RAGHAVENDRA T R
Contact: +91 9620021080
E-Mail: raghumek@gmail.com,raghumek@yahoo.com
In quest of managerial assignments in Coordinator (MEP) with a leading organization of high, repute in Construction industry,
preferably in Bangalore
Recently completed the REVIT-MEP & FIRE FIGHTING DESIGN courses from Taiba Engineering consultants, Bangalore.
EMPLOYMENT DETAIL
Since Mar’13 JMC Projects (I) Ltd., Delhi as Assistant Manager (Mechanical)
Jun’12-Feb’13 URC Construction (P) Ltd., Bangalore as Senior Engineer (Mechanical)
Jan’11-May’12 Larsen & Toubro Limited (L&T), ECC Division, TPPC Business Unit, Mumbai as Senior
Engineer (Mechanical)
Aug’08-Aug’10 Pratibha Industries Ltd., Mumbai as Junior Engineer
PROFILE SNAPSHOT
A dedicated & goal-oriented professional with nearly 8 years of experience in:
-Project Execution -Site Management
-MEP Operations -Reporting & Documentation -Liaison & Coordination
• A keen planner with experience in handling the gamut of tasks right from planning, monitoring, controlling phases of project
lifecycle to overall inter-discipline coordination, administration and resource planning
• Talent for proactively identifying & resolving problems, ramping up the project activities with on time deliverables and
maximizing productivity
• Deft at handling entire lifecycle from project definition & business requirements gathering, through implementation,
including integration, training, etc.
• Possesses experience in REVIT-MEP 2015 Module
• Played a pivotal role in handling 3x660MW Coal Fired Thermal Power MAHAGENCO Project, Nagpur, India
• A team player with exceptional analytical & interpersonal skills
My overall field of responsibilities as Asst Manager-MEP Services in Project Management Services is composed of several
different types of activities such as:
Project Management:
• Understanding project scope of work, participating in technical discussion ensuring compliance with the prescribed
company & clients standards and statutory regulations.
• Preparing project schedules and monitoring projects with respect to cost, resource deployment and time over-runs to
ensure timely execution of projects
1. Conducting Weekly Design review meeting & Progress review meetings, reviewing the progress according to the
schedules and Record of progress through minutes.
2. Exhaustive analysis of the proposed BOQ with costing and estimates. Check the materials proposed in the design for
their quality, cost and time of delivery.
3. Space planning for MEP services like HVAC, firefighting services, and PHE .
4. Analysis of vendor background at the time of pre-qualification by transparent and auditable process of vendor
selection, recommendation & finalizing of Vendors
5. Work closely with all segments, functions & business development teams & interact with functional leader to provide
reports & analysis for the executive management committee
6. Planning, scheduling, quality management & cost monitoring-measurement checking at every stage of the project.
7. Daily updating and preparing Weekly and Monthly Reports and tracking the Progress as per Schedule.
8. Tracking and reporting progress (Timeline, cash-flow, major issues, decisions and major action points).
BIM Modeling (Revit MEP)
Preparation of central file location●
Construction and coordination of Revit MEP model for specification, schematic, etc. setting up levels, grids, views, browser●
arrangement, and family arrangement.
Creating Work sets and Filters.●
Creating appropriate types and systems of services matching the project specifications.●
Grouping/modifying/or creating families, creating necessary views for construct of models,●
Creation file sharing, etc.
Developing 3d models of Hvac, fire fighting, plumbing.●
Set up and used both – equipment based and individual systems for pipe, ducts and other●
extrudes in Revit MEP.
Creating 3d views Level by level for Navis works clash study.●
Projecting Sheets with annotated layout, sections, 3D view tagging layouts, etc.●
Run Interference check between Arc, STR, and MEP disciplines●
Finishing Operations (ACP, Glazing, Metal false ceiling, Louvers):
• Studying drawings & Studying site condition and plans for the structural glazing, suspended false ceiling.
• Execution and supervision Execution and supervision of finishing works, Material procurement, dealing with consultants, co-
coordinating with sub-contractors, safety or works, getting permits to works etc.
ACADEMIC DETAILS
2009 PG Diploma in Process Piping Engineering & Design from of Asian academy of professional
Training, Pune
2008 BE(mechanical) from Bapuji Institute of Engineering and Technology, Davangere, VTU
University with 65.05%
CERTIFICATION
• SAP-PM Certified Professional (SAP AG)
• Piping Design and Engineering
• REVIT-MEP 2015
IT SKILLS
• Well versed with:
o Software-AutoCAD, most2D, ITEM-CAD.
o REVIT-MEP 2015
PERSONAL DETAILS
Date of Birth: 2nd
May, 1985
Permanent Address: #713/17, Srinivasa Nilaya, 1st
Cross, 1st
Main, Shiva kumara Layout, Hadadi Road, Davangere-
577005, Karnataka
Languages Known: Hindi, English and Kannada
Nationality: Indian
Marital status: Married
LinkedIn: raghushashitr
No. of dependents: 5 people
Passport No: G7583875
Driving License: KA 17 20052003509
Please refer to Annexure for Major Projects details
ANNEXURE
MAJOR PROJECTS
With JMC (I) Ltd., Delhi
Project Name: Delhi Metro Rail Project, Delhi, India
Period: Mar’15-Till Date
Role: Assistant Manager (Mechanical)
Description: Design & Execution of 8.9km viaduct including five elevated stations
With JMC (I) Ltd., Bangalore
Project Name: Bangalore Metro Rail Project, Karnataka, India
Period: Mar’13-Apr’15
Role: Assistant Manager (Mechanical)
Description: Design & execution of 2.8km viaduct including three elevated stations.
Job profile:
1. Monitor drawing / material / work conformances with provisions as per specification / IS & NFPA regulations.
2. Check the activities on site and provide the necessary reminders to the Project Director, Construction Manager and the Planning
Engineer for any immediate action.
3. Supervise the production of co-ordination drawings to ensure that all services are coordinated with each other and the building
structure is complying with the contract requirements.
4. Ensure all builders works drawings are comprehensive and discussed with the various engineers for the best implementation and
installation of services in coordination with other parties and main contractor.
5. Provide reminders, in advance, to the Project Director for any anticipated conflict that may happen in the future with respect to the
simultaneous activities of all MEP trades and main contractors.
6. Follow up the status of material and shop drawings and keep all parties informed of the status and follow up the implementation of
the Clients comments in timely manner.
7. Distribute detailed information, documents and regulations as applicable to all concerned parties and ensure their
acknowledgement and adherence to its contents.
8. Coordinate with main contractors, sub-contractors, MEP coordinator, Engineers and Construction Manager to obtain clearance
before starting the work to ensure smooth and efficient execution of work.
9. Provide Technical support and solve all Site technical issues to ensure completion of Projects within the stipulated time.
10. Site Visit as per site requirement to resolve the site related issues & problems arising out during execution stage
11. At project close out co-ordinate the production of as built drawings to ensure they are delivered as per the contract requirements
in terms of quality and time
With URC Construction (P) Ltd., Bangalore
Project Title: Fowler Webstrup India Pvt. Ltd., Malur, Karnataka, India
Period: Jun’12-Jan’13
Role: Senior Engineer (Mechanical)
Owner: Fowler Webstrup
Client: Fowler Webstrup consultants
With Larsen & Toubro Limited (L&T), ECC Division, TPPC Business Unit, Mumbai
Project Title: 3x660MW Coal Fired Thermal Power MAHAGENCO Project, Nagpur, India
Period: Feb’12-May’12
Role: Senior Engineer (Mechanical)
Owner: Mahagenco
Client: L&T Power
Project Title: 5x660MW Coal Fired Thermal Power APL Project, Mundra, Gujarat, India
Period: Jan’11-Feb’12
Role: Senior Engineer (Mechanical)
Owner: Adani Power Limited
Client: SEPCOIII Electric Power Construction CORP
With Pratibha Industries Ltd., Mumbai
Project Title: Commercial Phase II, Mulund, Mumbai
Period: Aug’08-Aug’10
Role: Junior Engineer(Mechanical-execution)
Owner: Nirmal life styles (P) ltd.,
Client: Sterling Consultancy Services Pvt. Ltd.
Project Title: Imperial Heights, Mumbai Central, Mumbai
Role: Junior Engineer(Mechanical-execution)
Owner: SPCL
Client: Sterling Consultancy Services Pvt. Ltd.
Description: It included Structure of 150 MT, 22 M Height Steel Crown Structure for India’s Tallest Tower.
Period: Aug’08-Aug’10
Project Title: Office of Ichiban Honda, Kalina, Mumbai
Client: GMS
Period: Aug’08-Aug’10
Role: Junior Engineer(Mechanical-execution)
Owner: Inchiban Honda.,
Client: Techflow Consultancy Services Pvt. Ltd.
Description: It entailed the Structure of 1700 MT of Unsymmetrical Shape & Huge Cantilever Area of Building.

raghavendra _CO-ORDINATOR(MEP)

  • 1.
    RAGHAVENDRA T R Contact:+91 9620021080 E-Mail: raghumek@gmail.com,raghumek@yahoo.com In quest of managerial assignments in Coordinator (MEP) with a leading organization of high, repute in Construction industry, preferably in Bangalore Recently completed the REVIT-MEP & FIRE FIGHTING DESIGN courses from Taiba Engineering consultants, Bangalore. EMPLOYMENT DETAIL Since Mar’13 JMC Projects (I) Ltd., Delhi as Assistant Manager (Mechanical) Jun’12-Feb’13 URC Construction (P) Ltd., Bangalore as Senior Engineer (Mechanical) Jan’11-May’12 Larsen & Toubro Limited (L&T), ECC Division, TPPC Business Unit, Mumbai as Senior Engineer (Mechanical) Aug’08-Aug’10 Pratibha Industries Ltd., Mumbai as Junior Engineer PROFILE SNAPSHOT A dedicated & goal-oriented professional with nearly 8 years of experience in: -Project Execution -Site Management -MEP Operations -Reporting & Documentation -Liaison & Coordination • A keen planner with experience in handling the gamut of tasks right from planning, monitoring, controlling phases of project lifecycle to overall inter-discipline coordination, administration and resource planning • Talent for proactively identifying & resolving problems, ramping up the project activities with on time deliverables and maximizing productivity • Deft at handling entire lifecycle from project definition & business requirements gathering, through implementation, including integration, training, etc. • Possesses experience in REVIT-MEP 2015 Module • Played a pivotal role in handling 3x660MW Coal Fired Thermal Power MAHAGENCO Project, Nagpur, India • A team player with exceptional analytical & interpersonal skills My overall field of responsibilities as Asst Manager-MEP Services in Project Management Services is composed of several different types of activities such as: Project Management: • Understanding project scope of work, participating in technical discussion ensuring compliance with the prescribed company & clients standards and statutory regulations. • Preparing project schedules and monitoring projects with respect to cost, resource deployment and time over-runs to ensure timely execution of projects 1. Conducting Weekly Design review meeting & Progress review meetings, reviewing the progress according to the schedules and Record of progress through minutes. 2. Exhaustive analysis of the proposed BOQ with costing and estimates. Check the materials proposed in the design for their quality, cost and time of delivery. 3. Space planning for MEP services like HVAC, firefighting services, and PHE . 4. Analysis of vendor background at the time of pre-qualification by transparent and auditable process of vendor selection, recommendation & finalizing of Vendors 5. Work closely with all segments, functions & business development teams & interact with functional leader to provide reports & analysis for the executive management committee 6. Planning, scheduling, quality management & cost monitoring-measurement checking at every stage of the project.
  • 2.
    7. Daily updatingand preparing Weekly and Monthly Reports and tracking the Progress as per Schedule. 8. Tracking and reporting progress (Timeline, cash-flow, major issues, decisions and major action points). BIM Modeling (Revit MEP) Preparation of central file location● Construction and coordination of Revit MEP model for specification, schematic, etc. setting up levels, grids, views, browser● arrangement, and family arrangement. Creating Work sets and Filters.● Creating appropriate types and systems of services matching the project specifications.● Grouping/modifying/or creating families, creating necessary views for construct of models,● Creation file sharing, etc. Developing 3d models of Hvac, fire fighting, plumbing.● Set up and used both – equipment based and individual systems for pipe, ducts and other● extrudes in Revit MEP. Creating 3d views Level by level for Navis works clash study.● Projecting Sheets with annotated layout, sections, 3D view tagging layouts, etc.● Run Interference check between Arc, STR, and MEP disciplines● Finishing Operations (ACP, Glazing, Metal false ceiling, Louvers): • Studying drawings & Studying site condition and plans for the structural glazing, suspended false ceiling. • Execution and supervision Execution and supervision of finishing works, Material procurement, dealing with consultants, co- coordinating with sub-contractors, safety or works, getting permits to works etc. ACADEMIC DETAILS 2009 PG Diploma in Process Piping Engineering & Design from of Asian academy of professional Training, Pune 2008 BE(mechanical) from Bapuji Institute of Engineering and Technology, Davangere, VTU University with 65.05% CERTIFICATION • SAP-PM Certified Professional (SAP AG) • Piping Design and Engineering • REVIT-MEP 2015 IT SKILLS • Well versed with: o Software-AutoCAD, most2D, ITEM-CAD. o REVIT-MEP 2015 PERSONAL DETAILS Date of Birth: 2nd May, 1985 Permanent Address: #713/17, Srinivasa Nilaya, 1st Cross, 1st Main, Shiva kumara Layout, Hadadi Road, Davangere- 577005, Karnataka Languages Known: Hindi, English and Kannada Nationality: Indian Marital status: Married LinkedIn: raghushashitr No. of dependents: 5 people Passport No: G7583875 Driving License: KA 17 20052003509
  • 3.
    Please refer toAnnexure for Major Projects details ANNEXURE MAJOR PROJECTS With JMC (I) Ltd., Delhi Project Name: Delhi Metro Rail Project, Delhi, India Period: Mar’15-Till Date Role: Assistant Manager (Mechanical) Description: Design & Execution of 8.9km viaduct including five elevated stations With JMC (I) Ltd., Bangalore Project Name: Bangalore Metro Rail Project, Karnataka, India Period: Mar’13-Apr’15 Role: Assistant Manager (Mechanical) Description: Design & execution of 2.8km viaduct including three elevated stations. Job profile: 1. Monitor drawing / material / work conformances with provisions as per specification / IS & NFPA regulations. 2. Check the activities on site and provide the necessary reminders to the Project Director, Construction Manager and the Planning Engineer for any immediate action. 3. Supervise the production of co-ordination drawings to ensure that all services are coordinated with each other and the building structure is complying with the contract requirements. 4. Ensure all builders works drawings are comprehensive and discussed with the various engineers for the best implementation and installation of services in coordination with other parties and main contractor. 5. Provide reminders, in advance, to the Project Director for any anticipated conflict that may happen in the future with respect to the simultaneous activities of all MEP trades and main contractors. 6. Follow up the status of material and shop drawings and keep all parties informed of the status and follow up the implementation of the Clients comments in timely manner. 7. Distribute detailed information, documents and regulations as applicable to all concerned parties and ensure their acknowledgement and adherence to its contents. 8. Coordinate with main contractors, sub-contractors, MEP coordinator, Engineers and Construction Manager to obtain clearance before starting the work to ensure smooth and efficient execution of work. 9. Provide Technical support and solve all Site technical issues to ensure completion of Projects within the stipulated time. 10. Site Visit as per site requirement to resolve the site related issues & problems arising out during execution stage 11. At project close out co-ordinate the production of as built drawings to ensure they are delivered as per the contract requirements in terms of quality and time With URC Construction (P) Ltd., Bangalore Project Title: Fowler Webstrup India Pvt. Ltd., Malur, Karnataka, India Period: Jun’12-Jan’13 Role: Senior Engineer (Mechanical) Owner: Fowler Webstrup Client: Fowler Webstrup consultants With Larsen & Toubro Limited (L&T), ECC Division, TPPC Business Unit, Mumbai Project Title: 3x660MW Coal Fired Thermal Power MAHAGENCO Project, Nagpur, India Period: Feb’12-May’12 Role: Senior Engineer (Mechanical) Owner: Mahagenco Client: L&T Power Project Title: 5x660MW Coal Fired Thermal Power APL Project, Mundra, Gujarat, India Period: Jan’11-Feb’12 Role: Senior Engineer (Mechanical) Owner: Adani Power Limited
  • 4.
    Client: SEPCOIII ElectricPower Construction CORP With Pratibha Industries Ltd., Mumbai Project Title: Commercial Phase II, Mulund, Mumbai Period: Aug’08-Aug’10 Role: Junior Engineer(Mechanical-execution) Owner: Nirmal life styles (P) ltd., Client: Sterling Consultancy Services Pvt. Ltd. Project Title: Imperial Heights, Mumbai Central, Mumbai Role: Junior Engineer(Mechanical-execution) Owner: SPCL Client: Sterling Consultancy Services Pvt. Ltd. Description: It included Structure of 150 MT, 22 M Height Steel Crown Structure for India’s Tallest Tower. Period: Aug’08-Aug’10 Project Title: Office of Ichiban Honda, Kalina, Mumbai Client: GMS Period: Aug’08-Aug’10 Role: Junior Engineer(Mechanical-execution) Owner: Inchiban Honda., Client: Techflow Consultancy Services Pvt. Ltd. Description: It entailed the Structure of 1700 MT of Unsymmetrical Shape & Huge Cantilever Area of Building.