The document discusses various industrial connection technology products from ifm, including:
- M8, M12, M16, and M23 connectors that provide vibration protection and high IP ratings for industrial applications involving oils, coolants, or other harsh conditions.
- Models with transparent black housings for optimum LED visibility even in bright lighting.
- Special versions adapted for welding equipment, hygienic/food applications, and hazardous/ATEX areas.
- Connectors that meet relevant industry standards.