Mohammad Athar Aftab Ozair is a Mechanical Engineer with over 5 years of experience in facilities management in Qatar and India. He is currently working as a Mechanical Engineer - Operations at Mosanada UGL, where he oversees the operations and maintenance of various facilities for Al Arabi Sports Club and the Qatar Volleyball Federation. Prior to his current role, he held positions as a site engineer in India, where he managed plumbing, fire safety, and mechanical projects.
A strong Project QA/QC Head , with a diversified experience covering Project Management, Design Department, Site Operations / Engineering & Installations, Commercial Management, Procurement Department, Safety Management, Documentation, Logistic Management, QA/QC Management and customer service. Possess strong work ethic and interpersonal skills paired with a proven career in MEP Projects management and leadership molded to suit varied Project requirements.
A strong Project QA/QC Head , with a diversified experience covering Project Management, Design Department, Site Operations / Engineering & Installations, Commercial Management, Procurement Department, Safety Management, Documentation, Logistic Management, QA/QC Management and customer service. Possess strong work ethic and interpersonal skills paired with a proven career in MEP Projects management and leadership molded to suit varied Project requirements.
I am Mechanical Engineer having more than 3 years experience in HVAC, firefighting, Production and Manufacturing. I want to utilize and enhance my capabilities, knowledge and skill in a viable manner for the benefit of the organization that encourages innovation and creativeness in the job process.
Student information management system project report ii.pdfKamal Acharya
Our project explains about the student management. This project mainly explains the various actions related to student details. This project shows some ease in adding, editing and deleting the student details. It also provides a less time consuming process for viewing, adding, editing and deleting the marks of the students.
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Dr.Costas Sachpazis
Terzaghi's soil bearing capacity theory, developed by Karl Terzaghi, is a fundamental principle in geotechnical engineering used to determine the bearing capacity of shallow foundations. This theory provides a method to calculate the ultimate bearing capacity of soil, which is the maximum load per unit area that the soil can support without undergoing shear failure. The Calculation HTML Code included.
Overview of the fundamental roles in Hydropower generation and the components involved in wider Electrical Engineering.
This paper presents the design and construction of hydroelectric dams from the hydrologist’s survey of the valley before construction, all aspects and involved disciplines, fluid dynamics, structural engineering, generation and mains frequency regulation to the very transmission of power through the network in the United Kingdom.
Author: Robbie Edward Sayers
Collaborators and co editors: Charlie Sims and Connor Healey.
(C) 2024 Robbie E. Sayers
Explore the innovative world of trenchless pipe repair with our comprehensive guide, "The Benefits and Techniques of Trenchless Pipe Repair." This document delves into the modern methods of repairing underground pipes without the need for extensive excavation, highlighting the numerous advantages and the latest techniques used in the industry.
Learn about the cost savings, reduced environmental impact, and minimal disruption associated with trenchless technology. Discover detailed explanations of popular techniques such as pipe bursting, cured-in-place pipe (CIPP) lining, and directional drilling. Understand how these methods can be applied to various types of infrastructure, from residential plumbing to large-scale municipal systems.
Ideal for homeowners, contractors, engineers, and anyone interested in modern plumbing solutions, this guide provides valuable insights into why trenchless pipe repair is becoming the preferred choice for pipe rehabilitation. Stay informed about the latest advancements and best practices in the field.
Hierarchical Digital Twin of a Naval Power SystemKerry Sado
A hierarchical digital twin of a Naval DC power system has been developed and experimentally verified. Similar to other state-of-the-art digital twins, this technology creates a digital replica of the physical system executed in real-time or faster, which can modify hardware controls. However, its advantage stems from distributing computational efforts by utilizing a hierarchical structure composed of lower-level digital twin blocks and a higher-level system digital twin. Each digital twin block is associated with a physical subsystem of the hardware and communicates with a singular system digital twin, which creates a system-level response. By extracting information from each level of the hierarchy, power system controls of the hardware were reconfigured autonomously. This hierarchical digital twin development offers several advantages over other digital twins, particularly in the field of naval power systems. The hierarchical structure allows for greater computational efficiency and scalability while the ability to autonomously reconfigure hardware controls offers increased flexibility and responsiveness. The hierarchical decomposition and models utilized were well aligned with the physical twin, as indicated by the maximum deviations between the developed digital twin hierarchy and the hardware.
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdffxintegritypublishin
Advancements in technology unveil a myriad of electrical and electronic breakthroughs geared towards efficiently harnessing limited resources to meet human energy demands. The optimization of hybrid solar PV panels and pumped hydro energy supply systems plays a pivotal role in utilizing natural resources effectively. This initiative not only benefits humanity but also fosters environmental sustainability. The study investigated the design optimization of these hybrid systems, focusing on understanding solar radiation patterns, identifying geographical influences on solar radiation, formulating a mathematical model for system optimization, and determining the optimal configuration of PV panels and pumped hydro storage. Through a comparative analysis approach and eight weeks of data collection, the study addressed key research questions related to solar radiation patterns and optimal system design. The findings highlighted regions with heightened solar radiation levels, showcasing substantial potential for power generation and emphasizing the system's efficiency. Optimizing system design significantly boosted power generation, promoted renewable energy utilization, and enhanced energy storage capacity. The study underscored the benefits of optimizing hybrid solar PV panels and pumped hydro energy supply systems for sustainable energy usage. Optimizing the design of solar PV panels and pumped hydro energy supply systems as examined across diverse climatic conditions in a developing country, not only enhances power generation but also improves the integration of renewable energy sources and boosts energy storage capacities, particularly beneficial for less economically prosperous regions. Additionally, the study provides valuable insights for advancing energy research in economically viable areas. Recommendations included conducting site-specific assessments, utilizing advanced modeling tools, implementing regular maintenance protocols, and enhancing communication among system components.
1. Mohammad Athar Aftab Ozair –Mechanical Engineer
Profile: A competent and dynamic engineering professional with an enriching cross functional
experience of 05 years, in Qatar and India. Currently associated with Mosanada UGL, spearheading
functionsas Mechanical Engineer– Operationsfor Al Arabi Sports Club& Qatar Volleyball federation,
Qatar.
Core Competencies: Mechanical Engineering ~ Facilities Management ~ Project Management ~
Maintenance ~ Project Planning ~ Training & Development ~Testing & Commissioning
Experience Profile:2.5 yrs. engineeringProjectsforHigh Rise Buildings, Industrial MEP projects, Clean
roomsExecution,maintenance of handoverprojects (MEP Equipment’s) ~ 2 yrs. Facilities Maintenance
& Management for Football Stadium.
Education
B.Tech (Mechanical Engineering), Jawaharlal Nehru Technological University, Hyderabad, 2011
Advance Diploma in Piping Engineering and Stress Analysis.
Employment Record
Mosanada UGL
Mechanical Engineer – Operations for client: Ministry of Youth & Sports, December 2013 onwards
Company Profile:
Mosanada UGL isa jointventure between Aspire Katara Investments, Qatar Olympic Committee and UGL
Services. Mosanada UGL provides integrated facilities management services in Qatar, from inception of
build design through to disposal of the property.
UGL's Servicesbusiness provides end-to-end corporate real estate and facilities management services to
corporations,governmentsandinstitutionsinAustralia,New Zealand, Asia, North America and the Middle
East.
Throughfive complementarybrands –UGL Services(Australia&New Zealand),UGL Services (Middle East),
UGL Services - Premas Operations, UGL Services - Equis and UGL Services - Unicco Operations – the
company delivers clients integrated solutions on a local, regional, national and multi-national basis.
Job Profile
Reports to Cluster Manager/ Site Supervisor
Responsible for the overall Operations and Maintenance of Al Arabi Sports Club & Qatar volleyball
federation building. Spearheads the Planning, Stores. Helpdesk and CMMS in the support towards
Operations. Operations and Maintenance include all Facilities Equipment related to Mechanical,
Electrical and Plumbing.
The facilitiesinclude the MainStadium,AdministrationBuilding,Multi-Purpose Hall, Jacuzzi and & Gym
etc.
Responsible forscopingthe worksforthe Maintenance Contracts,monitoringcontractor works related
to MEP, Pools and Chemical treatment etc.
Preparing Monthly Operations Report, participating in weekly coordination meetings with the client
and the contractors.
Reviewing and approving technical reports, modification works, improvement works and conducting
technical evaluation of reports. Manage and supervise contractor works in their technical reviews,
drawings, quotation reviews, specifications and quantities for project and rectification works.
Ensure successful andtimelyexecutionof processes/systems/proceduresforthe projects.
2. To interactwithCustomeronperiodical basis onprojectstatusandto checkthe implementationof
corrective actionas agreed.
Takescorrective measuresanddevelopsandimplementscontingencyplanswiththe projectteam
Reviewprojectperiodicallyandescalate the issuestomanagement,whereverrequired.
Reviewcostreductionopportunitiesthroughtechnical reviews,improvementproposalsandcost
benefitanalysis.
Coordinate andrun meeting with the Senior Managers to discuss and priorities open issues. Establish
action plans with deadlines and responsible stakeholders.
Carry out periodic Safety inspections on contractors’ site works in line with QEHSS requirements.
Significant Contributions / Achievements
Efficiently managing all operations of facilities management.
Major projects include MEP operations of Al Arabi Sports Club and Qatar Volleyball federation
Maximo work of CMMS and CMwork order
DLF Building India Ltd, India
Site Engineer, April 2011 - Feb 2013
Company Profile
DLF Limited is an Indian Based Real estate Company. Its primary is development of Residential
Commercial andretail Properties.The companyhasDevelop22majorcoloniesinCountry Capital Delhi
and isdiversifiedacross15 statesof Indiaand 24 citiesin India.The CompanyOperatesintwo segment
development business and Annity.
Job Profile
Responsible for Complete Installation Fire and Plumbing System from initial planning stage to
Final Execution Stage.
Direct interactions with Architect, Structural Engineer, Electrical Engineer, Plumbing Engineer,
Fire Fighting Engineer for HVAC Plant Room Layout, STP Plant, DG Room, AHU Installation, Pipe
Routing, Duct Routing for optimum solution.
Requirement Analysis, Planning, Site Inspection, Bill Checking etc. of Internal/ External works,
High rise building,
Cost estimation & evaluation for new Fire and Plumbing, Piping, Plumbing & Fire Fighting
system & upgrades.
Selection of Chillers, fire Pumps, Sewer Line, Waste Line Panels, Plumbing & Fire Fighting
accessories etc.
Site supervision and inspection for best Quality of work.
Coordination & Verification of Testing & Commissioning of MEP equipment’s.
Supervision in installation Piping, Plumbing & Firefighting equipment’s & accessories project
specification as per standard norms.
Floating request to consultant for material inspection and installation as per submittals and
specification.
Coordination with client to solve issues in Plumbing & Fire Fighting design and specifications.
Perform the tasks of developing, preparing and maintaining the budgets and schedules of
Plumbing & Fire Fighting projects.
Verification of Redline drawings with site actual & final as-built drawings.
Testing, diagnose and repair problem in the system and propose relevant solution.
Ensure proper running order of all systems.
Managing all SOP’s related to HVAC & MEP equipment’s for maintenance.
Monitoring duct & Piping pressure and external pressure on regular basis.
3. Running the HVAC equipment as per ambient temperature for energy saving.
Finding solutions for minimum consumption of power.
Cost control, vendor management, planning & budgetary controls.
Review of BOQs & Technical specifications in coordination with appointed design consultants.
Significant Contributions / Achievements
Project Planning & Management of DLF Magnolia Projects for Luxury Residential, and Commercial.
SS Engineers and Consultancy
Site Engineer, September 2011 – April 2012
Company Profile
S.S Engineers and Consultant an ISO 9001:2008 approved company is global leader in Designing, Fixing
Commission, Testing, Repair, Maintenance of Fire, Safety, IBMS e- security , Electrical and Plumbing
technology withalonghistoryof pioneering innovation in Residential, Commercial and Industrial. Which
establish in July 1997
Job Profile
Verification of Redline drawings with site actual & final as-built drawings.
Manpower Handling Company and contractor.
Site Execution of MEP services as per Consultant Approved Drawings.
Scheduling Preventive and Corrective maintenance.
Testing, diagnose and repair problem in the system and propose relevant solution.
Ensure proper running order of all systems.
Managing all SOP’s related to MEP equipment’s for maintenance.
Review of BOQs & Technical specifications in coordination with appointed design consultants.
Develop Sites & Fields Quality Audit Plans. Implement and maintain programs, procedures and
methods that ensure compliance with quality.
Prepare test data, Job plan, matrices, checklists and other test documents based on the
project.
Trainings
Coal Based Power Plant Industrial Training in NTPC Ltd Khalgaon, India.
First Aid International Training in Gulf Technical and safety Training Center Qatar.
Piping engineering and Stress Analysis training In IPEB Hyderabad
Trainings
Languages Known: English, Hindi & Urdu fluent in reading, writing and Speaking