Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Mohamed khairy CV
1. Mohamed Khairy
Profession:
MEP Department Manager
Years of Experience:
+22 Years
Present Address:
Kuwait City - Kuwait
Contacts:
00965 50 45 25 94
00965 98 90 0614
E-mail:
mo_kh_1970@yahoo.com
Date of Birth:
December 27th
, 1970
Location of Birth:
Cairo, Egypt
Nationality:
Egyptian
Social Status:
Married
Passport No.:
A14362030
Driving Licenses:
Egypt
Kuwait
Qatar
Saudi Arabia
Visa Type:
Transferrable Working Visa
With more than 22 years experience in the engineering field through construction, con-
struction supervision and project management for many I&C projects, residential projects,
hospitals, towers and factories. With extensive experience in dealing with professional and
sub-professional crews, clients, consultants and contractors.
I feel proud to put between your hands a summary of my resume containing my qualifica-
tions and skills hoping that it will explain my merit to join your esteemed firm and work
through the curriculum and the policy in order to provide my professional services to the
clients and ensure the implementation of the firm goals.
Thank you for the opportunity to submit my resume and waiting for your contact in the
near future, if you select a date for the interview to review my documents that support my
resume.
PROFESSIONAL MEMBERSHIP:-
Member of Egyptian Syndicate (No. 29/8633) Dated 12/09/1993.
Member of Kuwait Society of Engineers (No. 19962) Dated 02/07/2007.
Member of IEEE (No. 90515221) Dated 14/11/2008.
Membership of Saudi Council of Engineers (No. 123470) Dated: 09/04/2013.
QUALIFICATIONS:-
B.Sc. Power Electrical Engineering with Very Good Graduation Degree. (May 1993)
Faculty of Engineering and Technology, Helwan University
Graduation Project: Design of electrical and extra low voltage networks.
Distinct Graduation Project Degree.
CHARACTER ATTRIBUTE:-
Confident, self-disciplined, initiative, innovative, convincing, cautious, maintain high eth-
ics, decisive, assertive, committed to the company’s interests and policies, responsible with
a sense of accountability, attention to details, hands-on attitude, critical & proactive think-
ing, organized, passionate, efficient time management and hard working.
PROFESSIONAL ATTRIBUTE:-
- Fluent in English.
- Excellent command of Excel, Word & AutoCAD.
- Excellent understanding of specifications and authorities requirements.
- Complete project understanding in given discipline, from start to hand-over.
- Ready to work and travel as per profession requirements.
MAJOER ROLES:-
Electrical Eng. Manager SSH International Kuwait 2016
MEP Department Manager Saudi Bin Laden Saudi Arabia 2013-2016
Senior Electrical Engineer Hassan Alam Con., Egypt 2012-2013
Assistant Project Manager Dar Al Handasah Qatar 2009-2012
Elec., Engineering Manager SMEC Int., PTY Ltd., Kuwait 2008-2009
Senior Project Engineer Kharafi National Kuwait 2001-2008
Electrical Engineer Delta Star Co., Egypt 1994-2001
2. DETAILED CAREER HISTORY:-
Electrical Engineering Manager , Dar SSH International Engineering Consultant Co., Kuwait City, Kuwait
May 2016 till Now
Job Responsibilities:-
Monitor and inspect project construction activities and installation and ensure that all project phases meet the estab-
lished objectives.
Ensure strict compliance with established contractual specifications and standards which include inspection of materi-
als, site procedures, fabrications, methods and results, both before, during and after projects.
Monitor project quality performance and take appropriate corrective action and to report infringement, problems and
any unusual observations to immediate.
Review, approve and processing all technical submittals (Materials, method statements, calculations, simulations, shop
drawings, as-built drawings and operation and maintenance manuals).
Review contractor’s variation orders, proposals and preparing recommendations to the contractors.
Review contractor’s claims and prepare recommendations for claim.
Review the contractor project record documents relevant to their discipline
Managing the inspectors.
Analyze laboratory certificates and testing reports.
Prepare site work progress in cooperation with the senior planner.
Prepare monthly payment for the contractor as per site work progress in cooperation with the senior planner.
Assist with the inspection of completed works and monitor the start-up, testing, commissioning and handover of the
electrical works.
Attending the progress and coordination meetings.
Coordinate with the mechanical engineer about HVAC system requirements such as Chillers, Pumps, Plate heat ex-
changers, Filters, Fans, AHUs, Fan coil units and VAVs.
Coordinate with the mechanical engineer about the fire fighting system requirements such as pumps, dampers, switches
and valves.
Coordinate with the mechanical engineer about the requirements for smoke fans, pressurization fans and induction jet
fans.
Sign off on the completed works with completed documentation.
Projects:
Construction Supervision of Northern and Southern Boats Harbours - Ahmadi
The Client is KOC - Kuwait Oil Company
The Total Project Value is KWD 137,270,617.954
3. MEP Department Manager, Saudi Bin Laden Group - Architect & Building Construction Department (ABCD)
Riyadh Technical Office (RTO), Riyadh, Saudi Arabia
March 2013 till April 2016
Job Responsibilities:-
Review the concept design, the developed design and the final design layouts prior to submitting to the project consultant.
Review the electrical calculations such as (Illumination calculations, Short circuit Calculations, Voltage drop calcula-
tions….etc.,) prior to be submitted to the project consultant.
Review the tender documents (Design drawings, Bills of Quantities and the specifications) prior to be submitted to the pro-
ject consultant.
Review the installation method statements prior to be submitted to the project consultant.
Review the material submittals prior to be submitted to the project consultant.
Review the shop drawing layouts prior to be submitted to the project consultant.
Monitor project quality performance and take appropriate corrective action and to report infringement, problems and any
unusual observations to immediate.
Review as-built drawings and operation and maintenance manuals prior to be submitted to the project consultant.
Review variation orders and proposals prior to be submitted to the project consultant.
Attending the progress and coordination meetings.
Coordinate with the mechanical engineer about HVAC system requirements such as Chillers, Pumps, Plate heat exchangers,
Filters, Fans, AHUs, Fan coil units and VAVs.
Coordinate with the mechanical engineer about the fire fighting system requirements such as pumps, dampers, switches and
valves.
Coordinate with the mechanical engineer about the requirements for smoke fans, pressurization fans and induction jet fans.
Sign off on the completed works with completed documentation.
Projects:
Construction of King Abdullah Project for Developing the Security Headquarters.
The Client is Ministry of Interior – Kingdom of Saudi Arabia
The Total Project Value is SR 11,912,743,963
Construction of (610) locations with total area of (1,843,805 m2
) for:-
General security Authority (321) locations
Civil Defence Authority (35) Locations
Investigation Authority (89) Locations.
Customs Authority (41) Locations.
Strategic Buildings Security Authority (12) Locations.
Drugs Enforcement Authority (33) Locations.
Civil Affair Authority (57) Locations.
Borders Guards Authority (12) Locations.
Special Security Forces (6) Locations
King Fahd Police Academy (3) Locations
4. Senior Electrical Engineer, Hassan Allam Construction, Cairo, Egypt
February 2012 till February 2013
Responsibilities:-
Lead the team of electrical drafting and engineers to ensure that the material and drawings submittals are prepared
within the targeted schedule.
Ensure the preparation and revision of electrical shop drawings.
Verify the correctness of electrical, builders workshop drawings, installation details prepared by the draft team.
Ensure the material submittals are prepared and submitted to obtain the consultant approval or approval with com-
ments and to assist the project team to obtain final approval.
Obtain consultant’s technical clarifications.
Monitor performance and progress of the preparation of shop drawings in relation to the agrees program.
Liaise and coordinate with other sub-contractors and/or suppliers of specialized system of equipment.
Monitor the day to day running of the project.
Assist in the preparation , submission and follow up of applications for payments, variation accounts and final
accounts.
Assist with the preparation of close-out documents including the operation and maintenance manuals, As-built draw-
ings, as applicable.
Key Projects:
Construction of Emaar Uptown Cairo (Villages G, I and K) - Mokattam - Cairo
Assistant Project Manager & Senior Electrical Engineer, Dar Al Handasah (Shair and Partners), Doha, Qatar
June 2009 to January 2012
Responsibilities:-
Monitor and inspect project construction activities and installation and ensure that all project phases meet the established
objectives.
Ensure strict compliance with established contractual specifications and standards which include inspection of materials,
site procedures, fabrications, methods and results, both before, during and after projects.
Monitor project quality performance and take appropriate corrective action and to report infringement, problems and any
unusual observations to immediate.
Review, approve and processing all technical submittals (Materials, method statements, calculations, simulations, shop
drawings, as-built drawings and operation and maintenance manuals).
Review contractor’s variation orders, proposals and preparing recommendations to the contractors.
Review contractor’s claims and prepare recommendations for claim.
Review the contractor project record documents relevant to their discipline
Managing the inspectors.
Analyze laboratory certificates and testing reports.
Prepare site work progress in cooperation with the senior planner.
Prepare monthly payment for the contractor as per site work progress in cooperation with the senior planner.
Assist with the inspection of completed works and monitor the start-up, testing, commissioning and handover of the electri-
cal works.
5. Attending the progress and coordination meetings.
Coordinate with the mechanical engineer about HVAC system requirements such as Chillers, Pumps, Plate heat exchang-
ers, Filters, Fans, AHUs, Fan coil units and VAVs.
Coordinate with the mechanical engineer about the fire fighting system requirements such as pumps, dampers, switches and
valves.
Coordinate with the mechanical engineer about the requirements for smoke fans, pressurization fans and induction jet fans.
Sign off on the completed works with completed documentation.
Key Projects:
PM/CM of Doha High Rise Office Building – Doha City - Qatar
The Client is H.H. Sheikh Saud Bin Mohamed Bin Ali Al Thani
The Total Project Value is 1,200,000,000 QAR.
The project consists of 3 Basements for Car Parking, a Tower with Ground, Mezzanine, 43 Floors and Dome and a tech-
nical building for Sub-Station and Chillers Plant.
The Sub-Station contains 10No 1500 KVA Power Transformers, 10No MLTBs and 3No Diesel Generators 2000 KVA.
The Chillers Plant contains 8 No Chillers with 1212 Kw cooling load each.
The Tower is equipped with 130No AHUs, 15No. Lifts and 8No Panoramic Lifts
The Tower and Landscape are equipped with advanced special LED External Lighting System
The Project is equipped with 40 Kw UPS, CCTV System, Access Control System, Dimming and Lighting Control System,
Telephone/Data Network through Fibre Optic Cables, Advanced BMS, Fire Alarm System, Voice Evacuation System, CO
Detection system for Parking and 60No MCCs for different equipment.
Electrical Engineering Manager, SMEC International PTY Ltd.,
November 2008 till February 2009
Responsibilities:-
Monitor and inspect project construction activities and installation and ensure that all project phases meet the established
objectives.
Ensure strict compliance with established contractual specifications and standards which include inspection of materials,
site procedures, fabrications, methods and results, both before, during and after projects.
Monitor project quality performance and take appropriate corrective action and to report infringement, problems and any
unusual observations to immediate.
Review, approve and processing all technical submittals (Materials, method statements, calculations, simulations, shop
drawings, as-built drawings and operation and maintenance manuals).
Review contractor’s variation orders, proposals and preparing recommendations to the contractors.
Review contractor’s claims and prepare recommendations for claim.
Review the contractor project record documents relevant to their discipline
Managing the inspectors.
Analyze laboratory certificates and testing reports.
Prepare site work progress in cooperation with the senior planner.
Prepare monthly payment for the contractor as per site work progress in cooperation with the senior planner.
Assist with the inspection of completed works and monitor the start-up, testing, commissioning and handover of the electri-
cal works.
6. Attending the progress and coordination meetings.
Coordinate with the mechanical engineer about HVAC system requirements such as Chillers, Pumps, Plate heat exchangers,
Filters, Fans, AHUs, Fan coil units and VAVs.
Coordinate with the mechanical engineer about the fire fighting system requirements such as pumps, dampers, switches and
valves.
Coordinate with the mechanical engineer about the requirements for smoke fans, pressurization fans and induction jet fans.
Sign off on the completed works with completed documentation.
Projects:
PM of New Kuwait University City – Al Shadadiyea – Kuwait City - Kuwait
Senior Electrical Engineer, Kharafi National (K.S.C.), Kuwait City, Kuwait
October 2001 till October 2008
Responsibilities:-
Carryout engineering calculations, raising RFI’s for technical design deficiencies or missing information.
Lead the team of electrical drafting and engineers to ensure that the material and drawings submittals are prepared within
the targeted schedule.
Ensure the preparation and revision of electrical shop drawings.
Verify the correctness of electrical, builder workshop drawings, installation details prepared by the draft team.
Ensure the material submittals are prepared and submitted to obtain the consultant approval or approval with comments and
to assist the project team to obtain final approval.
Obtain consultant’s technical clarifications.
Prepare techno-economical letters.
Attend technical meeting with the main contractor and client’s representatives, as appropriate.
Monitor performance and progress of the preparation of shop drawings in relation to the agreed program.
Liaise and coordinate with other sub-contractors and/or suppliers of specialized system of equipment.
Undergo training identified/advised by the Engineering Manager.
Ensure compliance with all quality, health, safety and environmental obligations.
Perform any other tasks/duties as maybe directed by the Project Manager.
Advise the Project Manager on resource requirements for the project.
Prepare and make material and drawing submittals in accordance with the procurement policy.
Initiate such purchases as maybe required to satisfy the specified requirements of the project, by reference to the contract
documents and/or the list of approved suppliers maintained by the purchasing department, in accordance with the procure-
ment policy.
Monitor the day to day running of the project.
Assist in the preparation, submission and follow up of applications for payments, variation accounts and final accounts.
Assist with the preparation of close-out documents including the operation and maintenance manuals, As-built drawings, as
applicable.
7. Projects:
Construction of Amiri Diwan Garages (7, 8 & 9) (10000 sq.mt area)
Construction of Al Hamra Complex Car Park (3 Basement + 5 Floors)
Construction of Sheikh Sabah International Stadium (60000 Seats + External parking area)
Construction of Abdul Aziz Al Babtain Tower (3 Basements+Ground+Mezzanine+42 Floors)
Construction of New Amiri Terminal – Kuwait International Airport
Electrical Engineer, Delta Star Electromechanical Contracting, Cairo, Egypt
February 1994 till April 2001
Job Responsibilities:-
Lead the team of electrical drafting and engineers to ensure that the material and drawings submittals are prepared within
the targeted schedule.
Ensure the preparation and revision of electrical shop drawings.
Verify the correctness of electrical, builder works workshop drawings, installation details prepared by the draft team.
Ensure the material submittals are prepared and submitted to obtain the consultant approval or approval with comments and
to assist the project team to obtain final approval.
Obtain consultant’s technical clarifications.
Monitor performance and progress of the preparation of shop drawings in relation to the agreed program.
Liaise and coordinate with other sub-contractors and/or suppliers of specialized system of equipment.
Prepare and make material and drawing submittals in accordance with the procurement policy.
Monitor the day to day running of the project.
Assist in the preparation, submission and follow up of applications for payments, variation accounts and final accounts.
Assist with the preparation of close-out documents including the operation and maintenance manuals, As-built drawings, as
applicable.
Projects:
Construction of Pyramiza Cairo Hotel Extension – Giza - Egypt
Construction of Habitat Furniture Factory – Obour City - Egypt
Construction of Habitat Foam Factory – Obour City - Egypt
Construction of Lucent Technology Building – Cairo - Egypt
Construction of Mr. & Mrs. Mohamed Mahmoud Khalil Museum – Giza - Egypt
Construction of Mena Garden City Touristic Village – 6th
of October City - Egypt
8. Approvals Obtained:
Approval s from Kuwaiti Amiri Diwan for several projects in Bayan Palace as (Electrical Project Engineer) – 2003 & 2005.
Approval from Al Mada Project Management Company in Association with KEO International Consults for Abdul Aziz
Al Babtain Cultural Waqf Tower as (Senior Electrical Engineer) – November 2006.
Approval from Ministry of Public Works of Kuwait (MPW) for The New Amiri terminal Building project in Kuwait Inter-
national Airport as (Senior Electrical Engineer) - May 2008.
Approval from Kuwait University for the New Kuwait University City in Al Shadadiyah as (Manager –Electrical Engineer-
ing) – October 2008.
Approval from H.H Sheikh Saud Bin Ali Bin Mohamed Al Thani for Doha High Rise Building as (Senior Electrical Engi-
neer) – June 2009.
Approval from Kuwait Oil Company (KOC) for Construction Supervision of Northern and Southern Boats Harbours in Ah-