SlideShare a Scribd company logo
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 10 | Oct 2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1827
TRAFFIC CONGESTION: CAUSES AND SOLUTIONS
CASE STUDY: HINJEWADI, PUNE
Soham Sarda1, Janhavi Chavare2, Rohit Bhosale3, Akshay Birajdar4,
Shweta Andhale5, Prof. S. S. Shastri6
1,2,3,4,5,6Department of Civil Engineering, Sinhgad College of Engineering, Pune
----------------------------------------------------------------------***---------------------------------------------------------------------
Abstract – Congestion impacts the movement of people.
Traffic congestion not only causes pollution, but also wastes
time and energy. The major factor for traffic congestion in
Hinjewadi today is the imbalance seeninitsModalSplitRatio -
a very low ridership in public transport due to poor service
quality and less frequency - which leads to an increase in the
number of private vehicles causing congestion which further
leads to an increase in travel time and emission of exhaust
gases causing air pollution. Change in commuters’ thinking
and their behavioral pattern is studied by extensivesurveying.
Vehicle Composition and Occupancy Factor of commuters is
also analyzed to understand the traffic flow in the area. The
Origin-Destination matrix was drawn and the visuals were
created using VISSIM Software. Solutions for increasing
congestion in the area are given by suggesting optimal
infrastructural changes, enhancing the use of public/semi-
public transportation, and increasingtheOccupancyFactor of
vehicles. The future development of the IT-sector and the
impact of Pune Metro Rail are also taken into account.
Key Words: Modal Split, Origin-Destination Matrix,
Occupancy Factor, Vehicle Composition, Travel Time,
Congestion
1. INTRODUCTION
Traffic Congestion is one of the major issues experienced in
most metropolitan cities in the developing nations. Traffic
Congestion involves queuing, slower speeds and increased
travel time which wastes energy of the commuters and
causes stress, thus reducing the overall productivity and
imposing an intangible cost on the society. It also affects
various other factors like environment, usage of natural
resources, quality of life and safety of commuters as well as
pedestrians, directly and/or indirectly. Hence, UrbanTraffic
Congestion possesses a challenge for all large and growing
urban areas and thus many measures have been taken over
years to attenuate the same. As congestion continues to
increase, the conventional approach of‘building moreroads’
does not always work due to varying circumstances. In fact,
building new roads can actually compound congestion in
some cases by inducing greater demands for vehicle travel
that quickly eat away the additional capacity. This is
becoming more and more apparent in the form of greater
congestion and delays observed in major cities. Besidesthis,
suitable corridors in such cities for major roadwork are
becoming increasingly difficult to be obtained, thus
increasing the cost of construction.
The major factors contributing to Urban Traffic Congestion
can be categorized as follows:
 Prevailing imbalance in Modal Split
 Inadequate Transport Infrastructure
 Sub-optimal use of existing Infrastructure
Studying different major cities around the world shows us
how Public Transportation can reduce the transport
problems faced by Indian cities. These cities cannotafford to
cater only to private cars and two-wheelers.Theremustbea
general understanding amongst the locals that without
public transport, cities would be even less viable. To
encourage Public Transportation, one must increase the
quality and quantity of Public Transportation, while
simultaneously creating a balance on the Demand-and-
Supply scale.
The existing transport system in Indian cities has not been
able to keep up with the rapidly increasing demand over the
past few decades, particularly the ‘Bus Transit System’. The
last two decades have seen a gradual decline in the level of
Bus services in the country. Their relative output is further
diminished as commuters opt to travel with private and
semi-private vehicles as we can see in Fig. 1. Against this
backdrop of serious problem, traffic control techniques and
information systems are needed that can significantly
improve the traffic flow efficiency and its carrying capacity.
Application of Intelligent Transport System (ITS)
technologies in such areas has significant potential for
relieving congestion. In the past decade, ITS has surged
around the world providing us with additional tools to help
solve our transport problems. ITS can produce major
benefits in reducing congestion and its environmental
impacts. ITS not only has the ability to reduce the number of
accidents and thus boost public safety, but it can also make
remarkable improvements to the efficiency of Public
Transport fleets and Inter-Modal integration.
2. METHODOLOGY
Taking into account the variousparametersandtheextent of
the project, a list of research papers is studied. Literature
survey is the most important part of the project as itshowsa
direction to proceed and set achievable objectives. Various
papers related to traffic congestion measurements and
solutions were considered to get a broader outlook towards
the problem. This was followed by Reconnaissance Survey
which included study of the area, interaction with locals,
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 10 | Oct 2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1828
officials and experts, study of previous investigations, etc.
The Preliminary Survey included collecting data by
conducting various surveyslikeVolumetric Study,Road-Side
Interview Surveys, Occupancy Factor Survey, Origin-
Destination Survey, Speed and Delay Survey, Accident
Survey, etc. Based on the observations made during thefield
reconnaissance and analysis of data, the most obvious
problems have been identified and optimum solutions were
then formulated. The costs of thesealternatives,theirimpact
on the traffic flow and congestion, etc. were calculated using
various software. The impact of Pune Metro Rail was also
taken into consideration.
3. CASE STUDY
Hinjewadi is a suburb located in Pune (India),mainlyknown
for its IT-Park (Rajeev Gandhi Infotech Park). The 2800 acre
IT-Park in Hinjewadi houses more than 120 companies of
different sizes. The Infotech Park is subdivided in three
phases, with four further phases planned. According to a
survey conducted by OLA Cabs in the year 2017- Shivaji
Chowk, located in the IT-Park is considered amongst the
seven biggest bottlenecks in India. The average speed of
vehicles in Pune during peak hoursis22 kilometresperhour
(kmph) while that in Hinjewadi is just 16 kmph. In some
areas, the average speed drops as low as 6 kmph. On an
average, the commuters spend more than an hour totravel a
distance of 2 km between Wakad Taking into account the
various parameters and the extent of the project, a list of
research papers is studied. Literature survey is the most
important part of the project as it shows a direction to
proceed and set achievable objectives. Various papers
related to traffic congestion measurements and solutions
were considered to get a broader outlook towards the
problem. Thiswasfollowed byReconnaissanceSurveywhich
included study of the area, interaction with locals, officials
and experts, study of previous investigations, etc. The
Preliminary Survey included collecting data by conducting
various surveys like Volumetric Study, Road-Side Interview
Surveys, Occupancy Factor Survey, Origin-Destination
Survey, Speed and Delay Survey, Accident Survey, etc.Based
on the observations made during the field reconnaissance
and analysis of data, the most obvious problems have been
identified and optimum solutionswerethenformulated. The
costs of these alternatives, their impact on the traffic flow
and congestion, etc. were calculated using various software.
The impact of Pune Metro Rail was also taken into
consideration.
Hinjewadi is a suburb located in Pune (India),mainlyknown
for its IT-Park (Rajeev Gandhi Infotech Park). The 2800 acre
IT-Park in Hinjewadi houses more than 120 companies of
different sizes. The Infotech Park is subdivided in three
phases, with four further phases planned. According to a
survey conducted by OLA Cabs in the year 2017- Shivaji
Chowk, located in the IT-Park is considered amongst the
seven biggest bottlenecks in India. The average speed of
vehicles in Pune during peak hoursis22kilometresperhour
(kmph) while that in Hinjewadi is just 16 kmph. In some
areas, the average speed drops as low as 6 kmph. On an
average, the commuters spend more
Bridge and Wipro Circle. The companies in this area were
constructed before building a basic infrastructure. This has
led to the infrastructural development leap-frogging behind
the overall development of Hinjewadi.
Chart -1: Modal Split (Hinjewadi IT Park)
Cars (58%)
Bikes (33%)
Auto (3%)
Buses (6%)
Chart -2: Volumetric Study
0
1000
2000
3000
4000
5000
6000
08:00
09:30
11:00
12:30
02:00
03:30
05:00
06:30
08:00
09:30
PCU
PCU
3.1 Pre-feasibility study of Pune Metro Rail
Pune Metro is a rail based Rapid Transit System under
construction to serve the city of Pune and its industrial twin
Pimpri Chinchwad in Indian state, Maharashtra. The third
line (Phase – II) of the project – 23.33 km elevated route will
connect the Rajeev Gandhi IT-Park in Hinjewadi to Shivaji
Nagar, Pune. A survey to study the impact of this project on
the commuters of Hinjewadi was conducted. The study
included an online survey which focused on the possible
shortcomings Pune Metro could face in the near future and
provide suggestions to the afore-mentioned problems. The
survey included various questions for the commuters like:
travel distance, current mode of transport, average travel
time, preferred waiting time at the stations, etc. Theresult of
this survey was presented in the form of graphs and pie-
charts showing the adaptability and preference of the metro
rail, if constructed, by the household who generally
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 10 | Oct 2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1829
preferred bus as their primary source of commute. It helped
us understand the balance between the adequacy of Metro
Rail and demand side of dwellers. Some of the results from
the survey are exemplified below
Chart -3: Current Mode of Transportation
2 - W (54%)
4 - W (22%)
Semi-Public
(11%)
Public (13%)
Chart - 4: Preferred mode of transportation to reach
metro Station
Walking (27%)
2- W (41%)
4- W (6%)
Public (16%)
Semi-Private
(10%)
3.2 Causes of Traffic Congestion
Inadequacy of Traffic System
The traffic system fails to clear the queue during peak hours.
All cross-roads need at least 4-8 traffic policemen
simultaneously. A heavy patrol of 86 traffic controllers
including 4 officers, 31 warden, and 51 traffic police, work
from 8 a.m. to 10 p.m. in this area consisting of just 3 major
intersections.
Narrow Roads
The major routes connecting the IT park and Hinjewadi are
not wide enough for a free flow of traffic. Though most of
these roads have undergone road-widening recently, the
illegal encroachment of hawkers still creates bottlenecks at
various intersections.
Illegal Parking
Illegal road-side parking betweentheIndianOil Petrol pump
and Shivaji chowk hampers the flow of traffic leaving
Hinjewadi during the evening hours.
Increasing number of Commuters
With an ever-so-growing IT Sector at its core, there is a
continuous increase in the number of employees. This
directly puts a load on the Transport System as the number
of Commuters steeply increases along with it.
High purchasing power of Public
The standard of living of regular commuters increasesalong
with the growth of IT sector. This brings in thepsychology of
travelling alone, preferably so in a car, with maximum
comfort, thus, gradually increasing the modal share of
Private vehicles.
Redundant Public Transport Facilities
It has been observed that the frequency of public vehicles is
very low in the IT Park as on an average one government
transport bus (PMPML) is available every half hour. Buses
have then been issued by a local authority and some major
IT companies themselves. Still the employees prefer private
or semi-private transportation as it gives them more
freedom of movement. This, thereby, reduces the Modal
share of Public Transportation.
Improper Planning
The companies in this area were constructed beforebuilding
a basic infrastructure. This has led to the infrastructural
development leap-frogging behind the overall development
of Hinjewadi.
Improper Lane Management
One of the most common causes of traffic congestion in
every developing country is improper lane management.
Commuters in a hurry to reach their destination disregard
the traffic laws and indirectly end up slowing themselves.
Low Occupancy Factor
The occupancy factor in Hinjewadiis1.25for ‘Two wheelers’
and 1.87 for ‘Cars’. This is very low when compared to the
average occupancy factor for Pune city as specified in the
‘Comprehensive Mobility Plan for Pune’ is 1.6 for ‘Two
wheelers’ and 2.9 for ‘Cars’ respectively.
3.3 Solutions for Congestion
Various government as well as non-government
organizations have been working on the issue of traffic
congestion in Hinjewadi since last few years. The different
solutions implemented over this period include:
 Modification of roads – A 1.75 km road from Vinode
Vasti to Tata Junction through Laxmi Chowk and
one from Shivaji Chowk to Bhumkar Chowk (on
Dehu Rd.-Katraj Bypass) were recentlywidenedby
the State Government and PCMC respectively.
Along with this, two more routes are proposed for
widening, which include the road connecting
Wakad Flyover to the tail of Phase-I, and Balewadi
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 10 | Oct 2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1830
Stadium to Phase-II of IT Park. Apart from this, a
median is being constructed from Shivaji Chowk to
Jambhulkar Gym Junction while the road
connecting Mezza 9 and Bhumkar Chowk is being
asphalted and widened simultaneously.
 Proposed Alternate Routes-
o Lavasa City to Shivaji Chowk via Mann
Village
o Mhalunge to Infosys (Phase – I)
o Pirangut to Infosys (Phase – I)
 Contraflow Lanes
 Staggering of Office Timings
 Dedicated Bus Lane
 Infrastructural Changes like reduction in the
diameter of Wipro Circle from 40m to 20m.
 Removal of encroachments from Shivaji Chowk to
Bhumkar Chowk
Considering the various surveys and analysis of the traffic
flow along with this study, several short-termandlong-term
improvement plans were suggested. Creating awareness
related to traffic and its harm; removing encroachment of
hawkers between Shivaji Chowk andWakadFlyover;proper
lane management; and keeping a check on illegal parking
include the basic solutions which should be implemented on
high priority.
Other long term measures suggested include:
Grade Separation Interchange at Shivaji Chowk
[Underpass]:
The average queue length at Shivaji Chowk [Phase I – Dange
Chowk] is 318 m. during the peak hours. Moreover,a vehicle
has to wait for an average of 5 minutes at this signal during
this period. Similarly, the ‘Queue Length’ and ‘Stoppage
Time’ at various junctions were studied. Integrating these
values and the volumetric count observedatthesejunctions,
various simulations were run with the help of VISSIM
software. Comparing all the simulations, current scenario
and future development of Pune Metro, an underpass at
Shivaji Chowk connecting Phase-I and Dange Chowk was
suggested.
Vehicle Pooling Applications
Considering the Low Occupancy Factor, reasons behind the
same were studied through Road Side Interview Surveys.
The survey suggested that more than seventy percent of car
travellers, travel solo, thus, formulating new VehiclePooling
Applications for the usage of IT employeesinHinjewadiis an
immediate need. Companies can support this project by
encouraging the employees to use this app by providing
suitable incentives if needed.
Optimization of Metro-Zip Services
With minimal PMPML buses traversing in and out of the IT
Park, Metro-Zip [an initiative of Hinjewadi Industries
Association (HIA)] is the primary source of public
transportation in Hinjewadi. At present more than 120
Metro-Zip buses are in use. To improve the demand for the
same, various parameters were studied in a survey done of
around 280 people using this service. The study suggests
that the major scope for improvement lies in increasing the
transit service coverage and frequency. Various other
solutions like providing express commuter service and
transit priority measures, developing more accessible land
use patterns, providing services for inter-zonal movement,
etc. were also suggested.
Congestion Charges
The IT Park is experiencing adverse problems due to Traffic
Congestion with just three phases in function. Optimum
Congestion charges should be applied on the proposed
phases to preclude congestion.
4. RESULTS AND CONCLUSIONS
Traffic Congestion is an everyday problem faced by the
population of any developing countryandthevariousfactors
introducing traffic congestion are narrow roads, illegal
parking, improper lane management, low occupancy factor,
etc. The most common measures implemented throughout
these cities are to construct alternative routes or road
widening. While the construction of alternative routes is
affected by various socio-economic and political factors, it
has been understood that widening of roadsdoesnotalways
help in reducing the congestion. Greater the width of road,
greater is the number of vehicles. But private vehicles give
the utmost comfort to a commuter and thus, travelers tend
to use their own vehicles. This leads to increase in Modal
Share of private vehicles, and thereby a substantial decrease
in the share of public vehicles.
In Hinjewadi, according to various surveys conducted, the
private vehicle ridership is more than eighty percent while
the public vehicle ridership is as low as nine percent. The
occupancy factor obtained for bikes andcarsisalsoaslowas
1.25 and 1.87 respectively. The immediate need to curb the
congestion is blatant as the vicinity experiences around 4-5
fatal accidents and around 20 minor or major accidents per
month. The average queue length and stoppage time at
major intersections, travel time during the peak hours,
average trip length, etc were also studied and tabulated.
Along with this, the pre-feasibility study encompasses the
view of the locals as well as the daily commuters, regarding
the ‘Pune metro rail project’. An extensive survey which
could collect more responses should be conducted to
understand the nuances of the public regarding the project.
The results obtained from these surveys and observations
led to the investigation of the causes and solutions to the
congestion in this area. Traffic congestion curbs can be
refurbished by undertaking several strategies like road
widening, providing contra-flow lanes, infrastructural
changes, increasing the occupancy factor of vehicles and
creating awareness among travelers. Most importantly,
Improvement in the Metro-zip services along with public
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 10 | Oct 2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1831
awareness of the adverse effects of low occupancy rate is
necessary to mitigate the problem of congestion in
Hinjewadi.
ACKNOWLEDGEMENT
It gives us great pleasure to express sincere thanks to
Mr. A. V. Bhure, for all the help andguidance providedduring
the project work.
REFERENCES
[1] Measuring Urban Traffic Congestion- A Review
International Journal for Traffic and Transport Engineering,
2012, 2(4): 286 – 305
[2] Optimization of Public Transport Demand: A Case Study
of Bhopal
International Journal of Scientific andResearchPublications,
Volume 2, Issue 7, July 2012, ISSN 2250-3153
[3] Traffic Congestion In Indian Cities: ChallengesofARising
Power
Kyoto of the Cities, Naples, March 26-28, 2009
[4] Traffic Congestion- Causes And Solutions: A Study Of
Talegaon Dabhade City
Journal of Information, Knowledge and Research in Civil
Engineering, ISSN: 0975 – 6744 | Volume 3, Issue 1
[5] Research on Urban Road Traffic Congestion Charging
Based on Sustainable Development
2012 International Conference on Applied Physics and
Industrial Engineering
[6] Traffic Congestion and Possible Solutions in Urban
Transportation System
International Journal of Advance Research in Science and
Engineering, Volume 6, Issue 7, July 2017

More Related Content

What's hot

A study of sustainable transportation system in ahmedabad and delhi
A study of sustainable transportation system in ahmedabad and delhiA study of sustainable transportation system in ahmedabad and delhi
A study of sustainable transportation system in ahmedabad and delhi
IJARIIT
 
Intelligent Transportation Systems across the world
Intelligent Transportation Systems across the worldIntelligent Transportation Systems across the world
Intelligent Transportation Systems across the world
Anamhyder1
 
IRJET- Improvement of Traffic Congestion on Kollam Bypass(Ayathil-Kallumt...
IRJET-  	  Improvement of Traffic Congestion on Kollam Bypass(Ayathil-Kallumt...IRJET-  	  Improvement of Traffic Congestion on Kollam Bypass(Ayathil-Kallumt...
IRJET- Improvement of Traffic Congestion on Kollam Bypass(Ayathil-Kallumt...
IRJET Journal
 
Feasibility study of metro transport case study madurai
Feasibility study of metro transport case study maduraiFeasibility study of metro transport case study madurai
Feasibility study of metro transport case study maduraiIAEME Publication
 
Public Private Partnership - in Road Sector
Public Private Partnership - in Road SectorPublic Private Partnership - in Road Sector
Public Private Partnership - in Road Sector
Bathla Tuition Centre
 
Dynamic resource allocation in road transport sector using mobile cloud compu...
Dynamic resource allocation in road transport sector using mobile cloud compu...Dynamic resource allocation in road transport sector using mobile cloud compu...
Dynamic resource allocation in road transport sector using mobile cloud compu...
IAEME Publication
 
IRJET- A Review on Feasibilty Study on Facilities for Pedestraians at Iblur J...
IRJET- A Review on Feasibilty Study on Facilities for Pedestraians at Iblur J...IRJET- A Review on Feasibilty Study on Facilities for Pedestraians at Iblur J...
IRJET- A Review on Feasibilty Study on Facilities for Pedestraians at Iblur J...
IRJET Journal
 
Expansion of state highway 1
Expansion of state highway 1Expansion of state highway 1
Expansion of state highway 1Sneha Kaira
 
IRJET- Identification and Analysis of Black Spots along the Selected Road...
IRJET-  	  Identification and Analysis of Black Spots along the Selected Road...IRJET-  	  Identification and Analysis of Black Spots along the Selected Road...
IRJET- Identification and Analysis of Black Spots along the Selected Road...
IRJET Journal
 
Generation of Emergy Consumption Indicator using Sustainable Approach
Generation of Emergy Consumption Indicator using Sustainable ApproachGeneration of Emergy Consumption Indicator using Sustainable Approach
Generation of Emergy Consumption Indicator using Sustainable Approach
IRJET Journal
 
PREDICTION OF ROAD ACCIDENT MODELLING FOR INDIAN NATIONAL HIGHWAYS
PREDICTION OF ROAD ACCIDENT MODELLING FOR INDIAN NATIONAL HIGHWAYSPREDICTION OF ROAD ACCIDENT MODELLING FOR INDIAN NATIONAL HIGHWAYS
PREDICTION OF ROAD ACCIDENT MODELLING FOR INDIAN NATIONAL HIGHWAYS
IAEME Publication
 
IRJET- Analysis of Road Accident Model in Kaithal City
IRJET- Analysis of Road Accident Model in Kaithal CityIRJET- Analysis of Road Accident Model in Kaithal City
IRJET- Analysis of Road Accident Model in Kaithal City
IRJET Journal
 
Resetting urban mobility 2020+ in India
Resetting urban mobility 2020+ in IndiaResetting urban mobility 2020+ in India
Resetting urban mobility 2020+ in India
IET India
 
Future of Mobility
Future of MobilityFuture of Mobility
Future of MobilityHasan Aijaz
 
Delhi metro and Economics
Delhi metro and EconomicsDelhi metro and Economics
Delhi metro and Economics
Kunal Bhadane
 
Feasibility Study of Samruddhi Expressway
Feasibility Study of Samruddhi ExpresswayFeasibility Study of Samruddhi Expressway
Feasibility Study of Samruddhi Expressway
vivatechijri
 
Metro Plus How can the Metro System be more effective? Case Study of Delhi Metro
Metro Plus How can the Metro System be more effective? Case Study of Delhi MetroMetro Plus How can the Metro System be more effective? Case Study of Delhi Metro
Metro Plus How can the Metro System be more effective? Case Study of Delhi Metro
Alka Vikash
 
A CAR POOLING MODEL WITH CMGV AND CMGNV STOCHASTIC VEHICLE TRAVEL TIMES
A CAR POOLING MODEL WITH CMGV AND CMGNV STOCHASTIC VEHICLE TRAVEL TIMESA CAR POOLING MODEL WITH CMGV AND CMGNV STOCHASTIC VEHICLE TRAVEL TIMES
A CAR POOLING MODEL WITH CMGV AND CMGNV STOCHASTIC VEHICLE TRAVEL TIMES
Editor IJMTER
 
Big data analytics of ev charging stations
Big data analytics of ev charging stationsBig data analytics of ev charging stations
Big data analytics of ev charging stations
MuskanRath1
 

What's hot (20)

A study of sustainable transportation system in ahmedabad and delhi
A study of sustainable transportation system in ahmedabad and delhiA study of sustainable transportation system in ahmedabad and delhi
A study of sustainable transportation system in ahmedabad and delhi
 
Intelligent Transportation Systems across the world
Intelligent Transportation Systems across the worldIntelligent Transportation Systems across the world
Intelligent Transportation Systems across the world
 
IRJET- Improvement of Traffic Congestion on Kollam Bypass(Ayathil-Kallumt...
IRJET-  	  Improvement of Traffic Congestion on Kollam Bypass(Ayathil-Kallumt...IRJET-  	  Improvement of Traffic Congestion on Kollam Bypass(Ayathil-Kallumt...
IRJET- Improvement of Traffic Congestion on Kollam Bypass(Ayathil-Kallumt...
 
Feasibility study of metro transport case study madurai
Feasibility study of metro transport case study maduraiFeasibility study of metro transport case study madurai
Feasibility study of metro transport case study madurai
 
Public Private Partnership - in Road Sector
Public Private Partnership - in Road SectorPublic Private Partnership - in Road Sector
Public Private Partnership - in Road Sector
 
Dynamic resource allocation in road transport sector using mobile cloud compu...
Dynamic resource allocation in road transport sector using mobile cloud compu...Dynamic resource allocation in road transport sector using mobile cloud compu...
Dynamic resource allocation in road transport sector using mobile cloud compu...
 
IRJET- A Review on Feasibilty Study on Facilities for Pedestraians at Iblur J...
IRJET- A Review on Feasibilty Study on Facilities for Pedestraians at Iblur J...IRJET- A Review on Feasibilty Study on Facilities for Pedestraians at Iblur J...
IRJET- A Review on Feasibilty Study on Facilities for Pedestraians at Iblur J...
 
Expansion of state highway 1
Expansion of state highway 1Expansion of state highway 1
Expansion of state highway 1
 
IRJET- Identification and Analysis of Black Spots along the Selected Road...
IRJET-  	  Identification and Analysis of Black Spots along the Selected Road...IRJET-  	  Identification and Analysis of Black Spots along the Selected Road...
IRJET- Identification and Analysis of Black Spots along the Selected Road...
 
Generation of Emergy Consumption Indicator using Sustainable Approach
Generation of Emergy Consumption Indicator using Sustainable ApproachGeneration of Emergy Consumption Indicator using Sustainable Approach
Generation of Emergy Consumption Indicator using Sustainable Approach
 
PREDICTION OF ROAD ACCIDENT MODELLING FOR INDIAN NATIONAL HIGHWAYS
PREDICTION OF ROAD ACCIDENT MODELLING FOR INDIAN NATIONAL HIGHWAYSPREDICTION OF ROAD ACCIDENT MODELLING FOR INDIAN NATIONAL HIGHWAYS
PREDICTION OF ROAD ACCIDENT MODELLING FOR INDIAN NATIONAL HIGHWAYS
 
IRJET- Analysis of Road Accident Model in Kaithal City
IRJET- Analysis of Road Accident Model in Kaithal CityIRJET- Analysis of Road Accident Model in Kaithal City
IRJET- Analysis of Road Accident Model in Kaithal City
 
Resetting urban mobility 2020+ in India
Resetting urban mobility 2020+ in IndiaResetting urban mobility 2020+ in India
Resetting urban mobility 2020+ in India
 
Future of Mobility
Future of MobilityFuture of Mobility
Future of Mobility
 
Delhi metro and Economics
Delhi metro and EconomicsDelhi metro and Economics
Delhi metro and Economics
 
Feasibility Study of Samruddhi Expressway
Feasibility Study of Samruddhi ExpresswayFeasibility Study of Samruddhi Expressway
Feasibility Study of Samruddhi Expressway
 
Metro Plus How can the Metro System be more effective? Case Study of Delhi Metro
Metro Plus How can the Metro System be more effective? Case Study of Delhi MetroMetro Plus How can the Metro System be more effective? Case Study of Delhi Metro
Metro Plus How can the Metro System be more effective? Case Study of Delhi Metro
 
Metro
MetroMetro
Metro
 
A CAR POOLING MODEL WITH CMGV AND CMGNV STOCHASTIC VEHICLE TRAVEL TIMES
A CAR POOLING MODEL WITH CMGV AND CMGNV STOCHASTIC VEHICLE TRAVEL TIMESA CAR POOLING MODEL WITH CMGV AND CMGNV STOCHASTIC VEHICLE TRAVEL TIMES
A CAR POOLING MODEL WITH CMGV AND CMGNV STOCHASTIC VEHICLE TRAVEL TIMES
 
Big data analytics of ev charging stations
Big data analytics of ev charging stationsBig data analytics of ev charging stations
Big data analytics of ev charging stations
 

Similar to IRJET- Traffic Congestion: Causes and Solutions Case Study: Hinjewadi, Pune

Sustainability in Highway Projects: A Concise Review
Sustainability in Highway Projects: A Concise ReviewSustainability in Highway Projects: A Concise Review
Sustainability in Highway Projects: A Concise Review
IRJET Journal
 
Study of road transport system for Amravati city using Artificial Intelligence
Study of road transport system for Amravati city using Artificial IntelligenceStudy of road transport system for Amravati city using Artificial Intelligence
Study of road transport system for Amravati city using Artificial Intelligence
IRJET Journal
 
IRJET- A Review Paper on Movable Divider and Cost Efficiency
IRJET-  	  A Review Paper on Movable Divider and Cost EfficiencyIRJET-  	  A Review Paper on Movable Divider and Cost Efficiency
IRJET- A Review Paper on Movable Divider and Cost Efficiency
IRJET Journal
 
DEVELOPING DIVERSE TRANSIT HUB FOR SURAT RAIL STATION
DEVELOPING DIVERSE TRANSIT HUB FOR SURAT RAIL STATIONDEVELOPING DIVERSE TRANSIT HUB FOR SURAT RAIL STATION
DEVELOPING DIVERSE TRANSIT HUB FOR SURAT RAIL STATION
IRJET Journal
 
Alternative Solution on Kiwale Phata to Aundh BRTS Route
Alternative Solution on Kiwale Phata to Aundh BRTS RouteAlternative Solution on Kiwale Phata to Aundh BRTS Route
Alternative Solution on Kiwale Phata to Aundh BRTS Route
IRJET Journal
 
IRJET- Study on Effect of Mixed Traffic in Highways
IRJET- Study on Effect of Mixed Traffic in HighwaysIRJET- Study on Effect of Mixed Traffic in Highways
IRJET- Study on Effect of Mixed Traffic in Highways
IRJET Journal
 
Design of Highway with Major Bridge on Stagnant Water
Design of Highway with Major Bridge on Stagnant WaterDesign of Highway with Major Bridge on Stagnant Water
Design of Highway with Major Bridge on Stagnant Water
IRJET Journal
 
IRJET- Review Paper on Estimate Traffic Volume and Geometric Design on Select...
IRJET- Review Paper on Estimate Traffic Volume and Geometric Design on Select...IRJET- Review Paper on Estimate Traffic Volume and Geometric Design on Select...
IRJET- Review Paper on Estimate Traffic Volume and Geometric Design on Select...
IRJET Journal
 
IRJET- Review Paper on Considering Traffic Congestion Frame Work in Nagpur Me...
IRJET- Review Paper on Considering Traffic Congestion Frame Work in Nagpur Me...IRJET- Review Paper on Considering Traffic Congestion Frame Work in Nagpur Me...
IRJET- Review Paper on Considering Traffic Congestion Frame Work in Nagpur Me...
IRJET Journal
 
IRJET- Study on Transit Oriented Development
IRJET- Study on Transit Oriented DevelopmentIRJET- Study on Transit Oriented Development
IRJET- Study on Transit Oriented Development
IRJET Journal
 
A REVIEW ON EFFECTIVE SOLUTION OF TRAFFIC CONGESTION ISSUES OCCURRING IN THE ...
A REVIEW ON EFFECTIVE SOLUTION OF TRAFFIC CONGESTION ISSUES OCCURRING IN THE ...A REVIEW ON EFFECTIVE SOLUTION OF TRAFFIC CONGESTION ISSUES OCCURRING IN THE ...
A REVIEW ON EFFECTIVE SOLUTION OF TRAFFIC CONGESTION ISSUES OCCURRING IN THE ...
IRJET Journal
 
Assessment of Capacity and Level of Service for Urban Arterial Road in Jabalp...
Assessment of Capacity and Level of Service for Urban Arterial Road in Jabalp...Assessment of Capacity and Level of Service for Urban Arterial Road in Jabalp...
Assessment of Capacity and Level of Service for Urban Arterial Road in Jabalp...
IRJET Journal
 
IRJET-Smart Roads using IoT Devices.
IRJET-Smart Roads using IoT Devices.IRJET-Smart Roads using IoT Devices.
IRJET-Smart Roads using IoT Devices.
IRJET Journal
 
IRJET- Study of Design Traffic Signal
IRJET- Study of Design Traffic SignalIRJET- Study of Design Traffic Signal
IRJET- Study of Design Traffic Signal
IRJET Journal
 
IRJET- To Study Pedestrian Road Crossing Behaviour at Intersection under ...
IRJET-  	  To Study Pedestrian Road Crossing Behaviour at Intersection under ...IRJET-  	  To Study Pedestrian Road Crossing Behaviour at Intersection under ...
IRJET- To Study Pedestrian Road Crossing Behaviour at Intersection under ...
IRJET Journal
 
IRJET- Approach for a Transit Oriented Development in Chhattisgarh
IRJET- Approach for a Transit Oriented Development in ChhattisgarhIRJET- Approach for a Transit Oriented Development in Chhattisgarh
IRJET- Approach for a Transit Oriented Development in Chhattisgarh
IRJET Journal
 
IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...
IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...
IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...
IRJET Journal
 
Global Challenge Porjct Report -Coursework of University of Bristol
Global Challenge Porjct Report -Coursework of University of Bristol Global Challenge Porjct Report -Coursework of University of Bristol
Global Challenge Porjct Report -Coursework of University of Bristol
ssusera0a3b6
 
IRJET- Design of Parking Area and Traffic Signal for Moodbidri Town based...
IRJET-  	  Design of Parking Area and Traffic Signal for Moodbidri Town based...IRJET-  	  Design of Parking Area and Traffic Signal for Moodbidri Town based...
IRJET- Design of Parking Area and Traffic Signal for Moodbidri Town based...
IRJET Journal
 
IRJET- Traffic Prediction Techniques: Comprehensive analysis
IRJET- Traffic Prediction Techniques: Comprehensive analysisIRJET- Traffic Prediction Techniques: Comprehensive analysis
IRJET- Traffic Prediction Techniques: Comprehensive analysis
IRJET Journal
 

Similar to IRJET- Traffic Congestion: Causes and Solutions Case Study: Hinjewadi, Pune (20)

Sustainability in Highway Projects: A Concise Review
Sustainability in Highway Projects: A Concise ReviewSustainability in Highway Projects: A Concise Review
Sustainability in Highway Projects: A Concise Review
 
Study of road transport system for Amravati city using Artificial Intelligence
Study of road transport system for Amravati city using Artificial IntelligenceStudy of road transport system for Amravati city using Artificial Intelligence
Study of road transport system for Amravati city using Artificial Intelligence
 
IRJET- A Review Paper on Movable Divider and Cost Efficiency
IRJET-  	  A Review Paper on Movable Divider and Cost EfficiencyIRJET-  	  A Review Paper on Movable Divider and Cost Efficiency
IRJET- A Review Paper on Movable Divider and Cost Efficiency
 
DEVELOPING DIVERSE TRANSIT HUB FOR SURAT RAIL STATION
DEVELOPING DIVERSE TRANSIT HUB FOR SURAT RAIL STATIONDEVELOPING DIVERSE TRANSIT HUB FOR SURAT RAIL STATION
DEVELOPING DIVERSE TRANSIT HUB FOR SURAT RAIL STATION
 
Alternative Solution on Kiwale Phata to Aundh BRTS Route
Alternative Solution on Kiwale Phata to Aundh BRTS RouteAlternative Solution on Kiwale Phata to Aundh BRTS Route
Alternative Solution on Kiwale Phata to Aundh BRTS Route
 
IRJET- Study on Effect of Mixed Traffic in Highways
IRJET- Study on Effect of Mixed Traffic in HighwaysIRJET- Study on Effect of Mixed Traffic in Highways
IRJET- Study on Effect of Mixed Traffic in Highways
 
Design of Highway with Major Bridge on Stagnant Water
Design of Highway with Major Bridge on Stagnant WaterDesign of Highway with Major Bridge on Stagnant Water
Design of Highway with Major Bridge on Stagnant Water
 
IRJET- Review Paper on Estimate Traffic Volume and Geometric Design on Select...
IRJET- Review Paper on Estimate Traffic Volume and Geometric Design on Select...IRJET- Review Paper on Estimate Traffic Volume and Geometric Design on Select...
IRJET- Review Paper on Estimate Traffic Volume and Geometric Design on Select...
 
IRJET- Review Paper on Considering Traffic Congestion Frame Work in Nagpur Me...
IRJET- Review Paper on Considering Traffic Congestion Frame Work in Nagpur Me...IRJET- Review Paper on Considering Traffic Congestion Frame Work in Nagpur Me...
IRJET- Review Paper on Considering Traffic Congestion Frame Work in Nagpur Me...
 
IRJET- Study on Transit Oriented Development
IRJET- Study on Transit Oriented DevelopmentIRJET- Study on Transit Oriented Development
IRJET- Study on Transit Oriented Development
 
A REVIEW ON EFFECTIVE SOLUTION OF TRAFFIC CONGESTION ISSUES OCCURRING IN THE ...
A REVIEW ON EFFECTIVE SOLUTION OF TRAFFIC CONGESTION ISSUES OCCURRING IN THE ...A REVIEW ON EFFECTIVE SOLUTION OF TRAFFIC CONGESTION ISSUES OCCURRING IN THE ...
A REVIEW ON EFFECTIVE SOLUTION OF TRAFFIC CONGESTION ISSUES OCCURRING IN THE ...
 
Assessment of Capacity and Level of Service for Urban Arterial Road in Jabalp...
Assessment of Capacity and Level of Service for Urban Arterial Road in Jabalp...Assessment of Capacity and Level of Service for Urban Arterial Road in Jabalp...
Assessment of Capacity and Level of Service for Urban Arterial Road in Jabalp...
 
IRJET-Smart Roads using IoT Devices.
IRJET-Smart Roads using IoT Devices.IRJET-Smart Roads using IoT Devices.
IRJET-Smart Roads using IoT Devices.
 
IRJET- Study of Design Traffic Signal
IRJET- Study of Design Traffic SignalIRJET- Study of Design Traffic Signal
IRJET- Study of Design Traffic Signal
 
IRJET- To Study Pedestrian Road Crossing Behaviour at Intersection under ...
IRJET-  	  To Study Pedestrian Road Crossing Behaviour at Intersection under ...IRJET-  	  To Study Pedestrian Road Crossing Behaviour at Intersection under ...
IRJET- To Study Pedestrian Road Crossing Behaviour at Intersection under ...
 
IRJET- Approach for a Transit Oriented Development in Chhattisgarh
IRJET- Approach for a Transit Oriented Development in ChhattisgarhIRJET- Approach for a Transit Oriented Development in Chhattisgarh
IRJET- Approach for a Transit Oriented Development in Chhattisgarh
 
IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...
IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...
IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...
 
Global Challenge Porjct Report -Coursework of University of Bristol
Global Challenge Porjct Report -Coursework of University of Bristol Global Challenge Porjct Report -Coursework of University of Bristol
Global Challenge Porjct Report -Coursework of University of Bristol
 
IRJET- Design of Parking Area and Traffic Signal for Moodbidri Town based...
IRJET-  	  Design of Parking Area and Traffic Signal for Moodbidri Town based...IRJET-  	  Design of Parking Area and Traffic Signal for Moodbidri Town based...
IRJET- Design of Parking Area and Traffic Signal for Moodbidri Town based...
 
IRJET- Traffic Prediction Techniques: Comprehensive analysis
IRJET- Traffic Prediction Techniques: Comprehensive analysisIRJET- Traffic Prediction Techniques: Comprehensive analysis
IRJET- Traffic Prediction Techniques: Comprehensive analysis
 

More from IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
IRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
IRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
IRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
IRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
IRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
IRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
IRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
IRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
IRJET Journal
 

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Recently uploaded

Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
MuhammadTufail242431
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
Kamal Acharya
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
ShahidSultan24
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
Intella Parts
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
DuvanRamosGarzon1
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 

Recently uploaded (20)

Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 

IRJET- Traffic Congestion: Causes and Solutions Case Study: Hinjewadi, Pune

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 10 | Oct 2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1827 TRAFFIC CONGESTION: CAUSES AND SOLUTIONS CASE STUDY: HINJEWADI, PUNE Soham Sarda1, Janhavi Chavare2, Rohit Bhosale3, Akshay Birajdar4, Shweta Andhale5, Prof. S. S. Shastri6 1,2,3,4,5,6Department of Civil Engineering, Sinhgad College of Engineering, Pune ----------------------------------------------------------------------***--------------------------------------------------------------------- Abstract – Congestion impacts the movement of people. Traffic congestion not only causes pollution, but also wastes time and energy. The major factor for traffic congestion in Hinjewadi today is the imbalance seeninitsModalSplitRatio - a very low ridership in public transport due to poor service quality and less frequency - which leads to an increase in the number of private vehicles causing congestion which further leads to an increase in travel time and emission of exhaust gases causing air pollution. Change in commuters’ thinking and their behavioral pattern is studied by extensivesurveying. Vehicle Composition and Occupancy Factor of commuters is also analyzed to understand the traffic flow in the area. The Origin-Destination matrix was drawn and the visuals were created using VISSIM Software. Solutions for increasing congestion in the area are given by suggesting optimal infrastructural changes, enhancing the use of public/semi- public transportation, and increasingtheOccupancyFactor of vehicles. The future development of the IT-sector and the impact of Pune Metro Rail are also taken into account. Key Words: Modal Split, Origin-Destination Matrix, Occupancy Factor, Vehicle Composition, Travel Time, Congestion 1. INTRODUCTION Traffic Congestion is one of the major issues experienced in most metropolitan cities in the developing nations. Traffic Congestion involves queuing, slower speeds and increased travel time which wastes energy of the commuters and causes stress, thus reducing the overall productivity and imposing an intangible cost on the society. It also affects various other factors like environment, usage of natural resources, quality of life and safety of commuters as well as pedestrians, directly and/or indirectly. Hence, UrbanTraffic Congestion possesses a challenge for all large and growing urban areas and thus many measures have been taken over years to attenuate the same. As congestion continues to increase, the conventional approach of‘building moreroads’ does not always work due to varying circumstances. In fact, building new roads can actually compound congestion in some cases by inducing greater demands for vehicle travel that quickly eat away the additional capacity. This is becoming more and more apparent in the form of greater congestion and delays observed in major cities. Besidesthis, suitable corridors in such cities for major roadwork are becoming increasingly difficult to be obtained, thus increasing the cost of construction. The major factors contributing to Urban Traffic Congestion can be categorized as follows:  Prevailing imbalance in Modal Split  Inadequate Transport Infrastructure  Sub-optimal use of existing Infrastructure Studying different major cities around the world shows us how Public Transportation can reduce the transport problems faced by Indian cities. These cities cannotafford to cater only to private cars and two-wheelers.Theremustbea general understanding amongst the locals that without public transport, cities would be even less viable. To encourage Public Transportation, one must increase the quality and quantity of Public Transportation, while simultaneously creating a balance on the Demand-and- Supply scale. The existing transport system in Indian cities has not been able to keep up with the rapidly increasing demand over the past few decades, particularly the ‘Bus Transit System’. The last two decades have seen a gradual decline in the level of Bus services in the country. Their relative output is further diminished as commuters opt to travel with private and semi-private vehicles as we can see in Fig. 1. Against this backdrop of serious problem, traffic control techniques and information systems are needed that can significantly improve the traffic flow efficiency and its carrying capacity. Application of Intelligent Transport System (ITS) technologies in such areas has significant potential for relieving congestion. In the past decade, ITS has surged around the world providing us with additional tools to help solve our transport problems. ITS can produce major benefits in reducing congestion and its environmental impacts. ITS not only has the ability to reduce the number of accidents and thus boost public safety, but it can also make remarkable improvements to the efficiency of Public Transport fleets and Inter-Modal integration. 2. METHODOLOGY Taking into account the variousparametersandtheextent of the project, a list of research papers is studied. Literature survey is the most important part of the project as itshowsa direction to proceed and set achievable objectives. Various papers related to traffic congestion measurements and solutions were considered to get a broader outlook towards the problem. This was followed by Reconnaissance Survey which included study of the area, interaction with locals,
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 10 | Oct 2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1828 officials and experts, study of previous investigations, etc. The Preliminary Survey included collecting data by conducting various surveyslikeVolumetric Study,Road-Side Interview Surveys, Occupancy Factor Survey, Origin- Destination Survey, Speed and Delay Survey, Accident Survey, etc. Based on the observations made during thefield reconnaissance and analysis of data, the most obvious problems have been identified and optimum solutions were then formulated. The costs of thesealternatives,theirimpact on the traffic flow and congestion, etc. were calculated using various software. The impact of Pune Metro Rail was also taken into consideration. 3. CASE STUDY Hinjewadi is a suburb located in Pune (India),mainlyknown for its IT-Park (Rajeev Gandhi Infotech Park). The 2800 acre IT-Park in Hinjewadi houses more than 120 companies of different sizes. The Infotech Park is subdivided in three phases, with four further phases planned. According to a survey conducted by OLA Cabs in the year 2017- Shivaji Chowk, located in the IT-Park is considered amongst the seven biggest bottlenecks in India. The average speed of vehicles in Pune during peak hoursis22 kilometresperhour (kmph) while that in Hinjewadi is just 16 kmph. In some areas, the average speed drops as low as 6 kmph. On an average, the commuters spend more than an hour totravel a distance of 2 km between Wakad Taking into account the various parameters and the extent of the project, a list of research papers is studied. Literature survey is the most important part of the project as it shows a direction to proceed and set achievable objectives. Various papers related to traffic congestion measurements and solutions were considered to get a broader outlook towards the problem. Thiswasfollowed byReconnaissanceSurveywhich included study of the area, interaction with locals, officials and experts, study of previous investigations, etc. The Preliminary Survey included collecting data by conducting various surveys like Volumetric Study, Road-Side Interview Surveys, Occupancy Factor Survey, Origin-Destination Survey, Speed and Delay Survey, Accident Survey, etc.Based on the observations made during the field reconnaissance and analysis of data, the most obvious problems have been identified and optimum solutionswerethenformulated. The costs of these alternatives, their impact on the traffic flow and congestion, etc. were calculated using various software. The impact of Pune Metro Rail was also taken into consideration. Hinjewadi is a suburb located in Pune (India),mainlyknown for its IT-Park (Rajeev Gandhi Infotech Park). The 2800 acre IT-Park in Hinjewadi houses more than 120 companies of different sizes. The Infotech Park is subdivided in three phases, with four further phases planned. According to a survey conducted by OLA Cabs in the year 2017- Shivaji Chowk, located in the IT-Park is considered amongst the seven biggest bottlenecks in India. The average speed of vehicles in Pune during peak hoursis22kilometresperhour (kmph) while that in Hinjewadi is just 16 kmph. In some areas, the average speed drops as low as 6 kmph. On an average, the commuters spend more Bridge and Wipro Circle. The companies in this area were constructed before building a basic infrastructure. This has led to the infrastructural development leap-frogging behind the overall development of Hinjewadi. Chart -1: Modal Split (Hinjewadi IT Park) Cars (58%) Bikes (33%) Auto (3%) Buses (6%) Chart -2: Volumetric Study 0 1000 2000 3000 4000 5000 6000 08:00 09:30 11:00 12:30 02:00 03:30 05:00 06:30 08:00 09:30 PCU PCU 3.1 Pre-feasibility study of Pune Metro Rail Pune Metro is a rail based Rapid Transit System under construction to serve the city of Pune and its industrial twin Pimpri Chinchwad in Indian state, Maharashtra. The third line (Phase – II) of the project – 23.33 km elevated route will connect the Rajeev Gandhi IT-Park in Hinjewadi to Shivaji Nagar, Pune. A survey to study the impact of this project on the commuters of Hinjewadi was conducted. The study included an online survey which focused on the possible shortcomings Pune Metro could face in the near future and provide suggestions to the afore-mentioned problems. The survey included various questions for the commuters like: travel distance, current mode of transport, average travel time, preferred waiting time at the stations, etc. Theresult of this survey was presented in the form of graphs and pie- charts showing the adaptability and preference of the metro rail, if constructed, by the household who generally
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 10 | Oct 2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1829 preferred bus as their primary source of commute. It helped us understand the balance between the adequacy of Metro Rail and demand side of dwellers. Some of the results from the survey are exemplified below Chart -3: Current Mode of Transportation 2 - W (54%) 4 - W (22%) Semi-Public (11%) Public (13%) Chart - 4: Preferred mode of transportation to reach metro Station Walking (27%) 2- W (41%) 4- W (6%) Public (16%) Semi-Private (10%) 3.2 Causes of Traffic Congestion Inadequacy of Traffic System The traffic system fails to clear the queue during peak hours. All cross-roads need at least 4-8 traffic policemen simultaneously. A heavy patrol of 86 traffic controllers including 4 officers, 31 warden, and 51 traffic police, work from 8 a.m. to 10 p.m. in this area consisting of just 3 major intersections. Narrow Roads The major routes connecting the IT park and Hinjewadi are not wide enough for a free flow of traffic. Though most of these roads have undergone road-widening recently, the illegal encroachment of hawkers still creates bottlenecks at various intersections. Illegal Parking Illegal road-side parking betweentheIndianOil Petrol pump and Shivaji chowk hampers the flow of traffic leaving Hinjewadi during the evening hours. Increasing number of Commuters With an ever-so-growing IT Sector at its core, there is a continuous increase in the number of employees. This directly puts a load on the Transport System as the number of Commuters steeply increases along with it. High purchasing power of Public The standard of living of regular commuters increasesalong with the growth of IT sector. This brings in thepsychology of travelling alone, preferably so in a car, with maximum comfort, thus, gradually increasing the modal share of Private vehicles. Redundant Public Transport Facilities It has been observed that the frequency of public vehicles is very low in the IT Park as on an average one government transport bus (PMPML) is available every half hour. Buses have then been issued by a local authority and some major IT companies themselves. Still the employees prefer private or semi-private transportation as it gives them more freedom of movement. This, thereby, reduces the Modal share of Public Transportation. Improper Planning The companies in this area were constructed beforebuilding a basic infrastructure. This has led to the infrastructural development leap-frogging behind the overall development of Hinjewadi. Improper Lane Management One of the most common causes of traffic congestion in every developing country is improper lane management. Commuters in a hurry to reach their destination disregard the traffic laws and indirectly end up slowing themselves. Low Occupancy Factor The occupancy factor in Hinjewadiis1.25for ‘Two wheelers’ and 1.87 for ‘Cars’. This is very low when compared to the average occupancy factor for Pune city as specified in the ‘Comprehensive Mobility Plan for Pune’ is 1.6 for ‘Two wheelers’ and 2.9 for ‘Cars’ respectively. 3.3 Solutions for Congestion Various government as well as non-government organizations have been working on the issue of traffic congestion in Hinjewadi since last few years. The different solutions implemented over this period include:  Modification of roads – A 1.75 km road from Vinode Vasti to Tata Junction through Laxmi Chowk and one from Shivaji Chowk to Bhumkar Chowk (on Dehu Rd.-Katraj Bypass) were recentlywidenedby the State Government and PCMC respectively. Along with this, two more routes are proposed for widening, which include the road connecting Wakad Flyover to the tail of Phase-I, and Balewadi
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 10 | Oct 2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1830 Stadium to Phase-II of IT Park. Apart from this, a median is being constructed from Shivaji Chowk to Jambhulkar Gym Junction while the road connecting Mezza 9 and Bhumkar Chowk is being asphalted and widened simultaneously.  Proposed Alternate Routes- o Lavasa City to Shivaji Chowk via Mann Village o Mhalunge to Infosys (Phase – I) o Pirangut to Infosys (Phase – I)  Contraflow Lanes  Staggering of Office Timings  Dedicated Bus Lane  Infrastructural Changes like reduction in the diameter of Wipro Circle from 40m to 20m.  Removal of encroachments from Shivaji Chowk to Bhumkar Chowk Considering the various surveys and analysis of the traffic flow along with this study, several short-termandlong-term improvement plans were suggested. Creating awareness related to traffic and its harm; removing encroachment of hawkers between Shivaji Chowk andWakadFlyover;proper lane management; and keeping a check on illegal parking include the basic solutions which should be implemented on high priority. Other long term measures suggested include: Grade Separation Interchange at Shivaji Chowk [Underpass]: The average queue length at Shivaji Chowk [Phase I – Dange Chowk] is 318 m. during the peak hours. Moreover,a vehicle has to wait for an average of 5 minutes at this signal during this period. Similarly, the ‘Queue Length’ and ‘Stoppage Time’ at various junctions were studied. Integrating these values and the volumetric count observedatthesejunctions, various simulations were run with the help of VISSIM software. Comparing all the simulations, current scenario and future development of Pune Metro, an underpass at Shivaji Chowk connecting Phase-I and Dange Chowk was suggested. Vehicle Pooling Applications Considering the Low Occupancy Factor, reasons behind the same were studied through Road Side Interview Surveys. The survey suggested that more than seventy percent of car travellers, travel solo, thus, formulating new VehiclePooling Applications for the usage of IT employeesinHinjewadiis an immediate need. Companies can support this project by encouraging the employees to use this app by providing suitable incentives if needed. Optimization of Metro-Zip Services With minimal PMPML buses traversing in and out of the IT Park, Metro-Zip [an initiative of Hinjewadi Industries Association (HIA)] is the primary source of public transportation in Hinjewadi. At present more than 120 Metro-Zip buses are in use. To improve the demand for the same, various parameters were studied in a survey done of around 280 people using this service. The study suggests that the major scope for improvement lies in increasing the transit service coverage and frequency. Various other solutions like providing express commuter service and transit priority measures, developing more accessible land use patterns, providing services for inter-zonal movement, etc. were also suggested. Congestion Charges The IT Park is experiencing adverse problems due to Traffic Congestion with just three phases in function. Optimum Congestion charges should be applied on the proposed phases to preclude congestion. 4. RESULTS AND CONCLUSIONS Traffic Congestion is an everyday problem faced by the population of any developing countryandthevariousfactors introducing traffic congestion are narrow roads, illegal parking, improper lane management, low occupancy factor, etc. The most common measures implemented throughout these cities are to construct alternative routes or road widening. While the construction of alternative routes is affected by various socio-economic and political factors, it has been understood that widening of roadsdoesnotalways help in reducing the congestion. Greater the width of road, greater is the number of vehicles. But private vehicles give the utmost comfort to a commuter and thus, travelers tend to use their own vehicles. This leads to increase in Modal Share of private vehicles, and thereby a substantial decrease in the share of public vehicles. In Hinjewadi, according to various surveys conducted, the private vehicle ridership is more than eighty percent while the public vehicle ridership is as low as nine percent. The occupancy factor obtained for bikes andcarsisalsoaslowas 1.25 and 1.87 respectively. The immediate need to curb the congestion is blatant as the vicinity experiences around 4-5 fatal accidents and around 20 minor or major accidents per month. The average queue length and stoppage time at major intersections, travel time during the peak hours, average trip length, etc were also studied and tabulated. Along with this, the pre-feasibility study encompasses the view of the locals as well as the daily commuters, regarding the ‘Pune metro rail project’. An extensive survey which could collect more responses should be conducted to understand the nuances of the public regarding the project. The results obtained from these surveys and observations led to the investigation of the causes and solutions to the congestion in this area. Traffic congestion curbs can be refurbished by undertaking several strategies like road widening, providing contra-flow lanes, infrastructural changes, increasing the occupancy factor of vehicles and creating awareness among travelers. Most importantly, Improvement in the Metro-zip services along with public
  • 5. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 10 | Oct 2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1831 awareness of the adverse effects of low occupancy rate is necessary to mitigate the problem of congestion in Hinjewadi. ACKNOWLEDGEMENT It gives us great pleasure to express sincere thanks to Mr. A. V. Bhure, for all the help andguidance providedduring the project work. REFERENCES [1] Measuring Urban Traffic Congestion- A Review International Journal for Traffic and Transport Engineering, 2012, 2(4): 286 – 305 [2] Optimization of Public Transport Demand: A Case Study of Bhopal International Journal of Scientific andResearchPublications, Volume 2, Issue 7, July 2012, ISSN 2250-3153 [3] Traffic Congestion In Indian Cities: ChallengesofARising Power Kyoto of the Cities, Naples, March 26-28, 2009 [4] Traffic Congestion- Causes And Solutions: A Study Of Talegaon Dabhade City Journal of Information, Knowledge and Research in Civil Engineering, ISSN: 0975 – 6744 | Volume 3, Issue 1 [5] Research on Urban Road Traffic Congestion Charging Based on Sustainable Development 2012 International Conference on Applied Physics and Industrial Engineering [6] Traffic Congestion and Possible Solutions in Urban Transportation System International Journal of Advance Research in Science and Engineering, Volume 6, Issue 7, July 2017