINE OF LOOMING STANDARD NEW METAL ROOFING 12'-3" 2 1 EXISTING EXISTING FIN. GRADE FIN. FLOOR 9'-3" EXISTING 1ST FLOOR TOP PLATE 1'-6" SECOND LEVEL FINISH FLOOR 9'-0" SECOND LEVEL TOP OF PLATE 28'-7 1 4 " LINE OF LOOMING STANDARD IN COMPLIANCE NEW METAL ROOFING 12 4 FRONT ELEVATION SCALE: 1/4" = 1'-0" 3'-0" 1'-0" EXISTING EXIST. FIN. GRADE FIN. FLOOR EXISTING 1ST FLOOR TOP PLATE SECOND LEVEL FINISH FLOOR SECOND LEVEL TOP OF PLATE NEW METAL ROOFING REMOVED EXISTING NEW METAL ROOFING REMOVED EXISTING NEW METAL NEW METAL ROOFING SIDE ELEVATION SCALE: 1/4" = 1'-0" 6'-1" EXISTING FIN. FLOOR EXISTING 1ST FLOOR TOP PLATE SECOND LEVEL FINISH FLOOR SECOND LEVEL TOP OF PLATE PROPERTY LINE 2 1 9'-3" 1'-6" 9'-0" LINE OF LOOMING STANDARD NEW METAL ROOFING REAR ELEVATION SCALE: 1/4" = 1'-0" DASHED LINE INDICATES NEW PROPOSED CONSTRUCTION TO REMAIN ROOFING 28'-3" LINE OF GRADE HEIGHT AT AVG. GRADE SIDE ELEVATION SCALE: 1/4" = 1'-0" HEIGHT OF PIER AND BEAM FOUNDATION SHEET A4 1 OF 2 DATE: 12.13.2022 San Antonio, Texas 78209 SIMPSON RESIDENCE Attachment A
  • 12. 1 Lety Hernandez Subject: FW: Case No. 892F re: Sam and Alexa SImpson -----Original Message----- From: Eric Braseth < > Sent: Sunday, January 8, 2023 4:50 PM To: Lety Hernandez <lhernandez@alamoheightstx.gov> Subject: Case No. 892F re: Sam and Alexa SImpson Hello, I wanted to send an email as I will not be available for the review on January 17th, 2023. I have reviewed the design plans and changes for the Simpson residence and I do support the project and have reviewed the project plans. Thank you! Eric Braseth 352-318-4363 335 Argo Ave, Alamo Heights, TX 78209 Please be cautious **This email is not from your organization, please verify the Sender's Name matches the From Email Address!** ________________________________ Attachment B