Design of Highway with Major Bridge on Stagnant Water
Sofia Pathan1, Mrs. Bharti Shete2, Prof. Ashish Bijwe3
1PG Scholar, Department of Civil Engineering, Dr. Rajendra Gode Institute of Technology and Research, Amravati,
Maharashtra, India
2Head of the Department, Department of Civil Engineering, Dr. Sau. Kamal Tai Gawai Institute of Engineering &
Technology, Darapur, Amravati, Maharashtra, India
3Assistant Professor, Department of Civil Engineering, Dr. Rajendra Gode Institute of Technology and Research,
Amravati, Maharashtra, India
---------------------------------------------------------------------***---------------------------------------------------------------------
Abstract - One of the most important aims of the Indian
Government is to provide and improve the quality of Road
Transportation in the country. Hence, it becomes of the top
priorities to study and understand the latest and revised
editions of rules set forth by the government. To fulfil this
requirement, a project undertaken by NHAI (National
Highways Authority of India) has been studied and taken into
consideration. This paperaimsatunderstandingthedesigning
process of the project pavement in accordance with Indian
Standards of Road Congress. This paper also gives a brief idea
about the designing of a major bridge that coincides with the
road section of the project. The project available for
concessionaire is in Bhandara, Nagpur, Maharashtra, India. It
was found by laboratory tests that the CBR ofthesoilsampleis
quite low, and hence to achieve strength for construction it is
suggested that the sub-base should be cement treated. The
overall traffic is quite high over the span and it is suggested
that six – lane construction must be done over the desired
span. This paper also aims at suggesting the most economical
sections for design of bridge as per the hydraulic catchmentof
the dam. Old records were collected for the calculation
purposes.
Key Words: Design, Pavement, Bridge, Catchment
1.INTRODUCTION
1.1 General
Roads are one of the most important modes of
transportation in India. India has a network of over
6,215,797 kilometers of roads as of 31 March 2020. This
accounts for the second largest road network in the world
after the United States. The current condition of the nation’s
transportation system is of great concern to National and
State Departments of Transportation.
The project includes the 6 – Lane divided carriageway with
fully paved shoulders. The design speed is proposed to be
ruling design of 100 km/hr. as per contract terms. Minimum
design life of 20 years with minimum effective CBR of 8% is
proposed in the contract of this project.
1.2 Objective of Study:
 To analyze traffic count and design sustainable
pavement in accordance with the requirement.
 To analyze hydraulic catchment of the river for making
safe design of major bridge.
 To understand the design procedures involved.
2. LITERATURE REVIEW
Zhang et al. (2013) described about the development of a
new pavement network management system that helps
analysis and optimization. This LCCA optimization was
implemented to regulate the optimum conservation scheme
fora pavement networkand to reducesupportabilitymetrics
within a given analysis period. They discussed about
pavement deterioration, which is a main aspect to focus
future pavement conservation procedures and is extremely
difficult to focus faultlessly.
Pradhan Mantri Gram Sadak Yojana (2006) [12] presented
the choice of the appropriate economical and advantageous
pavement type, was made by carrying out life cycle cost
analysis, which considerstheinitialcostandthemaintenance
cost. They also presented the methodology of construction
for both rigid and flexible pavements.
Arijit Dutta (2014) [5] described the life cycle cost analysis
for roads. The report included various details about the
parameters to be dealt with while designing the pavement
economically. The report also consisted of consideration for
several possible ways for routine maintenance action to
reconstruction of road networks.
It is obvious fromall theliteraturereviewedinthisstudythat
despite adapting different methodologies and designs, there
were somecommon factors of samecentrality. It gives us the
scopeto understand the basics thatcan be put forwardwhile
finalizing the design and construction of pavements and
bridges. Another thing is that optimization of cost and
duration of project can economically affect the entire
transportation system in future.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 08 | Aug 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 1298
3. METHODOLOGY
3.1 Methodology for Design of Pavement –
Traffic surveys have been carried out in accordancewiththe
guidelines specified by IRC: 9-1972 [9] and IRC: 102-1988
[13] to calculate the wheel load and traffic intensity. The
methodology adopted for the traffic study is detailed as
below:
 The project road corridor is divided into two traffic
homogeneous sections based on change in traffic flow
pattern.
 The traffic surveys including classified traffic volume
count is carried out for each traffic homogeneous
section.
 The classified directional traffic volume is counted over
seven consecutive days for 24 hours on each day. The
vehicle classification considered wasinaccordancewith
IRC – 64. [14] Number of vehicles ineitherdirection was
noted at 1-hour intervals in accordance with their
classification by observers specially trained for this
purpose.
3.2 Methodology for Design of Major Bridge –
 Geotechnical investigation is carried out for the
proposed construction of Major Bridge Across River
Wainganga near Bhandara. Investigation was intended
to evaluate allowable bearing capacity of available
soil/rock stratum and other physical parameters
necessary for the design of suitable foundation.Scopeof
work included boring, Standard Penetration Tests as
well as disturbed & undisturbed soil sampling at field
and necessary laboratory testing on availablesoil /rock
samples.
 Bore logs were obtained by rotary drilling rig.
4. FINDINGS AND ANALYSIS
4.1 Findings of Traffic Survey
The classified traffic count data collected has been analyzed
for hourly and daily traffic intensity, traffic composition,
peak hour factor (PHF), directional distribution, average
daily traffic (ADT) and finally annual average daily traffic
(AADT) by applying the seasonal correction factors. The
AADT factor is considered as 1.00 from the prevailing
studies in the state.
Traffic volume analysis has been carried out to assess the
volume of traffic, composition, hourly variation in traffic
over 24 hours, and the daily variation in the traffic over 7
days at the project locations. The compiled data obtained
from field traffic survey has been analyzed to work out the
average daily traffic in terms of total vehicles andtotal PCUs.
Analysis was carried out to find the composition of traffic in
terms of fast- and slow-moving traffic and in terms of
various types of vehicles. The observed vehicular
compositions are shown in Table 1
Table -1: Summary of Composition of Traffic
Type of Vehicle
Name of Vehicle Number PCU
Two - Wheeler 27.473% 6.124%
Car / Jeep / Van / Taxi 21.186% 9.445%
Three-Wheeler 0.354% 0.158%
LCV 7.312% 4.890%
Govt. Bus 1.284% 1.717%
Private Bus 0.877% 1.173%
Minibus 0.207% 0.138%
Tractor 0.089% 0.059%
Tractor With Trolley/
Trailer
0.574% 1.151%
2 - Axle 8.373% 11.198%
3 - Axle 12.272% 24.621%
Multi Axle Truck 19.552% 39.226%
Total Fast Moving (A) 99.552% 99.9%
Cycle 0.448% 0.100%
Rickshaws - -
Bullock Cart - -
Total Slow Moving (B) 0.448% 0.100%
Total ADT (C) = (A) +
(B)
100% 100%
4.2 Analysis of Traffic Growth
Traffic demand forecasting is to be done for future traffic
volumes the project road is supposed to cater. This is
primarily based on the present-day traffic volume and likely
traffic growth rates periodically during the forecasting
period of 30 years for the proposed road improvements.
The traffic growth rates are dependent on various factors
such as growth in national economy, changes in socio-
economic conditions of the people etc. Forecasted traffic
forms the basisfordeterminingtherequirementsforcapacity
augmentation by way of widening of existing carriageway,
pavement design and economic / financial deciding viability
of project.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 08 | Aug 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 1299
Econometric modelling is attempted to estimate traffic
demand forecasting considering several variables such as
population, per capita income, net state domestic product
(NSDP) and past vehicle registration data. Time series data
on vehicle registration in the state was collected from
secondary sources. Similarly, time series past data on
population, state income (NSDP) and per capita income for
the state has also been obtained from the concerned
departments of Government.
The economic indicators of state are used for the regression
analysis along with vehicle registration data as presented in
Table 2.
Table -2: Economic Indicators for Maharashtra State.
Year NSDP Population Per Capital
Income
2010 1 599338 111118000
2011 2 667625 112372972
2012 3 695904 114170968
2013 4 749137 115969272
2014 5 805593 117766794
Based on the moderatedelasticityvaluesandaveragegrowth
rate of NSDP 2010-2014 andwith the givenmodelasfollows,
the future average annual compound traffic growth rates for
vehicle type are estimated as below:
 OPTIMISTIC: {Trend Growth of Vehicles} – Average
Growth Rate: 4.44%
 REALISTIC: {Growth from RegressionAnalysis}-Average
Growth Rate: 4.39%
 PESSIMISTIC: {Considered for Revenue Capacity} –
Average Growth Rate: 6.16%
4.3 Findings in Subgrade Soil Investigation
Subsoil investigation consisted of Drilling and sampling in
four boreholes, carrying out relevant laboratory tests on
representative soil and rock samples, preparation of
engineering report based on field and laboratory data.
The observed CBR of soil is 3%, since the required CBR for
pavement is 8%. The base course must be treated with
manufactured aggregates with measured amounts of
Portland cement and water that hardens after compaction
and curing to form a strong, durable, frost-resistant paving
material. CTB is versatile as it can be either mixed in place
and compacted after blending or mixed in a central plant
where it is hauled to the placement area and spread on a
prepared subgrade or subbase and compacted.
5. DESIGN
1.1 Design of Pavement
Based on the performance of existing designs and using
analytical approach, simple design charts and a catalogue of
pavement designs are added in the code. UsingDesigntraffic
in terms of cumulative number of standard axles and CBR
value of subgrade, appropriate designs could be chosen for
the given traffic and soil strength.
As specified in the IRC:37 2018 [3], the pavement designhas
been done as follows:
 The effective CBR of soil subgrade is 5%.
 The design life specified in the contract is 30 years.
 VDF has adopted as 5.35.
 The ADT, i.e., Average Daily Traffic of the given section
of bypass is computed to be 12075 CVPD.
 The realistic growth of the traffic is 4.39%.
 Distribution Factor = 0.45
 Initial Directional Traffic = 12075/6 (Since the bypass
is proposed to be a Six Lane Road)
 Cumulative number of standard axles to be catered for
in the design
N = 6038 × 365 × ((1+0.0439)30 -1) × 0.75 × 5.35
0.0439
Therefore, N = 106 msa
 Effective resilient modulus of subgrade = 17.6 ×
(5.0)0.64 = 49.30 MPa (less than 100 MPa, the upper
limit)
 With respect to catalogue for Pavement with
Bituminous Surface Course with Granular Base & Sub
– base of IRC:37 – 2018[3], design traffic is more than
50 msa. Hence, let us provide a SMA/ GGRB or BC with
modified bitumen surface course and DBM binder/
base layer with VG40 with viscosity more than 3500
Poise (at 60°C).
 Select crust for pavement is 50 mm Bituminous
Concrete (BC), 115 mm Dense Bituminous Macadam
(DBM), 150 mm Wet Mix Macadam (WMM), 200 mm
Cement Treated Sub Base (CTSB) & 500 mm Subgrade
(Compacted), in conformity with the Schedule B of the
contract.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 08 | Aug 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 1300
1.2 Design of Bridge
 Topographical Details:
i. Catchment Area = 22597.55 Sq. Km. (This catchment
area is taken from Water Resource Dept GOM) 59.55 Sq.
km Catchment area up to Proposed site Wainganga
Bridge (From local Nala) + 22538 Sq. km Catchment
Area up to Existing Wainganga Bridge (This Catchment
Area taken from Water Resources Dept GOM (India))
ii. Bed Width at proposed section = 163. 00 m
iii. Bank Width at proposed section = 374.00 m
iv. L.B.L. At proposed section = 232.080 m
v. Slope = 0.0009
vi. Hydraulic Gradient = 1 IN 1149.425
 Calculations:
Discharge has been calculatedusingManning’sFormula.
The calculations of discharge have been tabulated in
Table 3.
Table -3: Calculation of Discharge by Manning’s Formula
Rugosity Coefficient 0.040 0.035 0.040
Bed = Clean, straight bank, full stage, no rifts or deep pools but
some weeds and store
Bank = Winding, some pools and shoals, clean, some weeds and
stones
Compartment II I III
Wetted Area �2 1034.918 3786.424 572.994 5394.336
Wetted
Perimeter
m 326.949 318.544 415.080 1060.573
Hydraulic
Mean Depth
m 3.165 11.887 1.38
s 0.0009 0.0009 0.0009
Velocity m/sec 1.590 4.389 0.914 4.389
Discharge Cu.m./sec 1645.215 16619.870 523.836 18788.921
Total Manning’s Discharge at
H.F.L.
246.398 = 18788.921 Cu. m./ sec
Total Design Discharge Calculated as
Above
= 18786.446 Cu. m. / sec
within the permissible limit of 2%
0.01%
The calculations of waterway at HFL have been tabulated
in Table 4.
Table -4: Calculation of Waterway at HFL
Tallied H.F.L. = 246.398 Mtr.
L.B.L. = 232.080 Mtr.
Max. Flood
Depth
D (Tallied H.F.L. –
L.B.L.) =
14.318 Mtr.
Wetted Area
at H.F.L.
A = 5394.336 Sq.m.
Linear
Waterway at
H.F.L.
L = A/D = 376.75 Mtr.
Linear
Waterway by
Lacey’s
formula
L = 4.8 ��
657.95 Mtr.
It is Proposed
to Provide
12 Spans of 50.00 C/C
12 Spans of 47.00 Clear
Linear Water
way is
Proposed
= 600.00 Metre.
The Span Arrangement of Bridge is as
shown Above
H.F.L. 246.398 Mtr.
L.B.L. at
Proposed
Section
232.080 Mtr.
Total
Discharge
18788.921 cumec
For finalizing a design, it is important to calculate a safer
RTL for the bridge. The calculations are tabulated below.
Table -5: Calculation of RTL for the proposed Site
Particulars At Proposed
Site
At Observed
HFL by
CWC
At Observed
FTL by
Irrigation
R.T.L. = Designed
H.F.L.
246.398 247.300 246.000
+ Afflux 0.105 0.105 0.105
+ Clearance 2.650 2.650 2.650
+ Soffit of Slab 249.153 250.055 248.755
+ Slab
Thickness +
Box Girder
Depth (At
Centre)
3.000 3.000 3.000
+ Camber
2.5%
0.155 0.155 0.155
+ Wearing 0.065 0.065 0.065
The discharge calculated by Manning’s formula is fairly
tallied with the discharge by Inglis formula, i.e., which is
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 08 | Aug 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 1301
Coat
= Proposed
R.T.L.
252.373 253.275 251.975
As Per Clause 107.1 of IRC:5 –
1998
Particulars At Proposed
Site
R.T.L. = Designed
H.F.L.
246.398
+ Afflux 0.105
+ Freeboard 1.750
+ Camber 0.155
+ Wearing
Coat
0.065
= Proposed
R.T.L.
248.473
The Final Proposed
RTL is =
253.275
The suggested span arrangement is Balanced Cantilever
Bridge. Proposed Span Arrangement will be 5 modules of
balanced cantilever with total length of 600m divided into
ratio of 50m + 5 x 100m + 50m span. The superstructure
proposed is box type of structure with cast in-situ type of
construction using overhead crane under cantilever type of
construction. Superstructure will PSC in longitudinal
direction and RCC in transverse direction. There will be 6
piers and 2 abutments under this arrangement.
6. CONCLUSIONS
This study analyzed the process of design of pavement and
bridge. It can be concluded that Cement Treated Sub Base
should be provided since the traffic count is considerably
high. Also, it should be noted that regular crust of
Bituminous Cement cannot prove sufficient as perthetraffic
reports. In order to meet with the design requirement of 30
years, it becomes crucial to provide Bituminous Concrete of
50 mm thickness. It should be noted that Dense Bituminous
Macadam (DBM) and Wet Mix Macadam (WMM) have also
been increased in percentage. The recommended Option
considering the site situation and time of construction, i.e.,
Balanced Cantilever Bridge with cast in – situ construction.
Spans between Abutment and Piers shall be constructed by
trestle support. The spans which are in the deep river
portion shall be constructed as cantilever cast in – situ
construction using formwork.
REFERENCES
[1] IRC: 37 – 1970 – Guidelines for the Design of Flexible
Pavements
https://thelibraryofcivilengineer.files.wordpress.com/2
015/09/irc-37-1984-guidelines-for-the-design-of-
flexible-pavements-1st-revision.pdf
[2] IRC: 37 – 2001 - Guidelines for Design of Flexible
Pavements (Second Revision)
http://sscnagpur.ac.in/Department/Civil%20Engineeri
ng/IRC-37-2001.pdf
[3] IRC: 37 – 2018 – Guidelines for Design of Flexible
Pavements (Fourth Revision)
https://archive.org/details/irc-37-2018-guidelines-for-
the-design-of-flexible-pavements
[4] Design of Flexible Pavements:
https://engineeringenotes.com/transportation-
engineering/highway
[5] A General Study on Life Cycle Cost Analysis of Roads
Thesis in Master of Technology in Transportation
Engineering by Arijit Dutta, National Institute of
Technology Rourkela, 2014
http://ethesis.nitrkl.ac.in/5515/1/E-THESIS_6.pdf
[6] Indian Roads Congress Special Publication 38
Manual for Road Investment Decision Model
https://law.resource.org/pub/in/bis/irc/irc.gov.in.sp.0
38.1992.pdf
[7] IRC 62 – 1976 – Guidelines for Control of Access on
Highways
https://law.resource.org/pub/in/bis/irc/irc.gov.in.062.
1976.pdf
[8] IRC: SP: 019 – Manual for Survey. Investigation and
Preparation of Road Projects
https://law.resource.org/pub/in/bis/irc/irc.gov.in.sp.0
19.2001.pdf
[9] IRC: 009 – Traffic Census on Non – Urban Roads
https://law.resource.org/pub/in/bis/irc/irc.gov.in.009.
1972.pdf
[10] Manual ofStandardsandSpecificationspublishedby
MoRT&H
https://archive.org/details/govlawircy2013sp87
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 08 | Aug 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 1302
[11] IRC: SP: 87 – 2013
Manual of standards and specification forTwoLaningof
NH Ways
https://law.resource.org/pub/in/bis/irc/irc.gov.in.sp.0
87.2013.pdf
[12] Pradhan Mantri Gram Sadak Yojana
http://omms.nic.in/
[13] IRC 102: Traffic Studies for Planning Bypasses Around
Towns
https://law.resource.org/pub/in/bis/irc/irc.gov.in.102.
1988.pdf
[14] IRC: 64: Guidelines for Capacity of Roads in Rural Areas
https://law.resource.org/pub/in/bis/irc/irc.gov.in.064.
1990.pdf

More Related Content

Similar to Design of Highway with Major Bridge on Stagnant Water

TRAFFIC ANALYSIS AND DESIGN OF FLYOVER AT PERUMBAVOOR SIGNAL
TRAFFIC ANALYSIS AND DESIGN OF FLYOVER AT PERUMBAVOOR SIGNALTRAFFIC ANALYSIS AND DESIGN OF FLYOVER AT PERUMBAVOOR SIGNAL
TRAFFIC ANALYSIS AND DESIGN OF FLYOVER AT PERUMBAVOOR SIGNALIRJET Journal
 
Investigation And Analysis of Traffic Flow Capacity And Level of Service Dete...
Investigation And Analysis of Traffic Flow Capacity And Level of Service Dete...Investigation And Analysis of Traffic Flow Capacity And Level of Service Dete...
Investigation And Analysis of Traffic Flow Capacity And Level of Service Dete...IRJET Journal
 
Assessment of Capacity and Level of Service for Urban Arterial Road in Jabalp...
Assessment of Capacity and Level of Service for Urban Arterial Road in Jabalp...Assessment of Capacity and Level of Service for Urban Arterial Road in Jabalp...
Assessment of Capacity and Level of Service for Urban Arterial Road in Jabalp...IRJET Journal
 
TRAFFIC PARAMETERS: VOLUME COUNT, SPOT SPEED STUDY, SATUARATION FLOW
TRAFFIC PARAMETERS: VOLUME COUNT, SPOT SPEED STUDY, SATUARATION FLOWTRAFFIC PARAMETERS: VOLUME COUNT, SPOT SPEED STUDY, SATUARATION FLOW
TRAFFIC PARAMETERS: VOLUME COUNT, SPOT SPEED STUDY, SATUARATION FLOWIRJET Journal
 
Evaluation and strengthening of reconstructed roads excavated for utilities u...
Evaluation and strengthening of reconstructed roads excavated for utilities u...Evaluation and strengthening of reconstructed roads excavated for utilities u...
Evaluation and strengthening of reconstructed roads excavated for utilities u...IAEME Publication
 
EVALUATION AND STRENGTHENING OF RECONSTRUCTED ROADS EXCAVATED FOR UTILITIES U...
EVALUATION AND STRENGTHENING OF RECONSTRUCTED ROADS EXCAVATED FOR UTILITIES U...EVALUATION AND STRENGTHENING OF RECONSTRUCTED ROADS EXCAVATED FOR UTILITIES U...
EVALUATION AND STRENGTHENING OF RECONSTRUCTED ROADS EXCAVATED FOR UTILITIES U...IAEME Publication
 
IRJET- Study of Design Traffic Signal
IRJET- Study of Design Traffic SignalIRJET- Study of Design Traffic Signal
IRJET- Study of Design Traffic SignalIRJET Journal
 
IRJET- A Review Paper on Movable Divider and Cost Efficiency
IRJET-  	  A Review Paper on Movable Divider and Cost EfficiencyIRJET-  	  A Review Paper on Movable Divider and Cost Efficiency
IRJET- A Review Paper on Movable Divider and Cost EfficiencyIRJET Journal
 
A review of Design and Construction Parameters of Pavements
A review of Design and Construction Parameters of PavementsA review of Design and Construction Parameters of Pavements
A review of Design and Construction Parameters of PavementsIRJET Journal
 
IRJET- Identification and Analysis of Black Spots along the Selected Road...
IRJET-  	  Identification and Analysis of Black Spots along the Selected Road...IRJET-  	  Identification and Analysis of Black Spots along the Selected Road...
IRJET- Identification and Analysis of Black Spots along the Selected Road...IRJET Journal
 
Feasibility Study of Mass Transport in Nasik City
Feasibility Study of Mass Transport in Nasik CityFeasibility Study of Mass Transport in Nasik City
Feasibility Study of Mass Transport in Nasik CityIRJET Journal
 
IRJET- Study of Existing Highways and their Capacity Improvements
IRJET- Study of Existing Highways and their Capacity ImprovementsIRJET- Study of Existing Highways and their Capacity Improvements
IRJET- Study of Existing Highways and their Capacity ImprovementsIRJET Journal
 
Analyzing the role of Highway & their Maintenance A case study
Analyzing the role of Highway & their Maintenance A case studyAnalyzing the role of Highway & their Maintenance A case study
Analyzing the role of Highway & their Maintenance A case studyIRJET Journal
 
IRJET- Study on Vehicle Flow at Maraimalai Nagar Industrial Estate.
IRJET-  	  Study on Vehicle Flow at Maraimalai Nagar Industrial Estate.IRJET-  	  Study on Vehicle Flow at Maraimalai Nagar Industrial Estate.
IRJET- Study on Vehicle Flow at Maraimalai Nagar Industrial Estate.IRJET Journal
 
IRJET- Review Paper on Estimate Traffic Volume and Geometric Design on Select...
IRJET- Review Paper on Estimate Traffic Volume and Geometric Design on Select...IRJET- Review Paper on Estimate Traffic Volume and Geometric Design on Select...
IRJET- Review Paper on Estimate Traffic Volume and Geometric Design on Select...IRJET Journal
 
IRJET- Review Paper on Considering Traffic Congestion Frame Work in Nagpur Me...
IRJET- Review Paper on Considering Traffic Congestion Frame Work in Nagpur Me...IRJET- Review Paper on Considering Traffic Congestion Frame Work in Nagpur Me...
IRJET- Review Paper on Considering Traffic Congestion Frame Work in Nagpur Me...IRJET Journal
 
PLANNING DESIGNING AND ANALYSIS OF FLYOVEER BY USING STAAD PRO
PLANNING DESIGNING AND ANALYSIS OF FLYOVEER BY USING STAAD PROPLANNING DESIGNING AND ANALYSIS OF FLYOVEER BY USING STAAD PRO
PLANNING DESIGNING AND ANALYSIS OF FLYOVEER BY USING STAAD PROIRJET Journal
 
IRJET - To Study Impact of Road Roughness on Free Flow Speed of Vehicle
IRJET - To Study Impact of Road Roughness on Free Flow Speed of VehicleIRJET - To Study Impact of Road Roughness on Free Flow Speed of Vehicle
IRJET - To Study Impact of Road Roughness on Free Flow Speed of VehicleIRJET Journal
 
ESTIMATION OF CAPACITY AND MODEL DEVELOPMENT USING LINEAR REGRESSION
ESTIMATION OF CAPACITY AND MODEL DEVELOPMENT USING LINEAR REGRESSIONESTIMATION OF CAPACITY AND MODEL DEVELOPMENT USING LINEAR REGRESSION
ESTIMATION OF CAPACITY AND MODEL DEVELOPMENT USING LINEAR REGRESSIONIRJET Journal
 
Investigation And Analysis of Traffic Flow Capacity And Level of Service Dete...
Investigation And Analysis of Traffic Flow Capacity And Level of Service Dete...Investigation And Analysis of Traffic Flow Capacity And Level of Service Dete...
Investigation And Analysis of Traffic Flow Capacity And Level of Service Dete...IRJET Journal
 

Similar to Design of Highway with Major Bridge on Stagnant Water (20)

TRAFFIC ANALYSIS AND DESIGN OF FLYOVER AT PERUMBAVOOR SIGNAL
TRAFFIC ANALYSIS AND DESIGN OF FLYOVER AT PERUMBAVOOR SIGNALTRAFFIC ANALYSIS AND DESIGN OF FLYOVER AT PERUMBAVOOR SIGNAL
TRAFFIC ANALYSIS AND DESIGN OF FLYOVER AT PERUMBAVOOR SIGNAL
 
Investigation And Analysis of Traffic Flow Capacity And Level of Service Dete...
Investigation And Analysis of Traffic Flow Capacity And Level of Service Dete...Investigation And Analysis of Traffic Flow Capacity And Level of Service Dete...
Investigation And Analysis of Traffic Flow Capacity And Level of Service Dete...
 
Assessment of Capacity and Level of Service for Urban Arterial Road in Jabalp...
Assessment of Capacity and Level of Service for Urban Arterial Road in Jabalp...Assessment of Capacity and Level of Service for Urban Arterial Road in Jabalp...
Assessment of Capacity and Level of Service for Urban Arterial Road in Jabalp...
 
TRAFFIC PARAMETERS: VOLUME COUNT, SPOT SPEED STUDY, SATUARATION FLOW
TRAFFIC PARAMETERS: VOLUME COUNT, SPOT SPEED STUDY, SATUARATION FLOWTRAFFIC PARAMETERS: VOLUME COUNT, SPOT SPEED STUDY, SATUARATION FLOW
TRAFFIC PARAMETERS: VOLUME COUNT, SPOT SPEED STUDY, SATUARATION FLOW
 
Evaluation and strengthening of reconstructed roads excavated for utilities u...
Evaluation and strengthening of reconstructed roads excavated for utilities u...Evaluation and strengthening of reconstructed roads excavated for utilities u...
Evaluation and strengthening of reconstructed roads excavated for utilities u...
 
EVALUATION AND STRENGTHENING OF RECONSTRUCTED ROADS EXCAVATED FOR UTILITIES U...
EVALUATION AND STRENGTHENING OF RECONSTRUCTED ROADS EXCAVATED FOR UTILITIES U...EVALUATION AND STRENGTHENING OF RECONSTRUCTED ROADS EXCAVATED FOR UTILITIES U...
EVALUATION AND STRENGTHENING OF RECONSTRUCTED ROADS EXCAVATED FOR UTILITIES U...
 
IRJET- Study of Design Traffic Signal
IRJET- Study of Design Traffic SignalIRJET- Study of Design Traffic Signal
IRJET- Study of Design Traffic Signal
 
IRJET- A Review Paper on Movable Divider and Cost Efficiency
IRJET-  	  A Review Paper on Movable Divider and Cost EfficiencyIRJET-  	  A Review Paper on Movable Divider and Cost Efficiency
IRJET- A Review Paper on Movable Divider and Cost Efficiency
 
A review of Design and Construction Parameters of Pavements
A review of Design and Construction Parameters of PavementsA review of Design and Construction Parameters of Pavements
A review of Design and Construction Parameters of Pavements
 
IRJET- Identification and Analysis of Black Spots along the Selected Road...
IRJET-  	  Identification and Analysis of Black Spots along the Selected Road...IRJET-  	  Identification and Analysis of Black Spots along the Selected Road...
IRJET- Identification and Analysis of Black Spots along the Selected Road...
 
Feasibility Study of Mass Transport in Nasik City
Feasibility Study of Mass Transport in Nasik CityFeasibility Study of Mass Transport in Nasik City
Feasibility Study of Mass Transport in Nasik City
 
IRJET- Study of Existing Highways and their Capacity Improvements
IRJET- Study of Existing Highways and their Capacity ImprovementsIRJET- Study of Existing Highways and their Capacity Improvements
IRJET- Study of Existing Highways and their Capacity Improvements
 
Analyzing the role of Highway & their Maintenance A case study
Analyzing the role of Highway & their Maintenance A case studyAnalyzing the role of Highway & their Maintenance A case study
Analyzing the role of Highway & their Maintenance A case study
 
IRJET- Study on Vehicle Flow at Maraimalai Nagar Industrial Estate.
IRJET-  	  Study on Vehicle Flow at Maraimalai Nagar Industrial Estate.IRJET-  	  Study on Vehicle Flow at Maraimalai Nagar Industrial Estate.
IRJET- Study on Vehicle Flow at Maraimalai Nagar Industrial Estate.
 
IRJET- Review Paper on Estimate Traffic Volume and Geometric Design on Select...
IRJET- Review Paper on Estimate Traffic Volume and Geometric Design on Select...IRJET- Review Paper on Estimate Traffic Volume and Geometric Design on Select...
IRJET- Review Paper on Estimate Traffic Volume and Geometric Design on Select...
 
IRJET- Review Paper on Considering Traffic Congestion Frame Work in Nagpur Me...
IRJET- Review Paper on Considering Traffic Congestion Frame Work in Nagpur Me...IRJET- Review Paper on Considering Traffic Congestion Frame Work in Nagpur Me...
IRJET- Review Paper on Considering Traffic Congestion Frame Work in Nagpur Me...
 
PLANNING DESIGNING AND ANALYSIS OF FLYOVEER BY USING STAAD PRO
PLANNING DESIGNING AND ANALYSIS OF FLYOVEER BY USING STAAD PROPLANNING DESIGNING AND ANALYSIS OF FLYOVEER BY USING STAAD PRO
PLANNING DESIGNING AND ANALYSIS OF FLYOVEER BY USING STAAD PRO
 
IRJET - To Study Impact of Road Roughness on Free Flow Speed of Vehicle
IRJET - To Study Impact of Road Roughness on Free Flow Speed of VehicleIRJET - To Study Impact of Road Roughness on Free Flow Speed of Vehicle
IRJET - To Study Impact of Road Roughness on Free Flow Speed of Vehicle
 
ESTIMATION OF CAPACITY AND MODEL DEVELOPMENT USING LINEAR REGRESSION
ESTIMATION OF CAPACITY AND MODEL DEVELOPMENT USING LINEAR REGRESSIONESTIMATION OF CAPACITY AND MODEL DEVELOPMENT USING LINEAR REGRESSION
ESTIMATION OF CAPACITY AND MODEL DEVELOPMENT USING LINEAR REGRESSION
 
Investigation And Analysis of Traffic Flow Capacity And Level of Service Dete...
Investigation And Analysis of Traffic Flow Capacity And Level of Service Dete...Investigation And Analysis of Traffic Flow Capacity And Level of Service Dete...
Investigation And Analysis of Traffic Flow Capacity And Level of Service Dete...
 

More from IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTUREIRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsIRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASIRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProIRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemIRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesIRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web applicationIRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignIRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...IRJET Journal
 

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Recently uploaded

Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .Satyam Kumar
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and usesDevarapalliHaritha
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 

Recently uploaded (20)

Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and uses
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 

Design of Highway with Major Bridge on Stagnant Water

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 08 | Aug 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 1297 Design of Highway with Major Bridge on Stagnant Water Sofia Pathan1, Mrs. Bharti Shete2, Prof. Ashish Bijwe3 1PG Scholar, Department of Civil Engineering, Dr. Rajendra Gode Institute of Technology and Research, Amravati, Maharashtra, India 2Head of the Department, Department of Civil Engineering, Dr. Sau. Kamal Tai Gawai Institute of Engineering & Technology, Darapur, Amravati, Maharashtra, India 3Assistant Professor, Department of Civil Engineering, Dr. Rajendra Gode Institute of Technology and Research, Amravati, Maharashtra, India ---------------------------------------------------------------------***--------------------------------------------------------------------- Abstract - One of the most important aims of the Indian Government is to provide and improve the quality of Road Transportation in the country. Hence, it becomes of the top priorities to study and understand the latest and revised editions of rules set forth by the government. To fulfil this requirement, a project undertaken by NHAI (National Highways Authority of India) has been studied and taken into consideration. This paperaimsatunderstandingthedesigning process of the project pavement in accordance with Indian Standards of Road Congress. This paper also gives a brief idea about the designing of a major bridge that coincides with the road section of the project. The project available for concessionaire is in Bhandara, Nagpur, Maharashtra, India. It was found by laboratory tests that the CBR ofthesoilsampleis quite low, and hence to achieve strength for construction it is suggested that the sub-base should be cement treated. The overall traffic is quite high over the span and it is suggested that six – lane construction must be done over the desired span. This paper also aims at suggesting the most economical sections for design of bridge as per the hydraulic catchmentof the dam. Old records were collected for the calculation purposes. Key Words: Design, Pavement, Bridge, Catchment 1.INTRODUCTION 1.1 General Roads are one of the most important modes of transportation in India. India has a network of over 6,215,797 kilometers of roads as of 31 March 2020. This accounts for the second largest road network in the world after the United States. The current condition of the nation’s transportation system is of great concern to National and State Departments of Transportation. The project includes the 6 – Lane divided carriageway with fully paved shoulders. The design speed is proposed to be ruling design of 100 km/hr. as per contract terms. Minimum design life of 20 years with minimum effective CBR of 8% is proposed in the contract of this project. 1.2 Objective of Study:  To analyze traffic count and design sustainable pavement in accordance with the requirement.  To analyze hydraulic catchment of the river for making safe design of major bridge.  To understand the design procedures involved. 2. LITERATURE REVIEW Zhang et al. (2013) described about the development of a new pavement network management system that helps analysis and optimization. This LCCA optimization was implemented to regulate the optimum conservation scheme fora pavement networkand to reducesupportabilitymetrics within a given analysis period. They discussed about pavement deterioration, which is a main aspect to focus future pavement conservation procedures and is extremely difficult to focus faultlessly. Pradhan Mantri Gram Sadak Yojana (2006) [12] presented the choice of the appropriate economical and advantageous pavement type, was made by carrying out life cycle cost analysis, which considerstheinitialcostandthemaintenance cost. They also presented the methodology of construction for both rigid and flexible pavements. Arijit Dutta (2014) [5] described the life cycle cost analysis for roads. The report included various details about the parameters to be dealt with while designing the pavement economically. The report also consisted of consideration for several possible ways for routine maintenance action to reconstruction of road networks. It is obvious fromall theliteraturereviewedinthisstudythat despite adapting different methodologies and designs, there were somecommon factors of samecentrality. It gives us the scopeto understand the basics thatcan be put forwardwhile finalizing the design and construction of pavements and bridges. Another thing is that optimization of cost and duration of project can economically affect the entire transportation system in future.
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 08 | Aug 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 1298 3. METHODOLOGY 3.1 Methodology for Design of Pavement – Traffic surveys have been carried out in accordancewiththe guidelines specified by IRC: 9-1972 [9] and IRC: 102-1988 [13] to calculate the wheel load and traffic intensity. The methodology adopted for the traffic study is detailed as below:  The project road corridor is divided into two traffic homogeneous sections based on change in traffic flow pattern.  The traffic surveys including classified traffic volume count is carried out for each traffic homogeneous section.  The classified directional traffic volume is counted over seven consecutive days for 24 hours on each day. The vehicle classification considered wasinaccordancewith IRC – 64. [14] Number of vehicles ineitherdirection was noted at 1-hour intervals in accordance with their classification by observers specially trained for this purpose. 3.2 Methodology for Design of Major Bridge –  Geotechnical investigation is carried out for the proposed construction of Major Bridge Across River Wainganga near Bhandara. Investigation was intended to evaluate allowable bearing capacity of available soil/rock stratum and other physical parameters necessary for the design of suitable foundation.Scopeof work included boring, Standard Penetration Tests as well as disturbed & undisturbed soil sampling at field and necessary laboratory testing on availablesoil /rock samples.  Bore logs were obtained by rotary drilling rig. 4. FINDINGS AND ANALYSIS 4.1 Findings of Traffic Survey The classified traffic count data collected has been analyzed for hourly and daily traffic intensity, traffic composition, peak hour factor (PHF), directional distribution, average daily traffic (ADT) and finally annual average daily traffic (AADT) by applying the seasonal correction factors. The AADT factor is considered as 1.00 from the prevailing studies in the state. Traffic volume analysis has been carried out to assess the volume of traffic, composition, hourly variation in traffic over 24 hours, and the daily variation in the traffic over 7 days at the project locations. The compiled data obtained from field traffic survey has been analyzed to work out the average daily traffic in terms of total vehicles andtotal PCUs. Analysis was carried out to find the composition of traffic in terms of fast- and slow-moving traffic and in terms of various types of vehicles. The observed vehicular compositions are shown in Table 1 Table -1: Summary of Composition of Traffic Type of Vehicle Name of Vehicle Number PCU Two - Wheeler 27.473% 6.124% Car / Jeep / Van / Taxi 21.186% 9.445% Three-Wheeler 0.354% 0.158% LCV 7.312% 4.890% Govt. Bus 1.284% 1.717% Private Bus 0.877% 1.173% Minibus 0.207% 0.138% Tractor 0.089% 0.059% Tractor With Trolley/ Trailer 0.574% 1.151% 2 - Axle 8.373% 11.198% 3 - Axle 12.272% 24.621% Multi Axle Truck 19.552% 39.226% Total Fast Moving (A) 99.552% 99.9% Cycle 0.448% 0.100% Rickshaws - - Bullock Cart - - Total Slow Moving (B) 0.448% 0.100% Total ADT (C) = (A) + (B) 100% 100% 4.2 Analysis of Traffic Growth Traffic demand forecasting is to be done for future traffic volumes the project road is supposed to cater. This is primarily based on the present-day traffic volume and likely traffic growth rates periodically during the forecasting period of 30 years for the proposed road improvements. The traffic growth rates are dependent on various factors such as growth in national economy, changes in socio- economic conditions of the people etc. Forecasted traffic forms the basisfordeterminingtherequirementsforcapacity augmentation by way of widening of existing carriageway, pavement design and economic / financial deciding viability of project.
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 08 | Aug 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 1299 Econometric modelling is attempted to estimate traffic demand forecasting considering several variables such as population, per capita income, net state domestic product (NSDP) and past vehicle registration data. Time series data on vehicle registration in the state was collected from secondary sources. Similarly, time series past data on population, state income (NSDP) and per capita income for the state has also been obtained from the concerned departments of Government. The economic indicators of state are used for the regression analysis along with vehicle registration data as presented in Table 2. Table -2: Economic Indicators for Maharashtra State. Year NSDP Population Per Capital Income 2010 1 599338 111118000 2011 2 667625 112372972 2012 3 695904 114170968 2013 4 749137 115969272 2014 5 805593 117766794 Based on the moderatedelasticityvaluesandaveragegrowth rate of NSDP 2010-2014 andwith the givenmodelasfollows, the future average annual compound traffic growth rates for vehicle type are estimated as below:  OPTIMISTIC: {Trend Growth of Vehicles} – Average Growth Rate: 4.44%  REALISTIC: {Growth from RegressionAnalysis}-Average Growth Rate: 4.39%  PESSIMISTIC: {Considered for Revenue Capacity} – Average Growth Rate: 6.16% 4.3 Findings in Subgrade Soil Investigation Subsoil investigation consisted of Drilling and sampling in four boreholes, carrying out relevant laboratory tests on representative soil and rock samples, preparation of engineering report based on field and laboratory data. The observed CBR of soil is 3%, since the required CBR for pavement is 8%. The base course must be treated with manufactured aggregates with measured amounts of Portland cement and water that hardens after compaction and curing to form a strong, durable, frost-resistant paving material. CTB is versatile as it can be either mixed in place and compacted after blending or mixed in a central plant where it is hauled to the placement area and spread on a prepared subgrade or subbase and compacted. 5. DESIGN 1.1 Design of Pavement Based on the performance of existing designs and using analytical approach, simple design charts and a catalogue of pavement designs are added in the code. UsingDesigntraffic in terms of cumulative number of standard axles and CBR value of subgrade, appropriate designs could be chosen for the given traffic and soil strength. As specified in the IRC:37 2018 [3], the pavement designhas been done as follows:  The effective CBR of soil subgrade is 5%.  The design life specified in the contract is 30 years.  VDF has adopted as 5.35.  The ADT, i.e., Average Daily Traffic of the given section of bypass is computed to be 12075 CVPD.  The realistic growth of the traffic is 4.39%.  Distribution Factor = 0.45  Initial Directional Traffic = 12075/6 (Since the bypass is proposed to be a Six Lane Road)  Cumulative number of standard axles to be catered for in the design N = 6038 × 365 × ((1+0.0439)30 -1) × 0.75 × 5.35 0.0439 Therefore, N = 106 msa  Effective resilient modulus of subgrade = 17.6 × (5.0)0.64 = 49.30 MPa (less than 100 MPa, the upper limit)  With respect to catalogue for Pavement with Bituminous Surface Course with Granular Base & Sub – base of IRC:37 – 2018[3], design traffic is more than 50 msa. Hence, let us provide a SMA/ GGRB or BC with modified bitumen surface course and DBM binder/ base layer with VG40 with viscosity more than 3500 Poise (at 60°C).  Select crust for pavement is 50 mm Bituminous Concrete (BC), 115 mm Dense Bituminous Macadam (DBM), 150 mm Wet Mix Macadam (WMM), 200 mm Cement Treated Sub Base (CTSB) & 500 mm Subgrade (Compacted), in conformity with the Schedule B of the contract.
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 08 | Aug 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 1300 1.2 Design of Bridge  Topographical Details: i. Catchment Area = 22597.55 Sq. Km. (This catchment area is taken from Water Resource Dept GOM) 59.55 Sq. km Catchment area up to Proposed site Wainganga Bridge (From local Nala) + 22538 Sq. km Catchment Area up to Existing Wainganga Bridge (This Catchment Area taken from Water Resources Dept GOM (India)) ii. Bed Width at proposed section = 163. 00 m iii. Bank Width at proposed section = 374.00 m iv. L.B.L. At proposed section = 232.080 m v. Slope = 0.0009 vi. Hydraulic Gradient = 1 IN 1149.425  Calculations: Discharge has been calculatedusingManning’sFormula. The calculations of discharge have been tabulated in Table 3. Table -3: Calculation of Discharge by Manning’s Formula Rugosity Coefficient 0.040 0.035 0.040 Bed = Clean, straight bank, full stage, no rifts or deep pools but some weeds and store Bank = Winding, some pools and shoals, clean, some weeds and stones Compartment II I III Wetted Area �2 1034.918 3786.424 572.994 5394.336 Wetted Perimeter m 326.949 318.544 415.080 1060.573 Hydraulic Mean Depth m 3.165 11.887 1.38 s 0.0009 0.0009 0.0009 Velocity m/sec 1.590 4.389 0.914 4.389 Discharge Cu.m./sec 1645.215 16619.870 523.836 18788.921 Total Manning’s Discharge at H.F.L. 246.398 = 18788.921 Cu. m./ sec Total Design Discharge Calculated as Above = 18786.446 Cu. m. / sec within the permissible limit of 2% 0.01% The calculations of waterway at HFL have been tabulated in Table 4. Table -4: Calculation of Waterway at HFL Tallied H.F.L. = 246.398 Mtr. L.B.L. = 232.080 Mtr. Max. Flood Depth D (Tallied H.F.L. – L.B.L.) = 14.318 Mtr. Wetted Area at H.F.L. A = 5394.336 Sq.m. Linear Waterway at H.F.L. L = A/D = 376.75 Mtr. Linear Waterway by Lacey’s formula L = 4.8 ×�� 657.95 Mtr. It is Proposed to Provide 12 Spans of 50.00 C/C 12 Spans of 47.00 Clear Linear Water way is Proposed = 600.00 Metre. The Span Arrangement of Bridge is as shown Above H.F.L. 246.398 Mtr. L.B.L. at Proposed Section 232.080 Mtr. Total Discharge 18788.921 cumec For finalizing a design, it is important to calculate a safer RTL for the bridge. The calculations are tabulated below. Table -5: Calculation of RTL for the proposed Site Particulars At Proposed Site At Observed HFL by CWC At Observed FTL by Irrigation R.T.L. = Designed H.F.L. 246.398 247.300 246.000 + Afflux 0.105 0.105 0.105 + Clearance 2.650 2.650 2.650 + Soffit of Slab 249.153 250.055 248.755 + Slab Thickness + Box Girder Depth (At Centre) 3.000 3.000 3.000 + Camber 2.5% 0.155 0.155 0.155 + Wearing 0.065 0.065 0.065 The discharge calculated by Manning’s formula is fairly tallied with the discharge by Inglis formula, i.e., which is
  • 5. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 08 | Aug 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 1301 Coat = Proposed R.T.L. 252.373 253.275 251.975 As Per Clause 107.1 of IRC:5 – 1998 Particulars At Proposed Site R.T.L. = Designed H.F.L. 246.398 + Afflux 0.105 + Freeboard 1.750 + Camber 0.155 + Wearing Coat 0.065 = Proposed R.T.L. 248.473 The Final Proposed RTL is = 253.275 The suggested span arrangement is Balanced Cantilever Bridge. Proposed Span Arrangement will be 5 modules of balanced cantilever with total length of 600m divided into ratio of 50m + 5 x 100m + 50m span. The superstructure proposed is box type of structure with cast in-situ type of construction using overhead crane under cantilever type of construction. Superstructure will PSC in longitudinal direction and RCC in transverse direction. There will be 6 piers and 2 abutments under this arrangement. 6. CONCLUSIONS This study analyzed the process of design of pavement and bridge. It can be concluded that Cement Treated Sub Base should be provided since the traffic count is considerably high. Also, it should be noted that regular crust of Bituminous Cement cannot prove sufficient as perthetraffic reports. In order to meet with the design requirement of 30 years, it becomes crucial to provide Bituminous Concrete of 50 mm thickness. It should be noted that Dense Bituminous Macadam (DBM) and Wet Mix Macadam (WMM) have also been increased in percentage. The recommended Option considering the site situation and time of construction, i.e., Balanced Cantilever Bridge with cast in – situ construction. Spans between Abutment and Piers shall be constructed by trestle support. The spans which are in the deep river portion shall be constructed as cantilever cast in – situ construction using formwork. REFERENCES [1] IRC: 37 – 1970 – Guidelines for the Design of Flexible Pavements https://thelibraryofcivilengineer.files.wordpress.com/2 015/09/irc-37-1984-guidelines-for-the-design-of- flexible-pavements-1st-revision.pdf [2] IRC: 37 – 2001 - Guidelines for Design of Flexible Pavements (Second Revision) http://sscnagpur.ac.in/Department/Civil%20Engineeri ng/IRC-37-2001.pdf [3] IRC: 37 – 2018 – Guidelines for Design of Flexible Pavements (Fourth Revision) https://archive.org/details/irc-37-2018-guidelines-for- the-design-of-flexible-pavements [4] Design of Flexible Pavements: https://engineeringenotes.com/transportation- engineering/highway [5] A General Study on Life Cycle Cost Analysis of Roads Thesis in Master of Technology in Transportation Engineering by Arijit Dutta, National Institute of Technology Rourkela, 2014 http://ethesis.nitrkl.ac.in/5515/1/E-THESIS_6.pdf [6] Indian Roads Congress Special Publication 38 Manual for Road Investment Decision Model https://law.resource.org/pub/in/bis/irc/irc.gov.in.sp.0 38.1992.pdf [7] IRC 62 – 1976 – Guidelines for Control of Access on Highways https://law.resource.org/pub/in/bis/irc/irc.gov.in.062. 1976.pdf [8] IRC: SP: 019 – Manual for Survey. Investigation and Preparation of Road Projects https://law.resource.org/pub/in/bis/irc/irc.gov.in.sp.0 19.2001.pdf [9] IRC: 009 – Traffic Census on Non – Urban Roads https://law.resource.org/pub/in/bis/irc/irc.gov.in.009. 1972.pdf [10] Manual ofStandardsandSpecificationspublishedby MoRT&H https://archive.org/details/govlawircy2013sp87
  • 6. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 08 | Aug 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 1302 [11] IRC: SP: 87 – 2013 Manual of standards and specification forTwoLaningof NH Ways https://law.resource.org/pub/in/bis/irc/irc.gov.in.sp.0 87.2013.pdf [12] Pradhan Mantri Gram Sadak Yojana http://omms.nic.in/ [13] IRC 102: Traffic Studies for Planning Bypasses Around Towns https://law.resource.org/pub/in/bis/irc/irc.gov.in.102. 1988.pdf [14] IRC: 64: Guidelines for Capacity of Roads in Rural Areas https://law.resource.org/pub/in/bis/irc/irc.gov.in.064. 1990.pdf