Improving layout and workload of manufacturing system
using Delmia Quest simulation and inventory approach
Elena-Iuliana Gingu (Boteanu) Prof. dr. eng. Miron Zapciu
Machine and Manufacturing Systems Department, Machine and Manufacturing Systems Department,
POLITEHNICA University of Bucharest POLITEHNICA University of Bucharest
Abstract—This paper describes a case study of analysis and optimization of the facility layout in a manufacturing cell
using a systematic search method and a Quest computer simulation model with graphical representation of the
manufacturing processes. The simulation model objective was to obtain Layout design to achieve a high productivity in the
flexible manufacturing system (FMS), to determine bottleneck locations and what the optimal batch size should be. The
Quest software proved to be a powerful tool in assessing what changes should be made to a manufacturing cell before
incurring manufacturing improvements and/or performing actual capital investments. The aim of this study is to get
an understanding of the cell and its behaviour regarding production and to use the simulation software to change,
analyse and improve the cell.
Keywords— simulation, Delmia Quest, facility layout, inventory, costing.
I. INTRODUCTION
In today’s fast paced world of manufacturing system, everything changes fast and new challenges require new
solution, which should be more universal, flexible and provide more possibilities to react to the continuous changes. The
situation of simulation modelling solutions and tools are effectively used to address new issues and challenges these
which are more flexible, feasible and provide seamless integration of various simulation approaches. Discrete event
simulation has been one of the most valuable technologies for assisting in decision evaluation in simulation and
modelling. Simulation can be used in many areas such as automatic control, logistics, mechanics and production. In this
study, simulation refers to production simulations. Production is a wide area and many different software systems exist to
assist in the production. Using simulation gives a better possibility to early on in the project determine the total
investment cost but also to answer questions such as cost for running and productivity of the system. Different solutions
can be compared and the best alternative can be decided. Simulation can reduce the time for development and
installation. Simulation also provides fewer disturbances in the start up of the production. Quest can be used to simulate
and get data for everything related to production systems, such as buffers, status, queues, production times and so on. A
correct built-up simulation can provide answers to many questions such as, where to set ordering points, number of
operators needed, number of parts needed, what happens when a machine breaks or if one operator is sick and so on.
II. SIMULATION IN MANUFACTURING CELLS
A. Manufacturing cell
Manufacturing cell is an important part of manufacturing system. It can not only meet the demand of market for multi-
variety and low-volume production, but also adapt to the rapid changes of market and so improve the system’s flexibility.
Therefore, more and more researchers at home and abroad are paying attention to it. So far, there have already been in-
depth research and fruitful achievements about the design of manufacturing cell. The traditional design methods put
emphasis on the selection of equipment and further optimization of block layout. In current years, genetic algorithm has
been introduced into the developing of manufacturing cell by more and more researchers. However, this method usually
focuses on the optimal group of facilities. Queuing theory, also called stochastic service theory, is a subject that concerns
and solves the congestion resulting from stochastic factors. It was applied to the study of manufacturing system in 60’s
last century. To design a manufacturing cell based on queuing theory, we can build various of models to calculate those
involved parameters of servers (e.g. the number of servers, the optimal productivity) and then we choose equipment or
determine their running conditions according to these data. As a result, we get the manufacturing unit that is relatively
proper and satisfying [19].
B. Simulation
“Simulation is the imitation of the operation of a real-world process or system over time. It involves the generation of
an artificial history of a system and the observation of that artificial history to draw inferences concerning the operating
characteristics of the real system.”
Discrete-event simulation is a collection of events that happen in chronological order and change the system’s state.
The state of the system (or part of it) is changed instantly when an event happens. Discrete-event simulation models are
used to study how the system works during the period of observation.
Discrete-event simulation models are commonly used in the industry for the following purposes:
- Capacity calculations.
- Analyzing throughput and lead times.
International Journal of Innovative Research in Advanced Engineering (IJIRAE) ISSN: 2349-2163
Volume 1 Issue 6 (July 2014) http://ijirae.com
_________________________________________________________________________________________________
© 2014, IJIRAE- All Rights Reserved Page - 53
- Layout-planning.
- Balancing production.
- Supporting investment decisions and as risk-management tool.
- Identifying bottlenecks and testing out control techniques.
C. Simulation software
Since the 1960s simulation has been used in the mining industry mainly in relation to transport systems, mining
operations, mine planning and production scheduling. Easy-to-use animation is one of the primary reasons for the
increased popularity of simulation modelling in mining. Simulations are developed either in general purpose languages
such as FORTRAN or Pascal, or in simulation languages such as General Purpose Simulation System (GPSS). However,
in recent years several PC simulation languages have been developed that can be used to model mining systems. These
include GPSS, AutoMod, Arena, SimFactory, Clam, Taylor II, SLAM and QUEST [16].
A discrete-event simulation model can be created in different ways depending on the available resources and
objectives of the model:
- General programming language (C++, C#, Visual Basic, Java & etc.)
- Simulation specific programming language (Arena, Simscript, etc.)
- Off-the-shelf, tailored discrete-event simulation programs, such as o 3DCreate, Automod, ProModel, Quest,
Taylor/ED, ProcessModel, etc.
D. Delmia Quest
Delmia Quest is the digital manufacturing platform subsystem of Dassault Company based on discrete events. It
provides simulation environment based on the delivery of materials, processing and storage. It contains material element
for rapid modeling such as machine tool, buffer, treatment process, failure rate, maintenance, operator, path and material
export, which can help users simulate and analyze the process flow in 3D factory environment [20].
In a Delmia-QUEST model, inter alia, there are:
– Parts, the entities that move through the system, occupying resources and undergoing processing. They may
represent goods, customers, orders, tasks or messages between resources.
Fig. 1 Parts
– Sources, the entities that create parts and release them into the simulation; sinks, the entities that remove parts from
the model.
Fig. 2 Source
– Buffers, entities used to represent the locations where parts are stored or where they queue to get access to other
Fig. 4 Machines
The inputs for the machines are the parts representing the activities to do. In QUEST, each real task has its own
corresponding part.
- Labor is required by the processes defined for the machines
International Journal of Innovative Research in Advanced Engineering (IJIRAE) ISSN: 2349-2163
Volume 1 Issue 6 (July 2014) http://ijirae.com
_________________________________________________________________________________________________
© 2014, IJIRAE- All Rights Reserved Page - 54
resources such as machines;
Fig. 3 Buffers
– Machines, the entities that process parts.
Fig. 5 Labors
- Sink, collect the processed parts for their exit from the model.
Fig. 6 Sink
Quest provides three-dimensional simulation environment for the analysis of production process flow and production
efficiency. The Quest model must be established before simulation and analysis. The following three steps are basic steps
to establish a Quest model. Firstly, three-dimensional geometrical model of production resources object such as
processing equipment, logistics equipment and operator must be established, making production line in virtual
environment similar to real production line. Quest contains initial model of common production equipment and logistics
equipment, such as processing equipment, buffer station, feed station, AGV, crane, conveyor, labor and so on. Geometric
model should be placed in three-dimensional space according to workshop layout, which achieves virtual physical
modelling of the entire workshop. Secondly, object behavior, technological process and system operation rules of
production resources should be defined. The object behavior refers to the loading, processing, and unloading behaves of
the processing equipment. Logical order of workpiece is defined by technological process of manufacturing system,
making independent device in the system connected into a whole process logical [10], [11]. System operation rules can
ensure the normal operation of the simulation model and avoid conflict in the system. Finally, production line is
simulated based its model, real-time utilization and average utilization of the key equipment and labors can be obtained.
The data of logistics production beat and stacking situation can also be seen clearly. According to these data, the
bottlenecks in the production line can be found and then the layout of the production line and logistics scheme can be
optimized [5].
E. SCL and BCL
The conceptual manufacturing layout used the modelling languages, which are Simulation Control Language (SCL)
and Batch Control Language (BCL). Manufacturing design layout is developed by composing the control language and
synthesizing the structures: control, data, and operational. The modelling language is based on a set of object classes that
simulates the behaviour of a real system component.
The SCL provides modelling rules that govern the action and all aspects of element in order to meet the unique needs
of designed model and show determination of the outline structure in a fabrication manufacturing layout. The SCL logic
tracking functions are compiled and appended into the file-based by associating the modular procedural programs with
specific resource entities [13].
SCL code is a programming language similar to the more famous PASCAL. Thanks to the written logics and
procedures the developed model now presents the following advantages:
– It is able to builds a suboptimal solution through a new constructive heuristic algorithm designed and implemented;
– It is easy to use by non-expert personnel;
– It requires in input a unique and simple file: an Excel datasheet and provides in output Gantt charts ready to be used
in the workshop.
In SCL anything that doesn’t already exist in Quest can be created, this makes Quest very flexible and versatile.
International Journal of Innovative Research in Advanced Engineering (IJIRAE) ISSN: 2349-2163
Volume 1 Issue 6 (July 2014) http://ijirae.com
_________________________________________________________________________________________________
© 2014, IJIRAE- All Rights Reserved Page - 55
Contrast to the SCL, the BCL is used to create a series of runs with alternative scenarios without interruptions,
furthermore it has been developed beyond the interface control stage to edit or modify the parameters of simulation
environment when manipulate the model. BCL will create a series of runs with alternative scenarios without
interruptions.
The BCL commands were typed in one at a time, which will change an existing model which is part of the QUEST
software. Elements in BCL codes of the model are derived from the sub-data file content. There are BCL macros were
assigned for the model in the QUEST modelling environment. This utilizes the BCL macro function to execute BCL
codes in QUEST. Upon calling up the BCL macro, the BCL codes executed and generated line by line into the QUEST
interface. The process of implementing BCL function for model designed, QUEST software must be loaded first with a
file of BCL Commands. A text of BCL commands are specified as providing the initial instructions to QUEST which
includes building or reading a model and modifying and running the model. Almost all BCL commands can be apply
through SCL programming [12].
III. SIMULATION MODEL
In this study is presented a simulation in Delmia Quest software which is based on scenarios ”what if…” Delmia
Quest is used for model validation, as it was previously indicated in the studies, in the sense that a valid model will be
able to produce a reasonable prediction of the system’s performance [8].
The simulation corresponds to a nine hour workday consisting of eight hours of actual work and one hour of breaks.
The amount of time the laborer takes to move between each assigned machine must be established: Constant on the
Distributions, 10 seconds. The distributions to describe the time between failures and the time to repair for this failure
class are defined: Exponential from the Distributions, a Mean value of 3600 sec. The time to repair is defined: Uniform
from the Distributions, a Minimum Value of 180 sec and a Maximum Value of 300 sec.
A. Facility layout
Facility layout means planning for the location of all machines, utilities, employee workstations, customer service
areas, material storage areas, aisles, rest rooms, lunchrooms, drinking fountains, internal walls, offices, and computer
rooms, and for the flow patterns of materials and people around, into, and within buildings. Facility layout represents
physical layout of the fabrication lines, machines, workstations necessary for the production process of conversion from
fabrics, factories, industrial installations. Facility layout is a placement of the means of productions used to create
products. Facility layout is composed of product, its process routing, machine and some space. Different combinations of
these entities and their activities affect the type of facility layout. Considering the criteria of material handling route, the
types of facility layout are classified into three types: single-row layout, multi-row layout and loop layout. The single row
layout includes three shapes such as linear, U-shape and semi-circular [17]. In the linear layout, there may exist
bypassing and backtracking. Backtracking is the movement of some parts from a machine to another machine that
precedes it in the sequence of placed machines in a flow line arrangement. Bypassing occurs when a part skips some
machines while it is moving towards the end of a flow line arrangement [18].
For example:
Figure 7 displays the current layout with five labors arranged in a linear layout. Each labor works in his own machine.
Fig. 7 Current Layout: Linear layout
Figure 8 displays the improved layout with only three men power and the layout is designed to be in a U-shaped.
International Journal of Innovative Research in Advanced Engineering (IJIRAE) ISSN: 2349-2163
Volume 1 Issue 6 (July 2014) http://ijirae.com
_________________________________________________________________________________________________
© 2014, IJIRAE- All Rights Reserved Page - 56
Fig. 8 Improved Layout: U- shape layout
After a run simulation of 32400 seconds, it is noted that, in both cases there is the same number of parts, 394 parts.
Fig. 9 Element production
In the Linear layout there are five labors for the processes. From the observation, labor’s capability has not been used
effectively. In U- shape layout there are only three labors for the processes.
Fig. 10 Labor utilization efficiency in linear and U shape layout
0
10
20
30
40
50
60
70
80
90
100
Labor1_1 Labor2_1 Labor3_1 Labor4_1 Labor5_1
Utilization(%)
U-shape layout
Linear layout
International Journal of Innovative Research in Advanced Engineering (IJIRAE) ISSN: 2349-2163
Volume 1 Issue 6 (July 2014) http://ijirae.com
_________________________________________________________________________________________________
© 2014, IJIRAE- All Rights Reserved Page - 57
After the simulation is observed that only 3 labors of U-shaped layout made parts just as many as 5 labors of linear
layout.
B. Bottlenecks
The bottleneck is the resource that affects the performance of a system in the strongest manner, that is, the resource
that, for a given differential increment of change, has the largest influence on system performance. This is an operational
definition that can be tested via discrete event simulation using finite difference sensitivities of throughput (or other
performance metrics) to individual resource changes. It is essentially based on the partial derivative of the system
capacity with respect to an individual resource’s capacity, that is, the rate of change in system capacity for unit change in
resource capacity [4].
To see how the machine times affect the cell the bottleneck needed to be determined.
So, the bottlenecks in our study are:
- Machines, which are idle in the manufacturing process;
Fig. 11 Machine utilization efficiency in U shape
- Machines, which are overload and sequential inputs;
- Parts, which pass to their operation from one cell to other. This are the biggest inter-cell movement resources.
C. Inventory
Many companies are adopting lean manufacturing strategies to reduce waste while improving processes as well as
trying to reduce inventory. However, in reality their production processes continue producing to stock due to the
economic benefit. The major reason for choice of make-to-stock or large batch production is because of the significant
setup cost and setup time that might result in lost production and decreased production capacity [14], [15].
The optimal size of the batch can be determined considering many variables such as setup times, setup costs, forecasts
of demand, costs for inventory, process time and so on [9].
The batch size or run size, Qi, for product i is calculated from:
= (1)
where X is the number of cycles per week.
The total amount of time required to produce a single batch of each product in one cycle is then calculated from:
= ∑( + ), i=1,n (2)
The ratio Qi/pi is measured in hours since Qi is a production lot size divided by pi, the hourly production rate for
product i, and is equal to the number of hours to produce lot Qi [7].
The required scheduled hours per week, ts, is then derived from:
= ∑( + ) , i=1,n. (3)
We can now calculate maximum inventory (Bi) for part i:
= (1 − ), (4)
where ui is the hourly customer usage rate for product i and it is determined from:
= . (5)
Total annual cost is now defined as the sum of the three cost components:
Total annual cost= Annual cost of production labour +Annual cost of changeover +Annual cost of inventory,
where annual cost of production labour is:
Annual cost of direct production labour = ∑( ), i=1,n. (6)
We should caution that the above cost may not be realistic due to possible idle time where the required weekly
scheduled hours (ts) is less than the maximum allowable weekly hours (tmax) and workers must be paid due to
International Journal of Innovative Research in Advanced Engineering (IJIRAE) ISSN: 2349-2163
Volume 1 Issue 6 (July 2014) http://ijirae.com
_________________________________________________________________________________________________
© 2014, IJIRAE- All Rights Reserved Page - 58
contractual agreement, service, maintenance, etc. [2], which depends on the number of hours the facility is operating per
working day. The annual cost of changeover is obtained from = ∑( + ), i=1,n
and annual cost of inventory is equal to:
Annual cost of inventory = Annual cost (Average maximum inventory+ Average unbalanced inventory + safety stocks),
where the unbalanced inventory for part i is as follows:
=
( )
,				 			 <	
0,																					 ℎ
. (7)
For example:
= 96,			 = 120,						 = 6000
= (120 − 96)
6000
120
= 1200
Finally, the annual cost of inventory is calculated as follows [3]:
Annual cost of inventory= ∑ ( 1 − + ) + , i=1,n. (8).
Where the notations represents:
- X =Number of cycles per week.
- di =Weekly customer requirements (demand) for product i.
- pi= Hourly production rate for product i. This represents the average of good products produced per hour when
the system/machine that is being scheduled is running. It should not include time lost for changeovers.
- Ssi= Safety stock for product i.
- Li = Number of operators required for producing product i.
- Si= Setup (changeover) time (hours) for product i. The time interval from the last good product produced on the
outgoing product to the first good product run in the incoming product. This should be the combination of
changeover time plus the time required to start producing the first good part.
- Sai= Additional changeover (labour-hours) for product i. This can include both direct and indirect labour and/or
salary hours dedicated to completing a changeover in addition to operators.
- Ci= Inventory value of product i.
- Icap= Cost of capital. This is sum of all quantities: cost of capital plus taxes and insurance plus cost of storage
plus cost of breakage plus cost of spoilage.
- tmax =Maximum weekly hours available for production. This is the maximum scheduled operating hours
available for production and changeover based on management directives, contractual agreements, etc.
- tc= Customer weekly work hours. This represents the production hours that are to be worked by the customer or
the next operation.
- W= Hourly wage. This is the average wage (including benefits, overtime, etc.) that is paid to production
operators and support personnel (skilled trades) required to be present during the production for the
system/machine being scheduled.
- N= Number of working weeks per year.
- n= Number of different products i=1, 2, . . . ,N.
- Imax= Maximum total allowable inventory. This represents any constraint that is required on the level of total
inventory for the system/machine being scheduled. This could be as a result of space limitations, management
directive, rack constraints, preventative maintenance requirements or perhaps other reasons.
- Qi= Scheduled lot (batch size) for product i. This is the amount to be produced in each cycle for product i.
In Delmia Quest software, we consider the inventory (stocks) the parts on the buffers [1]. Buffers in Quest are used to
represent the locations where are stored or where they queue to get to other resources such as machines. A buffer might
thus represent a storage location in a warehouse, the hopper or buffer feeding parts into a machine or a queue for
customers waiting in a bank.
The Initial Stock button allows us to set the numbers and classes of parts that are already present in the buffer when
the model run begins. The default is zero. This parameter allows a buffer to begin with any number of any part classes
that has been defined in the model [6].
International Journal of Innovative Research in Advanced Engineering (IJIRAE) ISSN: 2349-2163
Volume 1 Issue 6 (July 2014) http://ijirae.com
_________________________________________________________________________________________________
© 2014, IJIRAE- All Rights Reserved Page - 59
Fig. 12 Buffers – State Times in U shape
D. Costing
Manufacturing cost has two classify methods. The first one classifies the manufacturing cost into fixed costs and
variable costs. The second separates manufacturing cost into: (1) direct labor, (2) material, and (3) overhead. Cost
Macros is used to analyze the running cost of various resources in a system after running a simulation and to calculate the
product cost of a system. These macros calculate the cost of the product based on the principle of ABC (Activity Based
Costing) [6]. For example, we made the cost analysis for five machines in U shape model using Delmia Quest software.
TABLE I
COST ANALYSIS REPORT
COST ANALYSIS REPORT – Machines
Element name : Machine1_1
Total Cost : $ 53.60199
Variable Cost : $ 48.465
Fixed Cost : $ 5.136986
Power : $ 3.3
Coolant : $ 0.165
Labor : $ 45
Maint : $ 0
Setup : $ 0
Element name : Machine2_1
Total Cost : $ 53.02449
Variable Cost : $ 47.8875
Fixed Cost : $ 5.136986
Power : $ 2.75
Coolant : $ 0.1375
Labor : $ 45
Maint : $ 0
Setup : $ 0
Element name : Machine3_1
Total Cost : $ 57.04948
Variable Cost : $ 51.91249
Fixed Cost : $ 5.136986
Power : $ 6.583333
Coolant : $ 0.3291667
Labor : $ 45
Maint : $ 0
Setup : $ 0
Element name : Machine4_1
Total Cost : $ 52.43678
Variable Cost : $ 47.29979
Fixed Cost : $ 5.136986
Power : $ 2.190278
Coolant : $ 0.1095139
Labor : $ 45
Maint : $ 0
Setup : $ 0
Element name : Machine5_1
Total Cost : $ 54.39767
Variable Cost : $ 49.26068
Fixed Cost : $ 5.136986
Power : $ 3.283333
Coolant : $ 0.1773535
Labor : $ 45
Maint : $ 0.8
Setup : $ 0
MODEL: Ucosting.mdl
Run Time : 8.999998Hour
0
100
200
300
400
500
600
Buffer1_1
Buffer2_1
Buffer3_1
Buffer4_1
Buffer5_1
State Times Idle State Times Busy - Processing
State Times Blocked - Wait Block
International Journal of Innovative Research in Advanced Engineering (IJIRAE) ISSN: 2349-2163
Volume 1 Issue 6 (July 2014) http://ijirae.com
_________________________________________________________________________________________________
© 2014, IJIRAE- All Rights Reserved Page - 60
Fig. 13 Cost analysis –Machines- in U shape
IV.CONCLUSIONS
The aim of this article is to analyse and manage the manufacturing flows in different configuration of cells, in order to
improve the productivity, to reduce the costs and to obtain required stocks where we have a series production. By using
simulation in Quest not only one variable at the time could be tested but also how combined changes affected the
production. The ability to test and measure the results that followed often lead to the discovery of other things to
improve. After a while the ability to forecast the effects of the changes increased. At the end of the project it was
surprisingly easy to predict how the system and the number of parts produced would respond to different changes. Quest
gives the ability to use graphs and charts to visualize almost any data imaginable from the cell. With the right model it
will only take a few seconds to get the same information that would take days or even years to measure out of the actual
production cell.
REFERENCES
[1] Ahmed El-Bouri and Subrahmanya Nairy, An investigation of cooperative dispatching for minimising mean
flowtime in a finite-buffer-capacity dynamic flowshop, International Journal of Production Research Vol. 49, No. 6,
15 March 2011, 1785–1800
[2] Bram Desmea, El-Houssaine Aghezzaf and Hendrik Vanmaele, Safety stock optimisation in two-echelon assembly
systems: normal approximation models, International Journal of Production Research Vol. 48, No. 19, 1 October
2010, 5767–5781
[3] Brander, P., 2005. Inventory control and scheduling problems in a single-machine multi-item system, Thesis
(Doctoral), Lulea, University of Technology. http://epubl.luth.se/1402-1544/2005/55/LTU-DT-0555-SE.pdf
[4] C.E. Betterton and S.J. Silver, Detecting bottlenecks in serial production lines – a focus on interdeparture time
variance, International Journal of Production Research, Vol. 50, No. 15, 1 August 2012, 4158–4174
[5] Can Wang, Changhua Qiu, Virtual Simulation of the Job Shop Scheduling System Based on Delmia/QUEST, 2008
Asia Simulation Conference — 7th Intl. Conf. on Sys. Simulation and Scientific Computing
[6] Dassault Systems, 2009. Quest Tutorial, Edition K, p.12-2 – 12-8.
[7] Horman Michael J. and H. Randolph Thomas, Role of Inventory Buffers in Construction Labor Performance,
Journal of Construction Engineering and Management July 2005
[8] Hu Lu,, Xia Liu, Wei Pang, Wenhua Ye and Bisheng Wei, Modeling and Simulation of Aircraft Assembly Line
Based on Quest, Advanced Materials Research Vol. 569 (2012) pp 666-669 Online available since 2012/Sep/28 at
www.scientific.net
[9] Jing Li, Wei Liu, Simulation of stock strategies in dynamic supply chains, Advanced Materials Research Vols. 472-
475 (2012) pp 3251-3257, Online available since 2012/Feb/27 at www.scientific.net
[10] Kendal K., Mangin C. et.al, Applied Science and Manufacturing, Vol. 7(1998),p.711 -720
[11] Kingstam P, Cullander P, Computers in Industry, Vol. 38(5) (1999),p.173 -186.
$-
$5
$10
$15
$20
$25
$30
$35
$40
$45
$50
$55
$60
Total Cost
VariableCost
Fixed Cost
International Journal of Innovative Research in Advanced Engineering (IJIRAE) ISSN: 2349-2163
Volume 1 Issue 6 (July 2014) http://ijirae.com
_________________________________________________________________________________________________
© 2014, IJIRAE- All Rights Reserved Page - 61
[12] Norhidayah M., Yupiter H.M., Roseleena J., Shaharudin A.,and Erry Y.A., Development of virtual assembly layout
with modeling languages approach and Simulation using Delmia Quest, IIUM Engineering Journal, Vol. 13, No. 1,
2011
[13] Salleh Noor Azlina Mohd, Salmiah Kasolang, Ahmed Jaffar, Simulation of Integrated Total Quality Management
(TQM) with Lean Manufacturing (LM) Practices in Forming Process Using Delmia Quest, Procedia Engineering
41 ( 2012 ) 1702 – 1707, www.sciencedirect.com
[14] Shahram Taja, Galia Novakova Nedeltchevab, George Pfeilc and Michael Roumayad, A spread-sheet model for
efficient production and scheduling of a manufacturing line/cell, International Journal of Production Research Vol.
50, No. 4, 15 February 2012, 1141–1154
[15] Shib Sankar Sana, Preventive maintenance and optimal buffer inventory for products sold with warranty in an
imperfect production system, International Journal of Production Research, Vol. 50, No. 23, 1 December 2012,
6763–6774
[16] Soumya Raghavendra Rao, Design and simulation of roadway development operations to improve productivity,
University of Wollongong, Research Online, 2010
[17] Technical Note Five, Facility layout, http://home.snc.edu/eliotelfner/333/facility%20layout.pdf
[18] Xiaohong Suo, Facility Layout, China Institute of Industrial Relations, Beijing, P.R.China
http://cdn.intechopen.com/pdfs-wm/36421.pdf
[19] Yanyan Zhang,Cheng Su,Yong Shang and Zhongxue Li, Service Rate Optimization of Manufacturing Cell Based
on Cost Model, Advanced Materials Research Vols. 314-316 (2011) pp 2055-205, Online available since
2011/Aug/16 at www.scientific.net
[20] Zhang Li, Guo Jia, Liu Chun, Ma Yupeng, Mechanical Engineer, Vol. 01 (2011), pp.48-50,
http://dx.doi.org/10.3901/JME.2011.12.048

More Related Content

What's hot

Bioprocess simulation
Bioprocess simulationBioprocess simulation
Bioprocess simulation
mohit kumar
 
Smart Factory Report
Smart Factory ReportSmart Factory Report
Smart Factory Report
Viswajit Mani Kumar Koyada
 
IJREI_Selection model for material handling equipment’s used in flexible manu...
IJREI_Selection model for material handling equipment’s used in flexible manu...IJREI_Selection model for material handling equipment’s used in flexible manu...
IJREI_Selection model for material handling equipment’s used in flexible manu...
Husain Mehdi
 
Cn4301514523
Cn4301514523Cn4301514523
Cn4301514523
IJERA Editor
 
Mechanical design and taboos of mechanical design
Mechanical design and taboos of mechanical designMechanical design and taboos of mechanical design
Mechanical design and taboos of mechanical design
JasmineHL
 
An Algorithm Based Simulation Modeling For Control of Production Systems
An Algorithm Based Simulation Modeling For Control of Production SystemsAn Algorithm Based Simulation Modeling For Control of Production Systems
An Algorithm Based Simulation Modeling For Control of Production Systems
IJMER
 
Modelling of Training Simulator for Steam Cracker Operators
Modelling of Training Simulator for Steam Cracker OperatorsModelling of Training Simulator for Steam Cracker Operators
Modelling of Training Simulator for Steam Cracker Operators
Risman Hatibi
 
Bo24437446
Bo24437446Bo24437446
Bo24437446
IJERA Editor
 
Planning and Scheduling of a Corrugated Cardboard Manufacturing Process in IoT
Planning and Scheduling of a Corrugated Cardboard Manufacturing Process in IoTPlanning and Scheduling of a Corrugated Cardboard Manufacturing Process in IoT
Planning and Scheduling of a Corrugated Cardboard Manufacturing Process in IoT
ijtsrd
 
Pro Model
Pro ModelPro Model
Application of Analytical HIERARACHY Process in Industries
Application of Analytical HIERARACHY Process in IndustriesApplication of Analytical HIERARACHY Process in Industries
Application of Analytical HIERARACHY Process in Industries
IJMER
 
GEOMETRIC MODELING FOR PLANT LAYOUT
GEOMETRIC MODELING FOR PLANT LAYOUTGEOMETRIC MODELING FOR PLANT LAYOUT
GEOMETRIC MODELING FOR PLANT LAYOUT
సుధీర్ నెలకుదిటి
 
IRJET- Optimization of Machining Facility Layout by using Simulation: Cas...
IRJET-  	  Optimization of Machining Facility Layout by using Simulation: Cas...IRJET-  	  Optimization of Machining Facility Layout by using Simulation: Cas...
IRJET- Optimization of Machining Facility Layout by using Simulation: Cas...
IRJET Journal
 
INDUSTRIAL ENGINEERING 2 nd module
INDUSTRIAL ENGINEERING 2 nd moduleINDUSTRIAL ENGINEERING 2 nd module
INDUSTRIAL ENGINEERING 2 nd module
Jim Alex
 

What's hot (14)

Bioprocess simulation
Bioprocess simulationBioprocess simulation
Bioprocess simulation
 
Smart Factory Report
Smart Factory ReportSmart Factory Report
Smart Factory Report
 
IJREI_Selection model for material handling equipment’s used in flexible manu...
IJREI_Selection model for material handling equipment’s used in flexible manu...IJREI_Selection model for material handling equipment’s used in flexible manu...
IJREI_Selection model for material handling equipment’s used in flexible manu...
 
Cn4301514523
Cn4301514523Cn4301514523
Cn4301514523
 
Mechanical design and taboos of mechanical design
Mechanical design and taboos of mechanical designMechanical design and taboos of mechanical design
Mechanical design and taboos of mechanical design
 
An Algorithm Based Simulation Modeling For Control of Production Systems
An Algorithm Based Simulation Modeling For Control of Production SystemsAn Algorithm Based Simulation Modeling For Control of Production Systems
An Algorithm Based Simulation Modeling For Control of Production Systems
 
Modelling of Training Simulator for Steam Cracker Operators
Modelling of Training Simulator for Steam Cracker OperatorsModelling of Training Simulator for Steam Cracker Operators
Modelling of Training Simulator for Steam Cracker Operators
 
Bo24437446
Bo24437446Bo24437446
Bo24437446
 
Planning and Scheduling of a Corrugated Cardboard Manufacturing Process in IoT
Planning and Scheduling of a Corrugated Cardboard Manufacturing Process in IoTPlanning and Scheduling of a Corrugated Cardboard Manufacturing Process in IoT
Planning and Scheduling of a Corrugated Cardboard Manufacturing Process in IoT
 
Pro Model
Pro ModelPro Model
Pro Model
 
Application of Analytical HIERARACHY Process in Industries
Application of Analytical HIERARACHY Process in IndustriesApplication of Analytical HIERARACHY Process in Industries
Application of Analytical HIERARACHY Process in Industries
 
GEOMETRIC MODELING FOR PLANT LAYOUT
GEOMETRIC MODELING FOR PLANT LAYOUTGEOMETRIC MODELING FOR PLANT LAYOUT
GEOMETRIC MODELING FOR PLANT LAYOUT
 
IRJET- Optimization of Machining Facility Layout by using Simulation: Cas...
IRJET-  	  Optimization of Machining Facility Layout by using Simulation: Cas...IRJET-  	  Optimization of Machining Facility Layout by using Simulation: Cas...
IRJET- Optimization of Machining Facility Layout by using Simulation: Cas...
 
INDUSTRIAL ENGINEERING 2 nd module
INDUSTRIAL ENGINEERING 2 nd moduleINDUSTRIAL ENGINEERING 2 nd module
INDUSTRIAL ENGINEERING 2 nd module
 

Viewers also liked

โครงงานคอมพิวเตอร์
โครงงานคอมพิวเตอร์ โครงงานคอมพิวเตอร์
โครงงานคอมพิวเตอร์
Sivakorn Pratoomphithak
 
Portfolio
PortfolioPortfolio
Portfolio
Teoh Kok Teong
 
Webapp on AWS
Webapp on AWSWebapp on AWS
Webapp on AWS
Freeman Zhang
 
SEDIMENT QUALITY ASSESSMENT OF AVARAGERE LAKE, DAVANAGERE CITY - A CASE STUDY
SEDIMENT QUALITY ASSESSMENT OF AVARAGERE LAKE, DAVANAGERE CITY - A CASE STUDYSEDIMENT QUALITY ASSESSMENT OF AVARAGERE LAKE, DAVANAGERE CITY - A CASE STUDY
SEDIMENT QUALITY ASSESSMENT OF AVARAGERE LAKE, DAVANAGERE CITY - A CASE STUDY
AM Publications
 
Derechos Humanos
Derechos HumanosDerechos Humanos
Derechos Humanos
Nidia Tsukanka
 
Stigma and its impact on the quality of life in people living with hiv aids i...
Stigma and its impact on the quality of life in people living with hiv aids i...Stigma and its impact on the quality of life in people living with hiv aids i...
Stigma and its impact on the quality of life in people living with hiv aids i...
PinHealth
 
Cosmic adventure 5.9 Length Contraction at Rest in Visonics
Cosmic adventure 5.9 Length Contraction at Rest in VisonicsCosmic adventure 5.9 Length Contraction at Rest in Visonics
Cosmic adventure 5.9 Length Contraction at Rest in Visonics
Stephen Kwong
 
What are the 5 Healthy Snacks to Eat at Work?
What are the 5 Healthy Snacks to Eat at Work?What are the 5 Healthy Snacks to Eat at Work?
What are the 5 Healthy Snacks to Eat at Work?
Health Care At Home India
 
Him director performance appraisal
Him director performance appraisalHim director performance appraisal
Him director performance appraisal
BigBang789
 
Cosmic Adventure 4.5 Proving the Lights
Cosmic Adventure 4.5 Proving the LightsCosmic Adventure 4.5 Proving the Lights
Cosmic Adventure 4.5 Proving the Lights
Stephen Kwong
 
сборник практик ИКЦ
сборник практик ИКЦсборник практик ИКЦ
сборник практик ИКЦ
altaicpp
 
Gradient [PRESSKIT Version 2]
Gradient [PRESSKIT Version 2]Gradient [PRESSKIT Version 2]
Gradient [PRESSKIT Version 2]
Chris O
 
Students conceptions of mathematics
Students conceptions of mathematicsStudents conceptions of mathematics
Students conceptions of mathematics
EPDLC
 
Midday assistant performance appraisal
Midday assistant performance appraisalMidday assistant performance appraisal
Midday assistant performance appraisal
EmmanuelPetit678
 
Florida lawmakers pass $78 billion state budget | Reuters
Florida lawmakers pass $78 billion state budget
| ReutersFlorida lawmakers pass $78 billion state budget
| Reuters
Florida lawmakers pass $78 billion state budget | Reuters
earsplittingfur8
 
Apartments Dubrovnik
Apartments DubrovnikApartments Dubrovnik
Apartments Dubrovnik
viaCroatia.com
 

Viewers also liked (17)

โครงงานคอมพิวเตอร์
โครงงานคอมพิวเตอร์ โครงงานคอมพิวเตอร์
โครงงานคอมพิวเตอร์
 
Portfolio
PortfolioPortfolio
Portfolio
 
Webapp on AWS
Webapp on AWSWebapp on AWS
Webapp on AWS
 
SEDIMENT QUALITY ASSESSMENT OF AVARAGERE LAKE, DAVANAGERE CITY - A CASE STUDY
SEDIMENT QUALITY ASSESSMENT OF AVARAGERE LAKE, DAVANAGERE CITY - A CASE STUDYSEDIMENT QUALITY ASSESSMENT OF AVARAGERE LAKE, DAVANAGERE CITY - A CASE STUDY
SEDIMENT QUALITY ASSESSMENT OF AVARAGERE LAKE, DAVANAGERE CITY - A CASE STUDY
 
Derechos Humanos
Derechos HumanosDerechos Humanos
Derechos Humanos
 
Stigma and its impact on the quality of life in people living with hiv aids i...
Stigma and its impact on the quality of life in people living with hiv aids i...Stigma and its impact on the quality of life in people living with hiv aids i...
Stigma and its impact on the quality of life in people living with hiv aids i...
 
Cosmic adventure 5.9 Length Contraction at Rest in Visonics
Cosmic adventure 5.9 Length Contraction at Rest in VisonicsCosmic adventure 5.9 Length Contraction at Rest in Visonics
Cosmic adventure 5.9 Length Contraction at Rest in Visonics
 
What are the 5 Healthy Snacks to Eat at Work?
What are the 5 Healthy Snacks to Eat at Work?What are the 5 Healthy Snacks to Eat at Work?
What are the 5 Healthy Snacks to Eat at Work?
 
Him director performance appraisal
Him director performance appraisalHim director performance appraisal
Him director performance appraisal
 
Cosmic Adventure 4.5 Proving the Lights
Cosmic Adventure 4.5 Proving the LightsCosmic Adventure 4.5 Proving the Lights
Cosmic Adventure 4.5 Proving the Lights
 
сборник практик ИКЦ
сборник практик ИКЦсборник практик ИКЦ
сборник практик ИКЦ
 
Gradient [PRESSKIT Version 2]
Gradient [PRESSKIT Version 2]Gradient [PRESSKIT Version 2]
Gradient [PRESSKIT Version 2]
 
Students conceptions of mathematics
Students conceptions of mathematicsStudents conceptions of mathematics
Students conceptions of mathematics
 
Midday assistant performance appraisal
Midday assistant performance appraisalMidday assistant performance appraisal
Midday assistant performance appraisal
 
Florida lawmakers pass $78 billion state budget | Reuters
Florida lawmakers pass $78 billion state budget
| ReutersFlorida lawmakers pass $78 billion state budget
| Reuters
Florida lawmakers pass $78 billion state budget | Reuters
 
Apartments Dubrovnik
Apartments DubrovnikApartments Dubrovnik
Apartments Dubrovnik
 
Presentation1
Presentation1Presentation1
Presentation1
 

Similar to Improving layout and workload of manufacturing system using Delmia Quest simulation and inventory approach

Implementation and Selection of Optimum Layout Design in Cellular Manufacturi...
Implementation and Selection of Optimum Layout Design in Cellular Manufacturi...Implementation and Selection of Optimum Layout Design in Cellular Manufacturi...
Implementation and Selection of Optimum Layout Design in Cellular Manufacturi...
AM Publications
 
Cellular manufacturing
Cellular manufacturingCellular manufacturing
Cellular manufacturing
Kealeboga Mogapi
 
Optimizing Facility Layout Through Simulation
Optimizing Facility Layout Through SimulationOptimizing Facility Layout Through Simulation
Optimizing Facility Layout Through Simulation
IRJET Journal
 
Introduction to System, Simulation and Model
Introduction to System, Simulation and ModelIntroduction to System, Simulation and Model
Introduction to System, Simulation and Model
Md. Hasan Imam Bijoy
 
Value stream mapping using simulation with ARENA
Value stream mapping using simulation with ARENAValue stream mapping using simulation with ARENA
Value stream mapping using simulation with ARENA
hrishik26
 
Simulation.pptx
Simulation.pptxSimulation.pptx
Simulation.pptx
AadeshkumarBhosale
 
Quasi-Static Evaluation of a Modular and Reconfigurable Manufacturing Cell
Quasi-Static Evaluation of a Modular and Reconfigurable Manufacturing CellQuasi-Static Evaluation of a Modular and Reconfigurable Manufacturing Cell
Quasi-Static Evaluation of a Modular and Reconfigurable Manufacturing Cell
Hillary Green
 
IRJET- A Comprehensive Outline of the Types of Simulation
IRJET- A Comprehensive Outline of the Types of SimulationIRJET- A Comprehensive Outline of the Types of Simulation
IRJET- A Comprehensive Outline of the Types of Simulation
IRJET Journal
 
Group technolog1 assegment
Group technolog1 assegmentGroup technolog1 assegment
Group technolog1 assegment
Said Yakubu Issahaku
 
A WORKSPACE SIMULATION FOR TAL TR-2 ARTICULATED ROBOT
A WORKSPACE SIMULATION FOR TAL TR-2 ARTICULATED ROBOT A WORKSPACE SIMULATION FOR TAL TR-2 ARTICULATED ROBOT
A WORKSPACE SIMULATION FOR TAL TR-2 ARTICULATED ROBOT
IAEME Publication
 
Unit 6 Simulation.pptx
Unit 6 Simulation.pptxUnit 6 Simulation.pptx
Unit 6 Simulation.pptx
Hafiz20006
 
Designing, implementation, evolution and execution of an intelligent manufact...
Designing, implementation, evolution and execution of an intelligent manufact...Designing, implementation, evolution and execution of an intelligent manufact...
Designing, implementation, evolution and execution of an intelligent manufact...
ijmech
 
SIMULATION
SIMULATIONSIMULATION
SIMULATION
Eminent Planners
 
Evaluation of the Process of Attention using the Simulation of Processes
Evaluation of the Process of Attention using the Simulation of ProcessesEvaluation of the Process of Attention using the Simulation of Processes
Evaluation of the Process of Attention using the Simulation of Processes
ijtsrd
 
Strategy for Social Media MK Plan by Slidesgo.pptx
Strategy for Social Media MK Plan by Slidesgo.pptxStrategy for Social Media MK Plan by Slidesgo.pptx
Strategy for Social Media MK Plan by Slidesgo.pptx
jshwyi
 
Lecture 1 - Introduction to Simulation Edited.ppt
Lecture 1 - Introduction to Simulation Edited.pptLecture 1 - Introduction to Simulation Edited.ppt
Lecture 1 - Introduction to Simulation Edited.ppt
FahimAhmed233860
 
Predicting Machine Learning Pipeline Runtimes in the Context of Automated Mac...
Predicting Machine Learning Pipeline Runtimes in the Context of Automated Mac...Predicting Machine Learning Pipeline Runtimes in the Context of Automated Mac...
Predicting Machine Learning Pipeline Runtimes in the Context of Automated Mac...
IRJET Journal
 
RESEARCH ON PLANT LAYOUT AND PRODUCTION LINE RUNNING SIMULATION IN PISTON FAC...
RESEARCH ON PLANT LAYOUT AND PRODUCTION LINE RUNNING SIMULATION IN PISTON FAC...RESEARCH ON PLANT LAYOUT AND PRODUCTION LINE RUNNING SIMULATION IN PISTON FAC...
RESEARCH ON PLANT LAYOUT AND PRODUCTION LINE RUNNING SIMULATION IN PISTON FAC...
IAEME Publication
 
30120140504022
3012014050402230120140504022
30120140504022
IAEME Publication
 
Literature-survey
Literature-surveyLiterature-survey
Literature-survey
Deepu Rajan
 

Similar to Improving layout and workload of manufacturing system using Delmia Quest simulation and inventory approach (20)

Implementation and Selection of Optimum Layout Design in Cellular Manufacturi...
Implementation and Selection of Optimum Layout Design in Cellular Manufacturi...Implementation and Selection of Optimum Layout Design in Cellular Manufacturi...
Implementation and Selection of Optimum Layout Design in Cellular Manufacturi...
 
Cellular manufacturing
Cellular manufacturingCellular manufacturing
Cellular manufacturing
 
Optimizing Facility Layout Through Simulation
Optimizing Facility Layout Through SimulationOptimizing Facility Layout Through Simulation
Optimizing Facility Layout Through Simulation
 
Introduction to System, Simulation and Model
Introduction to System, Simulation and ModelIntroduction to System, Simulation and Model
Introduction to System, Simulation and Model
 
Value stream mapping using simulation with ARENA
Value stream mapping using simulation with ARENAValue stream mapping using simulation with ARENA
Value stream mapping using simulation with ARENA
 
Simulation.pptx
Simulation.pptxSimulation.pptx
Simulation.pptx
 
Quasi-Static Evaluation of a Modular and Reconfigurable Manufacturing Cell
Quasi-Static Evaluation of a Modular and Reconfigurable Manufacturing CellQuasi-Static Evaluation of a Modular and Reconfigurable Manufacturing Cell
Quasi-Static Evaluation of a Modular and Reconfigurable Manufacturing Cell
 
IRJET- A Comprehensive Outline of the Types of Simulation
IRJET- A Comprehensive Outline of the Types of SimulationIRJET- A Comprehensive Outline of the Types of Simulation
IRJET- A Comprehensive Outline of the Types of Simulation
 
Group technolog1 assegment
Group technolog1 assegmentGroup technolog1 assegment
Group technolog1 assegment
 
A WORKSPACE SIMULATION FOR TAL TR-2 ARTICULATED ROBOT
A WORKSPACE SIMULATION FOR TAL TR-2 ARTICULATED ROBOT A WORKSPACE SIMULATION FOR TAL TR-2 ARTICULATED ROBOT
A WORKSPACE SIMULATION FOR TAL TR-2 ARTICULATED ROBOT
 
Unit 6 Simulation.pptx
Unit 6 Simulation.pptxUnit 6 Simulation.pptx
Unit 6 Simulation.pptx
 
Designing, implementation, evolution and execution of an intelligent manufact...
Designing, implementation, evolution and execution of an intelligent manufact...Designing, implementation, evolution and execution of an intelligent manufact...
Designing, implementation, evolution and execution of an intelligent manufact...
 
SIMULATION
SIMULATIONSIMULATION
SIMULATION
 
Evaluation of the Process of Attention using the Simulation of Processes
Evaluation of the Process of Attention using the Simulation of ProcessesEvaluation of the Process of Attention using the Simulation of Processes
Evaluation of the Process of Attention using the Simulation of Processes
 
Strategy for Social Media MK Plan by Slidesgo.pptx
Strategy for Social Media MK Plan by Slidesgo.pptxStrategy for Social Media MK Plan by Slidesgo.pptx
Strategy for Social Media MK Plan by Slidesgo.pptx
 
Lecture 1 - Introduction to Simulation Edited.ppt
Lecture 1 - Introduction to Simulation Edited.pptLecture 1 - Introduction to Simulation Edited.ppt
Lecture 1 - Introduction to Simulation Edited.ppt
 
Predicting Machine Learning Pipeline Runtimes in the Context of Automated Mac...
Predicting Machine Learning Pipeline Runtimes in the Context of Automated Mac...Predicting Machine Learning Pipeline Runtimes in the Context of Automated Mac...
Predicting Machine Learning Pipeline Runtimes in the Context of Automated Mac...
 
RESEARCH ON PLANT LAYOUT AND PRODUCTION LINE RUNNING SIMULATION IN PISTON FAC...
RESEARCH ON PLANT LAYOUT AND PRODUCTION LINE RUNNING SIMULATION IN PISTON FAC...RESEARCH ON PLANT LAYOUT AND PRODUCTION LINE RUNNING SIMULATION IN PISTON FAC...
RESEARCH ON PLANT LAYOUT AND PRODUCTION LINE RUNNING SIMULATION IN PISTON FAC...
 
30120140504022
3012014050402230120140504022
30120140504022
 
Literature-survey
Literature-surveyLiterature-survey
Literature-survey
 

More from AM Publications

DEVELOPMENT OF TODDLER FAMILY CADRE TRAINING BASED ON ANDROID APPLICATIONS IN...
DEVELOPMENT OF TODDLER FAMILY CADRE TRAINING BASED ON ANDROID APPLICATIONS IN...DEVELOPMENT OF TODDLER FAMILY CADRE TRAINING BASED ON ANDROID APPLICATIONS IN...
DEVELOPMENT OF TODDLER FAMILY CADRE TRAINING BASED ON ANDROID APPLICATIONS IN...
AM Publications
 
TESTING OF COMPOSITE ON DROP-WEIGHT IMPACT TESTING AND DAMAGE IDENTIFICATION ...
TESTING OF COMPOSITE ON DROP-WEIGHT IMPACT TESTING AND DAMAGE IDENTIFICATION ...TESTING OF COMPOSITE ON DROP-WEIGHT IMPACT TESTING AND DAMAGE IDENTIFICATION ...
TESTING OF COMPOSITE ON DROP-WEIGHT IMPACT TESTING AND DAMAGE IDENTIFICATION ...
AM Publications
 
THE USE OF FRACTAL GEOMETRY IN TILING MOTIF DESIGN
THE USE OF FRACTAL GEOMETRY IN TILING MOTIF DESIGNTHE USE OF FRACTAL GEOMETRY IN TILING MOTIF DESIGN
THE USE OF FRACTAL GEOMETRY IN TILING MOTIF DESIGN
AM Publications
 
TWO-DIMENSIONAL INVERSION FINITE ELEMENT MODELING OF MAGNETOTELLURIC DATA: CA...
TWO-DIMENSIONAL INVERSION FINITE ELEMENT MODELING OF MAGNETOTELLURIC DATA: CA...TWO-DIMENSIONAL INVERSION FINITE ELEMENT MODELING OF MAGNETOTELLURIC DATA: CA...
TWO-DIMENSIONAL INVERSION FINITE ELEMENT MODELING OF MAGNETOTELLURIC DATA: CA...
AM Publications
 
USING THE GENETIC ALGORITHM TO OPTIMIZE LASER WELDING PARAMETERS FOR MARTENSI...
USING THE GENETIC ALGORITHM TO OPTIMIZE LASER WELDING PARAMETERS FOR MARTENSI...USING THE GENETIC ALGORITHM TO OPTIMIZE LASER WELDING PARAMETERS FOR MARTENSI...
USING THE GENETIC ALGORITHM TO OPTIMIZE LASER WELDING PARAMETERS FOR MARTENSI...
AM Publications
 
ANALYSIS AND DESIGN E-MARKETPLACE FOR MICRO, SMALL AND MEDIUM ENTERPRISES
ANALYSIS AND DESIGN E-MARKETPLACE FOR MICRO, SMALL AND MEDIUM ENTERPRISESANALYSIS AND DESIGN E-MARKETPLACE FOR MICRO, SMALL AND MEDIUM ENTERPRISES
ANALYSIS AND DESIGN E-MARKETPLACE FOR MICRO, SMALL AND MEDIUM ENTERPRISES
AM Publications
 
REMOTE SENSING AND GEOGRAPHIC INFORMATION SYSTEMS
REMOTE SENSING AND GEOGRAPHIC INFORMATION SYSTEMS REMOTE SENSING AND GEOGRAPHIC INFORMATION SYSTEMS
REMOTE SENSING AND GEOGRAPHIC INFORMATION SYSTEMS
AM Publications
 
EVALUATE THE STRAIN ENERGY ERROR FOR THE LASER WELD BY THE H-REFINEMENT OF TH...
EVALUATE THE STRAIN ENERGY ERROR FOR THE LASER WELD BY THE H-REFINEMENT OF TH...EVALUATE THE STRAIN ENERGY ERROR FOR THE LASER WELD BY THE H-REFINEMENT OF TH...
EVALUATE THE STRAIN ENERGY ERROR FOR THE LASER WELD BY THE H-REFINEMENT OF TH...
AM Publications
 
HMM APPLICATION IN ISOLATED WORD SPEECH RECOGNITION
HMM APPLICATION IN ISOLATED WORD SPEECH RECOGNITIONHMM APPLICATION IN ISOLATED WORD SPEECH RECOGNITION
HMM APPLICATION IN ISOLATED WORD SPEECH RECOGNITION
AM Publications
 
PEDESTRIAN DETECTION IN LOW RESOLUTION VIDEOS USING A MULTI-FRAME HOG-BASED D...
PEDESTRIAN DETECTION IN LOW RESOLUTION VIDEOS USING A MULTI-FRAME HOG-BASED D...PEDESTRIAN DETECTION IN LOW RESOLUTION VIDEOS USING A MULTI-FRAME HOG-BASED D...
PEDESTRIAN DETECTION IN LOW RESOLUTION VIDEOS USING A MULTI-FRAME HOG-BASED D...
AM Publications
 
INTELLIGENT BLIND STICK
INTELLIGENT BLIND STICKINTELLIGENT BLIND STICK
INTELLIGENT BLIND STICK
AM Publications
 
EFFECT OF SILICON - RUBBER (SR) SHEETS AS AN ALTERNATIVE FILTER ON HIGH AND L...
EFFECT OF SILICON - RUBBER (SR) SHEETS AS AN ALTERNATIVE FILTER ON HIGH AND L...EFFECT OF SILICON - RUBBER (SR) SHEETS AS AN ALTERNATIVE FILTER ON HIGH AND L...
EFFECT OF SILICON - RUBBER (SR) SHEETS AS AN ALTERNATIVE FILTER ON HIGH AND L...
AM Publications
 
UTILIZATION OF IMMUNIZATION SERVICES AMONG CHILDREN UNDER FIVE YEARS OF AGE I...
UTILIZATION OF IMMUNIZATION SERVICES AMONG CHILDREN UNDER FIVE YEARS OF AGE I...UTILIZATION OF IMMUNIZATION SERVICES AMONG CHILDREN UNDER FIVE YEARS OF AGE I...
UTILIZATION OF IMMUNIZATION SERVICES AMONG CHILDREN UNDER FIVE YEARS OF AGE I...
AM Publications
 
REPRESENTATION OF THE BLOCK DATA ENCRYPTION ALGORITHM IN AN ANALYTICAL FORM F...
REPRESENTATION OF THE BLOCK DATA ENCRYPTION ALGORITHM IN AN ANALYTICAL FORM F...REPRESENTATION OF THE BLOCK DATA ENCRYPTION ALGORITHM IN AN ANALYTICAL FORM F...
REPRESENTATION OF THE BLOCK DATA ENCRYPTION ALGORITHM IN AN ANALYTICAL FORM F...
AM Publications
 
OPTICAL CHARACTER RECOGNITION USING RBFNN
OPTICAL CHARACTER RECOGNITION USING RBFNNOPTICAL CHARACTER RECOGNITION USING RBFNN
OPTICAL CHARACTER RECOGNITION USING RBFNN
AM Publications
 
DETECTION OF MOVING OBJECT
DETECTION OF MOVING OBJECTDETECTION OF MOVING OBJECT
DETECTION OF MOVING OBJECT
AM Publications
 
SIMULATION OF ATMOSPHERIC POLLUTANTS DISPERSION IN AN URBAN ENVIRONMENT
SIMULATION OF ATMOSPHERIC POLLUTANTS DISPERSION IN AN URBAN ENVIRONMENTSIMULATION OF ATMOSPHERIC POLLUTANTS DISPERSION IN AN URBAN ENVIRONMENT
SIMULATION OF ATMOSPHERIC POLLUTANTS DISPERSION IN AN URBAN ENVIRONMENT
AM Publications
 
PREPARATION AND EVALUATION OF WOOL KERATIN BASED CHITOSAN NANOFIBERS FOR AIR ...
PREPARATION AND EVALUATION OF WOOL KERATIN BASED CHITOSAN NANOFIBERS FOR AIR ...PREPARATION AND EVALUATION OF WOOL KERATIN BASED CHITOSAN NANOFIBERS FOR AIR ...
PREPARATION AND EVALUATION OF WOOL KERATIN BASED CHITOSAN NANOFIBERS FOR AIR ...
AM Publications
 
ANALYSIS ON LOAD BALANCING ALGORITHMS IMPLEMENTATION ON CLOUD COMPUTING ENVIR...
ANALYSIS ON LOAD BALANCING ALGORITHMS IMPLEMENTATION ON CLOUD COMPUTING ENVIR...ANALYSIS ON LOAD BALANCING ALGORITHMS IMPLEMENTATION ON CLOUD COMPUTING ENVIR...
ANALYSIS ON LOAD BALANCING ALGORITHMS IMPLEMENTATION ON CLOUD COMPUTING ENVIR...
AM Publications
 
A MODEL BASED APPROACH FOR IMPLEMENTING WLAN SECURITY
A MODEL BASED APPROACH FOR IMPLEMENTING WLAN SECURITY A MODEL BASED APPROACH FOR IMPLEMENTING WLAN SECURITY
A MODEL BASED APPROACH FOR IMPLEMENTING WLAN SECURITY
AM Publications
 

More from AM Publications (20)

DEVELOPMENT OF TODDLER FAMILY CADRE TRAINING BASED ON ANDROID APPLICATIONS IN...
DEVELOPMENT OF TODDLER FAMILY CADRE TRAINING BASED ON ANDROID APPLICATIONS IN...DEVELOPMENT OF TODDLER FAMILY CADRE TRAINING BASED ON ANDROID APPLICATIONS IN...
DEVELOPMENT OF TODDLER FAMILY CADRE TRAINING BASED ON ANDROID APPLICATIONS IN...
 
TESTING OF COMPOSITE ON DROP-WEIGHT IMPACT TESTING AND DAMAGE IDENTIFICATION ...
TESTING OF COMPOSITE ON DROP-WEIGHT IMPACT TESTING AND DAMAGE IDENTIFICATION ...TESTING OF COMPOSITE ON DROP-WEIGHT IMPACT TESTING AND DAMAGE IDENTIFICATION ...
TESTING OF COMPOSITE ON DROP-WEIGHT IMPACT TESTING AND DAMAGE IDENTIFICATION ...
 
THE USE OF FRACTAL GEOMETRY IN TILING MOTIF DESIGN
THE USE OF FRACTAL GEOMETRY IN TILING MOTIF DESIGNTHE USE OF FRACTAL GEOMETRY IN TILING MOTIF DESIGN
THE USE OF FRACTAL GEOMETRY IN TILING MOTIF DESIGN
 
TWO-DIMENSIONAL INVERSION FINITE ELEMENT MODELING OF MAGNETOTELLURIC DATA: CA...
TWO-DIMENSIONAL INVERSION FINITE ELEMENT MODELING OF MAGNETOTELLURIC DATA: CA...TWO-DIMENSIONAL INVERSION FINITE ELEMENT MODELING OF MAGNETOTELLURIC DATA: CA...
TWO-DIMENSIONAL INVERSION FINITE ELEMENT MODELING OF MAGNETOTELLURIC DATA: CA...
 
USING THE GENETIC ALGORITHM TO OPTIMIZE LASER WELDING PARAMETERS FOR MARTENSI...
USING THE GENETIC ALGORITHM TO OPTIMIZE LASER WELDING PARAMETERS FOR MARTENSI...USING THE GENETIC ALGORITHM TO OPTIMIZE LASER WELDING PARAMETERS FOR MARTENSI...
USING THE GENETIC ALGORITHM TO OPTIMIZE LASER WELDING PARAMETERS FOR MARTENSI...
 
ANALYSIS AND DESIGN E-MARKETPLACE FOR MICRO, SMALL AND MEDIUM ENTERPRISES
ANALYSIS AND DESIGN E-MARKETPLACE FOR MICRO, SMALL AND MEDIUM ENTERPRISESANALYSIS AND DESIGN E-MARKETPLACE FOR MICRO, SMALL AND MEDIUM ENTERPRISES
ANALYSIS AND DESIGN E-MARKETPLACE FOR MICRO, SMALL AND MEDIUM ENTERPRISES
 
REMOTE SENSING AND GEOGRAPHIC INFORMATION SYSTEMS
REMOTE SENSING AND GEOGRAPHIC INFORMATION SYSTEMS REMOTE SENSING AND GEOGRAPHIC INFORMATION SYSTEMS
REMOTE SENSING AND GEOGRAPHIC INFORMATION SYSTEMS
 
EVALUATE THE STRAIN ENERGY ERROR FOR THE LASER WELD BY THE H-REFINEMENT OF TH...
EVALUATE THE STRAIN ENERGY ERROR FOR THE LASER WELD BY THE H-REFINEMENT OF TH...EVALUATE THE STRAIN ENERGY ERROR FOR THE LASER WELD BY THE H-REFINEMENT OF TH...
EVALUATE THE STRAIN ENERGY ERROR FOR THE LASER WELD BY THE H-REFINEMENT OF TH...
 
HMM APPLICATION IN ISOLATED WORD SPEECH RECOGNITION
HMM APPLICATION IN ISOLATED WORD SPEECH RECOGNITIONHMM APPLICATION IN ISOLATED WORD SPEECH RECOGNITION
HMM APPLICATION IN ISOLATED WORD SPEECH RECOGNITION
 
PEDESTRIAN DETECTION IN LOW RESOLUTION VIDEOS USING A MULTI-FRAME HOG-BASED D...
PEDESTRIAN DETECTION IN LOW RESOLUTION VIDEOS USING A MULTI-FRAME HOG-BASED D...PEDESTRIAN DETECTION IN LOW RESOLUTION VIDEOS USING A MULTI-FRAME HOG-BASED D...
PEDESTRIAN DETECTION IN LOW RESOLUTION VIDEOS USING A MULTI-FRAME HOG-BASED D...
 
INTELLIGENT BLIND STICK
INTELLIGENT BLIND STICKINTELLIGENT BLIND STICK
INTELLIGENT BLIND STICK
 
EFFECT OF SILICON - RUBBER (SR) SHEETS AS AN ALTERNATIVE FILTER ON HIGH AND L...
EFFECT OF SILICON - RUBBER (SR) SHEETS AS AN ALTERNATIVE FILTER ON HIGH AND L...EFFECT OF SILICON - RUBBER (SR) SHEETS AS AN ALTERNATIVE FILTER ON HIGH AND L...
EFFECT OF SILICON - RUBBER (SR) SHEETS AS AN ALTERNATIVE FILTER ON HIGH AND L...
 
UTILIZATION OF IMMUNIZATION SERVICES AMONG CHILDREN UNDER FIVE YEARS OF AGE I...
UTILIZATION OF IMMUNIZATION SERVICES AMONG CHILDREN UNDER FIVE YEARS OF AGE I...UTILIZATION OF IMMUNIZATION SERVICES AMONG CHILDREN UNDER FIVE YEARS OF AGE I...
UTILIZATION OF IMMUNIZATION SERVICES AMONG CHILDREN UNDER FIVE YEARS OF AGE I...
 
REPRESENTATION OF THE BLOCK DATA ENCRYPTION ALGORITHM IN AN ANALYTICAL FORM F...
REPRESENTATION OF THE BLOCK DATA ENCRYPTION ALGORITHM IN AN ANALYTICAL FORM F...REPRESENTATION OF THE BLOCK DATA ENCRYPTION ALGORITHM IN AN ANALYTICAL FORM F...
REPRESENTATION OF THE BLOCK DATA ENCRYPTION ALGORITHM IN AN ANALYTICAL FORM F...
 
OPTICAL CHARACTER RECOGNITION USING RBFNN
OPTICAL CHARACTER RECOGNITION USING RBFNNOPTICAL CHARACTER RECOGNITION USING RBFNN
OPTICAL CHARACTER RECOGNITION USING RBFNN
 
DETECTION OF MOVING OBJECT
DETECTION OF MOVING OBJECTDETECTION OF MOVING OBJECT
DETECTION OF MOVING OBJECT
 
SIMULATION OF ATMOSPHERIC POLLUTANTS DISPERSION IN AN URBAN ENVIRONMENT
SIMULATION OF ATMOSPHERIC POLLUTANTS DISPERSION IN AN URBAN ENVIRONMENTSIMULATION OF ATMOSPHERIC POLLUTANTS DISPERSION IN AN URBAN ENVIRONMENT
SIMULATION OF ATMOSPHERIC POLLUTANTS DISPERSION IN AN URBAN ENVIRONMENT
 
PREPARATION AND EVALUATION OF WOOL KERATIN BASED CHITOSAN NANOFIBERS FOR AIR ...
PREPARATION AND EVALUATION OF WOOL KERATIN BASED CHITOSAN NANOFIBERS FOR AIR ...PREPARATION AND EVALUATION OF WOOL KERATIN BASED CHITOSAN NANOFIBERS FOR AIR ...
PREPARATION AND EVALUATION OF WOOL KERATIN BASED CHITOSAN NANOFIBERS FOR AIR ...
 
ANALYSIS ON LOAD BALANCING ALGORITHMS IMPLEMENTATION ON CLOUD COMPUTING ENVIR...
ANALYSIS ON LOAD BALANCING ALGORITHMS IMPLEMENTATION ON CLOUD COMPUTING ENVIR...ANALYSIS ON LOAD BALANCING ALGORITHMS IMPLEMENTATION ON CLOUD COMPUTING ENVIR...
ANALYSIS ON LOAD BALANCING ALGORITHMS IMPLEMENTATION ON CLOUD COMPUTING ENVIR...
 
A MODEL BASED APPROACH FOR IMPLEMENTING WLAN SECURITY
A MODEL BASED APPROACH FOR IMPLEMENTING WLAN SECURITY A MODEL BASED APPROACH FOR IMPLEMENTING WLAN SECURITY
A MODEL BASED APPROACH FOR IMPLEMENTING WLAN SECURITY
 

Recently uploaded

Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
MDSABBIROJJAMANPAYEL
 
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
PriyankaKilaniya
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
IJECEIAES
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
KrishnaveniKrishnara1
 
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURSCompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
RamonNovais6
 
Digital Twins Computer Networking Paper Presentation.pptx
Digital Twins Computer Networking Paper Presentation.pptxDigital Twins Computer Networking Paper Presentation.pptx
Digital Twins Computer Networking Paper Presentation.pptx
aryanpankaj78
 
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
MadhavJungKarki
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
kandramariana6
 
morris_worm_intro_and_source_code_analysis_.pdf
morris_worm_intro_and_source_code_analysis_.pdfmorris_worm_intro_and_source_code_analysis_.pdf
morris_worm_intro_and_source_code_analysis_.pdf
ycwu0509
 
Null Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAMNull Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAM
Divyanshu
 
Data Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason WebinarData Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason Webinar
UReason
 
AI for Legal Research with applications, tools
AI for Legal Research with applications, toolsAI for Legal Research with applications, tools
AI for Legal Research with applications, tools
mahaffeycheryld
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
171ticu
 
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
Gino153088
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
ijaia
 
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
Yasser Mahgoub
 
Design and optimization of ion propulsion drone
Design and optimization of ion propulsion droneDesign and optimization of ion propulsion drone
Design and optimization of ion propulsion drone
bjmsejournal
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
bijceesjournal
 
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by AnantLLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
Anant Corporation
 
Curve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods RegressionCurve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods Regression
Nada Hikmah
 

Recently uploaded (20)

Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
 
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
 
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURSCompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
 
Digital Twins Computer Networking Paper Presentation.pptx
Digital Twins Computer Networking Paper Presentation.pptxDigital Twins Computer Networking Paper Presentation.pptx
Digital Twins Computer Networking Paper Presentation.pptx
 
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
 
morris_worm_intro_and_source_code_analysis_.pdf
morris_worm_intro_and_source_code_analysis_.pdfmorris_worm_intro_and_source_code_analysis_.pdf
morris_worm_intro_and_source_code_analysis_.pdf
 
Null Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAMNull Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAM
 
Data Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason WebinarData Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason Webinar
 
AI for Legal Research with applications, tools
AI for Legal Research with applications, toolsAI for Legal Research with applications, tools
AI for Legal Research with applications, tools
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
 
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
 
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
 
Design and optimization of ion propulsion drone
Design and optimization of ion propulsion droneDesign and optimization of ion propulsion drone
Design and optimization of ion propulsion drone
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
 
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by AnantLLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
 
Curve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods RegressionCurve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods Regression
 

Improving layout and workload of manufacturing system using Delmia Quest simulation and inventory approach

  • 1. International Journal of Innovative Research in Advanced Engineering (IJIRAE) ISSN: 2349-2163 Volume 1 Issue 6 (July 2014) http://ijirae.com _________________________________________________________________________________________________ © 2014, IJIRAE- All Rights Reserved Page - 52 Improving layout and workload of manufacturing system using Delmia Quest simulation and inventory approach Elena-Iuliana Gingu (Boteanu) Prof. dr. eng. Miron Zapciu Machine and Manufacturing Systems Department, Machine and Manufacturing Systems Department, POLITEHNICA University of Bucharest POLITEHNICA University of Bucharest Abstract—This paper describes a case study of analysis and optimization of the facility layout in a manufacturing cell using a systematic search method and a Quest computer simulation model with graphical representation of the manufacturing processes. The simulation model objective was to obtain Layout design to achieve a high productivity in the flexible manufacturing system (FMS), to determine bottleneck locations and what the optimal batch size should be. The Quest software proved to be a powerful tool in assessing what changes should be made to a manufacturing cell before incurring manufacturing improvements and/or performing actual capital investments. The aim of this study is to get an understanding of the cell and its behaviour regarding production and to use the simulation software to change, analyse and improve the cell. Keywords— simulation, Delmia Quest, facility layout, inventory, costing. I. INTRODUCTION In today’s fast paced world of manufacturing system, everything changes fast and new challenges require new solution, which should be more universal, flexible and provide more possibilities to react to the continuous changes. The situation of simulation modelling solutions and tools are effectively used to address new issues and challenges these which are more flexible, feasible and provide seamless integration of various simulation approaches. Discrete event simulation has been one of the most valuable technologies for assisting in decision evaluation in simulation and modelling. Simulation can be used in many areas such as automatic control, logistics, mechanics and production. In this study, simulation refers to production simulations. Production is a wide area and many different software systems exist to assist in the production. Using simulation gives a better possibility to early on in the project determine the total investment cost but also to answer questions such as cost for running and productivity of the system. Different solutions can be compared and the best alternative can be decided. Simulation can reduce the time for development and installation. Simulation also provides fewer disturbances in the start up of the production. Quest can be used to simulate and get data for everything related to production systems, such as buffers, status, queues, production times and so on. A correct built-up simulation can provide answers to many questions such as, where to set ordering points, number of operators needed, number of parts needed, what happens when a machine breaks or if one operator is sick and so on. II. SIMULATION IN MANUFACTURING CELLS A. Manufacturing cell Manufacturing cell is an important part of manufacturing system. It can not only meet the demand of market for multi- variety and low-volume production, but also adapt to the rapid changes of market and so improve the system’s flexibility. Therefore, more and more researchers at home and abroad are paying attention to it. So far, there have already been in- depth research and fruitful achievements about the design of manufacturing cell. The traditional design methods put emphasis on the selection of equipment and further optimization of block layout. In current years, genetic algorithm has been introduced into the developing of manufacturing cell by more and more researchers. However, this method usually focuses on the optimal group of facilities. Queuing theory, also called stochastic service theory, is a subject that concerns and solves the congestion resulting from stochastic factors. It was applied to the study of manufacturing system in 60’s last century. To design a manufacturing cell based on queuing theory, we can build various of models to calculate those involved parameters of servers (e.g. the number of servers, the optimal productivity) and then we choose equipment or determine their running conditions according to these data. As a result, we get the manufacturing unit that is relatively proper and satisfying [19]. B. Simulation “Simulation is the imitation of the operation of a real-world process or system over time. It involves the generation of an artificial history of a system and the observation of that artificial history to draw inferences concerning the operating characteristics of the real system.” Discrete-event simulation is a collection of events that happen in chronological order and change the system’s state. The state of the system (or part of it) is changed instantly when an event happens. Discrete-event simulation models are used to study how the system works during the period of observation. Discrete-event simulation models are commonly used in the industry for the following purposes: - Capacity calculations. - Analyzing throughput and lead times.
  • 2. International Journal of Innovative Research in Advanced Engineering (IJIRAE) ISSN: 2349-2163 Volume 1 Issue 6 (July 2014) http://ijirae.com _________________________________________________________________________________________________ © 2014, IJIRAE- All Rights Reserved Page - 53 - Layout-planning. - Balancing production. - Supporting investment decisions and as risk-management tool. - Identifying bottlenecks and testing out control techniques. C. Simulation software Since the 1960s simulation has been used in the mining industry mainly in relation to transport systems, mining operations, mine planning and production scheduling. Easy-to-use animation is one of the primary reasons for the increased popularity of simulation modelling in mining. Simulations are developed either in general purpose languages such as FORTRAN or Pascal, or in simulation languages such as General Purpose Simulation System (GPSS). However, in recent years several PC simulation languages have been developed that can be used to model mining systems. These include GPSS, AutoMod, Arena, SimFactory, Clam, Taylor II, SLAM and QUEST [16]. A discrete-event simulation model can be created in different ways depending on the available resources and objectives of the model: - General programming language (C++, C#, Visual Basic, Java & etc.) - Simulation specific programming language (Arena, Simscript, etc.) - Off-the-shelf, tailored discrete-event simulation programs, such as o 3DCreate, Automod, ProModel, Quest, Taylor/ED, ProcessModel, etc. D. Delmia Quest Delmia Quest is the digital manufacturing platform subsystem of Dassault Company based on discrete events. It provides simulation environment based on the delivery of materials, processing and storage. It contains material element for rapid modeling such as machine tool, buffer, treatment process, failure rate, maintenance, operator, path and material export, which can help users simulate and analyze the process flow in 3D factory environment [20]. In a Delmia-QUEST model, inter alia, there are: – Parts, the entities that move through the system, occupying resources and undergoing processing. They may represent goods, customers, orders, tasks or messages between resources. Fig. 1 Parts – Sources, the entities that create parts and release them into the simulation; sinks, the entities that remove parts from the model. Fig. 2 Source – Buffers, entities used to represent the locations where parts are stored or where they queue to get access to other Fig. 4 Machines The inputs for the machines are the parts representing the activities to do. In QUEST, each real task has its own corresponding part. - Labor is required by the processes defined for the machines
  • 3. International Journal of Innovative Research in Advanced Engineering (IJIRAE) ISSN: 2349-2163 Volume 1 Issue 6 (July 2014) http://ijirae.com _________________________________________________________________________________________________ © 2014, IJIRAE- All Rights Reserved Page - 54 resources such as machines; Fig. 3 Buffers – Machines, the entities that process parts. Fig. 5 Labors - Sink, collect the processed parts for their exit from the model. Fig. 6 Sink Quest provides three-dimensional simulation environment for the analysis of production process flow and production efficiency. The Quest model must be established before simulation and analysis. The following three steps are basic steps to establish a Quest model. Firstly, three-dimensional geometrical model of production resources object such as processing equipment, logistics equipment and operator must be established, making production line in virtual environment similar to real production line. Quest contains initial model of common production equipment and logistics equipment, such as processing equipment, buffer station, feed station, AGV, crane, conveyor, labor and so on. Geometric model should be placed in three-dimensional space according to workshop layout, which achieves virtual physical modelling of the entire workshop. Secondly, object behavior, technological process and system operation rules of production resources should be defined. The object behavior refers to the loading, processing, and unloading behaves of the processing equipment. Logical order of workpiece is defined by technological process of manufacturing system, making independent device in the system connected into a whole process logical [10], [11]. System operation rules can ensure the normal operation of the simulation model and avoid conflict in the system. Finally, production line is simulated based its model, real-time utilization and average utilization of the key equipment and labors can be obtained. The data of logistics production beat and stacking situation can also be seen clearly. According to these data, the bottlenecks in the production line can be found and then the layout of the production line and logistics scheme can be optimized [5]. E. SCL and BCL The conceptual manufacturing layout used the modelling languages, which are Simulation Control Language (SCL) and Batch Control Language (BCL). Manufacturing design layout is developed by composing the control language and synthesizing the structures: control, data, and operational. The modelling language is based on a set of object classes that simulates the behaviour of a real system component. The SCL provides modelling rules that govern the action and all aspects of element in order to meet the unique needs of designed model and show determination of the outline structure in a fabrication manufacturing layout. The SCL logic tracking functions are compiled and appended into the file-based by associating the modular procedural programs with specific resource entities [13]. SCL code is a programming language similar to the more famous PASCAL. Thanks to the written logics and procedures the developed model now presents the following advantages: – It is able to builds a suboptimal solution through a new constructive heuristic algorithm designed and implemented; – It is easy to use by non-expert personnel; – It requires in input a unique and simple file: an Excel datasheet and provides in output Gantt charts ready to be used in the workshop. In SCL anything that doesn’t already exist in Quest can be created, this makes Quest very flexible and versatile.
  • 4. International Journal of Innovative Research in Advanced Engineering (IJIRAE) ISSN: 2349-2163 Volume 1 Issue 6 (July 2014) http://ijirae.com _________________________________________________________________________________________________ © 2014, IJIRAE- All Rights Reserved Page - 55 Contrast to the SCL, the BCL is used to create a series of runs with alternative scenarios without interruptions, furthermore it has been developed beyond the interface control stage to edit or modify the parameters of simulation environment when manipulate the model. BCL will create a series of runs with alternative scenarios without interruptions. The BCL commands were typed in one at a time, which will change an existing model which is part of the QUEST software. Elements in BCL codes of the model are derived from the sub-data file content. There are BCL macros were assigned for the model in the QUEST modelling environment. This utilizes the BCL macro function to execute BCL codes in QUEST. Upon calling up the BCL macro, the BCL codes executed and generated line by line into the QUEST interface. The process of implementing BCL function for model designed, QUEST software must be loaded first with a file of BCL Commands. A text of BCL commands are specified as providing the initial instructions to QUEST which includes building or reading a model and modifying and running the model. Almost all BCL commands can be apply through SCL programming [12]. III. SIMULATION MODEL In this study is presented a simulation in Delmia Quest software which is based on scenarios ”what if…” Delmia Quest is used for model validation, as it was previously indicated in the studies, in the sense that a valid model will be able to produce a reasonable prediction of the system’s performance [8]. The simulation corresponds to a nine hour workday consisting of eight hours of actual work and one hour of breaks. The amount of time the laborer takes to move between each assigned machine must be established: Constant on the Distributions, 10 seconds. The distributions to describe the time between failures and the time to repair for this failure class are defined: Exponential from the Distributions, a Mean value of 3600 sec. The time to repair is defined: Uniform from the Distributions, a Minimum Value of 180 sec and a Maximum Value of 300 sec. A. Facility layout Facility layout means planning for the location of all machines, utilities, employee workstations, customer service areas, material storage areas, aisles, rest rooms, lunchrooms, drinking fountains, internal walls, offices, and computer rooms, and for the flow patterns of materials and people around, into, and within buildings. Facility layout represents physical layout of the fabrication lines, machines, workstations necessary for the production process of conversion from fabrics, factories, industrial installations. Facility layout is a placement of the means of productions used to create products. Facility layout is composed of product, its process routing, machine and some space. Different combinations of these entities and their activities affect the type of facility layout. Considering the criteria of material handling route, the types of facility layout are classified into three types: single-row layout, multi-row layout and loop layout. The single row layout includes three shapes such as linear, U-shape and semi-circular [17]. In the linear layout, there may exist bypassing and backtracking. Backtracking is the movement of some parts from a machine to another machine that precedes it in the sequence of placed machines in a flow line arrangement. Bypassing occurs when a part skips some machines while it is moving towards the end of a flow line arrangement [18]. For example: Figure 7 displays the current layout with five labors arranged in a linear layout. Each labor works in his own machine. Fig. 7 Current Layout: Linear layout Figure 8 displays the improved layout with only three men power and the layout is designed to be in a U-shaped.
  • 5. International Journal of Innovative Research in Advanced Engineering (IJIRAE) ISSN: 2349-2163 Volume 1 Issue 6 (July 2014) http://ijirae.com _________________________________________________________________________________________________ © 2014, IJIRAE- All Rights Reserved Page - 56 Fig. 8 Improved Layout: U- shape layout After a run simulation of 32400 seconds, it is noted that, in both cases there is the same number of parts, 394 parts. Fig. 9 Element production In the Linear layout there are five labors for the processes. From the observation, labor’s capability has not been used effectively. In U- shape layout there are only three labors for the processes. Fig. 10 Labor utilization efficiency in linear and U shape layout 0 10 20 30 40 50 60 70 80 90 100 Labor1_1 Labor2_1 Labor3_1 Labor4_1 Labor5_1 Utilization(%) U-shape layout Linear layout
  • 6. International Journal of Innovative Research in Advanced Engineering (IJIRAE) ISSN: 2349-2163 Volume 1 Issue 6 (July 2014) http://ijirae.com _________________________________________________________________________________________________ © 2014, IJIRAE- All Rights Reserved Page - 57 After the simulation is observed that only 3 labors of U-shaped layout made parts just as many as 5 labors of linear layout. B. Bottlenecks The bottleneck is the resource that affects the performance of a system in the strongest manner, that is, the resource that, for a given differential increment of change, has the largest influence on system performance. This is an operational definition that can be tested via discrete event simulation using finite difference sensitivities of throughput (or other performance metrics) to individual resource changes. It is essentially based on the partial derivative of the system capacity with respect to an individual resource’s capacity, that is, the rate of change in system capacity for unit change in resource capacity [4]. To see how the machine times affect the cell the bottleneck needed to be determined. So, the bottlenecks in our study are: - Machines, which are idle in the manufacturing process; Fig. 11 Machine utilization efficiency in U shape - Machines, which are overload and sequential inputs; - Parts, which pass to their operation from one cell to other. This are the biggest inter-cell movement resources. C. Inventory Many companies are adopting lean manufacturing strategies to reduce waste while improving processes as well as trying to reduce inventory. However, in reality their production processes continue producing to stock due to the economic benefit. The major reason for choice of make-to-stock or large batch production is because of the significant setup cost and setup time that might result in lost production and decreased production capacity [14], [15]. The optimal size of the batch can be determined considering many variables such as setup times, setup costs, forecasts of demand, costs for inventory, process time and so on [9]. The batch size or run size, Qi, for product i is calculated from: = (1) where X is the number of cycles per week. The total amount of time required to produce a single batch of each product in one cycle is then calculated from: = ∑( + ), i=1,n (2) The ratio Qi/pi is measured in hours since Qi is a production lot size divided by pi, the hourly production rate for product i, and is equal to the number of hours to produce lot Qi [7]. The required scheduled hours per week, ts, is then derived from: = ∑( + ) , i=1,n. (3) We can now calculate maximum inventory (Bi) for part i: = (1 − ), (4) where ui is the hourly customer usage rate for product i and it is determined from: = . (5) Total annual cost is now defined as the sum of the three cost components: Total annual cost= Annual cost of production labour +Annual cost of changeover +Annual cost of inventory, where annual cost of production labour is: Annual cost of direct production labour = ∑( ), i=1,n. (6) We should caution that the above cost may not be realistic due to possible idle time where the required weekly scheduled hours (ts) is less than the maximum allowable weekly hours (tmax) and workers must be paid due to
  • 7. International Journal of Innovative Research in Advanced Engineering (IJIRAE) ISSN: 2349-2163 Volume 1 Issue 6 (July 2014) http://ijirae.com _________________________________________________________________________________________________ © 2014, IJIRAE- All Rights Reserved Page - 58 contractual agreement, service, maintenance, etc. [2], which depends on the number of hours the facility is operating per working day. The annual cost of changeover is obtained from = ∑( + ), i=1,n and annual cost of inventory is equal to: Annual cost of inventory = Annual cost (Average maximum inventory+ Average unbalanced inventory + safety stocks), where the unbalanced inventory for part i is as follows: = ( ) , < 0, ℎ . (7) For example: = 96, = 120, = 6000 = (120 − 96) 6000 120 = 1200 Finally, the annual cost of inventory is calculated as follows [3]: Annual cost of inventory= ∑ ( 1 − + ) + , i=1,n. (8). Where the notations represents: - X =Number of cycles per week. - di =Weekly customer requirements (demand) for product i. - pi= Hourly production rate for product i. This represents the average of good products produced per hour when the system/machine that is being scheduled is running. It should not include time lost for changeovers. - Ssi= Safety stock for product i. - Li = Number of operators required for producing product i. - Si= Setup (changeover) time (hours) for product i. The time interval from the last good product produced on the outgoing product to the first good product run in the incoming product. This should be the combination of changeover time plus the time required to start producing the first good part. - Sai= Additional changeover (labour-hours) for product i. This can include both direct and indirect labour and/or salary hours dedicated to completing a changeover in addition to operators. - Ci= Inventory value of product i. - Icap= Cost of capital. This is sum of all quantities: cost of capital plus taxes and insurance plus cost of storage plus cost of breakage plus cost of spoilage. - tmax =Maximum weekly hours available for production. This is the maximum scheduled operating hours available for production and changeover based on management directives, contractual agreements, etc. - tc= Customer weekly work hours. This represents the production hours that are to be worked by the customer or the next operation. - W= Hourly wage. This is the average wage (including benefits, overtime, etc.) that is paid to production operators and support personnel (skilled trades) required to be present during the production for the system/machine being scheduled. - N= Number of working weeks per year. - n= Number of different products i=1, 2, . . . ,N. - Imax= Maximum total allowable inventory. This represents any constraint that is required on the level of total inventory for the system/machine being scheduled. This could be as a result of space limitations, management directive, rack constraints, preventative maintenance requirements or perhaps other reasons. - Qi= Scheduled lot (batch size) for product i. This is the amount to be produced in each cycle for product i. In Delmia Quest software, we consider the inventory (stocks) the parts on the buffers [1]. Buffers in Quest are used to represent the locations where are stored or where they queue to get to other resources such as machines. A buffer might thus represent a storage location in a warehouse, the hopper or buffer feeding parts into a machine or a queue for customers waiting in a bank. The Initial Stock button allows us to set the numbers and classes of parts that are already present in the buffer when the model run begins. The default is zero. This parameter allows a buffer to begin with any number of any part classes that has been defined in the model [6].
  • 8. International Journal of Innovative Research in Advanced Engineering (IJIRAE) ISSN: 2349-2163 Volume 1 Issue 6 (July 2014) http://ijirae.com _________________________________________________________________________________________________ © 2014, IJIRAE- All Rights Reserved Page - 59 Fig. 12 Buffers – State Times in U shape D. Costing Manufacturing cost has two classify methods. The first one classifies the manufacturing cost into fixed costs and variable costs. The second separates manufacturing cost into: (1) direct labor, (2) material, and (3) overhead. Cost Macros is used to analyze the running cost of various resources in a system after running a simulation and to calculate the product cost of a system. These macros calculate the cost of the product based on the principle of ABC (Activity Based Costing) [6]. For example, we made the cost analysis for five machines in U shape model using Delmia Quest software. TABLE I COST ANALYSIS REPORT COST ANALYSIS REPORT – Machines Element name : Machine1_1 Total Cost : $ 53.60199 Variable Cost : $ 48.465 Fixed Cost : $ 5.136986 Power : $ 3.3 Coolant : $ 0.165 Labor : $ 45 Maint : $ 0 Setup : $ 0 Element name : Machine2_1 Total Cost : $ 53.02449 Variable Cost : $ 47.8875 Fixed Cost : $ 5.136986 Power : $ 2.75 Coolant : $ 0.1375 Labor : $ 45 Maint : $ 0 Setup : $ 0 Element name : Machine3_1 Total Cost : $ 57.04948 Variable Cost : $ 51.91249 Fixed Cost : $ 5.136986 Power : $ 6.583333 Coolant : $ 0.3291667 Labor : $ 45 Maint : $ 0 Setup : $ 0 Element name : Machine4_1 Total Cost : $ 52.43678 Variable Cost : $ 47.29979 Fixed Cost : $ 5.136986 Power : $ 2.190278 Coolant : $ 0.1095139 Labor : $ 45 Maint : $ 0 Setup : $ 0 Element name : Machine5_1 Total Cost : $ 54.39767 Variable Cost : $ 49.26068 Fixed Cost : $ 5.136986 Power : $ 3.283333 Coolant : $ 0.1773535 Labor : $ 45 Maint : $ 0.8 Setup : $ 0 MODEL: Ucosting.mdl Run Time : 8.999998Hour 0 100 200 300 400 500 600 Buffer1_1 Buffer2_1 Buffer3_1 Buffer4_1 Buffer5_1 State Times Idle State Times Busy - Processing State Times Blocked - Wait Block
  • 9. International Journal of Innovative Research in Advanced Engineering (IJIRAE) ISSN: 2349-2163 Volume 1 Issue 6 (July 2014) http://ijirae.com _________________________________________________________________________________________________ © 2014, IJIRAE- All Rights Reserved Page - 60 Fig. 13 Cost analysis –Machines- in U shape IV.CONCLUSIONS The aim of this article is to analyse and manage the manufacturing flows in different configuration of cells, in order to improve the productivity, to reduce the costs and to obtain required stocks where we have a series production. By using simulation in Quest not only one variable at the time could be tested but also how combined changes affected the production. The ability to test and measure the results that followed often lead to the discovery of other things to improve. After a while the ability to forecast the effects of the changes increased. At the end of the project it was surprisingly easy to predict how the system and the number of parts produced would respond to different changes. Quest gives the ability to use graphs and charts to visualize almost any data imaginable from the cell. With the right model it will only take a few seconds to get the same information that would take days or even years to measure out of the actual production cell. REFERENCES [1] Ahmed El-Bouri and Subrahmanya Nairy, An investigation of cooperative dispatching for minimising mean flowtime in a finite-buffer-capacity dynamic flowshop, International Journal of Production Research Vol. 49, No. 6, 15 March 2011, 1785–1800 [2] Bram Desmea, El-Houssaine Aghezzaf and Hendrik Vanmaele, Safety stock optimisation in two-echelon assembly systems: normal approximation models, International Journal of Production Research Vol. 48, No. 19, 1 October 2010, 5767–5781 [3] Brander, P., 2005. Inventory control and scheduling problems in a single-machine multi-item system, Thesis (Doctoral), Lulea, University of Technology. http://epubl.luth.se/1402-1544/2005/55/LTU-DT-0555-SE.pdf [4] C.E. Betterton and S.J. Silver, Detecting bottlenecks in serial production lines – a focus on interdeparture time variance, International Journal of Production Research, Vol. 50, No. 15, 1 August 2012, 4158–4174 [5] Can Wang, Changhua Qiu, Virtual Simulation of the Job Shop Scheduling System Based on Delmia/QUEST, 2008 Asia Simulation Conference — 7th Intl. Conf. on Sys. Simulation and Scientific Computing [6] Dassault Systems, 2009. Quest Tutorial, Edition K, p.12-2 – 12-8. [7] Horman Michael J. and H. Randolph Thomas, Role of Inventory Buffers in Construction Labor Performance, Journal of Construction Engineering and Management July 2005 [8] Hu Lu,, Xia Liu, Wei Pang, Wenhua Ye and Bisheng Wei, Modeling and Simulation of Aircraft Assembly Line Based on Quest, Advanced Materials Research Vol. 569 (2012) pp 666-669 Online available since 2012/Sep/28 at www.scientific.net [9] Jing Li, Wei Liu, Simulation of stock strategies in dynamic supply chains, Advanced Materials Research Vols. 472- 475 (2012) pp 3251-3257, Online available since 2012/Feb/27 at www.scientific.net [10] Kendal K., Mangin C. et.al, Applied Science and Manufacturing, Vol. 7(1998),p.711 -720 [11] Kingstam P, Cullander P, Computers in Industry, Vol. 38(5) (1999),p.173 -186. $- $5 $10 $15 $20 $25 $30 $35 $40 $45 $50 $55 $60 Total Cost VariableCost Fixed Cost
  • 10. International Journal of Innovative Research in Advanced Engineering (IJIRAE) ISSN: 2349-2163 Volume 1 Issue 6 (July 2014) http://ijirae.com _________________________________________________________________________________________________ © 2014, IJIRAE- All Rights Reserved Page - 61 [12] Norhidayah M., Yupiter H.M., Roseleena J., Shaharudin A.,and Erry Y.A., Development of virtual assembly layout with modeling languages approach and Simulation using Delmia Quest, IIUM Engineering Journal, Vol. 13, No. 1, 2011 [13] Salleh Noor Azlina Mohd, Salmiah Kasolang, Ahmed Jaffar, Simulation of Integrated Total Quality Management (TQM) with Lean Manufacturing (LM) Practices in Forming Process Using Delmia Quest, Procedia Engineering 41 ( 2012 ) 1702 – 1707, www.sciencedirect.com [14] Shahram Taja, Galia Novakova Nedeltchevab, George Pfeilc and Michael Roumayad, A spread-sheet model for efficient production and scheduling of a manufacturing line/cell, International Journal of Production Research Vol. 50, No. 4, 15 February 2012, 1141–1154 [15] Shib Sankar Sana, Preventive maintenance and optimal buffer inventory for products sold with warranty in an imperfect production system, International Journal of Production Research, Vol. 50, No. 23, 1 December 2012, 6763–6774 [16] Soumya Raghavendra Rao, Design and simulation of roadway development operations to improve productivity, University of Wollongong, Research Online, 2010 [17] Technical Note Five, Facility layout, http://home.snc.edu/eliotelfner/333/facility%20layout.pdf [18] Xiaohong Suo, Facility Layout, China Institute of Industrial Relations, Beijing, P.R.China http://cdn.intechopen.com/pdfs-wm/36421.pdf [19] Yanyan Zhang,Cheng Su,Yong Shang and Zhongxue Li, Service Rate Optimization of Manufacturing Cell Based on Cost Model, Advanced Materials Research Vols. 314-316 (2011) pp 2055-205, Online available since 2011/Aug/16 at www.scientific.net [20] Zhang Li, Guo Jia, Liu Chun, Ma Yupeng, Mechanical Engineer, Vol. 01 (2011), pp.48-50, http://dx.doi.org/10.3901/JME.2011.12.048