Efficient civil engineer with expertise in construction planning, design, management, and supervision of large infrastructure projects such as wind farms and roads. Experienced overseeing all aspects of project execution from initial planning through completion, including managing contractors, ensuring safety and quality standards, and addressing technical issues. Dedicated to on-time and on-budget delivery of structurally sound, well-designed projects.
7 years of experience as a document controller in the field of Logistics, Construction as well as Oil, Gas and Energy.
Proficient in Microsoft Office Application Package, operating On-soft Computer System & SAP Data Base.
Successfully finished my Contract assignment under W/S ATKINS & Partners Overseas, for implementation, management and control of Project documentation works for Engineering and Project Control Department for Saudi Aramco’s Oil and Gas Expansion Project.
7 years of experience as a document controller in the field of Logistics, Construction as well as Oil, Gas and Energy.
Proficient in Microsoft Office Application Package, operating On-soft Computer System & SAP Data Base.
Successfully finished my Contract assignment under W/S ATKINS & Partners Overseas, for implementation, management and control of Project documentation works for Engineering and Project Control Department for Saudi Aramco’s Oil and Gas Expansion Project.
Accomplished and highly motivated Environmental Manager with 15+ years experience in environmental management. Competent in Environmental and Social Impact Assessment (ESIA) studies,, Environmental Audits, Risk Assessments and Environmental Management of various projects including upstream and downstream oil & gas, large infrastructure projects such as roads and building services including experience in natural resource and ecosystems management.
Over 9 years of experience with various Telecommunication Companies of Fiber Optic experience (deployment, distribution networks, understanding of OFC theory and design, testing, troubleshoot fiber optic issues.) and passive infra of cell sites, Project Planning, Project coordination & Execution, Planning & Control, Quality Assurance, Technical Support, Expertise in Developing System & Procedures for Infrastructure Projects
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)MdTanvirMahtab2
This presentation is about the working procedure of Shahjalal Fertilizer Company Limited (SFCL). A Govt. owned Company of Bangladesh Chemical Industries Corporation under Ministry of Industries.
Saudi Arabia stands as a titan in the global energy landscape, renowned for its abundant oil and gas resources. It's the largest exporter of petroleum and holds some of the world's most significant reserves. Let's delve into the top 10 oil and gas projects shaping Saudi Arabia's energy future in 2024.
Automobile Management System Project Report.pdfKamal Acharya
The proposed project is developed to manage the automobile in the automobile dealer company. The main module in this project is login, automobile management, customer management, sales, complaints and reports. The first module is the login. The automobile showroom owner should login to the project for usage. The username and password are verified and if it is correct, next form opens. If the username and password are not correct, it shows the error message.
When a customer search for a automobile, if the automobile is available, they will be taken to a page that shows the details of the automobile including automobile name, automobile ID, quantity, price etc. “Automobile Management System” is useful for maintaining automobiles, customers effectively and hence helps for establishing good relation between customer and automobile organization. It contains various customized modules for effectively maintaining automobiles and stock information accurately and safely.
When the automobile is sold to the customer, stock will be reduced automatically. When a new purchase is made, stock will be increased automatically. While selecting automobiles for sale, the proposed software will automatically check for total number of available stock of that particular item, if the total stock of that particular item is less than 5, software will notify the user to purchase the particular item.
Also when the user tries to sale items which are not in stock, the system will prompt the user that the stock is not enough. Customers of this system can search for a automobile; can purchase a automobile easily by selecting fast. On the other hand the stock of automobiles can be maintained perfectly by the automobile shop manager overcoming the drawbacks of existing system.
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxR&R Consult
CFD analysis is incredibly effective at solving mysteries and improving the performance of complex systems!
Here's a great example: At a large natural gas-fired power plant, where they use waste heat to generate steam and energy, they were puzzled that their boiler wasn't producing as much steam as expected.
R&R and Tetra Engineering Group Inc. were asked to solve the issue with reduced steam production.
An inspection had shown that a significant amount of hot flue gas was bypassing the boiler tubes, where the heat was supposed to be transferred.
R&R Consult conducted a CFD analysis, which revealed that 6.3% of the flue gas was bypassing the boiler tubes without transferring heat. The analysis also showed that the flue gas was instead being directed along the sides of the boiler and between the modules that were supposed to capture the heat. This was the cause of the reduced performance.
Based on our results, Tetra Engineering installed covering plates to reduce the bypass flow. This improved the boiler's performance and increased electricity production.
It is always satisfying when we can help solve complex challenges like this. Do your systems also need a check-up or optimization? Give us a call!
Work done in cooperation with James Malloy and David Moelling from Tetra Engineering.
More examples of our work https://www.r-r-consult.dk/en/cases-en/
Cosmetic shop management system project report.pdfKamal Acharya
Buying new cosmetic products is difficult. It can even be scary for those who have sensitive skin and are prone to skin trouble. The information needed to alleviate this problem is on the back of each product, but it's thought to interpret those ingredient lists unless you have a background in chemistry.
Instead of buying and hoping for the best, we can use data science to help us predict which products may be good fits for us. It includes various function programs to do the above mentioned tasks.
Data file handling has been effectively used in the program.
The automated cosmetic shop management system should deal with the automation of general workflow and administration process of the shop. The main processes of the system focus on customer's request where the system is able to search the most appropriate products and deliver it to the customers. It should help the employees to quickly identify the list of cosmetic product that have reached the minimum quantity and also keep a track of expired date for each cosmetic product. It should help the employees to find the rack number in which the product is placed.It is also Faster and more efficient way.
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Dr.Costas Sachpazis
Terzaghi's soil bearing capacity theory, developed by Karl Terzaghi, is a fundamental principle in geotechnical engineering used to determine the bearing capacity of shallow foundations. This theory provides a method to calculate the ultimate bearing capacity of soil, which is the maximum load per unit area that the soil can support without undergoing shear failure. The Calculation HTML Code included.
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSEDuvanRamosGarzon1
AIRCRAFT GENERAL
The Single Aisle is the most advanced family aircraft in service today, with fly-by-wire flight controls.
The A318, A319, A320 and A321 are twin-engine subsonic medium range aircraft.
The family offers a choice of engines
Immunizing Image Classifiers Against Localized Adversary Attacksgerogepatton
This paper addresses the vulnerability of deep learning models, particularly convolutional neural networks
(CNN)s, to adversarial attacks and presents a proactive training technique designed to counter them. We
introduce a novel volumization algorithm, which transforms 2D images into 3D volumetric representations.
When combined with 3D convolution and deep curriculum learning optimization (CLO), itsignificantly improves
the immunity of models against localized universal attacks by up to 40%. We evaluate our proposed approach
using contemporary CNN architectures and the modified Canadian Institute for Advanced Research (CIFAR-10
and CIFAR-100) and ImageNet Large Scale Visual Recognition Challenge (ILSVRC12) datasets, showcasing
accuracy improvements over previous techniques. The results indicate that the combination of the volumetric
input and curriculum learning holds significant promise for mitigating adversarial attacks without necessitating
adversary training.
Welcome to WIPAC Monthly the magazine brought to you by the LinkedIn Group Water Industry Process Automation & Control.
In this month's edition, along with this month's industry news to celebrate the 13 years since the group was created we have articles including
A case study of the used of Advanced Process Control at the Wastewater Treatment works at Lleida in Spain
A look back on an article on smart wastewater networks in order to see how the industry has measured up in the interim around the adoption of Digital Transformation in the Water Industry.
Democratizing Fuzzing at Scale by Abhishek Aryaabh.arya
Presented at NUS: Fuzzing and Software Security Summer School 2024
This keynote talks about the democratization of fuzzing at scale, highlighting the collaboration between open source communities, academia, and industry to advance the field of fuzzing. It delves into the history of fuzzing, the development of scalable fuzzing platforms, and the empowerment of community-driven research. The talk will further discuss recent advancements leveraging AI/ML and offer insights into the future evolution of the fuzzing landscape.
Event Management System Vb Net Project Report.pdfKamal Acharya
In present era, the scopes of information technology growing with a very fast .We do not see any are untouched from this industry. The scope of information technology has become wider includes: Business and industry. Household Business, Communication, Education, Entertainment, Science, Medicine, Engineering, Distance Learning, Weather Forecasting. Carrier Searching and so on.
My project named “Event Management System” is software that store and maintained all events coordinated in college. It also helpful to print related reports. My project will help to record the events coordinated by faculties with their Name, Event subject, date & details in an efficient & effective ways.
In my system we have to make a system by which a user can record all events coordinated by a particular faculty. In our proposed system some more featured are added which differs it from the existing system such as security.
1. Bill Ochieng
Field Engineer/
Civil Works Supervisor
Résumé
Bill Resume.docx Corporate Base Page 1
Rev 7 (28-Jan-17)
SUMMARY
Efficient Civil Engineer equipped with expert construction planning, design, management and
Supervision.
Good interpersonal and Communication skills to colleagues and all parties involved, from
construction site workers to Project Managers.
Has a good grasp on Health Safety and Environment management on a big project.
Successfully sees projects through from initial planning stages to completion.
Experienced on structural design practice in steel, concrete and timber; good at civil works design
that encompasses road design, Storm water/sewer design, Substation construction, Overhead and
Transmission Lines ,material monitoring and Quantity take-off.
EXPERIENCE
Current Field Engineer/Civil Works Supervisor / for WorleyParsons RSA LAKE
TURKANA WIND POWER PROJECT (LTWP) –TURKANA, Kenya
The Lake Turkana Wind Power Project (LTWP) aims to provide 300MW of reliable, low cost
wind power to the Kenya national grid, equivalent to approximately 20% of the current installed
electricity generating capacity. The Project is of significant strategic benefit to Kenya, and at
Ksh76 billion (€623 million) will be the largest single private investment in Kenya’s history. The
wind farm site, covering 40,000 acres (162km
2
), is located in Loyangalani District, Marsabit West
County approximately 50km north of South Horr Township.
Scope of Work: Construction of A substation at Loyangalani; Construction of 365 Turbines;
Construction of an Overhead Line to the 400Kv Substation and Transmission line to Suswa;
Construction of an offsite Road to Gravel standards from Laisamis to the Wind farm, village
buildings and associated infrastructure.
Primary Objective- Designs Review, Civil works Supervision and Execution.
Management and Overseeing of construction to ensure projects civil works are carried out safely,
efficiently, cost effective and timeously to deliver a quality finished product.
Supervision of construction of the following:
- 1. 33/400kV Substation - Transformers, Gantries, MV Buildings & Equipment Foundations
- 2. 33kV Transmission lines from MV Building to the 365 No. Turbine Locations
- 3. 365No. X 1.0MW Turbine Foundations & Turbine installation
- 4. Steel structure installation works
- 5. LTWP Village
- 6. All major roads within the Projects
Engage in supervision of crew, including managing performance and behavior in the workplace.
Bring Experience in structural Steel, concrete on Civil Construction on site
2. Bill Ochieng
Field Engineer/
Civil Works Supervisor
Résumé
Bill Resume.docx Corporate Base Page 2
Rev 7 (28-Jan-17)
Manage site safety and environmental compliance.
Review Civil works Designs-Concrete Mix , Road, Drainage, waste Water, Tank, Pipeline and
Buildings
Respond to Technical Query’s and Request for information from various contractors.
Read and interpret drawings and surveys
Ability to integrate engineering and construction methodologies.
Manages the interfaces between different contractors related to the specific area of work
Provides discipline specific technical support to the site team in monitoring and management of
their respective areas.
Specific Accountabilities:
1. Quality Management
- Contributes to compliance with the Clients Quality policies and procedures
- Strong working knowledge of international engineering and construction systems and
procedures like ISO 9001:2008(ISO 9001:2015) and FIDIC.
- Review and Approval of contractors quality plans, related work method statements and
procedures
- Ensures contractors work according to their approved quality plans and procedures
- Reviews and approves quality dossiers from contractors for take-over of completed plant
- Raises non-conformance reports for defective or non-conforming workmanship including the
maintaining of non-conformance register
- Facilitation and approval of concessions including the updating and maintenance of register
- Supports auditors with assessment of contractor compliance
- Conducting and Coordination of site inspection activities in accordance with the approved
quality plans including final acceptance and handover
- Manage and maintain accurate field reports /daily reports Identify the maintain the process for
receiving, controlling and distributing of project records at the construction site in accordance
with the WP site documentation procedure.
- Development and implementation of site documentation distribution matrix to include home
office and site-generated documents. Liaison required ensuring site/home office matrices
concur.
2. Engineering Interaction
- Sets clear objectives to the engineering team, including achieving productivity and budget
targets
- Effectively interfaces with engineering team.
- Involve customer engineering support where this is a contractual requirement.
- Facilitation and approval of site queries including the updating and maintenance of register in
accordance with the Clients site query and field change procedure.
- Maintain flow of technical information.
3. Bill Ochieng
Field Engineer/
Civil Works Supervisor
Résumé
Bill Resume.docx Corporate Base Page 3
Rev 7 (28-Jan-17)
3. Communications Management
- Regularly provides clear reports to the construction manager
- Effective communication with the team, the contractor and the customer
- Accurate, timely and effective reporting in the format required by the Project to the
construction manager
- Daily reporting
- Weekly reporting
- Monthly reporting
4. Time Management and Cost Control
- Contributes to the development and maintenance of overall project schedule and specifically
pertaining to the relevant contractors schedule
- Supervises work in accordance with the approved schedule
- Does weekly progress assessment on relevant contractor’s work
- Establish and maintain a graphic representation of contractor progress for display and
reporting purposes
- Monitors cost aspects of the project within direct control to forecast final costs, identifies trends
and takes action to avoid cost overruns.
- Reviews monthly invoices from contractors for payment approval.
5. Environment Social Health and Safety (ESHS) Management
- Supports the WorleyParsons Project HSE Manager to control contractor’s implementation of
ESHS commitments according to the Employer’s and the Contractor’s ESHS systems.
- Monitors the contractor’s safety performance and reports to the Project HSE Manager any
irregularities on site.
- Notifies the Employer of any Environmental or Social irregularities.
- Supports the overall site security effort by being vigilant and reporting any possible potential
security risk and / or breach of security.
6. Risk Management
- Manages and/or Monitors the closure of all identified risks and opportunities.
7. Subcontracts Management
- Monitor performance of sub-contractors on site where applicable and report accordingly.
4. Bill Ochieng
Field Engineer/
Civil Works Supervisor
Résumé
Bill Resume.docx Corporate Base Page 4
Rev 7 (28-Jan-17)
2014 - 2015 Civil & Structural Superintendent for PEC.
LAKE TURKANA WIND POWER PROJECT (LTWP) –TURKANA, Kenya.
Conducts site investigations and inspections of structural engineering aspects of the project;
provides suggestions for structural engineering projects to ensure that standards and
requirements are met
Oversee The Clients Quality Assurance and Control plan implementation on all the construction
activities onsite.
Analyse, identify and resolve all technical issues in all files projects and ensure efficient
interpretation of all design drawings(structural)
Assist all engineering superintendents Contractors and subcontractors and ensure compliance to
all project schedules and evaluate all associated equipment and workforce to meet all design
requirements.
Document all civil field activities and perform regular inspection to check progress of all projects
activities.
Monitor and implement all safety programs for projects for assigned areas.
Writing of Progress Reports weekly and monthly capturing the technical details and critical
aspects that impacts on the project.
2013 - 2014 Assistant Roads Engineer, China Road & Bridge Corporation (K) –Nairobi,
Kenya
Nairobi Eastern and Northern Bypass Road Project Contract No. KURA/DEV/218/2012-2013.
Providing design and drafting services for roads design team for the preliminary and detail design
phases of a project;
Preparing drawings in accordance with the client and internationally recognised standard formats;
Preparing design drawings using AutoCAD Civil 3D or similar type software;
Reviewing design and drafting works completed by colleagues or other parties for compliance
with original design intent to standards and internationally recognised best practice;
Interpreting survey results into technical drawings;
Promoting and improving professional standards for road engineering design;
Undertaking design duties as assigned by the Design Office Manager, QA/QC Engineer and
Project Manager;
Undertaking any other duties as assigned by the Design Office Manager, QA/QC Engineer, or
Project Manager.
Civil Engineering Materials design, analysis, testing, performance, control, Technical
specifications
Design and direct the testing and/or control procedures.
Civil Engineering Materials referred: soils for earthworks, Asphalt, concrete and concrete by-
products.
5. Bill Ochieng
Field Engineer/
Civil Works Supervisor
Résumé
Bill Resume.docx Corporate Base Page 5
Rev 7 (28-Jan-17)
2013 Assistant Structural Engineer, China Hebei Water Conservancy & Hydropower
(K) LTD) –Mwea, Kirinyaga County
The project involved rehabilitation of Mwea Irrigation scheme
Analysis, Modelling, design and preparation of structural drawings for building contractors.
Prepare structural concepts for new designs and from an architect conceptual designs.
Structural calculations and Report writing.
work with geotechnical engineers to investigate ground conditions and analyses results of soil
sample and in-situ tests;
liaise with construction contractors to ensure that newly erected buildings are structurally sound;
Drafted water control and management structures like check turnout, culvert crossing, drop
structures, diversion box, parshall flume, weirs (duckbill, horse shoe)
Estimated quantities and cost of materials, equipment, or labour to determine the construction
cost and as depicted by the As Built Drawings.
Inspects project sites to monitor progress and ensure conformity to design specifications,
standards and safety and ensure Operations comply with standard operating procedures and
adhere to safety and health standards.
2012 Engineer Trainee, Kenya Urban Roads Authority –Nairobi County
The project involved rehabilitation and Maintenance of Seasons Road Kasarani
During the project period I was able to gather skills on Roads Design, construction & Maintenance and
Civil Works that included:
Practiced design and drafting procedures for urban and rural as outlined in the Kenyan Ministry of
Roads Design Manual.
Practiced further Interpreting survey results into technical drawing for Road and Structural design
Learnt Sequencing of Routine Cleaning and De-silting of Culverts, Replacement of Invert Block
Drains (IBD), Road Channels and Kerbs, Cutting Potholes,
Introduced to the procedures and Quality control checks with regards Priming, Laying of Asphalt
Concrete and Marshall Test.
Measurement of works, Taking Chain-ages and Levels using a Theodolite and a dumpy level.
2011 Engineer Trainee, The Ministry of Public Works-Department of Chief Engineer-
Structural
During the attachment period I got involved in the projects that the ministry was undertaking and
acquired expertise on structural designs of roads, buildings, civil work structures like water
management structures, drainage and appurtenance, High-rise buildings, waste water structures; I
also had an opportunity to participate and perfect the execution of the following tasks:
Structural calculations and Report writing.
Analysis, Modelling, design and preparation of structural drawings for building contractors.
analysed configurations of the basic structural components of a building or other structure;
6. Bill Ochieng
Field Engineer/
Civil Works Supervisor
Résumé
Bill Resume.docx Corporate Base Page 6
Rev 7 (28-Jan-17)
calculate the pressures, stresses and strains that each component, such as a beam or lintel, will
experience from other parts of the structure due to human use or environmental pressures such
as weather or earthquakes;
consider the strength of various materials, e.g. timber, concrete, steel and brick, to see how
their inclusion may necessitate a change of structural design;
liaise with other designers, including architects, to agree on safe designs and their fit with the
aesthetic concept of the construction;
examine structures at risk of collapse and advising how to improve their structural integrity, such
as recommending removal or repair of defective parts or rebuilding the entire structure;
make drawings, specifications and computer models of structures for building contractors;
work with geotechnical engineers to investigate ground conditions and analyse results of soil
sample and in-situ tests;
liaise with construction contractors to ensure that newly erected buildings are structurally sound;
apply expert knowledge of the forces that act on various structures;
Used computers and computer-aided design (CAD) technology for simulation purposes.
Designing documentation of Tenders and Contract Documents, Project management &
constructions Maintenance of Public roads and other infrastructural resources, Public transport
policy management.
EDUCATION
Degree in Bachelor of Science: Civil Construction and Environmental Engineering at JKUAT, Nairobi,
Kenya, 2012
REGISTRATIONS/AFFILIATIONS
Engineers Board of Kenya (EBK) & Institute Of Engineers of Kenya (IEK).
SPECIFIC TECHNICAL EXPERTISE/SPECIALIST COURSES
AutoCAD, Archicad, Google Sketch up Prokon and Civil 3D,RSAP,StaadPro,BlueBeam
Technical plan execution.
Project management& Construction
Good working knowledge of Ms Project.
Good in preparing Bills of quantities and Tender documents.
Has Training on EUROCODES Use.