SlideShare a Scribd company logo
INDUSTRIAL TRAINING SEMINAR
Presentation By:
ABHISHEK
VII Semester
Branch: Civil Engineering
Roll No: 14EJECE002
OUTLINE
 Summer Training at “ARSS INFRASTRUCTURE
PVT LTD” form 16th MAY 2017 to 16th July 2017.
 This training helped me to gain knowledge by
experiencing various work taking place in the site.
 Main objective was to learn about construction of
Railway over bridge.
INTRODUCTION TO COMPANY
 Name : ARSS Infrastructure Pvt Ltd.
 Establishment in 2000 year
 Management :
 Chairman : Mr. Subash Agarwal
 Managing Director : Mr. Rajesh Agarwal
 Location of Head Office :
 Plot-no-38, Sector-A, Zone-D
Mancheswar Industrial Estate
Bhubaneswar-751 010, Odisha, India.
Tel: 91 674 2588552/2588554
Fax: 91 674 2585074
 Turnover = 1013 crores
 Location of Office in Rajasthan :
 L-32,Income Tax Colony, Tonk Road
Jaipur - 302018, Rajsthan.
Tel:- 0141 2721568
Fax:- 0141 2720923,
 Area of projects :
 Road works
 Bridge works
 Railway works
 Power works
 Irrigation works
 Real Estate works
INTRODUCTION TO THE PROJECT
 Name of Project : Construction of Six-lane RoB,
Sitapura on JP-SWM
Railway line.
 Value of awarded work : 87.5 crore
 Name of agency : ARSS Infrastructure Projects
Ltd.
 Need for this project :
1. To improve traffic condition.
2. It is also Benificial for Industrial area, nearby
Institute & Colonies.
3. To save a lot of precious time which was being
consume because of railway crossing.
PROJECT LOCATION
DETAILS OF ROB
 6 lane and 2 way bridge
 Length of bridge = 935 m
 Width of bridge = 24 m at starting & 28.8 m at
ending
 Carriageway = 10.5 m
 Total number of piers : 54
 Distance between piers : 24 m c/c
STRUCTURE OF ROB
 Substructure
i. Pile foundation
ii. Pile cap
iii. Pier
iv. Pier cap
v. Pedestal
 Superstructure
i. Girder
 Reinforced Earth Wall
i. Panels
PILE FOUNDATION
 Type of pile :- Friction pile
 Depth of piles = 25m
 Diameter of piles = 1.2m
 Distance between two piles = 3D = 3.6m
 Piling process :-
 Excavation through piling rig machine.
 Fill bentonite through bentonite feeder tank in excavated
hole to stabilize it.
 Place the reinforcement cage in excavated hole.
 Insert and attach tremie pipes in excavated hole.
 Attach the hopper at top of the tremi pipe with a lifting
cap.
 Close the hole of hopper at bottom by lifting cap and
fill concrete through TM truck.
 Lift the lifting cap from hopper and allow concrete to fill
the hole.
 Lift tremie pipe after each interval of concreting.
PILE CAP
25 m
1.8 m
8.7 m
Pile
Cross-section of piles shaft :-
Cover block
Reinforcement cage of pile :-
PILE CAP
 A pile cap is a thick concrete mat that rests on
concrete piles. It distributes the load of structure
into piles.
 Grade of concrete used : M35
 Length of pile cap = 8.7m
 Width of pile cap = 5.1m
 Height of pile cap = 1.8m
Top view of pile shaft :-
8.7 m
5.1 m
PILE CAP
Pile cap :-
PIER
 A pier is a structure which transfers the load coming
through girder to the pile foundation. It supports the
superstructure of bridge.
 Concreting of pier is done with the help of pump.
 Grade of concrete used : M40
2.5 m
1.5 m
4 m
PIER
Top view of pier :-
Pier & Pier cap :-
PIER CAP
 The upper or bearing part of pier.
 It is designed to distribute concentrated loads
evenly over the area of the pier.
 Grade of concrete used : M40
4000 mm2950
mm
1000 mm
500 mm
PIER CAP
2950
mm
Cross-section of pier cap :-
PEDESTAL
 A concrete pedestal is a compression element
provided to carry the loads from supported
elements of superstructure like girder, deck etc. to
foundation below the ground.
 Number of pedestal in a pier cap = 8
PEDESTAL 800 mm
800 mm
Top view of Pedestal :-
GIRDER
 It is a supporting structure which supports the deck.
 Dimension of girder :-
 1.75 m high
 24 m long
 Total number of girders = 196
PANELS
 No. of panels = 1221
 P.C.C height under panels = 200 mm
 P.C.C width under panels = 450 mm
 Grade of concrete used : M35
BATCHING PLANT
 Capacity of batching plant = 15 m3/hr
 Grade of concrete used
 Pile & Pile cap M35
 P.C.C M15
 Pier & Pier cap M40
 Girder M45
 Deck slab M45
 Panel M35
 Admixer : BASF-525-Napthabase
 Aggregate size : 10mm & 20mm
Batching Plant :-
EQUIPMENTS
 Transit mixer :
 The transit mixer is a typical concrete mixer uses a
revolving drum to mix the components.
 Capacity = 6 cubic meter.
 Concrete pump :
 A concrete pump is a machine used for transferring
liquid concrete by pumping.
 Hydra Crane :
 It is mainly used for lifting heavy things and transporting
them to other places.
 Piling rig machine :
 It is used for digging in pile foundation.
 Needle Vibrator (60 mm dia) :
 Needle vibrator is use for compaction of concrete after
placing it.
 Dump Truck :
 It is used for transport the material such as aggregate,
cement etc.
Industrial training seminar PPT

More Related Content

What's hot

Industrial report for civil engg. training
Industrial report for civil engg. trainingIndustrial report for civil engg. training
Industrial report for civil engg. training
Ram1239
 
Construction of residential building summer training ppt
 Construction of residential building summer training ppt Construction of residential building summer training ppt
Construction of residential building summer training ppt
Sumit Singh
 
Summer Internship Report of Civil Engineering in Construction Site
Summer Internship Report of Civil Engineering in Construction SiteSummer Internship Report of Civil Engineering in Construction Site
Summer Internship Report of Civil Engineering in Construction Site
RAVI KUMAR
 
Construction of residential building
Construction of residential buildingConstruction of residential building
Construction of residential building
Sumit Singh
 
building consturction training report at cpwd (MNIT)
building consturction training report at cpwd (MNIT)building consturction training report at cpwd (MNIT)
building consturction training report at cpwd (MNIT)
rahul jangid
 
Civil Engineering Internship Presentation-Anis Rahman Khokan
Civil Engineering Internship Presentation-Anis Rahman KhokanCivil Engineering Internship Presentation-Anis Rahman Khokan
Civil Engineering Internship Presentation-Anis Rahman Khokan
Anis Rahman Khokan
 
Residential building construction ppt
Residential building construction pptResidential building construction ppt
Residential building construction ppt
Being Deepak
 
Summer training report in civil engineering
Summer training report in civil engineeringSummer training report in civil engineering
Summer training report in civil engineering
alok0025
 
AN INTERNSHIP REPORT ON RESIDENTIAL BUILDING CONSTRUCTION
AN INTERNSHIP  REPORT  ON  RESIDENTIAL  BUILDING  CONSTRUCTIONAN INTERNSHIP  REPORT  ON  RESIDENTIAL  BUILDING  CONSTRUCTION
AN INTERNSHIP REPORT ON RESIDENTIAL BUILDING CONSTRUCTIONAbhishek Singh
 
Civil engineering internship report
Civil engineering internship reportCivil engineering internship report
Civil engineering internship report
Md Mohsin Mohsin
 
PRESENTATION ON ROAD CONSTRUCTION INTERNSHIP NH34 BY IMRUL QUESH
PRESENTATION ON ROAD CONSTRUCTION  INTERNSHIP NH34 BY IMRUL QUESHPRESENTATION ON ROAD CONSTRUCTION  INTERNSHIP NH34 BY IMRUL QUESH
PRESENTATION ON ROAD CONSTRUCTION INTERNSHIP NH34 BY IMRUL QUESH
Imrul Quesh
 
Summer training report
Summer training reportSummer training report
Summer training report
Raj Vaibhav Singh
 
pile foundation and pile cap presentation
pile foundation and pile cap presentationpile foundation and pile cap presentation
pile foundation and pile cap presentation
Rahul bhatnagar
 
Industrial training presentation
Industrial training presentationIndustrial training presentation
Industrial training presentation
Nursyafiqah Ismail
 
SUMMER TRAINING REPORT ON BUILDING CONSTRUCTION
SUMMER TRAINING REPORT ON BUILDING CONSTRUCTIONSUMMER TRAINING REPORT ON BUILDING CONSTRUCTION
SUMMER TRAINING REPORT ON BUILDING CONSTRUCTION
Ved Jangid
 
A project report on flyover internship bihar rajya pul nirman nigam limited p...
A project report on flyover internship bihar rajya pul nirman nigam limited p...A project report on flyover internship bihar rajya pul nirman nigam limited p...
A project report on flyover internship bihar rajya pul nirman nigam limited p...
Prashant Shaurabh
 
final year civil engineering training report
final year civil engineering training report final year civil engineering training report
final year civil engineering training report
Poojan Patel
 
Training report ON BRIDGE
Training report ON BRIDGETraining report ON BRIDGE
Training report ON BRIDGE
Abhinay Saraswat
 

What's hot (20)

Industrial report for civil engg. training
Industrial report for civil engg. trainingIndustrial report for civil engg. training
Industrial report for civil engg. training
 
Construction of residential building summer training ppt
 Construction of residential building summer training ppt Construction of residential building summer training ppt
Construction of residential building summer training ppt
 
Summer Internship Report of Civil Engineering in Construction Site
Summer Internship Report of Civil Engineering in Construction SiteSummer Internship Report of Civil Engineering in Construction Site
Summer Internship Report of Civil Engineering in Construction Site
 
Construction of residential building
Construction of residential buildingConstruction of residential building
Construction of residential building
 
building consturction training report at cpwd (MNIT)
building consturction training report at cpwd (MNIT)building consturction training report at cpwd (MNIT)
building consturction training report at cpwd (MNIT)
 
Civil Engineering Internship Presentation-Anis Rahman Khokan
Civil Engineering Internship Presentation-Anis Rahman KhokanCivil Engineering Internship Presentation-Anis Rahman Khokan
Civil Engineering Internship Presentation-Anis Rahman Khokan
 
Residential building construction ppt
Residential building construction pptResidential building construction ppt
Residential building construction ppt
 
Summer training report in civil engineering
Summer training report in civil engineeringSummer training report in civil engineering
Summer training report in civil engineering
 
AN INTERNSHIP REPORT ON RESIDENTIAL BUILDING CONSTRUCTION
AN INTERNSHIP  REPORT  ON  RESIDENTIAL  BUILDING  CONSTRUCTIONAN INTERNSHIP  REPORT  ON  RESIDENTIAL  BUILDING  CONSTRUCTION
AN INTERNSHIP REPORT ON RESIDENTIAL BUILDING CONSTRUCTION
 
Civil engineering internship report
Civil engineering internship reportCivil engineering internship report
Civil engineering internship report
 
PRESENTATION ON ROAD CONSTRUCTION INTERNSHIP NH34 BY IMRUL QUESH
PRESENTATION ON ROAD CONSTRUCTION  INTERNSHIP NH34 BY IMRUL QUESHPRESENTATION ON ROAD CONSTRUCTION  INTERNSHIP NH34 BY IMRUL QUESH
PRESENTATION ON ROAD CONSTRUCTION INTERNSHIP NH34 BY IMRUL QUESH
 
Summer training report
Summer training reportSummer training report
Summer training report
 
Bridge report
Bridge reportBridge report
Bridge report
 
pile foundation and pile cap presentation
pile foundation and pile cap presentationpile foundation and pile cap presentation
pile foundation and pile cap presentation
 
Industrial training presentation
Industrial training presentationIndustrial training presentation
Industrial training presentation
 
SUMMER TRAINING REPORT ON BUILDING CONSTRUCTION
SUMMER TRAINING REPORT ON BUILDING CONSTRUCTIONSUMMER TRAINING REPORT ON BUILDING CONSTRUCTION
SUMMER TRAINING REPORT ON BUILDING CONSTRUCTION
 
A project report on flyover internship bihar rajya pul nirman nigam limited p...
A project report on flyover internship bihar rajya pul nirman nigam limited p...A project report on flyover internship bihar rajya pul nirman nigam limited p...
A project report on flyover internship bihar rajya pul nirman nigam limited p...
 
Casting yard
Casting yardCasting yard
Casting yard
 
final year civil engineering training report
final year civil engineering training report final year civil engineering training report
final year civil engineering training report
 
Training report ON BRIDGE
Training report ON BRIDGETraining report ON BRIDGE
Training report ON BRIDGE
 

Similar to Industrial training seminar PPT

Intership in DMRC
Intership in DMRCIntership in DMRC
Intership in DMRC
FAISAL ANSARI
 
Larsen and Toubro (Lucknow Metro Project) Summer Internship Presentation
Larsen and Toubro (Lucknow Metro Project) Summer Internship PresentationLarsen and Toubro (Lucknow Metro Project) Summer Internship Presentation
Larsen and Toubro (Lucknow Metro Project) Summer Internship Presentation
ShuBham RaNa
 
TRAINING REPORT ON COSTRUCTION OF FLYOVER FROM MITHAPUR TO CHIRIYATAND (BIHAR)
TRAINING REPORT ON  COSTRUCTION OF FLYOVER FROM  MITHAPUR TO CHIRIYATAND (BIHAR)TRAINING REPORT ON  COSTRUCTION OF FLYOVER FROM  MITHAPUR TO CHIRIYATAND (BIHAR)
TRAINING REPORT ON COSTRUCTION OF FLYOVER FROM MITHAPUR TO CHIRIYATAND (BIHAR)
vishal prakash
 
Saurabhk601
Saurabhk601Saurabhk601
Saurabhk601
Saurabh601
 
training report LMRC
training report LMRCtraining report LMRC
training report LMRC
Kamesh Tripathi
 
31_SHRUTIGARG_BC_GROUPREPORT.pdf
31_SHRUTIGARG_BC_GROUPREPORT.pdf31_SHRUTIGARG_BC_GROUPREPORT.pdf
31_SHRUTIGARG_BC_GROUPREPORT.pdf
ShrutiGarg261479
 
Summer Training Report =Bihar Rajya pul Nirman Nigam
Summer Training Report =Bihar Rajya pul Nirman NigamSummer Training Report =Bihar Rajya pul Nirman Nigam
Summer Training Report =Bihar Rajya pul Nirman Nigam
Raju kumar Gautam
 
flyover internship 2
flyover internship 2flyover internship 2
flyover internship 2Ravi Mehta
 
signature bridge short presentation
signature bridge short presentationsignature bridge short presentation
signature bridge short presentation
Pravin Gaurav
 
DELHI METRO UNDERGROUND TUNNELING : SHAHBAZ KHAN DMRC
DELHI METRO UNDERGROUND TUNNELING : SHAHBAZ KHAN DMRCDELHI METRO UNDERGROUND TUNNELING : SHAHBAZ KHAN DMRC
DELHI METRO UNDERGROUND TUNNELING : SHAHBAZ KHAN DMRC
Al Hakam Khan
 
training1 (1).pptx
training1 (1).pptxtraining1 (1).pptx
training1 (1).pptx
ErLavKushPrasad
 
JEEVA.pptx
JEEVA.pptxJEEVA.pptx
JEEVA.pptx
SachinHM14
 
Industrial Training Report-(2012-13)
Industrial Training Report-(2012-13)Industrial Training Report-(2012-13)
Industrial Training Report-(2012-13)AJAY SHAHU
 
Internship report with background
Internship report  with backgroundInternship report  with background
Internship report with background
Kazim sultani
 
Airport Buildings & Structures Construction
Airport Buildings & Structures ConstructionAirport Buildings & Structures Construction
Airport Buildings & Structures Construction
David H Moloney
 
Field visit report 2019
Field visit report 2019Field visit report 2019
Field visit report 2019
Nirob Ahmed
 

Similar to Industrial training seminar PPT (20)

Intership in DMRC
Intership in DMRCIntership in DMRC
Intership in DMRC
 
Larsen and Toubro (Lucknow Metro Project) Summer Internship Presentation
Larsen and Toubro (Lucknow Metro Project) Summer Internship PresentationLarsen and Toubro (Lucknow Metro Project) Summer Internship Presentation
Larsen and Toubro (Lucknow Metro Project) Summer Internship Presentation
 
TRAINING REPORT ON COSTRUCTION OF FLYOVER FROM MITHAPUR TO CHIRIYATAND (BIHAR)
TRAINING REPORT ON  COSTRUCTION OF FLYOVER FROM  MITHAPUR TO CHIRIYATAND (BIHAR)TRAINING REPORT ON  COSTRUCTION OF FLYOVER FROM  MITHAPUR TO CHIRIYATAND (BIHAR)
TRAINING REPORT ON COSTRUCTION OF FLYOVER FROM MITHAPUR TO CHIRIYATAND (BIHAR)
 
Saurabhk601
Saurabhk601Saurabhk601
Saurabhk601
 
Training
TrainingTraining
Training
 
training report LMRC
training report LMRCtraining report LMRC
training report LMRC
 
Project report
Project reportProject report
Project report
 
31_SHRUTIGARG_BC_GROUPREPORT.pdf
31_SHRUTIGARG_BC_GROUPREPORT.pdf31_SHRUTIGARG_BC_GROUPREPORT.pdf
31_SHRUTIGARG_BC_GROUPREPORT.pdf
 
Ayush
AyushAyush
Ayush
 
Summer Training Report =Bihar Rajya pul Nirman Nigam
Summer Training Report =Bihar Rajya pul Nirman NigamSummer Training Report =Bihar Rajya pul Nirman Nigam
Summer Training Report =Bihar Rajya pul Nirman Nigam
 
flyover internship 2
flyover internship 2flyover internship 2
flyover internship 2
 
signature bridge short presentation
signature bridge short presentationsignature bridge short presentation
signature bridge short presentation
 
DELHI METRO UNDERGROUND TUNNELING : SHAHBAZ KHAN DMRC
DELHI METRO UNDERGROUND TUNNELING : SHAHBAZ KHAN DMRCDELHI METRO UNDERGROUND TUNNELING : SHAHBAZ KHAN DMRC
DELHI METRO UNDERGROUND TUNNELING : SHAHBAZ KHAN DMRC
 
training1 (1).pptx
training1 (1).pptxtraining1 (1).pptx
training1 (1).pptx
 
JEEVA.pptx
JEEVA.pptxJEEVA.pptx
JEEVA.pptx
 
Industrial Training Report-(2012-13)
Industrial Training Report-(2012-13)Industrial Training Report-(2012-13)
Industrial Training Report-(2012-13)
 
Internship report with background
Internship report  with backgroundInternship report  with background
Internship report with background
 
Anantpur Report
Anantpur ReportAnantpur Report
Anantpur Report
 
Airport Buildings & Structures Construction
Airport Buildings & Structures ConstructionAirport Buildings & Structures Construction
Airport Buildings & Structures Construction
 
Field visit report 2019
Field visit report 2019Field visit report 2019
Field visit report 2019
 

Recently uploaded

Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
Kerry Sado
 
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
ssuser7dcef0
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
Vijay Dialani, PhD
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
gestioneergodomus
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
SyedAbiiAzazi1
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
BrazilAccount1
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
ClaraZara1
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
zwunae
 
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERSCW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
veerababupersonal22
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
Aditya Rajan Patra
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 

Recently uploaded (20)

Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
 
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
 
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERSCW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 

Industrial training seminar PPT

  • 1. INDUSTRIAL TRAINING SEMINAR Presentation By: ABHISHEK VII Semester Branch: Civil Engineering Roll No: 14EJECE002
  • 2. OUTLINE  Summer Training at “ARSS INFRASTRUCTURE PVT LTD” form 16th MAY 2017 to 16th July 2017.  This training helped me to gain knowledge by experiencing various work taking place in the site.  Main objective was to learn about construction of Railway over bridge.
  • 3. INTRODUCTION TO COMPANY  Name : ARSS Infrastructure Pvt Ltd.  Establishment in 2000 year  Management :  Chairman : Mr. Subash Agarwal  Managing Director : Mr. Rajesh Agarwal  Location of Head Office :  Plot-no-38, Sector-A, Zone-D Mancheswar Industrial Estate Bhubaneswar-751 010, Odisha, India. Tel: 91 674 2588552/2588554 Fax: 91 674 2585074  Turnover = 1013 crores
  • 4.  Location of Office in Rajasthan :  L-32,Income Tax Colony, Tonk Road Jaipur - 302018, Rajsthan. Tel:- 0141 2721568 Fax:- 0141 2720923,  Area of projects :  Road works  Bridge works  Railway works  Power works  Irrigation works  Real Estate works
  • 5. INTRODUCTION TO THE PROJECT  Name of Project : Construction of Six-lane RoB, Sitapura on JP-SWM Railway line.  Value of awarded work : 87.5 crore  Name of agency : ARSS Infrastructure Projects Ltd.  Need for this project : 1. To improve traffic condition. 2. It is also Benificial for Industrial area, nearby Institute & Colonies. 3. To save a lot of precious time which was being consume because of railway crossing.
  • 7. DETAILS OF ROB  6 lane and 2 way bridge  Length of bridge = 935 m  Width of bridge = 24 m at starting & 28.8 m at ending  Carriageway = 10.5 m  Total number of piers : 54  Distance between piers : 24 m c/c
  • 8. STRUCTURE OF ROB  Substructure i. Pile foundation ii. Pile cap iii. Pier iv. Pier cap v. Pedestal  Superstructure i. Girder  Reinforced Earth Wall i. Panels
  • 9. PILE FOUNDATION  Type of pile :- Friction pile  Depth of piles = 25m  Diameter of piles = 1.2m  Distance between two piles = 3D = 3.6m  Piling process :-  Excavation through piling rig machine.  Fill bentonite through bentonite feeder tank in excavated hole to stabilize it.  Place the reinforcement cage in excavated hole.  Insert and attach tremie pipes in excavated hole.  Attach the hopper at top of the tremi pipe with a lifting cap.
  • 10.  Close the hole of hopper at bottom by lifting cap and fill concrete through TM truck.  Lift the lifting cap from hopper and allow concrete to fill the hole.  Lift tremie pipe after each interval of concreting.
  • 11. PILE CAP 25 m 1.8 m 8.7 m Pile Cross-section of piles shaft :-
  • 13. PILE CAP  A pile cap is a thick concrete mat that rests on concrete piles. It distributes the load of structure into piles.  Grade of concrete used : M35  Length of pile cap = 8.7m  Width of pile cap = 5.1m  Height of pile cap = 1.8m
  • 14. Top view of pile shaft :- 8.7 m 5.1 m PILE CAP
  • 16. PIER  A pier is a structure which transfers the load coming through girder to the pile foundation. It supports the superstructure of bridge.  Concreting of pier is done with the help of pump.  Grade of concrete used : M40
  • 17. 2.5 m 1.5 m 4 m PIER Top view of pier :-
  • 18. Pier & Pier cap :-
  • 19. PIER CAP  The upper or bearing part of pier.  It is designed to distribute concentrated loads evenly over the area of the pier.  Grade of concrete used : M40
  • 20. 4000 mm2950 mm 1000 mm 500 mm PIER CAP 2950 mm Cross-section of pier cap :-
  • 21. PEDESTAL  A concrete pedestal is a compression element provided to carry the loads from supported elements of superstructure like girder, deck etc. to foundation below the ground.  Number of pedestal in a pier cap = 8
  • 22. PEDESTAL 800 mm 800 mm Top view of Pedestal :-
  • 23. GIRDER  It is a supporting structure which supports the deck.  Dimension of girder :-  1.75 m high  24 m long  Total number of girders = 196
  • 24. PANELS  No. of panels = 1221  P.C.C height under panels = 200 mm  P.C.C width under panels = 450 mm  Grade of concrete used : M35
  • 25. BATCHING PLANT  Capacity of batching plant = 15 m3/hr  Grade of concrete used  Pile & Pile cap M35  P.C.C M15  Pier & Pier cap M40  Girder M45  Deck slab M45  Panel M35  Admixer : BASF-525-Napthabase  Aggregate size : 10mm & 20mm
  • 27. EQUIPMENTS  Transit mixer :  The transit mixer is a typical concrete mixer uses a revolving drum to mix the components.  Capacity = 6 cubic meter.
  • 28.  Concrete pump :  A concrete pump is a machine used for transferring liquid concrete by pumping.
  • 29.  Hydra Crane :  It is mainly used for lifting heavy things and transporting them to other places.
  • 30.  Piling rig machine :  It is used for digging in pile foundation.
  • 31.  Needle Vibrator (60 mm dia) :  Needle vibrator is use for compaction of concrete after placing it.
  • 32.  Dump Truck :  It is used for transport the material such as aggregate, cement etc.