Vikram Prabhakar has over 8 years of experience in project management, planning, quality management, and contract administration in the telecommunications industry. He has a proven track record of successfully managing complex projects while adhering to tight schedules and budgets. Some of his key responsibilities include resource planning, vendor management, quality control, and preparing project plans, schedules, and reports. He is seeking a senior management role preferably in India or abroad.
BE + PGDBM, more than 18 yrs of exp in SCM, Logistics, Techno commercial operations, Purchase in Infrastructure, power, commercial, water supply, residential projects.
1. Vikram Prabhakar
Contact: 09910013803 ~ E-Mail: vikramprabhakar.ericsson@gmail.com, vikramprabh@gmail.com
SENIOR MANAGEMENT PROFESSIONAL:
Project Planning & Management/ Quality/ Contracts Administration & Management
Location Preference: preferably Any Where in India & Abroad
Sound understanding of the basic framework of operations in the Telecomm industry.
Repeatedly produced sustained business and revenue growth in changing markets.
AN OVERVIEW
Accomplished senior level professional with demonstrated experience of over 8 years in Project Management,
Planning, Execution of Contracts and Quality Management.
Result- oriented with the ability to coordinate multiple projects & teams simultaneously.
Continually strives to produce high quality homes while adhering to a tight schedule and budget.
Honed skills in planning, executing and spearheading projects involving method engineering, contract
administration and resource planning with a flair for adopting mechanized, modern construction methodologies /
techniques in compliance with quality standards.
Possess knowledge of Full Scope Projects, Up gradation projects.
Possess knowledge of Contract Negotiation, Subcontractor Management, Planning & Control Management and
External Product.
A keen communicator with honed problem solving and analytical abilities.
EB Upgration in Indus Upgartion Project.
CORE COMPETENCIES
Liaison Project Management/ Planning Contracts Administration & Management
Logistics Management Recruitment Training and Development
Resource Planning Client Relationship Management Infrastructure 2G,3G & 4G
Key Deliverables:
Managing the overall logistics process for site construction, telecom implementation & warehouse; liaising with the
Civil & Telecom Implementation Contractors involved in the project. Identifying any potential issues regarding
delays, quality of subcontractors and report these to the Senior Rollout Manager.
Successfully defined, established, implemented, maintained and monitored the quality parameters, QA processes
and quality metrics.
Preparing master schedules for all projects including resource schedules, execution methodologies, milestones, cash
flow projections / budgets and periodic monitoring. Scheduling and monitoring of resources.
Evaluating & executing contracting works and coordinating among consultants, contractors and clients; preparing
the tender specifications & finalisation of requirements and liaising with consultants on determining technical and
contractual matters.
Preparing job safety analysis, implementing & ensuring safety measures at site.
CAREER SCAN
2. Aug’14 – Till date Emerson Network Power (India) Pvt Ltd Circle Project Manager
Key Deliverables:
Project Data & Progress Monitoring.
Develop effective tracking mechanisms, Automation of process & work flow to ensure all projects deliveries with
Specified timelines.
Ensuring the quality adherence as per project requirements.
Periodic review of the project flow as per budgeted cost & additional works.
Reviews for value additions for work being done.
Review of field reports & certificates for quality & hygiene and ensure improvements.
Maintains project data for SLA, manpower & administrative issues.
Addressing all administrative issue & forwarding recommendation to management.
KPI & Business target finalisation for all reporting managers.
Ensuring of manpower adequacy with high efficiency.
Review of work executed on field and there field reports and provide the technical support training for
improvements.
Building of teams for the projects with effective training.
Contract review & ensuring all obligations as per agreement get fulfilled.
Routine interaction with support functions like finance, HR & IT regarding project team requirement & concerns and
resolving same.
Regular interaction with Design team to provide technical solution to customers
Maintaining data & performing reviews with finance for PO, Invoices & payment issue & supporting in resolving
same.
Submission of management report for all projects.
Corporate Customer periodic reviews & Interaction with customer circle level management
Attending to all customers concerns, tracking and reverting after closure & ensuring customer satisfaction.
Searching market & identifying new business opportunities.
Involved in new projects scope finalizations & preparation of project plan.
Evaluated the project’s contract scope and ensured the process and procedures with regards to cost, quality, time and
client satisfaction; formulated/ implemented project execution plans.
Reviewed contract specification and studied commercial terms/ conditions of contract for execution of the project.
Carried out preparation of the project plan, scheduling and daily/ periodical progress reports.
Participated in discussions with client/ vendors on technical scope.
Co-ordinated with project team at HO, client and other concerns as per requirement.
Involved in issuing the certificate for foundation/ erection after finally accepting the site to client as well as vendors
and maintained the proper records.
Co-ordinated with clients for updating the schedules & engineers daily schedule and the issues regarding sites;
certificate preparation, field notes collection, invoice preparation, submission and technical clearance from different
client head offices.
Supervised each and every document sent to HO or to client.
Executed project rollout in the given timeframe and updating to client as well as HO.
Dec’13 – Aug’14 Ramboll Telecom and Power Engineering. Electrical Project Manager
Key Deliverables:
Evaluated the project’s contract scope and ensured the process and procedures with regards to cost, quality, time and
client satisfaction; formulated/ implemented project execution plans.
Reviewed contract specification and studied commercial terms/ conditions of contract for execution of the project.
Carried out preparation of the project plan, scheduling and daily/ periodical progress reports.
3. Participated in discussions with client/ vendors on technical scope.
Co-ordinated with project team at HO, client and other concerns as per requirement.
Involved in issuing the certificate for foundation/ erection after finally accepting the site to client as well as vendors
and maintained the proper records.
Co-ordinated with clients for updating the schedules & engineers daily schedule and the issues regarding sites;
certificate preparation, field notes collection, invoice preparation, submission and technical clearance from different
client head offices.
Maintaining the trackers and DPRs (Daily Progress Report) on daily basis; supervised each and every document sent
to HO or to client.
Executed project rollout in the given timeframe and updating to client as well as HO.
Since Jul’08 – Dec’13 Ericsson India Pvt. Ltd., Meerut Project Lead
Key Deliverables Indus Project(Jul’08 To Jan’11):
Managing entire EB up-gradation project; handling project coordination between all sectors of rollout (acquisition,
procurement, logistic) and assisting Rollout Manager.
Involve in collection, control and rollout progress for daily reporting to rollout management; assisting the Rollout
Manager for the detailed organisation structure & responsibility matrix, planning resources and allocation of sites.
Creating database of civil works/ network equipment installation contractors.
Coordinating and ensuring availability/ quality of all infra material in warehouse and template and foundation bolts
as per rollout plan.
Co-ordinating between IMI (Quality Auditing Agency) on hold sites with client acquisition team and individual
vendors for smooth functioning.
Overseeing completion of Civil/ Tower/ Electrical/ Shelter/ DG (diesel generator) works at site; infra completion of
own build and sharing sites as per rollout plans.
Carried out verification of all vendor bills, security management to ensure availability of security guard at site and
updating/ sending project tracker and other data.
Highlights:
Holds the credit of managing 8635 Sites Survey / 2530 Sites Upgrade / 2530 Sites on AIR.
Worked on Alarm Integration Project for Airtel in Ericsson.
Lucratively managed 996 sites Survey/ 996 sites Alarm Updated for Airtel in Alram Integration Project.
Took initiatives to execute projects on time & within budgets to execute the task with in the budgets.
Bagged appreciation from client & manager for working by mail.
Managing team of 13 zonal engineers and handling 12 vendors( Electrical ,civil) in 35 districts of UPW circle.
Key Deliverables Bharti Project (Jan’11 to Dec’13):
JOB PROFILE IN BRIEF
3G WCDMA (Ericsson) roll out activity Node B Integration and responsible for end to end IP flow architecture between
RNC to Node B
1 years’ experience on Node B integration as a part of 3G Roll out activity in the circle.
Commissioning of various Node B (6601W, 6202 and 6601E) as per system planning.
4. Commissioning and trouble shoot on various Transmission as a part of media establishment
End to End Ethernet ping by ethernet testers to confirm IP flow from both north bound (onwards RNC) and south bound
(Towards Node B) traffic.
AT of integrated sites with concern vendors and sub vendors to ensure proper quality.
2G BSS Network Project Roll out and Network Expansions -
Relevant Experience
2 years of telecom experience in the field of BSS integration, expansion and Project Management.
Familiar with Ericsson BTS(RBS6601,RBS6101,RBS6601,RBS6202 in the network
Provide project coordination for network and non-network related jobs .
Core Competency
New Site Commissioning for Network Project Roll out.
New cell sites commissioned in the network as per systems.
TX calibration and VSWR measurements carried out during this activity and rectified the problems, if found any.
External alarms checks and other physical checks such as GSM antenna azimuth & tilt, antennae location, proper
grounding, etc. are ensured during commissioning.
Calibration data, VSWR measurements and other checking details documented in proper ISO format.
Cage Expansion and TRX expansion of BSCs
Vendor Management and project Roll out Planning for 3G( NODE B)
Summary as on date:-
• 2G Rollout- Sites done 550
• 3G Rollout- Sites done 680
• Cabex Rollout (Fresh Erlang)-2300 sites done
Swap RBS2202 with RBS6202 on 224 sites in 54 days including installation and integration, Also awarded for
the same from Circle head.
ACADEMIA
2011 MBA (Telecom) from Vinayaka Missions University, Salem, Tamil Nadu(Correspondence)
2008 B.Tech. (Electrical & Electronics) from Sikkim Manipal Institute of Technology, Sikkim Sikkim Manipal
University (Regular)
2004 12th
from GTB Public School, Meerut (CBSE)
2002 10th
from KV Sikh Lines,Meerut (CBSE)
IT SKILLS
Conversant with DOS, MS Office (Word, Excel, PowerPoint), Adobe, Anti-Virus, Internet Applications and Outlook.
Well versed with C, C++, Intel 8085/ 8086 Programming.
PERSONAL DOSSIER
Date of Birth: 8th
August 1987
Address: House No B-3,Shurakha Apartment Indrapuram Ghaziabad -201010, Uttar Pradesh
Language known: Hindi, English and Punjabi