“Productivity Improvement in Construction Industry using
Automation Techniques”
Ms. Mrudula Chopdar1, Prof. A. B. Patil2
1Post Graduation Student, Civil Engineering Dept, T.K.I.E.T Warananagar, Dist-Kolhapur, Maharashtra,India
2 Professor of Civil Engineering T.K.I.E.T, Warananagar, Dist-Kolhapur, Maharashtra,India
---------------------------------------------------------------------***---------------------------------------------------------------------
Abstract - Productivity is at the forefront of concerns facing professionals in the construction industry worldwide. This study
highlights the factors affecting productivity of the Construction industry. A questionnaire was used to gather the relevant data
from the study area .The top three factors affecting construction productivity are: Management of productivity, Human factors,
and External factors. Recommendations have been made in the study to address these factors.
Key Words: Construction 1, Productivity 2, Improvement Techniques 3, Automation 4, Evaluation 5
1.INTRODUCTION
The Construction industry of India is an important indicator of the development as it creates investmentopportunitiesacross
various related sectors. Construction industry is world's mostlargestandchallenging industry.Humanresourcehasastrategic
role in increasing productivity in construction industry. With the effective and optimum use of human resources can help in
productivity growth. The construction projects are mostly labor based with basic use of hand tools and equipment‘s in which
labour cost consists of about 30% to 50% of total project cost. Indian construction industry is one of fastest growing sector
globally. The construction sector gives second largest employment after agriculture. India shares about 8% of total GDP and
also provides employment to around 35 million peoples directly or indirectly. In construction industry one of the biggest
problems faced is of unskilled labour which impliesinproductivitylossandimpactson costoverrunandscheduledaily.Labour
productivity is one of important factor which affects physical progress of construction project. To perform effective job,
construction labour should be familiar with materials, tools and machineries that they use. Background of construction
industry and productivity is given and also explained, how low productivity affects the time and cost of construction project.
Many researchers have shown that poor construction management practices leads to poor performance, wastage of efforts in
different phases of construction projects. Researchers tried to overcome some of challenges by adding their efforts in
construction project, however many problems are yet to be solved in terms of construction productivity. Identifying and
analyzing the critical factor that influence construction productivity will lead to develop most effective method and strategies
to improve the construction productivity in upcoming time. Construction project is said to be successful if it is completed in
schedule duration and estimated cost. For that purpose productivity has to be efficient. Productivity forecasting plays an
important role in strategic and operational planning.Productivityisone ofthekeycomponentsofeverycompany‘ssuccessand
Competitiveness in the market. Productivity translates directly into cost savings and profitability a construction contractor
stands to gain or lose, depending on how well his company‘s productivity responds to competition. The growth of
infrastructure and development in emerging countrieslikeIndia mayrequiretheconstructionindustrytoshiftfrom traditional
methods of construction to modern ones in order to improve productivity and enhance performance.
A competitive, market orientedandrationalizedconstructiontomorrowrequiresdevelopingofautomatedconstructionsystem
today. This includes construction material production, prefabricationofconstruction components,onsiteconstruction,facility
management, rehabilitation and recycling. Today’s construction projects are characterizing by short design and build period,
increased demands of quality and low cost. These problems can be approached by a flexible automation based uponplanning,
engineering and construction management. By automation, increased productivity could reduce high labor cost share of40%
or more. Introduction of automation technology would result in better working and health conditions. Innextsectionpurpose
of study is explained and problem accumulated in construction productivity are given. The objectives of proposed work that
are to be achieved at the end of project.
2. METHODOLOGY
The main purpose of this dissertation is to provide more precise and uniform quality of construction through automation
techniques. A review of literature is conducted to determine the factors that influence productivity of construction projects
through productivity evaluation checklist. Analysis of formulated check listthroughdata collectedfrom Engineers, contractors
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 06 | June 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 392
labours etc. The best suggestive measures will be given for productivity improvement in construction industry through
automation techniques. Which finally declines higher cost, and increases efficiency and productivity of the project.
2.1 QUESTIONNAIRE DESIGN
The design of questionnaire is very simple and under stable for respondents. The advantage of questionnaires is in smaller
timing getting more accuracy in final outcome. Factors affecting the productivity of construction were identified through
literature survey. the questionnaire required the respondents to rank factorsaffecting thelaborproductivitywiththescale the
rating of ‘1’ representing very low effect; ‘2’ representing loweffect;‘3’representingmedium effect;‘4’representinghigheffect;
‘5’ representing very high effect.
3. CONCLUSION
The importance of implementing automation technologies is the need of today’s infrastructure project and constructionfirms
in order to increase the productivity and good quality of work. Both medium and large size firms require automation
technologies partly or fully to implement in different sectors. It is important to maintain the correct relationship between the
speed of processing and the speed of material delivery, which is essential for automation in construction industry. To achieve
satisfactory construction work with necessary quality and safety, we must follow the automation adopted by developed
countries.
 As the machines used for construction work are not up to mark, they need to be upgraded with the newer machines
with all the extra features in it.
 The work procedure, materials used, standard of quality etc. all shouldbedoneaccordingtotherecommendeddesign.
 There should be a different committee for stricter supervision on the constructional worksbytheirhigherauthorities
to avoid use of inferior quality materials, inefficient machines, improper work procedures etc. all that are being
followed nowadays.
 All labours/operators/workers need to be fully equipped with Personal Protective Equipment’s (PPEs) before the
commencement of any constructional activity.
There is wider scope for automation in construction sector and its utilization of automation is growing rapidly since last
decades.
ACKNOWLEDGMENT
I wish to express my thanks to Professor A. B. Patil (Guide) for the input he hasgivenduringthepreparationofthiswork.Iwish
to express my sincerely thanks to Dr. S. V. Anekar, Principal, Tatyasaheb Kore Institute of Engineering and Technology,
Warananagar, who contributed with important supervision in thesis preparation andforsupportingmetodothisdissertation
work. I acknowledge with thanks to faculty, teaching and non-teaching staff of the department, Central libraryand Colleagues.
REFERENCES
1) Anu V. Thomas and J. Sudhakumar (2014) “Factors Influencing Construction Labour productivity: An Indian Case
Study.
2) David NgwokeMbazor Sunday OkuomaOkoh (2015)“Productivity Improvement in Construction Project Delivery”
Vol.7, No.10
3) Dheeraj Nimawat and Ashish Shrivastava (2016) “Increasing Productivity through Automation”
4) David Rylander (2014)“ProductivityImprovementsinConstructionsiteOperations thoughleanthinkingand Wireless
Real-Time Control”
5) Eng. Varma Santosh, Prof. M. R. Apte (2014) “Productivity in Building Construction”.
6) Jospeh Hubert Ault (2013) “Control Charts as a Productivity Improvement Tool in Construction”
7) Khaled Mahmoud El-Gohary, M.Eng.; and RemonFayek Aziz, Ph.D., Factors Influencing Construction Labor
Productivity in Egypt, J. Manage. Eng. 2014.30:1-9
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 06 | June 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 393
8) Mehrdad Arashpour, Ron Wakefield,RonWakefield,NickBlismas“ImprovingConstructionProductivity:implicationof
even flow production principles.
9) Mohammed SallehHammad, AbdelnaserOmran, Abdul Hamid Kadir parker (2012) “Identifying ways to improve
productivity at construction industry”
BIOGRAPHIES
Ms. Mrudula MohansinghChopdar
B.E. (Civil Engg.), Pursuing M. E. in
Construction and Management,
(Tatyasaheb Kore Institute of
Engineering and Technology,
Warananagar.)

More Related Content

What's hot

IRJET- Study to Condense Expenditure through Engineering Management of Wood P...
IRJET- Study to Condense Expenditure through Engineering Management of Wood P...IRJET- Study to Condense Expenditure through Engineering Management of Wood P...
IRJET- Study to Condense Expenditure through Engineering Management of Wood P...
IRJET Journal
 
IRJET- Recognition of Factor Impacting Labor Productivity for Reinforcement I...
IRJET- Recognition of Factor Impacting Labor Productivity for Reinforcement I...IRJET- Recognition of Factor Impacting Labor Productivity for Reinforcement I...
IRJET- Recognition of Factor Impacting Labor Productivity for Reinforcement I...
IRJET Journal
 
IRJET- Identification of Crucial Factor Affecting to Sustainable Construc...
IRJET-  	  Identification of Crucial Factor Affecting to Sustainable Construc...IRJET-  	  Identification of Crucial Factor Affecting to Sustainable Construc...
IRJET- Identification of Crucial Factor Affecting to Sustainable Construc...
IRJET Journal
 
IRJET- Quality Assurance & Project Scheduling for Residential Building
IRJET-  	  Quality Assurance & Project Scheduling for Residential BuildingIRJET-  	  Quality Assurance & Project Scheduling for Residential Building
IRJET- Quality Assurance & Project Scheduling for Residential Building
IRJET Journal
 
A Review on Productivity Improvement in Construction Industry
A Review on Productivity Improvement in Construction IndustryA Review on Productivity Improvement in Construction Industry
A Review on Productivity Improvement in Construction Industry
IRJET Journal
 
IRJET- Assessment of Role of Material Management in Construction Projects
IRJET- 	  Assessment of Role of Material Management in Construction ProjectsIRJET- 	  Assessment of Role of Material Management in Construction Projects
IRJET- Assessment of Role of Material Management in Construction Projects
IRJET Journal
 
IRJET-A Review of Impact on Labour Management in Construction Industry
IRJET-A Review of Impact on Labour Management in Construction IndustryIRJET-A Review of Impact on Labour Management in Construction Industry
IRJET-A Review of Impact on Labour Management in Construction Industry
IRJET Journal
 
USE OF ANDROID TOOL FOR QUALITY CONSTRUCTION
USE OF ANDROID TOOL FOR QUALITY CONSTRUCTIONUSE OF ANDROID TOOL FOR QUALITY CONSTRUCTION
USE OF ANDROID TOOL FOR QUALITY CONSTRUCTION
International Journal of Technical Research & Application
 
IRJET- Review on Study of Quality Practices in Construction
IRJET- Review on Study of Quality Practices in ConstructionIRJET- Review on Study of Quality Practices in Construction
IRJET- Review on Study of Quality Practices in Construction
IRJET Journal
 
IRJET- A Review Paper on Lean Management in Construction Sites
IRJET-  	  A Review Paper on Lean Management in Construction SitesIRJET-  	  A Review Paper on Lean Management in Construction Sites
IRJET- A Review Paper on Lean Management in Construction Sites
IRJET Journal
 
IRJET- Improving Productivity in a Mechanical Industry using Industrial Engin...
IRJET- Improving Productivity in a Mechanical Industry using Industrial Engin...IRJET- Improving Productivity in a Mechanical Industry using Industrial Engin...
IRJET- Improving Productivity in a Mechanical Industry using Industrial Engin...
IRJET Journal
 
IRJET- Evaluation of Rework Factors Affecting Cost and Schedule Performance i...
IRJET- Evaluation of Rework Factors Affecting Cost and Schedule Performance i...IRJET- Evaluation of Rework Factors Affecting Cost and Schedule Performance i...
IRJET- Evaluation of Rework Factors Affecting Cost and Schedule Performance i...
IRJET Journal
 
The Impact of Traning and Development on Technical Competence in Open Cast Mi...
The Impact of Traning and Development on Technical Competence in Open Cast Mi...The Impact of Traning and Development on Technical Competence in Open Cast Mi...
The Impact of Traning and Development on Technical Competence in Open Cast Mi...
IRJET Journal
 
IRJET- Furniture Product Optimization by using Creative Phase of Value Engine...
IRJET- Furniture Product Optimization by using Creative Phase of Value Engine...IRJET- Furniture Product Optimization by using Creative Phase of Value Engine...
IRJET- Furniture Product Optimization by using Creative Phase of Value Engine...
IRJET Journal
 
Impact of delayness on construction projects
Impact of delayness on construction projectsImpact of delayness on construction projects
Impact of delayness on construction projects
IRJET Journal
 
Minimising waste in construction by using lean six sigma principle
Minimising waste in construction by using lean six sigma principleMinimising waste in construction by using lean six sigma principle
Minimising waste in construction by using lean six sigma principleIAEME Publication
 
50120140507007
5012014050700750120140507007
50120140507007
IAEME Publication
 
IRJET - A Review Paper on Effective Material Management to Minimize Probl...
IRJET -  	  A Review Paper on Effective Material Management to Minimize Probl...IRJET -  	  A Review Paper on Effective Material Management to Minimize Probl...
IRJET - A Review Paper on Effective Material Management to Minimize Probl...
IRJET Journal
 
IRJET- Review on Study of Factors Affecting Quality of Construction Project
IRJET- Review on Study of Factors Affecting Quality of Construction ProjectIRJET- Review on Study of Factors Affecting Quality of Construction Project
IRJET- Review on Study of Factors Affecting Quality of Construction Project
IRJET Journal
 
IRJET- A Study and Analysis of Construction Equipment Management used in ...
IRJET-  	  A Study and Analysis of Construction Equipment Management used in ...IRJET-  	  A Study and Analysis of Construction Equipment Management used in ...
IRJET- A Study and Analysis of Construction Equipment Management used in ...
IRJET Journal
 

What's hot (20)

IRJET- Study to Condense Expenditure through Engineering Management of Wood P...
IRJET- Study to Condense Expenditure through Engineering Management of Wood P...IRJET- Study to Condense Expenditure through Engineering Management of Wood P...
IRJET- Study to Condense Expenditure through Engineering Management of Wood P...
 
IRJET- Recognition of Factor Impacting Labor Productivity for Reinforcement I...
IRJET- Recognition of Factor Impacting Labor Productivity for Reinforcement I...IRJET- Recognition of Factor Impacting Labor Productivity for Reinforcement I...
IRJET- Recognition of Factor Impacting Labor Productivity for Reinforcement I...
 
IRJET- Identification of Crucial Factor Affecting to Sustainable Construc...
IRJET-  	  Identification of Crucial Factor Affecting to Sustainable Construc...IRJET-  	  Identification of Crucial Factor Affecting to Sustainable Construc...
IRJET- Identification of Crucial Factor Affecting to Sustainable Construc...
 
IRJET- Quality Assurance & Project Scheduling for Residential Building
IRJET-  	  Quality Assurance & Project Scheduling for Residential BuildingIRJET-  	  Quality Assurance & Project Scheduling for Residential Building
IRJET- Quality Assurance & Project Scheduling for Residential Building
 
A Review on Productivity Improvement in Construction Industry
A Review on Productivity Improvement in Construction IndustryA Review on Productivity Improvement in Construction Industry
A Review on Productivity Improvement in Construction Industry
 
IRJET- Assessment of Role of Material Management in Construction Projects
IRJET- 	  Assessment of Role of Material Management in Construction ProjectsIRJET- 	  Assessment of Role of Material Management in Construction Projects
IRJET- Assessment of Role of Material Management in Construction Projects
 
IRJET-A Review of Impact on Labour Management in Construction Industry
IRJET-A Review of Impact on Labour Management in Construction IndustryIRJET-A Review of Impact on Labour Management in Construction Industry
IRJET-A Review of Impact on Labour Management in Construction Industry
 
USE OF ANDROID TOOL FOR QUALITY CONSTRUCTION
USE OF ANDROID TOOL FOR QUALITY CONSTRUCTIONUSE OF ANDROID TOOL FOR QUALITY CONSTRUCTION
USE OF ANDROID TOOL FOR QUALITY CONSTRUCTION
 
IRJET- Review on Study of Quality Practices in Construction
IRJET- Review on Study of Quality Practices in ConstructionIRJET- Review on Study of Quality Practices in Construction
IRJET- Review on Study of Quality Practices in Construction
 
IRJET- A Review Paper on Lean Management in Construction Sites
IRJET-  	  A Review Paper on Lean Management in Construction SitesIRJET-  	  A Review Paper on Lean Management in Construction Sites
IRJET- A Review Paper on Lean Management in Construction Sites
 
IRJET- Improving Productivity in a Mechanical Industry using Industrial Engin...
IRJET- Improving Productivity in a Mechanical Industry using Industrial Engin...IRJET- Improving Productivity in a Mechanical Industry using Industrial Engin...
IRJET- Improving Productivity in a Mechanical Industry using Industrial Engin...
 
IRJET- Evaluation of Rework Factors Affecting Cost and Schedule Performance i...
IRJET- Evaluation of Rework Factors Affecting Cost and Schedule Performance i...IRJET- Evaluation of Rework Factors Affecting Cost and Schedule Performance i...
IRJET- Evaluation of Rework Factors Affecting Cost and Schedule Performance i...
 
The Impact of Traning and Development on Technical Competence in Open Cast Mi...
The Impact of Traning and Development on Technical Competence in Open Cast Mi...The Impact of Traning and Development on Technical Competence in Open Cast Mi...
The Impact of Traning and Development on Technical Competence in Open Cast Mi...
 
IRJET- Furniture Product Optimization by using Creative Phase of Value Engine...
IRJET- Furniture Product Optimization by using Creative Phase of Value Engine...IRJET- Furniture Product Optimization by using Creative Phase of Value Engine...
IRJET- Furniture Product Optimization by using Creative Phase of Value Engine...
 
Impact of delayness on construction projects
Impact of delayness on construction projectsImpact of delayness on construction projects
Impact of delayness on construction projects
 
Minimising waste in construction by using lean six sigma principle
Minimising waste in construction by using lean six sigma principleMinimising waste in construction by using lean six sigma principle
Minimising waste in construction by using lean six sigma principle
 
50120140507007
5012014050700750120140507007
50120140507007
 
IRJET - A Review Paper on Effective Material Management to Minimize Probl...
IRJET -  	  A Review Paper on Effective Material Management to Minimize Probl...IRJET -  	  A Review Paper on Effective Material Management to Minimize Probl...
IRJET - A Review Paper on Effective Material Management to Minimize Probl...
 
IRJET- Review on Study of Factors Affecting Quality of Construction Project
IRJET- Review on Study of Factors Affecting Quality of Construction ProjectIRJET- Review on Study of Factors Affecting Quality of Construction Project
IRJET- Review on Study of Factors Affecting Quality of Construction Project
 
IRJET- A Study and Analysis of Construction Equipment Management used in ...
IRJET-  	  A Study and Analysis of Construction Equipment Management used in ...IRJET-  	  A Study and Analysis of Construction Equipment Management used in ...
IRJET- A Study and Analysis of Construction Equipment Management used in ...
 

Similar to IRJET- Productivity Improvement in Construction Industry using Automation Techniques

IRJET-Survey on Effects of Productivity of Equipment in Construction Projects
IRJET-Survey on Effects of Productivity of Equipment in Construction ProjectsIRJET-Survey on Effects of Productivity of Equipment in Construction Projects
IRJET-Survey on Effects of Productivity of Equipment in Construction Projects
IRJET Journal
 
IRJET- Study to Reduce Cost Price of Wood Products Manufacturing by Value Eng...
IRJET- Study to Reduce Cost Price of Wood Products Manufacturing by Value Eng...IRJET- Study to Reduce Cost Price of Wood Products Manufacturing by Value Eng...
IRJET- Study to Reduce Cost Price of Wood Products Manufacturing by Value Eng...
IRJET Journal
 
Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...
Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...
Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...
IRJET Journal
 
“Remedies over the obstacles in implementing automation in indian infrastruct...
“Remedies over the obstacles in implementing automation in indian infrastruct...“Remedies over the obstacles in implementing automation in indian infrastruct...
“Remedies over the obstacles in implementing automation in indian infrastruct...
eSAT Publishing House
 
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET Journal
 
Application of Lean Construction Techniques in Civil Engineering: Plucking th...
Application of Lean Construction Techniques in Civil Engineering: Plucking th...Application of Lean Construction Techniques in Civil Engineering: Plucking th...
Application of Lean Construction Techniques in Civil Engineering: Plucking th...
IRJET Journal
 
IRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project FailureIRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET Journal
 
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET Journal
 
IRJET- Equipment Planning and Management in Road Construction Project
IRJET- Equipment Planning and Management in Road Construction ProjectIRJET- Equipment Planning and Management in Road Construction Project
IRJET- Equipment Planning and Management in Road Construction Project
IRJET Journal
 
IRJET- Construction Quality Management on Site
IRJET-  	  Construction Quality Management on SiteIRJET-  	  Construction Quality Management on Site
IRJET- Construction Quality Management on Site
IRJET Journal
 
IRJET- Study & Analysis of Subcontracting Practices in Infrastructure Project
IRJET- Study & Analysis of Subcontracting Practices in Infrastructure ProjectIRJET- Study & Analysis of Subcontracting Practices in Infrastructure Project
IRJET- Study & Analysis of Subcontracting Practices in Infrastructure Project
IRJET Journal
 
IRJET- Equipment Planning and Management in Road Construction Project
IRJET- Equipment Planning and Management in Road Construction ProjectIRJET- Equipment Planning and Management in Road Construction Project
IRJET- Equipment Planning and Management in Road Construction Project
IRJET Journal
 
IRJET-Automation in Construction –The Need of Mega Construction and Fast Trac...
IRJET-Automation in Construction –The Need of Mega Construction and Fast Trac...IRJET-Automation in Construction –The Need of Mega Construction and Fast Trac...
IRJET-Automation in Construction –The Need of Mega Construction and Fast Trac...
IRJET Journal
 
17 1st review
17 1st review17 1st review
17 1st review
Vishnuvardhan s
 
IRJET- Identification of Critical Factors Affecting Infrastructure Projec...
IRJET-  	  Identification of Critical Factors Affecting Infrastructure Projec...IRJET-  	  Identification of Critical Factors Affecting Infrastructure Projec...
IRJET- Identification of Critical Factors Affecting Infrastructure Projec...
IRJET Journal
 
IRJET- An Investigation of Maintenance Management of Construction Equipment f...
IRJET- An Investigation of Maintenance Management of Construction Equipment f...IRJET- An Investigation of Maintenance Management of Construction Equipment f...
IRJET- An Investigation of Maintenance Management of Construction Equipment f...
IRJET Journal
 
IRJET - Forecasting and Management of Triple Constraints in Construction proj...
IRJET - Forecasting and Management of Triple Constraints in Construction proj...IRJET - Forecasting and Management of Triple Constraints in Construction proj...
IRJET - Forecasting and Management of Triple Constraints in Construction proj...
IRJET Journal
 
IRJET- An Investigation of Maintenance Management of Construction Equipment f...
IRJET- An Investigation of Maintenance Management of Construction Equipment f...IRJET- An Investigation of Maintenance Management of Construction Equipment f...
IRJET- An Investigation of Maintenance Management of Construction Equipment f...
IRJET Journal
 
Improvement of construction labor productivity in chambal region
Improvement of construction labor productivity in chambal regionImprovement of construction labor productivity in chambal region
Improvement of construction labor productivity in chambal region
eSAT Journals
 
IRJET- Improvement of Labour Productivity in Construction Industry- Review
IRJET- Improvement of Labour Productivity in Construction Industry- ReviewIRJET- Improvement of Labour Productivity in Construction Industry- Review
IRJET- Improvement of Labour Productivity in Construction Industry- Review
IRJET Journal
 

Similar to IRJET- Productivity Improvement in Construction Industry using Automation Techniques (20)

IRJET-Survey on Effects of Productivity of Equipment in Construction Projects
IRJET-Survey on Effects of Productivity of Equipment in Construction ProjectsIRJET-Survey on Effects of Productivity of Equipment in Construction Projects
IRJET-Survey on Effects of Productivity of Equipment in Construction Projects
 
IRJET- Study to Reduce Cost Price of Wood Products Manufacturing by Value Eng...
IRJET- Study to Reduce Cost Price of Wood Products Manufacturing by Value Eng...IRJET- Study to Reduce Cost Price of Wood Products Manufacturing by Value Eng...
IRJET- Study to Reduce Cost Price of Wood Products Manufacturing by Value Eng...
 
Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...
Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...
Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...
 
“Remedies over the obstacles in implementing automation in indian infrastruct...
“Remedies over the obstacles in implementing automation in indian infrastruct...“Remedies over the obstacles in implementing automation in indian infrastruct...
“Remedies over the obstacles in implementing automation in indian infrastruct...
 
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
 
Application of Lean Construction Techniques in Civil Engineering: Plucking th...
Application of Lean Construction Techniques in Civil Engineering: Plucking th...Application of Lean Construction Techniques in Civil Engineering: Plucking th...
Application of Lean Construction Techniques in Civil Engineering: Plucking th...
 
IRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project FailureIRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project Failure
 
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
 
IRJET- Equipment Planning and Management in Road Construction Project
IRJET- Equipment Planning and Management in Road Construction ProjectIRJET- Equipment Planning and Management in Road Construction Project
IRJET- Equipment Planning and Management in Road Construction Project
 
IRJET- Construction Quality Management on Site
IRJET-  	  Construction Quality Management on SiteIRJET-  	  Construction Quality Management on Site
IRJET- Construction Quality Management on Site
 
IRJET- Study & Analysis of Subcontracting Practices in Infrastructure Project
IRJET- Study & Analysis of Subcontracting Practices in Infrastructure ProjectIRJET- Study & Analysis of Subcontracting Practices in Infrastructure Project
IRJET- Study & Analysis of Subcontracting Practices in Infrastructure Project
 
IRJET- Equipment Planning and Management in Road Construction Project
IRJET- Equipment Planning and Management in Road Construction ProjectIRJET- Equipment Planning and Management in Road Construction Project
IRJET- Equipment Planning and Management in Road Construction Project
 
IRJET-Automation in Construction –The Need of Mega Construction and Fast Trac...
IRJET-Automation in Construction –The Need of Mega Construction and Fast Trac...IRJET-Automation in Construction –The Need of Mega Construction and Fast Trac...
IRJET-Automation in Construction –The Need of Mega Construction and Fast Trac...
 
17 1st review
17 1st review17 1st review
17 1st review
 
IRJET- Identification of Critical Factors Affecting Infrastructure Projec...
IRJET-  	  Identification of Critical Factors Affecting Infrastructure Projec...IRJET-  	  Identification of Critical Factors Affecting Infrastructure Projec...
IRJET- Identification of Critical Factors Affecting Infrastructure Projec...
 
IRJET- An Investigation of Maintenance Management of Construction Equipment f...
IRJET- An Investigation of Maintenance Management of Construction Equipment f...IRJET- An Investigation of Maintenance Management of Construction Equipment f...
IRJET- An Investigation of Maintenance Management of Construction Equipment f...
 
IRJET - Forecasting and Management of Triple Constraints in Construction proj...
IRJET - Forecasting and Management of Triple Constraints in Construction proj...IRJET - Forecasting and Management of Triple Constraints in Construction proj...
IRJET - Forecasting and Management of Triple Constraints in Construction proj...
 
IRJET- An Investigation of Maintenance Management of Construction Equipment f...
IRJET- An Investigation of Maintenance Management of Construction Equipment f...IRJET- An Investigation of Maintenance Management of Construction Equipment f...
IRJET- An Investigation of Maintenance Management of Construction Equipment f...
 
Improvement of construction labor productivity in chambal region
Improvement of construction labor productivity in chambal regionImprovement of construction labor productivity in chambal region
Improvement of construction labor productivity in chambal region
 
IRJET- Improvement of Labour Productivity in Construction Industry- Review
IRJET- Improvement of Labour Productivity in Construction Industry- ReviewIRJET- Improvement of Labour Productivity in Construction Industry- Review
IRJET- Improvement of Labour Productivity in Construction Industry- Review
 

More from IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
IRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
IRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
IRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
IRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
IRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
IRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
IRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
IRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
IRJET Journal
 

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Recently uploaded

Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
Kamal Acharya
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
PrashantGoswami42
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
DuvanRamosGarzon1
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
Kamal Acharya
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
ssuser9bd3ba
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
MuhammadTufail242431
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
Intella Parts
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 

Recently uploaded (20)

Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 

IRJET- Productivity Improvement in Construction Industry using Automation Techniques

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 06 | June 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 391 “Productivity Improvement in Construction Industry using Automation Techniques” Ms. Mrudula Chopdar1, Prof. A. B. Patil2 1Post Graduation Student, Civil Engineering Dept, T.K.I.E.T Warananagar, Dist-Kolhapur, Maharashtra,India 2 Professor of Civil Engineering T.K.I.E.T, Warananagar, Dist-Kolhapur, Maharashtra,India ---------------------------------------------------------------------***--------------------------------------------------------------------- Abstract - Productivity is at the forefront of concerns facing professionals in the construction industry worldwide. This study highlights the factors affecting productivity of the Construction industry. A questionnaire was used to gather the relevant data from the study area .The top three factors affecting construction productivity are: Management of productivity, Human factors, and External factors. Recommendations have been made in the study to address these factors. Key Words: Construction 1, Productivity 2, Improvement Techniques 3, Automation 4, Evaluation 5 1.INTRODUCTION The Construction industry of India is an important indicator of the development as it creates investmentopportunitiesacross various related sectors. Construction industry is world's mostlargestandchallenging industry.Humanresourcehasastrategic role in increasing productivity in construction industry. With the effective and optimum use of human resources can help in productivity growth. The construction projects are mostly labor based with basic use of hand tools and equipment‘s in which labour cost consists of about 30% to 50% of total project cost. Indian construction industry is one of fastest growing sector globally. The construction sector gives second largest employment after agriculture. India shares about 8% of total GDP and also provides employment to around 35 million peoples directly or indirectly. In construction industry one of the biggest problems faced is of unskilled labour which impliesinproductivitylossandimpactson costoverrunandscheduledaily.Labour productivity is one of important factor which affects physical progress of construction project. To perform effective job, construction labour should be familiar with materials, tools and machineries that they use. Background of construction industry and productivity is given and also explained, how low productivity affects the time and cost of construction project. Many researchers have shown that poor construction management practices leads to poor performance, wastage of efforts in different phases of construction projects. Researchers tried to overcome some of challenges by adding their efforts in construction project, however many problems are yet to be solved in terms of construction productivity. Identifying and analyzing the critical factor that influence construction productivity will lead to develop most effective method and strategies to improve the construction productivity in upcoming time. Construction project is said to be successful if it is completed in schedule duration and estimated cost. For that purpose productivity has to be efficient. Productivity forecasting plays an important role in strategic and operational planning.Productivityisone ofthekeycomponentsofeverycompany‘ssuccessand Competitiveness in the market. Productivity translates directly into cost savings and profitability a construction contractor stands to gain or lose, depending on how well his company‘s productivity responds to competition. The growth of infrastructure and development in emerging countrieslikeIndia mayrequiretheconstructionindustrytoshiftfrom traditional methods of construction to modern ones in order to improve productivity and enhance performance. A competitive, market orientedandrationalizedconstructiontomorrowrequiresdevelopingofautomatedconstructionsystem today. This includes construction material production, prefabricationofconstruction components,onsiteconstruction,facility management, rehabilitation and recycling. Today’s construction projects are characterizing by short design and build period, increased demands of quality and low cost. These problems can be approached by a flexible automation based uponplanning, engineering and construction management. By automation, increased productivity could reduce high labor cost share of40% or more. Introduction of automation technology would result in better working and health conditions. Innextsectionpurpose of study is explained and problem accumulated in construction productivity are given. The objectives of proposed work that are to be achieved at the end of project. 2. METHODOLOGY The main purpose of this dissertation is to provide more precise and uniform quality of construction through automation techniques. A review of literature is conducted to determine the factors that influence productivity of construction projects through productivity evaluation checklist. Analysis of formulated check listthroughdata collectedfrom Engineers, contractors
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 06 | June 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 392 labours etc. The best suggestive measures will be given for productivity improvement in construction industry through automation techniques. Which finally declines higher cost, and increases efficiency and productivity of the project. 2.1 QUESTIONNAIRE DESIGN The design of questionnaire is very simple and under stable for respondents. The advantage of questionnaires is in smaller timing getting more accuracy in final outcome. Factors affecting the productivity of construction were identified through literature survey. the questionnaire required the respondents to rank factorsaffecting thelaborproductivitywiththescale the rating of ‘1’ representing very low effect; ‘2’ representing loweffect;‘3’representingmedium effect;‘4’representinghigheffect; ‘5’ representing very high effect. 3. CONCLUSION The importance of implementing automation technologies is the need of today’s infrastructure project and constructionfirms in order to increase the productivity and good quality of work. Both medium and large size firms require automation technologies partly or fully to implement in different sectors. It is important to maintain the correct relationship between the speed of processing and the speed of material delivery, which is essential for automation in construction industry. To achieve satisfactory construction work with necessary quality and safety, we must follow the automation adopted by developed countries.  As the machines used for construction work are not up to mark, they need to be upgraded with the newer machines with all the extra features in it.  The work procedure, materials used, standard of quality etc. all shouldbedoneaccordingtotherecommendeddesign.  There should be a different committee for stricter supervision on the constructional worksbytheirhigherauthorities to avoid use of inferior quality materials, inefficient machines, improper work procedures etc. all that are being followed nowadays.  All labours/operators/workers need to be fully equipped with Personal Protective Equipment’s (PPEs) before the commencement of any constructional activity. There is wider scope for automation in construction sector and its utilization of automation is growing rapidly since last decades. ACKNOWLEDGMENT I wish to express my thanks to Professor A. B. Patil (Guide) for the input he hasgivenduringthepreparationofthiswork.Iwish to express my sincerely thanks to Dr. S. V. Anekar, Principal, Tatyasaheb Kore Institute of Engineering and Technology, Warananagar, who contributed with important supervision in thesis preparation andforsupportingmetodothisdissertation work. I acknowledge with thanks to faculty, teaching and non-teaching staff of the department, Central libraryand Colleagues. REFERENCES 1) Anu V. Thomas and J. Sudhakumar (2014) “Factors Influencing Construction Labour productivity: An Indian Case Study. 2) David NgwokeMbazor Sunday OkuomaOkoh (2015)“Productivity Improvement in Construction Project Delivery” Vol.7, No.10 3) Dheeraj Nimawat and Ashish Shrivastava (2016) “Increasing Productivity through Automation” 4) David Rylander (2014)“ProductivityImprovementsinConstructionsiteOperations thoughleanthinkingand Wireless Real-Time Control” 5) Eng. Varma Santosh, Prof. M. R. Apte (2014) “Productivity in Building Construction”. 6) Jospeh Hubert Ault (2013) “Control Charts as a Productivity Improvement Tool in Construction” 7) Khaled Mahmoud El-Gohary, M.Eng.; and RemonFayek Aziz, Ph.D., Factors Influencing Construction Labor Productivity in Egypt, J. Manage. Eng. 2014.30:1-9
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 06 | June 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 393 8) Mehrdad Arashpour, Ron Wakefield,RonWakefield,NickBlismas“ImprovingConstructionProductivity:implicationof even flow production principles. 9) Mohammed SallehHammad, AbdelnaserOmran, Abdul Hamid Kadir parker (2012) “Identifying ways to improve productivity at construction industry” BIOGRAPHIES Ms. Mrudula MohansinghChopdar B.E. (Civil Engg.), Pursuing M. E. in Construction and Management, (Tatyasaheb Kore Institute of Engineering and Technology, Warananagar.)