START OF ANY PROJECT FOR BUILDING
CONSTRUCTION
▪ Land Acquisition
▪ Land Clearance
▪ Excavation & Compaction
▪ Leveling
▪ ...
ABOUT THE THE PROJECT
Project: Assotech Blith
Group Housing
Contract : Civil Work For
Assotech Blith ,Sector
99,gurgaon ...
ABOUT THE PROJECT
▪ Seven Towers
(A,B,C,D,E&F)
▪ Tower A- G+25
▪ Tower B&b’ &C- G+22
▪ Tower D&d’ –G+18
▪ Tower E,F,G –G+2...
AESTHETIC APPEARANCE
FRONT VIEW
MATERIALS USED
Spacers Fly ash bricks Chair
MATERIALS USED
MATERIALS USED
Tie rod sikanja Prop-jack
MATERIALS USED
 CHUCKNUT-USE WITH TIE ROD
 BELLER—SQUARE PIPES
MACHINARY USED
Gemzen Machine
Batching Plant
Electric Crane
Jcb
Mechanical Pump ETC.
ACTIVITIES I HAVE BEEM TRAINED
ABOUT
Shuttering of stair
Reinforcement bar
placing
Shuttering of treads
and risers
Casting...
•PLANNING
•DESIGN
•CONSTRUCTION
•CHECKING
•FINISHING
FOR EVERY
PART
COLUMN & SHEAR-WALL
(LAYOUT)
With The Help Of Layout Plan ,We Do The Layout.
For This Face Of Any Column Is Considered a...
COLUMN & SHEAR-WALL
(STARTER)
• L –angles
• 5-7.5cms height
• High grade mortar
STARTER MAKING
Checking starter height
Column starter formwork
Checking starter clear cover distances
Column Kicker Casting
In case of column starter casting they maintained the mixing
ratio about 1:1.5:3.
After kicker casti...
COLUMN & SHEAR-WALL
(Reinforcement)
Reinforcement
with the help of
drawing given
Reinforcement Placements of Column
Reinforcement Placements of Column according to design
Tie bar spacing
checking in column
end section
Checking lapping
length
Reinforcement Placements of
Column
SHUTTERING & CASTING
Column shuttering Column casting
COLUMN CURING
wrapping column with jute fabric( ) for
Curing
23
SHUTTERING OF BEAM AND SLAB
SHUTTERING OF BEAM AND SLAB (CONTINUED)
24
Shuttering work of slab before and after placing steel sheet
Fig 16: Beam Layout
From figure, this green marking beam (Beam-2) width and
depth, I checked after beam shuttering.25
SHUT...
CENTERING OF BEAM AND SLAB
26
Centering
I Checked stirrup spacing and lapping distance of beam-2, In
figure , it is showed by green marking.
27
Floor beam layout
...
REINFORCEMENT PLACEMENT OF BEAM
(CONTINUED)
For beam-2 constriction:
 3-16mmΦ bar in top
 3-20mmΦ bar in bottom
 2-20mm...
REINFORCEMENT PLACEMENT OF SLAB
29
Placing Slab Reinforcement in long and
short direction
Placing Crank, extra top & botto...
REINFORCEMENT PLACEMENT OF SLAB
(CONTINUED)
Where I checked slab
bar spacing, lapping
length and clear
distances, which I ...
Reinforcement bar spacing given
 6ʺ c/c in short direction
 5ʺ c/c in long direction
31
Checking the extra top bar lengt...
CASTING OF BEAM AND SLAB
After finishing binding all reinforcement, it was time for
casting. Slab, beam and stair were cas...
CASTING OF BEAM AND SLAB (CONTINUED)
33
concrete mixing in mixture
machine
using crane for pulling up
the concrete
Beam ca...
CURING OF BEAM AND SLAB
34
Fig 35: Curing of beam by moist jute fabric
Fig 36: Making border for pond Fig 37: Curing of sl...
CONSTRUCTION OF STAIR
The following works are followed at the time of stair construction:
 Shuttering of stair
 Reinforc...
Shuttering of Stair
36
shuttering of Stair
SHUTTERING OF TREADS AND RISERS
After placing all reinforcements, they placed wooden planks
for making treads and risers.
...
CASTING & CURING OF STAIR
38
Using vibrator during stair casting Curing of stair by moist jute fabric
23-Dec-15
BRICK WORK
Layout
BRICK WORK
Brick work Masonry
Finishing
BRICK WORK
Curing
Plastering
Curing
Painting& distempering
SAFETY REQUIREMENTS
▪Need to wear helmet all the time
▪Proper fencing is done
▪First aid kit is available along with
safet...
CONCLUSION
▪ Gained basic knowledge in the field of construction.
▪ Learned an importance of proper communication
between ...
BIBLIOGRAPHY
▪ http://www.slideshare.net/sh.robin27/superstructural-construction-
work-of-a-six-storied-residential-buildi...
Upcoming SlideShare
Loading in …5
×

Construction of residential building summer training ppt

presentation on summer training for 45 days on the topic construction of residential building

  • Login to see the comments

Construction of residential building summer training ppt

  1. 1. RESIDENTIAL BUILDING SUMIT SINGH ROLL NO:1309000107 IEC-CET CIVIL ENGINEERING 4TH YEAR Summer training on from Skyline engineering contracts (India) pvt. Ltd.
  2. 2. START OF ANY PROJECT FOR BUILDING CONSTRUCTION ▪ Land Acquisition ▪ Land Clearance ▪ Excavation & Compaction ▪ Leveling ▪ Demarcation Plan ▪ Layout , Shuttering And Footing ▪ Onward Construction Of Substructure & Super Structure
  3. 3. ABOUT THE THE PROJECT Project: Assotech Blith Group Housing Contract : Civil Work For Assotech Blith ,Sector 99,gurgaon (Haryana) Clint : Assotech Limited. Contractor: Skyline Engineering Contracts (India)pvt.Ltd.
  4. 4. ABOUT THE PROJECT ▪ Seven Towers (A,B,C,D,E&F) ▪ Tower A- G+25 ▪ Tower B&b’ &C- G+22 ▪ Tower D&d’ –G+18 ▪ Tower E,F,G –G+22 ▪ 12 Acres
  5. 5. AESTHETIC APPEARANCE
  6. 6. FRONT VIEW
  7. 7. MATERIALS USED Spacers Fly ash bricks Chair
  8. 8. MATERIALS USED
  9. 9. MATERIALS USED Tie rod sikanja Prop-jack
  10. 10. MATERIALS USED  CHUCKNUT-USE WITH TIE ROD  BELLER—SQUARE PIPES
  11. 11. MACHINARY USED Gemzen Machine Batching Plant Electric Crane Jcb Mechanical Pump ETC.
  12. 12. ACTIVITIES I HAVE BEEM TRAINED ABOUT Shuttering of stair Reinforcement bar placing Shuttering of treads and risers Casting of stair Curing of stair STAIRCASE Layout Starter Brick wall Masonry Finishing Curing Plastering Curing Painting& distempering BRICKWORK Leveling Formwork Reinforceme nt Concreting Finishing Curing SLAB& BEAMS Layout Starter Reinforceme nt Formwork Concreting Curing COLOUMS & SHEAR-WALL
  13. 13. •PLANNING •DESIGN •CONSTRUCTION •CHECKING •FINISHING FOR EVERY PART
  14. 14. COLUMN & SHEAR-WALL (LAYOUT) With The Help Of Layout Plan ,We Do The Layout. For This Face Of Any Column Is Considered as Reference Distance Of Other Column Faces Is Measured To Fix Layout Marking --Thread Is Used
  15. 15. COLUMN & SHEAR-WALL (STARTER) • L –angles • 5-7.5cms height • High grade mortar
  16. 16. STARTER MAKING Checking starter height Column starter formwork Checking starter clear cover distances
  17. 17. Column Kicker Casting In case of column starter casting they maintained the mixing ratio about 1:1.5:3. After kicker casting of column-2
  18. 18. COLUMN & SHEAR-WALL (Reinforcement) Reinforcement with the help of drawing given
  19. 19. Reinforcement Placements of Column Reinforcement Placements of Column according to design
  20. 20. Tie bar spacing checking in column end section Checking lapping length Reinforcement Placements of Column
  21. 21. SHUTTERING & CASTING Column shuttering Column casting
  22. 22. COLUMN CURING wrapping column with jute fabric( ) for Curing
  23. 23. 23 SHUTTERING OF BEAM AND SLAB
  24. 24. SHUTTERING OF BEAM AND SLAB (CONTINUED) 24 Shuttering work of slab before and after placing steel sheet
  25. 25. Fig 16: Beam Layout From figure, this green marking beam (Beam-2) width and depth, I checked after beam shuttering.25 SHUTTERING OF BEAM AND SLAB (CONTINUED)
  26. 26. CENTERING OF BEAM AND SLAB 26 Centering
  27. 27. I Checked stirrup spacing and lapping distance of beam-2, In figure , it is showed by green marking. 27 Floor beam layout REINFORCEMENT PLACEMENT OF BEAM (CONTINUED)
  28. 28. REINFORCEMENT PLACEMENT OF BEAM (CONTINUED) For beam-2 constriction:  3-16mmΦ bar in top  3-20mmΦ bar in bottom  2-20mmΦ extra bars in bottom  3-16mmΦ extra bars in top  For stirrup 10mmΦ bar 28 Floor beam-2 section
  29. 29. REINFORCEMENT PLACEMENT OF SLAB 29 Placing Slab Reinforcement in long and short direction Placing Crank, extra top & bottom Reinforcement in slab
  30. 30. REINFORCEMENT PLACEMENT OF SLAB (CONTINUED) Where I checked slab bar spacing, lapping length and clear distances, which I have showed in figure by red marking line. 30 Slab Layout Plan
  31. 31. Reinforcement bar spacing given  6ʺ c/c in short direction  5ʺ c/c in long direction 31 Checking the extra top bar length REINFORCEMENT PLACEMENT OF SLAB (CONTINUED)
  32. 32. CASTING OF BEAM AND SLAB After finishing binding all reinforcement, it was time for casting. Slab, beam and stair were casting at a time. In my site was used cement, sand and bricks chips ratio ware 1:1.5:3. 32
  33. 33. CASTING OF BEAM AND SLAB (CONTINUED) 33 concrete mixing in mixture machine using crane for pulling up the concrete Beam casting During slab casting, using vibrator & Steel runner.
  34. 34. CURING OF BEAM AND SLAB 34 Fig 35: Curing of beam by moist jute fabric Fig 36: Making border for pond Fig 37: Curing of slab by ponding of water
  35. 35. CONSTRUCTION OF STAIR The following works are followed at the time of stair construction:  Shuttering of stair  Reinforcement bar placing  Shuttering of treads and risers  Casting of stair  Curing of stair 35
  36. 36. Shuttering of Stair 36 shuttering of Stair
  37. 37. SHUTTERING OF TREADS AND RISERS After placing all reinforcements, they placed wooden planks for making treads and risers. 37 Checking tread width checking riser height 23-Dec-15
  38. 38. CASTING & CURING OF STAIR 38 Using vibrator during stair casting Curing of stair by moist jute fabric 23-Dec-15
  39. 39. BRICK WORK Layout
  40. 40. BRICK WORK Brick work Masonry Finishing
  41. 41. BRICK WORK Curing Plastering Curing Painting& distempering
  42. 42. SAFETY REQUIREMENTS ▪Need to wear helmet all the time ▪Proper fencing is done ▪First aid kit is available along with safety engineer as well as doctor ▪At height safety belts are also required
  43. 43. CONCLUSION ▪ Gained basic knowledge in the field of construction. ▪ Learned an importance of proper communication between office and work site. ▪ Learned wise use of available resources. ▪ The training has revamped my confidence. ▪ Learn about safety requirments at site. ▪ I m happy that I choose civil engineering.
  44. 44. BIBLIOGRAPHY ▪ http://www.slideshare.net/sh.robin27/superstructural-construction- work-of-a-six-storied-residential-building-65669135?qid=3e2ebd50- ffe6-41f8-bcdb-73c103e3af25&v=&b=&from_search=2 ▪ http://www.slideshare.net/AbhishekSingh892/an-internship-report-on- residential-building-construction?qid=ad32e196-5a77-4394-8500- 7a2bb466e499&v=&b=&from_search=3 ▪ Mentor’s notes.

×