My self Imteyaz. Ahmad. having reach experience(12 yrs) in MEP field Site /Project management (specially hotel project) . with design review & drawing coordination, tendering , cost budgeting , bill verification.
I got technical education from central university i.e A.M.U. Aligarh.
Currently working with Maxim infrastructure & real estate Pvt. Ltd.(HM GROUP) on the Marriott Hotel Project Shillong (Meghalaya).
Thanks & Regards
8014316443
Pankaj Resume - Construction Project ManagerPankaj Singh
8+ years of Civil Engineering experience and 5.5 years of experience in Information Technology (Legacy Applications) with 5 years of onsite (USA) experience
SUMMARY OF SKILLS
Expertise in Estimation softwares like HIT Office etc.
MS Office Proficient
Excellent in Internet and email communication
Knowledge of AUTOCAD and Primavera - P6
Team Building & Leadership
Construction Planning & Scheduling
Quality Assurance (QA) & Quality Control (QC) eviews, using Root Cause Analysis
Communication management
Safety & Compliance Management
Vendor & Materials Management
HR management
Excellent Interpersonal skills
As construction industry professional with over 30 years’ insightful experience in planning and execution of civil, structural & mechanical construction projects predominantly for diverse industrial facilities; I offer the distinction of spearheading construction projects costing up to INR 800 Cr. for last 15+ years, and currently working as Project Head with Godrej & Boyce mfg Co. Company, since August’15. Previously I have worked with Linde Engineering India , UDHE India Ltd. & Shapoorji Pallonji in the capacities of Sr. Construction Manager & Construction manager at different stages of my career.
In my current capacity I am leading a multidisciplinary INR 300 Cr. Factory expansion Project at Mohali Punjab. I have developed and demonstrated leadership skills in post-contract engineering, procurement and contracting functions including technical and commercial administration of contracts, and coordination with project participants & external agencies to bring out on time deliveries in alignment with approved schedule while resolving all execution conflicts and bottlenecks. I am proficient in working in ERP environment and computerized office working. I am fully conversant with steel structures and till date have carried out app 25000 tos of fabrication and erection of steel structures. In Algeria I have handled app 17000 M tons of steel fabrication and erection for Sorfert Fertilizers. I am also fully coversant with architectural finishes of buildings, landscaping and construction of hospitals and hotels. I am also conversant with specialized piping activities for SS Duplex and other special metals. I have experience in heavy lift erection including tandem lift. I have successfully carried out erection of 45 mt 350 ton columns and hydrogen buffer vessel 250 mts. I have experience in erection of aluminium silos and other highly complicated erection of misc equipments.
Looking for Hawaii vacation packages? SIT vacation offer extensive packages for Hawaii travelers and make your vacations at the most beautiful place on earth.
Pankaj Resume - Construction Project ManagerPankaj Singh
8+ years of Civil Engineering experience and 5.5 years of experience in Information Technology (Legacy Applications) with 5 years of onsite (USA) experience
SUMMARY OF SKILLS
Expertise in Estimation softwares like HIT Office etc.
MS Office Proficient
Excellent in Internet and email communication
Knowledge of AUTOCAD and Primavera - P6
Team Building & Leadership
Construction Planning & Scheduling
Quality Assurance (QA) & Quality Control (QC) eviews, using Root Cause Analysis
Communication management
Safety & Compliance Management
Vendor & Materials Management
HR management
Excellent Interpersonal skills
As construction industry professional with over 30 years’ insightful experience in planning and execution of civil, structural & mechanical construction projects predominantly for diverse industrial facilities; I offer the distinction of spearheading construction projects costing up to INR 800 Cr. for last 15+ years, and currently working as Project Head with Godrej & Boyce mfg Co. Company, since August’15. Previously I have worked with Linde Engineering India , UDHE India Ltd. & Shapoorji Pallonji in the capacities of Sr. Construction Manager & Construction manager at different stages of my career.
In my current capacity I am leading a multidisciplinary INR 300 Cr. Factory expansion Project at Mohali Punjab. I have developed and demonstrated leadership skills in post-contract engineering, procurement and contracting functions including technical and commercial administration of contracts, and coordination with project participants & external agencies to bring out on time deliveries in alignment with approved schedule while resolving all execution conflicts and bottlenecks. I am proficient in working in ERP environment and computerized office working. I am fully conversant with steel structures and till date have carried out app 25000 tos of fabrication and erection of steel structures. In Algeria I have handled app 17000 M tons of steel fabrication and erection for Sorfert Fertilizers. I am also fully coversant with architectural finishes of buildings, landscaping and construction of hospitals and hotels. I am also conversant with specialized piping activities for SS Duplex and other special metals. I have experience in heavy lift erection including tandem lift. I have successfully carried out erection of 45 mt 350 ton columns and hydrogen buffer vessel 250 mts. I have experience in erection of aluminium silos and other highly complicated erection of misc equipments.
Looking for Hawaii vacation packages? SIT vacation offer extensive packages for Hawaii travelers and make your vacations at the most beautiful place on earth.
Blog Państwowego Muzeum Etnograficznego w Warszawieblogifirmowe.com
Prezentacja na temat prowadzenia bloga Muzeum Etnograficznego w Warszawie wygłoszona podczas seminarium podsumowującego wyniki konkursu BLOG FIRMOWY ROKU 2014.
Internet w polskich firmach w świetle badań - 2013blogifirmowe.com
Prezentacja Andrzeja Garapicha, prezesa Polskich Badań Internetu wygłoszona podczas Seminarium podsumowującego wyniki konkursu na BLOG FIRMOWY ROKU 2012. Styczeń 2013.
Prezentacja na temat videobloga Jurak Owsiaka wygłoszona przez Karolinę Rojek (Kręcioła.tv) z Wielkiej Orkiestry Świątecznej Pomocy na konferencji BLOG FIRMOWY ROKU 2014.
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxR&R Consult
CFD analysis is incredibly effective at solving mysteries and improving the performance of complex systems!
Here's a great example: At a large natural gas-fired power plant, where they use waste heat to generate steam and energy, they were puzzled that their boiler wasn't producing as much steam as expected.
R&R and Tetra Engineering Group Inc. were asked to solve the issue with reduced steam production.
An inspection had shown that a significant amount of hot flue gas was bypassing the boiler tubes, where the heat was supposed to be transferred.
R&R Consult conducted a CFD analysis, which revealed that 6.3% of the flue gas was bypassing the boiler tubes without transferring heat. The analysis also showed that the flue gas was instead being directed along the sides of the boiler and between the modules that were supposed to capture the heat. This was the cause of the reduced performance.
Based on our results, Tetra Engineering installed covering plates to reduce the bypass flow. This improved the boiler's performance and increased electricity production.
It is always satisfying when we can help solve complex challenges like this. Do your systems also need a check-up or optimization? Give us a call!
Work done in cooperation with James Malloy and David Moelling from Tetra Engineering.
More examples of our work https://www.r-r-consult.dk/en/cases-en/
Event Management System Vb Net Project Report.pdfKamal Acharya
In present era, the scopes of information technology growing with a very fast .We do not see any are untouched from this industry. The scope of information technology has become wider includes: Business and industry. Household Business, Communication, Education, Entertainment, Science, Medicine, Engineering, Distance Learning, Weather Forecasting. Carrier Searching and so on.
My project named “Event Management System” is software that store and maintained all events coordinated in college. It also helpful to print related reports. My project will help to record the events coordinated by faculties with their Name, Event subject, date & details in an efficient & effective ways.
In my system we have to make a system by which a user can record all events coordinated by a particular faculty. In our proposed system some more featured are added which differs it from the existing system such as security.
Welcome to WIPAC Monthly the magazine brought to you by the LinkedIn Group Water Industry Process Automation & Control.
In this month's edition, along with this month's industry news to celebrate the 13 years since the group was created we have articles including
A case study of the used of Advanced Process Control at the Wastewater Treatment works at Lleida in Spain
A look back on an article on smart wastewater networks in order to see how the industry has measured up in the interim around the adoption of Digital Transformation in the Water Industry.
Cosmetic shop management system project report.pdfKamal Acharya
Buying new cosmetic products is difficult. It can even be scary for those who have sensitive skin and are prone to skin trouble. The information needed to alleviate this problem is on the back of each product, but it's thought to interpret those ingredient lists unless you have a background in chemistry.
Instead of buying and hoping for the best, we can use data science to help us predict which products may be good fits for us. It includes various function programs to do the above mentioned tasks.
Data file handling has been effectively used in the program.
The automated cosmetic shop management system should deal with the automation of general workflow and administration process of the shop. The main processes of the system focus on customer's request where the system is able to search the most appropriate products and deliver it to the customers. It should help the employees to quickly identify the list of cosmetic product that have reached the minimum quantity and also keep a track of expired date for each cosmetic product. It should help the employees to find the rack number in which the product is placed.It is also Faster and more efficient way.
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...Amil Baba Dawood bangali
Contact with Dawood Bhai Just call on +92322-6382012 and we'll help you. We'll solve all your problems within 12 to 24 hours and with 101% guarantee and with astrology systematic. If you want to take any personal or professional advice then also you can call us on +92322-6382012 , ONLINE LOVE PROBLEM & Other all types of Daily Life Problem's.Then CALL or WHATSAPP us on +92322-6382012 and Get all these problems solutions here by Amil Baba DAWOOD BANGALI
#vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore#blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #blackmagicforlove #blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #Amilbabainuk #amilbabainspain #amilbabaindubai #Amilbabainnorway #amilbabainkrachi #amilbabainlahore #amilbabaingujranwalan #amilbabainislamabad
Forklift Classes Overview by Intella PartsIntella Parts
Discover the different forklift classes and their specific applications. Learn how to choose the right forklift for your needs to ensure safety, efficiency, and compliance in your operations.
For more technical information, visit our website https://intellaparts.com
Democratizing Fuzzing at Scale by Abhishek Aryaabh.arya
Presented at NUS: Fuzzing and Software Security Summer School 2024
This keynote talks about the democratization of fuzzing at scale, highlighting the collaboration between open source communities, academia, and industry to advance the field of fuzzing. It delves into the history of fuzzing, the development of scalable fuzzing platforms, and the empowerment of community-driven research. The talk will further discuss recent advancements leveraging AI/ML and offer insights into the future evolution of the fuzzing landscape.
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)MdTanvirMahtab2
This presentation is about the working procedure of Shahjalal Fertilizer Company Limited (SFCL). A Govt. owned Company of Bangladesh Chemical Industries Corporation under Ministry of Industries.
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Imteyaz ahmad 12 yrs exp in MEP (Site / Project Management)
1. E-maiil ID: imteyazahmad78@gmail.com
Imteyaz Ahmad
Mob. No.: +91-8014316443
Career Objective:
Seeking challenging and progressive career with a reputed organization offering better
future prospects and professional environment.
PROFESSIONAL Qualification:
3 Years Diploma in DRAFTING & DESIGNING IN MECHANICAL ENGINEERING from
University Polytechnic, A.M.U. Aligarh, in 2003.
TOTAL EXPERIENCE: 12+ YEARS
Project Completed
1. Planning, Execution & Management of MEP work of Hotel
Ramada, Jaipur. (with Aimer air-conditioning Pvt.Ltd )
2. Planning, Execution & Management of HVAC work of City Mall,
Jaipur. (with Aimer air-conditioning Pvt.Ltd )
3. Planning, Execution & Management of MEP work of Park Inn
Hotel Jaipur. (with Aimer air-conditioning Pvt.Ltd )
4. Planning, Execution & Management of HVAC work of City Pulse,
Jaipur. (with Aimer air-conditioning Pvt.Ltd )
5. Planning, Execution & Management of HVAC work of Eleganzza
Mall, Dehradun part a. (with Aimer air-conditioning Pvt.Ltd )
6. Radisson Hotel Agra. (with sincere Developer Pvt.Ltd)
7. Taj gateway hotel & office block Faridabad (M B MALL Pvt.Ltd )
8. Gold souk Chennai (Ramada hotel & mall) & Gold souk Ludhiana.
(With Gold Souk International Limited.)
MAXIM INFRASTRUCTURE & REAL STATE PVT. LTD (HM GROUP)
PROJECT: MARRIOTT HOTEL SHILLONG
2. MANAGER MEP DURATION – MAY 13 TO TILL DATE
CURRENT RESPONSIBILITY:-
- Project scheduling including material and manpower planning.
- Tendering Cost budgeting, Coordination of drawing & work. Design reviewing.
- Monitoring site progress and coordinating with site team to clear on-site technical dependencies for
early completion of projects. Project co-ordination, monitoring and control of project time and cost.
- Ensure effective management and discipline to ensure safe execution of the project.
- Interacting with Architects/ Consultant and other department to understand their requirement &
providing necessary technical support.
- Checking Services drawings and preparing practical layout for erection and commissioning of project.
- Reporting to director regarding planning & Progress.
- Supervision of Services works carried out by contractors covering HVAC, Plumbing, Fire fighting,
STP, WTP, Lift, Boiler, LV (CCTV, Fire alarm system, DATA &Telephone, MATV, BMS) &
Electrical Works.
- Involved in Installation, Testing & Commissioning of Services Works.
- Preparation of Single line Diagrams, Load calculation (HVAC, Fire fighting, Plumbing ,Electrical)
- Involved in measurement and billing of Services work carried out by contractor.
- Interacting with contractor and supplier for providing technical inputs & engineering support from
conception to completion of project and shorting out technical and other project related issue.
Project Details;-
AERENS GOLD SOUK INTERNATIONAL LIMITED
(CORPORATE OFFICE GURGAON)
DEPUTY MANAGER MEP DURATION – JAN 12 TO
FAB13
RESPONSIBILITY:-
- Tendering Cost budgeting, Coordination of drawing & work. Design reviewing.
- Monitoring site progress and coordinating with site team to clear on-site technical dependencies for
early completion of projects. Project co-ordination, monitoring and control of project time and cost.
- Ensure effective management and discipline to ensure safe execution of the project.
- Interacting with Architects/ Consultant and other department to understand their requirement &
providing necessary technical support.
- Checking Services drawings and preparing practical layout for erection and commissioning of project.
- Reporting to APV regarding planning & Progress.
- Supervision of Services works carried out by contractors covering HVAC, Plumbing, Fire fighting,
STP, WTP, Lift, Boiler, LV (CCTV, Fire alarm system, DATA &Telephone, MATV, BMS) &
Electrical Works.
- Preparation of Single line Diagrams, Load calculation (HVAC, Fire fighting, Plumbing ,Electrical)
- Involved in measurement and billing of Services work carried out by contractor.
- Interacting with contractor and supplier for providing technical inputs & engineering support from
conception to completion of project and shorting out technical and other project related issue.
3. M B MALL (P) LTD. FARIDABAD
PROJECT: TAJ GATEWAY HOTEL AND OFFICES FARIDABAD
ASST. MANAGER – MEP DURATION– JUN 10 TO DEC 11
RESPONSIBILITY:-
- Project scheduling including material and manpower planning.
- Tendering, Cost budgeting, Coordination of drawing & work
- Monitoring site progress and coordinating with site team to clear on-site technical dependencies for
early completion of projects. Project co-ordination, monitoring and control of project time and cost.
- Ensure effective management and discipline to ensure safe execution of the project.
- Interacting with Architects/ Consultant and other department to understand their requirement &
providing necessary technical support.
- Checking Services drawings and preparing practical layout for erection and commissioning of project.
- Reporting to technical director regarding daily schedule, man power, material planning.
- Supervision of Services works carried out by contractors covering HVAC, Plumbing, Fire fighting,
STP, WTP, Lift, Boiler, LV (CCTV, Fire alarm system, DATA &Telephone, MATV, BMS) &
Electrical Works.
- Involved in Installation, Testing & Commissioning of Services Works including Laundry, kitchen,
health club, swimming pool equipments.
- Preparation of Single line Diagrams, Load calculation. (HVAC, Fire fighting, Plumbing ,Electrical)
- Involved in measurement and billing of Services work carried out by contractor.
- Interacting with contractor and supplier for providing technical inputs & engineering support from
conception to completion of project and shorting out technical and other project related issue.
SINCERE DEVELOPERS (P) LTD. AGRA
PROJECT: RADISSON AGRA COMPLETED
ASST. MANAGER – MEP DURATION – JUN 09 TO JUN 10
RESPONSIBILITY:-
- Project scheduling including material and manpower planning.
- Tendering, Cost budgeting, Coordination of drawing & work
- Monitoring site progress and coordinating with site team to clear on-site technical dependencies for
early completion of projects. Project co-ordination, monitoring and control of project time and cost.
- Ensure effective management and discipline to ensure safe execution of the project.
- Interacting with Architects/ Consultant and other department to understand their requirement &
providing necessary technical support.
- Checking Services drawings and preparing practical layout for erection and commissioning of project.
- Reporting to technical director regarding daily schedule, man power problems, material planning.
- Supervision of Services works carried out by contractors covering HVAC, Plumbing, Fire fighting,
STP, WTP, Boiler, Hot water generator, LV (CCTV, Fire alarm system, DATA &Telephone ,
MATV,BMS) & Electrical Works.
- Involved in Installation, Testing & Commissioning of Services Works including Laundry, kitchen,
health club, swimming pool equipments.
- Preparation of Single line Diagrams, Load calculation. (HVAC, Fire fighting, Plumbing ,Electrical)
- Involved in measurement and billing of Services work carried out by contractor.
- Interacting with contractor and supplier for providing technical inputs & engineering support from
conception to completion of project and shorting out technical and other project related issue.
AIMER AIR CONDITIONING PVT. LTD., DELHI
4. FROM JUNIOR ENGINEER (DESIGN) TO SR. ENGINEER – HVAC
DURATION – OCT 03 TO JUN 09
RESPONSIBILITY:-
• To visit the site and select appropriate positioning for indoor, outdoor, AHU ducting
and coordinating with project Engineer, Consultant/Architect/Builder.
• Installation of Ducting, Piping, Ductable Split Unit, FCU, AHU, Pump &Chillers.
• Designing of Duct, Heat load calculation, Grills, and Diffusers and taking approval
from Consultant.
• Taking approval on Drawings for starting the project.
• Estimating and valuing the projects and submitting
• To ensure the necessary quantities of material and delivering it at site.
• To ensure Quality control and Material Procurement.
• To coordinate with the consultant, architect and clients involved in the project.
• To check the quality of work during execution of project and improve it to the best
possible
• To take prices from supplier and negotiate to the least and agreeable price.
• To handle a team of workers during execution and commissioning.
• To collect payments and do other documentation at site.
• Reporting to Branch Manager and Project Manager on weekly and monthly basis.
• To ensure the safe work practices.
Computer Knowledge:
Auto CAD, MS Office, MS Project, Windows & Internet.
Personal Memorandum:
Father’s Name : Mr. Sheik Mohammed Aliyas
Correspondence Address : House No.2 Lane No.2
Near Basir Hospital
(DamDubi Main road
Taj Nagar,
Post Kopali Jamshedpur
Jharkhand
Date of Birth : October 28, 1978
Nationality : INDIAN
Marital Status : Married
Expected salary : INR 90000/month
5. Notice period : One & half month
Date: 28.08.2015
Place: Shillong (IMTEYAZ AHMAD)
6. Notice period : One & half month
Date: 28.08.2015
Place: Shillong (IMTEYAZ AHMAD)