COVERING LETTER
I am a Graduate in Mechanical Engineering with 11 years of working experience and
presently working with Bahwan Engineering Company’s project office in Muscat
since September 2010 and specifically engaged as a Lead Project Field Engineer at
Muscat International Airport project.
I am a Member of the American Society of Heating Refrigeration and Air-conditioning
Engineers (MASHRAE).
I am honored to request you to kindly consider this letter as an application for the
post of Mechanical Engineer in your company. I am enclosing a copy of my brief
curriculum Vitae for your consideration. I shall be happy to provide additional details
in case those are required.
It is rather difficult to describe how good I am and what must distinguish me from
many in my profession without being subjective. However, I must respectfully submit
with utmost sincerity that I am technical, positive team leader & worker, sincere,
honest, and dependable and all that would distinguish a professional from a crowd. I
am requesting an opportunity to present myself at an interview.
Page 1 of 8
CURRICULUM VITAE
PUNEET DOGRA
Mobile: + 968-94054553
E-Mail: mech.puneet@gmail.com,
lukman_check@yahoomail.com
Vision
While working with your organization I view myself to be an asset for the company
through my technical knowledge & hard work. I always give preference to company’s
goals over my personnel ambitions.
Academic Qualification
B.E in Mechanical Engineering from Nagpur University
Working Experiences (11 Years )
From September 2010 to till date Working with BAHWAN ENGINEERING
COMPANY LLC. as Assistant Manager.
Currently working on “Muscat International Air Port”. It is design & built contract
and is being classified in to three stages, schematic design stage, detail design
stage and constructing stage.
Design Stage :- September 2010 to November 2012:- Sr. Project Engineer
responsible for design of mechanical services and inter-discipline co-ordination of
Passenger Terminal Building and North Pier for all design stages.
Construction Stage :- December 2012 to till date :- Lead Project Field Engineer +
Also involved in the execution work for the plant room piping & West Pier
mechanical services. Leading the team of 9 MEP engineers + 18 Cad operator +
30 construction team.
Project Value:- 795.00 Million OMR.
Job Responsibilities
Design Stage :-
 Designing & Planning of HVAC system which involves cooling Load calculation,
AHU Selection, pump selection, piping design, pipe routing, duct design etc.
Page 2 of 8
 Planning and allocating the work to CAD operator. Checking & ensuring the
drawings papered are per the project requirements & specifications.
 Review the Control , P & I diagram for the Mechanical Equipment (AHU, Pump,
Plate Heat Exchanger, FCU ), developing the control logic for Mechanical
system.
 Coordinating MEP services in Revit, also acting as Revit coordinator, work
planning and allocation for the Revit operator.
 Reviewing the Material submittal prepared by the engineer and ensures that they
were in compliance with the employer requirements.
 Responsible for issuing Mechanical related contractual letters to consultant,
client, and sub-contractors.
 Responsible for Mechanical related interface activities and coordination with
project interface team.
 Preparing the wall and slab opening drawing and responsible for issuing Interface
control document (ICD) to structural team.
 Design review of specialized air outlet displacement system, customized outlet &
floor cooling systems.
 Coordinating with thermal CFD vendor and review the CFD report.
 Comparison study with multiple vendors to finalize the Mechanical material, and
instruct purchase department to proceed with procurement.
 Acting as an coordinator, for in house & out house coordination between MEP
services with India based structural team ( Bechtel ) and Turkey based
architectural ( Enka ) design team.
 Incorporating the design concept & calculation in drawing and getting IFC/GFC
drawings prepared and issuing to the respective construction departments.
 Visiting site on day to day basis. Ensuring that the construction is done as per the
method statements and procedures. Also solving the problem related to the
construction by giving spot decisions.
Construction Stage :-
 Responsible for the complete function of PFE operation and performance of
team.
 Responsible for work allocation to the PFE team and evaluating the performance
of individuals in PFE team.
 Responsible for generating the Field change documents (FCD) .
 Responsible for Mechanical, Electrical & Plumbing co-ordination.
Page 3 of 8
 Coordinating with architectural and structural team for the field changes.
 Responsible for getting the closure of access opening from the civil team.
 Responsible for the Fire closure of the opening after civil closure .Project has
total 32,000 openings to be fire sealed & 4500 fire dampers.
 Responsible for design support to construction team. Providing the design related
solution to the construction team.
 Resolving the services clashes registered by the construction team by providing
the spot solution and field change sketches and document.
 Responsible for the wet core area co-ordination .Project has total 760 toilets
& 92 pantries which carries total 15,785 sanitary wares.
 Responsible for firefighting coordination. Which covers 270 Km of piping, 900
fire hose reels, 63,000 sprinkler & 41 loops.
 Responsible for the co-ordination of storm water piping. Which covers around
13 Km.
 Responsible for the chilled water installation at for NP ,SP & WP. Project has
total 90 Km of piping, 161 AHU , 149 High Capacity FCU & 2100 FCUs.
 Ensuring the installation is carried out as per the construction drawings and
project specification.
 Responsible for the resolving the non confirmation (NCR) raised by the
consultant and clients.
 Maintaining and tracking the log of the opening closure, NCR , RFI , FCD and
clash registers.
 Responsible for the rotary ( Centrifugal Pumps , Fans etc) and static ( Heat
Exchangers, Pressurization units, chemical dosing system, side stream system
etc.) equipment installation and
Achievements & Extracurricular activities
 Received bonus more than 3 time of the basic salary.
 Taking technical education session for graduates & local Omani employees of
Bechtel, Enka & Bahwan (BEB).
 Nominated by Bechtel team for Six Sigma Yellow belt process improvements
program.
Page 4 of 8
From December 2007 to August 2010 worked with SPECTRAL SERVICES
CONSULTANTS PVT. As an MEP Project Manager.
(Joined as Project Engineer and was subsequently promoted to Project
Manager)
Job Responsibilities( Leading team of design and CAD
Engineers):-
 Conceptual Planning, Design Basis Report (DBR), Space planning with
Architects for MEP services, Analysis of energy conservation schemes, Concept
Design, Schematic drawings, detailed design report & budgetary cost estimation.
 Cooling and heat load calculations.
 Designing ducting layouts with selection of grilles, diffusers, hangers & supports,
dampers etc.
 Selection of Chiller, cooling tower, AHU blower with static pressure calculations.
FCU’s and AHU coil selections.
 Chilled water pump selection with pump head calculations and pipe designing.
 Preparation of bill of quantities and technical specifications for HVAC.
 Technical Evaluation of Subcontractors, Recommendation of Subcontractors
based upon technical competence.
 Site supervision and coordination of all constructions related work with the client,
other sub-contractors.
 Coordination of MEP layouts and RCP drawings.
 Approval of technical submittals and shop drawings.
 Handled LEED rated projects.
 Attending the site meeting as MEP coordinator with client, contractors and
solving the problem related to the construction by giving spot decisions.
Expertise in Various systems:
1. Air Cooled & water cooled Central Chilled water System
Page 5 of 8
3. Water cooled VRV system
4. Air cooled VRV system
5. Split/Packaged unit system
6. Industrial Ventilation System
7. Clean Room Application
8. Evaporative cooling
9. Under Floor Air conditioning
10. Displacement Ventilation.
11. Direct Outdoor Air systems (DOAS).
12. Cooling and Dehumidification (Low RH system)
13. Green building concepts.
14. Evaporative Air cooled chiller system.
15. Floor Cooling system.
16. CFD Analysis
Major Projects handled in India :
1.GIFT (Gujarat Industrial Finance Tec City) ,Ahmedabad(Township)
2. Purearth Infrastructure Ltd.- Central Square Plaza-I (Mall cum Office)
3. Purearth Infrastructure Ltd - Central Square Plaza-II & IV) (Mall cum Office)
4. Hotel, JW Marriott, Chandigarh
6. Oil and Natural Company ( ONGC) Dehradun (Platinum Rated Green Building)
7. Hotel Clarion Suit at Greater Noida.
8. Pullman Novotel Hotel at New Delhi (Gold Rated Green Building)
Achievements & Extracurricular activities:-
 Received Certificate of Appreciation from CMD.
 Member of continue education & was taking the technical Seminar & induction
program for new member Getting associated to the Spectral family.
 Apart for the daily routine work (HVAC design and MEP coordination) also played
the major role being the member of Business Development Team.
 Initiated the operation For Spectral Middle East (Bahrain).
Page 6 of 8
From March 2005 to November 2007 worked with SUVIDHA ENGINEERS INDIA
LTD. As an Sr. Project Engineer.
Job Responsibilities
 Designing & Planning of HVAC system which involves Load calculation, AHU
Selection, pump selection, piping design, pipe routing, duct design etc.
 Maintained the Expenditure Budgets of Installation & testing, commissioning,
balancing etc.
 Planning & ordering for the material required for the project.
 Appointing subcontractor for the project.
 Supervising team of site engineers & technicians in their day to day work and
activities of project.
Major Projects handled:
Clean Room Application Project:-
1. Sun Pharmaceutical Industries Jammu.
2. Ranbaxy Laboratories Ltd. Paonta .
3. Themis Medicare Ltd. Haridwar (Tablet & Ointment Block).
4. Indswift Laboratories Ltd. (Dera Bassi.)
5. DSM Anti-Infectives India Ltd.(Lotus)
6. DSM Anti-Infectives India Ltd. (Chameleon).
7. Themis Medicare Ltd. Haridwar (Injectable Block).
8. Ranbaxy Fine Chemicals Ltd. (Haridwar)
9. Indswift Labs Ltd. (Dera Bassi).
10.Comed Pharmaceutical (Baddi)
11.Themis Medicare Haridwar (Injection Block)
Page 7 of 8
Comfort Air-Conditioning Project:-
12.Tech Space Noida.(Gold rated Green Building)
Achievements: - Received Performance Linked Award & Performance
Appreciation letter for year 2005-2006
From July 2004 to February 2005 worked with ACV SYSTEM PVT. LTD. As an Site
Engineer.
Major Projects handled:
1. Acme Formulation Pvt. Ltd. Nalagarh, Himachal Pradesh.
2. Reckvina Pharmaceutical Pvt. Ltd. Baddi.
Knowledge of Codes and Standards: -
1. ASHRAE Standards
2. NFA Codes.
3. FEMA-412, FEMA-414
4. NATIONAL BUILDING CODE (NBC-2005),
5. ENERGY CONERVATION CODE (ECBC)
6. UBC
7. GREEN BUILDING REQUIREMENTS ( LEED USGBC & IGBC )
Computer & Software Skills:-
1. Microsoft Office
2. AutoCAD
3. Carrier Hourly Analysis Program HAP-E20-II (Version V4.5), Trace
4. Revit
5. Pump Selection Software
Page 8 of 8
6. Fan selection Software
7. Coil Selection Software.
8. AHU Selections Software.
Training & Workshops:-
1. Technical Workshop on Design & application of Thermal Energy Storage System
by ISHRAE
2. Technical Workshop on Life Cycle Cost Analysis by ISHRAE
3. Technical Workshop on HVAC Control & BMS by ISHRAE
4. Workshop on Fire & Life Safety Norms by FSAI in association with DFS
5. Concurrent International Conference on Indian Fire & Security by IFSECINDIA &
FIREXINDIA
Professional References:-
1. Mr. Rajiv Shani (+91-9811264064) – General Manager M/s Suvidha Engineers
India Ltd.
2. Mr. Vijay Mattoo (+91-9810027053) – Executive Director M/s AECOM India.
Personal Details
Name : Puneet Dogra
Father’s name :Mr. Anirudh Dogra
D.O.B. :13th
Sept.,1981
Languages Known : English, Hindi,
Marital Status : Married
Nationality : Indian
Page 9 of 8
6. Fan selection Software
7. Coil Selection Software.
8. AHU Selections Software.
Training & Workshops:-
1. Technical Workshop on Design & application of Thermal Energy Storage System
by ISHRAE
2. Technical Workshop on Life Cycle Cost Analysis by ISHRAE
3. Technical Workshop on HVAC Control & BMS by ISHRAE
4. Workshop on Fire & Life Safety Norms by FSAI in association with DFS
5. Concurrent International Conference on Indian Fire & Security by IFSECINDIA &
FIREXINDIA
Professional References:-
1. Mr. Rajiv Shani (+91-9811264064) – General Manager M/s Suvidha Engineers
India Ltd.
2. Mr. Vijay Mattoo (+91-9810027053) – Executive Director M/s AECOM India.
Personal Details
Name : Puneet Dogra
Father’s name :Mr. Anirudh Dogra
D.O.B. :13th
Sept.,1981
Languages Known : English, Hindi,
Marital Status : Married
Nationality : Indian
Page 9 of 8

CURRICULUM VITAE-1 (2)

  • 1.
    COVERING LETTER I ama Graduate in Mechanical Engineering with 11 years of working experience and presently working with Bahwan Engineering Company’s project office in Muscat since September 2010 and specifically engaged as a Lead Project Field Engineer at Muscat International Airport project. I am a Member of the American Society of Heating Refrigeration and Air-conditioning Engineers (MASHRAE). I am honored to request you to kindly consider this letter as an application for the post of Mechanical Engineer in your company. I am enclosing a copy of my brief curriculum Vitae for your consideration. I shall be happy to provide additional details in case those are required. It is rather difficult to describe how good I am and what must distinguish me from many in my profession without being subjective. However, I must respectfully submit with utmost sincerity that I am technical, positive team leader & worker, sincere, honest, and dependable and all that would distinguish a professional from a crowd. I am requesting an opportunity to present myself at an interview. Page 1 of 8
  • 2.
    CURRICULUM VITAE PUNEET DOGRA Mobile:+ 968-94054553 E-Mail: mech.puneet@gmail.com, lukman_check@yahoomail.com Vision While working with your organization I view myself to be an asset for the company through my technical knowledge & hard work. I always give preference to company’s goals over my personnel ambitions. Academic Qualification B.E in Mechanical Engineering from Nagpur University Working Experiences (11 Years ) From September 2010 to till date Working with BAHWAN ENGINEERING COMPANY LLC. as Assistant Manager. Currently working on “Muscat International Air Port”. It is design & built contract and is being classified in to three stages, schematic design stage, detail design stage and constructing stage. Design Stage :- September 2010 to November 2012:- Sr. Project Engineer responsible for design of mechanical services and inter-discipline co-ordination of Passenger Terminal Building and North Pier for all design stages. Construction Stage :- December 2012 to till date :- Lead Project Field Engineer + Also involved in the execution work for the plant room piping & West Pier mechanical services. Leading the team of 9 MEP engineers + 18 Cad operator + 30 construction team. Project Value:- 795.00 Million OMR. Job Responsibilities Design Stage :-  Designing & Planning of HVAC system which involves cooling Load calculation, AHU Selection, pump selection, piping design, pipe routing, duct design etc. Page 2 of 8
  • 3.
     Planning andallocating the work to CAD operator. Checking & ensuring the drawings papered are per the project requirements & specifications.  Review the Control , P & I diagram for the Mechanical Equipment (AHU, Pump, Plate Heat Exchanger, FCU ), developing the control logic for Mechanical system.  Coordinating MEP services in Revit, also acting as Revit coordinator, work planning and allocation for the Revit operator.  Reviewing the Material submittal prepared by the engineer and ensures that they were in compliance with the employer requirements.  Responsible for issuing Mechanical related contractual letters to consultant, client, and sub-contractors.  Responsible for Mechanical related interface activities and coordination with project interface team.  Preparing the wall and slab opening drawing and responsible for issuing Interface control document (ICD) to structural team.  Design review of specialized air outlet displacement system, customized outlet & floor cooling systems.  Coordinating with thermal CFD vendor and review the CFD report.  Comparison study with multiple vendors to finalize the Mechanical material, and instruct purchase department to proceed with procurement.  Acting as an coordinator, for in house & out house coordination between MEP services with India based structural team ( Bechtel ) and Turkey based architectural ( Enka ) design team.  Incorporating the design concept & calculation in drawing and getting IFC/GFC drawings prepared and issuing to the respective construction departments.  Visiting site on day to day basis. Ensuring that the construction is done as per the method statements and procedures. Also solving the problem related to the construction by giving spot decisions. Construction Stage :-  Responsible for the complete function of PFE operation and performance of team.  Responsible for work allocation to the PFE team and evaluating the performance of individuals in PFE team.  Responsible for generating the Field change documents (FCD) .  Responsible for Mechanical, Electrical & Plumbing co-ordination. Page 3 of 8
  • 4.
     Coordinating witharchitectural and structural team for the field changes.  Responsible for getting the closure of access opening from the civil team.  Responsible for the Fire closure of the opening after civil closure .Project has total 32,000 openings to be fire sealed & 4500 fire dampers.  Responsible for design support to construction team. Providing the design related solution to the construction team.  Resolving the services clashes registered by the construction team by providing the spot solution and field change sketches and document.  Responsible for the wet core area co-ordination .Project has total 760 toilets & 92 pantries which carries total 15,785 sanitary wares.  Responsible for firefighting coordination. Which covers 270 Km of piping, 900 fire hose reels, 63,000 sprinkler & 41 loops.  Responsible for the co-ordination of storm water piping. Which covers around 13 Km.  Responsible for the chilled water installation at for NP ,SP & WP. Project has total 90 Km of piping, 161 AHU , 149 High Capacity FCU & 2100 FCUs.  Ensuring the installation is carried out as per the construction drawings and project specification.  Responsible for the resolving the non confirmation (NCR) raised by the consultant and clients.  Maintaining and tracking the log of the opening closure, NCR , RFI , FCD and clash registers.  Responsible for the rotary ( Centrifugal Pumps , Fans etc) and static ( Heat Exchangers, Pressurization units, chemical dosing system, side stream system etc.) equipment installation and Achievements & Extracurricular activities  Received bonus more than 3 time of the basic salary.  Taking technical education session for graduates & local Omani employees of Bechtel, Enka & Bahwan (BEB).  Nominated by Bechtel team for Six Sigma Yellow belt process improvements program. Page 4 of 8
  • 5.
    From December 2007to August 2010 worked with SPECTRAL SERVICES CONSULTANTS PVT. As an MEP Project Manager. (Joined as Project Engineer and was subsequently promoted to Project Manager) Job Responsibilities( Leading team of design and CAD Engineers):-  Conceptual Planning, Design Basis Report (DBR), Space planning with Architects for MEP services, Analysis of energy conservation schemes, Concept Design, Schematic drawings, detailed design report & budgetary cost estimation.  Cooling and heat load calculations.  Designing ducting layouts with selection of grilles, diffusers, hangers & supports, dampers etc.  Selection of Chiller, cooling tower, AHU blower with static pressure calculations. FCU’s and AHU coil selections.  Chilled water pump selection with pump head calculations and pipe designing.  Preparation of bill of quantities and technical specifications for HVAC.  Technical Evaluation of Subcontractors, Recommendation of Subcontractors based upon technical competence.  Site supervision and coordination of all constructions related work with the client, other sub-contractors.  Coordination of MEP layouts and RCP drawings.  Approval of technical submittals and shop drawings.  Handled LEED rated projects.  Attending the site meeting as MEP coordinator with client, contractors and solving the problem related to the construction by giving spot decisions. Expertise in Various systems: 1. Air Cooled & water cooled Central Chilled water System Page 5 of 8
  • 6.
    3. Water cooledVRV system 4. Air cooled VRV system 5. Split/Packaged unit system 6. Industrial Ventilation System 7. Clean Room Application 8. Evaporative cooling 9. Under Floor Air conditioning 10. Displacement Ventilation. 11. Direct Outdoor Air systems (DOAS). 12. Cooling and Dehumidification (Low RH system) 13. Green building concepts. 14. Evaporative Air cooled chiller system. 15. Floor Cooling system. 16. CFD Analysis Major Projects handled in India : 1.GIFT (Gujarat Industrial Finance Tec City) ,Ahmedabad(Township) 2. Purearth Infrastructure Ltd.- Central Square Plaza-I (Mall cum Office) 3. Purearth Infrastructure Ltd - Central Square Plaza-II & IV) (Mall cum Office) 4. Hotel, JW Marriott, Chandigarh 6. Oil and Natural Company ( ONGC) Dehradun (Platinum Rated Green Building) 7. Hotel Clarion Suit at Greater Noida. 8. Pullman Novotel Hotel at New Delhi (Gold Rated Green Building) Achievements & Extracurricular activities:-  Received Certificate of Appreciation from CMD.  Member of continue education & was taking the technical Seminar & induction program for new member Getting associated to the Spectral family.  Apart for the daily routine work (HVAC design and MEP coordination) also played the major role being the member of Business Development Team.  Initiated the operation For Spectral Middle East (Bahrain). Page 6 of 8
  • 7.
    From March 2005to November 2007 worked with SUVIDHA ENGINEERS INDIA LTD. As an Sr. Project Engineer. Job Responsibilities  Designing & Planning of HVAC system which involves Load calculation, AHU Selection, pump selection, piping design, pipe routing, duct design etc.  Maintained the Expenditure Budgets of Installation & testing, commissioning, balancing etc.  Planning & ordering for the material required for the project.  Appointing subcontractor for the project.  Supervising team of site engineers & technicians in their day to day work and activities of project. Major Projects handled: Clean Room Application Project:- 1. Sun Pharmaceutical Industries Jammu. 2. Ranbaxy Laboratories Ltd. Paonta . 3. Themis Medicare Ltd. Haridwar (Tablet & Ointment Block). 4. Indswift Laboratories Ltd. (Dera Bassi.) 5. DSM Anti-Infectives India Ltd.(Lotus) 6. DSM Anti-Infectives India Ltd. (Chameleon). 7. Themis Medicare Ltd. Haridwar (Injectable Block). 8. Ranbaxy Fine Chemicals Ltd. (Haridwar) 9. Indswift Labs Ltd. (Dera Bassi). 10.Comed Pharmaceutical (Baddi) 11.Themis Medicare Haridwar (Injection Block) Page 7 of 8
  • 8.
    Comfort Air-Conditioning Project:- 12.TechSpace Noida.(Gold rated Green Building) Achievements: - Received Performance Linked Award & Performance Appreciation letter for year 2005-2006 From July 2004 to February 2005 worked with ACV SYSTEM PVT. LTD. As an Site Engineer. Major Projects handled: 1. Acme Formulation Pvt. Ltd. Nalagarh, Himachal Pradesh. 2. Reckvina Pharmaceutical Pvt. Ltd. Baddi. Knowledge of Codes and Standards: - 1. ASHRAE Standards 2. NFA Codes. 3. FEMA-412, FEMA-414 4. NATIONAL BUILDING CODE (NBC-2005), 5. ENERGY CONERVATION CODE (ECBC) 6. UBC 7. GREEN BUILDING REQUIREMENTS ( LEED USGBC & IGBC ) Computer & Software Skills:- 1. Microsoft Office 2. AutoCAD 3. Carrier Hourly Analysis Program HAP-E20-II (Version V4.5), Trace 4. Revit 5. Pump Selection Software Page 8 of 8
  • 9.
    6. Fan selectionSoftware 7. Coil Selection Software. 8. AHU Selections Software. Training & Workshops:- 1. Technical Workshop on Design & application of Thermal Energy Storage System by ISHRAE 2. Technical Workshop on Life Cycle Cost Analysis by ISHRAE 3. Technical Workshop on HVAC Control & BMS by ISHRAE 4. Workshop on Fire & Life Safety Norms by FSAI in association with DFS 5. Concurrent International Conference on Indian Fire & Security by IFSECINDIA & FIREXINDIA Professional References:- 1. Mr. Rajiv Shani (+91-9811264064) – General Manager M/s Suvidha Engineers India Ltd. 2. Mr. Vijay Mattoo (+91-9810027053) – Executive Director M/s AECOM India. Personal Details Name : Puneet Dogra Father’s name :Mr. Anirudh Dogra D.O.B. :13th Sept.,1981 Languages Known : English, Hindi, Marital Status : Married Nationality : Indian Page 9 of 8
  • 10.
    6. Fan selectionSoftware 7. Coil Selection Software. 8. AHU Selections Software. Training & Workshops:- 1. Technical Workshop on Design & application of Thermal Energy Storage System by ISHRAE 2. Technical Workshop on Life Cycle Cost Analysis by ISHRAE 3. Technical Workshop on HVAC Control & BMS by ISHRAE 4. Workshop on Fire & Life Safety Norms by FSAI in association with DFS 5. Concurrent International Conference on Indian Fire & Security by IFSECINDIA & FIREXINDIA Professional References:- 1. Mr. Rajiv Shani (+91-9811264064) – General Manager M/s Suvidha Engineers India Ltd. 2. Mr. Vijay Mattoo (+91-9810027053) – Executive Director M/s AECOM India. Personal Details Name : Puneet Dogra Father’s name :Mr. Anirudh Dogra D.O.B. :13th Sept.,1981 Languages Known : English, Hindi, Marital Status : Married Nationality : Indian Page 9 of 8