Intro to Problem-Based Learning /
What Makes an Effective PBL Problem?
Mark A. Serva
servam@udel.edu
21st
Century Literacies
• Develop proficiency with the tools of technology
• Build relationships with others to pose and solve
problems collaboratively and cross-culturally
• Design and share information for global
communities to meet a variety of purposes
• Manage, analyze and synthesize multiple streams of
simultaneous information
• Create, critique, analyze, and evaluate multi-media
texts
• Attend to the ethical responsibilities required by
these complex environments
National Council of Teachers of English, Feb. 15, 2008
How Do We Spend Our Class Time?
The following are considerations when designing a
class. For your class, how Important is each of
them, relative to the others?
Content Knowledge Hands-on Skills
Design & Creativity Critical Thinking
Real-World Context Disciplinary Integration
Communication Skills Teamwork/Collaboration
Student Intrinsic
Motivation
Self-Directed Learning
The above were developed by Jonathan Stolk and Robert Martello of Olin College.
I already assign problems…
From Physics, by Cutnell and Johnson, 1989, p. 93
PBL begins with a different kind of problem
Major League Baseball (MLB) is looking to sell the
Montreal Expos, which it currently owns. Competitive bids
have been submitted by two Mexican cities, Mexico City
and Monterrey. Prior to making a decision, MLB has asked
your consulting firm to evaluate the effect that altitude
would have on a fly ball in these two baseball stadiums . . .
•What variables are relevant?
•What is the problem?
•If you were hired as a consultant, how would you
proceed?
PBL Clearinghouse “What a Drag!,” by Ed Nowak
Technologies for Haiti Relief
• Propose a technology to address pressing issues
in Haiti post-earthquake
• Students research situation in Haiti and
available technologies (shelter, clean water,
construction, communication)
• Proposal, progress report, technical briefing,
document for wider audience, presentation
Steve Bernhardt, Technical Writing, UD
Presentation of Problem
Organize ideas and
prior knowledge
(What do we know?)
Pose questions (What do
we need to know?)
Assign responsibility
for questions; discuss
resources
Research questions;
summarize;
analyze findings
Reconvene, report
on research;
Integrate new
Information;
Refine questions
Resolution of Problem;
(How did we do?)
PBL: The Process
Next stage of
the problem
But I have to cover content…
• Good problems meet content and process
learning objectives.
• Good problems require learning and applying
content.
• Problems provide a meaningful context,
making concepts more memorable.
• Deep understanding is preferable to wide
exposure.
“Hybrid” PBL
• Non-exclusive use of problem-driven learning in
a class
• May include separate lecture segments or other
active-learning components
• Floating or peer facilitator models common
Course Transformation: A Balancing Act
Types of Learning Objectives
Content-oriented: subject specific
▫ Basic knowledge and understanding of specific
concepts, techniques, etc. in the discipline
Process-oriented: global skills
▫ Effective communication: oral and written
▫ Acquiring and evaluating information
▫ Working effectively with others
▫ Higher order, critical thinking
Step One:
Identify Learning Objectives
Think of a learning objective in your course:
▫ CONTENT: “My students will understand the management
issues that occur when you monitor your employees.”
▫ PROCESS: “My students will improve their understanding of
the process of management decision-making.”
▫ PROCESS: “My students will improve their memo-writing
abilities.”
How do you usually address this learning objective? What
kind of problem or activity do you usually assign?
▫ Typical end-of-chapter problem?
▫ A reading?
▫ Other?
Step Two:
Identify Real-World Context
• Name a realistic application of the
concept.
• Outline a scenario.
• The scenario ideally is real, but can also be
contrived.
Step Three: Draft the problem
• Add context by creating a realistic application of the
concept.
• Be a storyteller: Add motivation, realistic characters
• Require students to go beyond memorization by
researching ambiguous situations
▫ What information would students REALLY know in the real
world? What would they have to estimate?
▫ Instead of providing all information, what could students
research on their own?
• Require them to make a decision and defend it: what would
YOU do?
• Reinforce that decision-making is not easy by making the
situation ambiguous
Drafting the Problem (cont.)
• Good PBL problem often has multi-page,
multi-stage construction - leave students
guessing!
• Not all information should be given in
chapter or text—have students do outside
research.
• Challenge students to come to consensus,
reach conclusions, and make judgments,
deal with ambiguity
Good PBL Problems…
• relate to real world, motivate students
• require decision-making or judgments
• are multi-page, multi-stage
• are designed for group-solving
• pose open-ended initial questions that encourage
discussion
• incorporate course content objectives, higher order
thinking, other skills
“Christian Nation”
• What were the strengths of the problem?
• Weaknesses?
• How did the approach differ from how a traditional
history class might be taught?
• Could you use the problem in your class? What
would be the challenges? Could they be
overcome?
World Cultures Ideas
Music What is culture? Games and entertainment
Economy Food Crime and punishment
What is the world's best
country?
At random, pick a country.
Now at random pick a
century. What was your
country like then?
Family
Democratic Socialism
(Bernie Sanders). What
does it mean? How is it
implemented in other
countries? Is it successful?
Pick a TV show, book, or
movie that depicts another
country. How accurate is
it? Different?
Heroes

Intro to PBL and what makes an effective problem #openeducationwk

  • 1.
    Intro to Problem-BasedLearning / What Makes an Effective PBL Problem? Mark A. Serva servam@udel.edu
  • 2.
    21st Century Literacies • Developproficiency with the tools of technology • Build relationships with others to pose and solve problems collaboratively and cross-culturally • Design and share information for global communities to meet a variety of purposes • Manage, analyze and synthesize multiple streams of simultaneous information • Create, critique, analyze, and evaluate multi-media texts • Attend to the ethical responsibilities required by these complex environments National Council of Teachers of English, Feb. 15, 2008
  • 3.
    How Do WeSpend Our Class Time? The following are considerations when designing a class. For your class, how Important is each of them, relative to the others? Content Knowledge Hands-on Skills Design & Creativity Critical Thinking Real-World Context Disciplinary Integration Communication Skills Teamwork/Collaboration Student Intrinsic Motivation Self-Directed Learning The above were developed by Jonathan Stolk and Robert Martello of Olin College.
  • 4.
    I already assignproblems… From Physics, by Cutnell and Johnson, 1989, p. 93
  • 5.
    PBL begins witha different kind of problem Major League Baseball (MLB) is looking to sell the Montreal Expos, which it currently owns. Competitive bids have been submitted by two Mexican cities, Mexico City and Monterrey. Prior to making a decision, MLB has asked your consulting firm to evaluate the effect that altitude would have on a fly ball in these two baseball stadiums . . . •What variables are relevant? •What is the problem? •If you were hired as a consultant, how would you proceed? PBL Clearinghouse “What a Drag!,” by Ed Nowak
  • 6.
    Technologies for HaitiRelief • Propose a technology to address pressing issues in Haiti post-earthquake • Students research situation in Haiti and available technologies (shelter, clean water, construction, communication) • Proposal, progress report, technical briefing, document for wider audience, presentation Steve Bernhardt, Technical Writing, UD
  • 7.
    Presentation of Problem Organizeideas and prior knowledge (What do we know?) Pose questions (What do we need to know?) Assign responsibility for questions; discuss resources Research questions; summarize; analyze findings Reconvene, report on research; Integrate new Information; Refine questions Resolution of Problem; (How did we do?) PBL: The Process Next stage of the problem
  • 8.
    But I haveto cover content… • Good problems meet content and process learning objectives. • Good problems require learning and applying content. • Problems provide a meaningful context, making concepts more memorable. • Deep understanding is preferable to wide exposure.
  • 9.
    “Hybrid” PBL • Non-exclusiveuse of problem-driven learning in a class • May include separate lecture segments or other active-learning components • Floating or peer facilitator models common
  • 10.
  • 11.
    Types of LearningObjectives Content-oriented: subject specific ▫ Basic knowledge and understanding of specific concepts, techniques, etc. in the discipline Process-oriented: global skills ▫ Effective communication: oral and written ▫ Acquiring and evaluating information ▫ Working effectively with others ▫ Higher order, critical thinking
  • 12.
    Step One: Identify LearningObjectives Think of a learning objective in your course: ▫ CONTENT: “My students will understand the management issues that occur when you monitor your employees.” ▫ PROCESS: “My students will improve their understanding of the process of management decision-making.” ▫ PROCESS: “My students will improve their memo-writing abilities.” How do you usually address this learning objective? What kind of problem or activity do you usually assign? ▫ Typical end-of-chapter problem? ▫ A reading? ▫ Other?
  • 13.
    Step Two: Identify Real-WorldContext • Name a realistic application of the concept. • Outline a scenario. • The scenario ideally is real, but can also be contrived.
  • 14.
    Step Three: Draftthe problem • Add context by creating a realistic application of the concept. • Be a storyteller: Add motivation, realistic characters • Require students to go beyond memorization by researching ambiguous situations ▫ What information would students REALLY know in the real world? What would they have to estimate? ▫ Instead of providing all information, what could students research on their own? • Require them to make a decision and defend it: what would YOU do? • Reinforce that decision-making is not easy by making the situation ambiguous
  • 15.
    Drafting the Problem(cont.) • Good PBL problem often has multi-page, multi-stage construction - leave students guessing! • Not all information should be given in chapter or text—have students do outside research. • Challenge students to come to consensus, reach conclusions, and make judgments, deal with ambiguity
  • 16.
    Good PBL Problems… •relate to real world, motivate students • require decision-making or judgments • are multi-page, multi-stage • are designed for group-solving • pose open-ended initial questions that encourage discussion • incorporate course content objectives, higher order thinking, other skills
  • 17.
    “Christian Nation” • Whatwere the strengths of the problem? • Weaknesses? • How did the approach differ from how a traditional history class might be taught? • Could you use the problem in your class? What would be the challenges? Could they be overcome?
  • 18.
    World Cultures Ideas MusicWhat is culture? Games and entertainment Economy Food Crime and punishment What is the world's best country? At random, pick a country. Now at random pick a century. What was your country like then? Family Democratic Socialism (Bernie Sanders). What does it mean? How is it implemented in other countries? Is it successful? Pick a TV show, book, or movie that depicts another country. How accurate is it? Different? Heroes

Editor's Notes

  • #3 Here’s a more current statement of what defines contemporary literacy—from English teachers’ perspective.
  • #5 What is the value of such a problem? Students are asked to apply one or more concepts they’ve learned . . . gravitation and resulting forces. What processes does the student step through to solve this? ID type of problem (graviational force), look for correct equations (F=Gm1m2/r2), calculate and answer. Is this what we would call “problem solving” in the broad sense of the term? Ability to solve for net force on a sphere in a highly confined scenario is unlikely to be relevant to the student’s future career needs. Students have little input into the process by which problem is solved, other than correctly Iding problem type.
  • #6 Problem type not initially clear. Students have to determine what variables are involved, and how they might change due to parameters provided. Aside from realistic parameters similar to those for a “consulting” job, students have control and responsibility for developing the problem’s solution. More than one answer could be acceptable, depending on groups’
  • #7 My example—for a writing course…