RESUME
MOHAMMED HASHIM P.V
EMAIL I.D: f.m_hashim@yahoo.com
Moh.hashim@mail.com
Contact no: 0543996737
0557727073
Current Location:Riyadh, Kingdom Of Saudi Arabia
Facility Maintenance Engineer - “INTERIOR FIT OUT”
Seeking challenging and growth oriented opportunities in the field of Interior Project Management
PROFILE
 Having 8 years working experience in Kingdom of Saudi Arabia as Property Maintenance In
charge / Facility Maintenance Engineer specialized in Interior works and Day by day maintenance.
 Proficient in swiftly ramping up projects with competent cross-functional skills and ensuring on
time deliverables within pre-set cost parameters.
 Skilled in review drawing well-balanced conclusions when dealing with complex issues and in
interpreting procedures and guidelines in order to adapt them to cover complex situations.
 Excellent communicator with the ability to handle multiple functions and activities in high pressure
environments with tight deadlines.
 Demonstrated ability to manage human, financial and material resources towards the
achievement of stated targets/ objectives, to plan and manage work programs and to lead,
motivate and provide effective guidance to a team of professional and support staff.
PROFESSIONAL EXPERIENCE
SUHAIL BAHWAN AUTO MOBILES, KINGDOM OF SAUDI ARABIA since Sep 27.2010
Dealer of Renault as Facility Maintenance Engineer / worked under Admin dep.
 Completed tasks on time and within budget resulting in strengthening Management to Tenant
relationships. Created and maintained Preventive Maintenance Schedule to perform regular
checkups so as to avoid breakdown and disrepair.
 Monitored operations of electrical/mechanical equipment supporting the facility and facility's
critical operations.
 Maintained and repaired all Plumbing and Electrical fixtures ensuring they were in working
order at all times.
 Participated in facilities remodeling, new construction, and other planning activities,
recommended and estimated facility repairs and improvements for inclusion in the annual
budget, and operated large chiller and boilers for the heating and cooling of building interior.
 Participated in calls and responded to afterhours problems and emergencies; and was
required to return to duty within a specific recall time
 Reported directly to the chief Engineer
 Repaired and refinished office furniture; responsible for setting and maintain outside light
fixtures.
 Coordinate with Senior Manager in scheduling the daily activities of maintenance staff
 Managed preventive maintenance duties and completed pertinent repairs
 Documented daily task and resolved emergency situations
 Specialized in the area of lighting and fixtures, floor and tile repair, carpet replacement and
wall tapering
 Maintain inventory, log all repairs and keep the stock register updated at all times
 Utilize several trade skills such as HVAC, plumbing, electrical, carpentry and painting.
 24/7 availability to respond to service work orders and emergencies.
 Regulated plumbing, electrical, and HVAC systems
 Cleaning and constant upgrading of the building that includes painting
 Replace non-working light bulbs, paper towel dispenser, toilet paper etc.
 Monitor the day by day maintenance works.
Specialties: Commercial Buildings, Residential Buildings, Car Showrooms, Workshops,
Warehouses, Office buildings, Vehicle Yards and PDI centers etc.
Technical skills: Interior Civil Works, Fire Fighting, HVAC, Electrical Works, Plumbing, painting,
flooring work and Dry wall partitions.
AL- AMCO INTERIOR DESIGN EST.
As a Project coordinator 2009 to 03.01.10
 Responsible for the execution of interior work of multi facility hotel five star hotels, Automobiles
showroom, workshop, PDI center, Quick service center, shopping malls, and branded
showrooms, in all over the KSA.
 Responsible for executing the project while estimating the costs to be incurred during the
processing.
 Handle sites, coordinate activities, provide technical inputs for methodologies of coordination
with site management. Handle the Quantity Calculation for Client & Sub-Contractor Bill
 Responsible for executing designs, Quantity surveying, rate analysis, quality control.
 Responsible for studying tender documents and quoting rates.
 Responsible for preparing BOQs for Interior works
 Provide technical leadership while estimating and evaluating the effort/ schedules and
managed the team and its grievances.
 Finalize the sub contractors ensuring quality supply of materials for effective project
development
 I have done following projects During work with Al-Amco : Al Hilal football club in Thahliyah
Street, Ez Alsahra Holding Company in Al-Khindhi DQ, Gulf advantage auto mobiles co Ltd
Riyadh khurais road, City max, Nectar, Baskin Robbins, and villa project.
RESOURCINC INTERIOR, CONSULTING EST. RIYADH 2010 Jan to Sep
As Project Engineer (specialized in interior)
 Accountable for construction of flagship store Project, service centers, car show rooms office
interior as per MB norms and maintenance, administration of all showrooms and workshops
with good exposure of services like fire fighting, HVAC, Electrical, plumbing works.
 Strategically, plan, analyze & conceptualize the basic requirements while setting up the
technical infrastructure of the project, reviewing all the project proposals. Negotiate & execute
the contracts in consistent with contract & procurement policies/ procedures.
 Handle sites, coordinate fit-out activities, provide technical inputs for methodologies of fit out &
coordination with site management. Handle the Quantity Calculation for Client & Sub-
Contractor Bill.
 Liaise with external agencies, clients & consultants for determining technical specifications,
approvals for execution & obtaining on-time clearances. Oversee the inventory requirements
and the Bill of material at tender stage.
 Identify and finalize the contractors ensuring quality supply of materials for effective project
development.
 Monitor the workmanship while maintaining the old structure, ensuring all contractual
obligations are fulfilled and contract objectives met.
 Responsible for executing designs, Quantity surveying, rate analysis, quality control, drawings
and rules and instructions in the departmental codes, manuals, technical circulars etc. in force
from time to time.
 Follow the project from start to finish and make any necessary changes along the way,
ensuring that the procedure is being followed while the safety features of the project
during the time it is being completed.
 Identify & finalize the contractors ensuring quality supply of materials for effective project
development. Accountable for bill checking of contractor & workmanship while preparing
drawings and maintaining the old structure.
.
CELL-MAC CONSTRUCTION.CO. Jul’06 –Aug’08
As Project engineer for office interior
 Supervised and streamlined interior project works while monitoring project status.
 Maintain liaison with various Consultants, Contractors and Vendors.
 Responsible for executing the project while estimating the costs to be incurred during the
processing and getting the project approved from the authorities.
 Inspected & analyzed the proposed interior projects, visited the site, ensured that the plan fits
the location & vice versa.
 Provided technical leadership while estimating and evaluating the effort/schedules and
managed the team and its grievances.
 Accountable for preparation of bar charts, bill checking etc
 Coordinated among different agencies such as civil& interior, HVAC, Electrical, Plumbing and
fire fighting, Fire detection system, CCTV, Access control, A System etc.
QUALIFICATION:
(MBA) Himalayan University
Successfully completed Civil Engineering, (Diploma 3 Years)
Under (PNS) Engineering College Thrissur (irinjalakuda) Kerala.
HSE Engineering
NISM Security Management. (Safety Head)
Bangalore
Air condition & Refrigerator Mechanic
Premier College and institute
vattakkiner Calicut. (Kerala)
Successfully completed higher secondary school
Personal Details
DOB >15/06/1984 (32) Years
Marital status > Married
Driving License > Available Saudi Arabia and Indian
Languages
English Arabic Hindi Urdu Malayalam Tamil
Excellent Very Good Excellent Very Good Excellent Excellent
Igama Status > Transferable (2268590490)
Iqama profession > Marketing specialist
Passport No > E5838902
Hobbies > Reading books, Concentrating the job, keep good relationship with all
Computer Knowledge > MSOffice, Excel, word, power point, Internet, SAP sales and distribution
user level Experience and prepare PR-PO process.
Permanent Address: Muhammed Hashim pasilam veedu Naduvattam pal Company Beypore road
References: Available on request.
Thanks & Best regards

Facility maintenance In-charge CV updated

  • 1.
    RESUME MOHAMMED HASHIM P.V EMAILI.D: f.m_hashim@yahoo.com Moh.hashim@mail.com Contact no: 0543996737 0557727073 Current Location:Riyadh, Kingdom Of Saudi Arabia Facility Maintenance Engineer - “INTERIOR FIT OUT” Seeking challenging and growth oriented opportunities in the field of Interior Project Management PROFILE  Having 8 years working experience in Kingdom of Saudi Arabia as Property Maintenance In charge / Facility Maintenance Engineer specialized in Interior works and Day by day maintenance.  Proficient in swiftly ramping up projects with competent cross-functional skills and ensuring on time deliverables within pre-set cost parameters.  Skilled in review drawing well-balanced conclusions when dealing with complex issues and in interpreting procedures and guidelines in order to adapt them to cover complex situations.  Excellent communicator with the ability to handle multiple functions and activities in high pressure environments with tight deadlines.  Demonstrated ability to manage human, financial and material resources towards the achievement of stated targets/ objectives, to plan and manage work programs and to lead, motivate and provide effective guidance to a team of professional and support staff. PROFESSIONAL EXPERIENCE SUHAIL BAHWAN AUTO MOBILES, KINGDOM OF SAUDI ARABIA since Sep 27.2010 Dealer of Renault as Facility Maintenance Engineer / worked under Admin dep.  Completed tasks on time and within budget resulting in strengthening Management to Tenant relationships. Created and maintained Preventive Maintenance Schedule to perform regular checkups so as to avoid breakdown and disrepair.  Monitored operations of electrical/mechanical equipment supporting the facility and facility's critical operations.  Maintained and repaired all Plumbing and Electrical fixtures ensuring they were in working order at all times.  Participated in facilities remodeling, new construction, and other planning activities, recommended and estimated facility repairs and improvements for inclusion in the annual budget, and operated large chiller and boilers for the heating and cooling of building interior.
  • 2.
     Participated incalls and responded to afterhours problems and emergencies; and was required to return to duty within a specific recall time  Reported directly to the chief Engineer  Repaired and refinished office furniture; responsible for setting and maintain outside light fixtures.  Coordinate with Senior Manager in scheduling the daily activities of maintenance staff  Managed preventive maintenance duties and completed pertinent repairs  Documented daily task and resolved emergency situations  Specialized in the area of lighting and fixtures, floor and tile repair, carpet replacement and wall tapering  Maintain inventory, log all repairs and keep the stock register updated at all times  Utilize several trade skills such as HVAC, plumbing, electrical, carpentry and painting.  24/7 availability to respond to service work orders and emergencies.  Regulated plumbing, electrical, and HVAC systems  Cleaning and constant upgrading of the building that includes painting  Replace non-working light bulbs, paper towel dispenser, toilet paper etc.  Monitor the day by day maintenance works. Specialties: Commercial Buildings, Residential Buildings, Car Showrooms, Workshops, Warehouses, Office buildings, Vehicle Yards and PDI centers etc. Technical skills: Interior Civil Works, Fire Fighting, HVAC, Electrical Works, Plumbing, painting, flooring work and Dry wall partitions. AL- AMCO INTERIOR DESIGN EST. As a Project coordinator 2009 to 03.01.10  Responsible for the execution of interior work of multi facility hotel five star hotels, Automobiles showroom, workshop, PDI center, Quick service center, shopping malls, and branded showrooms, in all over the KSA.  Responsible for executing the project while estimating the costs to be incurred during the processing.  Handle sites, coordinate activities, provide technical inputs for methodologies of coordination with site management. Handle the Quantity Calculation for Client & Sub-Contractor Bill  Responsible for executing designs, Quantity surveying, rate analysis, quality control.  Responsible for studying tender documents and quoting rates.  Responsible for preparing BOQs for Interior works  Provide technical leadership while estimating and evaluating the effort/ schedules and managed the team and its grievances.  Finalize the sub contractors ensuring quality supply of materials for effective project development  I have done following projects During work with Al-Amco : Al Hilal football club in Thahliyah Street, Ez Alsahra Holding Company in Al-Khindhi DQ, Gulf advantage auto mobiles co Ltd Riyadh khurais road, City max, Nectar, Baskin Robbins, and villa project.
  • 3.
    RESOURCINC INTERIOR, CONSULTINGEST. RIYADH 2010 Jan to Sep As Project Engineer (specialized in interior)  Accountable for construction of flagship store Project, service centers, car show rooms office interior as per MB norms and maintenance, administration of all showrooms and workshops with good exposure of services like fire fighting, HVAC, Electrical, plumbing works.  Strategically, plan, analyze & conceptualize the basic requirements while setting up the technical infrastructure of the project, reviewing all the project proposals. Negotiate & execute the contracts in consistent with contract & procurement policies/ procedures.  Handle sites, coordinate fit-out activities, provide technical inputs for methodologies of fit out & coordination with site management. Handle the Quantity Calculation for Client & Sub- Contractor Bill.  Liaise with external agencies, clients & consultants for determining technical specifications, approvals for execution & obtaining on-time clearances. Oversee the inventory requirements and the Bill of material at tender stage.  Identify and finalize the contractors ensuring quality supply of materials for effective project development.  Monitor the workmanship while maintaining the old structure, ensuring all contractual obligations are fulfilled and contract objectives met.  Responsible for executing designs, Quantity surveying, rate analysis, quality control, drawings and rules and instructions in the departmental codes, manuals, technical circulars etc. in force from time to time.  Follow the project from start to finish and make any necessary changes along the way, ensuring that the procedure is being followed while the safety features of the project during the time it is being completed.  Identify & finalize the contractors ensuring quality supply of materials for effective project development. Accountable for bill checking of contractor & workmanship while preparing drawings and maintaining the old structure. . CELL-MAC CONSTRUCTION.CO. Jul’06 –Aug’08 As Project engineer for office interior  Supervised and streamlined interior project works while monitoring project status.  Maintain liaison with various Consultants, Contractors and Vendors.  Responsible for executing the project while estimating the costs to be incurred during the processing and getting the project approved from the authorities.  Inspected & analyzed the proposed interior projects, visited the site, ensured that the plan fits the location & vice versa.  Provided technical leadership while estimating and evaluating the effort/schedules and managed the team and its grievances.  Accountable for preparation of bar charts, bill checking etc  Coordinated among different agencies such as civil& interior, HVAC, Electrical, Plumbing and fire fighting, Fire detection system, CCTV, Access control, A System etc. QUALIFICATION:
  • 4.
    (MBA) Himalayan University Successfullycompleted Civil Engineering, (Diploma 3 Years) Under (PNS) Engineering College Thrissur (irinjalakuda) Kerala. HSE Engineering NISM Security Management. (Safety Head) Bangalore Air condition & Refrigerator Mechanic Premier College and institute vattakkiner Calicut. (Kerala) Successfully completed higher secondary school Personal Details DOB >15/06/1984 (32) Years Marital status > Married Driving License > Available Saudi Arabia and Indian Languages English Arabic Hindi Urdu Malayalam Tamil Excellent Very Good Excellent Very Good Excellent Excellent Igama Status > Transferable (2268590490) Iqama profession > Marketing specialist Passport No > E5838902 Hobbies > Reading books, Concentrating the job, keep good relationship with all Computer Knowledge > MSOffice, Excel, word, power point, Internet, SAP sales and distribution user level Experience and prepare PR-PO process. Permanent Address: Muhammed Hashim pasilam veedu Naduvattam pal Company Beypore road References: Available on request. Thanks & Best regards