Introduction
This internship training is aimed to introduce students to the requirements activities and operations
involved in working in architectural practices. I was worked under Jong Kit Architect J&J Studio in Shah
Alam for the past 8 weeks and supervised by Ar Kit Kwang Jong, Mr Jimmy and Ms June throughout my
internship period. I’ve commenced on the 2nd
January 2017 and ended on 3rd
March 2017. During the
internship period, I’ve approached different job scope daily according to the current projects given and
also expected to manipulate our time to multitask as well as complete the given tasks on time.
Project Overview
Project 1: Gardenia Factory
Site: Klang
The project is at the initial stage and yet to submit the Building Plans. I was assigned to propose the type
of ceiling, ceiling plan, complete the sanitary diagrammatic drawings and colour the building plans for
submission. This project was stressed by the client in terms of date of completion. Thus, I was given a
very limited time. Since it is my first task in the firm, I’ve learnt that different firm has its own format of
drawing, for example, the font size, drawing arrange and more. I’ve also learnt several types of ceilings
in this project and also the details of each ceiling. Furthermore, I have checked and correct the sanitary
diagrammatic of the project, I was able to apply my knowledge from building services to this task and
get to know the whole system well through this task. Last task of this project is to colour the building
plans with appropriate colours. I was able to learn to identify which area should be coloured by which
colour for the submission of authorities. My employer has told me that any incorrect colour will cause
the rejection of the submission and the submission fees will be burnt, so, I’ve do it with extra caution to
avoid any mistakes from the tasks.
This project will conduct a meeting weekly, I got to chance to observe them to prepare the documents
and minutes. There are some suppliers came to our office and discuss their products and I was at the
side to observe the meeting and learnt that the way how the architects deal with suppliers.
Project 2: 3-storey Bungalow Construction
Site: Country Height Damansara
This project is to build a 3-storey bungalow. I was assigned to prepare a complete set of tender drawings
including window and door schedules, window and door details, toilet details, ramp details, staircase
details, bridge details, refuse chamber details, kitchen details, gate details, pond details, pool details,
balcony details, temporary building details, diagrammatic drawings, schedule of finishes and a list of
these drawings. I’ve the privilege to handle the project and given a month to complete these drawings.
I’ve also observe my employer to prepare the documents for the authorities such as BP, Borang B and
the report of this project. Through this project, I’ve learnt that different authority has different checklist
for submission and it will change over time so we have to keep update with the checklist before the
submission of the documents. I’ve visited the OSC (One Stop Centre) in DBKL for the submission and
observe my colleagues deal with the officers in OSC.
Project 3: 2-Storey Bungalow Construction
Site: Cheras
This is a 2-Storey Bungalow in construction stage and my employer brought me there for me observe
and learn the construction elements. My employer assigned me to records the number of manhole and
it dimensions, the types and dimensions of doors and windows frames, the pipes system, and the roof
system. Then, I have to list of the elements stated above and our employer will explain the framing
system with inner frame and outer frame, the common dimension of manhole and I have to draw out
the sanitary diagrammatic and roof plan with explanation of the system. I’ve told how the architect deal
with the contractor on site and the proper way to record each dimension.
Project 4: Kindergarten measured drawings
Site: Kota Kemuning
This is project where the kindergarten constructed a wooden house at the classroom without informing
the authority and it was caught doing that and force to closed down until further notice. Our firm was
called to help out with the situation with producing a set of drawings and communicate with the
authority (MBSA). I went to the site for measuring the building and met the client for understanding the
situation. After that, I was assigned to draw the building plans and discuss with my colleagues regarding
the discussion with the authority. I’ve learn the Building By-Law’s requirement while discuss with my
colleagues regarding to the illegal buildings built by the kindergarten. I’ve also involved in the meeting
with the client to give them some advises and solution. I’ve also learnt how to produce a Building Plan
according to the requirements needed by the authority.
Project 5: Semi-D and terrace houses
Site: Sri Gombak
This project still at the design stage and I was assigned to improve the design of the buildings. During
this project, I was involved in using Autocad, Sketchup and Lumion to design the building. This is my first
time of using Sketchup and Lumion, so I was able to learn new software and at the same time know how
to design to please the client. I’ve learnt to think critically and be creative although there is limited cost
and time. I’ve rendered the design so the client has better visualization and better understanding with
the design.
Learning Outcome and Conclusion
During the 8 weeks internship training, I’ve learnt to adapt the architectural working
environment. I got to understand how a project going to run, from the start of a project and end of a
project, and how to communicate with client, officers in the authorities. Furthermore, I’ve learnt to
manage my time properly to meet the deadline of each project and complete it as prefect as possible. I
was also understood how an architect involved in the construction site and responsibilities of an
architect in the project.
I’ve also improved with my skills of technical drawings and be sensitive with the errors in a
drawing. Moreover, I’ve learnt to follow the requirements given by the authorities when doing the
drawings.
Besides the projects I’ve mentioned above, I have also involved in other projects which in
Building Submission Stage and CCC form submission stage. I got to observe how my colleagues manage
all these documents accordingly and submit it to the authorities. Although I wasn’t assign any task from
these projects, but my employer allowed me to observe the procedure and I was able to understand
how the documents being prepared.
Thus, it was a fruitful experience for me not only in the working skills but also get to excel new
software during my internship period, which would be helpful for myself.
Attachments
All images are owned by Jongkit Architect and protected under the company’s copyright and intellectual
right.
Figure 1.1: Gardenia factory ceiling plans drawings
Figure 1.2: List of drawings for 3-Storey Bungalow in Country Height Damansara
Figure 1.3: Toilet details for 3-Storey Bungalow
Figure 1.4: Rendering of Semi-D in Sri Gombak
Figure 1.5: Rendering of terrace house in Sri Gombak
Figure1.6: Site Visit to Tadika in Kota Kemuning
Figure 1.7: Site Visit to Bungalow in Cheras

More Related Content

What's hot

Internship Report and Logsheet - Taylor's University Lakeside Campus
Internship Report and Logsheet - Taylor's University Lakeside CampusInternship Report and Logsheet - Taylor's University Lakeside Campus
Internship Report and Logsheet - Taylor's University Lakeside CampusLovie Tey
 
Architecture Internship Report by Lim Joe Onn
Architecture Internship Report by Lim Joe OnnArchitecture Internship Report by Lim Joe Onn
Architecture Internship Report by Lim Joe OnnJoe Onn Lim
 
Internship Report
Internship ReportInternship Report
Internship ReportEuxuan Ong
 
Internship Report
Internship Report Internship Report
Internship Report zahurul88
 
Intern report
Intern reportIntern report
Intern reporthongbinng
 
METHODS OF DOCUMENTATION AND MEASURED DRAWING (ISTANA BANDAR)
METHODS OF DOCUMENTATION AND MEASURED DRAWING (ISTANA BANDAR)METHODS OF DOCUMENTATION AND MEASURED DRAWING (ISTANA BANDAR)
METHODS OF DOCUMENTATION AND MEASURED DRAWING (ISTANA BANDAR)Vicky Lee
 
Internship report on Interior and Exterior Designing Firm
Internship report on Interior and Exterior Designing FirmInternship report on Interior and Exterior Designing Firm
Internship report on Interior and Exterior Designing FirmFouad Hasan
 
MMU INTERNSHIP REPORT JAAYNE JEEVITA A / P RONALD ALFRED
MMU INTERNSHIP REPORT JAAYNE JEEVITA A / P RONALD ALFREDMMU INTERNSHIP REPORT JAAYNE JEEVITA A / P RONALD ALFRED
MMU INTERNSHIP REPORT JAAYNE JEEVITA A / P RONALD ALFREDJaayneWilliam
 
BSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT
BSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT BSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT
BSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT jolynnTJL
 
ECA Workshop - Brief
ECA Workshop - BriefECA Workshop - Brief
ECA Workshop - BriefKai Yun Pang
 
Internship Report File
Internship Report File   Internship Report File
Internship Report File Tay Jit Ying
 
Internship Training and Report
Internship Training and ReportInternship Training and Report
Internship Training and ReportJoyce Wee
 
Safia haque
Safia haqueSafia haque
Safia haque0172322
 
Internship report
Internship reportInternship report
Internship reportAlfred Tan
 
Final submission be 2.0
Final submission be 2.0Final submission be 2.0
Final submission be 2.0ahmong4
 
Building construction-report (1)
Building construction-report (1)Building construction-report (1)
Building construction-report (1)Soh Shing
 
Internship Report by Md. Mizanur Rahman-Id No.08304083
Internship Report by Md. Mizanur Rahman-Id No.08304083Internship Report by Md. Mizanur Rahman-Id No.08304083
Internship Report by Md. Mizanur Rahman-Id No.08304083numan_bu
 
Measurement 4 Tender Document
Measurement 4 Tender Document Measurement 4 Tender Document
Measurement 4 Tender Document xingxin_GOh
 

What's hot (20)

Report final
Report finalReport final
Report final
 
Internship Report and Logsheet - Taylor's University Lakeside Campus
Internship Report and Logsheet - Taylor's University Lakeside CampusInternship Report and Logsheet - Taylor's University Lakeside Campus
Internship Report and Logsheet - Taylor's University Lakeside Campus
 
Architecture Internship Report by Lim Joe Onn
Architecture Internship Report by Lim Joe OnnArchitecture Internship Report by Lim Joe Onn
Architecture Internship Report by Lim Joe Onn
 
Internship Report
Internship ReportInternship Report
Internship Report
 
Internship Report
Internship Report Internship Report
Internship Report
 
Intern report
Intern reportIntern report
Intern report
 
METHODS OF DOCUMENTATION AND MEASURED DRAWING (ISTANA BANDAR)
METHODS OF DOCUMENTATION AND MEASURED DRAWING (ISTANA BANDAR)METHODS OF DOCUMENTATION AND MEASURED DRAWING (ISTANA BANDAR)
METHODS OF DOCUMENTATION AND MEASURED DRAWING (ISTANA BANDAR)
 
Internship report on Interior and Exterior Designing Firm
Internship report on Interior and Exterior Designing FirmInternship report on Interior and Exterior Designing Firm
Internship report on Interior and Exterior Designing Firm
 
MMU INTERNSHIP REPORT JAAYNE JEEVITA A / P RONALD ALFRED
MMU INTERNSHIP REPORT JAAYNE JEEVITA A / P RONALD ALFREDMMU INTERNSHIP REPORT JAAYNE JEEVITA A / P RONALD ALFRED
MMU INTERNSHIP REPORT JAAYNE JEEVITA A / P RONALD ALFRED
 
BSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT
BSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT BSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT
BSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT
 
ECA Workshop - Brief
ECA Workshop - BriefECA Workshop - Brief
ECA Workshop - Brief
 
Internship Report File
Internship Report File   Internship Report File
Internship Report File
 
Internship Training and Report
Internship Training and ReportInternship Training and Report
Internship Training and Report
 
Safia haque
Safia haqueSafia haque
Safia haque
 
Internship report
Internship reportInternship report
Internship report
 
Final submission be 2.0
Final submission be 2.0Final submission be 2.0
Final submission be 2.0
 
Internship report
Internship reportInternship report
Internship report
 
Building construction-report (1)
Building construction-report (1)Building construction-report (1)
Building construction-report (1)
 
Internship Report by Md. Mizanur Rahman-Id No.08304083
Internship Report by Md. Mizanur Rahman-Id No.08304083Internship Report by Md. Mizanur Rahman-Id No.08304083
Internship Report by Md. Mizanur Rahman-Id No.08304083
 
Measurement 4 Tender Document
Measurement 4 Tender Document Measurement 4 Tender Document
Measurement 4 Tender Document
 

Viewers also liked

MEASURED DRAWING - RAINBOW SHOP HOUSES, IPOH
MEASURED DRAWING - RAINBOW SHOP HOUSES, IPOHMEASURED DRAWING - RAINBOW SHOP HOUSES, IPOH
MEASURED DRAWING - RAINBOW SHOP HOUSES, IPOHYen Min Khor
 
Arc2625 report file teo chenyi0320618
Arc2625 report file teo chenyi0320618Arc2625 report file teo chenyi0320618
Arc2625 report file teo chenyi0320618Chenyi Teo
 
Industrial Training Report(HLL) Darshana 2016
Industrial Training Report(HLL) Darshana 2016Industrial Training Report(HLL) Darshana 2016
Industrial Training Report(HLL) Darshana 2016Darshana Sankalpa
 
Methods of Documentation and Measured Drawings
Methods of Documentation and Measured DrawingsMethods of Documentation and Measured Drawings
Methods of Documentation and Measured DrawingsAdibah Awang
 
QS Industrial Training Report - CHUA CHONG LIANG 1104838
QS Industrial Training Report - CHUA CHONG LIANG 1104838QS Industrial Training Report - CHUA CHONG LIANG 1104838
QS Industrial Training Report - CHUA CHONG LIANG 1104838Bryan Chong Liang Chua
 
Writing and Presenting an Industrial Training Report
Writing and Presenting an Industrial Training ReportWriting and Presenting an Industrial Training Report
Writing and Presenting an Industrial Training ReportBC Chew
 
Presentation facilities deck
Presentation facilities deckPresentation facilities deck
Presentation facilities deckhongbinng
 
Pavillion slides
Pavillion slidesPavillion slides
Pavillion slideshongbinng
 
Presentation slides 1
Presentation slides 1Presentation slides 1
Presentation slides 1hongbinng
 
INTERNSHIP REPORT
INTERNSHIP REPORTINTERNSHIP REPORT
INTERNSHIP REPORTTristan Yu
 
Industrial Training Report: Ozone pharmaceuticals
Industrial Training Report: Ozone pharmaceuticalsIndustrial Training Report: Ozone pharmaceuticals
Industrial Training Report: Ozone pharmaceuticalsDibrugarh University
 
Intern log sheet
Intern log sheetIntern log sheet
Intern log sheethongbinng
 
Practical training report
Practical training reportPractical training report
Practical training reportNicolai Sidek
 
Contoh Laporan Latihan Industri (FULL)
Contoh Laporan Latihan Industri (FULL)Contoh Laporan Latihan Industri (FULL)
Contoh Laporan Latihan Industri (FULL)Rizalshah Zulkifli
 
Internship Report on Building Construction
Internship Report on Building ConstructionInternship Report on Building Construction
Internship Report on Building ConstructionEsmael Aragaw
 

Viewers also liked (19)

Log sheets
Log sheetsLog sheets
Log sheets
 
LOGSHEET+REPORT
LOGSHEET+REPORTLOGSHEET+REPORT
LOGSHEET+REPORT
 
MEASURED DRAWING - RAINBOW SHOP HOUSES, IPOH
MEASURED DRAWING - RAINBOW SHOP HOUSES, IPOHMEASURED DRAWING - RAINBOW SHOP HOUSES, IPOH
MEASURED DRAWING - RAINBOW SHOP HOUSES, IPOH
 
Arc2625 report file teo chenyi0320618
Arc2625 report file teo chenyi0320618Arc2625 report file teo chenyi0320618
Arc2625 report file teo chenyi0320618
 
Industrial Training Report(HLL) Darshana 2016
Industrial Training Report(HLL) Darshana 2016Industrial Training Report(HLL) Darshana 2016
Industrial Training Report(HLL) Darshana 2016
 
Methods of Documentation and Measured Drawings
Methods of Documentation and Measured DrawingsMethods of Documentation and Measured Drawings
Methods of Documentation and Measured Drawings
 
QS Industrial Training Report - CHUA CHONG LIANG 1104838
QS Industrial Training Report - CHUA CHONG LIANG 1104838QS Industrial Training Report - CHUA CHONG LIANG 1104838
QS Industrial Training Report - CHUA CHONG LIANG 1104838
 
Writing and Presenting an Industrial Training Report
Writing and Presenting an Industrial Training ReportWriting and Presenting an Industrial Training Report
Writing and Presenting an Industrial Training Report
 
Presentation facilities deck
Presentation facilities deckPresentation facilities deck
Presentation facilities deck
 
Pavillion slides
Pavillion slidesPavillion slides
Pavillion slides
 
Pp1 seminar
Pp1 seminarPp1 seminar
Pp1 seminar
 
Presentation slides 1
Presentation slides 1Presentation slides 1
Presentation slides 1
 
INTERNSHIP REPORT
INTERNSHIP REPORTINTERNSHIP REPORT
INTERNSHIP REPORT
 
Industrial Training Report: Ozone pharmaceuticals
Industrial Training Report: Ozone pharmaceuticalsIndustrial Training Report: Ozone pharmaceuticals
Industrial Training Report: Ozone pharmaceuticals
 
Intern log sheet
Intern log sheetIntern log sheet
Intern log sheet
 
Practical training report
Practical training reportPractical training report
Practical training report
 
Contoh Laporan Latihan Industri (FULL)
Contoh Laporan Latihan Industri (FULL)Contoh Laporan Latihan Industri (FULL)
Contoh Laporan Latihan Industri (FULL)
 
Internship Report on Building Construction
Internship Report on Building ConstructionInternship Report on Building Construction
Internship Report on Building Construction
 
INTERNSHIP REPORT
INTERNSHIP REPORTINTERNSHIP REPORT
INTERNSHIP REPORT
 

Similar to Internship report

Internship Report ARC 2615 -GOH YEN NEE 0315551
Internship Report ARC 2615 -GOH YEN NEE 0315551Internship Report ARC 2615 -GOH YEN NEE 0315551
Internship Report ARC 2615 -GOH YEN NEE 0315551Crysmond Goh
 
Internship report
Internship reportInternship report
Internship reportKelvin Fong
 
Defining and documenting a project
Defining and documenting a projectDefining and documenting a project
Defining and documenting a projectJing Fan Koh
 
Project Management Project 1
Project Management Project 1Project Management Project 1
Project Management Project 1zerospaces_
 
Stakeholder’s Involvement in Construction Industry
Stakeholder’s Involvement in Construction IndustryStakeholder’s Involvement in Construction Industry
Stakeholder’s Involvement in Construction IndustryAkshika Mahanama
 
Thousiq Ahmed civil engineer
Thousiq Ahmed civil  engineerThousiq Ahmed civil  engineer
Thousiq Ahmed civil engineerThousiq Ahmed
 
5 years experienced BIM Engineer_Murali
5 years experienced BIM Engineer_Murali5 years experienced BIM Engineer_Murali
5 years experienced BIM Engineer_MuraliMurali D
 
Internship Report
Internship ReportInternship Report
Internship Reportdtan97
 
Pankaj Bose RESUME
Pankaj Bose RESUMEPankaj Bose RESUME
Pankaj Bose RESUMEPankaj Bose
 
Project management
Project managementProject management
Project managementBenjamin Tan
 
Internship report 2015 yaseen syed
Internship report 2015 yaseen syedInternship report 2015 yaseen syed
Internship report 2015 yaseen syedYaseen Syed
 
Ici magazine final
Ici magazine finalIci magazine final
Ici magazine finalJian Leo
 
internship training and report
internship training and reportinternship training and report
internship training and reportJing Fan Koh
 
Arc2615 report file khorhaoxiang0318065
Arc2615 report file khorhaoxiang0318065Arc2615 report file khorhaoxiang0318065
Arc2615 report file khorhaoxiang0318065Khor Hao Xiang
 
magazine____.pdf
magazine____.pdfmagazine____.pdf
magazine____.pdfgabchin29
 
Magazine __
Magazine  __Magazine  __
Magazine __rivenhau
 
magazine____.pdf
magazine____.pdfmagazine____.pdf
magazine____.pdfgabchin29
 

Similar to Internship report (20)

Internship Report ARC 2615 -GOH YEN NEE 0315551
Internship Report ARC 2615 -GOH YEN NEE 0315551Internship Report ARC 2615 -GOH YEN NEE 0315551
Internship Report ARC 2615 -GOH YEN NEE 0315551
 
Internship report
Internship reportInternship report
Internship report
 
Internship report
Internship reportInternship report
Internship report
 
Defining and documenting a project
Defining and documenting a projectDefining and documenting a project
Defining and documenting a project
 
Project Management Project 1
Project Management Project 1Project Management Project 1
Project Management Project 1
 
Stakeholder’s Involvement in Construction Industry
Stakeholder’s Involvement in Construction IndustryStakeholder’s Involvement in Construction Industry
Stakeholder’s Involvement in Construction Industry
 
Thousiq Ahmed civil engineer
Thousiq Ahmed civil  engineerThousiq Ahmed civil  engineer
Thousiq Ahmed civil engineer
 
5 years experienced BIM Engineer_Murali
5 years experienced BIM Engineer_Murali5 years experienced BIM Engineer_Murali
5 years experienced BIM Engineer_Murali
 
Internship Report
Internship ReportInternship Report
Internship Report
 
Pankaj Bose RESUME
Pankaj Bose RESUMEPankaj Bose RESUME
Pankaj Bose RESUME
 
Project management
Project managementProject management
Project management
 
Internship report 2015 yaseen syed
Internship report 2015 yaseen syedInternship report 2015 yaseen syed
Internship report 2015 yaseen syed
 
avinash chandrashekar-CV
avinash chandrashekar-CVavinash chandrashekar-CV
avinash chandrashekar-CV
 
Ici magazine final
Ici magazine finalIci magazine final
Ici magazine final
 
internship training and report
internship training and reportinternship training and report
internship training and report
 
Arc2615 report file khorhaoxiang0318065
Arc2615 report file khorhaoxiang0318065Arc2615 report file khorhaoxiang0318065
Arc2615 report file khorhaoxiang0318065
 
magazine____.pdf
magazine____.pdfmagazine____.pdf
magazine____.pdf
 
Magazine __
Magazine  __Magazine  __
Magazine __
 
Magazine __
Magazine  __Magazine  __
Magazine __
 
magazine____.pdf
magazine____.pdfmagazine____.pdf
magazine____.pdf
 

More from ChengWei Chia

Food and culture proposal submission final
Food and culture proposal submission finalFood and culture proposal submission final
Food and culture proposal submission finalChengWei Chia
 
Roppongi group to au_march 2017
Roppongi group to au_march 2017Roppongi group to au_march 2017
Roppongi group to au_march 2017ChengWei Chia
 
Ccc case study report taylor's university
Ccc case study report taylor's universityCcc case study report taylor's university
Ccc case study report taylor's universityChengWei Chia
 
Tales of three cities – mapping the townscape (petaling street and central ma...
Tales of three cities – mapping the townscape (petaling street and central ma...Tales of three cities – mapping the townscape (petaling street and central ma...
Tales of three cities – mapping the townscape (petaling street and central ma...ChengWei Chia
 
Structural analysis of a bungalow report
Structural analysis of a bungalow reportStructural analysis of a bungalow report
Structural analysis of a bungalow reportChengWei Chia
 
Roof truss system (truss analysis)
Roof truss system (truss analysis)Roof truss system (truss analysis)
Roof truss system (truss analysis)ChengWei Chia
 
Building services in public buildings report (1)
Building services in public buildings report (1)Building services in public buildings report (1)
Building services in public buildings report (1)ChengWei Chia
 
Asian architecture case study paper_8d_house
Asian architecture case study paper_8d_houseAsian architecture case study paper_8d_house
Asian architecture case study paper_8d_houseChengWei Chia
 
Asian architecture abstract_8d_house
Asian architecture abstract_8d_houseAsian architecture abstract_8d_house
Asian architecture abstract_8d_houseChengWei Chia
 
Asian architecture paper presentation_8d_house
Asian architecture paper presentation_8d_houseAsian architecture paper presentation_8d_house
Asian architecture paper presentation_8d_houseChengWei Chia
 
Asian architecture topic proposal_8d_house
Asian architecture topic proposal_8d_houseAsian architecture topic proposal_8d_house
Asian architecture topic proposal_8d_houseChengWei Chia
 

More from ChengWei Chia (20)

Project 2 report
Project 2 reportProject 2 report
Project 2 report
 
Studio report a3
Studio report a3Studio report a3
Studio report a3
 
Food and culture proposal submission final
Food and culture proposal submission finalFood and culture proposal submission final
Food and culture proposal submission final
 
Synopsis 3
Synopsis 3Synopsis 3
Synopsis 3
 
Synopsis 2
Synopsis 2Synopsis 2
Synopsis 2
 
Synopsis 1
Synopsis 1Synopsis 1
Synopsis 1
 
Introduction
IntroductionIntroduction
Introduction
 
Roppongi group to au_march 2017
Roppongi group to au_march 2017Roppongi group to au_march 2017
Roppongi group to au_march 2017
 
Btech IBS
Btech IBSBtech IBS
Btech IBS
 
Project 2
Project 2Project 2
Project 2
 
Ccc case study report taylor's university
Ccc case study report taylor's universityCcc case study report taylor's university
Ccc case study report taylor's university
 
Tales of three cities – mapping the townscape (petaling street and central ma...
Tales of three cities – mapping the townscape (petaling street and central ma...Tales of three cities – mapping the townscape (petaling street and central ma...
Tales of three cities – mapping the townscape (petaling street and central ma...
 
Structural analysis of a bungalow report
Structural analysis of a bungalow reportStructural analysis of a bungalow report
Structural analysis of a bungalow report
 
Roof truss system (truss analysis)
Roof truss system (truss analysis)Roof truss system (truss analysis)
Roof truss system (truss analysis)
 
Building services in public buildings report (1)
Building services in public buildings report (1)Building services in public buildings report (1)
Building services in public buildings report (1)
 
Asian architecture case study paper_8d_house
Asian architecture case study paper_8d_houseAsian architecture case study paper_8d_house
Asian architecture case study paper_8d_house
 
Asian architecture abstract_8d_house
Asian architecture abstract_8d_houseAsian architecture abstract_8d_house
Asian architecture abstract_8d_house
 
Asian architecture paper presentation_8d_house
Asian architecture paper presentation_8d_houseAsian architecture paper presentation_8d_house
Asian architecture paper presentation_8d_house
 
Asian architecture topic proposal_8d_house
Asian architecture topic proposal_8d_houseAsian architecture topic proposal_8d_house
Asian architecture topic proposal_8d_house
 
14@
14@14@
14@
 

Recently uploaded

call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxRoyAbrique
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Celine George
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsanshu789521
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 

Recently uploaded (20)

call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha elections
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
9953330565 Low Rate Call Girls In Rohini Delhi NCR
9953330565 Low Rate Call Girls In Rohini  Delhi NCR9953330565 Low Rate Call Girls In Rohini  Delhi NCR
9953330565 Low Rate Call Girls In Rohini Delhi NCR
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 

Internship report

  • 1. Bachelor of Science (Honours) in Architecture INTERNSHIP TRAINING & REPORT [ARC2615, ARC2613 & ARC2622] Name: Chia Cheng Wei Student ID: 0322091 Company Name: Jongkit Architect Supervisor: Ar Rosalind, Jimmy Teh, June Attached period: 2nd January 2017 – 3rd March 2017 Tutor: Dr. Salvi Tamil
  • 2. Introduction This internship training is aimed to introduce students to the requirements activities and operations involved in working in architectural practices. I was worked under Jong Kit Architect J&J Studio in Shah Alam for the past 8 weeks and supervised by Ar Kit Kwang Jong, Mr Jimmy and Ms June throughout my internship period. I’ve commenced on the 2nd January 2017 and ended on 3rd March 2017. During the internship period, I’ve approached different job scope daily according to the current projects given and also expected to manipulate our time to multitask as well as complete the given tasks on time. Project Overview Project 1: Gardenia Factory Site: Klang The project is at the initial stage and yet to submit the Building Plans. I was assigned to propose the type of ceiling, ceiling plan, complete the sanitary diagrammatic drawings and colour the building plans for submission. This project was stressed by the client in terms of date of completion. Thus, I was given a very limited time. Since it is my first task in the firm, I’ve learnt that different firm has its own format of drawing, for example, the font size, drawing arrange and more. I’ve also learnt several types of ceilings in this project and also the details of each ceiling. Furthermore, I have checked and correct the sanitary diagrammatic of the project, I was able to apply my knowledge from building services to this task and get to know the whole system well through this task. Last task of this project is to colour the building plans with appropriate colours. I was able to learn to identify which area should be coloured by which colour for the submission of authorities. My employer has told me that any incorrect colour will cause the rejection of the submission and the submission fees will be burnt, so, I’ve do it with extra caution to avoid any mistakes from the tasks. This project will conduct a meeting weekly, I got to chance to observe them to prepare the documents and minutes. There are some suppliers came to our office and discuss their products and I was at the side to observe the meeting and learnt that the way how the architects deal with suppliers. Project 2: 3-storey Bungalow Construction Site: Country Height Damansara This project is to build a 3-storey bungalow. I was assigned to prepare a complete set of tender drawings including window and door schedules, window and door details, toilet details, ramp details, staircase details, bridge details, refuse chamber details, kitchen details, gate details, pond details, pool details, balcony details, temporary building details, diagrammatic drawings, schedule of finishes and a list of these drawings. I’ve the privilege to handle the project and given a month to complete these drawings. I’ve also observe my employer to prepare the documents for the authorities such as BP, Borang B and the report of this project. Through this project, I’ve learnt that different authority has different checklist
  • 3. for submission and it will change over time so we have to keep update with the checklist before the submission of the documents. I’ve visited the OSC (One Stop Centre) in DBKL for the submission and observe my colleagues deal with the officers in OSC. Project 3: 2-Storey Bungalow Construction Site: Cheras This is a 2-Storey Bungalow in construction stage and my employer brought me there for me observe and learn the construction elements. My employer assigned me to records the number of manhole and it dimensions, the types and dimensions of doors and windows frames, the pipes system, and the roof system. Then, I have to list of the elements stated above and our employer will explain the framing system with inner frame and outer frame, the common dimension of manhole and I have to draw out the sanitary diagrammatic and roof plan with explanation of the system. I’ve told how the architect deal with the contractor on site and the proper way to record each dimension. Project 4: Kindergarten measured drawings Site: Kota Kemuning This is project where the kindergarten constructed a wooden house at the classroom without informing the authority and it was caught doing that and force to closed down until further notice. Our firm was called to help out with the situation with producing a set of drawings and communicate with the authority (MBSA). I went to the site for measuring the building and met the client for understanding the situation. After that, I was assigned to draw the building plans and discuss with my colleagues regarding the discussion with the authority. I’ve learn the Building By-Law’s requirement while discuss with my colleagues regarding to the illegal buildings built by the kindergarten. I’ve also involved in the meeting with the client to give them some advises and solution. I’ve also learnt how to produce a Building Plan according to the requirements needed by the authority. Project 5: Semi-D and terrace houses Site: Sri Gombak This project still at the design stage and I was assigned to improve the design of the buildings. During this project, I was involved in using Autocad, Sketchup and Lumion to design the building. This is my first time of using Sketchup and Lumion, so I was able to learn new software and at the same time know how to design to please the client. I’ve learnt to think critically and be creative although there is limited cost and time. I’ve rendered the design so the client has better visualization and better understanding with the design.
  • 4. Learning Outcome and Conclusion During the 8 weeks internship training, I’ve learnt to adapt the architectural working environment. I got to understand how a project going to run, from the start of a project and end of a project, and how to communicate with client, officers in the authorities. Furthermore, I’ve learnt to manage my time properly to meet the deadline of each project and complete it as prefect as possible. I was also understood how an architect involved in the construction site and responsibilities of an architect in the project. I’ve also improved with my skills of technical drawings and be sensitive with the errors in a drawing. Moreover, I’ve learnt to follow the requirements given by the authorities when doing the drawings. Besides the projects I’ve mentioned above, I have also involved in other projects which in Building Submission Stage and CCC form submission stage. I got to observe how my colleagues manage all these documents accordingly and submit it to the authorities. Although I wasn’t assign any task from these projects, but my employer allowed me to observe the procedure and I was able to understand how the documents being prepared. Thus, it was a fruitful experience for me not only in the working skills but also get to excel new software during my internship period, which would be helpful for myself.
  • 5. Attachments All images are owned by Jongkit Architect and protected under the company’s copyright and intellectual right.
  • 6. Figure 1.1: Gardenia factory ceiling plans drawings Figure 1.2: List of drawings for 3-Storey Bungalow in Country Height Damansara
  • 7. Figure 1.3: Toilet details for 3-Storey Bungalow Figure 1.4: Rendering of Semi-D in Sri Gombak
  • 8. Figure 1.5: Rendering of terrace house in Sri Gombak Figure1.6: Site Visit to Tadika in Kota Kemuning
  • 9. Figure 1.7: Site Visit to Bungalow in Cheras