SlideShare a Scribd company logo
RAVI SHANKAR (Age-31 Yrs) E-Mail: ravishankar315@gmail.com Contact: +91-7042103645
BE Mechanical with nearly 8 years in Project execution, QA/QC of HVAC/Plumbing/Fire
protection/sewage treatment/aviation fuel hydrant/pre engineering building/warehouses
projects.
Professional summary
 An all in one multi-tasking professional with proven track record in project execution, QC/QA, coordination of
mechanical utilities services, implementation of Kaizen and lean construction concepts.
 Leading the pre engineering building works & sewage treatment plant project as my current assignment.
 Exposure in many other aspects of project management, starting from the bid stage through to completion,
including design, procurement and site management.
 Began carrier with GMR Airports as a project executive. Executed Terminal-T3 project, Delhi.
 Presently working with Turner construction company/Boeing for IAF infrastructure facility project, Hindon Air
force station, Ghaziabad.
 Consistently rated a top performer–achieved ‘‘Exceeds Expectations” rating in all the performance
appraisals so far.
 Saved Rs.5 Crore towards energy consumption cost of HVAC system at IGI Airport, Delhi by implementing
Kaizen and lean construction concepts.
 Expertise in execution and quality control of MEP projects including review of contract, design,
specifications, shop drawings, product data, Qualities assurance plans.
 Working as an interface with government agencies, client, contractors, suppliers etc.
 Knowledge of methods & equipment used in mechanical utilities services, installation, testing and
commissioning of plumbing, firefighting, HVAC, sewage treatment and pre engineering building steel works.
 Strong command on relevant IS codes/ASHARE/NFPA/ASTM/NBCI requirement.
 Confident and credible individual with the kind of communications skills that inspire at all levels of business.
 Meticulous organizer, who possesses excellent stakeholder management, team working skills and performs
well under pressure,. Consistently meets deadlines with unflinching aggression.
 Excellent in swiftly ramping up projects in close co-ordination with contractors, consultants, architects and
other external agencies, ensuring on time deliverables.
Experience Track
Project management
 Manage Project from scratch to start of commercial operation of the project which include managing the
conceptual designs, budgeting, design reviews, procurement and contracts, construction, testing and
commissioning and final handing over.
 Handling end to end projects encompassing planning, estimation, scope definition.
 Carrying out screening studies, site survey and feedback to designer for necessary changes as per site
requirement.
 Interacting with the client at all stages of the project for securing approvals, reporting progress
 Finalising requirements and specifications in consultation with consultants / collaborators, suppliers.
 Presenting reports defining project progress, discussions with vendors and PMCs for problem resolutions.
 Coordinating with the PMC for ensuring quality checks and maintaining overall quality assurance with
necessary documentation through the PMC and vendor POCs.
 Conducting snag identification activities with PMC QC engineers and preparing plans for timely handover of the
project.
Quality Assurance/control
 Review QA/QC Procedures and Document Control as submitted by the Contractors and ensure implementation
is in compliance with Contract requirements.
 Attend all activities on site and ensure their compliance with QA/QC procedure in respect of the format signed
off by Contractors QA/QC Manager.
 Ensure traceability of all materials and equipment from purchasing up to delivery on site. Check all materials
and equipment as delivered on site and ensure its compliance with approved materials and specification.
Contract Management/Vendor Management
 Coordinating with consultants, contractors for preparation & finalization of requirements, estimates & BOQ.
 Evaluating & executing contracting works as well as handling technical negotiation.
 First hand Short listing of contractors. Supporting the process of award and review of contracts.
 Finalizing SLAs as per the work requirements and strict monitoring of the same. Impose penalties for non-
adherence to SLAs, finalise deductions in billings of the contractors.
 Ensure NFA, Purchase requisitions for all CAPEX and OPEX works and follow up with procurement/finance team
for timely award of contracts.
 Developing long-term partnerships with suppliers, managing day-to-day supplier performance to ensure
meeting of service, cost, delivery and quality norms.
 Initiate Payment process i.e.- ensure correct billing after including deductions, create NFP,Service
entries,MIGO in SAP MM module and follow up with finance for timely release of payment.
 Coordinating with suppliers for new product development and implementation as well as executing vendor
evaluation, vendor rating calculation and necessary actions for under performance.
Employment Scan
Since Feb’14-with Turner construction company C/O-Boeing. Construction of infrastructure facility for
Indian Air force, Ghaziabad
Client—United States Army Corporation of Engineers
Senior project engineer -Mechanical
Accountabilities
 Review of design, specifications, drawings, and product data submittals of Fuel hydrant system/sewage
treatment plant, plumbing, fire protection works followed by execution.
 Leading sewage treatment plant project of 1000cum/day capacity. Managing team of two mechanical and 2
civil engineers.
 Inspection of PEB materials & MEP works.
 Frame and Review erection sequence for whole pre engineering building steel structure and warehouse works
(4000MT).
 Overall in charge of two PEB warehouse construction w.r.t qualities, execution, building alignment and final
hand over.
 Conduct factory inspections for quality control of fabricated steel members ,followed by site execution as per
specification requirement and codes such as ASTM32M M,IS 1367,part 3,IS 4000:1992,IS 2062,IS
800,IS12748.
 Execution of Fuel hydrant system project followed by testing and commissioning & final hand over.
 Coordination with contractors, suppliers, stake holders for timely execution.
 Project monitoring w.r.t milestones.
 Execution of Fire fighting works. Responsible for9 km of ductile iron piping, over 4100 no sprinklers, 200 fire
hydrants, hose reel and high speed deluge sprinkler system
 Monitoring regular work progress with reports towards meeting the project deliverables.
 Monitoring project resource and manpower requirements and organizing weekly review meetings with follow
up Minutes of Meeting reports.
 Keeping the project focus in line with detailed project plans.
 Planning and scheduling project timelines in close coordination with the client and vendors.
 Tracking project deliverables using appropriate tools like MS Project and/or MS excel reports.
 Ensuring the project implementation is as per the requirements of shop drawings (Good for Construction)
June’08-Feb 14 with GMR Airport Developers Ltd., New Delhi
Junior Manager - Engineering (Mechanical)
Accountabilities
 To study all type of drawing like, P&I diagram, equipment drawings, structural &architectural drawings.
 To Review technical submittals as per the technical specifications, RFP and contract documents.
 To monitor the project work & preparation of progress reports.
 Inspection of incoming material and making data sheet.
 Execution of the work as per HVAC shop drawings. Responsible for 4 km of HDPE&1000 metres of CI piping
for drainage and sanitary works of IGI Airport, T-3. Executed 12000 square metre of ducting works.
 Responsible for installation, testing of 758 numbers of AHUs.
 Project monitoring and generating progress report for management review. Ensuring weekly/monthly MIS.
 Deep involvement at site execution, Follow up with contractors, suppliers for in time material delivery and
inspection.
 Negotiation, Contract, project execution, vendor management/Development. Monitoring of SLA with three big
contractors at the IGI Airport-T3.
 To initiate and execute all preliminary works related to procurement on SAP MM Module—PR generation,
Floating RFQ, Negotiation with vendors, payment related issues.
Scholastics
B.E (Mechanical Engineering) with first class from R V College of Engineering, Bangalore in 2008.
XII (Maths, Physics & Chemistry)
St. Xavier’s College Ranchi. First class
X -Baldwin Academy, Patna, and C.B.S.E. Board. First class with distinction
Ravi cv on 5 th april 2015

More Related Content

What's hot

Imteyaz ahmad 12 yrs exp in MEP (Site / Project Management)
Imteyaz ahmad   12 yrs exp in MEP (Site / Project Management)Imteyaz ahmad   12 yrs exp in MEP (Site / Project Management)
Imteyaz ahmad 12 yrs exp in MEP (Site / Project Management)Imteyaz Ahmad
 
Curriculum Vitae end to start 19-7-2016
Curriculum Vitae end to start 19-7-2016Curriculum Vitae end to start 19-7-2016
Curriculum Vitae end to start 19-7-2016Ayman Issa
 
Vignesh Kumar C- TPI Coordinator
Vignesh Kumar C- TPI CoordinatorVignesh Kumar C- TPI Coordinator
Vignesh Kumar C- TPI CoordinatorVignesh Kumar C
 
Raman K Gupta ,QC Engr
Raman K Gupta ,QC EngrRaman K Gupta ,QC Engr
Raman K Gupta ,QC EngrRaman K Gupta
 
N.V.VAIDYA-05-06-2016
N.V.VAIDYA-05-06-2016N.V.VAIDYA-05-06-2016
N.V.VAIDYA-05-06-2016NITIN VAIDYA
 
Mazhar SheikhMECH ENGR-CV- 2016-Construction
Mazhar SheikhMECH ENGR-CV- 2016-ConstructionMazhar SheikhMECH ENGR-CV- 2016-Construction
Mazhar SheikhMECH ENGR-CV- 2016-ConstructionMazhar Sheikh
 
Resume_Omkar Palit
Resume_Omkar PalitResume_Omkar Palit
Resume_Omkar PalitOmkar Palit
 
Planning Engineer _CV
Planning Engineer _CVPlanning Engineer _CV
Planning Engineer _CVSajith Nair
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain
 
CV-Sidharth Sunny- Project Engineer
CV-Sidharth Sunny- Project EngineerCV-Sidharth Sunny- Project Engineer
CV-Sidharth Sunny- Project EngineerSidharth Sunny
 

What's hot (19)

Raguram palnichamy jun 2019
Raguram palnichamy jun 2019Raguram palnichamy jun 2019
Raguram palnichamy jun 2019
 
Imteyaz ahmad 12 yrs exp in MEP (Site / Project Management)
Imteyaz ahmad   12 yrs exp in MEP (Site / Project Management)Imteyaz ahmad   12 yrs exp in MEP (Site / Project Management)
Imteyaz ahmad 12 yrs exp in MEP (Site / Project Management)
 
Curriculum Vitae end to start 19-7-2016
Curriculum Vitae end to start 19-7-2016Curriculum Vitae end to start 19-7-2016
Curriculum Vitae end to start 19-7-2016
 
Vignesh Kumar C- TPI Coordinator
Vignesh Kumar C- TPI CoordinatorVignesh Kumar C- TPI Coordinator
Vignesh Kumar C- TPI Coordinator
 
Ghullam murtaza cv (1)
Ghullam murtaza cv (1)Ghullam murtaza cv (1)
Ghullam murtaza cv (1)
 
Ajay Resume
Ajay Resume Ajay Resume
Ajay Resume
 
Amol-KulkarniResume
Amol-KulkarniResumeAmol-KulkarniResume
Amol-KulkarniResume
 
Engr. Sikandar_resume
Engr. Sikandar_resumeEngr. Sikandar_resume
Engr. Sikandar_resume
 
Raman K Gupta ,QC Engr
Raman K Gupta ,QC EngrRaman K Gupta ,QC Engr
Raman K Gupta ,QC Engr
 
N.V.VAIDYA-05-06-2016
N.V.VAIDYA-05-06-2016N.V.VAIDYA-05-06-2016
N.V.VAIDYA-05-06-2016
 
Mazhar SheikhMECH ENGR-CV- 2016-Construction
Mazhar SheikhMECH ENGR-CV- 2016-ConstructionMazhar SheikhMECH ENGR-CV- 2016-Construction
Mazhar SheikhMECH ENGR-CV- 2016-Construction
 
MUHAMMAD ZEESHAN
MUHAMMAD ZEESHANMUHAMMAD ZEESHAN
MUHAMMAD ZEESHAN
 
CV of Dinesh
CV of DineshCV of Dinesh
CV of Dinesh
 
Resume_Omkar Palit
Resume_Omkar PalitResume_Omkar Palit
Resume_Omkar Palit
 
Mari cv - office
Mari cv - officeMari cv - office
Mari cv - office
 
Planning Engineer _CV
Planning Engineer _CVPlanning Engineer _CV
Planning Engineer _CV
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
 
Resume - M Anil Kumar - 16-07-2016
Resume - M Anil Kumar - 16-07-2016Resume - M Anil Kumar - 16-07-2016
Resume - M Anil Kumar - 16-07-2016
 
CV-Sidharth Sunny- Project Engineer
CV-Sidharth Sunny- Project EngineerCV-Sidharth Sunny- Project Engineer
CV-Sidharth Sunny- Project Engineer
 

Viewers also liked

売れるネットショップの作り方を知っているのは誰か?
売れるネットショップの作り方を知っているのは誰か?売れるネットショップの作り方を知っているのは誰か?
売れるネットショップの作り方を知っているのは誰か?Le Grand
 
ENGIE harnesses TagCommander to drive digital performance
ENGIE harnesses TagCommander to drive digital performanceENGIE harnesses TagCommander to drive digital performance
ENGIE harnesses TagCommander to drive digital performanceCommanders Act
 
Improving HR Document Availability and Process Workflows with Electronic Imaging
Improving HR Document Availability and Process Workflows with Electronic ImagingImproving HR Document Availability and Process Workflows with Electronic Imaging
Improving HR Document Availability and Process Workflows with Electronic ImagingVerbella CMG
 
我々は積極的に在宅勤務をすべき
我々は積極的に在宅勤務をすべき我々は積極的に在宅勤務をすべき
我々は積極的に在宅勤務をすべき内田 啓太郎
 
SAP hybris - User Account Management
SAP hybris - User Account ManagementSAP hybris - User Account Management
SAP hybris - User Account ManagementZhuo Huang
 
Sunil Kumar Burle Resume
Sunil Kumar Burle  ResumeSunil Kumar Burle  Resume
Sunil Kumar Burle ResumeSunil Kumar
 
データサイエンティスト養成勉強会 こんな僕がデータサイエンティストになれた秘密
データサイエンティスト養成勉強会 こんな僕がデータサイエンティストになれた秘密データサイエンティスト養成勉強会 こんな僕がデータサイエンティストになれた秘密
データサイエンティスト養成勉強会 こんな僕がデータサイエンティストになれた秘密Ryo Matsuura
 

Viewers also liked (11)

売れるネットショップの作り方を知っているのは誰か?
売れるネットショップの作り方を知っているのは誰か?売れるネットショップの作り方を知っているのは誰か?
売れるネットショップの作り方を知っているのは誰か?
 
NTG Resume 102016
NTG Resume 102016NTG Resume 102016
NTG Resume 102016
 
SAP PLM training by kmr software services
SAP PLM training by kmr software servicesSAP PLM training by kmr software services
SAP PLM training by kmr software services
 
ENGIE harnesses TagCommander to drive digital performance
ENGIE harnesses TagCommander to drive digital performanceENGIE harnesses TagCommander to drive digital performance
ENGIE harnesses TagCommander to drive digital performance
 
Improving HR Document Availability and Process Workflows with Electronic Imaging
Improving HR Document Availability and Process Workflows with Electronic ImagingImproving HR Document Availability and Process Workflows with Electronic Imaging
Improving HR Document Availability and Process Workflows with Electronic Imaging
 
我々は積極的に在宅勤務をすべき
我々は積極的に在宅勤務をすべき我々は積極的に在宅勤務をすべき
我々は積極的に在宅勤務をすべき
 
CV-AMMAR BAMA-F2 (2)
CV-AMMAR BAMA-F2 (2)CV-AMMAR BAMA-F2 (2)
CV-AMMAR BAMA-F2 (2)
 
MPK - Resume
MPK - ResumeMPK - Resume
MPK - Resume
 
SAP hybris - User Account Management
SAP hybris - User Account ManagementSAP hybris - User Account Management
SAP hybris - User Account Management
 
Sunil Kumar Burle Resume
Sunil Kumar Burle  ResumeSunil Kumar Burle  Resume
Sunil Kumar Burle Resume
 
データサイエンティスト養成勉強会 こんな僕がデータサイエンティストになれた秘密
データサイエンティスト養成勉強会 こんな僕がデータサイエンティストになれた秘密データサイエンティスト養成勉強会 こんな僕がデータサイエンティストになれた秘密
データサイエンティスト養成勉強会 こんな僕がデータサイエンティストになれた秘密
 

Similar to Ravi cv on 5 th april 2015

Similar to Ravi cv on 5 th april 2015 (20)

Vikram Prabhakar Updated Resume
Vikram Prabhakar Updated ResumeVikram Prabhakar Updated Resume
Vikram Prabhakar Updated Resume
 
UPDATED RESUME 2016
UPDATED RESUME 2016UPDATED RESUME 2016
UPDATED RESUME 2016
 
Project Engineer 3
Project Engineer 3Project Engineer 3
Project Engineer 3
 
Pradeep-CV
Pradeep-CVPradeep-CV
Pradeep-CV
 
Manohar Resume
Manohar ResumeManohar Resume
Manohar Resume
 
Diosdado CV (updated)(1)
Diosdado CV (updated)(1)Diosdado CV (updated)(1)
Diosdado CV (updated)(1)
 
SANTHOSH KUMAR UP RCV
SANTHOSH KUMAR UP RCVSANTHOSH KUMAR UP RCV
SANTHOSH KUMAR UP RCV
 
Harish Resume.pdf
Harish Resume.pdfHarish Resume.pdf
Harish Resume.pdf
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
 
Resume-Civil - QC Engineer - Gowrijayashankar
Resume-Civil - QC Engineer - GowrijayashankarResume-Civil - QC Engineer - Gowrijayashankar
Resume-Civil - QC Engineer - Gowrijayashankar
 
Project Careers Oil&Gas
Project Careers Oil&Gas Project Careers Oil&Gas
Project Careers Oil&Gas
 
Prudhivi__Rushi_CV
Prudhivi__Rushi_CVPrudhivi__Rushi_CV
Prudhivi__Rushi_CV
 
A_suresha_rao_Jan_2015
A_suresha_rao_Jan_2015A_suresha_rao_Jan_2015
A_suresha_rao_Jan_2015
 
Saptak_CV
Saptak_CVSaptak_CV
Saptak_CV
 
CV Pholapatra Latest Rev 05
CV Pholapatra Latest Rev 05CV Pholapatra Latest Rev 05
CV Pholapatra Latest Rev 05
 
Sachin parab
Sachin parabSachin parab
Sachin parab
 
Henry CV
Henry CVHenry CV
Henry CV
 
Srinivaskumar_cv_16
Srinivaskumar_cv_16Srinivaskumar_cv_16
Srinivaskumar_cv_16
 
Resume - Shibu Thomas rev
Resume - Shibu Thomas revResume - Shibu Thomas rev
Resume - Shibu Thomas rev
 
Senior Planning Engineer -Mohidee Sheik Asan
Senior Planning Engineer -Mohidee Sheik AsanSenior Planning Engineer -Mohidee Sheik Asan
Senior Planning Engineer -Mohidee Sheik Asan
 

Recently uploaded

Online resume builder management system project report.pdf
Online resume builder management system project report.pdfOnline resume builder management system project report.pdf
Online resume builder management system project report.pdfKamal Acharya
 
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdfA CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdfKamal Acharya
 
Digital Signal Processing Lecture notes n.pdf
Digital Signal Processing Lecture notes n.pdfDigital Signal Processing Lecture notes n.pdf
Digital Signal Processing Lecture notes n.pdfAbrahamGadissa
 
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical EngineeringC Sai Kiran
 
IT-601 Lecture Notes-UNIT-2.pdf Data Analysis
IT-601 Lecture Notes-UNIT-2.pdf Data AnalysisIT-601 Lecture Notes-UNIT-2.pdf Data Analysis
IT-601 Lecture Notes-UNIT-2.pdf Data AnalysisDr. Radhey Shyam
 
Scaling in conventional MOSFET for constant electric field and constant voltage
Scaling in conventional MOSFET for constant electric field and constant voltageScaling in conventional MOSFET for constant electric field and constant voltage
Scaling in conventional MOSFET for constant electric field and constant voltageRCC Institute of Information Technology
 
The Ultimate Guide to External Floating Roofs for Oil Storage Tanks.docx
The Ultimate Guide to External Floating Roofs for Oil Storage Tanks.docxThe Ultimate Guide to External Floating Roofs for Oil Storage Tanks.docx
The Ultimate Guide to External Floating Roofs for Oil Storage Tanks.docxCenterEnamel
 
Top 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering ScientistTop 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering Scientistgettygaming1
 
Natalia Rutkowska - BIM School Course in Kraków
Natalia Rutkowska - BIM School Course in KrakówNatalia Rutkowska - BIM School Course in Kraków
Natalia Rutkowska - BIM School Course in Krakówbim.edu.pl
 
KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and Visualization
KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and VisualizationKIT-601 Lecture Notes-UNIT-5.pdf Frame Works and Visualization
KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and VisualizationDr. Radhey Shyam
 
Laundry management system project report.pdf
Laundry management system project report.pdfLaundry management system project report.pdf
Laundry management system project report.pdfKamal Acharya
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdfKamal Acharya
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Aryaabh.arya
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234AafreenAbuthahir2
 
İTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering WorkshopİTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering WorkshopEmre Günaydın
 
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWINGBRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWINGKOUSTAV SARKAR
 
ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES  INTRODUCTION UNIT-IENERGY STORAGE DEVICES  INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES INTRODUCTION UNIT-IVigneshvaranMech
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industriesMuhammadTufail242431
 
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data StreamKIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data StreamDr. Radhey Shyam
 

Recently uploaded (20)

Online resume builder management system project report.pdf
Online resume builder management system project report.pdfOnline resume builder management system project report.pdf
Online resume builder management system project report.pdf
 
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdfA CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
 
Digital Signal Processing Lecture notes n.pdf
Digital Signal Processing Lecture notes n.pdfDigital Signal Processing Lecture notes n.pdf
Digital Signal Processing Lecture notes n.pdf
 
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
 
IT-601 Lecture Notes-UNIT-2.pdf Data Analysis
IT-601 Lecture Notes-UNIT-2.pdf Data AnalysisIT-601 Lecture Notes-UNIT-2.pdf Data Analysis
IT-601 Lecture Notes-UNIT-2.pdf Data Analysis
 
Scaling in conventional MOSFET for constant electric field and constant voltage
Scaling in conventional MOSFET for constant electric field and constant voltageScaling in conventional MOSFET for constant electric field and constant voltage
Scaling in conventional MOSFET for constant electric field and constant voltage
 
The Ultimate Guide to External Floating Roofs for Oil Storage Tanks.docx
The Ultimate Guide to External Floating Roofs for Oil Storage Tanks.docxThe Ultimate Guide to External Floating Roofs for Oil Storage Tanks.docx
The Ultimate Guide to External Floating Roofs for Oil Storage Tanks.docx
 
Top 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering ScientistTop 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering Scientist
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
Natalia Rutkowska - BIM School Course in Kraków
Natalia Rutkowska - BIM School Course in KrakówNatalia Rutkowska - BIM School Course in Kraków
Natalia Rutkowska - BIM School Course in Kraków
 
KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and Visualization
KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and VisualizationKIT-601 Lecture Notes-UNIT-5.pdf Frame Works and Visualization
KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and Visualization
 
Laundry management system project report.pdf
Laundry management system project report.pdfLaundry management system project report.pdf
Laundry management system project report.pdf
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
İTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering WorkshopİTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering Workshop
 
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWINGBRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
 
ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES  INTRODUCTION UNIT-IENERGY STORAGE DEVICES  INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
 
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data StreamKIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
 

Ravi cv on 5 th april 2015

  • 1. RAVI SHANKAR (Age-31 Yrs) E-Mail: ravishankar315@gmail.com Contact: +91-7042103645 BE Mechanical with nearly 8 years in Project execution, QA/QC of HVAC/Plumbing/Fire protection/sewage treatment/aviation fuel hydrant/pre engineering building/warehouses projects. Professional summary  An all in one multi-tasking professional with proven track record in project execution, QC/QA, coordination of mechanical utilities services, implementation of Kaizen and lean construction concepts.  Leading the pre engineering building works & sewage treatment plant project as my current assignment.  Exposure in many other aspects of project management, starting from the bid stage through to completion, including design, procurement and site management.  Began carrier with GMR Airports as a project executive. Executed Terminal-T3 project, Delhi.  Presently working with Turner construction company/Boeing for IAF infrastructure facility project, Hindon Air force station, Ghaziabad.  Consistently rated a top performer–achieved ‘‘Exceeds Expectations” rating in all the performance appraisals so far.  Saved Rs.5 Crore towards energy consumption cost of HVAC system at IGI Airport, Delhi by implementing Kaizen and lean construction concepts.  Expertise in execution and quality control of MEP projects including review of contract, design, specifications, shop drawings, product data, Qualities assurance plans.  Working as an interface with government agencies, client, contractors, suppliers etc.  Knowledge of methods & equipment used in mechanical utilities services, installation, testing and commissioning of plumbing, firefighting, HVAC, sewage treatment and pre engineering building steel works.  Strong command on relevant IS codes/ASHARE/NFPA/ASTM/NBCI requirement.  Confident and credible individual with the kind of communications skills that inspire at all levels of business.  Meticulous organizer, who possesses excellent stakeholder management, team working skills and performs well under pressure,. Consistently meets deadlines with unflinching aggression.  Excellent in swiftly ramping up projects in close co-ordination with contractors, consultants, architects and other external agencies, ensuring on time deliverables. Experience Track Project management  Manage Project from scratch to start of commercial operation of the project which include managing the conceptual designs, budgeting, design reviews, procurement and contracts, construction, testing and commissioning and final handing over.  Handling end to end projects encompassing planning, estimation, scope definition.  Carrying out screening studies, site survey and feedback to designer for necessary changes as per site requirement.  Interacting with the client at all stages of the project for securing approvals, reporting progress  Finalising requirements and specifications in consultation with consultants / collaborators, suppliers.  Presenting reports defining project progress, discussions with vendors and PMCs for problem resolutions.  Coordinating with the PMC for ensuring quality checks and maintaining overall quality assurance with necessary documentation through the PMC and vendor POCs.  Conducting snag identification activities with PMC QC engineers and preparing plans for timely handover of the project. Quality Assurance/control  Review QA/QC Procedures and Document Control as submitted by the Contractors and ensure implementation is in compliance with Contract requirements.  Attend all activities on site and ensure their compliance with QA/QC procedure in respect of the format signed off by Contractors QA/QC Manager.  Ensure traceability of all materials and equipment from purchasing up to delivery on site. Check all materials and equipment as delivered on site and ensure its compliance with approved materials and specification. Contract Management/Vendor Management  Coordinating with consultants, contractors for preparation & finalization of requirements, estimates & BOQ.  Evaluating & executing contracting works as well as handling technical negotiation.  First hand Short listing of contractors. Supporting the process of award and review of contracts.  Finalizing SLAs as per the work requirements and strict monitoring of the same. Impose penalties for non- adherence to SLAs, finalise deductions in billings of the contractors.  Ensure NFA, Purchase requisitions for all CAPEX and OPEX works and follow up with procurement/finance team for timely award of contracts.  Developing long-term partnerships with suppliers, managing day-to-day supplier performance to ensure
  • 2. meeting of service, cost, delivery and quality norms.  Initiate Payment process i.e.- ensure correct billing after including deductions, create NFP,Service entries,MIGO in SAP MM module and follow up with finance for timely release of payment.  Coordinating with suppliers for new product development and implementation as well as executing vendor evaluation, vendor rating calculation and necessary actions for under performance. Employment Scan Since Feb’14-with Turner construction company C/O-Boeing. Construction of infrastructure facility for Indian Air force, Ghaziabad Client—United States Army Corporation of Engineers Senior project engineer -Mechanical Accountabilities  Review of design, specifications, drawings, and product data submittals of Fuel hydrant system/sewage treatment plant, plumbing, fire protection works followed by execution.  Leading sewage treatment plant project of 1000cum/day capacity. Managing team of two mechanical and 2 civil engineers.  Inspection of PEB materials & MEP works.  Frame and Review erection sequence for whole pre engineering building steel structure and warehouse works (4000MT).  Overall in charge of two PEB warehouse construction w.r.t qualities, execution, building alignment and final hand over.  Conduct factory inspections for quality control of fabricated steel members ,followed by site execution as per specification requirement and codes such as ASTM32M M,IS 1367,part 3,IS 4000:1992,IS 2062,IS 800,IS12748.  Execution of Fuel hydrant system project followed by testing and commissioning & final hand over.  Coordination with contractors, suppliers, stake holders for timely execution.  Project monitoring w.r.t milestones.  Execution of Fire fighting works. Responsible for9 km of ductile iron piping, over 4100 no sprinklers, 200 fire hydrants, hose reel and high speed deluge sprinkler system  Monitoring regular work progress with reports towards meeting the project deliverables.  Monitoring project resource and manpower requirements and organizing weekly review meetings with follow up Minutes of Meeting reports.  Keeping the project focus in line with detailed project plans.  Planning and scheduling project timelines in close coordination with the client and vendors.  Tracking project deliverables using appropriate tools like MS Project and/or MS excel reports.  Ensuring the project implementation is as per the requirements of shop drawings (Good for Construction) June’08-Feb 14 with GMR Airport Developers Ltd., New Delhi Junior Manager - Engineering (Mechanical) Accountabilities  To study all type of drawing like, P&I diagram, equipment drawings, structural &architectural drawings.  To Review technical submittals as per the technical specifications, RFP and contract documents.  To monitor the project work & preparation of progress reports.  Inspection of incoming material and making data sheet.  Execution of the work as per HVAC shop drawings. Responsible for 4 km of HDPE&1000 metres of CI piping for drainage and sanitary works of IGI Airport, T-3. Executed 12000 square metre of ducting works.  Responsible for installation, testing of 758 numbers of AHUs.  Project monitoring and generating progress report for management review. Ensuring weekly/monthly MIS.  Deep involvement at site execution, Follow up with contractors, suppliers for in time material delivery and inspection.  Negotiation, Contract, project execution, vendor management/Development. Monitoring of SLA with three big contractors at the IGI Airport-T3.  To initiate and execute all preliminary works related to procurement on SAP MM Module—PR generation, Floating RFQ, Negotiation with vendors, payment related issues. Scholastics B.E (Mechanical Engineering) with first class from R V College of Engineering, Bangalore in 2008. XII (Maths, Physics & Chemistry) St. Xavier’s College Ranchi. First class X -Baldwin Academy, Patna, and C.B.S.E. Board. First class with distinction