This document lists 150 Indian Standards (IS) relating to various topics. It provides the standard reference number, author, and title for each standard. The standards cover topics such as fire clay refractories, plywood tea chests, structural steel, paints, cement, aggregates, fabrics, and many other materials and products.
Precast concrete piles were used as the building component for the Petronas Twin Towers project in Malaysia. Precast concrete piles have advantages such as quality control during manufacturing, strength to resist forces, and ease of installation. However, they also have disadvantages like heavy weight requiring special equipment for handling and transportation, and noise pollution during pile driving. The construction process involves precasting the piles, transporting them to the site, and driving them into the ground using a pile driver until reaching the desired depth and load capacity. Quality control checks are done during manufacturing and installation to ensure specification compliance.
This document appears to be a project report for designing a sump well with a capacity of 200 kl at the NRI campus in Bhopal, India. It includes sections on introduction, campus details, water requirements, design of the sump well, pump house, and various cost estimates. The project involves designing critical water infrastructure for the campus including a sump well to store water, meeting the daily water needs of the campus population.
This document discusses reinforced concrete columns. It begins by defining columns and different column types, including based on shape, reinforcement, loading conditions, and slenderness ratio. Short columns fail due to material strength while slender columns are at risk of buckling. The document covers column design considerations like unsupported length and effective length. It provides examples of single storey building column design and discusses minimum longitudinal reinforcement requirements in columns.
This document discusses riveted connections in steel structures. It describes the different types of rivets, including their shape and method of installation. Some key types are snap headed rivets, pan headed rivets, and flat counter sunk rivets. It also outlines the advantages and disadvantages of riveted connections. Advantages include ease of installation without electricity, while disadvantages include noise and required skilled labor. The document further explains different riveted joint configurations, including lap joints and butt joints, providing examples of single and double riveted versions of each. Finally, it briefly outlines potential failure modes of riveted connections, such as shear failure of rivets or plates, and bearing failure of plates or
Prefabricated construction systems in India- Precast Status and needed ImpetusIEI GSC
Presentation on Prefabricated construction systems in India- Precast Status and needed Impetus by Prof S. K. Singh,Sr. Principal Scientist & Professor, AcSIR, CSIR-Central Building Research Institute, Roorkee at #33NCCE 33rd National Convention of Civil Engineers at #IEIGSC
This document provides information about pile foundations, including:
- Piles transfer structural loads through weak soil layers into stronger soils and rocks below.
- Common types of piles include pre-cast concrete, cast-in-situ concrete (e.g. Raymond, MacArthur), steel, timber, and composite piles.
- Piles are selected based on factors like soil properties, loading conditions, costs, and availability of materials. Proper pile type and design are necessary to safely support structures.
This document provides the National Building Code of India 2005 which contains regulations for building construction. It aims to promote safety and accountability in building construction. The Code covers administrative rules, development controls, fire safety, building materials, landscaping, and signs/displays. It is intended to standardize building rules across India and allow for modern construction practices. Adopting uniform standards can improve construction quality while reducing costs.
This document discusses residential metal roof trusses made of steel or aluminum. It explains that roof truss strength comes from their triangular shape, with top chords in compression and bottom chords in tension. When specifying a steel roof truss, builders should provide the span, pitch, overhang details, and gable end preferences to manufacturers. Trusses are constructed from C-shaped galvanized steel and installed by lifting and placing them according to plan.
Precast concrete piles were used as the building component for the Petronas Twin Towers project in Malaysia. Precast concrete piles have advantages such as quality control during manufacturing, strength to resist forces, and ease of installation. However, they also have disadvantages like heavy weight requiring special equipment for handling and transportation, and noise pollution during pile driving. The construction process involves precasting the piles, transporting them to the site, and driving them into the ground using a pile driver until reaching the desired depth and load capacity. Quality control checks are done during manufacturing and installation to ensure specification compliance.
This document appears to be a project report for designing a sump well with a capacity of 200 kl at the NRI campus in Bhopal, India. It includes sections on introduction, campus details, water requirements, design of the sump well, pump house, and various cost estimates. The project involves designing critical water infrastructure for the campus including a sump well to store water, meeting the daily water needs of the campus population.
This document discusses reinforced concrete columns. It begins by defining columns and different column types, including based on shape, reinforcement, loading conditions, and slenderness ratio. Short columns fail due to material strength while slender columns are at risk of buckling. The document covers column design considerations like unsupported length and effective length. It provides examples of single storey building column design and discusses minimum longitudinal reinforcement requirements in columns.
This document discusses riveted connections in steel structures. It describes the different types of rivets, including their shape and method of installation. Some key types are snap headed rivets, pan headed rivets, and flat counter sunk rivets. It also outlines the advantages and disadvantages of riveted connections. Advantages include ease of installation without electricity, while disadvantages include noise and required skilled labor. The document further explains different riveted joint configurations, including lap joints and butt joints, providing examples of single and double riveted versions of each. Finally, it briefly outlines potential failure modes of riveted connections, such as shear failure of rivets or plates, and bearing failure of plates or
Prefabricated construction systems in India- Precast Status and needed ImpetusIEI GSC
Presentation on Prefabricated construction systems in India- Precast Status and needed Impetus by Prof S. K. Singh,Sr. Principal Scientist & Professor, AcSIR, CSIR-Central Building Research Institute, Roorkee at #33NCCE 33rd National Convention of Civil Engineers at #IEIGSC
This document provides information about pile foundations, including:
- Piles transfer structural loads through weak soil layers into stronger soils and rocks below.
- Common types of piles include pre-cast concrete, cast-in-situ concrete (e.g. Raymond, MacArthur), steel, timber, and composite piles.
- Piles are selected based on factors like soil properties, loading conditions, costs, and availability of materials. Proper pile type and design are necessary to safely support structures.
This document provides the National Building Code of India 2005 which contains regulations for building construction. It aims to promote safety and accountability in building construction. The Code covers administrative rules, development controls, fire safety, building materials, landscaping, and signs/displays. It is intended to standardize building rules across India and allow for modern construction practices. Adopting uniform standards can improve construction quality while reducing costs.
This document discusses residential metal roof trusses made of steel or aluminum. It explains that roof truss strength comes from their triangular shape, with top chords in compression and bottom chords in tension. When specifying a steel roof truss, builders should provide the span, pitch, overhang details, and gable end preferences to manufacturers. Trusses are constructed from C-shaped galvanized steel and installed by lifting and placing them according to plan.
This document discusses building codes and regulations. It begins by defining building codes and regulations, noting that they vary by region and are established by local authorities. The purpose of codes is then outlined, including ensuring public health and safety, construction requirements, and fire safety. Several key aspects of building codes are then described, such as objectives of building codes, principles underlying them, applications of codes, and regulations for different types of buildings. Specific code requirements for aspects like floor area ratio, light and ventilation, and safety from fire are also detailed.
ADVANCED TECHNIQUES IN CONSTRUCTIONS IN HIGH RISE BUILDINGSASHOK KUMAR TIWARY
The document summarizes a technical seminar on advanced construction techniques for high-rise buildings. It defines high-rise buildings according to different standards, and discusses the need for high-rises due to increasing population density. Various construction methods are described, including slip forming, jump forming, and tunnel forming. Main equipment used includes tower cranes and concrete pumps. Advantages of high-rises include accommodating more people and businesses while using less land area. Disadvantages include higher construction costs and accessibility issues if elevators fail.
This document discusses suspension bridges. It describes how suspension bridges work, with the deck hung below cables on vertical suspenders. The key elements of suspension bridges are identified as the main cable, suspenders, decking/stiffening girder, supporting towers, and anchor cables. Forces on different parts of the suspension bridge are analyzed. Examples of large modern suspension bridges, like the Sunshine Skyway Bridge and Akashi Kaikyo Bridge, are provided.
Welded connections in steel structures - Limit State Design of Steel StructuresAshishVivekSukh
Two members are connected by means of welds is known as welded connection.
More efficient use of the materials.
Earlier designers considered welds as less fatigue resistant.
Good welds achive at site is impossible.
Testing and quality control of welds became easier because NDT
Waffle slabs are reinforced concrete slabs reinforced in two orthogonal directions, forming a ribbed plate. They are characterized by their total edge height, lightening block height, rib spacing, rib thickness, and compression layer thickness. Waffle slabs can adequately support distributed and point loads in two directions. Benefits include flexibility, light weight allowing longer spans, fast construction, slim depths, robustness, vibration control, thermal mass, and durability. Waffle slabs are constructed with ribs forming a grid pattern and solid fills at supports. Larger spans may use post-tensioning or joist construction. Proper design considers loads, materials, deformations, and tile installation compatibility.
This document discusses the need for raft foundations. Raft foundations are recommended when:
1) Building loads are heavy or soil capacity is low, so individual footings would cover too much area.
2) Soil contains weak lenses or cavities, making differential settlement hard to predict.
3) Structures are sensitive to differential settlement.
4) Structures like silos naturally suit raft foundations.
5) Floating foundations are needed over very weak soil.
6) Buildings require basements or underground pits.
7) Individual footings would experience large bending stresses.
Raft foundations increase capacity, decrease settlement, and equalize differential settlement compared to individual footings. However,
This document provides an analysis and design of a G+3 residential building. It includes details of the building such as dimensions, material properties, and load calculations. An equivalent static analysis is performed to calculate the seismic lateral loads at each floor level. The results of the structural analysis including bending moment and shear force diagrams are presented. Slab, beam, column and footing designs are to be covered in the thesis work according to the scope.
Summer training report in civil engineeringalok0025
This document provides a report on a summer training completed by Alok Kumar Singh from May 5th to July 4th, 2015 at a construction site for the Panchsheel Apartments project. The report details the construction process, materials used, safety procedures, and Alok's contributions during his training. It includes sections on site layout, excavation, foundation work, concrete mixing and pouring, wall and slab construction, quality control measures, and photos from the construction site. The training provided Alok with valuable practical experience in civil engineering and construction project management.
CE 72.32 (January 2016 Semester): Lecture 1a - Overview of Tall BuildingsFawad Najam
Humans have historically admired tall structures for their visibility and social status. The document discusses the evolution of tall buildings from ancient structures like pyramids to modern skyscrapers, driven by urbanization. It describes key milestones like the development of tubular structural systems to enable increasingly taller buildings. The design of modern tall buildings requires integrated, multi-disciplinary teams and continues to be enabled by new technologies.
The document discusses various requirements for fire safety in high-rise buildings according to Indian standards. It defines a high-rise building as one that is more than 15-18 meters in height. Requirements include a minimum road width of 12 meters to accommodate fire engines, sufficient setbacks around buildings, a minimum of two staircases including one external emergency staircase, fire safety measures for lifts, compartmentation of buildings to limit fire spread, installation of fire dampers, provision of refuge areas, a public address system for evacuation, and a helipad for buildings over 60 meters in height.
The document discusses machine foundations used in the oil and gas industry. It begins by introducing the different types of machines, such as centrifugal and reciprocating machines, and how they are classified based on speed. It then discusses the various types of foundations used to support these machines, including block foundations and frame foundations. The document outlines the inputs needed for foundation design, which include project specifications, soil parameters, and machine details from the vendor. It describes the process of analyzing machine foundations, including dynamic and static analyses. Key aspects like natural frequencies, displacements, and strength are evaluated.
Specification for different classes of BrickworksVighnesh Rane
This document classifies and specifies requirements for three classes of brickwork used in construction. First class brickwork uses high quality, uniformly shaped bricks with a crushing strength over 10.7N/mm2. It is used for load-bearing walls. Second class brickwork allows for slightly irregular bricks with strength over 7N/mm2 and is used for internal and compound walls. Third class brickwork consists of lower quality, non-uniform bricks with strength over 3.5N/mm2 and is used for temporary construction or flooring.
M.Tech Structural Engineering Project on Voided and Cellular Bridge introductionvaignan
This document discusses the analysis of voided and cellular bridge deck structures using the Midas-Civil software. It provides background on voided slab and cellular slab bridges, including their advantages and disadvantages. The literature review found that no previous studies have analyzed these deck types specifically using Midas-Civil. Therefore, the project aims to perform this analysis and compare the manual and Midas-Civil results. The schedule outlines initial manual analysis followed by modeling in Midas-Civil to validate the hand calculations.
railway and bridge engineering ppt.pptxRESHMAFEGADE
This document provides information about railway engineering and permanent way components. It discusses:
1. The different modes of transportation and their merits and demerits, including roadways, railways, airways, and waterways.
2. The classification of Indian railways by gauge, including broad, meter, and narrow gauges.
3. The key components that make up the permanent way of a railway track, such as rails, sleepers, ballast, and fixtures.
4. Different types of rail joints used in railway tracks, including supported, suspended, welded, and staggered joints.
The document provides details about the construction of a two-lane bridge over a railway crossing in Moradabad, India by UP State Bridge Corporation Limited. It summarizes the key components of the bridge, including pile foundations with friction piles, pier foundations, pier caps, pedestals, bearings, abutments, girders, deck slabs, and crash barriers. It also provides details on the materials used, such as concrete grades between M30-M40 and rebar sizes from 6mm to 32mm. Construction testing methods like slump tests, sieve tests, and cube tests are also summarized.
This document provides details of the analysis and design of a multi-storey reinforced concrete building project. It includes the objectives, which are to analyze and design the main structural elements of the building including slabs, columns, shear walls, and foundations. It also summarizes the building being a 12-storey residential building in Gorakhpur, India. The document outlines the various structural elements that will be designed, including flat slab structural systems, column types and design, shear wall design, and pile foundation design.
This document discusses raft/mat foundations, including:
- A raft foundation is a thick reinforced concrete slab that supports columns and transmits loads into the soil. It is used for structures with large or uneven column loads.
- Types of raft foundations include flat plate, thickened under columns, beam and slab, box structures, and mats on piles.
- Construction involves soil testing, excavation, reinforcement placement, forming, concrete pouring, and curing. Raft foundations are economic and reduce differential settlement but require treatment for point loads.
Deflection & cracking of RC structure(limit state method)gudtik
This document summarizes structural design considerations for deflection and cracking in reinforced concrete beams. It discusses:
1) How deflection occurs when a structure carries a load and guidelines for limiting deflection to prevent issues.
2) How cracking develops in concrete when tensile strength is exceeded from beam deflection.
3) Codal provisions for maximum allowable crack widths depending on exposure conditions.
4) Methods for controlling crack widths, including bar spacing and calculating crack widths.
5) Codal provisions for limiting span-to-depth ratios to control deflections.
6) How to calculate short-term and long-term deflections, including effects of creep and shrinkage.
The document provides details of the computer aided design and analysis of a G+20 multi-storey residential building located in Patna using STAAD-Pro software. The building is designed as a reinforced concrete framed structure according to Indian codes IS 456, IS 875, and IS 1893. Load calculations are performed for dead loads, live loads, and wind loads. Analysis of the building is carried out to determine member forces from gravity and lateral loads.
This document provides an overview of reinforced concrete mat foundations and discusses what is known and unknown about their seismic design. Key points:
- Mat foundations distribute loads over a large area to reduce differential settlement and resist uplift from overturning. Their behavior is modeled as an upside-down slab system.
- Soil properties, demand levels defined by codes, and spatial variability of ground motions present challenges to seismic design and remain areas with uncertainties.
- Traditional design focuses on local punching shear from columns but global shear and interaction with walls transferring overturning demands are less understood.
- Current code provisions may not fully activate thick mats or address soil-structure interaction, representing gaps in knowledge.
The
IS 2062(2011) Seventh Revision: Hot rolled medium and high tensile structural...rajguptanitw
This Indian Standard (Seventh Revision) was adopted by the Bureau of Indian Standards, after the draft
finalized by the Wrought Steel Products Sectional Committee had been approved by the Metallurgical
Engineering Division Council.
This standard was first published in 1962 and revised in 1969, 1975, 1984, 1992, 1999 and 2006. While reviewing
this standard, in the light of experience gained during these years, the Committee decided to revise it to bring
in line with the present practices being followed by the Indian steel industry, both in the integrated as well as
secondary sectors. The Committee further decided to harmonize the standard with the overseas standards on
carbon-manganese and high strength low alloy (HSLA) of structural steels.
In this revision, the following changes have been made:
a) Title has been modified and the word ‘low’ has been deleted, keeping in view the grades of steel
contained in the standard. Requirements of low tensile structural steel are covered in IS 15911 : 2010
‘Structural steel (ordinary quality) — Specification’.
b) Amendment No. 1 has been incorporated with suitable modifications.
c) Number of basic grades has been changed to nine. A new grade of E275, in line with European Standard,
has been incorporated to take care of the requirements of medium tensile structural steels in the
construction segment. Moreover, for each grade two to four sub-qualities have been introduced,
depending upon the grade, where sub-qualities A, BR, B0 and C, in line with other international standards,
indicate the mode of killing and impact test requirements.
d) The clause on ‘Manufacture’ has been modified, where the scope is suitably widened to include
different steel making and rolling practices in vogue.
e) Silicon content of semi-killed steel has been clearly specified.
For all the tests specified in this standard (chemical/physical/others), the method as specified in relevant
ISO Standard may also be followed as an alternate method.
While revising the standard, assistance has been derived from the following international specifications:
ASTM A 36 : 2008 Specification for structural steel
ASTM A 572 : 2007 Specification for high-strength low-alloy columbium-vanadium structural steel
EN 10025-2 : 2004 Hot rolled products of structural steels
The composition of the Committee responsible for the formulation of this standard is given in Annex A.
For the purpose of deciding whether a particular requirement of this standard is complied with, the final value,
observed or calculated, expressing the result of a test or analysis, shall be rounded off in accordance with
IS 2 : 1960 ‘Rules for rounding off numerical values (revised)’. The number of significant places retained in
the rounded off value should be the same as that of the specified value in this standard.
LIST OF IMPORTANT INDIAN STANDARDS ON SAFETY & HEALTHBimal Chandra Das
This document lists important Indian standards related to safety and health across various industries and topics. It provides standards for machinery, consumer products, electrical and electronics, transportation, civil engineering construction, chemicals and other hazardous materials, fire protection, and personal protection. The standards cover a wide range of issues including lifts, grinding wheels, pressure vessels, gas cylinders, industrial plant layout, domestic gas stoves, electrical equipment, powered trucks, scaffolding, hazardous chemicals, fire safety, welding, noise reduction, and personal protective equipment.
This document discusses building codes and regulations. It begins by defining building codes and regulations, noting that they vary by region and are established by local authorities. The purpose of codes is then outlined, including ensuring public health and safety, construction requirements, and fire safety. Several key aspects of building codes are then described, such as objectives of building codes, principles underlying them, applications of codes, and regulations for different types of buildings. Specific code requirements for aspects like floor area ratio, light and ventilation, and safety from fire are also detailed.
ADVANCED TECHNIQUES IN CONSTRUCTIONS IN HIGH RISE BUILDINGSASHOK KUMAR TIWARY
The document summarizes a technical seminar on advanced construction techniques for high-rise buildings. It defines high-rise buildings according to different standards, and discusses the need for high-rises due to increasing population density. Various construction methods are described, including slip forming, jump forming, and tunnel forming. Main equipment used includes tower cranes and concrete pumps. Advantages of high-rises include accommodating more people and businesses while using less land area. Disadvantages include higher construction costs and accessibility issues if elevators fail.
This document discusses suspension bridges. It describes how suspension bridges work, with the deck hung below cables on vertical suspenders. The key elements of suspension bridges are identified as the main cable, suspenders, decking/stiffening girder, supporting towers, and anchor cables. Forces on different parts of the suspension bridge are analyzed. Examples of large modern suspension bridges, like the Sunshine Skyway Bridge and Akashi Kaikyo Bridge, are provided.
Welded connections in steel structures - Limit State Design of Steel StructuresAshishVivekSukh
Two members are connected by means of welds is known as welded connection.
More efficient use of the materials.
Earlier designers considered welds as less fatigue resistant.
Good welds achive at site is impossible.
Testing and quality control of welds became easier because NDT
Waffle slabs are reinforced concrete slabs reinforced in two orthogonal directions, forming a ribbed plate. They are characterized by their total edge height, lightening block height, rib spacing, rib thickness, and compression layer thickness. Waffle slabs can adequately support distributed and point loads in two directions. Benefits include flexibility, light weight allowing longer spans, fast construction, slim depths, robustness, vibration control, thermal mass, and durability. Waffle slabs are constructed with ribs forming a grid pattern and solid fills at supports. Larger spans may use post-tensioning or joist construction. Proper design considers loads, materials, deformations, and tile installation compatibility.
This document discusses the need for raft foundations. Raft foundations are recommended when:
1) Building loads are heavy or soil capacity is low, so individual footings would cover too much area.
2) Soil contains weak lenses or cavities, making differential settlement hard to predict.
3) Structures are sensitive to differential settlement.
4) Structures like silos naturally suit raft foundations.
5) Floating foundations are needed over very weak soil.
6) Buildings require basements or underground pits.
7) Individual footings would experience large bending stresses.
Raft foundations increase capacity, decrease settlement, and equalize differential settlement compared to individual footings. However,
This document provides an analysis and design of a G+3 residential building. It includes details of the building such as dimensions, material properties, and load calculations. An equivalent static analysis is performed to calculate the seismic lateral loads at each floor level. The results of the structural analysis including bending moment and shear force diagrams are presented. Slab, beam, column and footing designs are to be covered in the thesis work according to the scope.
Summer training report in civil engineeringalok0025
This document provides a report on a summer training completed by Alok Kumar Singh from May 5th to July 4th, 2015 at a construction site for the Panchsheel Apartments project. The report details the construction process, materials used, safety procedures, and Alok's contributions during his training. It includes sections on site layout, excavation, foundation work, concrete mixing and pouring, wall and slab construction, quality control measures, and photos from the construction site. The training provided Alok with valuable practical experience in civil engineering and construction project management.
CE 72.32 (January 2016 Semester): Lecture 1a - Overview of Tall BuildingsFawad Najam
Humans have historically admired tall structures for their visibility and social status. The document discusses the evolution of tall buildings from ancient structures like pyramids to modern skyscrapers, driven by urbanization. It describes key milestones like the development of tubular structural systems to enable increasingly taller buildings. The design of modern tall buildings requires integrated, multi-disciplinary teams and continues to be enabled by new technologies.
The document discusses various requirements for fire safety in high-rise buildings according to Indian standards. It defines a high-rise building as one that is more than 15-18 meters in height. Requirements include a minimum road width of 12 meters to accommodate fire engines, sufficient setbacks around buildings, a minimum of two staircases including one external emergency staircase, fire safety measures for lifts, compartmentation of buildings to limit fire spread, installation of fire dampers, provision of refuge areas, a public address system for evacuation, and a helipad for buildings over 60 meters in height.
The document discusses machine foundations used in the oil and gas industry. It begins by introducing the different types of machines, such as centrifugal and reciprocating machines, and how they are classified based on speed. It then discusses the various types of foundations used to support these machines, including block foundations and frame foundations. The document outlines the inputs needed for foundation design, which include project specifications, soil parameters, and machine details from the vendor. It describes the process of analyzing machine foundations, including dynamic and static analyses. Key aspects like natural frequencies, displacements, and strength are evaluated.
Specification for different classes of BrickworksVighnesh Rane
This document classifies and specifies requirements for three classes of brickwork used in construction. First class brickwork uses high quality, uniformly shaped bricks with a crushing strength over 10.7N/mm2. It is used for load-bearing walls. Second class brickwork allows for slightly irregular bricks with strength over 7N/mm2 and is used for internal and compound walls. Third class brickwork consists of lower quality, non-uniform bricks with strength over 3.5N/mm2 and is used for temporary construction or flooring.
M.Tech Structural Engineering Project on Voided and Cellular Bridge introductionvaignan
This document discusses the analysis of voided and cellular bridge deck structures using the Midas-Civil software. It provides background on voided slab and cellular slab bridges, including their advantages and disadvantages. The literature review found that no previous studies have analyzed these deck types specifically using Midas-Civil. Therefore, the project aims to perform this analysis and compare the manual and Midas-Civil results. The schedule outlines initial manual analysis followed by modeling in Midas-Civil to validate the hand calculations.
railway and bridge engineering ppt.pptxRESHMAFEGADE
This document provides information about railway engineering and permanent way components. It discusses:
1. The different modes of transportation and their merits and demerits, including roadways, railways, airways, and waterways.
2. The classification of Indian railways by gauge, including broad, meter, and narrow gauges.
3. The key components that make up the permanent way of a railway track, such as rails, sleepers, ballast, and fixtures.
4. Different types of rail joints used in railway tracks, including supported, suspended, welded, and staggered joints.
The document provides details about the construction of a two-lane bridge over a railway crossing in Moradabad, India by UP State Bridge Corporation Limited. It summarizes the key components of the bridge, including pile foundations with friction piles, pier foundations, pier caps, pedestals, bearings, abutments, girders, deck slabs, and crash barriers. It also provides details on the materials used, such as concrete grades between M30-M40 and rebar sizes from 6mm to 32mm. Construction testing methods like slump tests, sieve tests, and cube tests are also summarized.
This document provides details of the analysis and design of a multi-storey reinforced concrete building project. It includes the objectives, which are to analyze and design the main structural elements of the building including slabs, columns, shear walls, and foundations. It also summarizes the building being a 12-storey residential building in Gorakhpur, India. The document outlines the various structural elements that will be designed, including flat slab structural systems, column types and design, shear wall design, and pile foundation design.
This document discusses raft/mat foundations, including:
- A raft foundation is a thick reinforced concrete slab that supports columns and transmits loads into the soil. It is used for structures with large or uneven column loads.
- Types of raft foundations include flat plate, thickened under columns, beam and slab, box structures, and mats on piles.
- Construction involves soil testing, excavation, reinforcement placement, forming, concrete pouring, and curing. Raft foundations are economic and reduce differential settlement but require treatment for point loads.
Deflection & cracking of RC structure(limit state method)gudtik
This document summarizes structural design considerations for deflection and cracking in reinforced concrete beams. It discusses:
1) How deflection occurs when a structure carries a load and guidelines for limiting deflection to prevent issues.
2) How cracking develops in concrete when tensile strength is exceeded from beam deflection.
3) Codal provisions for maximum allowable crack widths depending on exposure conditions.
4) Methods for controlling crack widths, including bar spacing and calculating crack widths.
5) Codal provisions for limiting span-to-depth ratios to control deflections.
6) How to calculate short-term and long-term deflections, including effects of creep and shrinkage.
The document provides details of the computer aided design and analysis of a G+20 multi-storey residential building located in Patna using STAAD-Pro software. The building is designed as a reinforced concrete framed structure according to Indian codes IS 456, IS 875, and IS 1893. Load calculations are performed for dead loads, live loads, and wind loads. Analysis of the building is carried out to determine member forces from gravity and lateral loads.
This document provides an overview of reinforced concrete mat foundations and discusses what is known and unknown about their seismic design. Key points:
- Mat foundations distribute loads over a large area to reduce differential settlement and resist uplift from overturning. Their behavior is modeled as an upside-down slab system.
- Soil properties, demand levels defined by codes, and spatial variability of ground motions present challenges to seismic design and remain areas with uncertainties.
- Traditional design focuses on local punching shear from columns but global shear and interaction with walls transferring overturning demands are less understood.
- Current code provisions may not fully activate thick mats or address soil-structure interaction, representing gaps in knowledge.
The
IS 2062(2011) Seventh Revision: Hot rolled medium and high tensile structural...rajguptanitw
This Indian Standard (Seventh Revision) was adopted by the Bureau of Indian Standards, after the draft
finalized by the Wrought Steel Products Sectional Committee had been approved by the Metallurgical
Engineering Division Council.
This standard was first published in 1962 and revised in 1969, 1975, 1984, 1992, 1999 and 2006. While reviewing
this standard, in the light of experience gained during these years, the Committee decided to revise it to bring
in line with the present practices being followed by the Indian steel industry, both in the integrated as well as
secondary sectors. The Committee further decided to harmonize the standard with the overseas standards on
carbon-manganese and high strength low alloy (HSLA) of structural steels.
In this revision, the following changes have been made:
a) Title has been modified and the word ‘low’ has been deleted, keeping in view the grades of steel
contained in the standard. Requirements of low tensile structural steel are covered in IS 15911 : 2010
‘Structural steel (ordinary quality) — Specification’.
b) Amendment No. 1 has been incorporated with suitable modifications.
c) Number of basic grades has been changed to nine. A new grade of E275, in line with European Standard,
has been incorporated to take care of the requirements of medium tensile structural steels in the
construction segment. Moreover, for each grade two to four sub-qualities have been introduced,
depending upon the grade, where sub-qualities A, BR, B0 and C, in line with other international standards,
indicate the mode of killing and impact test requirements.
d) The clause on ‘Manufacture’ has been modified, where the scope is suitably widened to include
different steel making and rolling practices in vogue.
e) Silicon content of semi-killed steel has been clearly specified.
For all the tests specified in this standard (chemical/physical/others), the method as specified in relevant
ISO Standard may also be followed as an alternate method.
While revising the standard, assistance has been derived from the following international specifications:
ASTM A 36 : 2008 Specification for structural steel
ASTM A 572 : 2007 Specification for high-strength low-alloy columbium-vanadium structural steel
EN 10025-2 : 2004 Hot rolled products of structural steels
The composition of the Committee responsible for the formulation of this standard is given in Annex A.
For the purpose of deciding whether a particular requirement of this standard is complied with, the final value,
observed or calculated, expressing the result of a test or analysis, shall be rounded off in accordance with
IS 2 : 1960 ‘Rules for rounding off numerical values (revised)’. The number of significant places retained in
the rounded off value should be the same as that of the specified value in this standard.
LIST OF IMPORTANT INDIAN STANDARDS ON SAFETY & HEALTHBimal Chandra Das
This document lists important Indian standards related to safety and health across various industries and topics. It provides standards for machinery, consumer products, electrical and electronics, transportation, civil engineering construction, chemicals and other hazardous materials, fire protection, and personal protection. The standards cover a wide range of issues including lifts, grinding wheels, pressure vessels, gas cylinders, industrial plant layout, domestic gas stoves, electrical equipment, powered trucks, scaffolding, hazardous chemicals, fire safety, welding, noise reduction, and personal protective equipment.
This document provides details on fire safety standards for building construction in India. It outlines four types of construction classified based on their fire resistance ratings. It specifies the minimum fire resistance times for various structural building elements. It also provides tables listing the minimum thicknesses of different wall constructions made of materials like concrete, bricks, blocks etc. to achieve the specified fire resistance ratings. The standard aims to reduce fire spread by requiring structural elements to have adequate fire resistance and limiting the use of easily ignitable materials in wall and ceiling linings.
This document discusses filtration techniques in Unani medicine. It defines filtration and describes factors that affect the filtration rate. It outlines various filter media like cloth, paper, cotton wool and membranes. It also discusses filter aids and common filtration equipment like funnels, filters, and filter presses. Vacuum filtration is described as a preferred technique in Unani to efficiently collect solids through terms like tarweeq, tasfiya and tarsheeh.
This document provides an overview of blacksmithing and forging processes. It discusses that blacksmiths produce objects from metal using hand tools or power tools after heating the metal. The main forging processes covered are open die forging, impression die forging, and closed forging. Key forging operations like upsetting, drawing down, punching, and bending are also summarized. The document outlines common forging materials and various heating devices used like furnaces. Important hand tools for blacksmithing like hammers, tongs, chisels, and swages are also described.
The sheet metal shop works with thin metal sheets to cut, form, and join them into various shapes using hand tools and simple machines. Common materials used include black iron, galvanized iron, stainless steel, copper, aluminum, tin plates, and lead. Key sheet metal hand tools include various measuring tools, hammers, snips, stakes, and groovers. Common sheet metal operations are shearing, bending, drawing, and squeezing. Important sheet metal joints include hems, seams, and specialized seams like lap, grooved, and dovetail seams. Larger machines like shearing machines, bar folders, and forming machines are also used.
The document provides information about the CSWIP 3.1 Welding Inspector course and certification. The course covers topics related to welding inspection including welding processes, defects, testing, and codes/standards. Candidates must pass both written and practical exams in areas like inspecting plate and pipe welds to receive certification, which must be renewed every 5-10 years. The CSWIP program has three levels of certification for welding inspectors.
It is used for measuring small dimensions. It consists of a blade and a stock.
(b)
Try Square: It is used for checking the squareness and for marking lines at right angles.
(c)
Combination Square: It is used for marking lines at right angles and for measuring depth.
(d)
Steel Tape: It is used for measuring long dimensions.
Marking Tools
(a)
Pencil: It is used for marking lines on wood.
(b)
Scriber: It is used for marking lines on wood and metal surfaces.
(c)
Dividers: It is used for transferring measurements and
Sp 34-1987 handbook on reinforcement and detailingjemmabarsby
This document is a handbook on reinforcement and detailing published by the Bureau of Indian Standards. It provides information on different types of steel used for reinforcement in concrete, including mild steel, medium tensile steel, high strength deformed steel bars, and hard-drawn steel wire fabric. It specifies the requirements for each type of steel in terms of chemical composition, mechanical properties, dimensions and tolerances. The handbook also covers detailing functions, structural drawings, general detailing requirements, bar bending schedules, and detailing of different structural elements like foundations, columns, beams etc.
This document provides descriptions of various workshop tools and machines used in design and technology classes, including different types of drill bits for drilling holes in various materials, saws for cutting wood and metal, hammers, files, clamps for holding materials, and power tools like drills, sanders, and saws. Safety equipment like goggles are required for some power tools like pillar drills. A variety of hand tools and machines allow students to shape, cut, drill, and finish materials like wood, metal, and plastic for design projects.
Bar Bending Schedule (BBS) is a chart which gives a clear picture of bar length, diameter of bar ,bar mark ,location of bar.
It allow workers to place steel properly.
The document provides an overview of plumbing systems and utilities. It discusses the history and practice of plumbing in the Philippines, components of plumbing systems including water supply and distribution. It also covers water sources, treatment and purification methods, wells and pumps. Storage tanks, valves and controls are also summarized.
This document provides the specification for copper in the form of refinery shapes. It specifies the grades, chemical composition, physical properties, dimensions, masses and tolerances for various types of copper including cathode copper, electrolytic tough pitch copper, fire refined high conductivity copper, and others. The document outlines test methods for determining chemical composition and electrical resistivity. It provides tables listing copper grades and their associated refinery shape forms, tolerances for dimensions of horizontally cast wire bars, and limits for chemical composition and electrical resistivity.
Save time and money on your projects with innovative solutions from Merit Brass Company: copper press fittings and valves.
About Merit Brass Company
Merit has a rich history of offering the most comprehensive flow control and piping connection technology. Their goal is to make the Merit Experience for
their customers seamless by bundling a complete line of consistent, high quality piping products, flow control devices and piping system solutions. Merit
features a full range of stainless steel and brass fittings, nipples, pipe, valves, flanges, stainless steel butt weld fittings, tubing, tube fittings and valves,
forged steel fittings and press technology, which includes both stainless steel and copper.
This document provides a list of Indian Standard (IS) codes related to civil engineering and specifically codes for cement and concrete. It categorizes over 100 IS codes for cement and concrete, covering standards for different types of cement, concrete, aggregates, testing methods, construction practices, and more. The codes establish standards for materials, testing procedures, construction techniques, and other areas important for cement and concrete used in civil engineering projects in India.
The document provides information on products manufactured by Keddco including swage nipples, bull plugs, and other oil country tubular goods. It lists available sizes and materials for each product, as well as specifications for threading, coatings, weld bevels, and markings. Standard, extra heavy, schedule 160, and double extra heavy weights are shown for swage nipples from 1/8" to 300" in size.
This document lists publications referred to in the specifications. It includes two appendices - Appendix 1 lists IRC publications with number, designation and title. Appendix 2 lists Indian and foreign standards referred to in the specifications with number, designation and title. The appendices provide a comprehensive listing of documents and standards that are referenced in the specifications.
This document provides a chart detailing standard trim materials available for API 600 valves according to trim number, including the trim material grade, old BS designation, and typical service. Key information includes:
- Trim 1 is 410 stainless steel for oil, oil vapors, and general non-corrosive services up to 320°C.
- Trim 2 is 304 stainless steel for moderate pressure corrosive services up to 450°C.
- Hard faced and alloy trims like Monel and Alloy 20 are listed for higher pressure and corrosive services.
- The chart provides a reference for selecting the appropriate trim material based on service conditions and requirements.
The document provides a detailed list of Indian Standard (IS) codes relevant for civil engineering practice, organized into categories including design loads, structural detailing, bricks, fire and life safety measures, sanitary appliances and fittings, and earthquake design. It includes over 150 individual IS code standards covering topics such as dead and imposed loads, reinforced concrete detailing, brick masonry, the national building code, plumbing fixtures, and seismic-resistant design.
This document provides specifications for materials used in the manufacture of magnesium oxychloride flooring compositions, including calcined magnesite, magnesium chloride, fillers, and pigments. It specifies requirements for the chemical composition, physical properties, grading, and packaging of calcined magnesite. It also describes requirements for moisture content, resin content, fineness, and grading of wood flour and sawdust fillers. Standards for other fillers and aggregates and various pigments are referenced.
ProTech Flow Solutions Ltd has a current stocklist of flanges in various sizes from 1/2 to 8 inches, with class ratings from 600 to 2500, and made of ASTM/ASME SA182 F316L stainless steel. The flanges can have weld neck, slip-on, blind, NPT or socket weld ends, and be supplied with a large raised face to ANSI B16.5 dimensions. They are manufactured by Officine Binder Galperti or Vilmar.
This document outlines specifications for precast concrete coping blocks. It specifies requirements for materials used in manufacturing coping blocks such as cement, aggregates, additives, and concrete strength. It also provides dimensions and tolerances for the cross-section and length of coping blocks. The specifications are intended to ensure coping blocks effectively prevent water penetration, direct water away from walls, resist displacement forces, allow for movement, and provide durability.
Metal Seated Ball Valves Manufacturers. Madhukar VB
Microfinish Valves Inc. manufactures various types of ball valves mainly floating ball valves, trunnion mounted ball valves. Floating ball valves come in the following varieties: forged and cast ball valves, one piece flanged
Ball valves, cast two piece, cryogenic ball valves, ASME B16.34 API 6D Floating Ball Valves, three way ball valves. for more info visit: http://www.microfinishvalvesinc.com
Pipe fitting . in Pipes and tubes manufatuers, supplier, dealer in mumbai ,i...DivyaDarshanMetallic
This document provides information on various stainless steel products including tubes, pipes, and sections. It lists the chemical compositions, mechanical properties, specifications, and grades of different stainless steel materials. Key details include outside diameter and wall thickness ranges, available lengths, common grades according to international standards, supply conditions, and applications in various industries.
This document provides the specification for cement concrete flooring tiles in India. It outlines the various types of tiles covered (plain cement, plain colored, terrazzo), classes based on duty (general purpose, heavy duty), materials used, dimensions, tolerances, testing methods, and other quality requirements. The revision updates certain provisions based on experience and comments received, including allowing a larger wearing layer thickness and modifying the abrasion resistance test method. It aims to improve quality while keeping requirements relevant to indigenous manufacturers.
This document outlines specifications for nine classes of carbon steel billets, blooms, slabs, and bars intended for forgings. It specifies requirements for chemical composition, mechanical properties, dimensional tolerances, freedom from defects, sampling procedures, and testing methods. The standard aims to ensure the materials meet the needs of users for various forgings applications.
This document lists 51 Indian Standards related to structural steel, welding, galvanizing, tower construction, and electrical hardware. The standards cover topics such as rolling and cutting tolerances for hot rolled steel products, material specifications, fabrication and erection of structures, welding, painting, nominal dimensions of rolled steel products, hot-dip galvanizing, tower drawings and plans, erection of towers, insulating rubber mats, and electrodes for welding. The document provides a reference for standards relevant to structural steel, fabrication, galvanizing, and electrical hardware.
SEALEXCEL is a fast-growing manufacturing company in the field of design, development, production and marketing of high-quality valves and fittings for international and domestic markets, Since 1987.
https://www.sealexcel.com/pipe-fittings/
stainless pipe fittings, stainless steel pipe fittings manufacturers
This document provides information on the Indian Standard method for the Brinell hardness test for metallic materials. It outlines the key aspects of the test including:
- The test uses a hardened steel or hard metal ball of a specified diameter that is pressed into the material's surface under a defined load.
- The Brinell hardness value is determined based on the diameter of the indentation left in the surface after removal of the load.
- The standard provides details on apparatus, test pieces, procedures, symbols and designations, and test forces to be used for different materials.
This document provides the specifications for plain hard drawn steel wire intended for use in prestressed concrete. It outlines the following key points:
- The wire shall be cold drawn from steel produced via various processes to contain less than 0.05% sulfur and phosphorus.
- Nominal diameters shall be 3.0 mm, 4.0 mm, or 5.0 mm within specified tolerances.
- The wire must meet minimum tensile strength requirements and have a proof stress of at least 75% of the tensile strength.
- It must pass reverse bend tests without fracturing to demonstrate adequate ductility.
The document also describes manufacturing requirements, permissible defects, testing methods and sampling procedures to
The document provides an overview of the American Petroleum Institute (API) 682 2nd Edition standard for shaft sealing systems for centrifugal and rotary pumps. It describes the purpose and benefits of the standard in promoting best practices for mechanical seal selection and operation. The standard establishes three seal categories and defines acceptable seal types, arrangements, operating ranges, and qualification testing requirements. The 2nd Edition expands the scope of the previous edition to include additional seal types and arrangements.
Build the Next Generation of Apps with the Einstein 1 Platform.
Rejoignez Philippe Ozil pour une session de workshops qui vous guidera à travers les détails de la plateforme Einstein 1, l'importance des données pour la création d'applications d'intelligence artificielle et les différents outils et technologies que Salesforce propose pour vous apporter tous les bénéfices de l'IA.
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELijaia
As digital technology becomes more deeply embedded in power systems, protecting the communication
networks of Smart Grids (SG) has emerged as a critical concern. Distributed Network Protocol 3 (DNP3)
represents a multi-tiered application layer protocol extensively utilized in Supervisory Control and Data
Acquisition (SCADA)-based smart grids to facilitate real-time data gathering and control functionalities.
Robust Intrusion Detection Systems (IDS) are necessary for early threat detection and mitigation because
of the interconnection of these networks, which makes them vulnerable to a variety of cyberattacks. To
solve this issue, this paper develops a hybrid Deep Learning (DL) model specifically designed for intrusion
detection in smart grids. The proposed approach is a combination of the Convolutional Neural Network
(CNN) and the Long-Short-Term Memory algorithms (LSTM). We employed a recent intrusion detection
dataset (DNP3), which focuses on unauthorized commands and Denial of Service (DoS) cyberattacks, to
train and test our model. The results of our experiments show that our CNN-LSTM method is much better
at finding smart grid intrusions than other deep learning algorithms used for classification. In addition,
our proposed approach improves accuracy, precision, recall, and F1 score, achieving a high detection
accuracy rate of 99.50%.
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...PriyankaKilaniya
Energy efficiency has been important since the latter part of the last century. The main object of this survey is to determine the energy efficiency knowledge among consumers. Two separate districts in Bangladesh are selected to conduct the survey on households and showrooms about the energy and seller also. The survey uses the data to find some regression equations from which it is easy to predict energy efficiency knowledge. The data is analyzed and calculated based on five important criteria. The initial target was to find some factors that help predict a person's energy efficiency knowledge. From the survey, it is found that the energy efficiency awareness among the people of our country is very low. Relationships between household energy use behaviors are estimated using a unique dataset of about 40 households and 20 showrooms in Bangladesh's Chapainawabganj and Bagerhat districts. Knowledge of energy consumption and energy efficiency technology options is found to be associated with household use of energy conservation practices. Household characteristics also influence household energy use behavior. Younger household cohorts are more likely to adopt energy-efficient technologies and energy conservation practices and place primary importance on energy saving for environmental reasons. Education also influences attitudes toward energy conservation in Bangladesh. Low-education households indicate they primarily save electricity for the environment while high-education households indicate they are motivated by environmental concerns.
Supermarket Management System Project Report.pdfKamal Acharya
Supermarket management is a stand-alone J2EE using Eclipse Juno program.
This project contains all the necessary required information about maintaining
the supermarket billing system.
The core idea of this project to minimize the paper work and centralize the
data. Here all the communication is taken in secure manner. That is, in this
application the information will be stored in client itself. For further security the
data base is stored in the back-end oracle and so no intruders can access it.
Generative AI Use cases applications solutions and implementation.pdfmahaffeycheryld
Generative AI solutions encompass a range of capabilities from content creation to complex problem-solving across industries. Implementing generative AI involves identifying specific business needs, developing tailored AI models using techniques like GANs and VAEs, and integrating these models into existing workflows. Data quality and continuous model refinement are crucial for effective implementation. Businesses must also consider ethical implications and ensure transparency in AI decision-making. Generative AI's implementation aims to enhance efficiency, creativity, and innovation by leveraging autonomous generation and sophisticated learning algorithms to meet diverse business challenges.
https://www.leewayhertz.com/generative-ai-use-cases-and-applications/
Software Engineering and Project Management - Software Testing + Agile Method...Prakhyath Rai
Software Testing: A Strategic Approach to Software Testing, Strategic Issues, Test Strategies for Conventional Software, Test Strategies for Object -Oriented Software, Validation Testing, System Testing, The Art of Debugging.
Agile Methodology: Before Agile – Waterfall, Agile Development.
Discover the latest insights on Data Driven Maintenance with our comprehensive webinar presentation. Learn about traditional maintenance challenges, the right approach to utilizing data, and the benefits of adopting a Data Driven Maintenance strategy. Explore real-world examples, industry best practices, and innovative solutions like FMECA and the D3M model. This presentation, led by expert Jules Oudmans, is essential for asset owners looking to optimize their maintenance processes and leverage digital technologies for improved efficiency and performance. Download now to stay ahead in the evolving maintenance landscape.
1. INDIAN STANDARDS
SR# / REF # AUTHOR TITLE
1
1 /9237,
13376,
16669,
16670, 16671
IS 2 - 1960 Rules For Rounding Off Numerical Values (5 Copies)
2 /14655 TO
14657
IS 4 - 1949 Practice For Make Up Of Periodicals (3 Copies)
3 /16672,
16677
IS 4 - 1963 Guide For Layout Of Learned Periodicals (2 Copies)
4 /16678 IS 6 - 1967 Specification For Moderate Heat Duty Fire Clay Refractories Group A
5 /16679 IS 7 - 1980 Specification For Moderate Heat Duty Fire Clay Refractories Group B
6 /13373,
16674, 16680
IS 8 - 1967 Specification For High Heat Duty Fire Clay Refractories (3 Copies)
7 /16681 IS 8 - 1983 Specification For High Heat Duty Fire Clay Refractories
8 /16682 IS 10(Pt-1 ) - 1976 Specification For Plywood Tea-Chests General
9 /16683 IS 10(Pt-2 ) - 1976 Specification For Plywood Tea Chests, Plywood
10 /16684,
16685
IS 10(Pt-4 ) - 1976 Specification For Plywood Tea Chests, Assembly & Packing & Metal
Fittings (2 Copies)
11 /14695 IS 10 - 1975 Nomogram For Thickness Of Masonry Walls
12 /1414 IS 12(Pt-3 ) - 1964 Guide For Drafting Indian Standards
13 /5992,
5993, 16686
IS 12 - 1964 Guide For Drafting Indian Standards 2nd Revision (3 Copies)
14 /16675 IS 12 - 1967 Guide For Drafting Indian Standards
15 /16687 IS 12 - 1988 Guide For Drafting & Presentation Of IS, Drafting & Editorial Practice
16 /14659 IS 18 - 1949 Abbreviations For Titles Of Periodicals
17 /16688 IS 18 - 1970 Guide For Abbreviations Of Words In Title Of Periodicals
18 /16689 IS 20 - 1977 Specification For Cast Aluminum & Alloys For Manufactures Of
Utensils
19 /16690 IS 26 - 1979 Specification For Tin Ingot
20 /16691 IS 27 - 1977 Specification For Pig Lead
21 /16692 IS 33 - 1976 Methods Of Sampling & Test For Inorganic Pigments & Extends For
Paints
22 /16693 IS 40 - 1971 Specification For Carbon Black For Paints
23 /6053,
14447,14511
TO 14516,
14493,
14494, 16695
IS 73 - 1961 Secification For Paving Bitumen (11 Copies)
24 /6036,
16695
IS 73 - 1992 Secification For Paving Bitumen
25 /16696 IS 74 - 1979 Methods Of Sampling & Test For Drying Oils For Paints
26 /16697 IS 85 - 1950 Methods Of Test For Oil Pasts For Paints
27 /16698 IS 93 - 1950 Specification For Oil Paste For Paints
28 /16646 IS 101(Pt-1/Sec-3) - 1986 Methods Of Sampling & Test For Paints, Varnishes &Related
Products, Test On Liquid Paints (General & Physical)
29 /16644 IS 101(Pt-1/Sec-7) - 1987 Methods Of Sampling Test For Paints Varnishes, Test On Liquid
Paints(General & Physical)
30 /16645 IS 101(Pt-5/Sec-4) - 1988 Methods Of Sampling & Test For Paints, Varnishes &Related
Products, Mechanical Test
31 /16643 IS 101 - 1964 Methods Of Test For Ready Mixed Paints & Enamels
32 /16647 IS 102 - 1962 Specification For Ready Mixed Paint, Brushing, Red Lead ,On
Setting Priming
33 /16648,
16649
IS 104 - 1962 Specification For Ready Mixed Paint ,Brushing, Zinc, Chrome,
Priming (2 Copies)
34 /16650 IS 110 - 1983 Specification For Ready Mixed Paint, Brushing, Grey Filler, For
Enamels ,For Use Over Primers
2. INDIAN STANDARDS
SR# / REF # AUTHOR TITLE
2
35 /16651 IS 130 - 1964 Specification For Ready Mixed Paints, Spraying, Finishing For
Railway Wagon Stock To Indian Standard Colour No.446 Red
Oxides.
36 /16654 IS 137 - 1965 Specification For Ready Mixed Paints Brushing Matt Or Egg-Shell
Flat, Finishing Interior To Indian Standard Colour As Required
37 /16652,
16653
IS 138 - 1969 Specification For Ready Mix Paint Marking For Packages & Petrol
Containers Colour As Required (2 Copies)
38 /16655 IS 139 - 1981 Specification For Ready Mixed Paints, Marking Quick Drying For
Marking With Rubber Stamps
39 /16656 IS 145 - 1950 Specififation For Ready Mixed Paints, Slushing, Petrol Resisting, Air
Drying For Interior Painting Of Tanks & Containers Red Oxide
40 /16658 IS 156 - 1950 Specification For Ready Mixed Paint, Brushing For Use On Floors,
Colour As Required
41 /16657,
16659
IS 159 - 1981 Specification For Ready Mixed Paint, Brushing, Acid Resisting (2
Copies)
42 /16660 IS 170 - 1981 Specification For Acetone
43 /16661 IS 171 - 1985 Specification For Cotton & Cotton Regenerated Cellulose Fiber
Blended Gray Yarn
44 /16662 IS 174 - 1983 Specification For Flannelettes
45 /16663,
16668
IS 191 - 1967 Specification For Copper (2 Copies)
46 /16664 IS 193 - 1977 Specification For Soft Solder
47 /16665 IS 193 - 1982 Specification For Soft Solder
48 /14660 TO
14665
IS 195 - 1955 Fire Clay Mortar For Laying Fire Clay Refractory Bricks (6 Copies)
49 /16667 IS 195 - 1963 Specification For Fire Clay Mortar For Laying Fire Clay Refractory
Bricks
50 /16666 IS 197 - 1969 Methods Of Sampling & Test For Varnishes And Lacquers
51 /14667 TO
14670
IS 201 - 1950 Method Of Analysis Of Tolerances Of Water For Textile Purposes (4
Copies)
52 /16700 IS 204(Pt-2 ) - 1978 Specification For Tower Bolts Non Ferrous Metals
53 /16701 IS 205 - 1978 Non Ferrous Metal Butt Hinges
54 /16702 IS 206 - 1981 Specification For Tee & Strap Hinges
55 /16738 IS 208 - 1972 Specification For Door Handles
56 /16703 IS 208 - 1979 Specification For Door Handles
57 /16704 IS 210 - 1970 Specification For Grey Iron Casting
58 /16705 IS 210 - 1978 Specification For Grey Iron Castings
59 /16706 IS 211 - 1977 Specification For Antimony Ingot
60 /14566 IS 212 - 1961 Crude Coal Tar For General Use
61 /14461,
14462
IS 215 - 1961 Road Tar (2 Copies)
62 /14434 IS 216 - 1961 Coal Tar Pitch
63 /13921 TO
13923, 13982
TO 13986,
15196 TO
15198
IS 217 - 1961 Cut Back Bitumen (11 Copies)
64 /16707 IS 220 - 1972 Specification For Ferro-Gallo Tannate Fountain Pen Ink Ferro-Gallo
Tannate 01 % Iron Content
65 /16739 IS 222 - 1962 Specification For Ink Fluid For General Purpose
66 /14519 TO
14523
IS 223 - 1950 Tensile Testing Of Metals( Ferrous) (5 Copies)
67 /16708 IS 224 - 1979 Specification For Foundry, Pig Iron For General Purpose
68 /14465 IS 225 - 1957 Pig Iron (Charcoal)
69 /14932 IS 226 - 1958 Structural Steel(Standard Quality)
3. INDIAN STANDARDS
SR# / REF # AUTHOR TITLE
3
70 /16709,
16710,
IS 226 - 1962 Specification For Structural Steel (Standard Quality) 2 Copies
71 /16741 IS 226 - 1969 Specification For Structural Steel(Standard Quality)
72 /9736,
14457,
14931, 16711
IS 226 - 1975 Specification For Structural Steel (Standard Quality) (4 Copies)
73 /14485 TO
14490
IS 227 - 1954 Malleable Iron Castings (6 Copies)
74 /16713 IS 228(Pt-1 ) - 1972 Methods For Chemical Analysis Of Steel Determination Of Carbon
By Volumetric Method(Carbono.1)
75 /16715 IS 228(Pt-2 ) - 1972 Method For Chemical Analysis Of Steels, Determination Of
Manganese In Plain Carbon & Low Alloy Steels By Arsenife Method
76 /16714 IS 228(Pt-3 ) - 1972 Methods For Chemical Analysis Of Steels, Determination Of
Phosphorus By Alkali Metric Method
77 /16717 IS 228(Pt-12 ) - 1982 Method For Chemical Analysis Of Steel, Determination Of
Mangenese By Periodate Spectro Photo Metric Method In Low &
High Alloy Steel
78 /16712 IS 228 - 1959 Methods Of Chemical Analysis Of Pig Iron Cast Iron & Plain Carbon
& Low Alloy Steel
79 /16718 IS 255 - 1982 Specification For Sodium Sulphate, Anhydrous(Technical Grade)
80 /16719,
16720
IS 260 - 1969 Specification Fiction For Aluminum Sulphate Non Ferric (2 Copies)
81 /16721 IS 264 - 1976 Specification For Nitric Acid
82 /16740 IS 265 - 1962 Specification For Hydrochloric Acid
83 /16722 IS 265 - 1987 Specification For Hydraulic Acid
84 /14458 IS 269 - 1951 Ordinary Rapid-Hardening And Heat Portland Cement
85 /16723,
16742 to
16744
IS 269 - 1958 Specification For Ordinary, Rapid-Hardening & Low-Heat Portland
Cement (4 Copies)
86 /16724,
16765
IS 269 - 1967 Specification For Ordinary Rapid Harding And Low Heat Portland
Cement (2 Copies)
87 /16725 IS 269 - 1976 Specification For Ordinary & Low Heat Portland Cement
88 /16726 IS 269 - 1989 Ordinary Portland Cement 33 Grade Specification
89 /16727 IS 276 - 1976 Specification For Austenitic Manganese Steel Casting
90 /16728 IS 277 - 1977 Specification For Galvanized Steel Sheets (Plain & Corrugated)
91 /14218 IS 278 - 1978 Galvanized Steel Barbed Wire For Fancing
92 /16729 IS 279 - 1981 Specification For Galvanized Steel Wire For Telegraph & Telephone
Purpose
93 /16730 IS 280 - 1978 Specification For Mild Steel Wire For General Engineering Purposes
94 /16731 IS 282 - 1982 Specification For Hard Drawn Copper Conductors For Overhead
Transmission
95 /14530 TO
14534
IS 287 - 1960 Maximum Permissible Moisture Content Of Timber Used For
Different Purposes Channels In Different Climates (5 Copies)
96 /16732 IS 288 - 1981 Specification For Arsenic Copper Rods For Boiler Stay Bolts & Rivets
97 /16766 IS 289 - 1963 Specification For Aluminum Paste For Paints
98 /16733 IS 291 - 1977 Specification For Naval Brass Rods & Sections(Suitable For
Machining & Forging)
99 /16734 IS 292 - 1983 Specification For Leaded Brass Ingots & Casting
100 /16767 IS 294 - 1962 Specification For Superphosphate
101 /16768 IS 296 - 1965 Specification For Sodium Carbonate/Anhydrous
102 /1419,
16735, 16736
IS 296 - 1974 Specification For Sodium Carbonate Anhydrous (3 Copies)
103 /16737,
16769
IS 299 - 1975 Specification For Alumino Ferric (2 Copies)
4. INDIAN STANDARDS
SR# / REF # AUTHOR TITLE
4
104 /9796,
16745,
16746, 16747
IS 303 - 1960 Specification For Plywood For General Purposes (4 Copies)
105 /16770,
16771, 16772
IS 303 - 1975 Specification For Plywood For General Purposes (3 Copies)
106 /16773 IS 304 - 1981 Specification For High Tensile Brass Ingot & Castings
107 /16774 IS 305 - 1981 Specification For Aluminium Bronze Ingot & Castings
108 /16775 IS 306 - 1983 Specification For Tin Bronze Ingots & Castings
109 /5239 IS 318 - 1978 Specification For Electric Bacteriological Incubators
110 /16776 IS 318 - 1981 Specification For Leaded Tin Bronze Ingots & Castings
111 /14019,
14020
IS 323 - 1959 Rectified Spirit (2 Copies)
112 /16777 IS 325 - 1978 Specification For Three-Phase Induction Motors, 1978
113 /14000,
14432, 16779
IS 334 - 1953 Glossary Of Terms Relating To Bitumen And Tar (3 Copies)
114 /2103,
16748
IS 334 - 1965 Glossary Of Terms Relating To Bitumen & Tar (2 Copies)
115 /9822,
16778,
16780, 16781
IS 334 - 1982 Glossary Of Terms Relating To Bitumen & Tar (4 Copies)
116 /16782 IS 342 - 1976 Specification For Varnish Acid Resisting
117 /16749 IS 354(Pt-2 ) - 1986 Method Of Sampling & Test For Resins For Paints, Test Methods For
Aikyd Resins
118 /16783 IS 354 - 1976 Methods Of Sampling & Test For Resins For Paints
119 /16784 IS 362 - 1982 Specification For Parliament Hinges
120 /14484 IS 363 - 1961 Specification For Hasps & Staples
121 /16785 is 363 - 1976 Specification For Hasps & Staples
122 /16786 IS 365 - 1983 Specification For Electric Hot Plates
123 /9737 IS 366 - 1976 Specification For Electric Irons
124 /16750 IS 367 - 1977 Specification For Electric Kettles & Jugs For Household & Similar
Use
125 /16787 IS 367 - 1983 Specification For Electric Kettles & Jugs For Household & Similar
Use
126 /16751 IS 368 - 1977 Specification For Electric Immersion Water Heaters
127 /16788 IS 369 - 1983 Specification For Electric Radiators
128 /16789 IS 371 - 1979 Specification For Ceiling Roses
129 /12335 IS 373 - 1957 Methods Of Testing Small Clear Specimens Of Timber
130 /16790 IS 374 - 1979 Specification For Electric Ceiling Type Fans & Regulators
131 /16752,
16753
IS 376 - 1969 Specification For Sodium Hydroxide Analytical Reagents (2 Copies)
132 /1415,
16791, 16792
IS 376 - 1976 Specification For Sodium Hydroxide Analytical Reagent (3 Copies)
133 /16754 IS 376 - 1986 Specification For Sodium Hydroxide Analytical Reagents
134 /16793,
16794
IS 381 - 1972 Specification For Sodium Silicate (2 Copies)
135 /14666 IS 382 - 1952 Practice For Alphabetical Arrangements
136 /14517,
14518
IS 383 - 1952 Coarse And Fine Aggregates From Natural Sources For Concrete (2
Copies)
137 /14693,
16755,
16756,
16757,
16758,
16759, 16760
IS 383 - 1963 Specification For Coarse & Fine Aggregate From Natural Sources
For Concrete (7 Copies)
5. INDIAN STANDARDS
SR# / REF # AUTHOR TITLE
5
138 /5290,
5995, 9801,
16795,
16796, 16797
IS 383 - 1970 Specification For Coarse & Fine Aggregates From Natural Sources
For Concrete (6 Copies)
139 /5251 IS 383 - 1997 Specification For Coarse And Fine Aggregates From Natural Sources
For Concrete 8Th Rep Oct 1991
140 /6054 IS 389 - 1963 Corse & Fine Aggregate From Natural Sources For Concrete
141 /707,
16798,
16799, 16800
IS 392 - 1975 Method For Determining Water Absorption And Penetration Of
Fabrics Using Bundesmann Type Apparatus (4 Copies)
142 /9261,
16801
IS 397(Pt-1 ) - 1972 Method For Statistical Quality Control During Production, Control
Charts For Variables (2 Copies)
143 /16761 IS 397 - 1975 Method For Statistical Quality Control During Production,
Controlcharts For Attributes &Counts Of Defects
144 /16803 IS 398(Pt-1 ) - 1976 Specification For Aluminium Conductors For Overhead Transmission
Purposes, Aluminium Stranded Conductors
145 /16804 IS 398(Pt-2 ) - 1976 Specification For Aluminium Conductors For Overhead Transmission,
Purposes, Aluminium Conductors, Galvanized Steel Reinforced
146 /16805 IS 398(Pt-3 ) - 1976 Specification For Aluminium Conductors For Overhead Transmission
Purposes, Aluminium Conductors Aluminized Steel Reinforced
147 /16806 IS 398(Pt-4 ) - 1979 Specification For Aluminium Conductor For Overhead
Transmissin,Purposes, Aluminium Alloy Stranded Conduction
(Aluminium Magnesium Silicon)
148 /16807 IS 398(Pt-5 ) - 1979 Specification For Aluminium Conductor For Over Head Transmission
Purposes, Aluminum Conductor Galva Steel Reinforced For Extra
High Voltage
149 /16802 IS 398 - 1961 Specification For Hard Drawn Standard Aluminum & Steel-Cored
Aluminium Conductors For Overhead Power Transmission Purpose
150
/14604,14008
, 14009,
16763
IS 399 - 1963 Classification Of Commercial Timbers And Their Zonal Distribution (4
Copies)
151 /16826,
16727,
16728, 16729
IS 401 - 1961 Code Of Practice For Preservation Of Timber (4 Copies)
152 /16825,
16830
IS 401 - 1967 Code Of Practice For Preservation Of Timber (2 Copies)
153 /16824 IS 401 - 1982 Code Of Practice For Preservation Of Timber
154 /16831 IS 403 - 1964 Methods Of Chemical Analysis Of Lead & Antimonial Lead
155 /16832 IS 404(Pt-1 ) - 1977 Specification For Lead Pipes For Other Than Chemical Purposes
156 /16833 IS 405(Pt-1 ) - 1977 Specification For Lead Sheet & Strip, For Chemical Industries
157 /16834 IS 405(Pt-2 ) - 1977 Specification For Lead Sheet & Strip, For Other Than Chemical
Purposes
158 /16835 IS 407 - 1981 Specification For Brass Tubes For General Purposes
159 /16836 IS 410 - 1977 Specification For Cold Rolled Brass Sheet,Strip And Foil
160 /16838 IS 418 - 1978 Specification For Tungsten Filament General Service Electric Lamps
161 /16837 IS 421 - 1963 Specification For Jointing Paste For Bedding Moulding On Coaching
Stock
162 /16839,
16840
IS 422 - 1967 Specification For Brass Sheet & Strip For The Manufacture Of
Utensils ( 2 Copies )
163 /16841 IS 422 - 1981 Specification For Brass Sheet & Strip For The Manufacture Of
Utensils
164 /16843,
16844,
IS 432(Pt-1 ) - 1966 Specification For Mild Steel & Medium Tensile Steel Bras & Hard
Drawn Steel Wire For Concrete Reinforcement (2 Copies)
6. INDIAN STANDARDS
SR# / REF # AUTHOR TITLE
6
165 /9818,
16845 to
16847
IS 432(Pt-1 ) - 1982 Mild Steel And Medium Tensile Steel Bars And Hand Drawn Steel
Wire For Concrete Reinforcement, Pt. 1 Steel Bars (4 Copies)
166 /16848,
16849
IS 432(Pt-2 ) - 1966 Specification For Mild Steel & Medium Tensile Steel Bars & Hard
Drawn Steel Wire For C.R.F, Hard Drawn Steel Wire (2Copies)
167 /9819,
16850 to
16852
IS 432(Pt-2 ) - 1982 Mild Steel And Medium Tensile Steel Bars And Hand Drawn Steel
Wire For Concrete Reinforcement, Pt. 2 Steel Wire (4 Copies)
168 /14558
TO 14565,
16842
IS 432 - 1960 Mild Steel And Medium Tensile Steel Bars And Hard Drawn Steel
Wire For Concrete Reinforcement (9 Copies )
169 /16853 IS 434(Pt-1 ) - 1964 Specification For Rubber Insulated Cables, With Copper Conductors
170 /16854 IS 436(Pt-1/Sec-2) - 1976 Methods For Sampling Of Coal And Coke, Sampling Of Coal Section
2 Mechanical Sampling
171 /14435 IS 437 - 1956 Size Grading Of Coal And Coke For Marketing
172 /16855,
16856
IS 440 - 1964 Methods Of Chemical Analysis Of Copper (2 Copies)
173 /16858 IS 443 - 1975 Methods Of Sampling & Test For Rubber Hoses
174 /16859 IS 451 - 1961 Specification For Wood Screws
175 /16860 IS 452 - 1973 Door Spring Rat Tail Type
176 /14436,
14021 TO
14024
IS 454 - 1961 Digboi Type Cut Back Bitumen (5 Copies)
177 /14014 IS 455 - 1962 Portland Blast Furnace Slag Cement
178 /16823 IS 455 - 1967 Portland Blast Furnace Slag Cement
179 /9815,
16857,
16823, 16822
IS 455 - 1976 Specification For Portland Slag Cement (4 Copies)
180 /9798 IS 456 - 1957 Code Of Practice For Plain And Reinforced Concrete For General
Building Construction
181 /16862,
16867
IS 456 - 1963 Code Of Practice For Plain & Reinforced Concrete For General
Building Construction (2Copies)
182 /9263,
9642, 16869
to 16878
IS 456 - 1964 Code Of Practice For Plain & Reinforced Concrete For General
Building Construction (12Copies)
183 /16861,
16863,
16864, 16868
IS 456 - 1967 Code Of Practice For Plain And Rein Forced Concrete For General
Building Construction (4 Copies)
184 /16866 IS 456 - 1969 Portland Slag Cement Specification
185 /16865 IS 456 - 1972 Code Of Practice For Plain And Reinforced Concrete Amendment
No.5 May 1972
186 /5380,
5386, 9262,
9741, 9925
IS 456 - 1978 Code Of Practice For Plain And Reinforced Concrete (5 Copies)
187 /16879 IS 456 - 1984 Code Of Practice For Plain & Reinforced Concrete
188 /16880,
16881,
16882,
16883,
16884, 16885
IS 457 - 1957 Code Of Practice For General Construction Of Plain & Reinforced
Concrete For Dams & Other Massive Structure (6Copies)
189 /9260,
14025 to
14027
IS 458 - 1961 Specification For Concrete Pipes (With And Without Reinforcement)
(5 Copies)
190 /16817 IS 458 - 1971 Specification For Concrete Pipes (With & Without Reinforcement)
191 /1619,
1681, 1682
IS 458 - 1980 Design Aids For Reinforced Concrete To IS 456-78 (3 Copies)
7. INDIAN STANDARDS
SR# / REF # AUTHOR TITLE
7
192 /14032 IS 459 - 1962 Unreinforced Corrugated Asbestos Cement Sheets
193 /16818 IS 459 - 1970 Unreinforced Corrugated & Semi-Corrugated Asbestos Cement
Sheet
194 /2062,
16815, 16816
IS 460(Pt-1 ) - 1978 Specification For Test Sieves, Wire Cloth Test Sieves (3 Copies)
195 /1418,
10328, 16814
IS 460(Pt-1 ) - 1985 Specification For Test Sieves Part 1 Wire Cloth Test Sieves (3
Copies)
196 /10408,
10365
IS 460(Pt-2 ) - 1978 Perforated Plate Test Sieves (2 Copies)
197 /1436,
16813
IS 460(Pt-2 ) - 1985 Specification For Test Sieves Part 2 Perforated Plate Test Sieves (2
Copies)
198 /16808,
16809,
16810, 16811
IS 460(Pt-3 ) - 1985 Specification For Test Sieves, Methods Of Examination Of Test
Sieves (4 Copies)
199 /14031,
14438,
16819, 16820
IS 460 - 1962 Test Sieves (4 Copies)
200 /1413 IS 460 - 1978 Specification For Test Sieves
201 /16764 IS 466 - 1964 Method For Conducting Average & Of Practice For Plain &
Reinforced Concrete
202 /16812 IS 482 - 1981 Specification For Reels For Covered Round Electrical Winding Wires
203 /14464 IS 497 - 1953 Tensile Testing Of Metals (Non-Ferrous)
204 /16886,
16887
IS 513 - 1973 Specification For Cold Rolled Carbon Steel Sheets (2Copies)
205 /14671,
14672
IS 515 - 1959 Natural And Manufactured Aggregates For Use In Mass Concrete (2
Copies)
206 /5176,
5375, 9799,
9800, 16888,
16889
IS 516 - 1959 Methods Of Tests For Strength Of Concrete (6 Copies)
207 /14277 IS 529 - 1976 Solid Woven Impregnated Cotton Belting For Power Transmission
208 /14208 IS 530 - 1976 Solid Woven Impregnated Hair Belting For Power Transmission
209 /16890 IS 531 - 1981 Specification For Leaded Brass Strip For Instrument Parts
210 /16891 IS 550 - 1979 Specification For Safes
211 /14673,
14674
IS 554 - 1955 Pipe Threads For Gas List Tubes And Screwed Fittings (2 Copies)
212 /16892,
16893
IS 571 - 1969 Specification For Mono Sodium Phosphate (2Copies)
213 /16894 IS 586 - 1976 Specification For Leclanche Type Dry Batteries For
Telecommunication Signalling & Purposes
214 /9264,
16895
IS 590 - 1964 Specification For Fixed Paper Dielectric Capacitors For Dc (2 Copies)
215 /9265,
16896
IS 591 - 1964 Specification For Mains Transformers For Electronic Equipments (2
Copies)
216 /16897 IS 597 - 1978 Specification For Pack Rolled Tin Plate & Pack -Rolled Black Plate
217 /14675 IS 605 - 1960 Code Of Practice For Construction Of Food Grain Storage Structures
Suitable For Trade And Government Purpose For The Central
Region
218 /16898 IS 613 - 1984 Specification For Copper Rods & Bars For Electrical Purposes
219 /16899 IS 620 - 1984 Specification For Wooden Tool Handles General Requirement
220 /16900 IS 639 - 1982 Specification For Gold Leaf
221 /16901 IS 648 - 1980 Specification For Non Oriented Electrical Steel Sheets & Strips For
Magnetic Circuits
222 /14437 IS 650 - 1955 Specification For Standard Sand For Testing Of Cement
8. INDIAN STANDARDS
SR# / REF # AUTHOR TITLE
8
223 /16902,
16903,
16904,
16905, 16906
IS 650 - 1966 Specification For Standard Sand For Testing Of Cement (5Copies)
224 /16907 IS 651 - 1965 Specification For Salt Glazed Stoneware Pipes And Fitting
225 /16908 IS 651 - 1980 Specification For Salt Glazed Stoneware Pipes & Fitting
226 /16909 IS 653 - 1962 Specification For Sheet Linoleum
227 /16913 IS 653 - 1980 Specification For Lenoleum Sheets & Tiles
228 /14685 IS 654 - 1957 Clay Roofing Tiles, Mangalore Pattern
229 /16910,
16911, 16912
IS 654 - 1962 Specification For Clay Roofing Tiles Mangabre Pattern (3Copies)
230 /16914,
16915
IS 654 - 1972 Specification For Clay Roffing Tiles Mangalore Pattern (2Copies)
231 /16916,
16917
IS 657 - 1962 Specification For Materials For Use In The Manufactures Of
Magnesium Oxychloride Flooring Compositions (2 Copies)
232 /16918 IS 657 - 1982 Specification For Materials For Use In The Manufacture Of
Magnesium Oxychloride Flooring Compositions
233 /16919,
16921
IS 658 - 1962 Code Of Practice For Magnesium Oxychloride Composition Floors(2
Copies)
234 /16920 IS 658 - 1982 Code Of Practice For Magnesium Oxychloride Composition Floors(2
Copies
235 /16922 IS 661 - 1964 Code Of Practice For Insulation And Safe Operation Of Cold Storage
236 /16233 IS 690(Pt-2 ) - 1983 Method Of Determination Of Colour Fastness Of Textile Materials To
Sea Water
237 /16923 IS 691 - 1984 Specification For Flexible Trailing Cables For Use In Coal Mines
238 /16924 IS 692 - 1965 Specification For Paper Insulated Lead Sheel Thed Cables For
Electricity
239 /16345 IS 693 - 1970 National Building Code Of India 1970
240 /16925 IS 694 - 1977 Specification For PVC Insulated Cables For Working Voltages Up To
And Including 1100 Volts
241 /1706 IS 696 - 1960 Code Of Practice For General Engineering Drawings
242 /14481,
16926, 16927
IS 702 - 1961 Specification For Industrial Bitumine (3 Copies)
243 /6035 IS 702 - 1988 Specification For Industrial Bitumen, IS 702 1988
244 /9742,
16930,
16931, 16932
IS 707 - 1976 Glossary Of Terms Applicable To Timber Technology And Utilization
(4 Copies)
245 /13938
TO 13940
IS 710 - 1957 Marine Ply Wood (3 Copies)
246 /16928,
16929
IS 710 - 1976 Specification For Marine Plywood (2 Copies)
247 /9795 IS 712 - 1956 Specification For Building Limes (2 Copies)
248 /16937,
16938,
16941, 16943
IS 712 - 1964 Specification For Building Limes (4 Copies)
249 /2099,
2100, 16934,
16936,
16939, 16940
IS 712 - 1973 Specification For Building Limes (6 Copies)
250 /9267,
9792, 13927,
13928,
14417,
16933, 16942
IS 712 - 1984 Specification For Building Limes (6 Copies)
251 /16935 IS 712 - 1989 Specification For Building Limes
252 /16944 IS 713 - 1981 Specification For Zinc Base Alloy Ingots For Die Casting
9. INDIAN STANDARDS
SR# / REF # AUTHOR TITLE
9
253 /16945 IS 722(Pt-1 ) - 1977 Specifcation For A C Electricity Meters General Requirement & Test
254 /16946 IS 722(Pt-2 ) - 1977 Specification For A C Eletricity Meters, Singlephase Whole Current
Watthour Meters Class-2
255 /16947 IS 722(Pt-3 ) - 1977 Specification For A C Electricity Meters, Threephase Wholecurrent &
Trans.Operated & Singlephase Trans.Operated Class-2
256 /16948 IS 729 - 1979 Specification For Drawer Locks Cupboard Locks & Box Locks
257 /16949,
16950, 16951
IS 730 - 1966 Specification For Hook Bolt For Corrugated Sheet Roofing (3Copies)
258 /14344 IS 730 - 1978 Hook Bolts For Corrugated Sheet Roofing
259 /16952 IS 732(Pt-1 ) - 1982 Code Of Practice For Electrical Wiring Installations, Definitions
General Rquirement
260 /16953 IS 732(Pt-2 ) - 1983 Code Of Practice For Electrical Wiring Installation
261 /16954 IS 732(Pt-3 ) - 1982 Code Of Practice For Electrical Wiring Installation
262 /16955 IS 738 - 1977 Specification For Wrought Aluminium Alloy Drawn Tuto For
Alluminium & General Engineering Purposes
263 /16956 IS 739 - 1977 Specification For Wrought Aluminium & Alluminium Alloy Wire For
General Engineering Purposes
264 /16957 IS 740 - 1977 Specification For Wrought Alluminium & Alluminium Alloy Rivet Stock
For General Engeering Purposes
265 /16958 IS 742 - 1981 Specification For Zinc Base Alloy Die Castings
266 /14581
TO 14585
IS 770 - 1960 General Classification Of Coals (5 Copies)
267 /16965 IS 770 - 1964 General Classification Of Coal
268 /16963,
16964
IS 770 - 1977 Classification & Codification Of Indian Coals & Lignites (2Copies)
269 /16967 IS 771(Pt-1 ) - 1979 Specification For Glazed Fire -Clay Sanitary Applinces, General
Rrequiremets
270 /16968 IS 771(Pt-2 ) - 1979 Specification For Glazed Fire Clay Sanitary Appliances, Specific
Requirtement Of Kitchen & Laboratory Sinks
271 /16966 IS 771(Pt-3/Sec-1) - 1979 Specification For Glazed Fire Clay Sanitary Appliances,
Specification Requirements Of Urinals Sec1.Slab Urinals
272 /16969 IS 771(Pt-3/Sec-2) - 1979 Specification For Glazed Fire Clay Sanitary Applinces, Specification
Requirements Of Urinals Sec.2 Stall Urinals
273 /16974 IS 771(Pt-3/Sec-2) - 1985 Specification For Glazed Fire Clay Sanitary Applinces, Specification
Requirements Of Urinals Sec.2 Stall Urinals
274 /16971 IS 771(Pt-4 ) - 1979 Specification For Glazed Fire Clay Sanitary Applinances, Specific
Requirement Of Post-Mortem Slabs
275 /16970 IS 771(Pt-5 ) - 1979 Specification For Glazed Fire Clay Sanitary Appliances, Specific
Requirements Of Shower Trays
276 /16972 IS 771(Pt-6 ) - 1979 Specification For Glazed Fire Clay Sanitary Appliances, Specific
Requirement Of Bed Pan Sinks
277 /16973 IS 771(Pt-8 ) - 1981 Specification For Glazed Fire Clay Sanitary Appliances, Specific
Requirement Of Slope Sinks
278 /16975 IS 774 - 1971 Specification For Flushing Cisterns For Water Closets & Urinals
(Other Than Plastic Cisterns)
279 /16976 IS 774 - 1981 Specification For Flushing Cisterns For Water Closets & Urinals
(Other Than Plastic Cisterns)
280 /13915 IS 777 - 1976 Glazed Earth Ware Tiles
281 /16977 IS 778 - 1980 Specification For Copper Alloy Gate Globe & Check Valves For
Water Works Purposes
282 /16978,
16979
IS 778 - 1984 Specification For Copper Alloy Gate , Globes & Check Valves For
Water Works Purposes (2Copies)
283 /16980 IS 779 - 1978 Specification For Water Meters (Domestic Type)
284 /5218 IS 779 - 1994 Water Meters(Domestic Type)-Specifications
10. INDIAN STANDARDS
SR# / REF # AUTHOR TITLE
10
285 /16982 IS 780 - 1984 Specification For Sluice Valves For Water Works Purposes(50 To
300 Mm Sizes)
286 /16959 IS 781 - 1977 Specification For Cast Copper Alloy Screw Down Bib Taps & Stop
Values For Water Services
287 /16983 IS 781 - 1984 Specification For Cast Copper Alloy Screw Down Bib Taps & Stop
Valves For Water Services
288 /16981 IS 782 - 1978 Specification For Cauking Lead
289 /16984,
16985,
16986,
16987,
16988,
16989, 16990
IS 783 - 1959 Code Of Practice For Laying Of Conncrete Pipes (7Copies)
290 /14448,
16960, 16962
IS 784 - 1959 Specification For Prestressed Concrete Pipes, (3 Copies)
291 /16991 IS 784 - 1978 Specification For Prestressed Concrete Pipes (Including Fittings)
292 /16992 IS 785 - 1964 Specification For Reinforced Concrete Poles For Over Head Power &
Telecommunication Lines
293 /1704,
1899, 9269,
14676 TO
14678,
14933, 14934
IS 786 - 1956 Conversion Factors And Conversion Tables (8 Copies)
294 /11721 IS 786 - 1959 Indian Standard Conversion Factors And Tables
295 /2112,
6032, 6033
IS 786 - 1967 Si Supplement To Indian Standard Conversion Factors & Conversion
Tables, IS 786 1967 (Supplement) (3 Copies)
296 /9266 IS 787 - 1964 Guide For Inter Conversion Of Values From One System Of Units To
Another
297 /16993 IS 789 - 1971 Specification For Ink, Drawing, Water Proof, Black
298 /14686 IS 790 - 1956 General Structure Of Preliminary Pages Of A Book
299 /14687 IS 791 - 1956 Half-Title-Leaf Of A Book
300 /14688 IS 792 - 1956 Title-Leaf Of A Book
301 /16994 IS 792 - 1964 Specification For Title-Page & Back Of Title Page Of A Book
302 /14689 IS 793 - 1956 Practice For Author Statement In The Title Page Of A Book
303 /14690 IS 794 - 1956 Practice For Table Of Contents
304 /13924
TO 13926
IS 795 - 1956 Canons For Making Abstracts (3 Copies)
305 /16995 IS 795 - 1976 Guide For Preparation Of Abstracts
306 /16961 IS 796 - 1959 Glossary Of Cataloguing Terms
307 /16996 IS 796 - 1966 Glossary Of Cataloguing Terms
308 /17015 IS 800 - 1956 Code Of Practice For Use Of Structural Steel In General Building
Construction
309 /9268,
14592,
17012,
17013,
17014
IS 800 - 1962 Code Of Practice For Use Of Structural Steel In General Building
Construction (5 Copies)
310 /10429 IS 800 - 1984 Code Of Practice For General Construction In Steel
311 /17007 IS 801 - 1975 Code Of Practice For Use Of Cold Formed Light Guage Steel
Structural Memers In General Building Construction
312 /17008 IS 802(Pt-1 ) - 1977 Code Of Practice For Use Of Strustural Steel In Over Head
Transmission Line Towers Load & Permissible stress
313 /17005 IS 802(Pt-2 ) - 1978 Code Of Practice For Use Of Structure Steel In Overhead
Transmission Line Towers, P-2 Fabrication, Galvanizing, Inspection
& Packing
11. INDIAN STANDARDS
SR# / REF # AUTHOR TITLE
11
314 /17006 IS 802(Pt-3 ) - 1978 Code Of Practice For Use Of Structural Steel In Over Head
Transmission Line Towers, P-3 Testing
315 /17016 IS 803 - 1976 Code Of Practice For Design Fabrication & Erection Of Vertical Mild
Steel Cylindrical Welded Oil Storage Tank
316 /17004 IS 805 - 1968 Code Of Practice For Use Of Steel In Gravity Water Tanks
317 /17000 IS 807 - 1976 Code Of Practice For Design Manufacture Erection & Testing
(Structural Portion )Of Cranes & Hoists
318 /14189 IS 808(Pt-2 ) - 1978 Dimensions For Hot Rolled Steel Sections Part-2 Columns
319 /14466 IS 808(Pt-5 ) - 1976 Dimension For Hot-Rolled Steel Sections Part-5 Equal Leg Angles
320 /14469 IS 808(Pt-6 ) - 1976 Dimension For Hot-Rolled Steel Sections Part-6 Unequal Leg Angles
321 /17001,
17002
IS 808 - 1964 Specification For Rolled Steel Beam Channel & Angle Sections
(2Copies)
322 /16997 IS 809 - 1970 Specification For Rubber Flooring Materials For General Purposes
323 /16998,
16999
IS 811 - 1965 Specification For Cold Formed Light Guage Structural Steel Sections
(2Copies)
324 /1600 IS 812 - 1951 Methods For The Sampling &Testing Of Mineral Aggregates, Sand &
Filters
325 /17009 IS 814 - 1957 Specification For Covered Electrodes For Menual Metal Arc Welding
Of Carbon & Carbon Manganese
326 /1946,
14702
IS 815 - 1956 Classification And Coding Of Covered Electrodes For Metal Arc
Welding Of Mild Steel And Low Alloy Steel (2 Copies)
327 /17022,
17023
IS 815 - 1974 Classification Coding Of Covered Electodes For Metal Arc Welding
Of Structural Steels (2Copies)
328 /14703 IS 816 - 1956 Code Of Practice For Use Of Metal Arc Welding For General
Construction In Mild Steel
329 /9271,
14700
IS 825 - 1956 Colour Code For Fixed Resistors (2 Copies)
330 /17010,
17011
IS 841 - 1968 Specification For Hand Hammers (2 Copies)
331 /14496 IS 844(Pt-3 ) - 1979 Screw Drivers
332 /17019,
17020
IS 848 - 1974 Specification For Synthetic Resin Adhesives For Plywood (Phenolic
& Aminoplastic) (2Copies)
333 /17024 IS 851 - 1978 Specification For Synthetic Resin Adhesives For Construction Works
(Non Structural ) In Wood
334 /1707 IS 852 - 1957 Animal Glue For General Wood Working Purposes
335 /14701 IS 874 - 1956 Dextrose Minohydrate
336 /17017 IS 875(Pt-1 ) - 1987 Code Of Practice For Design Loads (Other Than Earth Quake) For
Building & Structures P-1 Dead Load Unit Weight Of Building
Material & Stored Material
337 /17018 IS 875(Pt-3 ) - 1987 Code Of Practice For Design Load (Other Than Earth Quake)For
Building & Structures P-3 Wind Loads
338 /17003 IS 875(Pt-4 ) - 1987 Code Of Practice For Design Loads(Other Than Earthquake)For
Building & Structure,P-4 Snow Load
339 /10349 IS 875(Pt-5 ) - 1964 Code Of Practice For Design Loads Of Buildings And Structures -
Special Loads And Load Combinations Loading Standards
340 /1427,
17021
IS 875 - 1957 Code Of Practice For Structural Safety Of Buildings Loading
Standards (2 Copies)
341
/15414,15410
, 14463,
13876
IS 875 - 1964 Code Of Practice For Structural Safety Of Building Loading
Standards (4 Copies)
342 /17025 IS 878 - 1975 Specification For Graduated Measuring Cylinders
343 /14427,
14451
IS 883 - 1957 Code Of Practice For Use Of Structural Timber In Building (Material
Grading & Design) (2 Copies)
344 /17026 IS 883 - 1963 Code Of Practice For Use Of Structural Timber In Building
(Materials,Grading & Design
12. INDIAN STANDARDS
SR# / REF # AUTHOR TITLE
12
345 /17028,
17029
IS 884 - 1985 Specification For First Aid Hose Reel For Fire Fighting (2 Copies)
346 /14698 IS 886 - 1957 Dimensions For Screw Threads
347 /17027 IS 897 - 1982 Specification For Tungsten Filament Electric Lamps For Railway
Rolling Stock
348 /17030 IS 903 - 1984 Specification For Fire Hose Delivery Coupling Branch Pipe Nozzles &
Nozzle Spanner
349 /17031 IS 904 - 1983 Specification For 2Way & 3Way Suction Collecting Heads For Fire
Fighting Purposes
350 /17032 IS 907 - 1984 Specification For Struction Strainers Cylindrical Type For Fire
Fighting Purposes
351 /17033 IS 917 - 1958 Specification For Activated Calcium Carbonate For Rubber Industry
352 /17034,
17035
IS 918 - 1968 Specification For Calcium Carbonate Precipitated For Cosmetics
Industry (2Copies)
353 /17036 IS 927 - 1981 Specification For Fire Hooks
354 /17037 IS 928 - 1984 Specification For Fire Bells
355 /17038 IS 930 - 1977 Specification For Wooden Extension Ladder For Fire Brigade Use
356 /17039 IS 933 - 1976 Specification For Portable, Chemical Fire Extinguisher Foam Type
357 /17040 IS 934 - 1974 Specification For Portable Chemical Fire Extenguisher Soda Acid
Type
358 /17041 IS 937 - 1981 Specification For Washer For Water Fitting For Fire Fighting
Purposes
359 /17042 IS 939 - 1977 Specification For Snatch Block Use With Fiber Rope For Fire
Brigade Use
360 /17043 IS 940 - 1976 Specification For Potable Chemical Fire Extingusher,Water Type
(Gas Pressure)
361 /17044 IS 941 - 1976 Functional Requirements For Blower & Exhauster For Fire Fighting
362 /17045 IS 942 - 1982 Functional Requirement For 275 Min Portable Pump Set For Fire
Fighting
363 /17046 IS 946 - 1982 Functional Requirement For Motor Fire Engine
364 /17047 IS 948 - 1983 Functional Requirement For Water Tender Type `A' For Fire Brigade
Use
365 /17048 IS 950 - 1980 Functional Requirement For Water Tender Type `B' For Fire Brigade
Use
366 /17049 IS 951 - 1977 Specification For Functional Requirements Crash Tender For Air
Fields
367 /17050 IS 955 - 1980 Functional Requirement For Dry Powder Tender For Fire Brigade
Use
368 /17051 IS 958 - 1975 Specification For Temporary Corrosion Preventive, Grease, Soft
Film, Cold Application
369 /17052 IS 961 - 1962 Specification For Structrural Steel( High Tensile)
370 /17053,
17054
IS 961 - 1975 Specification For Structrural Steel( High Tensile) (2 Copies)
371 /17055 IS 962 - 1967 Code Of Practice For Architectural & Building Drawing
372 /17056 IS 964 - 1956 Methods For Chemical Analysis Of Silver Solder
373 /9785,
17057,
17058,
17059,
17060,
17061, 17062
IS 965 - 1963 Equivelent Metric Units For Scales,Dimensions & Quantities In
General Construction Work (7 Copies)
374 /17063 IS 996 - 1979 Specification For Single Phase Small A C & Universal Electric Motors
375 /13899 IS 997 - 1957 Lime Stone For Glass Industry
376 /17064 IS 997 - 1973 Specification For Limestone & Dolomite For Glass Industry
13. INDIAN STANDARDS
SR# / REF # AUTHOR TITLE
13
377 /17065 IS 998(Pt-1 ) - 1983 Methods Of Chemical Analysis Of Solders(Soft & Resin
Cord)Determination Of Tin & Antimony
378 /17066 IS 998(Pt-2 ) - 1983 Methods Of Chemical Analysis Of Solders ( Soft & Resin Cord )
Determination Of Iron, Copper & Arsenic
379 /17067 IS 998(Pt-3 ) - 1983 Methods Of Chemical Analysis Of Solders (Soft & Resin Cord),
Determination Of Cadmium, Zinc, Aluminuium, Bismuth, Nikel
380 /17068,
17095
IS 1003(Pt-1 ) - 1966 Specification For Timber Panelled & Glazed Shutter, Door Shutters
(2 Copies)
381 /17069,
17070
IS 1003(Pt-2 ) - 1966 Specification For Timber Panelled & Glazed Shutter, Window &
Ventilator Shutter (2Copies)
382 /1692,
14679, 14680
IS 1003 - 1957 Specification For Timber Paneled &Glazed Shutters (3 Copies)
383 /9976,
17100,
17101,
17102,
17103,
17104, 17105
IS 1020 - 1957 Conversion Table For Ordinary Use (7 Copies)
384 /17071 IS 1020 - 1984 Specification For In Flexible Trailing Cables For Use In Quarries &
Metalliforous Mines
385 /17309 IS 1021 - 1982 Specification For Standared Signal Generator In The Frequency
Range 30 Mh2 To 500Mh2 , Permormance Requ
386 /14699 IS 1030 - 1956 Steel Casting For General Engineering Purposes
387 /17107,
17108,
17109, 17110
IS 1030 - 1962 Specification For Carbon Steel Casting For General Engineering
Purposes (4 Copies)
388 /17073 IS 1030 - 1982 Specification For Carbon Steel Casting For General Engineering
Purposes
389 /17111 IS 1035 - 1964 Methods Of Sampling & Test For Bleaching Earths
390 /17112,
17114, 14477
to 14480
IS 1038 - 1957 Specification For Steel Doors Windows & Ventilators (6 Copies)
391 /9241 IS 1038 - 1975 Specification For Steel Doors, Windows And Ventilators
392 /17074 IS 1046 - 1979 Specification For Cash Boxes
393 /6050 IS 1056 - 1965 Commercial Metric Weight
394 /9242,
17072
IS 1058 - 1962 Specification For Commercial Metric Capacity Measures (2 Copies)
395 /17113 IS 1061 - 1975 Specification For Disinfectant Fluids Black & White
396 /17075 IS 1067 - 1981 Specification For Electroplated Coatings Of Silver For Decorative &
Protective Purposes
397 /9239 IS 1068 - 1988 Specification For Copper, Nickel And Chromium Electroplated
Coatings
398 /14577
TO 14580
IS 1069 - 1957 Water For Storage Batteries (4 Copies)
399 /17076,
17077,
17078,
17079,
17080,
17081,
17082, 17083
IS 1070 - 1960 Specification For Water Distilled Quality (8Copies)
400 /14416,
14568
IS 1077 - 1957 Specifications For Common Burnt Clay Building Bricks (2 Copies)
401 /17084,
17085,
17086,
17087, 17088
IS 1077 - 1970 Specification For Common Burnt Clay Building Bricks (5Copies)
14. INDIAN STANDARDS
SR# / REF # AUTHOR TITLE
14
402 /9770 IS 1077 - 1976 Specification For Common Burnt Clay Building Bricks
403 /14419 IS 1077 - 1989 Common Burnt Clay Building Bricks
404 /14694 IS 1078 - 1975 Methods For Determination Of Specific Gravity & Porosity Of Natural
Building Stones
405 /1424,
1437, 9691,
10411, 17089
to 17091
IS 1080 - 1962 Code Of Practice For Design And Construction Of Shallow
Foundations On Soils ( 7 Copies)
406 /17096 IS 1080 - 1980 Code Of Practice For Design & Construction Of Simple Spread
Foundations
407 /1425,
17097
IS 1080 - 1985 Code Of Practice For Design & Construction Of Shallow Foundations
In Soils (Other Than Rraft, Ring & Shell ) (2 Copies)
408 /17092,
17093,
17094, 17099
IS 1081 - 1960 Code Of Practice For Fixing & Glazing Of Metal (Steel & Aluminium
)Doors, Windows & Ventilators (4 Copies)
409 /17098 IS 1084 - 1969 Specification For Manila Ropes
410 /14697 IS 1110 - 1957 Ferro Silicon
411 /17115 IS 1110 - 1981 Specification For Ferrosilicon
412 /10415,
17116,
17117,
17118, 17119
IS 1121(Pt-1 ) - 1974 Methods Of Test For Determination Of Sterngth Properties Of Natural
Building Stones,Compresive Strength (5 Copies)
413 /9776,
17120,
17121,
17122, 17123
IS 1121(Pt-2 ) - 1974 Method Of Test For Determination Propereties Of Natural Building
Stones,Transverse Strength (5 Copies)
414 /9797,
17124,
17125,
17126,
17127, 17128
IS 1121(Pt-3 ) - 1974 Methods Of Test For Determination Of Strength Properties Of Natural
Building Stones,Tensile Strength (6 Copies)
415 /10413 IS 1121(Pt-3 ) - 1979 Method Of Test For Determination Of Strength Properties Of Natural
Building Stones Tensile Strength
416 /10412,
17129,
19130,
17131,
17132,
IS 1121(Pt-4 ) - 1974 Methods Of Test For Determinationof Strength Properties Of Natural
Building Stones,Shear Strength (5 Copies)
417 /10414 IS 1121(Pt-6 ) - 1974 Method Of Test For Determination Of Strength Properties Of Natural
Building Stones Transverse Strength
418 /14423,
13995
IS 1121 - 1957 Method For Determination Of Compressive Transfers And Shear
Strengths Of Natural Building Stone (2 Copies)
419 /14421 IS 1122 - 1957 Method For Determination Of Specific Gravity And Porosity Of
Natural Building Stone
420 /2098,
9789, 10416,
17133,
17134,
17135,
17136,
17137,
17138, 17139
IS 1122 - 1974 Methods Of Test For Determination Of True Specific Gravity Of
Natural Building Stones (10 Copies)
421 /14449,
13999,
14426, 14453
IS 1123 - 1957 Method For Petrographical Examination Of Natural Building Stone (4
Copies)
15. INDIAN STANDARDS
SR# / REF # AUTHOR TITLE
15
422 /2131,
9748, 10324,
10359,
17143,
17144,
17145,
17146,
17147,
17148,
IS 1123 - 1975 Methods Of Identification Of Natural Building Stones (10 Copies)
423 /14420,
14422
IS 1124 - 1957 Method Of Test For Water Absorption Of Natural Building Stone (2
Copies)
424 /2101,
10367,
17149, 17150
IS 1124 - 1974 Method Of Test For Determination Of Water Absorption, Apparent
Specific Gravity & Porosity Of Natural Building Stones (4 Copies)
425 /14428 IS 1125 - 1957 Method Of Test For Weathering Of Natural Building Stone
426 /10358,
17140, 17141
IS 1125 - 1974 Methods Of Test For Determination Of Weathering Of Natural
Building Stones (3 Copies)
427 /14442,
17142
IS 1126 - 1957 Method Of Test For Determination Of Durability Of Natural Building
Stones (2 Copies)
428 /10417,
17151
IS 1126 - 1974 Method Of Test For Determination Of Durability Of Natural Building
Stones (2 Copies)
429 /14429,
14440
IS 1127 - 1957 Dimension And Workmanship Of Natural Building Stone (2 Copies)
430 /10360,
17152
IS 1127 - 1970 Recommendations For Dimensions And Workmanship Of Natural
Building Stones For Masonry Work (2 Copies)
431 /13998,
14454
IS 1128 - 1957 Lime Stone Slabs (2 Copies)
432 /10018,
17153,
17154,
17155,
IS 1128 - 1974 Specification For Lime Stone ( Slab & Tiles) (4 Copies)
433 /14441 IS 1129 - 1950 Dressing Of Natural Building Stone
434 /17156,
17157,
IS 1129 - 1972 Recomendation Of Dressing Of Natural Building Stone (2 Copies)
435 /2047,
2096, 17158,
17159,
IS 1130 - 1969 Specification For Marble(Blocks,Slab & Tiles) (4 Copies)
436 /14705,
14706
IS 1135 - 1957 General Requirement For Leaf Springs For Automobile Suspension
(2 Copies)
437 /17160,
17161,
17162,
17163,
17164,
17165,
IS 1137 - 1959 Thickness Of Sheet & Diameter Of Wire (6 Copies)
438 /14430 IS 1139 - 1959 Hot Rolled Mild Steel And Medium Tensile Steel Deterred Bars For
Concrete Reinforcement
439 /17166,
17167,
17168,
17169,
17170,
17171,
17172,
IS 1139 - 1966 Specification Of Hot Rolled Mild Steel & Medium Tensile Steel &
Highyield Strength Steel Deformed Bars For Concrete
Reinforcement (7Copies)
440 /9743,
17173,
17174,
IS 1141 - 1973 Code Of Practice For Seasoning Of Timber (3 Copies)
16. INDIAN STANDARDS
SR# / REF # AUTHOR TITLE
16
441 /17175 IS 1146 - 1981 Specification For Rubber & Plastics Containers For Lead Acid
Storage Batteries
442 /17176 IS 1148 - 1982 Specification For Hot Rolled Steel Rivet Bars For Structural
Purpose(Up To 40 mm Dia)
443 /17177 IS 1149 - 1982 Specification For High Tansile Steel Rivet Bars For Strctural
Purposes
444 /17178 IS 1150 - 1976 Trade Names & Abbriviated Symbols For Timber Species
445 /17179 IS 1153 - 1975 Specification For Temporary Corrosion Preventive, Fluid, Hard Film
Solvent Deposited
446 /17180 IS 1161 - 1979 Specification For Steel Tubes For Structural Purposes
447 /13993,
13994
IS 1171 - 1957 Ferro Manganese (2 Copies)
448 /14439 IS 1172 - 1957 Code Of Basic Requirement For Water Supply, Drainage And
Sanitation
449 /17106 IS 1172 - 1963 Code Of Basic Requirement For Water Supply Drainage & Sanitation
450 /9240,
17183,
17184,
17185,
17186,
17187,
17188, 17189
IS 1172 - 1983 Code Of Basic Requirement For Water Supply, Drainage &
Sanitation (8 Copies)
451 /14424,
14460
IS 1173 - 1957 Hot Rolled & Slit Steel Tee Bars ( 2 Copies )
452 /17190 IS 1173 - 1978 Specification For Hot Rolled & Slit Steel Tee Bars
453 /14425 IS 1174 - 1957 Definition Of Mica Terms
454 /17191 IS 1176 - 1977 Dimension For Aerial Rod & Slabs Of Ferrimagnetic Materials
455 /17192 IS 1180(Pt-1 ) - 1981 Specification For Outdoor Type Threephase Disribution Transformers
Up To & Including 100Kva 11Kv, Non Sealed Type
456 /17193 IS 1180(Pt-2 ) - 1979 Specification For Outdoor Type Threephase Disribution Transformers
Up To & Including 100Kva 11Kv, Sealed Type
457 /13996,
13997, 14452
IS 1182 - 1957 General Recommendation For Radiographic Examination Of Fusion
Welded Joints (3 Copies)
458 /17194 IS 1182 - 1983 Recomended Practice For Radiograph Examination Of Fusion
Welded Butt Joints In Steel Plates
459 /17197,
17198,
17199,
17201,
IS 1191 - 1958 Code Of Practice For Playing Mastic Asphatt Flooring (4 Copies)
460 /17195,
17196, 9258-
59
IS 1191 - 1959 Glossary Of Terms Used In Measurement Of Flow Of Water In Open
Channels (4 Copies)
461 /14625 IS 1192 - 1954 Velocity Area Methods For Measurement Of Flow Of Water In Open
Channels
462 /1760,
9255, 9924
IS 1192 - 1959 Velocity Area Method For Measurement Of Flow Of Water In Open
Channels (3 Copies)
463 /9256-57,
14691,
14692,
17202, 17203
IS 1193 - 1959 Measurement Of Flow Of Water In Open Channels Using Notches,
Weirs And Flumes (6 Copies)
464 /9498,
14433
IS 1194 - 1960 Forms For Recording Measurement Of Flow Of Water In Open
Channels
465 /17200,
13990 to
13992
IS 1195 - 1978 Specification For Bitumen Mastic For Flooring (4 Copies)
466 /17204 IS 1197 - 1970 Code Of Practice For Laying Of Rubber Floors
17. INDIAN STANDARDS
SR# / REF # AUTHOR TITLE
17
467 /17206,
17207,
17208,
IS 1198 - 1958 Code Of Practice For Laying & Maintanance Of Lenoleum Floors (3
Copies)
468 /17205 IS 1198 - 1982 Code Of Practice For Laying Fixing & Maintanance Of Linolaum
Floors
469 /9802,
17209,
17210,
17211,
17212,
IS 1199 - 1959 Method Of Sampling & Analysis Of Concrete(5 Copies)
470 /17215,
17216,
IS 1200(Pt-1 ) - 1959 Method Of Measurement Of Building & Civil Engineering Works
Earth Works (2 Copies)
471 /9254 IS 1200(Pt-1 ) - 1974 Measurement Of Building And Civil Engineering Works, Pt. 1
Earthwork
472 /17217,
17218,
IS 1200(Pt-2 ) - 1968 Method Of Measurement Of Building & Civil Engineering Work,
Cement Concrete Works (2 Copies)
473 /9251 IS 1200(Pt-2 ) - 1974 Measurement Of Building And Civil Engineering Works, Pt. 2
Concrete Works
474 /17219,
17220,
IS 1200(Pt-3 ) - 1970 Method Of Measurement Of Building & Civil Engineering Work ,
Brick Work (2 Copies)
475 /9252,
17213
IS 1200(Pt-3 ) - 1976 Measurement Of Building And Civil Engineering Works, Pt. 3
Brickwork (2 Copies)
476 /17221,
17222,
17223,
IS 1200(Pt-4 ) - 1976 A Method Of Measurement Of Building & Civil Engineering Works,
Stone Masonary (3 Copies)
477 /9249,
17243
IS 1200(Pt-5 ) - 1972 Measurement Of Building And Civil Engineering Works, Pt. 5 Form
Work (2 Copies)
478 /17224 IS 1200(Pt-7 ) - 1972 Method Of Measurement Of Building & Civil Engineering Works,
Hard Ware
479 /17225,
17226,
17227,
IS 1200(Pt-8 ) - 1967 Method Of Measurement Of Building & Civil Engineering Works,
Steel Work & Iron Work (3 Copies)
480 /17231 IS 1200(Pt-11 ) - 1971 Method Of Measurement Of Building & Civil Engineering Works,
Paving & Floor Finishes
481 /17228 IS 1200(Pt-11 ) - 1977 Method Of Measurement Of Building & Civil Engineering Works,
Paving, Floor,Finishes,Dado &Skirting
482 /17229 IS 1200(Pt-12 ) - 1971 Method Of Measurement Of Building & Civil Engineering Works,
Plastering & Painting
483 /17235,
17236,
17237, 17238
IS 1200(Pt-13 ) - 1970 Method Of Measurement Of Building & Civil Engineering Works,
White Washing, Colour Washing, Distempring,Painting Of Building
Surfaces (4 Copies)
484 /17230 IS 1200(Pt-13 ) - 1976 Method Of Measurement Of Building & Civil Engineering Works,
White Washig,Colour Washing Distempring & Painting Of Building
Surfaces
485 /17253,
17254,
17255, 17256
IS 1200(Pt-14 ) - 1970 Method Of Measurement Of Building & Civil Engineering Works,
Glazing (4 Copies)
486 /17239 IS 1200(Pt-14 ) - 1984 Method Of Measurement Of Building & Civil Engineering Works,
Glazing
487 /17244,
17245,
17246, 17247
IS 1200(Pt-15 ) - 1968 Method Of Measurement Of Building & Civil Engineering Works,
Painting,Polishing, Varnishing, etc (4 Copies)
488 /17232,
17233, 17234
IS 1200(Pt-16 ) - 1969 Method Of Measurement Of Building & Civil Engineering Works,
Laying Of Water & Sewer Lines Including Appurtenant Items (3
Copies)
489 /9250,
17248
IS 1200(Pt-16 ) - 1979 Measurement Of Building And Civil Engineering Works, Pt. 16 Laying
Of Water And Sewer Lines, Appurtenant Items (2 Copies)
18. INDIAN STANDARDS
SR# / REF # AUTHOR TITLE
18
490 /9247,
17249,
17250, 17251
IS 1200(Pt-17 ) - 1969 Method Of Measurement Of Building & Civil Eng.Works, Roadwork
Including Airfield Pavement (4 Copies)
491 /2118 IS 1200(Pt-17 ) - 1971 Methods Of Measurement Of Building & Civil Engineering Works Part
17 Road Works Including Air Field Pavements
492 /17241 IS 1200(Pt-17 ) - 1985 Method Of Measurement Of Building & Civil Eng.Works, Road Work
,Including Air Field Pavement
493 /17252 IS 1200(Pt-18 ) - 1971 Method Of Measurement Of Building & Civil Engineering Works,
Demolition & Dismantling
494 /17259 IS 1200(Pt-19 ) - 1970 Method Of Measurement Of Building & Civil Engineering Works,
Water Supply Plumbing Drains &Sanitary Fittings
495 /17257 IS 1200(Pt-20 ) - 1969 Method Of Measurement Of Building & Civil Engineering Works,
Laying Of Gas & Oil Pipe Lines
496 /17263 IS 1200(Pt-20 ) - 1981 Method Of Measurement Of Building & Civil Engineering Works,
Laying Of Gas & Oil Pipe Lines
497 /17242 IS 1200(Pt-22 ) - 1982 Method Of Measurement Of Building & Civil Engineering Works,
Materials
498 /17258,
17260, 17261
IS 1200(Pt-23 ) - 1971 Method Of Measurement Of Building & Civil Engineering Works,
Piling (3 Copies)
499 /17265 IS 1200(Pt-24 ) - 1971 Method Of Measurement Of Building & Civil Engineering Works,
Well Foundations
500 /17264 IS 1200(Pt-24 ) - 1983 Method Of Measurement Of Building & Civil Engineering Works,
Well Foundations
501 /17240 IS 1200(Pt-26 ) - 1971 Method Of Measurement Of Building & Civil Engineering Works,
Tunneling
502 /17214,
17262
IS 1200 - 1958 Method Of Measurement Of Building Work (2 Copies)
503 /9253 IS 1200 - 1964 Measurement Of Building Works
504 /6097,
6139, 17268,
17269,
17270,
17271, 17272
IS 1201to1220 - 1958 Method For Testing Tar & Bitumen (7 Copies)
505 /6023,
6024, 17266,
17267, 17266
IS 1201-1220 - 1978 Method Of Testing For Tar & Bituminous Materials, (5 Copies)
506 /17274 IS 1230 - 1968 Specification For Cast Iron Rain Water Pipes & Fittings
507 /17275 IS 1230 - 1979 Specification For Cast Iron Rain Water Pipes & Fittings
508 /17304 IS 1233 - 1958 Recommendations For Modular Co-Ordination Of Dimensions In The
Building Industry
509 /17279
17280
IS 1237 - 1959 Specification For Cement Concrete Flooring Tiles (2 Copies)
510 /9977,
17276, 17277
IS 1239(Pt-1 ) - 1973 Specification For Mild Steel Tubes, Tubulars And Other Wrought
Steel Fittings, Pt. 1 Mild Steel Tubes (3 Copies)
511 /17281 IS 1239(Pt-1 ) - 1979 Specification For Mild Steel Tubes,Tubulars,& Other Wrought Steel
Fittings, Mild Steel Tubes
512 /17282 IS 1239(Pt-2 ) - 1982 Specification For Mild Steel Tubes,Tubulars,& Other Wrought Steel
Fittings, Mild Steel Tubulars & Other,Wrought Steel Pipe Fitting
513 /17278,
14450
IS 1239 - 1958 Specification For Mild Steel Tubes & Tubulars (2 Copies)
514 /17283 IS 1248(Pt-1 ) - 1983 Specification For Direct Acting Indicating Analouge Electrical
Measuring, Instrument & Their Accessories
515 /17284 IS 1248(Pt-3 ) - 1983 Specification For Direct Acting Indicating Analouge Electrical
Measuring Instrument & Their Accessories ,P-3, Wattmeters &
Varmetersa
19. INDIAN STANDARDS
SR# / REF # AUTHOR TITLE
19
516 /17273,
17286
IS 1248(Pt-4 ) - 1983 Specification For Direct Acting Indicating Analogue Electrical
Measuring Instrument & Their Accessories Part 4 Frequency Meters
(2 Copies)
517 /17285 IS 1248(Pt-5 ) - 1983 Specification For Direct Acting Indicating Analouge Electrical
Measuring Instrument & Their Accessories, P-5, Phase Meters,
Power Factor Meters & Synchroscope
518 /17287 IS 1248(Pt-8 ) - 1984 Specification For Direct Acting Indicating Analouge Electrical
Measuring Instrument & Their Accessories
519 /17288 IS 1248(Pt-9 ) - 1983 Specification For Direct Acting Indicating Analouge Electrical
Measuring Instrument & Their Accesories, Test Methods
520 /17289,
17290,
17291,
IS 1250 - 1958 Proof Correction For Printers & Authors, (3 Copies)
521 /17294,
17295,
17296,
17297,
17298,
IS 1256 - 1958 Code Of Practice For Building Byelaws
522 /9248 IS 1256 - 1967 Code Of Practice For Building Bylaws
523 /17292 IS 1264 - 1981 Specification For Brass Gravity Die Casting (Ingots & Casting)
524 /17299,
17300,
IS 1275 - 1958 Rules For Making Alphabetical Indexes (2 Copies)
525 /17301 IS 1288 - 1958 Method Of Test For Mineral Gypsum
526 /13936,
13937,
17293, 17303
IS 1292 - 1958 Specification For Silica Mortar For Laying Silica Bricks In Furnaces (4
Copies)
527 /17302 IS 1293 - 1958 Specification For Three Pin Plugs & Socket Outlets
528 /13934,
13935
IS 1298 - 1958 Methods Of Test For Determination Of Free Lime In Portland Cement
(2 Copies)
529 /17305 IS 1305 - 1984 Specification For Graphite For Use In Foundry Coatings
530 /17306 IS 1314 - 1984 Specification For Calcium Chloride
531 /17333 IS 1322 - 1959 Specification For Bitumen Felts For Water Proofing & Damp Proofing
532 /17330 IS 1322 - 1965 Specification For Bitumen Felts For Water Proofing & Damp Proofing
533 /17331
,17332
IS 1322 - 1970 Specification For Bitumen Felts For Water Proofing & Damp Proofing
(2 Copies)
534 /17307 IS 1323 - 1982 Code Of Practice For Oxy-Acetylene Welding For Structural Work In
Mild Steel
535 /17329 IS 1326 - 1976 Specification For Non-Coniferous Sawn Timber (Baulks & Scantling)
536 /17335 IS 1327 - 1977 Method Of Determination Of Mass Of Tin Coating On Tinplate
537 /14621,
13916
IS 1328 - 1958 Veneered Decorative Ply Wood (2 Copies)
538 /17336 IS 1328 - 1982 Specification For Veneered Decorative Plywood
539 /9746,
17337, 17338
IS 1329 - 1975 Specification For Aircraft Timber (Baulks& Scanttings) (3 Copies)
540 /14445 IS 1332 - 1950 Reinforced Concrete Street Lighting Columns
541 /17339 IS 1335 - 1979 Methods For Direct Determination Of Alumina In Refractory Materials
542 /17340 IS 1339 - 1977 Specification For Lead & Lead Alloys For Sheating Of Electric Cables
543 /17341 IS 1340 - 1977 Code Of Practice For Chromate Conversion Coating On Zinc &
Cadmium Coated Articles & Zinc Base Alloys
544 /17334 IS 1341 - 1976 Specification For Steel Butt Hinges
545 /17342 IS 1341 - 1981 Specification For Steel Butt Hinges
546 /17343,
17345,
17348,
17349,
17350,
IS 1343 - 1960 Code Of Practice For Prestreesed Concrete (5 Copies)
20. INDIAN STANDARDS
SR# / REF # AUTHOR TITLE
20
547 /9855,
17344,
17346,
17347,
17351,
IS 1343 - 1980 Code Of Practice For Prestressed Concrete (5 Copies)
548 /13931,
13932,
13933,
15193,
15194, 15195
IS 1344 - 1956 Surkhi For Use In Mortar And Concrete (6 Copies)
549 /2097,
17353, 17354
IS 1344 - 1968 Specification For Burnt Clay Pozzolana (3 Copies)
550 /9772 IS 1344 - 1981 Specification For Calcined Clay Pozzolana
551 /17355 IS 1346 - 1959 Code Of Practice For Water Proofing Of Roofs With Bitumen Felts
552 /17356 IS 1346 - 1966 Code Of Practice For Water Proofing Of Roofs With Bitumen Felts
553 /17352 IS 1346 - 1976 Code Of Practice For Water Proofing Of Roofs With Bitumen Felts
554 /17357 IS 1350(Pt-1 ) - 1970 Methods Of Test For Coal & Coke, Proximate Analysis
555 /17359,
17360
IS 1350(Pt-1 ) - 1984 Methods Of Test For Coal & Coke, Proximate Analysis (2 Copies)
556 /17358,
17361, 17362
IS 1350(Pt-2 ) - 1970 Methods Of Test For Coal & Coke, Determination Of Calorific Value
(3 Copies)
557 /17363,
17364
IS 1350(Pt-3 ) - 1969 Method Of Test For Coal & Coke, Determinaton Of Sulphur (2
Copies)
558 /17365,
17366,
17367, 17368
IS 1350(Pt-4/Sec-1) - 1969 Method Of Test For Coal & Coke, Ultimate Analysis Sec1 /
Determination Of Caron & Hydrogen (4 Copies)
559 /17369,
17370,
17371,
17372,
17373,
IS 1350(Pt-4/Sec-2) - 1975 Method Of Test For Coal & Coke, Ultimate Analysis / Sec2 /
Determination Of Nitrogen (5 Copies)
560 /13971 IS 1350 - 1959 Methods Of Test For Coal And Coke, Proximate Analysis, Total
Sulfur And Calorific Value
561 /13972 IS 1351 - 1959 Methods Of Test For Coal And Coke Ultimate Analysis
562 /13970 IS 1355 - 1959 Methods Of Test For Ash Of Coal And Coke
563 /17374,
17375
IS 1355 - 1984 Method Of Detrmination Of Chemical Of Ash Of Coal & Coke
Composition (2 Copies)
564 /17376 IS 1357 - 1977 Specification For Priting Type Metal Ingots
565 /17377 IS 1357 - 1984 Specification For Priting Type Metal Ingots
566 /17378 IS 1358 - 1959 Practice For Layout Of Library Catalouge Code
567 /17379 IS 1358 - 1967 Practice For Layout Of Library Catalouge Code
568 /17380 IS 1359 - 1977 Specification For Electroplating Coating Of Tin
569 /1945,
13973 TO
13975
IS 1361 - 1959 Steel Windows For Industrial Buildings (4 Copies)
570 /14217 IS 1365 - 1978 Slotted Counter Sunk Head Screw
571 /14401 IS 1370 - 1976 Friction Surface Rubber Transmission Belting
572 /17381 IS 1378 - 1979 Specification For Oxidized-Copper Finishes
573 /17382 IS 1384 - 1977 Specification For Oil Pressure Lanterns
574 /9973,
17383
IS 1387 - 1967 General Requirements For The Supply Of Metallurgical Materials (2
Copies)
575 /17384 IS 1394 - 1984 Glossary Of Terms Relating To Metal Containers
576 /17385 IS 1395 - 1982 Specification For Low & Medium Alloy Steel Covered Electrodes For
Manual Metal Arc Welding
577 /17387 IS 1403 - 1981 Methods For Reverse Bend Testing Of Metals
21. INDIAN STANDARDS
SR# / REF # AUTHOR TITLE
21
578 /17386 IS 1404 - 1970 Specification For Anti-Corrosive Paint, Brushing For Ships Bottoms &
Hulls, Red, Choclate Or Black As Required
579 /17388,
17389,
IS 1405 - 1966 Method Of Sampling Iron Ores(2 Copies)
580 /17394 IS 1406 - 1981 Specification For Rectangular Tins For Liquids
581 /17393 IS 1407 - 1980 Specification For Round Paint Tins
582 /17390,
17391,
17395,
IS 1414 - 1962 Code Of Practice For Fixing Wall Coverings (3 Copies)
583 /17392 IS 1417 - 1981 Grades Of Gold & Gold Alloys
584 /14510,
14613, 14620
IS 1432 - 1959 General Requirements For Weighing Instruments (3 Copies)
585 /17396 IS 1440 - 1959 Specification For Ink, Metal Stamp, Black
586 /17398,
17399,
IS 1443 - 1959 Code Of Practice For Laying & Finishng Of Cement Concrete
Flooring Tiles (2 Copies)
587 /17397 IS 1443 - 1989 Code Of Practice For Laying & Finishing Of Cement Concrete
Flooring Tiles
588 /17400 IS 1445 - 1977 Specification For Porcelain Insulators For Overhead Power Lines
With Nominal Volatage Up To & Including 1000V
589 /17401,
17402
IS 1449 - 1976 Methods Of Sampling Manganese Ore (2 Copies)
590 /18209 IS 1459 - 1974 Specification For Kerosine
591 /13888,
13889
IS 1464 - 1959 Ridge And Ceiling Tiles (2 Copies)
592 /18224,
18225
IS 1464 - 1973 Specification For Clay Ridge & Celling Tiles (2 Copies)
593 /18221 IS 1464 - 1992 Clay Ridge Find Ceiling Tiles Specification
594 /18222 IS 1466 - 1985 Specification For Ferrovanadium
595 /18219 IS 1468 - 1981 Specification For Ferro Titanium
596 /18220 IS 1469 - 1984 Specification For Ferromolybdenum
597 /18223 IS 1470 - 1979 Specification For Silico -Manganese
598 /18215 IS 1472 - 1977 Method For Sampling Ferro Alloy For Detemination Of Chemical
Composition
599 /18216,
18217, 18218
IS 1473 - 1960 Method Of Chemical Analysis Of Mangenese Ores (3 Copies)
600 /18213 IS 1475 - 1978 Specification For Self-Contained Drinking Water Coolers
601 /18214 IS 1476 - 1979 Specification For Domestic Refrigerator (Mechanically Operated)
602 /18210 IS 1477(Pt-1 ) - 1969 Code Of Practice For Finishing Of Iron & Steel In Building Painting &
Allied Finishes
603 /9245,
18211
IS 1477(Pt-1 ) - 1971 Code Of Practice For Painting Of Ferrous Metals In Buildings, Pt. 1
Pretreatment (2 Copies)
604 /18212 IS 1477(Pt-2 ) - 1971 Code Of Practice For Painting Of Ferrous Metals In Building Painting
605 /13890
TO 13892
IS 1478 - 1959 Clay Flooring Tiles (3 Copies)
606 /18231,
18232
IS 1478 - 1969 Specification For Clay Flooring Tiles(2 Copies)
607 /5225,
5301
IS 1489(Pt-1 ) - 1991 Portland Pozzolana Cement-Specification Pt-1 Fly Ash Based (2
Copies)
608 /5226 IS 1489(Pt-2 ) - 1991 Portland Pozzolana Cement-Specification Pt-2 Calcined Clay Based
609 /14491,
14492
IS 1489 - 1962 For Portland Pozzolana Cements (2 Copies)
610 /18227 IS 1489 - 1967 Specification For Portland Pozzolana Cement
22. INDIAN STANDARDS
SR# / REF # AUTHOR TITLE
22
611 /9246,
18226,
18228,
18229, 18230
IS 1489 - 1976 Specification For Portland Pozzolana Cement (5 Copies)
612 /18233 IS 1493(Pt-1 ) - 1981 Method Of Chemical Analysis Of Iron Ores, Determination Of
Common Constituents
613 /18234 IS 1493 - 1959 Method Of Chemical Analysis Of Iron Ore
614 /18235,
18236, 13893
TO 13897
IS 1498 - 1959 Classification & Identification Of Soils For General Engineering
Purposes (7 Copies)
615 /699,
6143, 9243,
14590, 18238
to 18241,
IS 1498 - 1970 Classification & Identification Of Soils For General Engineering
Purposes (8 Copies)
616 /18237 IS 1499 - 1977 Method For Charpy Impact Test U-Notch For Metals
617 /18242,
18243
IS 1500 - 1968 Method For Brinell Hardness Test For Steel (2 Copies)
618 /18244 IS 1501(Pt-1 ) - 1984 Method For Vickers Hardness Test For Metalic Materials,Hvs To Hv
100 Supesending IS- 1910-1961,IS;2866:1968 & IS:9258:1979
619 /18245 IS 1501(Pt-2 ) - 1985 Method For Vickerrs Hardness Test For Metallice Materials Hv 0.2 To
Less Then Hv5
620 /18246 IS 1503 - 1979 Specification For Wooden Packing Cases
621 /18247 IS 1513 - 1980 Specification For Wooden Pattern Euipment For Foundries
622 /14076
TO 14078,
18248
IS 1514 - 1959 Methods Of Sampling And Test For Quick Lime And Hydrated Lime
(4 Copies)
623 /18250 IS 1521 - 1960 Method For Tensile Testing Of Steel Wire
624 /13886,
13887,
14455, 18249
IS 1521 - 1972 Method For Tensile Testing Of Steel Wire (4 Copies)
625 /9774,
18251,
18252, 18253
IS 1527 - 1960 Methods Of Chemical Analysis Of Fireclay And Silica Reflactory
Materials (4 Copies)
626 /18277,
18278
IS 1528(Pt-1 ) - 1974 Methods Of Sampling & Refractory Material , Determination Of
Pyrometric Cone Equivalent (Pce) Or Softening Point (2 Copies)
627 /18271 IS 1528(Pt-2 ) - 1974 Methods Of Sampling & Physical Tests For Refractory Materials,
Determination Of Refractoriness Under Load (2 Copies )
628 /18267,
18268
IS 1528(Pt-3 ) - 1974 Methods Of Sampling & Physical Tests For Refractory Materials,
Determination Of Spalling Resistance (2 Copies)
629 /18273 IS 1528(Pt-3 ) - 1983 Methods Of Sampling & Physical Tests For Refractory Materials,
Determination Of Spalling Resistance
630 /18269,
18270
IS 1528(Pt-4 ) - 1974 Methods Of Sampling & Physical Tests For Refractory Materials,
Determination Of Cold Crushing Strength (2 Copies)
631 /18263,
16264
IS 1528(Pt-5 ) - 1974 Methods Of Sampling & Physical Tests For Refractory Materials,
Determination Of Modulus Of Rupture (2 Copies)
632 /18265 IS 1528(Pt-6 ) - 1974 Methods Of Sampli.& Physi.Tests For Refractory Materials ,
Determination Of Permenent Change After Reheating (2 Copies)
633 /18259,
18260
IS 1528(Pt-7 ) - 1974 Methods Of Sampling & Physical Tests For Refractory Materials,
Methods Of Sampling & Criteria For Conformity (2 Copies)
634 /18261,
18262
IS 1528(Pt-8 ) - 1974 Methods Of Sampling & Physical Tests For Refractory Materials ,
Determination Of Appraent Porosity (2 Copies)
635 /18255,
18256, 18257
IS 1528(Pt-9 ) - 1974 Methods Of Sampling And Physical Tests For Refractory Materials,
Determination Of True Specification Gravity & Density (3 Copies)
636 /18258 IS 1528(Pt-10 ) - 1974 Methods Of Sampling & Physical Tests For Refractory Materials ,
Determination Of Size Of Refractory Bricks
637 /18284,
18285
IS 1528(Pt-11 ) - 1974 Methods Of Sampling & Refractory Material, Determination Of
Warpage (2 Copies)
23. INDIAN STANDARDS
SR# / REF # AUTHOR TITLE
23
638 /18286,
18287
IS 1528(Pt-12 ) - 1974 Methods Of Sampling & Physical Tests For Refractory Material ,
Determination Of Bulk Density(2 Copies)
639 /18279,
18280, 18281
IS 1528(Pt-13 ) - 1974 Methods Of Sampling & Refractory Material, Disintegration Of
Resistence To Effect Of Carbon Monoxide (3 Copies )
640 /18282,
18283
IS 1528(Pt-14 ) - 1974 Methods Of Sampling & Refractory Material, Determination Of Siave
Analysis (2 Copies )
641 /18274,
18275, 18276
IS 1528 - 1962 Methods Of Sampling & Physical Test For Refractory Materials(3
Copies)
642 /18254 IS 1534(Pt-1 ) - 1977 Specificcation For Bailasts For Fluorescent Lamps, For Swith Start
Circuits
643 /9244,
18288,
18289, 18290
IS 1536 - 1976 Specification For Centrifugally Cast Iron Prressure Pipes For Water,
Gas & Sewage(4 Copies)
644 /18291,
18292,
18293,
18294, 18295
IS 1537 - 1976 Specification For Vertrically Cast Iron Prressure Pipes For Water,
Gas & Sewage (5 Copies)
645 /18296 IS 1538(Pt-14 ) - 1984 Specification For Castironfitting For Prressurepipes For Water, Gas &
Sewage, Specific Requirement For Doble Socket Tapers
646 /18297,
18298
IS 1538(Pt-23 ) - 1976 Specification For Cast Iron Fittigs For Prressure Pipes For Water,
Gas & Sewage (2Copies)
647 /18299 IS 1538(Pt-24 ) - 1982 Specification For Cast Iron Fittings For Prressure Pipes For Water,
Gas & Sewage All Specific Requirment For Flanged Radial Tees
648 /9274 IS 1538(Pt-1-23 ) - 1976 Specification For Cast Iron Fittings For Pressure Pipes For Water,
Gas And Sewage
649 /18300 IS 1540(Pt-1 ) - 1967 Specification For Quick Lime & Hydrated Lime For Chemical
Industries, Quick Lime
650 /18301 IS 1540(Pt-2 ) - 1970 Specification For Quick Lime & Hydrated Lime For Chemical
Industries, Hydrated Lime
651 /18302,
18303,
18304, 18305
IS 1542 - 1977 Specification For Sand For Plaster (4 Copies)
652 /18306 IS 1545 - 1982 Specification For Solid Drawn Copper Alloy Tubes For Condonsers &
Heat Exchangers
653 /18307 IS 1548 - 1969 Manual On Basic Principles Of Lot Sampling
654 /18308,
18309
IS 1553 - 1960 Code Of Practice Relating To Primary Elements In The Design Of
Lobrary Buildings (2 Copies)
655 /18310,
18311
IS 1553 - 1976 Recommendations Relating To Primary Elements In The Design Of
Library Buildings (2 Copies)
656 /18312 IS 1554(Pt-1 ) - 1976 Specification For PVC Insulated (Heavy Duty)Electric Cables, For
Working Voltages Up To & Including 1100V
657 /18313 IS 1554(Pt-2 ) - 1981 Specification For PVC Insulated (Heavy Duty)Electric Cables, For
Working Voltages From 3.3Kv & Including 11Kv
658 /18314 IS 1559(Pt-3 ) - 1982 Methods Of Chemical Analysis Of Ferro-Silicon , Determination Of
Sulpher
659 /18315 IS 1559(Pt-4 ) - 1982 Methods Of Chemical Analysis Of Ferro-Silicon , Determination Of
Phosherus
660 /18316 IS 1559(Pt-5 ) - 1982 Methods Of Chemical Analysis Of Ferro-Silicon , Determination Of
Aluminium
661 /18317 IS 1559(Pt-6 ) - 1982 Methods Of Chemical Analysis Of Ferro-Silicon, Determination Of
Calcium
662 /18318 IS 1559(Pt-7 ) - 1982 Methods Of Chemical Analysis Of Ferro-Silicon , Determination Of
Manganese
663 /18319,
18320
IS 1566 - 1967 Specification For Hard Drawn Steel Wire Fabric For Concrete
Reinforcement (2 Copies)
664 /18321 IS 1566 - 1982 Specification For Hard Drawn Steel Wire Fabric For Concrete
Reinforcement
24. INDIAN STANDARDS
SR# / REF # AUTHOR TITLE
24
665 /18322 IS 1569 - 1976 Specification For Capacitors For Use In Tubula
Fluorescent,Highpressure Mercury & L/P Sodium,Vapour
Dis.Lampcir
666 /18323 IS 1570(Pt-1 ) - 1978 Schedules For Wrought Steels, Steel Specified By Tensile And/Or
Yield Properties
667 /18324 IS 1570(Pt-2 ) - 1979 Schedule For Wrought Steels, Carbon Steel (Un Alloyed Steels)
668 /18325 IS 1570(Pt-3 ) - 1979 Shedule For Wroght Steels, Carbon & Carbon-Manganese Free
Cutting Steels
669 /9275 IS 1570 - 1961 Schedules For Wrought Steels For General Engineering Purposes
670 /13929,
13930, 14618
IS 1580 - 1960 Bitumen (Plastic For Water Proofing Purpose (3 Copies)
671 /18326,
18327
IS 1580 - 1969 Specification For Bituminous Compounds For Water Proofing &
Caulking Purposes (2 Copies)
672 /14431 IS 1592 - 1960 Asbestos Cement Pressure Pipes
673 /18328 IS 1592 - 1970 Specification For Asbestos Cement Pressure Pipes
674 /18329 IS 1596 - 1977 Specification For Polythylene Insulated Cables For Working Voltage
Up To & Including 1.100 Volts
675 /2108,
18330,
18331
IS 1597(Pt-1 ) - 1967 Code Of Practice Of Construction Of Stone Masonry, Part 1 Rubble
Stone Masonry (3 Copies)
676 /18332,
18333
IS 1597(Pt-2 ) - 1967 Code Of Practice For Construction Of Stone Masonary, Ashlar
Masonary (2 Copies)
677 /18334,
18335
IS 1598 - 1960 Methods Of Izod Impact Test For Steel (2 Copies)
678 /18336 IS 1598 - 1977 Methods For Izod Impact Test Of Metals
679 /18337,
18338,
18339,
18340, 18341
IS 1599 - 1960 Methods Of Bend Test For Steel Product Other Than
Sheet,Strip,Wire & Tube (5 Copies)
680 /18342 IS 1599 - 1974 Methods For Bend Test For Steel Product Other Than Sheet,Strip
Wire & Tube
681 /18343 IS 1599 - 1985 Method For Bend Test
682 /9974,
18344,
18345,
18346,
18347, 18348
IS 1607 - 1960 Methods For Dry Sieving (6 Copies)
683 /18349 IS 1607 - 1977 Methods For Test Sieving
684 /18350 IS 1608 - 1972 Methods For Tensile Testing Of Steel Products
685 /18351,
18352
IS 1609 - 1966 Code Of Practice For Laying Damp Proof Treatment Using Bitumen
Felts (2 Copies)
686 /18353 IS 1609 - 1976 Code Of Practice For Laying Damp Proof Treatment Using Bitumen
Felts
687 /18354 IS 1622 - 1964 Methods Of Sampling & Test For Micro-Biological Examination Of
Water Used In Industry
688 /18365,
18366,
18367,
18368, 18369
IS 1624 - 1960 Code Of Practice For Field Testing Of Building Lime (5 Copies)
689 /18362,
18363, 18364
IS 1624 - 1974 Method Of Field Testing Of Building Lime (3 Copies)
690 /18370,
18371
IS 1624 - 1986 Method Of Testing Of Building Lime (2 Copies)
691 /2122 IS 1625 - 1952 Code Of Practice For Preparation For Lime Mortar For Use In
Building Super Seded By IS 2250
25. INDIAN STANDARDS
SR# / REF # AUTHOR TITLE
25
692 /18372,
18373
IS 1625 - 1962 Code Of Practice For Preparation & Use Of Lime Mortar In Building
(2 Copies)
693 /18374 IS 1625 - 1971 Code Of Practice For Preparation Of Lime Mortar For Use In Building
694 /18376 IS 1626(Pt-3 ) - 1981 Specification For Asbestos Cement Buldings Pipes & Pipe Fittings,
Gutter Fittings & Roof Fittings
695 /14010
TO 14013
IS 1626 - 1960 Asbestos Cement Building Pipes, Gutters And Fitting(Spigot &
Socket Type) (4 Copies)
696 /18375 IS 1626 - 1980 Specification For Asbestos Cement Building Pipes & Pipe Fittings &
Gutters & Gutter Fittings & Roofing Fittings
697 /18377 IS 1630 - 1984 Specification For Mason'S Tools For Plaster Work & Pointing Work
698 /14015
TO 14018
IS 1631 - 1960 Methods Of Test(Physical)For Industrial Water (4 Copies)
699 /18359,
18360, 18361
IS 1634 - 1960 Code Of Practice For Design & Construction Of Wood Stairs (3
Copies)
700 /18355,
18356,
18357, 18358
IS 1635 - 1960 Code Of Practice For Field Slaking Of Lime & Preparation Of Putty
(4 Copies)
701 /18378,
18379, 18381
IS 1635 - 1975 Code Of Practice For Field Slaking Of Building Lime Preparation Of
Putty (3 Copies)
702 /18413 IS 1641 - 1960 Code Of Practice For Fire Safety Of Building(General)General
Principles & Fire Grading
703 /18414 IS 1642 - 1960 Code Of Practice For Fire Safety Of Building(General)Material &
Details Of Construction
704 /18409,
18410, 18411
IS 1643 - 1960 Code Of Practice For Fire Safety Of Building(General)Exposure
Hazard (3 Copies)
705 /18412 IS 1644 - 1960 Code Of Practice For Fire Safety Of Building(General)Personal
Hazard
706 /18405,
18406, 18407
IS 1645 - 1960 Code Of Practice For Fire Safety Of
Building(General)Chimneys,Flues Pipes & Hearths (3 Copies)
707 /18408 IS 1646 - 1961 Code Of Practice For Fire Safety Of Building(General)Electrical
Installations
708 /18403 IS 1646 - 1982 Code Of Practice For Fire Safety Of Building General Electrical
Installations
709 /18404 IS 1647 - 1960 Code Of Practice For Fire Safety Of Building(General)Non Electric
Equipment Oil,Gas Heaters & Burners
710 /18401 IS 1648 - 1961 Code Of Practice For Fire Safety Of Building(General)Fire Fighting
Equipment & Its Maintenance
711 /18402 IS 1649 - 1962 Code Of Practice For Design & Construction Flues & Chimneys For
Domestice Heating Applinces
712 /18398 IS 1650 - 1960 Colours For Building & Decorative Finishes
713 /18380 IS 1652 - 1984 Code Of Practice For Field Slaking Of Building Lime Preparation Of
Putty
714 /18397 IS 1654 - 1978 Specification For Load Antimony Alloys
715 /9768,
18400
IS 1658 - 1966 Specification For Fibre Hardboards (2 Copies)
716 /18399 IS 1658 - 1977 Specification For Fibre Hard Boards
717 /18394 IS 1659 - 1960 Specification For Black Boards
718 /9781,
18391,
18392,
18393,
18395, 18396
IS 1659 - 1979 Specification For Black Boards (6 Copies)
719 /18384,
18385,
18386, 18387
IS 1661 - 1960 Code Of Practice For Cement & Cement Lime Plaster Finishes On
Walls & Cellings (4 Copies)
26. INDIAN STANDARDS
SR# / REF # AUTHOR TITLE
26
720 /18388,
18389, 18390
IS 1661 - 1972 Code Of Practice For Application Of Cement & Cement Llime Plaster
Finishes (3 Copies)
721 /18382,
18383
IS 1663 - 1972 Method For Tensile Testing Of Steel Sheet & Strip Of Thickness
0.5Mm To 3.00Mm (2 Copies)
722 /18415 IS 1673 - 1984 Specification For Mild Steel Wire Cold Heading Quality
723 /14456 IS 1678 - 1960 Prestressed Concrete Poles For Overhead Power, Traction &
Telecommunication Line
724 /18416 IS 1678 - 1978 Specification For Prestressed Concrete Poles For Overhead
Power,Traction & Telecommunication Lines
725 /18417,
18418
IS 1680 - 1960 Code Of Practice For Treatment Of Water For Land Boilers (2
Copies)
726 /18419 IS 1703 - 1977 Specification For Ball Valves(Horizontal Plunger Type)Including
Floats For Water Supply Purposes
727 /18420,
18421, 18422
IS 1706 - 1960 Method For Determination Of Resistance To Wear By Abrasion Of
Natural Building Stones (3 Copies)
728 /2123 IS 1706 - 1972 Method For Determination Of Resistance To Wear By Abrasion Of
Natural Building Stone
729 /18423 IS 1707 - 1979 Specification For Wood Wool For General Packaging Purposes
730 /14001,
14002
IS 1708 - 1960 Methods Of Testing Of Small Clear Specimens Of Timber (2 Copies)
731 /18429 IS 1708 - 1963 Method Of Testing Small Clear Specimens Of Timber
732 /9775,
18424,
18425,
18426,
18427,
18428,
IS 1708 - 1969 Method Of Testing Small Clear Specimens Of Timber (6 Copies)
733 /18430 IS 1709 - 1984 Specification For Capacitors For Electric Fan Motors
734 /18431 IS 1710 - 1960 Specification For Vertical Turbinepumps For Clear,Cold,Fresh Water
735 /18432 IS 1716 - 1960 Method For Reverse Bend Testing Of Steel Wire
736 /18434 IS 1716 - 1971 Method For Reverse Bend Testing Of Steel Wire
737 /18433 IS 1717 - 1985 Method For Simple Torson Test For Wire
738 /18453,
18454, 18455
IS 1725 - 1960 Specification For Soil Cement Blocks Used In General Building
Construction (3 Copies)
739 /14444,
14696
IS 1725 - 1969 Soil Cement Blocks Used In General Building Construction (2
Copies)
740 /18456,
18457
IS 1726(Pt-2 ) - 1974 Specification For Cast Iron Manhole Covers & Frames . Specific
Requirent Of Hd Circular Type (2 Copies)
741 /18449,
18450
IS 1726(Pt-3 ) - 1974 Specification For Cast Iron Manhole Covers & Frames, Specific
Requiremens Of Hd Double Triangular Type (2 Copies)
742 /18451,
18452
IS 1726(Pt-4 ) - 1974 Specification For Cast Iron Manhole Covers & Frames, Specific
Requiremens For Md Circular Type (2 Copies)
743 /18445,
18446
IS 1726(Pt-5 ) - 1974 Specification For Cast Iron Manhole Covers & Frames, Specific
Requiremens For Md Rectangular Type (2 Copies)
744 /18447,
18448
IS 1726(Pt-6/Sec-1) - 1974 Specification For Cast Iron Manhole Covers & Frames, Single Seal
(2 Copies)
745 /18440,
to 18444
IS 1726(Pt-7/Sec-1) - 1974 Specification For Cast Iron Manhole Covers & Frames, Specific
Requirements For Ld Square Type (5 Copies)
746 /9803,
18435
IS 1727 - 1960 Method Of Test For Pozolanic Materials (2 Copies)
747 /2124,
18436,
18437,
18438, 18439
IS 1727 - 1967 Method Of Test For Pozzolanic Materials (5 Copies)
748 /1684,
1765, 1958
IS 1734(Pt-1 TO 20 ) - 1972 Methods Of Test For Plywood Part 1 To 20 In One Volume 1972 (3
Copies)
27. INDIAN STANDARDS
SR# / REF # AUTHOR TITLE
27
749 /9786 IS 1734(Pt-1-20 ) - 1980 Methods Of Test For Plywood
750 /13948
TO 13950
IS 1734 - 1960 Method Of Test For Plywood (3 Copies)
751 /18458 IS 1751 - 1984 Specification For Fireclay Cupola Refractories
752 /18459 IS 1755 - 1983 Method For Wrapping Test Forformetallic Wire
753 /18462 IS 1759 - 1961 Specification For Powrahs
754 /18460,
18461
IS 1760 - 1962 Chemical Analysis Of Lime Stone,Dolomite & Chemical Analysis (2
Copies)
755 /9771 IS 1760 - 1962 Methods Of Chemical Analysis Of Limestone, Dolomite And Allied
Materials
756 /9272,
18463
IS 1765 - 1966 Specification For Ck Potentiometers For Laboratory & Industrial Uses
(2 Copies)
757 /18464 IS 1765 - 1980 Specification For Direct Current Potentiometers
758 /18465 IS 1777 - 1978 Specification For Industrial Luminaire With Metal Reflectors
759 /18466 IS 1778 - 1980 Specification For Reels & Drums For Bare Conductors
760 /18468 IS 1784 - 1977 Specification For Screwed Closures For Drums
761 /18467 IS 1784 - 1984 Specification For Screwed Closures For Drums
762 /18469,
18470, 18471
IS 1785(Pt-1 ) - 1966 Specification For Plain Hard Drawn Steel Wire For Prestressed
Concrete, Cold Drawn Stress Relieved Wire (3 Copies)
763 /18472 IS 1785(Pt-1 ) - 1983 Specification For Plain Hard Drawn Steel Wire For Prestressed
Concrete, Cold Drawn Stress Relieved Wire
764 /18475 IS 1785(Pt-2 ) - 1966 Specification For Plain Hard Drawn Steel Wire For Prestressed
Concrete, A S Drawn Wire
765 /18473,
18474
IS 1785(Pt-2 ) - 1967 Specification For Plain Hard Drawn Steel Wire For Prestressed
Concrete, As Drawn Wire (2 Copies)
766 /18476 IS 1785(Pt-2 ) - 1983 Specification For Plain Hard Drawn Steel Wire For Prestressed
Concrete, Cold Drawn Stress Relieved Wire
767 /13898,
14006
IS 1785 - 1961 Plain Hard Drawn Steel Wire For Prestressed Concrete (2 Copies)
768 /13880,
14004,
14005, 14446
IS 1786 - 1961 Cold Twisted Steel Bars For Concrete Reinforcement (4 Copies)
769 /18482,
18483, 18484
IS 1786 - 1966 Specification For Coldhoisted Steel Barsffor Concrete Reinforcement
(3 Copies)
770 /9744,
18477
IS 1786 - 1985 Specification For High Strength Deformed Steel Bars And Wires For
Concrete Reinforcement
771 /13881,
18485, 18486
IS 1789 - 1961 Method For Brinell Hardness Test For Grey Cast Iron (3 Copies)
772 /13882 IS 1790 - 1961 Method For Brinell Hardness Test For Light Metals & Their Alloys
773 /18478 IS 1791 - 1968 Specification For Batch Type Concrete Mixter
774 /9816,
18479,
18480, 18481
IS 1791 - 1985 General Requirement For Batch Type Concrete Mixers (4 Copies)
775 /18487 IS 1795 - 1982 Specification For Pillar Tapes For Water Supply Purposes
776 /18488 IS 1799 - 1981 Specification For Citral
777 /18495,
18496
IS 1805 - 1961 Glossary Of Terms Relating To Building Stone,Occurrence,Quarrying
& Dressing (2 Copies)
778 /2125,
9778, 9812,
18489,
18490,
18491,
18492,
18493, 18494
IS 1805 - 1973 Glossary Of Terms Relating To Stones Quarrying & Dressing (9
Copies)
779 /18497 IS 1811 - 1984 Methods Of Sampling Foundry Sand
28. INDIAN STANDARDS
SR# / REF # AUTHOR TITLE
28
780 /18498 IS 1812 - 1982 Specification For Carbon Steel Wire For The Manufacture Of Wood
Screws
781 /18499 IS 1820 - 1979 Recommended Shapes, Sizes For Mass Aluminium Notched Bars &
Ingots For Remelting Purposes
782 /18500 IS 1823 - 1974 Specification For Floor Door Stoppers
783 /14549,
14550, 14551
IS 1826 - 1961 Ventilation Blinds For Windows (3 Copies)
784 /18501,
18502
IS 1828 - 1975 Method For Load Verification Of Tensile Testing Machines, (2
Copies)
785 /14459 IS 1829(Pt-1 ) - 1961 Library Furniture & Fitting, Part-I- Timber
786 /18503 IS 1829(Pt-1 ) - 1978 Specification For Library Furniture & Fittings, Timber
787 /18504,
18505
IS 1829(Pt-2 ) - 1977 Specification For Library Furniture & Fittings, Steel (2 Copies)
788 /18506 IS 1833 - 1980 Specification For Diazinon ,Technical
789
/14681,14682
, 14572 TO
14576
IS 1834 - 1961 Hot Applied Sealing Compounds For Joints In Concrete (7 Copies)
790 /18507 IS 1834 - 1984 Specification For Hot Applied Sealing Compound For Joints In
Concrete
791 /18508 IS 1835 - 1976 Specification For Round Steel Wire For Ropes
792 /14570 IS 1838(Pt-1 ) - 1961 Preformed Filters For Expansion Joint In Concrete Non-Extruding &
Resilient Type Part 1 Bitumen Impregnated Fiber
793 /18509 IS 1838(Pt-1 ) - 1983 Specification For Preformed Fillers For Expansion.Joint In Concrete.
Pavement & Structures.(Non Extruding &
Resident Type)
794 /18510 IS 1838(Pt-2 ) - 1984 Specification For Preformed Fillers For Expansion Joint In Conrete
Pavement & Structure (Non Extruding & Resident Type)
795 /14615,
15191, 15192
IS 1838 - 1961 Preformed Filters For Expansion Joint In Concrete, Non Extruding &
Resilient Type (3 Copies)
796 /18511 IS 1841 - 1978 Specification For E C Grade Aluminium Rod Produced By Rolling
797 /18519,
18520,
18521, 18522
IS 1849(Pt-1/Sec-1) - 1976 Guide For Design & Instalation Of Vertical Mixed Feed Type Lime
Kilin , Lime Stone Sec/1Masonary Type Shaft (4 Copies)
798 /5093 IS 1849(Pt-1/Sec-2) - 1991 Design Installation Vertical Mixed Feed Lime Kiln-Guide Pt-1-
Limestone Sec-2Reinforced Cement Concrete
799 /18516,
18517, 18518
IS 1849(Pt-2 ) - 1977 Guide For Design & Instalation Of Vertical Mixed Feed Type Lime
Kiln , For Lime Shell (3 Copies)
800 /18512,
18513,
18514, 18515
IS 1849 - 1967 Code Of Practice For Design & Installation Of Lime Klin (4 Copies)
801 /18523 IS 1852 - 1979 Rolling & Cutting Tolerances For Hot Rolled Steel Product
802 /6051 IS 1853 - 1961 Self Indication & Semi Self Indicating Counter Type Weighing
Machine, IS 1853 1961
803 /14336 IS 1855 - 1977 Standard Steel Wire Ropes For Winding And Man Riding Haulage’S
In Mines
804 /14393 IS 1856 - 1977 Steel Wire Ropes For Haulage Purposes
805 /18524 IS 1860 - 1980 Code Of Practice For Installation Operation & Maintenance Of
Electric Passenger& Goods Lifts
806 /18530 IS 1861(Pt-1/Sec-1) - 1975 Guide For Manufacture Of Lime In Vertical Mixed Feed Type Klins,
From Limestone Sec/1Small Scale Industries
807 /18525 IS 1861(Pt-1 ) - 1990 Manufacture Of Lime In Vertical Mixed Feed Type Klin, From Lime
Stone
808 /18531,
18532
IS 1861(Pt-2 ) - 1977 Guide For Manufacture Of Lime In Vertical Mixed Feed Type Klins ,
From Lime Shell (2 Copies)
29. INDIAN STANDARDS
SR# / REF # AUTHOR TITLE
29
809 /18526,
18527,
18528, 18529
IS 1861 - 1961 Codeof Practice For Manufacture Of Lime In Vertical Mixed Feed
Type Klin (4 Copies)
810 /18537 IS 1863 - 1979 Specification For Rolled Steel Bulb Flates
811 /18538,
18539
IS 1864 - 1963 Dimension For Angle Sections With Legs Of Unequal Width &
Thickness (2 Copies)
812 /18535 IS 1864 - 1979 Specification For Hot Rolled Steel `L' Sections For Shipbuilding
813 /18536 IS 1866 - 1978 Code Of Practice For Maintenance & Supervision Of Mineral
Insulating Oil In Equipment
814 /18533 IS 1866 - 1983 Code Of Practice For Maitenance & Supervision Of Mineral Insulating
Oil In Equipment
815 /18534 IS 1868 - 1982 Specification For Anodic Coatings On Aluminium & Its Alloys
816 /18540 IS 1875 - 1978 Specification For Carbon Steel Billets,Blooms,Slabs & Bars For
Forgings
817 /18542 IS 1884 - 1981 Specification For Electric Horns For Automobiles
818 /18552 IS 1885(Pt-3 ) - 1978 Electro Technical Vocabulary, Acoustics Sec/7 Music
819 /18553 IS 1885(Pt-6 ) - 1978 Electro Technical Vocabulary , Printed Circuits
820 /18554 IS 1885(Pt-7/Sec-6) - 1978 Electro Technical Vocabulary, Semi Conductor Devices Sec/6/
Optoelectronic Devices
821 /18555 IS 1885(Pt-27 ) - 1985 Electro Technical Vocabulary, Power Electronics
822 /18556 IS 1885(Pt-38 ) - 1977 Electro Technical Vocabulary , Transformers
823 /18557 IS 1885(Pt-42 ) - 1977 Electro Technical Vocabulary, Power Capacitors
824 /18558 IS 1885(Pt-43 ) - 1977 Electro Technical Vocabulary, Electrical Equipment Used In Medical
Practice
825 /18559 IS 1885(Pt-44 ) - 1978 Electro Technical Vocabulary, Piero Electric Devices *Superseding
IS-1885-Part 5-1965& 1885(Part-33)-1972
826 /18560 IS 1885(Pt-45 ) - 1977 Electro Technical Vocabulary, Capacitors
827 /18561 IS 1885(Pt-46 ) - 1977 Electro Technical Vocabulary , Resistors
828 /18562 IS 1885(Pt-47 ) - 1977 Electro Technical Vocabulary Equipment, Digital Electronic
Equipment
829 /18564 IS 1885(Pt-48/Sec-2) - 1978 Electro Technical Vocabulary , Recording Sec/2 Disk Recording
830 /18563 IS 1885(Pt-48/Sec-1) - Electro Technical Vocabulary , Recording Sec/1/Tap Recording
831 /18565 IS 1885(Pt-49 ) - 1978 Electro Technical Vocabulary , Industrial Process Measurement &
Control
832 /18566,
18567
IS 1885(Pt-50 ) - 1978 Electro Technical Vocabulary , Telecontrol (2 Copies)
833 /18568 IS 1885(Pt-52/Sec-1) - 1979 Electro Technical Vocabulary , Indusrial Elecro Heating
Sec1/General Terms
834 /18569 IS 1885(Pt-52/Sec-2) - 1979 Electro Technical Vocabulary , Industrial Electroheating Sec
2/Resistance Heating
835 /18544 IS 1885(Pt-52/Sec-3) - 1980 Elect Rotechnical Vocabulary , Data Processing Sec/2 Equipment
Technology
836 /18575 IS 1885(Pt-52/Sec-12) - 1980 Electro Technical Vocabulary , Data Processing Sec12/Information
Theory
837 /18570 IS 1885(Pt-52/Sec-5) - 1980 Electro Technical Vocabulary , Data Processing
Sec5/Representation Of Data
838 /18571 IS 1885(Pt-52/Sec-6) - 1980 Electro Technical Vocabulary , Data Processing Sec6/ Preparation &
Handling Of Data
839 /18572 IS 1885(Pt-52/Sec-9) - 1980 Electro Technical Vocabulary , Data Processing Sec9/Data
Media,Storage & Related Equipment
840 /18573 IS 1885(Pt-52/Sec-10) - 1980 Electro Technical Vocabulary , Data Processing Sec10/Data
Communication
841 /18546 IS 1885(Pt-52/Sec-13) - 1980 Electro Technical Vocabulary, Data Processing /Sec/3Analogy &
Hybrid Computing
30. INDIAN STANDARDS
SR# / REF # AUTHOR TITLE
30
842 /18545 IS 1885(Pt-52/Sec-4) - 1980 Electro Technical Vocabulary, Data Processing Sec-4 Organisation
Of Data
843 /18574 IS 1885(Pt-52/Sec-11) - 1981 Electro Technical Vocabulary , Data Processing Sec11/Operating
Techniques & Facilities
844 /18547 IS 1885(Pt-54 ) - 1980 Electro Technical Vocabulary, Insulators
845 /18576 IS 1885(Pt-55 ) - 1981 Electro Technical Vocabulary , Electric Fans
846 /18577 IS 1885(Pt-56 ) - 1981 Electro Technical Vocabulary , Microwave Components &
Accessories
847 /18580 IS 1885(Pt-57 ) - 1982 Electrotechnical Vocabulary, Electrical & Magnetic Circuits
848 /18581 IS 1885(Pt-58 ) - 1984 Electrotechnical Vocabulary, Telecommunication Channels And
Network
849 /18579 IS 1885(Pt-60 ) - 1984 Electrotechnical Vocabulary, Terms Related To Electrical Apparatus
For Explosive Atmospheres
850 /18578 IS 1885(Pt-61 ) - 1985 Electrotechnical Vocabulary, Nuclear Medical Instrument
851 /18548 IS 1885(Pt-L1/Sec-7) - 1885 Electro Technical Vocabulary, Data Processing Sec/7 Digital
Computer Programming
852 /18550 IS 1885(Pt-L1/Sec-1) - 1980 Electro Technical Vocabulary, Data Processing Sec/1 Fundamental
Terms
853 /18549 IS 1885(Pt-L1/Sec-8) - 1980 Electro Technical Vocabulary, Dataprocessing Sec/8/Control,Input-
Out Put & Arithmatic Equipment
854 /18551 IS 1885(Pt-L1/Sec-2) - 1980 Electro Technical Vocabulary. Data Processing Sec/2/ Arithmatic &
Logic Operation
855 /18541 IS 1885 - 1983 Specification For Mental Shelving Racks (Adjustable Type)
856 /1416 IS 1888 - 1962 Methods Of Load Test On Soils
857 /1029,
1423, 9694,
10318,
18586, 18587
IS 1888 - 1971 Methods Of Load Test On Soils (6 Copies)
858 /18543,
18582,
18583,
18584, 18585
IS 1888 - 1982 Method Of Load Test On Soils (5 Copies)
859 /14587,
14597
IS 1890(Pt-2 ) - 1961 Quantities, Units And Symbols Part 2 Periodic And Related
Phenomena (2 Copies)
860 /14588 IS 1890(Pt-4 ) - 1961 Iso Recommendation R-31, Part 4 Quantities And Units Part 4 Heats
861 /14598 IS 1890(Pt-11 ) - 1961 Quantities, Units And Symbols Part 11 Mathematical Signs And
Symbols For Use In Physical Science And Technology
862 /14230 IS 1891(Pt-1 ) - 1978 Rubber Conveyor And Elevator Textile Belting Part-1-General
Purpose Belting
863 /14380 IS 1891(Pt-2 ) - 1978 Rubber Conveyor And Elevator Textile Belting Part-2-Heat Resistant
Belting
864 /14379 IS 1891(Pt-3 ) - 1978 Rubber Conveyor And Elevator Textile Belting Part-3 Oil-Resistant
Belting
865 /14378 IS 1891(Pt-4 ) - 1978 Rubber Conveyor And Elevator Textile Belting Part-4-Hygienic
Belting
866 /18588,
18589, 2114
IS 1892 - 1962 Code Of Practice For Site Investigation For Foundations (3 Copies)
867 /698,
9707, 18590,
18591, 18592
IS 1892 - 1979 Code Of Practice For Sub Surface Investigation For Foundation (5
Copies)
868 /14704 IS 1893 - 1962 Indian Standard Recommendations For Earth Quake Resistant
Design Of Structures
869 /18596 IS 1893 - 1966 Criteria For Earthavave Resistant Design Of Structures
870 /14624,
13969, 14548
IS 1893 - 1967 Recommendations For Earth Quake Resistant Design Of Structure (3
Copies)
31. INDIAN STANDARDS
SR# / REF # AUTHOR TITLE
31
871 /1422,
2070, 18593
IS 1893 - 1975 Criteria For Earth Quake Resistance Design Of Structures (3 Copies)
872 /10361 IS 1893 - 1975 Criteria For Earthquake Resistant Design Of Structures
873 /18597,
18598, 18599
IS 1893 - 1984 Criteria For Earth Quake Resistant Design Of Structures (3 Copies)
874 /18594,
18595
IS 1894 - 1972 Method For Tensile Testing Of Steel Tubes (2 Copies)
875 /18600 IS 1897 - 1983 Specification For Copper Strip For Electrical Purposes
876 /9783,
18601,
18602, 18603
IS 1898 - 1975 Specification For Aircraft Timber In Converted Form Finishal Form (4
Copies)
877 /9738 IS 1900 - 1974 Methods Of Tests For Wood Poles
878 /18604 IS 1901 - 1978 Specification For Visual Indicator Lamps
879 /1420,
2129, 18611
IS 1904 - 1966 Code Of Practice For Structural Safety Of Buildings Shallow
Foundations (3 Copies)
880 /9690,
18610,
10404, 10334
IS 1904 - 1978 Code Of Practice For Design And Construction Of Foundations In
Soils - General Requirements (4 Copies)
881 /1008 IS 1904 - 1979 Code Of Practice For Structural Safety Of Building Shallow
Foundation
882 /18606 IS 1904 - 1986 Code Of Practice For Design & Construction Of Foundations In Soils
General Requirements
883 /9273 IS 1905 - 1961 Code Of Practice For Structural Safety Of Buildings, Masonry Walls
884 /18607,
18608, 18609
IS 1905 - 1969 Code Of Practice For Structural Safety Of Building Masonary Walls
(3 Copies)
885 /18612 IS 1905 - 1980 Code Of Prctice For Structurl Safety Of Building Masonary Walls
886 /2128 IS 1905 - 1987 Code Of Practice For Structural Use Of Un-Reinforced Masonry
887 /18613,
18614
IS 1911 - 1961 Schedule Of Unit Weight Of Building Materials (2 Copies)
888 /18615 IS 1913(Pt-1 ) - 1978 General & Safety Requirements For Luminaires, Tubular Fluoresent
Lamps
889 /18616 IS 1914(Pt-1To4 ) - 1977 Specification For Carbon Steel,Boiler Tubes & Super Heater Tubes
890 /18605 IS 1914(Pt-1To4 ) - 1982 Specification For Carbon Steel Boiler Tubes & Superheater Tubes
891 /18617 IS 1915 - 1961 Code Of Practice For Steel Bridge
892 /18618,
18619
IS 1916 - 1963 Specification For Steel Cylinder Rein Forced Concrete Pipes (2
Copies)
893 /18620,
18621, 18622
IS 1917 - 1962 Methods Of Chemical Analysis Of Quartzite & High Silica Sand (3
Copies)
894 /18623,
18624
IS 1918 - 1966 Methods Of Physical Test For Foundry Sands (2 Copies)
895 /6137 IS 1924 - 1957 Methods Of Test For Stabilized Soil, S 1924-1957 No 31
896 /18019 IS 1936 - 1981 Specification For Exploders
897 /18021 IS 1938 - 1981 Method For Determinationof Coating Mass Per Unit Arceof
Conversion Coating Metallic Materials(Gravimetric)
898 /18020 IS 1939 - 1981 Specification For Chromate Conversion Coatings On Electro Plated
Zinc &Cadmium Coatings
899 /18625 IS 1944(Pt-5 ) - 1981 Code-Of Practic For Lighting Of Public Thorough Fares, Lighting For
Grade Seperated Junctions Bridge & Elevated Roads
900 /18628 IS 1944(Pt-6 ) - 1981 Code-Of Practic For Lighting Of Public Thorough Fares, Lighting For
Town & City Centres & Areas Of Cvic Importance
901 /18629 IS 1944(Pt-7 ) - 1981 Code-Of Practic For Lighting Of Public Thorough Fares, Lighting For
Roads With Special Requirement
902 /18626 IS 1946 - 1961 Code-Of Practic For Use Of Fixing Devices In Walls,Celing,& Floors
Of Solid Construction
32. INDIAN STANDARDS
SR# / REF # AUTHOR TITLE
32
903
/13944TO
13947
IS 1948 - 1961 Aluminum Doors, Windows And Ventilators (4 Copies)
904 /13977
TO 13980
IS 1949 - 1961 Aluminum Windows For Industrial Buildings (4 Copies)
905 /18627 IS 1950 - 1962 Code-Of Practic For Sound Insulation Of Non Industrial Building
906 /708,
18634,
18635, 18636
IS 1954 - 1969 Method For Determination Of Length & Width Of Fabric( 4 Copies)
907 /18637 IS 1954 - 1990 Method For Determination Of Length & Width Of Woven Fabric
Method
908 /18630,
18631
IS 1956(Pt-1 ) - 1976 Glossary Of Terms Relating To Iron & Steel , General Metallergy
Heat Treatment & Testing(2 Copies)
909 /18632,
18633
IS 1956(Pt-6 ) - 1976 Glossary Of Terms Relating To Iron & Steel , Forging (Including
Drop Forging)(2 Copies)
910 /18638 IS 1956(Pt-7 ) - 1976 Glossary Of Terms Relating To Iron & Steel , Wrought Iron
911 /18639,
18640
IS 1956(Pt-8 ) - 1976 Glossary Of Terms Relating To Iron & Steel , Steel Tubes & Pipes( 2
Copies)
912 /14007 IS 1959 - 1960 Block Board
913 /18641 IS 1959 - 1983 Specification For Silver Anodes For Electro Plating, Wrought Iron
914 /709,
18642,
18643, 18644
IS 1964 - 1970 Methods For Determination Of Weight Per Square Meter & Weight
Per Liner Meter Of Fabrics(4 Copies)
915 /710,
18645,
18646, 18647
IS 1966 - 1975 Methods For Determination Of Bursting Strength & Bursting
Distension Of Fabric Diaphragm Method (4 Copies)
916 /14683,
14684
IS 1969 - 1961 Method For Determination Of Fastness Of Dyestuffs To Metals In
The Dye Bath Iron And Copper (2 Copies)
917 /715,
17404,
17405,
17406, 17407
IS 1969 - 1968 Method For Determination Of Breaking Load & Elongation At Break
Of Woven Textile Fabrics (5 Copies)
918 /17408,
17409,
17410,
IS 1977 - 1969 Specification For Structural Steel (Ordinary Quality) (3 Copies)
919 /17411 IS 1978 - 1982 Specification For Line Pipe
920 /9270,
17412
IS 1980 - 1967 Specification For Ceramic Dielectric Capacitors, Type I (2
Copies)
921 /17413 IS 1982 - 1971 Code Of Practice For Anti-Mortem & Post Mortem Inspection Of Meat
Animal
922 /17414,
17415,
IS 1984(Pt-1 ) - 1971 Specification For Lass Vials For Pharmaticual Preparations,Vials For
Parentecal Preparations (2 Copies)
923 /17416 IS 1985(Pt-1 ) - 1980 Recomended Practice For Praparation Of Iron & Steel For
Electroplating
924 /17417 IS 1986 - 1981 Cde Of Practice For Hard Chromium Plating On Iron & Steel For
General Engineering Purposes
925 /17418 IS 1992 - 1979 Specification For Electroplated Coating Of Lead
926 /17419 IS 1993 - 1982 Specification For Cold Reduced Tinplate & Cold Reduced Black Plate
927 /17420 IS 1998 - 1962 Method Of Test For Thermosetting Synthetic Resin Bonded
Laminated Sheets
928 /17421 IS 1999 - 1962 Method Of Sampling Bauxite
929 /18650,
18651, 18652
IS 2000 - 1962 Methods Of Chemical Analysis Beauxile (3 Copies)
930 /9303 IS 2001 - 1968 Specification For Fixed Silvered Mica Capacitors
931 /14353 IS 2014 - 1977 T-Bolts
932 /14249 IS 2015 - 1977 T- Nuts
33. INDIAN STANDARDS
SR# / REF # AUTHOR TITLE
33
933 /18653 IS 2026(Pt-1 ) - 1977 Specification For Power Transformer , General
934 /18654 IS 2026(Pt-2 ) - 1977 Specification For Power Transformer , Temperature Rise
935 /18655 IS 2026(Pt-3 ) - 1977 Specification For Power Transformers , Insulation Levels & Dielectric
Test
936 /18656 IS 2026(Pt-3 ) - 1981 Specification For Power Transformers , Insulation -Levels &
Dielectric Test
937 /18657 IS 2026(Pt-4 ) - 1977 Specification For Power Transformer , Terminal Markings,Tappings
& Connections
938 /18658 IS 2032(Pt-18 ) - 1976 Graphical Symbols Used In Electro-Technology , Symbols &
Connection Diagrams For Integrating Meters
939 /18659,
18660
IS 2032(Pt-19 ) - 1977 Graphical Symbols Used In Electro Technology , Electrical
Equipment Used In Medical Practice(2 Copies)
940 /18661 IS 2032(Pt-20 ) - 1977 Graphical Symbols Used In Electro Technology , Radio
Communi.Transmission Circuits Lines &Accessories
941 /18662 IS 2032(Pt-21 ) - 1977 Graphical Symbols Used In Electro Technology , Electric Welding
Equipment
942 /18663 IS 2032(Pt-22 ) - 1978 Graphical Symbols Used In Electro Technology , Electro Equipment
Used In Medical Practice
943 /18664 IS 2032(Pt-24 ) - 1980 Graphical Symbols Used In Electro Technology , Binary Logic
Elements
944 /18665 IS 2032(Pt-25 ) - 1980 Graphical Symbols Used In Electro Technology , Electrical
Installation In Ships
945 /18666 IS 2032(Pt-27 ) - 1982 Graphical Symbols Used In Electro Technology , Graphical Symbols
For Relays
946 /18667 IS 2032(Pt-28 ) - 1983 Graphical Symbols Used In Electro Technology , Transformers
947 /18668 IS 2036 - 1974 Sspecification For Phenolic Laminated Sheets
948 /18669 IS 2039(Pt-1To3 ) - 1981 Spcification For Steel Tubes For Bicycle & Allied Purposes
949 /18670,
18671
IS 2041 - 1962 Specification For Steel Plates For Pressure Vessels(2 Copies)
950 /18672 IS 2041 - 1982 Specification For Steel Plates For Pressure Vessels Used At
Moderate & Low Temprature
951 /18673 IS 2043 - 1984 Specification For Siliceous Fire Clay Refractories
952 /18674 IS 2044 - 1981 Specification For Silimanite Refractories For Glass Melting Tank
Furnaces
953 /18675 IS 2046 - 1969 Specification For Decorative Thermosetting Synthetic Resin Bonded
Laminated Sheets
954 /18676 IS 2047 - 1979 Specification For Aluminium Alloy Hardness (Master Alloys)
955 /18677 IS 2049 - 1978 Colour Code For The Identification Of Wrought Steels For General
Engineering Purposes
956 /18678,
18679
IS 2062 - 1969 Specification For Structural Steel ( Fusion Welding Quality)(2 Copies)
957 /18681 IS 2062 - 1984 Specification For Weldable Structural Steel
958 /18680 IS 2062 - 1989 Specification For Structural Steel (Fusion Welding Quality
959 /18682,
18683, 18684
IS 2065 - 1963 Code Of Practice For Water Supply In Building(3 Copies)
960 /18685 IS 2069 - 1981 Specification For Drums For Covered Winding Wires & Strips For
Electrical Purposes
961 /18686,
18687
IS 2074 - 1962 Specification For Ready Mixed Paint Red Oxide Zinc Chrome
Printing(2 Copis)
962 /18688 IS 2078 - 1962 Method For Tensile Testing Of Grey Cast Iron(3 Copies)
963 /18691 IS 2078 - 1979 Method For Tensile Testing Of Grey Cast Iron
964 /18694 IS 2081(Pt-1 ) - 1976 Specification For Taper Terminal Cable Connectors For Automo Bile
Batteries Brass Type Connectors
965 /18692,
18693
IS 2082 - 1962 Specification For Stabilized Hydrogen Peroxide(2 Copies)