SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN
BACHELOR OR SCIENCE (HONS) IN ARCHITECTURE
INTERNSHIP TRAINING AND REPORT (ARC 2615)
3RD
JAN-10TH
MAC 2017
STUDENT NAME: GOH YEN NEE
STUDENT ID: 0315551
LECTURER: AR.SATEERAH HASSAN
INTERNSHIP COMPANY: AKITEK AKIPRIMA
TABLE OF CONTENT
1.0 INTRODUCTION- EMPLOYER INFORMATION
2.0 INTERNSHIP TASK INVOLVEMENT
2.1PROJECT 1
2.2PROJECT 2
2.3PROJECT 3
2.4PROJECT 4
2.5MINOR TASK INVOLVEMENT
3.0 WEEKLY LOG SHEETS
4.0 CONCLUSIONS
INTRODUCTION
Through this short semester program, I have applied my internship in one of the
architecture firm in SS15, Subang Jaya which is Akitek Akiprima. I have chosen this firm due
to its high experience in architecture region which it established in 1980. This company have
few branches which are from Penang, Vietnam and Subang Jaya. The architects here are
majority have higher experience in the region especially Ar. Ray Cheah, the founder of the
Akitek Akiprima coming with Ar.Cheah Kah Lip from Subang Branch and Ar. Kathy from
Penang branch. I will be learning the working system of the firm under the supervisor which
is Mr. Azmi, the Head of Technical Department. 10 weeks of internship will be started in this
firm which made me excited and happy to get new experience
EMPLOYER INFORMATION
COMPANY NAME: Akitek Akiprima
YEAR OF ENTABLISMENT: 1980
OUR PHILOSOPHY: Inherent in all operations is the philosophy of building from within. Just as a
building without a strong structure tends to ruin, we believe in first building our company structure,
then we can begin serving our clients. Weekly team meetings to discuss on-going projects, and
person senior supervision on-site to ensure building and material quality are common occurrences in
this company.
COMPANY ADDRESS: E-01-4, Subang Square Business Park (East Wing), Jalan SS15/4G, 47500
Subang Jaya, Selangor Darul Ehsan, Malaysia.
COMPANY WEBSITE: www.akiprima.com.my
COMPANY EMAIL ADDRESS: akiprima-kl@akiworld.com
CONTACT LINE: +60-3-5633 5877
INTERNSHIP TASK
INVOLVEMENT
2.1PROJECT 1
2.2PROJECT 2
2.3PROJECT 3
2.4PROJECT 4
2.5MINOR TASK INVOLVEMENT
2.1 PROJECT 1
PROJECT NAME PROPOSED CONDOMINIUM (DVQ)
LOCATION MUKIM BENTONG, PAHANG
WEEK WEEK 1
In the beginning of the internships, I have get involved in the task of hatching the
drawings that need to be submitted to the authority for the second times. That’s the first
time I read an official drawings for the authority which made me to be fresh in the company.
The project is a service condominium that located in the Bentong, Pahang where there is a
lot of facilities including shopping mall at the bottom and it took around few years to
develop from a schematic drawing to a construction stage.
I had hatched the circulation plan, elevations and section drawings according to the
materials of the building to allow the authority understand on the materials that going to be
used during further construction. In this company, there is a system of using the standard
format and layer colours for every drawing so every staff would not be messed up with each
other works. I have been briefed on the procedure of the working system during the first
day of the internship from my supervisor. Each of the project is named as a shortcut code so
it could easier to search in the system based on the alphabets. I have taught by staff about
the software used which known as Cadian but it is quite similar with AutoCad software
actually. From the colouring, we also need to put the legends and specification of materials
before submission to authority. My supervisor also taught me about some technical
knowledge based on the drawings such as the thickness of concrete for different purpose of
levels in the condominium and others.
Through the first week of internship, it made me understand the differences
between the experiences during studying and working period. Working in a company would
be more systematic on the guideline on each stage to complete a building and it would
gained more technical-based knowledge which could help me in further study especially
during assignment time.
APPENDIX
Picture of hatching left evelation of this project with complete specfications, gridline,
dimensions and coloured materials.
Picture of hatching right evelation according to the material layers
Picture of sectional drawing to observe the facility of swimming pool include the service apartment.
Picture of floor plans drawing for references during the hatching of elevation and section for
discover the specified materials.
Picture of specific layers that need to follow during the coloring for the drawings submission
Completed right elevation drawing with format table for authorities subsmission
Completed left elevation drawing with format table for submission
Section B-B drawing for authorities submission
2.2 PROJECT 2
PROJECT NAME PROPOSED MIXED DEVELOPMENT
,MESAHILL (DRH)
LOCATION NILAI
WEEK WEEK 2-8
This project is given task on involving in the site inspection under staff guidance. This
is considered the last stage on construction where the building is done and need to be
further detailed inspection on the interior space. The site is located in Nilai which known as
Mesahill, a service apartment with a lot of facilities. I have briefed by the staff on the task of
inspection where we need to check the defects on each units from each level. The main
target of the building is for the college students as Manipal University is located just next to
it. There should be four towers at the site but only two towers are completely built which
have 22 levels and each level have 32 units. The service apartment is starting from level 6
while lower than that are parking lots and shopping mall.
I have given some checklists sheet for each unit to inspect. Before we start to
inspect, we decided to wear safety helmets and boots for your safety precautions. There
have several units which are different in spacing arrangement that need to be concerned
more. I need to record down the defects that happened according to the spaces located
while taking photos as evidences for easier to seek during the renovation. Due to the
numerous units, it took a very long period to be done even till end of the internship for
another inspection again after first renovation. Basically, I decided to write a report
according to unit by unit which attached with the photos taken after the site inspection
done. The report was then sent to the contractors to look forward about the imperfections
of unit. I had also went to the authority in Nilai which is MPN for updating the drawings with
the specialists.
I have learnt from observing the building construction from different stages and it
made me understand that site inspection is not easy due to the hotness for moving around
to check whether the building is perfect which in the need of working cooperatively with the
contactors on site. It is considered a good experience of attaching to the site visit while
communicate with the professional people.
APPENDIX
Ph
oto
s of
site
Documents For Site Inspections
This is how the inspection work on which check every building element defects, record down and
take picture of them for references.
Visit to MPN, Nilai
2.3 PROJECT 3
PROJECT NAME PROPOSED MASTER PLAN (DXD)
LOCATION JALAN NIPAH AMPANG
WEEK WEEK 7
In this project, I have given task on doing the lift lobby detailing for tender
submission. This project is also an apartment that designed based on limited space area on a
single unit but in the need from client to involve all different purpose of interior spaces. The
pathway to enter different spaces in the unit is quite tight compared to a standard pathway.
The main target of the project is to allow more people to live in a small unit but involving all
the specific spaces needed.
I have been briefed on referring from the plans drawing to draw the detailed plan
and section on the lift lobby which is starting from lower ground plan to the top floor plan. It
is around 48 levels of whole building. I tried to look forward each of the floor plan drawings
and coming out with more specific lift lobby detailed drawings. The detailed drawing need
to be drawn with respective layers and hatched according to the materials used.
Specifications, dimensions and gridline need to be added for further understanding to
others.
Overall, I have learnt that detailing of specific space is important for stage of
construction so the specified contractors could understand on the process of building
construction with detailed specification, dimensions and selected materials used. The skill of
detailing need to be more concerned so that would not have errors during construction.
APPENDIX
Picture of detailing lift lobby which the dimensions, hatching, gridline, specifications and scale need
to be included for tender drawings submission.
Picture of No.1 Lift lobby details for Phase 2
Picture of No.2 lift lobby details for phase 2
Picture of No.3 lift lobby details for phase 3
2.4 PROJECT 4
PROJECT NAME PROPOSED MIXED DEVELOPMENT (DQP)
LOCATION TAMAN MALURI
WEEK WEEK 7
Basically, this project which the design of the buildings have not fixed yet as there is
some minor problem which passed to another staff to do. So, it took a long period to be
done in hatching as the drawings were keep changing. It changed from the details of
condominium which are the type of windows and doors used, artificial exterior element,
thickness of beam and column, and void proposed to the spaces.
From this project, I have been briefed on doing the colouring on the elevations and
section for authority submission and plan drawings for BOMBA submission. Hatching of
building plan (BP) for authority and BOMBA submission is totally different as building plan
need to be overall coloured which including circulation, building structure, and materials
but BOMBA drawings only focus on the fire staircase, fire lift lobby and fire walls in between
with unit and unit. I have hatched the two elevations, one section and one BOMBA faculty
floor plan which done on time as the staff need urgently for submission. I have also helped
in folding the papers after get done with all the drawings.
Through this task, I have observed the differences of authority and BOMBA drawings
regarding their requirements, format, and specifications needed before getting approved
for further construction and it is a good knowledge gained during the internship life.
APPENDIX
Picture of right elevation hatching using Cadian software
Picture of front and rear elevation drawings hatched
Picture of Floor plan hatched for BOMBA submission where there is only need to color the fire
staircase and fire lift lobby.
2.5 MINOR INVOLVEMENT TASK-PLOT/PRINT/FOLD
PROJECT NAME NEW ATRIA (AZB)
LOCATION DAMANSARA
WEEK WEEK 2
Picture of 100 above pages printed and arranged accordingly
I have been giving task on plotting the drawings into A1 size and printed out for
documentation. It was around 100 above pages to print and needed to organize into several
sets for easier to look forward. From the drawings, I could observed the format drawings
that done by the staff and on how they designed on each part of the buildings. I could also
study the complete detailed drawings which can be future references. Discovering people's
work is also part of the learning that can gained a lot of technical knowledge where else
could help in further study.
PROJECT NAME RENOVATION FIRST SUBANG MALL (DYE)
LOCATION SUBANG JAYA
WEEK WEEK 2
I have been briefed by my supervisor on folding the A1 size drawings to A4 size.
There is some specific way to fold from a bigger size to a smaller sheet. This is to allow the
people could carry easily to anywhere and professional specialist could know the drawings
without totally opened up by seeing the table content as it faced to the top of the paper
even though it had folded. It was also made the specialist to sign for the drawings easily. I
learnt that folding between A0 and A1 size into A4 sheet are totally different way after
getting taught by the staff. It could be the important part for every submission as to send to
the authority and BOMBA for references without difficulty. Learning part of the skill is much
worth even though is a little thing but could really understand the process working in an
architecture firm.
Picture of folding from A1 size into A4 size.
WEEKLY LOG SHEETS
(WEEK 1-8)
CONCLUSION
Overall, I would glad and appreciate for having my short internship in Akitek
Akiprima which is only 10 weeks. Having a working experience could made me grow up in
my life even though is just a short period. It made me become more understanding in the
course especially the role of working in an architecture firm.
I have learnt a lot which coming from the drawings that I had read and done during
the internship period. I even get comment by Ar. Ray Cheah about my work during schooling
where he think that I should tried to make it simplified than complicated. I appreciated his
comment as I know he is an experienced architect in this firm. I would like to thank my
supervisor, Mr Azmi for his patience in teaching about technical drawings which could
enhance my technical skill and it would help me during further study. Site inspection also
gained the most where we could observe each of the building construction that happened
on the site which in the need of working cooperatively with specialists. I could know more
on every role of character in the site in order to complete the building.
Truly, the experience when working in systematic architecture firm and during
school time are seriously different where architecture can be more abstract in University
but during work, we need to think every each logical details for construction which need to
be more concerned. It is definitely create a worth experience of internship program in my
study.

More Related Content

What's hot

Construction Project Management ppt
Construction Project Management pptConstruction Project Management ppt
Construction Project Management ppt
RajeshPV12
 
training report on commercial building
training report on commercial buildingtraining report on commercial building
training report on commercial building
Sumit Saini
 
Project management report project 1
Project management report project 1Project management report project 1
Project management report project 1
Afiq Knick
 
Final Bills of Quantity
Final Bills of QuantityFinal Bills of Quantity
Final Bills of Quantity
Arissa Loh
 
Construction work of a multi storied residential building
Construction work of a multi storied residential buildingConstruction work of a multi storied residential building
Construction work of a multi storied residential building
Shariful Haque Robin
 
SITE REPORT (PAD FOOTING)
SITE REPORT (PAD FOOTING)SITE REPORT (PAD FOOTING)
SITE REPORT (PAD FOOTING)
I'mMiss Lily
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculation
ZIyeeTan
 
Building Construction Report
Building Construction ReportBuilding Construction Report
Building Construction Report
Sheau Hui Tan
 
Civil enginerring internship report
Civil enginerring internship reportCivil enginerring internship report
Civil enginerring internship report
Zahid Khan
 
Internship Report Construction Site and Office Work
Internship Report Construction Site and Office WorkInternship Report Construction Site and Office Work
Internship Report Construction Site and Office Work
AkshathaBhandary
 
Site visit report qs semester 1
Site visit report   qs semester 1Site visit report   qs semester 1
Site visit report qs semester 1
KhangWei Chin
 
Building construction 1 group report
Building construction 1 group reportBuilding construction 1 group report
Building construction 1 group report
XingYue0907
 
Site Visit Report
Site Visit ReportSite Visit Report
Site Visit ReportZIyeeTan
 
REPORTS ON BUILDING CONSTRUCTION
REPORTS ON BUILDING CONSTRUCTIONREPORTS ON BUILDING CONSTRUCTION
REPORTS ON BUILDING CONSTRUCTION
Rising Sher
 
Building construction-report (1)
Building construction-report (1)Building construction-report (1)
Building construction-report (1)Soh Shing
 
Construction Site Report
Construction Site ReportConstruction Site Report
Construction Site Report
Shao Xun Sean Thun
 
Industrial case study report (Final)
Industrial case study report (Final)Industrial case study report (Final)
Industrial case study report (Final)pranay kumar
 
Project Management Individual Assignment
Project Management Individual AssignmentProject Management Individual Assignment
Project Management Individual Assignment
Arissa Loh
 
Presentation IBS.pptx
Presentation IBS.pptxPresentation IBS.pptx
Presentation IBS.pptx
TravorRundie
 
Assignment - Preliminary Cost Appraisal
Assignment - Preliminary Cost AppraisalAssignment - Preliminary Cost Appraisal
Assignment - Preliminary Cost Appraisal
Kai Yun Pang
 

What's hot (20)

Construction Project Management ppt
Construction Project Management pptConstruction Project Management ppt
Construction Project Management ppt
 
training report on commercial building
training report on commercial buildingtraining report on commercial building
training report on commercial building
 
Project management report project 1
Project management report project 1Project management report project 1
Project management report project 1
 
Final Bills of Quantity
Final Bills of QuantityFinal Bills of Quantity
Final Bills of Quantity
 
Construction work of a multi storied residential building
Construction work of a multi storied residential buildingConstruction work of a multi storied residential building
Construction work of a multi storied residential building
 
SITE REPORT (PAD FOOTING)
SITE REPORT (PAD FOOTING)SITE REPORT (PAD FOOTING)
SITE REPORT (PAD FOOTING)
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculation
 
Building Construction Report
Building Construction ReportBuilding Construction Report
Building Construction Report
 
Civil enginerring internship report
Civil enginerring internship reportCivil enginerring internship report
Civil enginerring internship report
 
Internship Report Construction Site and Office Work
Internship Report Construction Site and Office WorkInternship Report Construction Site and Office Work
Internship Report Construction Site and Office Work
 
Site visit report qs semester 1
Site visit report   qs semester 1Site visit report   qs semester 1
Site visit report qs semester 1
 
Building construction 1 group report
Building construction 1 group reportBuilding construction 1 group report
Building construction 1 group report
 
Site Visit Report
Site Visit ReportSite Visit Report
Site Visit Report
 
REPORTS ON BUILDING CONSTRUCTION
REPORTS ON BUILDING CONSTRUCTIONREPORTS ON BUILDING CONSTRUCTION
REPORTS ON BUILDING CONSTRUCTION
 
Building construction-report (1)
Building construction-report (1)Building construction-report (1)
Building construction-report (1)
 
Construction Site Report
Construction Site ReportConstruction Site Report
Construction Site Report
 
Industrial case study report (Final)
Industrial case study report (Final)Industrial case study report (Final)
Industrial case study report (Final)
 
Project Management Individual Assignment
Project Management Individual AssignmentProject Management Individual Assignment
Project Management Individual Assignment
 
Presentation IBS.pptx
Presentation IBS.pptxPresentation IBS.pptx
Presentation IBS.pptx
 
Assignment - Preliminary Cost Appraisal
Assignment - Preliminary Cost AppraisalAssignment - Preliminary Cost Appraisal
Assignment - Preliminary Cost Appraisal
 

Viewers also liked

Travelers job postings
Travelers job postingsTravelers job postings
Travelers job postings
TAMU SVA
 
Planeacion operativa diopositivas
Planeacion operativa diopositivasPlaneacion operativa diopositivas
Planeacion operativa diopositivas
luis garzon
 
Internship Report
Internship ReportInternship Report
Internship Report
Siew John Loong
 
Manufactura mapa mental
Manufactura mapa mentalManufactura mapa mental
Manufactura mapa mental
maria bracho
 
Festival de citas ppt maría agüero
Festival de citas ppt maría agüeroFestival de citas ppt maría agüero
Festival de citas ppt maría agüero
maria aguero
 
3 Panunumpa ng Pilipinas
3 Panunumpa ng Pilipinas3 Panunumpa ng Pilipinas
3 Panunumpa ng Pilipinas
Richard Maboloc
 
Sintesis
Sintesis Sintesis
Sintesis
eli Rdz
 
RELEVANCE - Mueble multiusos
RELEVANCE - Mueble multiusos RELEVANCE - Mueble multiusos
RELEVANCE - Mueble multiusos
Laura Isern
 
Sedgwick e0498336-d0105-sp7-module 01-30537a-checkpoint a
Sedgwick e0498336-d0105-sp7-module 01-30537a-checkpoint aSedgwick e0498336-d0105-sp7-module 01-30537a-checkpoint a
Sedgwick e0498336-d0105-sp7-module 01-30537a-checkpoint a
Colleen Sedgwick
 
аллея славы жетписова а.у.
аллея славы жетписова а.у.аллея славы жетписова а.у.
аллея славы жетписова а.у.
oquzaman
 
Arc2625 report file ngejiachen0317738
Arc2625 report file ngejiachen0317738Arc2625 report file ngejiachen0317738
Arc2625 report file ngejiachen0317738
Nge Chen
 
Internship Report
Internship ReportInternship Report
Internship Report
leejanicee
 
Internship Report
Internship ReportInternship Report
Internship Report
Buddhima Wijeweera
 
Architecture Internship Report by Lim Joe Onn
Architecture Internship Report by Lim Joe OnnArchitecture Internship Report by Lim Joe Onn
Architecture Internship Report by Lim Joe Onn
Joe Onn Lim
 
Hydraulicmotorpump.com | hagglunds motors
Hydraulicmotorpump.com | hagglunds motorsHydraulicmotorpump.com | hagglunds motors
Hydraulicmotorpump.com | hagglunds motors
hagglundsmotors
 
Top 10 bugs in C++ open source projects, checked in 2016
Top 10 bugs in C++ open source projects, checked in 2016Top 10 bugs in C++ open source projects, checked in 2016
Top 10 bugs in C++ open source projects, checked in 2016
PVS-Studio
 

Viewers also liked (16)

Travelers job postings
Travelers job postingsTravelers job postings
Travelers job postings
 
Planeacion operativa diopositivas
Planeacion operativa diopositivasPlaneacion operativa diopositivas
Planeacion operativa diopositivas
 
Internship Report
Internship ReportInternship Report
Internship Report
 
Manufactura mapa mental
Manufactura mapa mentalManufactura mapa mental
Manufactura mapa mental
 
Festival de citas ppt maría agüero
Festival de citas ppt maría agüeroFestival de citas ppt maría agüero
Festival de citas ppt maría agüero
 
3 Panunumpa ng Pilipinas
3 Panunumpa ng Pilipinas3 Panunumpa ng Pilipinas
3 Panunumpa ng Pilipinas
 
Sintesis
Sintesis Sintesis
Sintesis
 
RELEVANCE - Mueble multiusos
RELEVANCE - Mueble multiusos RELEVANCE - Mueble multiusos
RELEVANCE - Mueble multiusos
 
Sedgwick e0498336-d0105-sp7-module 01-30537a-checkpoint a
Sedgwick e0498336-d0105-sp7-module 01-30537a-checkpoint aSedgwick e0498336-d0105-sp7-module 01-30537a-checkpoint a
Sedgwick e0498336-d0105-sp7-module 01-30537a-checkpoint a
 
аллея славы жетписова а.у.
аллея славы жетписова а.у.аллея славы жетписова а.у.
аллея славы жетписова а.у.
 
Arc2625 report file ngejiachen0317738
Arc2625 report file ngejiachen0317738Arc2625 report file ngejiachen0317738
Arc2625 report file ngejiachen0317738
 
Internship Report
Internship ReportInternship Report
Internship Report
 
Internship Report
Internship ReportInternship Report
Internship Report
 
Architecture Internship Report by Lim Joe Onn
Architecture Internship Report by Lim Joe OnnArchitecture Internship Report by Lim Joe Onn
Architecture Internship Report by Lim Joe Onn
 
Hydraulicmotorpump.com | hagglunds motors
Hydraulicmotorpump.com | hagglunds motorsHydraulicmotorpump.com | hagglunds motors
Hydraulicmotorpump.com | hagglunds motors
 
Top 10 bugs in C++ open source projects, checked in 2016
Top 10 bugs in C++ open source projects, checked in 2016Top 10 bugs in C++ open source projects, checked in 2016
Top 10 bugs in C++ open source projects, checked in 2016
 

Similar to Internship Report ARC 2615 -GOH YEN NEE 0315551

Internship report
Internship reportInternship report
Internship report
ChengWei Chia
 
Internship report
Internship reportInternship report
Internship report
Kelvin Fong
 
BSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT
BSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT BSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT
BSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT
jolynnTJL
 
Internship Report - IMAGES REDACTED
Internship Report - IMAGES REDACTEDInternship Report - IMAGES REDACTED
Internship Report - IMAGES REDACTED
Amos Tan
 
Intern report
Intern reportIntern report
Intern report
hongbinng
 
Internship report
Internship reportInternship report
Internship report
Alfred Tan
 
Internship Training and Report
Internship Training and ReportInternship Training and Report
Internship Training and Report
Joyce Wee
 
Internship report
Internship reportInternship report
Internship report
cocongkening
 
Arc2625 report file teo chenyi0320618
Arc2625 report file teo chenyi0320618Arc2625 report file teo chenyi0320618
Arc2625 report file teo chenyi0320618
Chenyi Teo
 
Internship Report
Internship ReportInternship Report
Internship Report
dtan97
 
Arc2615 report file khorhaoxiang0318065
Arc2615 report file khorhaoxiang0318065Arc2615 report file khorhaoxiang0318065
Arc2615 report file khorhaoxiang0318065
Khor Hao Xiang
 
Internship Report
Internship ReportInternship Report
Internship Report
KohSungJie
 
Stakeholder’s Involvement in Construction Industry
Stakeholder’s Involvement in Construction IndustryStakeholder’s Involvement in Construction Industry
Stakeholder’s Involvement in Construction Industry
Akshika Mahanama
 
Internship Training Report
Internship Training ReportInternship Training Report
Internship Training Report
jiahui331
 
Application of-value-engineering-in-residential-building-ijertv9 is050725
Application of-value-engineering-in-residential-building-ijertv9 is050725Application of-value-engineering-in-residential-building-ijertv9 is050725
Application of-value-engineering-in-residential-building-ijertv9 is050725
Minn Lwin
 
ARC 3612 PROJECT MANAGEMENT- PROJECT 1- DEFINING AND DOCUMENTING A RESIDENTIA...
ARC 3612 PROJECT MANAGEMENT- PROJECT 1- DEFINING AND DOCUMENTING A RESIDENTIA...ARC 3612 PROJECT MANAGEMENT- PROJECT 1- DEFINING AND DOCUMENTING A RESIDENTIA...
ARC 3612 PROJECT MANAGEMENT- PROJECT 1- DEFINING AND DOCUMENTING A RESIDENTIA...
Angeline KH
 
Arc2622 report file chok jiajun0323117
Arc2622 report file chok jiajun0323117Arc2622 report file chok jiajun0323117
Arc2622 report file chok jiajun0323117
Jia Jun Chok
 
internship ppt.pptx
internship ppt.pptxinternship ppt.pptx
internship ppt.pptx
AdityaSapkale1
 
Internship Report File
Internship Report File   Internship Report File
Internship Report File
Tay Jit Ying
 
Arc2625 reportfile lynettelaw0317761
Arc2625 reportfile lynettelaw0317761Arc2625 reportfile lynettelaw0317761
Arc2625 reportfile lynettelaw0317761
Lynette Law
 

Similar to Internship Report ARC 2615 -GOH YEN NEE 0315551 (20)

Internship report
Internship reportInternship report
Internship report
 
Internship report
Internship reportInternship report
Internship report
 
BSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT
BSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT BSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT
BSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT
 
Internship Report - IMAGES REDACTED
Internship Report - IMAGES REDACTEDInternship Report - IMAGES REDACTED
Internship Report - IMAGES REDACTED
 
Intern report
Intern reportIntern report
Intern report
 
Internship report
Internship reportInternship report
Internship report
 
Internship Training and Report
Internship Training and ReportInternship Training and Report
Internship Training and Report
 
Internship report
Internship reportInternship report
Internship report
 
Arc2625 report file teo chenyi0320618
Arc2625 report file teo chenyi0320618Arc2625 report file teo chenyi0320618
Arc2625 report file teo chenyi0320618
 
Internship Report
Internship ReportInternship Report
Internship Report
 
Arc2615 report file khorhaoxiang0318065
Arc2615 report file khorhaoxiang0318065Arc2615 report file khorhaoxiang0318065
Arc2615 report file khorhaoxiang0318065
 
Internship Report
Internship ReportInternship Report
Internship Report
 
Stakeholder’s Involvement in Construction Industry
Stakeholder’s Involvement in Construction IndustryStakeholder’s Involvement in Construction Industry
Stakeholder’s Involvement in Construction Industry
 
Internship Training Report
Internship Training ReportInternship Training Report
Internship Training Report
 
Application of-value-engineering-in-residential-building-ijertv9 is050725
Application of-value-engineering-in-residential-building-ijertv9 is050725Application of-value-engineering-in-residential-building-ijertv9 is050725
Application of-value-engineering-in-residential-building-ijertv9 is050725
 
ARC 3612 PROJECT MANAGEMENT- PROJECT 1- DEFINING AND DOCUMENTING A RESIDENTIA...
ARC 3612 PROJECT MANAGEMENT- PROJECT 1- DEFINING AND DOCUMENTING A RESIDENTIA...ARC 3612 PROJECT MANAGEMENT- PROJECT 1- DEFINING AND DOCUMENTING A RESIDENTIA...
ARC 3612 PROJECT MANAGEMENT- PROJECT 1- DEFINING AND DOCUMENTING A RESIDENTIA...
 
Arc2622 report file chok jiajun0323117
Arc2622 report file chok jiajun0323117Arc2622 report file chok jiajun0323117
Arc2622 report file chok jiajun0323117
 
internship ppt.pptx
internship ppt.pptxinternship ppt.pptx
internship ppt.pptx
 
Internship Report File
Internship Report File   Internship Report File
Internship Report File
 
Arc2625 reportfile lynettelaw0317761
Arc2625 reportfile lynettelaw0317761Arc2625 reportfile lynettelaw0317761
Arc2625 reportfile lynettelaw0317761
 

More from Crysmond Goh

PROJECT MANAGEMENT PROJECT 2
PROJECT MANAGEMENT PROJECT 2PROJECT MANAGEMENT PROJECT 2
PROJECT MANAGEMENT PROJECT 2
Crysmond Goh
 
PROJECT MANAGEMENT PROJECT 1-A PLACE FOR ALL
PROJECT MANAGEMENT PROJECT 1-A PLACE FOR ALLPROJECT MANAGEMENT PROJECT 1-A PLACE FOR ALL
PROJECT MANAGEMENT PROJECT 1-A PLACE FOR ALL
Crysmond Goh
 
Project 2 Construction Solutions GYN
Project 2 Construction Solutions GYNProject 2 Construction Solutions GYN
Project 2 Construction Solutions GYN
Crysmond Goh
 
Food & Culture Project 3 Magazine Style
Food & Culture Project 3 Magazine Style Food & Culture Project 3 Magazine Style
Food & Culture Project 3 Magazine Style
Crysmond Goh
 
Research report Food & Culture GYN
Research report Food & Culture GYNResearch report Food & Culture GYN
Research report Food & Culture GYN
Crysmond Goh
 
Comparative Analysis Essay -GYN
Comparative Analysis Essay -GYNComparative Analysis Essay -GYN
Comparative Analysis Essay -GYN
Crysmond Goh
 
Synopsis 3 the eye of the skin -GYN
Synopsis 3 the eye of the skin -GYNSynopsis 3 the eye of the skin -GYN
Synopsis 3 the eye of the skin -GYN
Crysmond Goh
 
Synopsis 2 Architecture Where Desire Can Live -GYN
Synopsis 2 Architecture Where Desire Can Live -GYNSynopsis 2 Architecture Where Desire Can Live -GYN
Synopsis 2 Architecture Where Desire Can Live -GYN
Crysmond Goh
 
Sipnosis 1 In the Cause of Architecture- GYN
Sipnosis 1 In the Cause of Architecture- GYNSipnosis 1 In the Cause of Architecture- GYN
Sipnosis 1 In the Cause of Architecture- GYN
Crysmond Goh
 
Report Bscience 2 Evaluation Performance Lighting & Acoustics
Report Bscience 2 Evaluation Performance Lighting & AcousticsReport Bscience 2 Evaluation Performance Lighting & Acoustics
Report Bscience 2 Evaluation Performance Lighting & Acoustics
Crysmond Goh
 
Final report project 2 GYN integration
Final report project 2 GYN integrationFinal report project 2 GYN integration
Final report project 2 GYN integration
Crysmond Goh
 
ESSAY CULTURE & HISTORY II
ESSAY CULTURE & HISTORY IIESSAY CULTURE & HISTORY II
ESSAY CULTURE & HISTORY IICrysmond Goh
 
MPU REPORT HUBUNGAN ETNIK (MELANAU)
MPU REPORT HUBUNGAN ETNIK (MELANAU)MPU REPORT HUBUNGAN ETNIK (MELANAU)
MPU REPORT HUBUNGAN ETNIK (MELANAU)Crysmond Goh
 
Esd complete essay
Esd complete essayEsd complete essay
Esd complete essayCrysmond Goh
 
PROJECT 1 (BUILDING CONSTRUCTION 1)
PROJECT 1 (BUILDING CONSTRUCTION 1)PROJECT 1 (BUILDING CONSTRUCTION 1)
PROJECT 1 (BUILDING CONSTRUCTION 1)Crysmond Goh
 
Report final assognment
Report final assognmentReport final assognment
Report final assognmentCrysmond Goh
 
Report of the last samurai
Report of the last samuraiReport of the last samurai
Report of the last samuraiCrysmond Goh
 
English essay superhero
English essay superheroEnglish essay superhero
English essay superheroCrysmond Goh
 
Maths assignment area and volume calculation
Maths assignment area and volume calculationMaths assignment area and volume calculation
Maths assignment area and volume calculationCrysmond Goh
 

More from Crysmond Goh (20)

PROJECT MANAGEMENT PROJECT 2
PROJECT MANAGEMENT PROJECT 2PROJECT MANAGEMENT PROJECT 2
PROJECT MANAGEMENT PROJECT 2
 
PROJECT MANAGEMENT PROJECT 1-A PLACE FOR ALL
PROJECT MANAGEMENT PROJECT 1-A PLACE FOR ALLPROJECT MANAGEMENT PROJECT 1-A PLACE FOR ALL
PROJECT MANAGEMENT PROJECT 1-A PLACE FOR ALL
 
Project 2 Construction Solutions GYN
Project 2 Construction Solutions GYNProject 2 Construction Solutions GYN
Project 2 Construction Solutions GYN
 
Food & Culture Project 3 Magazine Style
Food & Culture Project 3 Magazine Style Food & Culture Project 3 Magazine Style
Food & Culture Project 3 Magazine Style
 
Research report Food & Culture GYN
Research report Food & Culture GYNResearch report Food & Culture GYN
Research report Food & Culture GYN
 
Comparative Analysis Essay -GYN
Comparative Analysis Essay -GYNComparative Analysis Essay -GYN
Comparative Analysis Essay -GYN
 
Synopsis 3 the eye of the skin -GYN
Synopsis 3 the eye of the skin -GYNSynopsis 3 the eye of the skin -GYN
Synopsis 3 the eye of the skin -GYN
 
Synopsis 2 Architecture Where Desire Can Live -GYN
Synopsis 2 Architecture Where Desire Can Live -GYNSynopsis 2 Architecture Where Desire Can Live -GYN
Synopsis 2 Architecture Where Desire Can Live -GYN
 
Sipnosis 1 In the Cause of Architecture- GYN
Sipnosis 1 In the Cause of Architecture- GYNSipnosis 1 In the Cause of Architecture- GYN
Sipnosis 1 In the Cause of Architecture- GYN
 
Report Bscience 2 Evaluation Performance Lighting & Acoustics
Report Bscience 2 Evaluation Performance Lighting & AcousticsReport Bscience 2 Evaluation Performance Lighting & Acoustics
Report Bscience 2 Evaluation Performance Lighting & Acoustics
 
Final report project 2 GYN integration
Final report project 2 GYN integrationFinal report project 2 GYN integration
Final report project 2 GYN integration
 
ESSAY CULTURE & HISTORY II
ESSAY CULTURE & HISTORY IIESSAY CULTURE & HISTORY II
ESSAY CULTURE & HISTORY II
 
MPU REPORT HUBUNGAN ETNIK (MELANAU)
MPU REPORT HUBUNGAN ETNIK (MELANAU)MPU REPORT HUBUNGAN ETNIK (MELANAU)
MPU REPORT HUBUNGAN ETNIK (MELANAU)
 
Esd complete essay
Esd complete essayEsd complete essay
Esd complete essay
 
PROJECT 1 (BUILDING CONSTRUCTION 1)
PROJECT 1 (BUILDING CONSTRUCTION 1)PROJECT 1 (BUILDING CONSTRUCTION 1)
PROJECT 1 (BUILDING CONSTRUCTION 1)
 
Report final assognment
Report final assognmentReport final assognment
Report final assognment
 
Report of the last samurai
Report of the last samuraiReport of the last samurai
Report of the last samurai
 
English essay superhero
English essay superheroEnglish essay superhero
English essay superhero
 
Maths assignment area and volume calculation
Maths assignment area and volume calculationMaths assignment area and volume calculation
Maths assignment area and volume calculation
 
Report survey
Report surveyReport survey
Report survey
 

Recently uploaded

Criminal IP - Threat Hunting Webinar.pdf
Criminal IP - Threat Hunting Webinar.pdfCriminal IP - Threat Hunting Webinar.pdf
Criminal IP - Threat Hunting Webinar.pdf
Criminal IP
 
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单
ewymefz
 
一比一原版(CBU毕业证)卡普顿大学毕业证如何办理
一比一原版(CBU毕业证)卡普顿大学毕业证如何办理一比一原版(CBU毕业证)卡普顿大学毕业证如何办理
一比一原版(CBU毕业证)卡普顿大学毕业证如何办理
ahzuo
 
Empowering Data Analytics Ecosystem.pptx
Empowering Data Analytics Ecosystem.pptxEmpowering Data Analytics Ecosystem.pptx
Empowering Data Analytics Ecosystem.pptx
benishzehra469
 
一比一原版(UPenn毕业证)宾夕法尼亚大学毕业证成绩单
一比一原版(UPenn毕业证)宾夕法尼亚大学毕业证成绩单一比一原版(UPenn毕业证)宾夕法尼亚大学毕业证成绩单
一比一原版(UPenn毕业证)宾夕法尼亚大学毕业证成绩单
ewymefz
 
一比一原版(RUG毕业证)格罗宁根大学毕业证成绩单
一比一原版(RUG毕业证)格罗宁根大学毕业证成绩单一比一原版(RUG毕业证)格罗宁根大学毕业证成绩单
一比一原版(RUG毕业证)格罗宁根大学毕业证成绩单
vcaxypu
 
做(mqu毕业证书)麦考瑞大学毕业证硕士文凭证书学费发票原版一模一样
做(mqu毕业证书)麦考瑞大学毕业证硕士文凭证书学费发票原版一模一样做(mqu毕业证书)麦考瑞大学毕业证硕士文凭证书学费发票原版一模一样
做(mqu毕业证书)麦考瑞大学毕业证硕士文凭证书学费发票原版一模一样
axoqas
 
Ch03-Managing the Object-Oriented Information Systems Project a.pdf
Ch03-Managing the Object-Oriented Information Systems Project a.pdfCh03-Managing the Object-Oriented Information Systems Project a.pdf
Ch03-Managing the Object-Oriented Information Systems Project a.pdf
haila53
 
Best best suvichar in gujarati english meaning of this sentence as Silk road ...
Best best suvichar in gujarati english meaning of this sentence as Silk road ...Best best suvichar in gujarati english meaning of this sentence as Silk road ...
Best best suvichar in gujarati english meaning of this sentence as Silk road ...
AbhimanyuSinha9
 
Levelwise PageRank with Loop-Based Dead End Handling Strategy : SHORT REPORT ...
Levelwise PageRank with Loop-Based Dead End Handling Strategy : SHORT REPORT ...Levelwise PageRank with Loop-Based Dead End Handling Strategy : SHORT REPORT ...
Levelwise PageRank with Loop-Based Dead End Handling Strategy : SHORT REPORT ...
Subhajit Sahu
 
一比一原版(UIUC毕业证)伊利诺伊大学|厄巴纳-香槟分校毕业证如何办理
一比一原版(UIUC毕业证)伊利诺伊大学|厄巴纳-香槟分校毕业证如何办理一比一原版(UIUC毕业证)伊利诺伊大学|厄巴纳-香槟分校毕业证如何办理
一比一原版(UIUC毕业证)伊利诺伊大学|厄巴纳-香槟分校毕业证如何办理
ahzuo
 
一比一原版(BU毕业证)波士顿大学毕业证成绩单
一比一原版(BU毕业证)波士顿大学毕业证成绩单一比一原版(BU毕业证)波士顿大学毕业证成绩单
一比一原版(BU毕业证)波士顿大学毕业证成绩单
ewymefz
 
一比一原版(UofM毕业证)明尼苏达大学毕业证成绩单
一比一原版(UofM毕业证)明尼苏达大学毕业证成绩单一比一原版(UofM毕业证)明尼苏达大学毕业证成绩单
一比一原版(UofM毕业证)明尼苏达大学毕业证成绩单
ewymefz
 
Chatty Kathy - UNC Bootcamp Final Project Presentation - Final Version - 5.23...
Chatty Kathy - UNC Bootcamp Final Project Presentation - Final Version - 5.23...Chatty Kathy - UNC Bootcamp Final Project Presentation - Final Version - 5.23...
Chatty Kathy - UNC Bootcamp Final Project Presentation - Final Version - 5.23...
John Andrews
 
一比一原版(Adelaide毕业证书)阿德莱德大学毕业证如何办理
一比一原版(Adelaide毕业证书)阿德莱德大学毕业证如何办理一比一原版(Adelaide毕业证书)阿德莱德大学毕业证如何办理
一比一原版(Adelaide毕业证书)阿德莱德大学毕业证如何办理
slg6lamcq
 
一比一原版(UVic毕业证)维多利亚大学毕业证成绩单
一比一原版(UVic毕业证)维多利亚大学毕业证成绩单一比一原版(UVic毕业证)维多利亚大学毕业证成绩单
一比一原版(UVic毕业证)维多利亚大学毕业证成绩单
ukgaet
 
哪里卖(usq毕业证书)南昆士兰大学毕业证研究生文凭证书托福证书原版一模一样
哪里卖(usq毕业证书)南昆士兰大学毕业证研究生文凭证书托福证书原版一模一样哪里卖(usq毕业证书)南昆士兰大学毕业证研究生文凭证书托福证书原版一模一样
哪里卖(usq毕业证书)南昆士兰大学毕业证研究生文凭证书托福证书原版一模一样
axoqas
 
一比一原版(TWU毕业证)西三一大学毕业证成绩单
一比一原版(TWU毕业证)西三一大学毕业证成绩单一比一原版(TWU毕业证)西三一大学毕业证成绩单
一比一原版(TWU毕业证)西三一大学毕业证成绩单
ocavb
 
FP Growth Algorithm and its Applications
FP Growth Algorithm and its ApplicationsFP Growth Algorithm and its Applications
FP Growth Algorithm and its Applications
MaleehaSheikh2
 
【社内勉強会資料_Octo: An Open-Source Generalist Robot Policy】
【社内勉強会資料_Octo: An Open-Source Generalist Robot Policy】【社内勉強会資料_Octo: An Open-Source Generalist Robot Policy】
【社内勉強会資料_Octo: An Open-Source Generalist Robot Policy】
NABLAS株式会社
 

Recently uploaded (20)

Criminal IP - Threat Hunting Webinar.pdf
Criminal IP - Threat Hunting Webinar.pdfCriminal IP - Threat Hunting Webinar.pdf
Criminal IP - Threat Hunting Webinar.pdf
 
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单
 
一比一原版(CBU毕业证)卡普顿大学毕业证如何办理
一比一原版(CBU毕业证)卡普顿大学毕业证如何办理一比一原版(CBU毕业证)卡普顿大学毕业证如何办理
一比一原版(CBU毕业证)卡普顿大学毕业证如何办理
 
Empowering Data Analytics Ecosystem.pptx
Empowering Data Analytics Ecosystem.pptxEmpowering Data Analytics Ecosystem.pptx
Empowering Data Analytics Ecosystem.pptx
 
一比一原版(UPenn毕业证)宾夕法尼亚大学毕业证成绩单
一比一原版(UPenn毕业证)宾夕法尼亚大学毕业证成绩单一比一原版(UPenn毕业证)宾夕法尼亚大学毕业证成绩单
一比一原版(UPenn毕业证)宾夕法尼亚大学毕业证成绩单
 
一比一原版(RUG毕业证)格罗宁根大学毕业证成绩单
一比一原版(RUG毕业证)格罗宁根大学毕业证成绩单一比一原版(RUG毕业证)格罗宁根大学毕业证成绩单
一比一原版(RUG毕业证)格罗宁根大学毕业证成绩单
 
做(mqu毕业证书)麦考瑞大学毕业证硕士文凭证书学费发票原版一模一样
做(mqu毕业证书)麦考瑞大学毕业证硕士文凭证书学费发票原版一模一样做(mqu毕业证书)麦考瑞大学毕业证硕士文凭证书学费发票原版一模一样
做(mqu毕业证书)麦考瑞大学毕业证硕士文凭证书学费发票原版一模一样
 
Ch03-Managing the Object-Oriented Information Systems Project a.pdf
Ch03-Managing the Object-Oriented Information Systems Project a.pdfCh03-Managing the Object-Oriented Information Systems Project a.pdf
Ch03-Managing the Object-Oriented Information Systems Project a.pdf
 
Best best suvichar in gujarati english meaning of this sentence as Silk road ...
Best best suvichar in gujarati english meaning of this sentence as Silk road ...Best best suvichar in gujarati english meaning of this sentence as Silk road ...
Best best suvichar in gujarati english meaning of this sentence as Silk road ...
 
Levelwise PageRank with Loop-Based Dead End Handling Strategy : SHORT REPORT ...
Levelwise PageRank with Loop-Based Dead End Handling Strategy : SHORT REPORT ...Levelwise PageRank with Loop-Based Dead End Handling Strategy : SHORT REPORT ...
Levelwise PageRank with Loop-Based Dead End Handling Strategy : SHORT REPORT ...
 
一比一原版(UIUC毕业证)伊利诺伊大学|厄巴纳-香槟分校毕业证如何办理
一比一原版(UIUC毕业证)伊利诺伊大学|厄巴纳-香槟分校毕业证如何办理一比一原版(UIUC毕业证)伊利诺伊大学|厄巴纳-香槟分校毕业证如何办理
一比一原版(UIUC毕业证)伊利诺伊大学|厄巴纳-香槟分校毕业证如何办理
 
一比一原版(BU毕业证)波士顿大学毕业证成绩单
一比一原版(BU毕业证)波士顿大学毕业证成绩单一比一原版(BU毕业证)波士顿大学毕业证成绩单
一比一原版(BU毕业证)波士顿大学毕业证成绩单
 
一比一原版(UofM毕业证)明尼苏达大学毕业证成绩单
一比一原版(UofM毕业证)明尼苏达大学毕业证成绩单一比一原版(UofM毕业证)明尼苏达大学毕业证成绩单
一比一原版(UofM毕业证)明尼苏达大学毕业证成绩单
 
Chatty Kathy - UNC Bootcamp Final Project Presentation - Final Version - 5.23...
Chatty Kathy - UNC Bootcamp Final Project Presentation - Final Version - 5.23...Chatty Kathy - UNC Bootcamp Final Project Presentation - Final Version - 5.23...
Chatty Kathy - UNC Bootcamp Final Project Presentation - Final Version - 5.23...
 
一比一原版(Adelaide毕业证书)阿德莱德大学毕业证如何办理
一比一原版(Adelaide毕业证书)阿德莱德大学毕业证如何办理一比一原版(Adelaide毕业证书)阿德莱德大学毕业证如何办理
一比一原版(Adelaide毕业证书)阿德莱德大学毕业证如何办理
 
一比一原版(UVic毕业证)维多利亚大学毕业证成绩单
一比一原版(UVic毕业证)维多利亚大学毕业证成绩单一比一原版(UVic毕业证)维多利亚大学毕业证成绩单
一比一原版(UVic毕业证)维多利亚大学毕业证成绩单
 
哪里卖(usq毕业证书)南昆士兰大学毕业证研究生文凭证书托福证书原版一模一样
哪里卖(usq毕业证书)南昆士兰大学毕业证研究生文凭证书托福证书原版一模一样哪里卖(usq毕业证书)南昆士兰大学毕业证研究生文凭证书托福证书原版一模一样
哪里卖(usq毕业证书)南昆士兰大学毕业证研究生文凭证书托福证书原版一模一样
 
一比一原版(TWU毕业证)西三一大学毕业证成绩单
一比一原版(TWU毕业证)西三一大学毕业证成绩单一比一原版(TWU毕业证)西三一大学毕业证成绩单
一比一原版(TWU毕业证)西三一大学毕业证成绩单
 
FP Growth Algorithm and its Applications
FP Growth Algorithm and its ApplicationsFP Growth Algorithm and its Applications
FP Growth Algorithm and its Applications
 
【社内勉強会資料_Octo: An Open-Source Generalist Robot Policy】
【社内勉強会資料_Octo: An Open-Source Generalist Robot Policy】【社内勉強会資料_Octo: An Open-Source Generalist Robot Policy】
【社内勉強会資料_Octo: An Open-Source Generalist Robot Policy】
 

Internship Report ARC 2615 -GOH YEN NEE 0315551

  • 1. SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN BACHELOR OR SCIENCE (HONS) IN ARCHITECTURE INTERNSHIP TRAINING AND REPORT (ARC 2615) 3RD JAN-10TH MAC 2017 STUDENT NAME: GOH YEN NEE STUDENT ID: 0315551 LECTURER: AR.SATEERAH HASSAN INTERNSHIP COMPANY: AKITEK AKIPRIMA
  • 2. TABLE OF CONTENT 1.0 INTRODUCTION- EMPLOYER INFORMATION 2.0 INTERNSHIP TASK INVOLVEMENT 2.1PROJECT 1 2.2PROJECT 2 2.3PROJECT 3 2.4PROJECT 4 2.5MINOR TASK INVOLVEMENT 3.0 WEEKLY LOG SHEETS 4.0 CONCLUSIONS
  • 3. INTRODUCTION Through this short semester program, I have applied my internship in one of the architecture firm in SS15, Subang Jaya which is Akitek Akiprima. I have chosen this firm due to its high experience in architecture region which it established in 1980. This company have few branches which are from Penang, Vietnam and Subang Jaya. The architects here are majority have higher experience in the region especially Ar. Ray Cheah, the founder of the Akitek Akiprima coming with Ar.Cheah Kah Lip from Subang Branch and Ar. Kathy from Penang branch. I will be learning the working system of the firm under the supervisor which is Mr. Azmi, the Head of Technical Department. 10 weeks of internship will be started in this firm which made me excited and happy to get new experience EMPLOYER INFORMATION COMPANY NAME: Akitek Akiprima YEAR OF ENTABLISMENT: 1980 OUR PHILOSOPHY: Inherent in all operations is the philosophy of building from within. Just as a building without a strong structure tends to ruin, we believe in first building our company structure, then we can begin serving our clients. Weekly team meetings to discuss on-going projects, and person senior supervision on-site to ensure building and material quality are common occurrences in this company. COMPANY ADDRESS: E-01-4, Subang Square Business Park (East Wing), Jalan SS15/4G, 47500 Subang Jaya, Selangor Darul Ehsan, Malaysia. COMPANY WEBSITE: www.akiprima.com.my COMPANY EMAIL ADDRESS: akiprima-kl@akiworld.com CONTACT LINE: +60-3-5633 5877
  • 4.
  • 5. INTERNSHIP TASK INVOLVEMENT 2.1PROJECT 1 2.2PROJECT 2 2.3PROJECT 3 2.4PROJECT 4 2.5MINOR TASK INVOLVEMENT
  • 6. 2.1 PROJECT 1 PROJECT NAME PROPOSED CONDOMINIUM (DVQ) LOCATION MUKIM BENTONG, PAHANG WEEK WEEK 1 In the beginning of the internships, I have get involved in the task of hatching the drawings that need to be submitted to the authority for the second times. That’s the first time I read an official drawings for the authority which made me to be fresh in the company. The project is a service condominium that located in the Bentong, Pahang where there is a lot of facilities including shopping mall at the bottom and it took around few years to develop from a schematic drawing to a construction stage. I had hatched the circulation plan, elevations and section drawings according to the materials of the building to allow the authority understand on the materials that going to be used during further construction. In this company, there is a system of using the standard format and layer colours for every drawing so every staff would not be messed up with each other works. I have been briefed on the procedure of the working system during the first day of the internship from my supervisor. Each of the project is named as a shortcut code so it could easier to search in the system based on the alphabets. I have taught by staff about the software used which known as Cadian but it is quite similar with AutoCad software actually. From the colouring, we also need to put the legends and specification of materials before submission to authority. My supervisor also taught me about some technical knowledge based on the drawings such as the thickness of concrete for different purpose of levels in the condominium and others. Through the first week of internship, it made me understand the differences between the experiences during studying and working period. Working in a company would be more systematic on the guideline on each stage to complete a building and it would gained more technical-based knowledge which could help me in further study especially during assignment time.
  • 7. APPENDIX Picture of hatching left evelation of this project with complete specfications, gridline, dimensions and coloured materials. Picture of hatching right evelation according to the material layers
  • 8. Picture of sectional drawing to observe the facility of swimming pool include the service apartment. Picture of floor plans drawing for references during the hatching of elevation and section for discover the specified materials.
  • 9. Picture of specific layers that need to follow during the coloring for the drawings submission Completed right elevation drawing with format table for authorities subsmission
  • 10. Completed left elevation drawing with format table for submission Section B-B drawing for authorities submission
  • 11. 2.2 PROJECT 2 PROJECT NAME PROPOSED MIXED DEVELOPMENT ,MESAHILL (DRH) LOCATION NILAI WEEK WEEK 2-8 This project is given task on involving in the site inspection under staff guidance. This is considered the last stage on construction where the building is done and need to be further detailed inspection on the interior space. The site is located in Nilai which known as Mesahill, a service apartment with a lot of facilities. I have briefed by the staff on the task of inspection where we need to check the defects on each units from each level. The main target of the building is for the college students as Manipal University is located just next to it. There should be four towers at the site but only two towers are completely built which have 22 levels and each level have 32 units. The service apartment is starting from level 6 while lower than that are parking lots and shopping mall. I have given some checklists sheet for each unit to inspect. Before we start to inspect, we decided to wear safety helmets and boots for your safety precautions. There have several units which are different in spacing arrangement that need to be concerned more. I need to record down the defects that happened according to the spaces located while taking photos as evidences for easier to seek during the renovation. Due to the numerous units, it took a very long period to be done even till end of the internship for another inspection again after first renovation. Basically, I decided to write a report according to unit by unit which attached with the photos taken after the site inspection done. The report was then sent to the contractors to look forward about the imperfections of unit. I had also went to the authority in Nilai which is MPN for updating the drawings with the specialists. I have learnt from observing the building construction from different stages and it made me understand that site inspection is not easy due to the hotness for moving around to check whether the building is perfect which in the need of working cooperatively with the contactors on site. It is considered a good experience of attaching to the site visit while communicate with the professional people.
  • 13. Documents For Site Inspections This is how the inspection work on which check every building element defects, record down and take picture of them for references. Visit to MPN, Nilai
  • 14. 2.3 PROJECT 3 PROJECT NAME PROPOSED MASTER PLAN (DXD) LOCATION JALAN NIPAH AMPANG WEEK WEEK 7 In this project, I have given task on doing the lift lobby detailing for tender submission. This project is also an apartment that designed based on limited space area on a single unit but in the need from client to involve all different purpose of interior spaces. The pathway to enter different spaces in the unit is quite tight compared to a standard pathway. The main target of the project is to allow more people to live in a small unit but involving all the specific spaces needed. I have been briefed on referring from the plans drawing to draw the detailed plan and section on the lift lobby which is starting from lower ground plan to the top floor plan. It is around 48 levels of whole building. I tried to look forward each of the floor plan drawings and coming out with more specific lift lobby detailed drawings. The detailed drawing need to be drawn with respective layers and hatched according to the materials used. Specifications, dimensions and gridline need to be added for further understanding to others. Overall, I have learnt that detailing of specific space is important for stage of construction so the specified contractors could understand on the process of building construction with detailed specification, dimensions and selected materials used. The skill of detailing need to be more concerned so that would not have errors during construction.
  • 15. APPENDIX Picture of detailing lift lobby which the dimensions, hatching, gridline, specifications and scale need to be included for tender drawings submission. Picture of No.1 Lift lobby details for Phase 2
  • 16. Picture of No.2 lift lobby details for phase 2 Picture of No.3 lift lobby details for phase 3
  • 17. 2.4 PROJECT 4 PROJECT NAME PROPOSED MIXED DEVELOPMENT (DQP) LOCATION TAMAN MALURI WEEK WEEK 7 Basically, this project which the design of the buildings have not fixed yet as there is some minor problem which passed to another staff to do. So, it took a long period to be done in hatching as the drawings were keep changing. It changed from the details of condominium which are the type of windows and doors used, artificial exterior element, thickness of beam and column, and void proposed to the spaces. From this project, I have been briefed on doing the colouring on the elevations and section for authority submission and plan drawings for BOMBA submission. Hatching of building plan (BP) for authority and BOMBA submission is totally different as building plan need to be overall coloured which including circulation, building structure, and materials but BOMBA drawings only focus on the fire staircase, fire lift lobby and fire walls in between with unit and unit. I have hatched the two elevations, one section and one BOMBA faculty floor plan which done on time as the staff need urgently for submission. I have also helped in folding the papers after get done with all the drawings. Through this task, I have observed the differences of authority and BOMBA drawings regarding their requirements, format, and specifications needed before getting approved for further construction and it is a good knowledge gained during the internship life. APPENDIX Picture of right elevation hatching using Cadian software
  • 18. Picture of front and rear elevation drawings hatched Picture of Floor plan hatched for BOMBA submission where there is only need to color the fire staircase and fire lift lobby.
  • 19. 2.5 MINOR INVOLVEMENT TASK-PLOT/PRINT/FOLD PROJECT NAME NEW ATRIA (AZB) LOCATION DAMANSARA WEEK WEEK 2 Picture of 100 above pages printed and arranged accordingly I have been giving task on plotting the drawings into A1 size and printed out for documentation. It was around 100 above pages to print and needed to organize into several sets for easier to look forward. From the drawings, I could observed the format drawings that done by the staff and on how they designed on each part of the buildings. I could also study the complete detailed drawings which can be future references. Discovering people's work is also part of the learning that can gained a lot of technical knowledge where else could help in further study.
  • 20. PROJECT NAME RENOVATION FIRST SUBANG MALL (DYE) LOCATION SUBANG JAYA WEEK WEEK 2 I have been briefed by my supervisor on folding the A1 size drawings to A4 size. There is some specific way to fold from a bigger size to a smaller sheet. This is to allow the people could carry easily to anywhere and professional specialist could know the drawings without totally opened up by seeing the table content as it faced to the top of the paper even though it had folded. It was also made the specialist to sign for the drawings easily. I learnt that folding between A0 and A1 size into A4 sheet are totally different way after getting taught by the staff. It could be the important part for every submission as to send to the authority and BOMBA for references without difficulty. Learning part of the skill is much worth even though is a little thing but could really understand the process working in an architecture firm. Picture of folding from A1 size into A4 size.
  • 22.
  • 23.
  • 24.
  • 25.
  • 26.
  • 27.
  • 28.
  • 29.
  • 30. CONCLUSION Overall, I would glad and appreciate for having my short internship in Akitek Akiprima which is only 10 weeks. Having a working experience could made me grow up in my life even though is just a short period. It made me become more understanding in the course especially the role of working in an architecture firm. I have learnt a lot which coming from the drawings that I had read and done during the internship period. I even get comment by Ar. Ray Cheah about my work during schooling where he think that I should tried to make it simplified than complicated. I appreciated his comment as I know he is an experienced architect in this firm. I would like to thank my supervisor, Mr Azmi for his patience in teaching about technical drawings which could enhance my technical skill and it would help me during further study. Site inspection also gained the most where we could observe each of the building construction that happened on the site which in the need of working cooperatively with specialists. I could know more on every role of character in the site in order to complete the building. Truly, the experience when working in systematic architecture firm and during school time are seriously different where architecture can be more abstract in University but during work, we need to think every each logical details for construction which need to be more concerned. It is definitely create a worth experience of internship program in my study.