The document is a curriculum vitae for M. Zahir Hussain, a Senior Mechanical Consulting Engineer with over 21 years of experience in construction projects. It summarizes his academic qualifications, including a Bachelor's degree in Mechanical Engineering, work experience in various roles and organizations, and lists his current responsibilities which include design review, supervision, coordination, and ensuring quality and safety standards. It also provides a brief overview of major projects he has worked on.
Imteyaz ahmad 12 yrs exp in MEP (Site / Project Management)Imteyaz Ahmad
My self Imteyaz. Ahmad. having reach experience(12 yrs) in MEP field Site /Project management (specially hotel project) . with design review & drawing coordination, tendering , cost budgeting , bill verification.
I got technical education from central university i.e A.M.U. Aligarh.
Currently working with Maxim infrastructure & real estate Pvt. Ltd.(HM GROUP) on the Marriott Hotel Project Shillong (Meghalaya).
Thanks & Regards
8014316443
Candidate with thorough knowledge about principles of M.E.P Design, engineering specifications and safety systems, seeks to work as a HVAC Design engineering for a reputed organization.
Sr.mechanical engineer have more than 17 years experience in MEP field starting from design up to handing over to client and follow up the maintenance, Able to manage and coordinate all construction activities successful career by working for a ambitious & exciting company.
Imteyaz ahmad 12 yrs exp in MEP (Site / Project Management)Imteyaz Ahmad
My self Imteyaz. Ahmad. having reach experience(12 yrs) in MEP field Site /Project management (specially hotel project) . with design review & drawing coordination, tendering , cost budgeting , bill verification.
I got technical education from central university i.e A.M.U. Aligarh.
Currently working with Maxim infrastructure & real estate Pvt. Ltd.(HM GROUP) on the Marriott Hotel Project Shillong (Meghalaya).
Thanks & Regards
8014316443
Candidate with thorough knowledge about principles of M.E.P Design, engineering specifications and safety systems, seeks to work as a HVAC Design engineering for a reputed organization.
Sr.mechanical engineer have more than 17 years experience in MEP field starting from design up to handing over to client and follow up the maintenance, Able to manage and coordinate all construction activities successful career by working for a ambitious & exciting company.
A Civil Engineer with 8 years of vast experience in infrastructure like Metro Stations, Road, Tunnels, Bridges, Pipe Line projects for water transmission and High Rise Buildings. Experience in Structural detailed design & Shop drawings for structures of Metro Stations, Bridges, Roads and rail alignment drawings and geotechnical profile. Knowledge of construction methods and construction sequences in civil structural constructions above or below the ground. Sound Knowledge of Quality Management System. Knowledge in dealing with Quality Manuals, ITPs, NCR’s, Method statements & Inspection. knowledge of asphalt and concrete characteristics and working standards. Knowledge of International Standards & Codes (ASTM, ACI, AASHTO).
Respected Sir,
I am writing to express my keen interest in the role of Mechanical Engineer in your organization. As my resume indicates I have completed Bachelor degree in Mechanical Engineering from PGP College of Engineering And Technology, Tamil Nadu and also I have 5 years’ experience in MEP Company in UAE as a Mechanical Engineer
I would like to work for an organization where I can be given the opportunity to expand my knowledge in real life situations. It's my pleasure to gain further hands on experience by working with leading engineers of your Company. And I am flexible, adaptable and able to pick ideas quickly.
My resume, which is enclosed, contains additional information on my experience and skills. I would appreciate any opportunity to discuss further with you and to provide further information regarding the vacancy available. I can be reached any time over the phone or email below.
Thank you for your time and consideration reading this e-mail. I look forward to speak with you about any such opportunity with a lot of good faith in you.
Expecting a positive response in favour.
Thanking you
Sayooj.k
+971551998478
k_sayooj@yahoo.com
Saudi Arabia stands as a titan in the global energy landscape, renowned for its abundant oil and gas resources. It's the largest exporter of petroleum and holds some of the world's most significant reserves. Let's delve into the top 10 oil and gas projects shaping Saudi Arabia's energy future in 2024.
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)MdTanvirMahtab2
This presentation is about the working procedure of Shahjalal Fertilizer Company Limited (SFCL). A Govt. owned Company of Bangladesh Chemical Industries Corporation under Ministry of Industries.
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfKamal Acharya
The College Bus Management system is completely developed by Visual Basic .NET Version. The application is connect with most secured database language MS SQL Server. The application is develop by using best combination of front-end and back-end languages. The application is totally design like flat user interface. This flat user interface is more attractive user interface in 2017. The application is gives more important to the system functionality. The application is to manage the student’s details, driver’s details, bus details, bus route details, bus fees details and more. The application has only one unit for admin. The admin can manage the entire application. The admin can login into the application by using username and password of the admin. The application is develop for big and small colleges. It is more user friendly for non-computer person. Even they can easily learn how to manage the application within hours. The application is more secure by the admin. The system will give an effective output for the VB.Net and SQL Server given as input to the system. The compiled java program given as input to the system, after scanning the program will generate different reports. The application generates the report for users. The admin can view and download the report of the data. The application deliver the excel format reports. Because, excel formatted reports is very easy to understand the income and expense of the college bus. This application is mainly develop for windows operating system users. In 2017, 73% of people enterprises are using windows operating system. So the application will easily install for all the windows operating system users. The application-developed size is very low. The application consumes very low space in disk. Therefore, the user can allocate very minimum local disk space for this application.
Explore the innovative world of trenchless pipe repair with our comprehensive guide, "The Benefits and Techniques of Trenchless Pipe Repair." This document delves into the modern methods of repairing underground pipes without the need for extensive excavation, highlighting the numerous advantages and the latest techniques used in the industry.
Learn about the cost savings, reduced environmental impact, and minimal disruption associated with trenchless technology. Discover detailed explanations of popular techniques such as pipe bursting, cured-in-place pipe (CIPP) lining, and directional drilling. Understand how these methods can be applied to various types of infrastructure, from residential plumbing to large-scale municipal systems.
Ideal for homeowners, contractors, engineers, and anyone interested in modern plumbing solutions, this guide provides valuable insights into why trenchless pipe repair is becoming the preferred choice for pipe rehabilitation. Stay informed about the latest advancements and best practices in the field.
Welcome to WIPAC Monthly the magazine brought to you by the LinkedIn Group Water Industry Process Automation & Control.
In this month's edition, along with this month's industry news to celebrate the 13 years since the group was created we have articles including
A case study of the used of Advanced Process Control at the Wastewater Treatment works at Lleida in Spain
A look back on an article on smart wastewater networks in order to see how the industry has measured up in the interim around the adoption of Digital Transformation in the Water Industry.
Final project report on grocery store management system..pdfKamal Acharya
In today’s fast-changing business environment, it’s extremely important to be able to respond to client needs in the most effective and timely manner. If your customers wish to see your business online and have instant access to your products or services.
Online Grocery Store is an e-commerce website, which retails various grocery products. This project allows viewing various products available enables registered users to purchase desired products instantly using Paytm, UPI payment processor (Instant Pay) and also can place order by using Cash on Delivery (Pay Later) option. This project provides an easy access to Administrators and Managers to view orders placed using Pay Later and Instant Pay options.
In order to develop an e-commerce website, a number of Technologies must be studied and understood. These include multi-tiered architecture, server and client-side scripting techniques, implementation technologies, programming language (such as PHP, HTML, CSS, JavaScript) and MySQL relational databases. This is a project with the objective to develop a basic website where a consumer is provided with a shopping cart website and also to know about the technologies used to develop such a website.
This document will discuss each of the underlying technologies to create and implement an e- commerce website.
Water scarcity is the lack of fresh water resources to meet the standard water demand. There are two type of water scarcity. One is physical. The other is economic water scarcity.
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdffxintegritypublishin
Advancements in technology unveil a myriad of electrical and electronic breakthroughs geared towards efficiently harnessing limited resources to meet human energy demands. The optimization of hybrid solar PV panels and pumped hydro energy supply systems plays a pivotal role in utilizing natural resources effectively. This initiative not only benefits humanity but also fosters environmental sustainability. The study investigated the design optimization of these hybrid systems, focusing on understanding solar radiation patterns, identifying geographical influences on solar radiation, formulating a mathematical model for system optimization, and determining the optimal configuration of PV panels and pumped hydro storage. Through a comparative analysis approach and eight weeks of data collection, the study addressed key research questions related to solar radiation patterns and optimal system design. The findings highlighted regions with heightened solar radiation levels, showcasing substantial potential for power generation and emphasizing the system's efficiency. Optimizing system design significantly boosted power generation, promoted renewable energy utilization, and enhanced energy storage capacity. The study underscored the benefits of optimizing hybrid solar PV panels and pumped hydro energy supply systems for sustainable energy usage. Optimizing the design of solar PV panels and pumped hydro energy supply systems as examined across diverse climatic conditions in a developing country, not only enhances power generation but also improves the integration of renewable energy sources and boosts energy storage capacities, particularly beneficial for less economically prosperous regions. Additionally, the study provides valuable insights for advancing energy research in economically viable areas. Recommendations included conducting site-specific assessments, utilizing advanced modeling tools, implementing regular maintenance protocols, and enhancing communication among system components.
Courier management system project report.pdfKamal Acharya
It is now-a-days very important for the people to send or receive articles like imported furniture, electronic items, gifts, business goods and the like. People depend vastly on different transport systems which mostly use the manual way of receiving and delivering the articles. There is no way to track the articles till they are received and there is no way to let the customer know what happened in transit, once he booked some articles. In such a situation, we need a system which completely computerizes the cargo activities including time to time tracking of the articles sent. This need is fulfilled by Courier Management System software which is online software for the cargo management people that enables them to receive the goods from a source and send them to a required destination and track their status from time to time.
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxR&R Consult
CFD analysis is incredibly effective at solving mysteries and improving the performance of complex systems!
Here's a great example: At a large natural gas-fired power plant, where they use waste heat to generate steam and energy, they were puzzled that their boiler wasn't producing as much steam as expected.
R&R and Tetra Engineering Group Inc. were asked to solve the issue with reduced steam production.
An inspection had shown that a significant amount of hot flue gas was bypassing the boiler tubes, where the heat was supposed to be transferred.
R&R Consult conducted a CFD analysis, which revealed that 6.3% of the flue gas was bypassing the boiler tubes without transferring heat. The analysis also showed that the flue gas was instead being directed along the sides of the boiler and between the modules that were supposed to capture the heat. This was the cause of the reduced performance.
Based on our results, Tetra Engineering installed covering plates to reduce the bypass flow. This improved the boiler's performance and increased electricity production.
It is always satisfying when we can help solve complex challenges like this. Do your systems also need a check-up or optimization? Give us a call!
Work done in cooperation with James Malloy and David Moelling from Tetra Engineering.
More examples of our work https://www.r-r-consult.dk/en/cases-en/
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
Resume of zahir hussain
1. P a g e | 1
CURRICULAM_VITAE
M. Zahir Hussain
Senior Mechanical Consulting Engineer
Contact : +966 59 3623806
+966 53 8969056
Email: zahiriba24@yahoo.com
hussainzahir76@gmail.com
Academic Qualification : Bachelor of Mechanical
Engineering – 1992 with First class.
( Madurai Kamaraj University )
Computer knowledge : Having a working knowledge in Microsoft
Windows environment and related HVAC software
Career summary : 21 years of experience out of which 18 years in
construction industry as a M.E.P Engineer in
various organizations. Technical know- how gained
from diversified projects and roles coupled
interacting ability and firm commitment have served
to successfully complete all projects undertaken,
Work Experience :
Presently I am working as a Senior Mechanical Engineer cum Assistant Resident Engineer
in Dar Al Riyadh Engineering and Architectural Consultant, Riyadh, Saudi Arabia and
handling the King Abdullah Financial District (KAFD) Iconic Projects in different size of
mixed use high rise buildings, M/S. Rayadah Investment Company. Ongoing Projects
undertaken by myself during the Period Sep 2011 – till date.
Duties and responsibilities for post contract services:
Design review and Supervision of HVAC, Plumbing (Drainage, Water supply &
Firefighting) Systems, Water storage facility, Laundry and kitchen equipments.
Coordinate with the local utility agencies such as civil defense, water authority and
local municipality for drainage system.
Supervision of Construction project quality control and monitoring of construction
activities
Monitor the construction program closely and recommend any remedial actions to
the project director in the event of any delay.
Selection of HVAC, Water Supply, Sewer, Surface water drainage & Fire Fighting
Equipments.
Checking Contractor’s shop drawings and material submittals.
Prescribe setting out information to the contractors, check setting out, instruct
corrections where necessary and receive setting out records.
Co-ordination with specialists consultants for Concept Architecture, Infrastructure
consultants, Façade, Laundry, Kitchens, Interior design, Structure designer, elevator
2. P a g e | 2
consultants, Fire Engineering, Acoustic Engineering, Value Engineering specialists,
Project management teams, clients and local authorities representatives
Supervise the work on site, examine the plant materials and workmanship employed,
receive the supplier / contractor’s notices of work being ready for inspection or tests
to be carried out and attend as soon as possible.
Certify work completed and payment due so as to ensure that the provisions of the
construction contract are met in full and in particular to exclude any unsatisfactory or
incomplete work or deliveries.
Attend all site management, progress, construction coordination and quality and
safety meetings as and when requested by the project manager
Involvement to issue the taking over certificate in collaboration with the project
manager and cost consultant to the contractors.
Supervise the commissioning of all plant and systems and the reliability run and
decide if satisfactory or not. In the later case, immediately instruct the necessary
corrective action notifying the project director in writing of the contractual and
technical implications
Implement overall project operation and maintenance strategy that will ensure a
seamless hand over from contractor to operation at taking over the project
Cooling & Heating load calculation Review
Preparation of Design Criteria Reports
Coordinate the handing over to the client of spares provided under the construction
contract.
LEED Reports Review & Coordination of interdisciplinary LEED requirements.
From Jan. 2003 – March 2011 Ian Banham and Associates
(MEP Design and supervision Consultant)
Consulting Engineers, Dubai
Senior Mechanical Engineer
From Nov. 2000 to Dec. 2002 Emirates Trading and Associates (ETA
Company)
( A subsidiary of ETA ASCON Group of
Companies )
Abu Dhabi
Project Engineer
From Dec. 1995 to Aug. 2000 Al Jabr Trading and contracting Company
Dammam , Saudi Arabia
HVAC Mechanical Engineer
From July 1993 to July 1995 Themis Chemical Ltd.
Gujarat, India
Junior Officer
PROFILE: (Post contract Electro Mechanical Scope of works)
3. P a g e | 3
Reviewing and coordination of mechanical engineering design submittals from
contractors, as well as following up site supervision, design conflicts and variation
orders.
Reviewing technical submissions and design layouts as well as material submittals
from contractors
Having a knowledge of all aspects of Mechanical building services both technical
and contractual.
Ability to review building services documentation throughout the project requirements
and contribute to content and direction.
Reviewing of design calculations for HVAC system including Heat Load, Chiller
capacity, Pressure drop calculations for chilled water system, Duct design
calculations, External static pressure calculations, Exhaust system calculations,
Fresh air calculations, Stair case pressurization calculations, Smoke exhaust system
calculations etc. using ASHRAE standards and latest available software.
Supervision and execution of HVAC, plumbing , fire fighting works, irrigation and
water features and Building Management system for commercial and residential
building, tall tower and mixed use development.
Reviewing of Hydraulic calculations, pump sizing & system pipe sizing for Domestic
water system, hot water system, central filtration system ,Firefighting pumps & tank
capacity for Fire sprinkler system , firefighting dry and wet hydrant systems and
drainage system.
Reviewing method statements for installations and testing and commissioning for
HVAC, smoke management system, Plumbing, Firefighting & Conveying System and
monitor implementation of ITP.
Capable of HVAC system comparison and life cycle analysis to select the proper
system
Pre -testing and commissioning of M.E.P works.
Technical discussion, meeting with contractors and respective service authorities.
Complete correspondence of contractual letters and monitoring progress.
Design check – up, contract control and supervision of projects from conception to
final handing over.
Directing and co -coordinating the administration of construction changes, approval
of progress claim and involvement with project management / client for getting the
approval.
Study design drawings and prepare / review shop drawings with proper coordination,
compliance to specs / authorities regulations.
Having hands on experience to propose value-engineering option such as cost
savings method.
4. P a g e | 4
Liaise with authorities for No Objection certificate for water and drainage system.
Liaise for authority to obtain the NOC for district cooling system inside the building
for confirming the ETS room location , size and chilled water schematic diagram.
Closely interact with utility service provider and ensure the compliance with design
and quality requirements.
Involvement of civil defense approval for confirming design adherence of fire zones,
smoke extract scheme, stair well pressurization scheme and fire fighting system
requirement with civil defense regulation.
Take part in project and risk management reviews
Coordinate with quantity surveyors or payment related issues and change orders
Assures the contractor’s Design and Material Deliverables are as per project
requirements
Review the As-Built drawings and O&M Manuals and make sure that all site
conditions are properly addressed.
Review Contractor’s proposed sub-contractor(s) associated with the mechanical
engineering packages
Continually review the contractor’s construction schedule during the progress of site
works
Knowledgeable in building design services, associates regulations and technical
codes and standards.
I can fairly handle the design review of the mechanical services.
Ensure full compliance with the required quality and safety standards reject the non
– confirming work elements or materials.
Planning and monitor work progress to ensure proper sequence of works,
completion of critical activities.
Having a sound knowledge for giving the approval of third party pre- qualification
documents and submitted RFI for witness test.
Implementing the project quality plan and quality procedures and productivity related
to all MEP works submittals in accordance with program of work on the project.
Ability to make independent decisions in the planning, organizing and coordinating to
develop solutions to complex problems.
Attend critical inspection in Factory premises for major equipments.
Having a sound knowledge in interfacing of mechanical
equipment with electrical controls systems for normal operation and
emergency operation during fire or other emergency condition ( Fire and life safety
system )
MAJOR PROJECTS ( COMPLETED)
5. P a g e | 5
Residential Apartments, Medical centre and Administration
Buildings for M/s. Saudi Aramco, Consultant – BECTEL.
Abu Dhabi National Oil company – Ruwais GUP Expansion Project Phase II for M/s
ADNOC.
Ras Abu Fontas B1 Project for M/s Qatar water and Electricity Authority (QWEA),
Qatar.
Partial List of Projects carried out in U.A.E.
Takreer – Atheer new Head Quarters building for M/s. ADNOC.
Group of 4 nos. G + 6 Residential Buildings (Type T1A – The Greens) for M/s.
Emaar Properties, Dubai.
The Meadows – Phase 4 – 384 Nos. Villas for M/s Emaar Properties, Dubai
The Meadows – Phase 5 – 234 Nos. Villas for M/s Emaar Properties, Dubai
Dubai International Academy at Emirates Hills, G + 2 storey buildings for M/s Emaar
, Dubai
Hattan Phase II and III – 112 Nos Villas for M/s Emaar Properties, Dubai.
558 and 260 key villas and buildings at Dubai land for M/S. Dubai Properties.
2B+G+24 storey commercial / Residential Twin Towers at Al Majaz, Sharjah.
Churchill Towers at Business Bay (Residential and Commercial bldgs. 3B + G + 3P +
56 / 42 storey bldgs.) M/s Emirates National Investment.
Abu Dhabi Education council ( ADEC ) School project at Al Ain areas for package
3 and 7.
PERSONAL PROFILE
A self – starter and high-energy person with a desire to participate on a hands on
basis.
Excellent communication and interpersonal skills.
Presents ideas clearly and concisely, persuasive, strong interpersonal skills with
people from all disciplines within a company.
High enthusiasm and drive and strong ability to work autonomously without loosing
sight of team’s objective.
Listen to subtle communication and convert them in to active resolution.
6. P a g e | 6
Strong leadership qualities, ability / desire to work within a team structure.
OTHER DETAILS:
Marital Status : Married.
Date of birth : 02:04:1970
Nationality : Indian
Passport No. : M 8520138
Driving License : Holding valid U.A.E. and Saudi license
MEMBERSHIP AND AFFILATION
Indian Engineering Council Reg. 710621
Saudi Engineering Council Reg. 77829