SlideShare a Scribd company logo
Vikram Prabhakar
Contact: 09910013803 ~ E-Mail: vikramprabhakar.ericsson@gmail.com, vikramprabh@gmail.com
SENIOR MANAGEMENT PROFESSIONAL:
Project Planning & Management/ Quality/ Contracts Administration & Management
Location Preference: preferably Any Where in India & Abroad
 Sound understanding of the basic framework of operations in the Telecomm industry.
 Repeatedly produced sustained business and revenue growth in changing markets.
AN OVERVIEW
 Accomplished senior level professional with demonstrated experience of over 8 years in Project Management,
Planning, Execution of Contracts and Quality Management.
 Result- oriented with the ability to coordinate multiple projects & teams simultaneously.
 Continually strives to produce high quality homes while adhering to a tight schedule and budget.
 Honed skills in planning, executing and spearheading projects involving method engineering, contract
administration and resource planning with a flair for adopting mechanized, modern construction methodologies /
techniques in compliance with quality standards.
 Possess knowledge of Full Scope Projects, Up gradation projects.
 Possess knowledge of Contract Negotiation, Subcontractor Management, Planning & Control Management and
External Product.
 A keen communicator with honed problem solving and analytical abilities.
 EB Upgration in Indus Upgartion Project.
CORE COMPETENCIES
Liaison Project Management/ Planning Contracts Administration & Management
Logistics Management Recruitment Training and Development
Resource Planning Client Relationship Management Infrastructure 2G,3G & 4G
Key Deliverables:
 Managing the overall logistics process for site construction, telecom implementation & warehouse; liaising with the
Civil & Telecom Implementation Contractors involved in the project. Identifying any potential issues regarding
delays, quality of subcontractors and report these to the Senior Rollout Manager.
 Successfully defined, established, implemented, maintained and monitored the quality parameters, QA processes
and quality metrics.
 Preparing master schedules for all projects including resource schedules, execution methodologies, milestones, cash
flow projections / budgets and periodic monitoring. Scheduling and monitoring of resources.
 Evaluating & executing contracting works and coordinating among consultants, contractors and clients; preparing
the tender specifications & finalisation of requirements and liaising with consultants on determining technical and
contractual matters.
 Preparing job safety analysis, implementing & ensuring safety measures at site.
CAREER SCAN
Aug’14 – Till date Emerson Network Power (India) Pvt Ltd Circle Project Manager
Key Deliverables:
 Project Data & Progress Monitoring.
 Develop effective tracking mechanisms, Automation of process & work flow to ensure all projects deliveries with
Specified timelines.
 Ensuring the quality adherence as per project requirements.
 Periodic review of the project flow as per budgeted cost & additional works.
 Reviews for value additions for work being done.
 Review of field reports & certificates for quality & hygiene and ensure improvements.
 Maintains project data for SLA, manpower & administrative issues.
 Addressing all administrative issue & forwarding recommendation to management.
 KPI & Business target finalisation for all reporting managers.
 Ensuring of manpower adequacy with high efficiency.
 Review of work executed on field and there field reports and provide the technical support training for
improvements.
 Building of teams for the projects with effective training.
 Contract review & ensuring all obligations as per agreement get fulfilled.
 Routine interaction with support functions like finance, HR & IT regarding project team requirement & concerns and
resolving same.
 Regular interaction with Design team to provide technical solution to customers
 Maintaining data & performing reviews with finance for PO, Invoices & payment issue & supporting in resolving
same.
 Submission of management report for all projects.
 Corporate Customer periodic reviews & Interaction with customer circle level management
 Attending to all customers concerns, tracking and reverting after closure & ensuring customer satisfaction.
 Searching market & identifying new business opportunities.
 Involved in new projects scope finalizations & preparation of project plan.
 Evaluated the project’s contract scope and ensured the process and procedures with regards to cost, quality, time and
client satisfaction; formulated/ implemented project execution plans.
 Reviewed contract specification and studied commercial terms/ conditions of contract for execution of the project.
 Carried out preparation of the project plan, scheduling and daily/ periodical progress reports.
 Participated in discussions with client/ vendors on technical scope.
 Co-ordinated with project team at HO, client and other concerns as per requirement.
 Involved in issuing the certificate for foundation/ erection after finally accepting the site to client as well as vendors
and maintained the proper records.
 Co-ordinated with clients for updating the schedules & engineers daily schedule and the issues regarding sites;
certificate preparation, field notes collection, invoice preparation, submission and technical clearance from different
client head offices.
 Supervised each and every document sent to HO or to client.
 Executed project rollout in the given timeframe and updating to client as well as HO.
Dec’13 – Aug’14 Ramboll Telecom and Power Engineering. Electrical Project Manager
Key Deliverables:
 Evaluated the project’s contract scope and ensured the process and procedures with regards to cost, quality, time and
client satisfaction; formulated/ implemented project execution plans.
 Reviewed contract specification and studied commercial terms/ conditions of contract for execution of the project.
 Carried out preparation of the project plan, scheduling and daily/ periodical progress reports.
 Participated in discussions with client/ vendors on technical scope.
 Co-ordinated with project team at HO, client and other concerns as per requirement.
 Involved in issuing the certificate for foundation/ erection after finally accepting the site to client as well as vendors
and maintained the proper records.
 Co-ordinated with clients for updating the schedules & engineers daily schedule and the issues regarding sites;
certificate preparation, field notes collection, invoice preparation, submission and technical clearance from different
client head offices.
 Maintaining the trackers and DPRs (Daily Progress Report) on daily basis; supervised each and every document sent
to HO or to client.
 Executed project rollout in the given timeframe and updating to client as well as HO.
Since Jul’08 – Dec’13 Ericsson India Pvt. Ltd., Meerut Project Lead
Key Deliverables Indus Project(Jul’08 To Jan’11):
 Managing entire EB up-gradation project; handling project coordination between all sectors of rollout (acquisition,
procurement, logistic) and assisting Rollout Manager.
 Involve in collection, control and rollout progress for daily reporting to rollout management; assisting the Rollout
Manager for the detailed organisation structure & responsibility matrix, planning resources and allocation of sites.
 Creating database of civil works/ network equipment installation contractors.
 Coordinating and ensuring availability/ quality of all infra material in warehouse and template and foundation bolts
as per rollout plan.
 Co-ordinating between IMI (Quality Auditing Agency) on hold sites with client acquisition team and individual
vendors for smooth functioning.
 Overseeing completion of Civil/ Tower/ Electrical/ Shelter/ DG (diesel generator) works at site; infra completion of
own build and sharing sites as per rollout plans.
 Carried out verification of all vendor bills, security management to ensure availability of security guard at site and
updating/ sending project tracker and other data.
Highlights:
 Holds the credit of managing 8635 Sites Survey / 2530 Sites Upgrade / 2530 Sites on AIR.
 Worked on Alarm Integration Project for Airtel in Ericsson.
 Lucratively managed 996 sites Survey/ 996 sites Alarm Updated for Airtel in Alram Integration Project.
 Took initiatives to execute projects on time & within budgets to execute the task with in the budgets.
 Bagged appreciation from client & manager for working by mail.
 Managing team of 13 zonal engineers and handling 12 vendors( Electrical ,civil) in 35 districts of UPW circle.
Key Deliverables Bharti Project (Jan’11 to Dec’13):
JOB PROFILE IN BRIEF
3G WCDMA (Ericsson) roll out activity Node B Integration and responsible for end to end IP flow architecture between
RNC to Node B
1 years’ experience on Node B integration as a part of 3G Roll out activity in the circle.
Commissioning of various Node B (6601W, 6202 and 6601E) as per system planning.
Commissioning and trouble shoot on various Transmission as a part of media establishment
End to End Ethernet ping by ethernet testers to confirm IP flow from both north bound (onwards RNC) and south bound
(Towards Node B) traffic.
AT of integrated sites with concern vendors and sub vendors to ensure proper quality.
2G BSS Network Project Roll out and Network Expansions -
Relevant Experience
2 years of telecom experience in the field of BSS integration, expansion and Project Management.
Familiar with Ericsson BTS(RBS6601,RBS6101,RBS6601,RBS6202 in the network
Provide project coordination for network and non-network related jobs .
Core Competency
New Site Commissioning for Network Project Roll out.
New cell sites commissioned in the network as per systems.
TX calibration and VSWR measurements carried out during this activity and rectified the problems, if found any.
External alarms checks and other physical checks such as GSM antenna azimuth & tilt, antennae location, proper
grounding, etc. are ensured during commissioning.
Calibration data, VSWR measurements and other checking details documented in proper ISO format.
Cage Expansion and TRX expansion of BSCs
Vendor Management and project Roll out Planning for 3G( NODE B)
Summary as on date:-
• 2G Rollout- Sites done 550
• 3G Rollout- Sites done 680
• Cabex Rollout (Fresh Erlang)-2300 sites done
 Swap RBS2202 with RBS6202 on 224 sites in 54 days including installation and integration, Also awarded for
the same from Circle head.
ACADEMIA
2011 MBA (Telecom) from Vinayaka Missions University, Salem, Tamil Nadu(Correspondence)
2008 B.Tech. (Electrical & Electronics) from Sikkim Manipal Institute of Technology, Sikkim Sikkim Manipal
University (Regular)
2004 12th
from GTB Public School, Meerut (CBSE)
2002 10th
from KV Sikh Lines,Meerut (CBSE)
IT SKILLS
 Conversant with DOS, MS Office (Word, Excel, PowerPoint), Adobe, Anti-Virus, Internet Applications and Outlook.
 Well versed with C, C++, Intel 8085/ 8086 Programming.
PERSONAL DOSSIER
Date of Birth: 8th
August 1987
Address: House No B-3,Shurakha Apartment Indrapuram Ghaziabad -201010, Uttar Pradesh
Language known: Hindi, English and Punjabi

More Related Content

What's hot

Aftab resume
Aftab resumeAftab resume
Aftab resume
Aftab Ozair
 
Senior Planning Engineer -Mohidee Sheik Asan
Senior Planning Engineer -Mohidee Sheik AsanSenior Planning Engineer -Mohidee Sheik Asan
Senior Planning Engineer -Mohidee Sheik AsanMohideen Sheik Asan
 
Epc issues and recommendations
Epc issues and recommendationsEpc issues and recommendations
Epc issues and recommendationsubk1411
 
Facility maintenance In-charge CV updated
Facility maintenance In-charge  CV updatedFacility maintenance In-charge  CV updated
Facility maintenance In-charge CV updatedMohammed Hashim
 
CV_Updated.11
CV_Updated.11CV_Updated.11
CV_Updated.11Kamesh P
 
Mazhar SheikhMECH ENGR-CV- 2016-Construction
Mazhar SheikhMECH ENGR-CV- 2016-ConstructionMazhar SheikhMECH ENGR-CV- 2016-Construction
Mazhar SheikhMECH ENGR-CV- 2016-ConstructionMazhar Sheikh
 
Project Planning & Control Engineer
Project Planning & Control EngineerProject Planning & Control Engineer
Project Planning & Control Engineer
Moshir Shabbir Moshir
 
Ali Abbas - Premises Engineer
Ali Abbas - Premises EngineerAli Abbas - Premises Engineer
Ali Abbas - Premises EngineerAli Abbas
 
Robert W Self Resume 2009
Robert W Self Resume 2009Robert W Self Resume 2009
Robert W Self Resume 2009
guest3e8191
 
MEPF Rroject Manager ( Execution, Desing,servises)
MEPF Rroject Manager ( Execution, Desing,servises)MEPF Rroject Manager ( Execution, Desing,servises)
MEPF Rroject Manager ( Execution, Desing,servises)
GHANSHYAM KHATRI
 
CV - Waseem Odeh - EE
CV - Waseem Odeh - EECV - Waseem Odeh - EE
CV - Waseem Odeh - EEwaseem odeh
 

What's hot (20)

Aftab resume
Aftab resumeAftab resume
Aftab resume
 
CV-Essam Saadeh
CV-Essam SaadehCV-Essam Saadeh
CV-Essam Saadeh
 
Ahmad Haddad
Ahmad HaddadAhmad Haddad
Ahmad Haddad
 
Senior Planning Engineer -Mohidee Sheik Asan
Senior Planning Engineer -Mohidee Sheik AsanSenior Planning Engineer -Mohidee Sheik Asan
Senior Planning Engineer -Mohidee Sheik Asan
 
Sunshine Andres
Sunshine AndresSunshine Andres
Sunshine Andres
 
Henry CV
Henry CVHenry CV
Henry CV
 
Epc issues and recommendations
Epc issues and recommendationsEpc issues and recommendations
Epc issues and recommendations
 
Facility maintenance In-charge CV updated
Facility maintenance In-charge  CV updatedFacility maintenance In-charge  CV updated
Facility maintenance In-charge CV updated
 
CV_Updated.11
CV_Updated.11CV_Updated.11
CV_Updated.11
 
Mazhar SheikhMECH ENGR-CV- 2016-Construction
Mazhar SheikhMECH ENGR-CV- 2016-ConstructionMazhar SheikhMECH ENGR-CV- 2016-Construction
Mazhar SheikhMECH ENGR-CV- 2016-Construction
 
Muralidhar
MuralidharMuralidhar
Muralidhar
 
Lukas CV
Lukas CVLukas CV
Lukas CV
 
Project Planning & Control Engineer
Project Planning & Control EngineerProject Planning & Control Engineer
Project Planning & Control Engineer
 
Ali Abbas - Premises Engineer
Ali Abbas - Premises EngineerAli Abbas - Premises Engineer
Ali Abbas - Premises Engineer
 
Robert W Self Resume 2009
Robert W Self Resume 2009Robert W Self Resume 2009
Robert W Self Resume 2009
 
Nestor Gabilan CV - Sr. Planning Engineer
Nestor Gabilan CV - Sr. Planning EngineerNestor Gabilan CV - Sr. Planning Engineer
Nestor Gabilan CV - Sr. Planning Engineer
 
ac (1)
ac (1)ac (1)
ac (1)
 
Epc presentation robert foxpresentation
Epc presentation robert foxpresentationEpc presentation robert foxpresentation
Epc presentation robert foxpresentation
 
MEPF Rroject Manager ( Execution, Desing,servises)
MEPF Rroject Manager ( Execution, Desing,servises)MEPF Rroject Manager ( Execution, Desing,servises)
MEPF Rroject Manager ( Execution, Desing,servises)
 
CV - Waseem Odeh - EE
CV - Waseem Odeh - EECV - Waseem Odeh - EE
CV - Waseem Odeh - EE
 

Similar to Vikram Prabhakar Updated Resume

CV ISMAIL SHAIKH-31.10.2015
CV ISMAIL SHAIKH-31.10.2015CV ISMAIL SHAIKH-31.10.2015
CV ISMAIL SHAIKH-31.10.2015Ismail Shaikh
 
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEER
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEERResume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEER
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEERAbd~el Hakim mohamed izran
 
Ready for new opportunities
Ready for new opportunities Ready for new opportunities
Ready for new opportunities
DeepakSharma2602
 
Ravi cv on 5 th april 2015
Ravi cv on 5 th april 2015Ravi cv on 5 th april 2015
Ravi cv on 5 th april 2015
Ravi Shankar
 
Resume for Senior Manager - projects
Resume for  Senior Manager -  projectsResume for  Senior Manager -  projects
Resume for Senior Manager - projectspramod patel
 
Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2mahmood mansor
 
Resume Short Version with Project List 07252016
Resume Short Version with Project List 07252016Resume Short Version with Project List 07252016
Resume Short Version with Project List 07252016L Douglas Sargent Jr
 
Saptak_CV
Saptak_CVSaptak_CV
Saptak_CV
Saptak Thakkar
 
Adnan Kamal Dabban CV
Adnan Kamal Dabban CV Adnan Kamal Dabban CV
Adnan Kamal Dabban CV Adnan Dabban
 
CV for civil engineer (Updated)--- Alpesh Parmar
CV for civil engineer (Updated)--- Alpesh ParmarCV for civil engineer (Updated)--- Alpesh Parmar
CV for civil engineer (Updated)--- Alpesh ParmarALPESH CONTRACTOR
 

Similar to Vikram Prabhakar Updated Resume (20)

CV ISMAIL SHAIKH-31.10.2015
CV ISMAIL SHAIKH-31.10.2015CV ISMAIL SHAIKH-31.10.2015
CV ISMAIL SHAIKH-31.10.2015
 
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEER
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEERResume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEER
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEER
 
Soumyajit Das
Soumyajit DasSoumyajit Das
Soumyajit Das
 
Ready for new opportunities
Ready for new opportunities Ready for new opportunities
Ready for new opportunities
 
Ravi cv on 5 th april 2015
Ravi cv on 5 th april 2015Ravi cv on 5 th april 2015
Ravi cv on 5 th april 2015
 
SASI NEW RESUME
SASI NEW RESUMESASI NEW RESUME
SASI NEW RESUME
 
Resume 2016
Resume 2016Resume 2016
Resume 2016
 
Ravi Ranjan_CV
Ravi Ranjan_CVRavi Ranjan_CV
Ravi Ranjan_CV
 
Azhar Hameed (Resume-2017)
Azhar Hameed (Resume-2017)Azhar Hameed (Resume-2017)
Azhar Hameed (Resume-2017)
 
Sachin parab
Sachin parabSachin parab
Sachin parab
 
Resume_Mohammad Shahadat Hossain
Resume_Mohammad Shahadat HossainResume_Mohammad Shahadat Hossain
Resume_Mohammad Shahadat Hossain
 
Resume for Senior Manager - projects
Resume for  Senior Manager -  projectsResume for  Senior Manager -  projects
Resume for Senior Manager - projects
 
Amol-KulkarniResume
Amol-KulkarniResumeAmol-KulkarniResume
Amol-KulkarniResume
 
Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2
 
Mari cv - office
Mari cv - officeMari cv - office
Mari cv - office
 
Resume Short Version with Project List 07252016
Resume Short Version with Project List 07252016Resume Short Version with Project List 07252016
Resume Short Version with Project List 07252016
 
Saptak_CV
Saptak_CVSaptak_CV
Saptak_CV
 
Adnan Kamal Dabban CV
Adnan Kamal Dabban CV Adnan Kamal Dabban CV
Adnan Kamal Dabban CV
 
dillip ( C.V ) Project Manager
dillip ( C.V ) Project Managerdillip ( C.V ) Project Manager
dillip ( C.V ) Project Manager
 
CV for civil engineer (Updated)--- Alpesh Parmar
CV for civil engineer (Updated)--- Alpesh ParmarCV for civil engineer (Updated)--- Alpesh Parmar
CV for civil engineer (Updated)--- Alpesh Parmar
 

Vikram Prabhakar Updated Resume

  • 1. Vikram Prabhakar Contact: 09910013803 ~ E-Mail: vikramprabhakar.ericsson@gmail.com, vikramprabh@gmail.com SENIOR MANAGEMENT PROFESSIONAL: Project Planning & Management/ Quality/ Contracts Administration & Management Location Preference: preferably Any Where in India & Abroad  Sound understanding of the basic framework of operations in the Telecomm industry.  Repeatedly produced sustained business and revenue growth in changing markets. AN OVERVIEW  Accomplished senior level professional with demonstrated experience of over 8 years in Project Management, Planning, Execution of Contracts and Quality Management.  Result- oriented with the ability to coordinate multiple projects & teams simultaneously.  Continually strives to produce high quality homes while adhering to a tight schedule and budget.  Honed skills in planning, executing and spearheading projects involving method engineering, contract administration and resource planning with a flair for adopting mechanized, modern construction methodologies / techniques in compliance with quality standards.  Possess knowledge of Full Scope Projects, Up gradation projects.  Possess knowledge of Contract Negotiation, Subcontractor Management, Planning & Control Management and External Product.  A keen communicator with honed problem solving and analytical abilities.  EB Upgration in Indus Upgartion Project. CORE COMPETENCIES Liaison Project Management/ Planning Contracts Administration & Management Logistics Management Recruitment Training and Development Resource Planning Client Relationship Management Infrastructure 2G,3G & 4G Key Deliverables:  Managing the overall logistics process for site construction, telecom implementation & warehouse; liaising with the Civil & Telecom Implementation Contractors involved in the project. Identifying any potential issues regarding delays, quality of subcontractors and report these to the Senior Rollout Manager.  Successfully defined, established, implemented, maintained and monitored the quality parameters, QA processes and quality metrics.  Preparing master schedules for all projects including resource schedules, execution methodologies, milestones, cash flow projections / budgets and periodic monitoring. Scheduling and monitoring of resources.  Evaluating & executing contracting works and coordinating among consultants, contractors and clients; preparing the tender specifications & finalisation of requirements and liaising with consultants on determining technical and contractual matters.  Preparing job safety analysis, implementing & ensuring safety measures at site. CAREER SCAN
  • 2. Aug’14 – Till date Emerson Network Power (India) Pvt Ltd Circle Project Manager Key Deliverables:  Project Data & Progress Monitoring.  Develop effective tracking mechanisms, Automation of process & work flow to ensure all projects deliveries with Specified timelines.  Ensuring the quality adherence as per project requirements.  Periodic review of the project flow as per budgeted cost & additional works.  Reviews for value additions for work being done.  Review of field reports & certificates for quality & hygiene and ensure improvements.  Maintains project data for SLA, manpower & administrative issues.  Addressing all administrative issue & forwarding recommendation to management.  KPI & Business target finalisation for all reporting managers.  Ensuring of manpower adequacy with high efficiency.  Review of work executed on field and there field reports and provide the technical support training for improvements.  Building of teams for the projects with effective training.  Contract review & ensuring all obligations as per agreement get fulfilled.  Routine interaction with support functions like finance, HR & IT regarding project team requirement & concerns and resolving same.  Regular interaction with Design team to provide technical solution to customers  Maintaining data & performing reviews with finance for PO, Invoices & payment issue & supporting in resolving same.  Submission of management report for all projects.  Corporate Customer periodic reviews & Interaction with customer circle level management  Attending to all customers concerns, tracking and reverting after closure & ensuring customer satisfaction.  Searching market & identifying new business opportunities.  Involved in new projects scope finalizations & preparation of project plan.  Evaluated the project’s contract scope and ensured the process and procedures with regards to cost, quality, time and client satisfaction; formulated/ implemented project execution plans.  Reviewed contract specification and studied commercial terms/ conditions of contract for execution of the project.  Carried out preparation of the project plan, scheduling and daily/ periodical progress reports.  Participated in discussions with client/ vendors on technical scope.  Co-ordinated with project team at HO, client and other concerns as per requirement.  Involved in issuing the certificate for foundation/ erection after finally accepting the site to client as well as vendors and maintained the proper records.  Co-ordinated with clients for updating the schedules & engineers daily schedule and the issues regarding sites; certificate preparation, field notes collection, invoice preparation, submission and technical clearance from different client head offices.  Supervised each and every document sent to HO or to client.  Executed project rollout in the given timeframe and updating to client as well as HO. Dec’13 – Aug’14 Ramboll Telecom and Power Engineering. Electrical Project Manager Key Deliverables:  Evaluated the project’s contract scope and ensured the process and procedures with regards to cost, quality, time and client satisfaction; formulated/ implemented project execution plans.  Reviewed contract specification and studied commercial terms/ conditions of contract for execution of the project.  Carried out preparation of the project plan, scheduling and daily/ periodical progress reports.
  • 3.  Participated in discussions with client/ vendors on technical scope.  Co-ordinated with project team at HO, client and other concerns as per requirement.  Involved in issuing the certificate for foundation/ erection after finally accepting the site to client as well as vendors and maintained the proper records.  Co-ordinated with clients for updating the schedules & engineers daily schedule and the issues regarding sites; certificate preparation, field notes collection, invoice preparation, submission and technical clearance from different client head offices.  Maintaining the trackers and DPRs (Daily Progress Report) on daily basis; supervised each and every document sent to HO or to client.  Executed project rollout in the given timeframe and updating to client as well as HO. Since Jul’08 – Dec’13 Ericsson India Pvt. Ltd., Meerut Project Lead Key Deliverables Indus Project(Jul’08 To Jan’11):  Managing entire EB up-gradation project; handling project coordination between all sectors of rollout (acquisition, procurement, logistic) and assisting Rollout Manager.  Involve in collection, control and rollout progress for daily reporting to rollout management; assisting the Rollout Manager for the detailed organisation structure & responsibility matrix, planning resources and allocation of sites.  Creating database of civil works/ network equipment installation contractors.  Coordinating and ensuring availability/ quality of all infra material in warehouse and template and foundation bolts as per rollout plan.  Co-ordinating between IMI (Quality Auditing Agency) on hold sites with client acquisition team and individual vendors for smooth functioning.  Overseeing completion of Civil/ Tower/ Electrical/ Shelter/ DG (diesel generator) works at site; infra completion of own build and sharing sites as per rollout plans.  Carried out verification of all vendor bills, security management to ensure availability of security guard at site and updating/ sending project tracker and other data. Highlights:  Holds the credit of managing 8635 Sites Survey / 2530 Sites Upgrade / 2530 Sites on AIR.  Worked on Alarm Integration Project for Airtel in Ericsson.  Lucratively managed 996 sites Survey/ 996 sites Alarm Updated for Airtel in Alram Integration Project.  Took initiatives to execute projects on time & within budgets to execute the task with in the budgets.  Bagged appreciation from client & manager for working by mail.  Managing team of 13 zonal engineers and handling 12 vendors( Electrical ,civil) in 35 districts of UPW circle. Key Deliverables Bharti Project (Jan’11 to Dec’13): JOB PROFILE IN BRIEF 3G WCDMA (Ericsson) roll out activity Node B Integration and responsible for end to end IP flow architecture between RNC to Node B 1 years’ experience on Node B integration as a part of 3G Roll out activity in the circle. Commissioning of various Node B (6601W, 6202 and 6601E) as per system planning.
  • 4. Commissioning and trouble shoot on various Transmission as a part of media establishment End to End Ethernet ping by ethernet testers to confirm IP flow from both north bound (onwards RNC) and south bound (Towards Node B) traffic. AT of integrated sites with concern vendors and sub vendors to ensure proper quality. 2G BSS Network Project Roll out and Network Expansions - Relevant Experience 2 years of telecom experience in the field of BSS integration, expansion and Project Management. Familiar with Ericsson BTS(RBS6601,RBS6101,RBS6601,RBS6202 in the network Provide project coordination for network and non-network related jobs . Core Competency New Site Commissioning for Network Project Roll out. New cell sites commissioned in the network as per systems. TX calibration and VSWR measurements carried out during this activity and rectified the problems, if found any. External alarms checks and other physical checks such as GSM antenna azimuth & tilt, antennae location, proper grounding, etc. are ensured during commissioning. Calibration data, VSWR measurements and other checking details documented in proper ISO format. Cage Expansion and TRX expansion of BSCs Vendor Management and project Roll out Planning for 3G( NODE B) Summary as on date:- • 2G Rollout- Sites done 550 • 3G Rollout- Sites done 680 • Cabex Rollout (Fresh Erlang)-2300 sites done  Swap RBS2202 with RBS6202 on 224 sites in 54 days including installation and integration, Also awarded for the same from Circle head. ACADEMIA 2011 MBA (Telecom) from Vinayaka Missions University, Salem, Tamil Nadu(Correspondence) 2008 B.Tech. (Electrical & Electronics) from Sikkim Manipal Institute of Technology, Sikkim Sikkim Manipal University (Regular) 2004 12th from GTB Public School, Meerut (CBSE) 2002 10th from KV Sikh Lines,Meerut (CBSE) IT SKILLS  Conversant with DOS, MS Office (Word, Excel, PowerPoint), Adobe, Anti-Virus, Internet Applications and Outlook.  Well versed with C, C++, Intel 8085/ 8086 Programming. PERSONAL DOSSIER Date of Birth: 8th August 1987 Address: House No B-3,Shurakha Apartment Indrapuram Ghaziabad -201010, Uttar Pradesh Language known: Hindi, English and Punjabi