CAREER OBJECTIVE
To build a strong career in the field of Project Management (Civil Engineering –
Construction Management) which provides me an opportunity to utilize my skills and
diversified 15+ years of rich experience in Civil Constructions, like in industrial/
Residential,Hotel projects, hospital,institutional, commercial, and fit outs projects,Mega
mall project (Petrochemical, Hydrocarbon,oil and Gas projects, Mechanical,Transformer
industry Process, pharmaceutical, Automobiles,institutional, interior an fit outs project
( CBSC/ICSC/ENGLISH MEDIUM SCHOOL electrical, automobile, cotton industry,Suger
industry) Project Planning-Management-Execution, Commercial Operations, Site
Engineering, Strategic Planning and Team Management across large scale Industrial
projects, Institutional, Engineering works with National-Multinational EPC companies.
EXECUTIVE PROFILE
 Hardcore experience in the other field like mechanical equipment’s erection, smooth coordination with
electrical works, in-depth knowledge in electrical, HVAC WORKS, utmost experience in interior and
fit outs projects.
 In-depth experience in PEB Building from design philosophy, checks shop drawing, smooth operation
for checks during fabrications of works, coordination for in time delivery with safe unload, and smooth
execution during erection within time frame and with zero accident policy.
 Adequate experience in supervising and managing overall project activities including project
scheduling and resource allocation while utilizing of men, material, machine and money to maximize
operational efficiency, Adept at designing and implementing quality systems and procedures to
ensure strict adherence to quality parameters.
 Key competencies in present construction methodologies and in managing materials & manpower
resources to register maximum productive output.
 Proven expertise in planning and construction, management and maintenance of buildings (both
commercial and residential) with multi-disciplinary knowledge, infrastructure design field such
as drainage, earthworks, sanitation, plumbing installations and civil works for water storage
facilities, tank pads, including swimming pools, parks and playgrounds.
 Possess clear understanding of Construction Methods & Implementation, sound knowledge of the
industrial standards and Health & Safety Norms (HSE Guidelines) essential for commissioning
projects
 Well conversant with code of practices for construction and quality requirements, and with various
laws & provisions applicable on manpower and expertise in computer application, surveying with both
digital and mechanical instruments, ground investigation, analysis, estimating, planning and execution
of infrastructure projects.
 Key experience in the FIRE –SPRINKLER SYSTEM, X-RAY Room with quality Lab for Mechanical
Industry.
p.t.o
Past Employer. 3.9.2012 to 31.12.2015
TBEA ENERGY INDIA PVT LTD- Green field project. China based Transformer Company
Designation: Manager- Civil, Project. Cost : 350crores ( overall project cost).
Project cost : Rs 450 crores.
Key area works : work in TBEA
 Gantry stock yard, Main entry with Express connectivity, Road works, Compound wall,
Estimation of civil works, Scrutiny of bills, Technical guide line to project head during
project, EPC WORKS, site visit for EPC , Technical guide line to EPC TEAM FOR
civil bid. Recruitment of Technical and contract employee for projects, Technical guide-
line to management.
 Interior and fit-outs project for admin and plant building, living area works, other
ancillary works.
 Support to project team for their works, vendor development works, liaison works with
govt authority,
 Support to management for Land related technical works like survey, support for future
project like Railway, report study technical study and data analysis.
 Coordination with technical consultant and architects.
 Support to Tbea project deptt and management for project documentation works and
cost controlling of projects works.
Achievement :
 Extra skill, Better technical, exchange of skill from Chinese works techniques in India.
For civil, peb and equipment’s erection and process techniques with documents for
equipment’s.
 Documentation of works of diff Projects works
 Lot of motivation and upgrading with digest multiple skill right at one places.
 Bonus from tbea for in time completion of works - Gantry stock yard area with
controlling cost, completion of project within tbea timeframe maintaining quality and
safety.
p.t.o
 Budget cost Management and estimation approval, tendering and execution works.
 Managing large construction and directing Project Management initiatives like defining technical
specifications, reporting and documentation, budgeting and cost estimates, commissioning and
executing the entire Project.
 Preparing commercial offers / proposals along with handling contracts / billing related formalities and
documentation
 Liaison and coordinating with various contractors, clients, govt. and statutory bodies to settle techno-
commercial disputes / clarifications during the execution of the project
 Managing the tendering process including preparation of RFPs, conducting pre-tender meetings,
commercial cum technical tender meetings, tender evaluation, BOQ & Cost estimates and finally
award of tender to eligible contractors.
 Accountable for managing several projects with emphasis on waterproofing, restoration and
retrofitting epoxy flooring and coatings, civil works, external facades and finishing works.
 Compiling reports and payment certificates, and convene meetings with various related parties and
agencies and keeping coordination with Architects and RCC Consultants.
 Spearheading efforts across supervising & monitoring the overall project performance on regular basis
& taking steps for further improvements with a view to complete project within stipulated time
& budget.
 Expertise in supervising and managing overall project activities including project scheduling and
resource allocation of men, material, machine and money to maximize operational efficiency;
identifying key milestones and forecasting completion timeline.
 Regularly coordinating with architects & contractors to identify and isolate project bottlenecks and
clarify any ambiguities to accelerate project execution.
 Adept at maintaining perfect coordination with the project team & all internal/external parties to freeze
the technical parameters; carrying out work measurements and providing technical validation for jobs.
 Efficiently liaising and coordinating with clients, consultants, architects and sub-contractors of the
projects while ensuring profitability and project deliverable.
 Deftly supervising & monitoring the overall project performance on regular basis & taking steps for
further improvements with a view to complete project within stipulated time frame & prescribed
budget.
 Strategically planning & controlling all project activities connected with safe and efficient operations;
implementing quality standards for meeting the set targets within time & cost parameters.
 Judiciously supervising site activities including man and material management while providing
technical inputs for methodologies of construction & maintenance.
 Designing and implementing stringent systems and quality plans / manuals to ensure high quality
standards during all the stages of project.
 Involving in all phases of project execution; troubleshot and resolved complex technical problems,
consistently meeting project deadlines and highest possible quality standards.
 Drawing up project plans, schedule of activities, planned, procured, mobilized, and deployed resources
to deliver the project within defined time and costliness.
 Pioneer in managing resources while creating estimates for the project, work breakdown structure,
project plan, contingency plan & schedules, identifying risks within defined scope, quality, time and
cost constraints.
p.t.o
WORK EXPERIENCE
IDEX FLUID AND METERING PVT LTD- US BASED FIRM. (GREEN FIELD PROJECT.)
(JAN’11-to- March-12) PROJECT COMPLETED.
Project Consultant-Project
Reporting to: Managing Director/ Director-Project;
Project Cost: $3.6 Million
Job Responsibilities:
 Managing large construction and directing Project Management initiatives like defining technical
specifications, reporting and documentation, budgeting and cost estimates, commissioning and
executing the entire Project.
 Preparing commercial offers / proposals along with handling contracts / billing related formalities
and documentation
 Liaison and coordinating with various contractors, clients, govt. and statutory bodies to settle
techno-commercial disputes / clarifications during the execution of the project
 Managing the tendering process including preparation of RFPs, conducting pre-tender meetings,
commercial cum technical tender meetings, tender evaluation, BOQ & Cost estimates and finally
award of tender to eligible contractors.
 Accountable for managing several projects with emphasis on waterproofing, restoration and
retrofitting epoxy flooring and coatings, civil works, external facades and finishing works.
 Compiling reports and payment certificates, and convene meetings with various related parties and
agencies and keeping coordination with Architects and RCC Consultants.
 Spearheading efforts across supervising & monitoring the overall project performance on regular
basis & taking steps for further improvements with a view to complete project within stipulated
time & budget.
 Expertise in supervising and managing overall project activities including project scheduling and
resource allocation of men, material, machine and money to maximize operational efficiency;
identifying key milestones and forecasting completion timeline.
 Regularly coordinating with architects & contractors to identify and isolate project bottlenecks and
clarify any ambiguities to accelerate project execution.
 Demonstrated competencies in complete management of construction projects right from
site development to final execution.
 Proven expertise in project planning, designing, scheduling, resource mobilization &
management, quality control, work measurements quantity surveys and project review to
facilitate project delivery within defined cost and timelines.
 Proficient in inducing swift project ramp up to ensure committed project delivery with strict
compliance to defined quality systems/procedures in executing diverse civil project
management functions.
 Professional strengths in maintaining perfect coordination with suppliers,
subcontractors, site engineers, client representatives, architects, and consultants to resolve
ambiguities and isolate bottlenecks to accelerate work progress.
 Self-driven, motivated and disciplined with strong leadership, analytical and problem
solving skills. Superior communication skills.
p.t.o
TDW INDIA LTD – US BASED MNCS
(MAR’09-DEC’10)
Consulting Site In charge-Project
Project cost: $7.4 Million, green field project.
Reporting to: General Manager- project- India/ Director-Project: Singapore an USA.
Project Cost: $7.4 Million
Job Responsibilities:
 Managing large construction and directing Project Management initiatives like INITIATING,
PLANNING, COSTING, budget approval, execution, controlling the time and cost an closeout
with proper documentations works. Defining technical specifications, reporting and
documentation, budgeting and cost estimates, commissioning and executing the entire Project.
 Preparing commercial offers / proposals along with handling contracts / billing related
formalities and documentation
 Liaison and coordinating with various contractors, clients, govt. and statutory bodies to settle
techno-commercial disputes / clarifications during the execution of the project
 Managing the tendering process including preparation of RFPs, conducting pre-tender
meetings, commercial cum technical tender meetings, tender evaluation, BOQ & Cost
estimates and finally award of tender to eligible contractors.
 Accountable for managing several projects with emphasis on waterproofing, restoration and
retrofitting epoxy flooring and coatings, civil works, external facades and finishing works.
 Compiling reports and payment certificates, and convene meetings with various related parties
and agencies and keeping coordination with Architects and RCC Consultants.
 Spearheading efforts across supervising & monitoring the overall project performance on
regular basis & taking steps for further improvements with a view to complete project within
stipulated time & budget.
 Expertise in supervising and managing overall project activities including project scheduling
and resource allocation of men, material, machine and money to maximize operational
efficiency; identifying key milestones and forecasting completion timeline.
p.t.o
Areas of Expertise
Project Planning /Scheduling Project Design/Tech. Specs. Resource Planning
Cost Estimates, budgeting,
cost control application.
Subcontracting Quality/ Construction
Management
Procurement/Stores Mgmt. Client/Contractors’ Billing Work Measurements
Documentations works. Field review reports. Prepare review report of projects.
EDUCATION:
 New S.S.C from Hill memorial High school ( GSEB)- VADODARA- Gujarat in Year 1989 with First
class distinction. ( GSEB-MARCH-1989).
 Diploma in Civil engineering FROM polytechnic, M.S UNIVERSITY, Vadodara in April-1992.
With First class distinction.
 BE (Civil), 1999 From M.S University, Vadodara, INDIA, Form Faculty of technology and
engineering, M.S University, Vadoadara, Gujarat.- INDIA.
 CERTIFICATION: Undergoing PMP certification
SOFT SKILLS:
 Design Systems: AutoCAD R14/2000/2002/2005
 Database: MS-Access
 MS Office: Word, Excel, Word Star, PowerPoint
 Planning Tools: Ms-Project, (since 2005) Primavera (Since 2010)
 Operating System: MS-DOS, Windows NT/98/2000/XP
 Graphic : MS-Visio, PowerPoint
 E-mail: Lotus Notes, Outlook
SEMINARS
 Atomic energy Rules 1996 for construction of NUCLEAR POWER Plant.
 Site work Safety Standards / Legal Requirements.
 Prevention of Control of Accidents at Sites.
 Hazards in Construction Industry.
 PMI Workshop seminar in Ahmadabad.
TRAININGS
 Undergoing study in pure safety – online training.
 Study in construction and project management from NICMAR- Pune.
 Study for PMI EXAM.
 Under per sue for application to RICS FOR chartered quantity surveyor.
 Study in - Post graduation in Human Rights from delhi- India Through correspondence mode..
Awards :
 Cheque Prizes awards of One pay package for prime dedication for leadership role of green field
project (completion of project in time- with cost controlling of project and project completion with
zero accident policy). Organization Name: IDEX LFLUID AND METERING PVT LTD.
Year : 2011- 2012, Awards of INR : 75000/- ( through cheque)
 Cash Prizes awards of One pay package for prime dedication in all sectors of Tdw India limited- US
BASED FIRM.
Name of organization: TDW INDIA LIMITED.
Year - 2009-2010 Awards of INR 72500/- (through cheque).
p.t.o
Social activities :
 Since last 13 years support to Four English medium school for development In Vadodara and other
location for better child education including my home village.
PERSONAL DOSSIER
 Date of Birth: 29th Jun 1973.
 Passport: Available,( H 7799570, expiry date : 12/10/2019)
 Gender : Male.
 Contact mobile no : 09898083428/09998018928
 Email : apcs2005@hotmail.com
Pramod. Patel.
M : 9898083428
E Mail : apcs2005@hotmail.com
Resume for  Senior Manager -  projects
Resume for  Senior Manager -  projects

Resume for Senior Manager - projects

  • 1.
    PRAMOD MANUBHAI PATELB.E CIVIL, PMI MEMBER- USA. Chief Estimator. D-168, Rajdeep Society, Near Baroda High School, Opp Polo Ground, Vadodara, Gujarat 390001 Contact:9898083428,9998018928;Email:apcs2005@hotmail.com, pramodpatel_2906@rediffmail.com PROJECT MANAGEMENT - CIVIL ENGINEERING - CONSTRUCTION MANAGEMENT CAREER OBJECTIVE To build a strong career in the field of Project Management (Civil Engineering – Construction Management) which provides me an opportunity to utilize my skills and diversified 15+ years of rich experience in Civil Constructions, like in industrial/ Residential,Hotel projects, hospital,institutional, commercial, and fit outs projects,Mega mall project (Petrochemical, Hydrocarbon,oil and Gas projects, Mechanical,Transformer industry Process, pharmaceutical, Automobiles,institutional, interior an fit outs project ( CBSC/ICSC/ENGLISH MEDIUM SCHOOL electrical, automobile, cotton industry,Suger industry) Project Planning-Management-Execution, Commercial Operations, Site Engineering, Strategic Planning and Team Management across large scale Industrial projects, Institutional, Engineering works with National-Multinational EPC companies. EXECUTIVE PROFILE  Hardcore experience in the other field like mechanical equipment’s erection, smooth coordination with electrical works, in-depth knowledge in electrical, HVAC WORKS, utmost experience in interior and fit outs projects.  In-depth experience in PEB Building from design philosophy, checks shop drawing, smooth operation for checks during fabrications of works, coordination for in time delivery with safe unload, and smooth execution during erection within time frame and with zero accident policy.  Adequate experience in supervising and managing overall project activities including project scheduling and resource allocation while utilizing of men, material, machine and money to maximize operational efficiency, Adept at designing and implementing quality systems and procedures to ensure strict adherence to quality parameters.  Key competencies in present construction methodologies and in managing materials & manpower resources to register maximum productive output.  Proven expertise in planning and construction, management and maintenance of buildings (both commercial and residential) with multi-disciplinary knowledge, infrastructure design field such as drainage, earthworks, sanitation, plumbing installations and civil works for water storage facilities, tank pads, including swimming pools, parks and playgrounds.  Possess clear understanding of Construction Methods & Implementation, sound knowledge of the industrial standards and Health & Safety Norms (HSE Guidelines) essential for commissioning projects  Well conversant with code of practices for construction and quality requirements, and with various laws & provisions applicable on manpower and expertise in computer application, surveying with both digital and mechanical instruments, ground investigation, analysis, estimating, planning and execution of infrastructure projects.  Key experience in the FIRE –SPRINKLER SYSTEM, X-RAY Room with quality Lab for Mechanical Industry. p.t.o
  • 2.
    Past Employer. 3.9.2012to 31.12.2015 TBEA ENERGY INDIA PVT LTD- Green field project. China based Transformer Company Designation: Manager- Civil, Project. Cost : 350crores ( overall project cost). Project cost : Rs 450 crores. Key area works : work in TBEA  Gantry stock yard, Main entry with Express connectivity, Road works, Compound wall, Estimation of civil works, Scrutiny of bills, Technical guide line to project head during project, EPC WORKS, site visit for EPC , Technical guide line to EPC TEAM FOR civil bid. Recruitment of Technical and contract employee for projects, Technical guide- line to management.  Interior and fit-outs project for admin and plant building, living area works, other ancillary works.  Support to project team for their works, vendor development works, liaison works with govt authority,  Support to management for Land related technical works like survey, support for future project like Railway, report study technical study and data analysis.  Coordination with technical consultant and architects.  Support to Tbea project deptt and management for project documentation works and cost controlling of projects works. Achievement :  Extra skill, Better technical, exchange of skill from Chinese works techniques in India. For civil, peb and equipment’s erection and process techniques with documents for equipment’s.  Documentation of works of diff Projects works  Lot of motivation and upgrading with digest multiple skill right at one places.  Bonus from tbea for in time completion of works - Gantry stock yard area with controlling cost, completion of project within tbea timeframe maintaining quality and safety. p.t.o
  • 3.
     Budget costManagement and estimation approval, tendering and execution works.  Managing large construction and directing Project Management initiatives like defining technical specifications, reporting and documentation, budgeting and cost estimates, commissioning and executing the entire Project.  Preparing commercial offers / proposals along with handling contracts / billing related formalities and documentation  Liaison and coordinating with various contractors, clients, govt. and statutory bodies to settle techno- commercial disputes / clarifications during the execution of the project  Managing the tendering process including preparation of RFPs, conducting pre-tender meetings, commercial cum technical tender meetings, tender evaluation, BOQ & Cost estimates and finally award of tender to eligible contractors.  Accountable for managing several projects with emphasis on waterproofing, restoration and retrofitting epoxy flooring and coatings, civil works, external facades and finishing works.  Compiling reports and payment certificates, and convene meetings with various related parties and agencies and keeping coordination with Architects and RCC Consultants.  Spearheading efforts across supervising & monitoring the overall project performance on regular basis & taking steps for further improvements with a view to complete project within stipulated time & budget.  Expertise in supervising and managing overall project activities including project scheduling and resource allocation of men, material, machine and money to maximize operational efficiency; identifying key milestones and forecasting completion timeline.  Regularly coordinating with architects & contractors to identify and isolate project bottlenecks and clarify any ambiguities to accelerate project execution.  Adept at maintaining perfect coordination with the project team & all internal/external parties to freeze the technical parameters; carrying out work measurements and providing technical validation for jobs.  Efficiently liaising and coordinating with clients, consultants, architects and sub-contractors of the projects while ensuring profitability and project deliverable.  Deftly supervising & monitoring the overall project performance on regular basis & taking steps for further improvements with a view to complete project within stipulated time frame & prescribed budget.  Strategically planning & controlling all project activities connected with safe and efficient operations; implementing quality standards for meeting the set targets within time & cost parameters.  Judiciously supervising site activities including man and material management while providing technical inputs for methodologies of construction & maintenance.  Designing and implementing stringent systems and quality plans / manuals to ensure high quality standards during all the stages of project.  Involving in all phases of project execution; troubleshot and resolved complex technical problems, consistently meeting project deadlines and highest possible quality standards.  Drawing up project plans, schedule of activities, planned, procured, mobilized, and deployed resources to deliver the project within defined time and costliness.  Pioneer in managing resources while creating estimates for the project, work breakdown structure, project plan, contingency plan & schedules, identifying risks within defined scope, quality, time and cost constraints. p.t.o
  • 4.
    WORK EXPERIENCE IDEX FLUIDAND METERING PVT LTD- US BASED FIRM. (GREEN FIELD PROJECT.) (JAN’11-to- March-12) PROJECT COMPLETED. Project Consultant-Project Reporting to: Managing Director/ Director-Project; Project Cost: $3.6 Million Job Responsibilities:  Managing large construction and directing Project Management initiatives like defining technical specifications, reporting and documentation, budgeting and cost estimates, commissioning and executing the entire Project.  Preparing commercial offers / proposals along with handling contracts / billing related formalities and documentation  Liaison and coordinating with various contractors, clients, govt. and statutory bodies to settle techno-commercial disputes / clarifications during the execution of the project  Managing the tendering process including preparation of RFPs, conducting pre-tender meetings, commercial cum technical tender meetings, tender evaluation, BOQ & Cost estimates and finally award of tender to eligible contractors.  Accountable for managing several projects with emphasis on waterproofing, restoration and retrofitting epoxy flooring and coatings, civil works, external facades and finishing works.  Compiling reports and payment certificates, and convene meetings with various related parties and agencies and keeping coordination with Architects and RCC Consultants.  Spearheading efforts across supervising & monitoring the overall project performance on regular basis & taking steps for further improvements with a view to complete project within stipulated time & budget.  Expertise in supervising and managing overall project activities including project scheduling and resource allocation of men, material, machine and money to maximize operational efficiency; identifying key milestones and forecasting completion timeline.  Regularly coordinating with architects & contractors to identify and isolate project bottlenecks and clarify any ambiguities to accelerate project execution.  Demonstrated competencies in complete management of construction projects right from site development to final execution.  Proven expertise in project planning, designing, scheduling, resource mobilization & management, quality control, work measurements quantity surveys and project review to facilitate project delivery within defined cost and timelines.  Proficient in inducing swift project ramp up to ensure committed project delivery with strict compliance to defined quality systems/procedures in executing diverse civil project management functions.  Professional strengths in maintaining perfect coordination with suppliers, subcontractors, site engineers, client representatives, architects, and consultants to resolve ambiguities and isolate bottlenecks to accelerate work progress.  Self-driven, motivated and disciplined with strong leadership, analytical and problem solving skills. Superior communication skills.
  • 5.
    p.t.o TDW INDIA LTD– US BASED MNCS (MAR’09-DEC’10) Consulting Site In charge-Project Project cost: $7.4 Million, green field project. Reporting to: General Manager- project- India/ Director-Project: Singapore an USA. Project Cost: $7.4 Million Job Responsibilities:  Managing large construction and directing Project Management initiatives like INITIATING, PLANNING, COSTING, budget approval, execution, controlling the time and cost an closeout with proper documentations works. Defining technical specifications, reporting and documentation, budgeting and cost estimates, commissioning and executing the entire Project.  Preparing commercial offers / proposals along with handling contracts / billing related formalities and documentation  Liaison and coordinating with various contractors, clients, govt. and statutory bodies to settle techno-commercial disputes / clarifications during the execution of the project  Managing the tendering process including preparation of RFPs, conducting pre-tender meetings, commercial cum technical tender meetings, tender evaluation, BOQ & Cost estimates and finally award of tender to eligible contractors.  Accountable for managing several projects with emphasis on waterproofing, restoration and retrofitting epoxy flooring and coatings, civil works, external facades and finishing works.  Compiling reports and payment certificates, and convene meetings with various related parties and agencies and keeping coordination with Architects and RCC Consultants.  Spearheading efforts across supervising & monitoring the overall project performance on regular basis & taking steps for further improvements with a view to complete project within stipulated time & budget.  Expertise in supervising and managing overall project activities including project scheduling and resource allocation of men, material, machine and money to maximize operational efficiency; identifying key milestones and forecasting completion timeline.
  • 6.
    p.t.o Areas of Expertise ProjectPlanning /Scheduling Project Design/Tech. Specs. Resource Planning Cost Estimates, budgeting, cost control application. Subcontracting Quality/ Construction Management Procurement/Stores Mgmt. Client/Contractors’ Billing Work Measurements Documentations works. Field review reports. Prepare review report of projects.
  • 7.
    EDUCATION:  New S.S.Cfrom Hill memorial High school ( GSEB)- VADODARA- Gujarat in Year 1989 with First class distinction. ( GSEB-MARCH-1989).  Diploma in Civil engineering FROM polytechnic, M.S UNIVERSITY, Vadodara in April-1992. With First class distinction.  BE (Civil), 1999 From M.S University, Vadodara, INDIA, Form Faculty of technology and engineering, M.S University, Vadoadara, Gujarat.- INDIA.  CERTIFICATION: Undergoing PMP certification SOFT SKILLS:  Design Systems: AutoCAD R14/2000/2002/2005  Database: MS-Access  MS Office: Word, Excel, Word Star, PowerPoint  Planning Tools: Ms-Project, (since 2005) Primavera (Since 2010)  Operating System: MS-DOS, Windows NT/98/2000/XP  Graphic : MS-Visio, PowerPoint  E-mail: Lotus Notes, Outlook SEMINARS  Atomic energy Rules 1996 for construction of NUCLEAR POWER Plant.  Site work Safety Standards / Legal Requirements.  Prevention of Control of Accidents at Sites.  Hazards in Construction Industry.  PMI Workshop seminar in Ahmadabad. TRAININGS  Undergoing study in pure safety – online training.  Study in construction and project management from NICMAR- Pune.  Study for PMI EXAM.  Under per sue for application to RICS FOR chartered quantity surveyor.  Study in - Post graduation in Human Rights from delhi- India Through correspondence mode.. Awards :  Cheque Prizes awards of One pay package for prime dedication for leadership role of green field project (completion of project in time- with cost controlling of project and project completion with zero accident policy). Organization Name: IDEX LFLUID AND METERING PVT LTD. Year : 2011- 2012, Awards of INR : 75000/- ( through cheque)
  • 8.
     Cash Prizesawards of One pay package for prime dedication in all sectors of Tdw India limited- US BASED FIRM. Name of organization: TDW INDIA LIMITED. Year - 2009-2010 Awards of INR 72500/- (through cheque). p.t.o Social activities :  Since last 13 years support to Four English medium school for development In Vadodara and other location for better child education including my home village. PERSONAL DOSSIER  Date of Birth: 29th Jun 1973.  Passport: Available,( H 7799570, expiry date : 12/10/2019)  Gender : Male.  Contact mobile no : 09898083428/09998018928  Email : apcs2005@hotmail.com Pramod. Patel. M : 9898083428 E Mail : apcs2005@hotmail.com