Consolidated Construction Consortium Ltd. HSE MANAGEMENT MANUAL
Chennai
DOC. NO. : CCCL/HSE/001
DATE : 02-09-2011
REV. NO. : 2
HEALTH, SAFETY & ENVIRONMENTAL MANAGEMENT MANUAL
HHEEAALLTTHH,, SSAAFFEETTYY
AANNDD
EENNVVIIRROONNMMEENNTTAALL MMAANNAAGGEEMMEENNTT MMAANNUUAALL
CCoonnssoolliiddaatteedd CCoonnssttrruuccttiioonn CCoonnssoorrttiiuumm LLttdd
IInn CCoommpplliiaannccee wwiitthh
OOHHSSAASS 1188000011:: 22000077
&&
IISSOO 1144000011::22000044
Consolidated Construction Consortium Ltd. HSE MANAGEMENT MANUAL
Chennai
DOC. NO. : CCCL/HSE/001
DATE : 02-09-2011
REV. NO. : 2
HEALTH, SAFETY & ENVIRONMENTAL MANAGEMENT MANUAL Page: 1 of 1
0.1 MANUAL CONTROL PAGE
HHEEAALLTTHH,, SSAAFFEETTYY
AANNDD
EENNVVIIRROONNMMEENNTTAALL MMAANNAAGGEEMMEENNTT MMAANNUUAALL
HSE MANUAL Rev. No. 2 Date : 02-09-2011
ISSUED BY HEAD – HSE
ISSUED TO
Consolidated Construction Consortium Ltd. HSE MANAGEMENT MANUAL
Chennai
DOC. NO. : CCCL/HSE/001
DATE : 02-09-2011
REV. NO. : 2
HEALTH, SAFETY & ENVIRONMENTAL MANAGEMENT MANUAL Page 1 of 1
0.2 TABLE OF CONTENTS
Revision Status
HSE Manual
Ref.
Title
Rev. No. Date
0.1 Manual Control Page 2 02-09-2011
0.2 Table of Contents 2 02-09-2011
0.3 Record of Revisions 2 02-09-2011
0.4 Organization Profile 0 16-04-2008
0.5 Adequacy Matrix 1 02-09-2011
1.0 Scope 0 16-04-2008
2.0 References 0 16-04-2008
3.0 Terms & Definitions 0 16-04-2008
4.0 HSE Management System 0 16-04-2008
4.1 HSE Management System at
CCCL
0 16-04-2008
4.2 HSE Policy 0 16-04-2008
4.3 HSE Planning 2 02-09-2011
4.4 Implementation &
Operation
1 20-03-2009
4.5 Checking & Corrective Action 0 16-04-2008
4.6 Management Review 0 16-04-2008
Consolidated Construction Consortium Ltd. HSE MANAGEMENT MANUAL
Chennai
DOC. NO. : CCCL/HSE/001
DATE : 02-09-2011
REV. NO. : 2
HEALTH, SAFETY & ENVIRONMENTAL MANAGEMENT MANUAL Page 1 of 1
Back to Table of Contents
0.3 RECORD OF REVISIONS
HSE Manual Section
Ref.
Rev. No. Date Brief Record of Revision
4.4 (Implementation
and Operation)
1 20-03-2009 In section 4.4 for positions,
accountability included.
4.3 HSE Planning 1 10-03-2010
In section 4.3.3 for Objectives and
Targets
4.3 HSE Planning 2 02-09-2011
Earlier section 4.3.1A and 4.3.1B
combined as 4.3.1
Consolidated Construction Consortium Ltd. HSE MANAGEMENT MANUAL
Chennai
DOC. NO. : CCCL/HSE/001
DATE : 16-04-2008
REV. NO. : 0
HEALTH, SAFETY & ENVIRONMENTAL MANAGEMENT MANUAL Page 1 of 3
Back to Table of Contents
0.4 ORGANIZATION PROFILE
CCCL is a professionally managed civil construction company started in 1997 by young
and highly talented engineering professionals.
The company is managed by highly dedicated young technical and commercial team
backed by a strong dynamic leadership of Mr. S. Sivaramakrishnan, Managing Director
under the able guidance and support of Mr. R. Sarabeswar, Chairman & CEO.
The CCCL team has professionals in all the key areas of construction as follows.
• Design
• Project Management Services
• Execution of Projects
a) Major Housing Complexes
b) Industrial Structures
c) Commercial Complexes
d) Airport Complexes
e) Waste water treatment plants
f) Long span Pre-cast Concrete Structures
g) Retro fitting
Execution of Pre-engineered buildings
CCCL has every capability to undertake large turnkey projects. Besides on-site
computerized monitoring, a comprehensive control over all projects through link-up with a
central server at regional centre guarantees fluent progress of projects at all times.
In last 10 years CCCL has built more than 300 buildings and structures for various clients
in different part of India which are monuments and stand as testimony to the ability of
CCCL.
A few of the technical achievement of CCCL are given in below :
• Largest Post Tensioned Structure in India
• Longest Portal Frame Structure in India
• Best of its class in Large Turnkey Operations
Consolidated Construction Consortium Ltd. HSE MANAGEMENT MANUAL
Chennai
DOC. NO. : CCCL/HSE/001
DATE : 16-04-2008
REV. NO. : 0
HEALTH, SAFETY & ENVIRONMENTAL MANAGEMENT MANUAL Page 2 of 3
Back to Table of Contents
• First International Convention Center in Mangalore
• Biggest Dome Structure in Asia and Second Largest in the World
• Largest Single Shell Hyperbolic Parabolic Structure in India
• First Platinum Rated Green Building in the World by the US green Building Council
CCCL has received many accolades and has been conferred with many awards for its
stellar performance in building industry from various Government agencies & corporate
clients.
CCCL has been awarded ISO 9001-2000 certification by BVCI for implementation of the
Quality Management System to meet the high standards of quality and enhance customer
satisfaction.
CCCL has emphasized safety of all its employees and others working in the project sites
by framing the HSE policy and is fully committed to address all areas to provide and
maintain healthy and safe working environment to its employees and others working in
project sites.
THE PRODUCT DIVISIONS
Mechanical and Electrical Division
Our M&E Division is primarily responsible for the management and execution of electrical,
mechanical, plumbing, heating, ventilation and air-conditioning works at project locations.
This division has been providing its services for projects that we construct and is
proposing to commence the provision of services for projects which it tenders
independently. This division also provides consultancy and execution services for various
contract works. These services are typically provided at a fixed rate per square foot. In
addition to providing and implementing electrical, mechanical, plumbing and air-
conditioning works, the M&E division also provides design, estimation and procurement
services.
Consolidated Interiors Limited (CIL)
Our Subsidiary, CIL is engaged in the provision of interior contracting and fit out services
for our own projects and to a range of third party public and private sector clients. It was
formed as a result of a goodwill agreement entered into between our Company and
Trendtech CDAC, an entity engaged in providing interior contracting services.
Consolidated Construction Consortium Ltd. HSE MANAGEMENT MANUAL
Chennai
DOC. NO. : CCCL/HSE/001
DATE : 16-04-2008
REV. NO. : 0
HEALTH, SAFETY & ENVIRONMENTAL MANAGEMENT MANUAL Page 3 of 3
Back to Table of Contents
Building Products Division
Our Building Products Division consists of batching plant for production of ready mixed
concrete and manufacturing facility for production of building blocks. We have 12 batching
plants engaged in the production of various grades of ready mixed concrete at various
locations in India. Our batching plants are located to our various project locations
depending on demand and have operated in locations like Tamil
Nadu, Karnataka, Andhra Pradesh, Maharashtra and Chandigarh.
Software Designs Department (Yuga Design)
Yuga Design is our in house software design division which provides integrated software
based engineering design services to a variety of domestic and international clients
including large engineering companies and to prominent architects.
Glazing Solutions
To date we have been providing glazing solutions as part of our turn-key construction
services to various clients through third party service providers. In order to improve our
scheme of concentric integration we have begun the process of incorporating Noble
Consolidated Glazings Limited with the object of providing glazing solutions in-house.
The key factors for success of the company lies in three values of being Creative,
Committed and Customer Focused.
To respond quickly and cater to customer requirements, CCCL has expanded its business
and has set up regional offices at Chennai, Bangalore, Hyderabad, New Delhi, Pune,
Kolkatta and Thiruvananthapuram.
Consolidated Construction Consortium Ltd. HSE MANAGEMENT MANUAL
Chennai
DOC. NO. : CCCL/HSE/001
DATE : 02-09-2011
REV. NO. : 1
HEALTH, SAFETY & ENVIRONMENTAL MANAGEMENT MANUAL Page 1 of 2
Back to Table of Contents
0.5 ADEQUACY MATRIX
OHSAS
18001 & ISO
14001
Cl. Ref
HSEM
Ref.
Title
2nd
Level
Documents
- 0.1 Manual Control Page -
- 0.2 Table of contents -
0.3 Records of Revisions
- 0.4 Organization Profile -
- 0.5 Adequacy Matrix -
1.0 1.0 Scope -
2.0 2.0 References -
3.0 3.0 Terms and definitions -
3.1 Glossary of Terms -
3.2 Abbreviations -
4.0 4.0 Health, Safety & Environmental
Management System
-
4.1 4.1 General Requirements: Scope of Health,
Safety & Environmental Management
System at CCCL
-
4.2 4.2 Health, Safety & Environmental Policy -
4.3 4.3 HSE Planning -
4.3.1 4.3.1 Procedure for Identification of
Environmental Aspects, Hazards,
Evaluation of Impacts, Risks &
Determination of Control Measures
CSP-4.3.1
4.3.2 4.3.2 Legal & Other Requirements CSP-4.3.2
4.3.3 4.3.3 HSE Objectives & Targets and
Management Program
CSP-4.3.3A
CSP-4.3.3B
4.4 4.4 Implementation & Operation -
4.4.1 4.4.1 HSE Organization Structure: Resources,
Roles, Responsibility, Authority &
Accountability
-
Consolidated Construction Consortium Ltd. HSE MANAGEMENT MANUAL
Chennai
DOC. NO. : CCCL/HSE/001
DATE : 02-09-2011
REV. NO. : 1
HEALTH, SAFETY & ENVIRONMENTAL MANAGEMENT MANUAL Page 2 of 2
Back to Table of Contents
OHSAS
18001 & ISO
14001
Cl. Ref
HSEM
Ref
Title 2nd
Level
Documents
4.4.2 4.4.2 Competence, Training and Awareness CSP-4.4.2
4.4.3
4.4.3
Consultation, Participation &
Communication
CSP- 4.4.3
4.4.4 4.4.4 HSE Documentation -
4.4.5 4.4.5 Control of Documents CSP- 4.4.5
4.4.6 4.4.6 Operational Control CSP- 4.4.6
4.4.7 4.4.7 Emergency Preparedness and Response CSP- 4.4.7
4.5 4.5 Checking & Corrective Action -
4.5.1 4.5.1 Performance measurement & monitoring CSP- 4.5.1
4.5.2 4.5.2 Evaluation of Compliance CSP- 4.5.2
4.5.3
4.5.3
Incident Investigations, Non Conformity,
Corrective Action & Preventive Action
CSP- 4.5.3
4.5.4 4.5.4 Control of Records CSP-4.5.4
4.5.5 4.5.5 Internal Audit CSP-4.5.5
4.6 4.6 Management Review -
Consolidated Construction Consortium Ltd. HSE MANAGEMENT MANUAL
Chennai
DOC. NO. : CCCL/HSE/001
DATE : 16-04-2008
REV. NO. : 0
HEALTH, SAFETY & ENVIRONMENTAL MANAGEMENT MANUAL Page 1 of 2
Back to Table of Contents
1.0 SCOPE
Health, Safety and Environmental Manual details the Health, Safety and
Environmental management system of Consolidated Construction Consortium
Limited in meeting the requirements of:
OHSAS 18001: 2007 Occupational Health and Safety
Management Systems – Requirements
ISO: 14001: 2004 Environmental Management Systems –
Requirements with guidance for use.
CCCL Management has opted for Third Party Certification process and towards this
the documentation has been prepared for compliance.
The effective date of implementation
of this manual is from 16-04-2008.
Consolidated Construction Consortium Ltd. HSE MANAGEMENT MANUAL
Chennai
DOC. NO. : CCCL/HSE/001
DATE : 16-04-2008
REV. NO. : 0
HEALTH, SAFETY & ENVIRONMENTAL MANAGEMENT MANUAL Page 2 of 2
Back to Table of Contents
1.1 Safety and Health Guidelines
Work safety, improvement of health, and environmental protection matters are
important aspects of our entrepreneurial business activities. Consequently the
Board of Directors supports all measures to upgrade work safety and the health of
our workforce.
Accidents and health risks can be totally or at least partially avoided if risks and
dangers will be managed and countered by an organised implementation of safety
measures.
These include in particular:
a) a clear assignment of authorities, responsibilities and accountabilities.
b) full attention, without any compromise, to safety & Environmental
standards, the use of technical safety installations and personal protective
equipment by our employees and
c) continuous on the job training of all personnel
To promote work health, safety & environmental improvement is one of the
predominant tasks of each Manager. The prevention of accidents on the basis of
efficient safety measures is an indispensable proof of qualification.
It is, however, only through planned co-operation of all group and company
employees that these guidelines can be successfully applied in practice in order to
further enhance work safety and health issues of our workforce.
The Board of Directors of CCCL considers health, safety & environment a
decisive prerequisite and to also improve our company's financial performance.
Consolidated Construction Consortium Ltd. HSE MANAGEMENT MANUAL
Chennai
DOC. NO. : CCCL/HSE/001
DATE : 16-04-2008
REV. NO. : 0
HEALTH, SAFETY & ENVIRONMENTAL MANAGEMENT MANUAL Page 1 of 1
Back to Table of Contents
2.0 REFERENCES
OHSAS 18001:2007 - Occupational, Health and Safety Management
Systems – Requirements.
OHSAS 18002:2000 - Occupational, Health & Safety Management
Systems - Guidelines for the implementation of
OHSAS 18001.
ISO 14001 - 2004 - Environmental Management Systems -
Requirements with guidance for use.
ISO 14004-2004 - Environmental management systems – General
guidelines on principles, systems and supporting
techniques.
Laws and Regulations related to HSE (Detailed in Register of Regulations)
Consolidated Construction Consortium Ltd. HSE MANAGEMENT MANUAL
Chennai
DOC. NO. : CCCL/HSE/001
DATE : 16-04-2008
REV. NO. : 0
HEALTH, SAFETY & ENVIRONMENTAL MANAGEMENT MANUAL Page 1 of 2
Back to Table of Contents
3.0 TERMS & DEFINITIONS
3.1 Glossary of Terms
As described in OHSAS 18001: 2007 and in ISO 14001: 2004 Standards
3.2 Abbreviations
CCCL - Consolidated Construction Consortium Ltd
CEO - Chief Executive Officer
CSF - CCCL Safety Format
CSP - CCCL Safety Procedure
DO - Director – Operations
DMR - Deputy Management Representative
EMP - Environmental Management Program
HO - Head Office
HSE - Health, Safety and Environment
HSEM - Health, Safety and Environmental Manual
HSEMS - Health, Safety and Environmental Management System
HOD - Head of the Department
HSMP - Health & Safety Management Programme
IA - Internal Audit
ISO - International Organization for Standardization
LC - Legal Concern
MD - Managing Director
MR - Management Representative
NCR - Non Conformity Report
OCP - Operational Control Procedure
OH&S - Occupational Health & Safety
PC - Project Coordinator
PIC - Project In-charge
Consolidated Construction Consortium Ltd. HSE MANAGEMENT MANUAL
Chennai
DOC. NO. : CCCL/HSE/001
DATE : 16-04-2008
REV. NO. : 0
HEALTH, SAFETY & ENVIRONMENTAL MANAGEMENT MANUAL Page 2 of 2
Back to Table of Contents
PM - Project Manager
PPE - Personal Protective Equipment
RM - Regional Manager
RO - Regional Office
ROR - Register of Regulations
RSH - Regional Sector Heads
RSC - Regional Safety Coordinator
SE - Safety Engineer
SH - Sector Heads
SS - Safety Supervisor
SSC - Sector Safety Coordinator
Consolidated Construction Consortium Ltd. HSE MANAGEMENT MANUAL
Chennai
DOC. NO. : CCCL/HSE/001
DATE : 16-04-2008
REV. NO. : 0
HEALTH, SAFETY & ENVIRONMENTAL MANAGEMENT MANUAL Page 1 of 1
Back to Table of Contents
4.0 HEALTH, SAFETY ENVIRONMENTAL MANAGEMENT SYSTEM
4.1 General Requirements: Scope of Health, Safety Environmental Management
System at CCCL
The scope covers
“All activities related to Engineering, Procurement and Construction services for
Buildings, Industrial Structures and Infrastructure projects”
This system encompasses all activities performed at Head Office, Regional offices
and Construction Project Sites connected with Regional Offices.
This HSE management system aims to eliminate or minimize impacts/risks
associated with its activities and covers all employees (Including employees
engaged by sub-contractors) and other interested parties.
The activities are systematized with respect to OHSAS: 18001-2007 & ISO
14001:2004, this HSE Manual is prepared and implemented for achieving
continual improvement on 'Health and Safety Management System performance'.
Consolidated Construction Consortium Ltd. HSE MANAGEMENT MANUAL
Chennai
DOC. NO. : CCCL/HSE/001
DATE : 16-04-2008
REV. NO. : 0
HEALTH, SAFETY & ENVIRONMENTAL MANAGEMENT MANUAL Page 1 of 1
Back to Table of Contents
4.2 HSE POLICY
Consolidated Construction Consortium Ltd. HSE MANAGEMENT MANUAL
Chennai
DOC. NO. : CCCL/HSE/001
DATE : 02-09-2011
REV. NO. : 2
HEALTH, SAFETY & ENVIRONMENTAL MANAGEMENT MANUAL Page 1 of 3
Back to Table of Contents
4.3 HSE PLANNING
4.3.1 Identification of Environmental Aspects, Hazards, Evaluation of Impacts,
Risks & Determination of Control Measures
Significant Aspects and Major Risks associated with the activities at all
construction project sites, Head Office and Regional Office are identified
considering
• Emissions to air
• Releases to water
• Waste Management
• Land Contamination
• Raw materials usage & natural resources and covering
• Routine & Non routine Activities
• Activities of all personnel having access to work place Viz. Workers of sub-
contractors and visitors
• Facilities provided and
• Procurement of Equipment and Materials
The impacts are evaluated based on their Quantum, Severity, and Probability &
Duration, Resource Conservation Potential, Legal & Other Requirements,
Interested Party Concern and Emergency.
The risk assessment associated with the identified hazards is carried out based
on probability of occurrence & severity of the hazard impact
Refer CSP-4.3.1 “Procedure for Identification of Environmental Aspects,
Hazards, Evaluation of Impacts, Risks & Determination of Control
Measures.”
Head - HSE management ensures to consider the information as a result of
identification of aspects having significant impact and identification of hazards
based on risk assessment in setting up “Objectives & Targets“ for Occupational
Health & Safety Performance.
4.3.2 Legal & Other Requirements
CCCL considers the following for identifying Legal and Other Requirements
applicable, for Safety, Health and Environmental Management.
• Site-specific requirements such as operating permits.
Consolidated Construction Consortium Ltd. HSE MANAGEMENT MANUAL
Chennai
DOC. NO. : CCCL/HSE/001
DATE : 02-09-2011
REV. NO. : 2
HEALTH, SAFETY & ENVIRONMENTAL MANAGEMENT MANUAL Page 2 of 3
Back to Table of Contents
• Industry specific requirements
• Applicable Legal & Other requirements
• Any other requirements basedon authorizations, agreements,
Contracts and permits
• CCCL Policy guidelines.
CCCL identifies, updates and communicates these “Legal & Other
Requirements” as per “Procedure for Identification of Legal & Other
Requirements”.
Refer CSP- 4.3.2 “Procedure For Identification of Legal & Other
Requirements.”
4.3.3 HSE Objectives & Targets and Management Programmes
CCCL considers the following for setting “Objectives and Targets”
a) Legal requirements
b) Risks associated with Occupational Health & Safety Hazards.
c) Significant Environmental Aspects & Impacts
d) Views of Interested Parties.
e) CCCL-HSE Policy Guidelines (Other Requirements).
f) Financial / Operational / Business related / Technological options.
CCCL sets these objectives & targets consistent with HSE policy.
Refer CSP-4.3.3A “Procedure for Setting Objectives and Targets”
Company – wide objectives and targets are
a) Power consumption reduction 2% every year
b) Frequency Rate reduction 5% every year
c) Shuttering/Scaffolding Material damage reduction 2% every year
d) Steel scrap reduction 2% every year.
e) Cement wastage reduction 2% every year.
f) Achieve safety training coverage to 20% of total manpower in a year.
Consolidated Construction Consortium Ltd. HSE MANAGEMENT MANUAL
Chennai
DOC. NO. : CCCL/HSE/001
DATE : 02-09-2011
REV. NO. : 2
HEALTH, SAFETY & ENVIRONMENTAL MANAGEMENT MANUAL Page 3 of 3
Back to Table of Contents
Management Programmes
CCCL Site management prepares Health & Safety Management Programme
(HSMP) and Environmental Management Program (EMP) for achieving its
”Objectives & Targets” set for Occupational Health & Safety Performance at
respective sites. These programs indicate responsibility, resources needed and
time frame by which these are to be achieved.
CCCL prepares new HSMP / EMP to meet the new development or modified
activities specific to the project sites
Refer CSP-4.3.3B “Procedure for Health & Safety Management Programme
and Environmental Management Program”
The Overall HSE Planning is detailed in the flow diagram below
HSE Policy
Objectives
&
Targets
Health & Safety
Management
Programmes
Company
HSE
Committee
Site HSE
Committee
Legal Compliance
Significant Aspects
Significant Hazards
View of Interested
Parties
Business Concern
Monitor, Review and
set new objectives &
targets for continual
improvement
Consolidated Construction Consortium Ltd. HSE MANAGEMENT MANUAL
Chennai
DOC. NO. : CCCL/HSE/001
DATE : 20-03-2009
REV. NO. : 1
HEALTH, SAFETY & ENVIRONMENTAL MANAGEMENT MANUAL Page 1 of 13
Back to Table of Contents
4.4 IMPLEMENTATION & OPERATIONS
4.4.1 HSE Organization Structure: Resources, Roles, Responsibility, Authority and Accountability
CCCL has set up an organization structure for implementing and to continually improve HSE performance
Consolidated Construction Consortium Ltd. HSE MANAGEMENT MANUAL
Chennai
DOC. NO. : CCCL/HSE/001
DATE : 20-03-2009
REV. NO. : 1
HEALTH, SAFETY & ENVIRONMENTAL MANAGEMENT MANUAL Page 2 of 13
Back to Table of Contents
RESPONSIBILITIES , AUTHORITIES AND ACCOUNTABILITIES
Responsibilities, authorities of personnel who manage, perform and verify HSE
activities are as detailed below.
Managing Director
MD is the Chairman of the Company HSE Management Committee and is
responsible for periodical reviews of company level HSE management and to
provide necessary resources.
Regional Manager/Regional Sector Manager
RM/RSH is the member of the Company HSE Management Committee is
responsible and accountable for review and implementation of HSE
management for all the sites under his control and provides necessary
resources.
Head - HSE
Head – HSE is the Management Representative (MR) is overall responsible,
and assisted by Deputy Management Representative (DMR), for:
a) Ensures the HSE management system requirements are established,
implemented and maintained
b) Conduct Company HSE Management Committee meetings periodically.
c) Presents the summary of performance on HSE management at sites to HSE
management committee, including recommendations for improvement.
d) Communicates the Health, Safety and Environmental policies to all
employees.
e) Issue necessary directives to Regional Safety coordinators and render
advice to the Project manager, as required.
f) Monitor and assess HSE measures of Sites/Region and fix accountability on
Sector Heads, Project in Charges towards non- compliance of HSE
requirement and HSE performance.
g) Compile Corporate Accident Statistics.
Consolidated Construction Consortium Ltd. HSE MANAGEMENT MANUAL
Chennai
DOC. NO. : CCCL/HSE/001
DATE : 20-03-2009
REV. NO. : 1
HEALTH, SAFETY & ENVIRONMENTAL MANAGEMENT MANUAL Page 3 of 13
Back to Table of Contents
Regional Safety Coordinator
a) Ensures the HSE management system requirements are implemented and
maintained
b) Conduct Company Regional HSE Management Committee meetings
periodically.
c) Presents the summary of performance on HSE management at sites to
Regional HSE management committee, including recommendations for
improvement.
d) Communicates the Health, Safety and Environmental policies to all
employees.
e) Render assistance to the Regional Managers in formulating and adhering
to the client's contract health, safety and environmental plan, in line with
the HSE policy of CCCL and the requirements of the activities of the
contract.
f) Issue necessary directives to Safety Engineers and render advice to the
Project manager/Project In-Charges, as required.
g) Monitor and assess HSE measures of the Sites and fix accountability to the
Project in-charges/Project Engineers for the non-compliance of HSE
requirement.
h) Investigating all serious accidents to reinforce the safety programme or the
code of practice itself.
i) Formulate new safety measures required for the Project.
j) Compile Regional Accident Statistics.
Safety Engineer / Supervisor
a) Ensure that supervisors and workers have received the necessary /
required HSE Induction training.
b) Conduct regular HSE inspection at sites.
c) Monitor Toolbox talks conducted by Project Engineer/ Supervisor
Consolidated Construction Consortium Ltd. HSE MANAGEMENT MANUAL
Chennai
DOC. NO. : CCCL/HSE/001
DATE : 20-03-2009
REV. NO. : 1
HEALTH, SAFETY & ENVIRONMENTAL MANAGEMENT MANUAL Page 4 of 13
Back to Table of Contents
d) Conduct Toolbox meetings at area level. (Tool Box Talk review on other
activities.)
e) Take part in investigations of accidents (incidents’ including near misses).
f) Gathering and compiling of safety data.
g) Interact with Project Manager, Resident Engineer, Supervisors and
Workers.
h) Interact with Client's HSE Department.
i) Perform safety audits as per specific instructions.
j) Identify the areas of environmental protection requirements.
k) Discuss with Management on training requirements and implement
education of the workforce.
l) Improve HSE awareness amongst all CCCL personnel by using standard
training aids such as videos, posters, films, handouts, etc.
m) Monitor the activities involving potential environmental damage and advise
the Project Manager on corrective actions.
n) Take part in Client's :
- HSE meetings
- HSE audit
o) Discuss with the Project Manager/ Project In-Charge on the effectiveness
of the HSE monitoring programme.
p) Monitor First aid facilities.
q) Notify RSC on the HSE non-compliance and person responsible for that.
Project Coordinator
Project Coordinator is overall responsible and accountable for the HSE
Management related to persons working at the project sites with him.
a) PC with the help of Regional Safety Coordinator prepares project specific
safety instructions taking into consideration the local applicable legal
Consolidated Construction Consortium Ltd. HSE MANAGEMENT MANUAL
Chennai
DOC. NO. : CCCL/HSE/001
DATE : 20-03-2009
REV. NO. : 1
HEALTH, SAFETY & ENVIRONMENTAL MANAGEMENT MANUAL Page 5 of 13
Back to Table of Contents
requirements, in addition to the relevant portions of Safety Instructions of
company.
b) PC will ensure that a site specific HSE committee is formed by Project
Manager within 30 days of job starting.
c) PC will monitor the site safety performance
Project Manager / Project in Charge
The Project Manager / Project in charge will be fully responsible and
accountable for all activities of the work site. His detailed responsibilities include
the following:
a) Implement CCCL and Client HSE Policy and HSE Plan.
b) Ensure the provision and use of suitable safety equipment and protective
clothing.
c) Ensure that plant, vehicles and equipment are suitable, regularly
maintained, correctly operated and not misused.
d) Ensure that all accidents are reported and investigated.
e) Initiate action to rectify the unsafe conditions and practices.
f) Ascertain that all 'First Aid' facilities are kept available and maintained.
g) Ensure that provision of a tidy and well-organised working environment.
h) Ensure that the employees, under his control, are adequately trained for
the work in hand.
i) Issue clear, specific and regular instructions on HSE requirements, when
directing operations.
j) Consult the Head-HSE / Regional HSE Coordinator / Site HSE Personnel /
P & M Manager on safety aspects related to particular activity / plant or
machinery.
k) Conduct site HSE meetings.
l) Liaise and communicate with Client's HSE Department.
Consolidated Construction Consortium Ltd. HSE MANAGEMENT MANUAL
Chennai
DOC. NO. : CCCL/HSE/001
DATE : 20-03-2009
REV. NO. : 1
HEALTH, SAFETY & ENVIRONMENTAL MANAGEMENT MANUAL Page 6 of 13
Back to Table of Contents
m) Set and maintain a personal example at all times.
n) Take part in :
- The Investigation and reporting of incidents.
- Site HSE Audits
- Site Hygiène inspections
- All HSE meetings.
P & M Engineer
The P & M Engineer shall be conversant with relevant rules and regulations of
the CCCL HSE policy. His responsibilities/accountabilities will include:
a) Responsibility that HSE Standards are being followed by Technicians and
visitors at all times.
b) Ensure that employees are given adequate information, instructions,
supervision and training to enable them to carryout the duties and activities
safely as required by CCCL / Client HSE Management System.
c) Ensure that suitable Personal Protective Equipment such as Protective
Clothing, Safety Helmet, Safety Belt, etc. is provided and used.
d) Ensure that vehicles, plant and equipment are adequately maintained in an
efficient, safe condition and comply with the relevant laws of the country
and licensing requirements.
e) Ensure that the lifting equipment displays SWL and is thoroughly inspected
(by a third party) every 12 months. Records of such inspections must be
kept at site.
f) Ensure that only trained, competent / experienced operators operate the
vehicles, plants and machines.
g) Ensure that fixed, portable electrical installation and equipment are
regularly checked by competent electrical staff.
h) Ensure that all accidents and dangerous occurrences are reported and the
more serious ones thoroughly investigated.
i) Ensure the safe storage, transport and use of flammable and compressed
gas cylinders.
j) Set a personal example at all times.
Consolidated Construction Consortium Ltd. HSE MANAGEMENT MANUAL
Chennai
DOC. NO. : CCCL/HSE/001
DATE : 20-03-2009
REV. NO. : 1
HEALTH, SAFETY & ENVIRONMENTAL MANAGEMENT MANUAL Page 7 of 13
Back to Table of Contents
Project Engineers / Supervisors / Foremen
Since the Site Engineers / Supervisors / Foreman are responsible and
accountable for providing a safe work environment to their workforce, the
primary safety inspections are their responsibility. As they spend most of their
time in respective construction sections it is their task to continuously monitor
working conditions.
Their qualifications include awareness of accident potential, application of HSE
measures to their areas, ability to make intelligent decisions regarding corrective
actions, diplomacy in handling personnel and situations.
Their responsibilities include:
a) To be aware of the hazards of their activities and the necessary controls to
prevent incidents.
b) To ensure that all personnel on site have undergone the mandatory HSE
Induction training courses prior to mobilising to site.
c) To ensure that all employees are provided with necessary Personal
Protective Equipment.
d) To implement and promote awareness of safe working practices on job
sites.
e) To ensure that only trained and competent persons shall operate vehicles,
plants and equipment.
f)To ensure that cranes and lifting equipment have valid test certificates.
g) To ensure that all employees are given adequate information, instructions
and supervision to enable them to work safely. As a part of this, they will
conduct the daily Tool Box Talks.
h) Take part in the investigation of incidents and the dissemination of learning
points to their workforce.
i) Take part in the HSE meetings.
Consolidated Construction Consortium Ltd. HSE MANAGEMENT MANUAL
Chennai
DOC. NO. : CCCL/HSE/001
DATE : 20-03-2009
REV. NO. : 1
HEALTH, SAFETY & ENVIRONMENTAL MANAGEMENT MANUAL Page 8 of 13
Back to Table of Contents
Sub-Contractor / Supervisor
The Sub-contractor and his supervisors are responsible and accountable for the
safety of workers engaged by them and also they are held responsible if any of
their activity/ worker causes danger to other workers/ activity.
a) Sub-contractor shall ensure that all their workers attend safety induction
conducted by company's Safety Engineer/Supervisor before engaging
them on the job at site.
b) Sub-contractor and their supervisor are responsible to provide all personal
safety and protective equipment required, to perform the job as suggested
by site Safety Officer / Safety In charge.
c) Sub-contractor or his supervisor should take part in site HSE committee
and communicate the HSE committee proceedings to his workmen.
d) Sub-contractor or his supervisor should spare the workmen representatives
selected by company for attending Site HSE committee meetings, safety
audit and enquiries whenever required.
e) Sub-contractor shall provide clean drinking water, wash rooms and canteen
facilities and maintain the facilities in hygiene condition.
f)Sub-contractor shall provide equipment and lifting appliances, which conform
to specified requirements under rules.
g) Sub-contractor shall arrange safety talk for 30 min. at least once in every
week before starting the work, with the help of company's Safety
Engineer/Supervisor/Project Engineer
h) Sub-contractor or his supervisor should ensure that all the observations/
nonconformities given by Safety Audit Team are complied with in stipulated
time period.
i) Sub-contractor should make provisions for first aid and medical facilities to
his employees.
Consolidated Construction Consortium Ltd. HSE MANAGEMENT MANUAL
Chennai
DOC. NO. : CCCL/HSE/001
DATE : 20-03-2009
REV. NO. : 1
HEALTH, SAFETY & ENVIRONMENTAL MANAGEMENT MANUAL Page 9 of 13
Back to Table of Contents
Workforce
General responsibilities and accountabilities for the workers will be as follows:
a) Every worker should/wear use personal Protective equipment provided to
them.
b) Every worker should follow all safety rules/ precautions such that the work
practices do not cause injury to themselves or co-workers.
c) Every worker is individually duty bound to take active interest in safety
measures and observe safety precautions. In the same way Supervisors
are responsible and accountable for the safety of their personnel and all
safety requirements in their area of activity.
d) All injuries occurred at Site - Major or Minor MUST BE reported to First Aid
Centre and to the immediate Supervisor.
e) Any unsafe condition/hazards observed affecting men, material or
equipments must be reported to immediate Supervisor and Safety officer/
site safety in charge.
f) Actively participate in Tool Box Talks.
Management Representative
Head – HSE is appointed as “Management Representative” and is given full
authority and organizational freedom for ensuring that the requirements of HSE
systems described in this manual are implemented and maintained.
Management Representative shall have the following responsibilities.
a) To ensure that Procedures needed for the HSE Management System of
the company are established, implemented and maintained in accordance
with the OHSAS 18001:2007 & ISO 14000: 2004.
b) To report to 'Top-Management’ on the performance of HSE Management
System'.
Further he will:
• Convene Company HSE Management Committee meetings periodically.
• Present the summary of performance on HSE management at sites to
Company HSE Committee
Consolidated Construction Consortium Ltd. HSE MANAGEMENT MANUAL
Chennai
DOC. NO. : CCCL/HSE/001
DATE : 20-03-2009
REV. NO. : 1
HEALTH, SAFETY & ENVIRONMENTAL MANAGEMENT MANUAL Page 10 of 13
Back to Table of Contents
• Communicate the Health, Safety and Environmental policies to all
employees.
• Plan and organize HSE Audits
• Ensure corrective actions on system non-conformities through follow-up
audits
• Liaison with external parties on matters relating to HSE Management
System of the Company
In all matters pertaining to HSE, the decision of Head - HSE shall be final. He
will have the authority to stop any work, which in his opinion does not conform to
HSE – Management System requirements.
4.4.2 Competence, Training & Awareness
a) Competency requirement for operating personnel whose work can cause
significant environmental impact / occupation health and safety risk are
identified as per CSP-4.4.2 Procedure for competency mapping, training
and awareness.
b) CCCL identifies training needs and provides necessary training.
i) SE/SS to conduct awareness programmes to Construction Engineers
/Supervisors at project site on HSE procedures/ instructions/ check
lists/ formats.
ii) SE/SS to conduct safety induction training to all contractor’s
supervisors and workmen.
iii) SE/SS/PE to conduct safety talks to contractors’ supervisors and
workers once in a week on safety issues for a duration of 30 minutes.
iv) The training shall be imparted taking into account the ability, literacy
levels, the language comprehension and risk levels of the personnel to
be trained.
c) Awareness with respect to HSE policy and procedures.
d) Awareness of safety precautions related to their activities as detailed in
“Operational Control Procedures”.
e) Emergency preparedness and response requirements specific to site.
f) Benefits of HSE performance improvement
Consolidated Construction Consortium Ltd. HSE MANAGEMENT MANUAL
Chennai
DOC. NO. : CCCL/HSE/001
DATE : 20-03-2009
REV. NO. : 1
HEALTH, SAFETY & ENVIRONMENTAL MANAGEMENT MANUAL Page 11 of 13
Back to Table of Contents
g) Consequences of departure from operating procedures.
Refer:CSP-4.4.2 “Procedure for competency mapping, & training and
awareness”.
4.4.3 Consultation, Participation & Communication
CCCL communicates HSE-Policy to all employees through:
Training
Display of Posters at prominent locations at the offices & sites
Bulletins
New recruits are provided orientation with respect to HSE-Policy during their
induction training.
CCCL communicates with respect to Environmental, Occupational Health &
Safety information to
Employees at various levels and functions through internal
correspondence, meetings, circulars etc. and
Interested Parties through pre-contract reviews, feedback sessions,
notifications etc
Company HSE Committee and Site HSE-Committees are constituted in
order to involve employees in the HSE Programs implementation through
consultation and participation mechanisms.
CCCL consults employees through these committees and ensures their
involvement in the areas of
Development and review of policies & procedures to manage risk;
Changes that affect work place health and safety.
CCCL informs employees and interested parties with respect to matters relating
to Environmental, Health & Safety Concerns through Head - HSE management.
Refer : CSP-4.4.3 “Procedure for Consultation, Participation and
Communication”
Consolidated Construction Consortium Ltd. HSE MANAGEMENT MANUAL
Chennai
DOC. NO. : CCCL/HSE/001
DATE : 20-03-2009
REV. NO. : 1
HEALTH, SAFETY & ENVIRONMENTAL MANAGEMENT MANUAL Page 12 of 13
Back to Table of Contents
4.4.4 HSE Documentation
The Health, Safety & Environmental Management System documentation in
CCCL includes the following:
"HSE Policy" and "HSE Objectives".
HSE Manual - First level
HSE Procedures (CSPs) - Second level
Operational Control Procedures (OCPs) – Third level
Formats and Records – Fourth Level
The fourth level documents will consist of records and other formats used for
maintaining the Health, Safety & Environmental Management System.
DOCUMENTATION PYRAMID
.
3
4
The HSE Procedures supporting the HSE management system are listed in the
adequacy matrix.
Refer : HSEM 0.5 –“Adequacy Matrix”
Ist Level
2nd
Level
3rd
Level
4th
Level
HSE Manual
HSE Procedures
OCPs
Formats & Records
1
2
1
Consolidated Construction Consortium Ltd. HSE MANAGEMENT MANUAL
Chennai
DOC. NO. : CCCL/HSE/001
DATE : 20-03-2009
REV. NO. : 1
HEALTH, SAFETY & ENVIRONMENTAL MANAGEMENT MANUAL Page 13 of 13
Back to Table of Contents
4.4.5 Control of Documents
The procedure for ensuring availability of pertinent issues of appropriate
documents to the users shall be as per:
Refer : CSP-4.4.5 “Procedure for Control of Documents”
4.4.6 Operational Control
CCCL identifies and carries out operations under specified conditions, which are
Associated with significant environmental aspects &
Associated with significant risks/major risks.
Specific operating instructions in the form of “Operating Control Procedures” are
developed for these activities, where their absence could lead to deviations from
HSE management system requirements, HSE-Policy and objectives & targets.
Refer : CSP-4.4.6 ” Preparation and issue of Operational control
procedures”
4.4.7 Emergency Preparedness & Response
CCCL identifies situations having potential for incidents/accidents and prepares
emergency preparedness plan & response for preventing / mitigating.
a) Likely illness / injuries / property damage.
b) Environmental impacts associated with them.
CCCL reviews & revises (if necessary) it’s emergency preparedness & response
procedures after the occurrence of incidents/accidents or emergency situations.
CCCL organizes mock drills/ test periodically (where practicable).
Refer : CSP-4.4.7 “Procedure For Emergency Preparedness &
Response”
Consolidated Construction Consortium Ltd. HSE MANAGEMENT MANUAL
Chennai
DOC. NO. : CCCL/HSE/001
DATE : 16-04-2008
REV. NO. : 0
HEALTH, SAFETY & ENVIRONMENTAL MANAGEMENT MANUAL Page 1 of 2
Back to Table of Contents
4.5 CHECKING & CORRECTIVE ACTION
4.5.1 Performance measurement and monitoring
The operations having significant risks are controlled and monitored through
“Operation Control Procedures” (OCPs).
CCCL monitors the operations through implementation of these OCPs while
carrying out various site operations.
CCCL monitors accidents, ill health, and incidents (including near misses)
The measuring and monitoring equipment are calibrated and records
maintained.
CCCL monitors the HSMPs for implementation and maintains progress reports.
CCCL evaluates and ensures compliance with relevant environmental health
and safety legislations.
Refer CSP- 4.5.1 procedure for “Performance Measurement & Monitoring”
4.5.2 Evaluation of Compliance
CCCL periodically evaluates its compliance with applicable legal and other
requirements to which it subscribes and maintains records as per CSP 4.5.2 -
“Procedure for Evaluation of Compliance”
4.5.3 Incident Investigations, Nonconformities, corrective actions and
preventive actions
CCCL established a procedure for Handling Investigation of incidents and
Nonconformities.
CCCL takes needed corrective / preventive action as per the procedure to
eliminate causes of actual and potential nonconformities and are appropriate to
the magnitude and commensurate with Environmental Impacts /OH&S risks
encountered.
CCCL implements and records changes to procedures resulting from
Corrective/Preventive action.
Consolidated Construction Consortium Ltd. HSE MANAGEMENT MANUAL
Chennai
DOC. NO. : CCCL/HSE/001
DATE : 16-04-2008
REV. NO. : 0
HEALTH, SAFETY & ENVIRONMENTAL MANAGEMENT MANUAL Page 2 of 2
Back to Table of Contents
Refer CSP – 4.5.3 Procedure for Handling Incident Investigations,
Nonconformity, Corrective Action & Preventive Action.
4.5.4 Control of Records
Records are established and maintained:
a) To provide evidence of conformity to requirements;
b) To demonstrate the effective operation of HSE management system.
A documented procedure has been established for Identification, Storage,
Protection & retrieval indicating the retention period and disposition of records.
Refer CSP - 4.5.4 “Procedure for Control of Records”
4.5.5 Internal Audit
CCCL establishes and maintains a procedure for conducting HSE-system
internal audits. The internal audit schedules are issued twice a year by Head -
HSE management.
Head - HSE management considers HSE performance while preparing audit
schedules.
The schedules are based on the Environmental importance and results of risk
assessments carried out.
Refer : CSP- 4.5.5 “Procedure for Internal Audits.”
Consolidated Construction Consortium Ltd. HSE MANAGEMENT MANUAL
Chennai
DOC. NO. : CCCL/HSE/001
DATE : 16-04-2008
REV. NO. : 0
HEALTH, SAFETY & ENVIRONMENTAL MANAGEMENT MANUAL Page 1 of 2
Back to Table of Contents
4.6 MANAGEMENT REVIEW
Management review is conducted by the Company’s HSE Management Committee.
The HSE Management Committee is the apex level committee to oversee the
overall effectiveness of company's HSE policies, procedures. The committee meet
at least twice in a year preferably after completing internal audits for reviewing the
HSE management system performance.
4.6.1 Company HSE Management Committee
Constitution and responsibilities of various HSE committee members is detailed
in clause no. 4.4.1. Head - HSE management organises to maintain record of
minutes of HSE Management Committee meetings.
The structure of the HSE management committee is as follows
Chairman: MD
Facilitator: Head - HSE management
Members: RM, RSH, SH, HOD
Periodicity: Twice in a year
HSE - Management Committee will review HSE-performance as per the
‘Agenda’ for ensuring that HSE management system continues to be suitable,
adequate and effective is continually improving.
The HSE - Management Committee ‘Agenda’ shall include the feedback from
project sites HSE committees on the following points.
a) Status of Legal and regulatory compliance
b) Review of incidents and accidents
c) Review of external interested party complaints
d) Review of the results of Mock drills
e) Results of Internal Audits and System Audits
f)Status of corrective & preventive actions
g) Review HSE Objectives & Targets and HSE performance of the
organisation
h) Review of HSE Policy
i) Changes in legal and other requirements relating to environmental aspects
and occupational healthy and safety
j) Resources adequacy
k) Follow up action of previous Management Reviews
l) Recommendation for improvement
Consolidated Construction Consortium Ltd. HSE MANAGEMENT MANUAL
Chennai
DOC. NO. : CCCL/HSE/001
DATE : 16-04-2008
REV. NO. : 0
HEALTH, SAFETY & ENVIRONMENTAL MANAGEMENT MANUAL Page 2 of 2
Back to Table of Contents
The committee will deliberate and take appropriate decisions for time bound
implementation. Head - HSE management to record the decisions taken in the
HSE committee meeting and communicate to all concerned. Head - HSE
management to review the implementation of the decisions and report to top
management on the status.
4.6.2 Site HSE Committees
The site HSE committee consists of the following members:
Project Manager (PM)/ Project in charge – Chairman cum Convenor
Safety Engineer/ Safety Supervisor– Secretary
Project Engineers (Civil / Mech. / Elec. etc),
Sub-contractor’s representatives & Workers representatives
Note: No. of worker representatives should not be less than management
representatives.
The site HSE committee meetings are conducted once in a quarter with the
following agenda points and the feedback is sent to HO / Head - HSE for review
and to include after compiling in the company’s HSE - management committee
meetings.
a) Safety audit results.
b) Accident investigation reports, if any.
c) Compliance to safety audit observations.
d) Compliance to system audit observations.
e) Awareness, training and adequacy of displays and posters.
f) Provision, use and quality of Personal Protective Equipment (PPE).
g) Observations/inputs from workers representative.
h) Adequacy of emergency preparedness and ensuring Emergency Response
is current with the needs. Review of the results of Mock-drill.
i) Review of previous minutes of meeting
j) Review of forthcoming activities at the site and precautions to be taken
against potential hazards.
k) Review of Environmental Management Programmes (EMPs) and Health &
Safety Management Programmes (HSMPs).
l) Others, if any.
Note: Special site HSE Committee Meeting may be held any time as required.

More Related Content

What's hot

13 initial project site office set up risk assessment templates
13 initial project site office set up risk assessment templates13 initial project site office set up risk assessment templates
13 initial project site office set up risk assessment templatesDwarika Bhushan Sharma
 
HIRA TRAINING PPT.pptx
HIRA  TRAINING PPT.pptxHIRA  TRAINING PPT.pptx
HIRA TRAINING PPT.pptxMoolRaj3
 
Hse monthly report june 2015. rev.01 by.arber dogani example statistics
Hse monthly report   june 2015. rev.01 by.arber dogani  example statisticsHse monthly report   june 2015. rev.01 by.arber dogani  example statistics
Hse monthly report june 2015. rev.01 by.arber dogani example statisticsArber Dogani
 
Basic Safety Officer's Course
Basic  Safety Officer's CourseBasic  Safety Officer's Course
Basic Safety Officer's CourseTaqvi11
 
ISO 45001 Employee Awareness Training
ISO 45001 Employee Awareness TrainingISO 45001 Employee Awareness Training
ISO 45001 Employee Awareness TrainingDr Madhu Aman Sharma
 
HSE Training Presentation for ISO 14001, ISO 45001 Integration
HSE Training Presentation for ISO 14001, ISO 45001 IntegrationHSE Training Presentation for ISO 14001, ISO 45001 Integration
HSE Training Presentation for ISO 14001, ISO 45001 IntegrationGlobal Manager Group
 
Iso 45001 hazard identification and risk assessment
Iso 45001 hazard identification and risk assessmentIso 45001 hazard identification and risk assessment
Iso 45001 hazard identification and risk assessmentHpm India
 
El001 environmental aspects and impacts register website
El001 environmental aspects and impacts register   websiteEl001 environmental aspects and impacts register   website
El001 environmental aspects and impacts register websiteAbid Iqbal
 
Integrated ISO 14001, ISO 45001 Certification Documents
Integrated ISO 14001, ISO 45001 Certification DocumentsIntegrated ISO 14001, ISO 45001 Certification Documents
Integrated ISO 14001, ISO 45001 Certification DocumentsGlobal Manager Group
 
Monthly Safety Report Feb 2012
Monthly Safety Report Feb 2012Monthly Safety Report Feb 2012
Monthly Safety Report Feb 2012ChinaHarbour
 
Visitors SHE Induction Presentation 2016
Visitors SHE Induction Presentation 2016Visitors SHE Induction Presentation 2016
Visitors SHE Induction Presentation 2016Chris Morris
 
How to Implement ISO 45001
How to Implement ISO 45001 How to Implement ISO 45001
How to Implement ISO 45001 Craig Thornton
 
25 demolition of existing concrete structures risk assessment templates
25 demolition of existing concrete structures risk assessment templates25 demolition of existing concrete structures risk assessment templates
25 demolition of existing concrete structures risk assessment templatesDwarika Bhushan Sharma
 
Workshop Technology unit 1 - Accident Prevention
Workshop Technology unit 1 - Accident PreventionWorkshop Technology unit 1 - Accident Prevention
Workshop Technology unit 1 - Accident PreventionAfif Akmal
 
Basic Fire Fighting Training
Basic Fire Fighting TrainingBasic Fire Fighting Training
Basic Fire Fighting TrainingChristian Escaler
 
Health & Safety Induction Training
Health & Safety Induction TrainingHealth & Safety Induction Training
Health & Safety Induction TrainingThe Pathway Group
 

What's hot (20)

13 initial project site office set up risk assessment templates
13 initial project site office set up risk assessment templates13 initial project site office set up risk assessment templates
13 initial project site office set up risk assessment templates
 
HIRA TRAINING PPT.pptx
HIRA  TRAINING PPT.pptxHIRA  TRAINING PPT.pptx
HIRA TRAINING PPT.pptx
 
Hse monthly report june 2015. rev.01 by.arber dogani example statistics
Hse monthly report   june 2015. rev.01 by.arber dogani  example statisticsHse monthly report   june 2015. rev.01 by.arber dogani  example statistics
Hse monthly report june 2015. rev.01 by.arber dogani example statistics
 
Iso 45001 2018
Iso 45001 2018Iso 45001 2018
Iso 45001 2018
 
Dropped Objects (DROPS) Prevention
Dropped Objects (DROPS) PreventionDropped Objects (DROPS) Prevention
Dropped Objects (DROPS) Prevention
 
Basic Safety Officer's Course
Basic  Safety Officer's CourseBasic  Safety Officer's Course
Basic Safety Officer's Course
 
ISO 45001 Employee Awareness Training
ISO 45001 Employee Awareness TrainingISO 45001 Employee Awareness Training
ISO 45001 Employee Awareness Training
 
HSE Training Presentation for ISO 14001, ISO 45001 Integration
HSE Training Presentation for ISO 14001, ISO 45001 IntegrationHSE Training Presentation for ISO 14001, ISO 45001 Integration
HSE Training Presentation for ISO 14001, ISO 45001 Integration
 
Iso 45001 hazard identification and risk assessment
Iso 45001 hazard identification and risk assessmentIso 45001 hazard identification and risk assessment
Iso 45001 hazard identification and risk assessment
 
El001 environmental aspects and impacts register website
El001 environmental aspects and impacts register   websiteEl001 environmental aspects and impacts register   website
El001 environmental aspects and impacts register website
 
Induction QHSE
Induction QHSEInduction QHSE
Induction QHSE
 
Integrated ISO 14001, ISO 45001 Certification Documents
Integrated ISO 14001, ISO 45001 Certification DocumentsIntegrated ISO 14001, ISO 45001 Certification Documents
Integrated ISO 14001, ISO 45001 Certification Documents
 
Monthly Safety Report Feb 2012
Monthly Safety Report Feb 2012Monthly Safety Report Feb 2012
Monthly Safety Report Feb 2012
 
Visitors SHE Induction Presentation 2016
Visitors SHE Induction Presentation 2016Visitors SHE Induction Presentation 2016
Visitors SHE Induction Presentation 2016
 
How to Implement ISO 45001
How to Implement ISO 45001 How to Implement ISO 45001
How to Implement ISO 45001
 
Life Saving Rules - HSE
Life Saving Rules - HSELife Saving Rules - HSE
Life Saving Rules - HSE
 
25 demolition of existing concrete structures risk assessment templates
25 demolition of existing concrete structures risk assessment templates25 demolition of existing concrete structures risk assessment templates
25 demolition of existing concrete structures risk assessment templates
 
Workshop Technology unit 1 - Accident Prevention
Workshop Technology unit 1 - Accident PreventionWorkshop Technology unit 1 - Accident Prevention
Workshop Technology unit 1 - Accident Prevention
 
Basic Fire Fighting Training
Basic Fire Fighting TrainingBasic Fire Fighting Training
Basic Fire Fighting Training
 
Health & Safety Induction Training
Health & Safety Induction TrainingHealth & Safety Induction Training
Health & Safety Induction Training
 

Viewers also liked

Adepp Monitor User Guide
Adepp Monitor User GuideAdepp Monitor User Guide
Adepp Monitor User Guideguest360c0efa
 
Gallowglass security ltd h&s i nductionv1
Gallowglass security ltd h&s i nductionv1Gallowglass security ltd h&s i nductionv1
Gallowglass security ltd h&s i nductionv1Jaco Nieuwoudt
 
Petronas health, safety and environment guidelines (HSE)
Petronas health, safety and environment guidelines (HSE)Petronas health, safety and environment guidelines (HSE)
Petronas health, safety and environment guidelines (HSE)Easwaran Kanason
 
Fire drill procedure
Fire drill procedureFire drill procedure
Fire drill procedureMaria Hidalgo
 
Fire safety in the Workplace
Fire safety in the WorkplaceFire safety in the Workplace
Fire safety in the WorkplaceAlphaPlusChampion
 

Viewers also liked (20)

Project hse plan
Project hse planProject hse plan
Project hse plan
 
Adepp Monitor User Guide
Adepp Monitor User GuideAdepp Monitor User Guide
Adepp Monitor User Guide
 
Gallowglass security ltd h&s i nductionv1
Gallowglass security ltd h&s i nductionv1Gallowglass security ltd h&s i nductionv1
Gallowglass security ltd h&s i nductionv1
 
Hse 6 revision_2
Hse 6 revision_2Hse 6 revision_2
Hse 6 revision_2
 
OCCUPATIONAL HEALTH AND SAFETY
OCCUPATIONAL HEALTH AND SAFETYOCCUPATIONAL HEALTH AND SAFETY
OCCUPATIONAL HEALTH AND SAFETY
 
Nebosh unit ib questions ans matrix
Nebosh unit ib questions ans matrixNebosh unit ib questions ans matrix
Nebosh unit ib questions ans matrix
 
Welcome heath safety
Welcome heath safetyWelcome heath safety
Welcome heath safety
 
Nebosh unit ic questions matrix - ans
Nebosh unit ic questions matrix - ansNebosh unit ic questions matrix - ans
Nebosh unit ic questions matrix - ans
 
Hse plan
Hse planHse plan
Hse plan
 
Introduction to HSE
Introduction to HSEIntroduction to HSE
Introduction to HSE
 
Safety evaluation Best practices-04.11.10
Safety evaluation   Best practices-04.11.10Safety evaluation   Best practices-04.11.10
Safety evaluation Best practices-04.11.10
 
Amn safety induction j 175 - staff rev 4 - s 14
Amn safety induction  j 175 - staff rev 4 - s 14Amn safety induction  j 175 - staff rev 4 - s 14
Amn safety induction j 175 - staff rev 4 - s 14
 
Safety_induction
Safety_inductionSafety_induction
Safety_induction
 
Health and safety
Health and safetyHealth and safety
Health and safety
 
Petronas health, safety and environment guidelines (HSE)
Petronas health, safety and environment guidelines (HSE)Petronas health, safety and environment guidelines (HSE)
Petronas health, safety and environment guidelines (HSE)
 
Hse Action Plan
Hse Action PlanHse Action Plan
Hse Action Plan
 
Session 2 General Safety Requirements
Session 2   General Safety RequirementsSession 2   General Safety Requirements
Session 2 General Safety Requirements
 
Fire drill procedure
Fire drill procedureFire drill procedure
Fire drill procedure
 
Fire safety in the Workplace
Fire safety in the WorkplaceFire safety in the Workplace
Fire safety in the Workplace
 
Industrial safety.ppt
Industrial safety.pptIndustrial safety.ppt
Industrial safety.ppt
 

Similar to Hse apex manual

REDECO Profile 1394.11.21 Eng
REDECO Profile 1394.11.21 EngREDECO Profile 1394.11.21 Eng
REDECO Profile 1394.11.21 EngNasrin Khazali
 
Resume a.lakshmi narayanan-ehsq expert
Resume a.lakshmi narayanan-ehsq expertResume a.lakshmi narayanan-ehsq expert
Resume a.lakshmi narayanan-ehsq expertA Lakshmi Narayanan
 
construction quality improvement- Presentation
construction quality improvement- Presentationconstruction quality improvement- Presentation
construction quality improvement- PresentationManjunatha L.R
 
Internship Report_Zealcon_By_Ajmad_Mehmood_and_Muddassir_Raza
Internship Report_Zealcon_By_Ajmad_Mehmood_and_Muddassir_RazaInternship Report_Zealcon_By_Ajmad_Mehmood_and_Muddassir_Raza
Internship Report_Zealcon_By_Ajmad_Mehmood_and_Muddassir_RazaMuddassir Raza
 
ajay jain FINAL REPORT
ajay jain FINAL REPORTajay jain FINAL REPORT
ajay jain FINAL REPORTAJAY JAIN
 
Auspicious_Profile_Teletalk(DT)_technical _Proposal
Auspicious_Profile_Teletalk(DT)_technical _ProposalAuspicious_Profile_Teletalk(DT)_technical _Proposal
Auspicious_Profile_Teletalk(DT)_technical _ProposalMd Joynal Abaden
 
A project report on DLW export procedure to non railway customer by Anand kum...
A project report on DLW export procedure to non railway customer by Anand kum...A project report on DLW export procedure to non railway customer by Anand kum...
A project report on DLW export procedure to non railway customer by Anand kum...Anand Kumar Tiwari
 
RESUME - Vikram Panwar - CE
RESUME - Vikram Panwar - CERESUME - Vikram Panwar - CE
RESUME - Vikram Panwar - CEVikram Panwar
 
descon internship report
descon internship  reportdescon internship  report
descon internship reportEngineerQazi
 
Occupational health and safety management system
Occupational health and safety management systemOccupational health and safety management system
Occupational health and safety management systemeSAT Publishing House
 
Occupational health and safety management system (ohsms) model for constructi...
Occupational health and safety management system (ohsms) model for constructi...Occupational health and safety management system (ohsms) model for constructi...
Occupational health and safety management system (ohsms) model for constructi...eSAT Journals
 
Training report of Elin Electronics Ltd.
Training report  of Elin Electronics Ltd.Training report  of Elin Electronics Ltd.
Training report of Elin Electronics Ltd.adi174
 
Vocational training report l&t
Vocational training report l&tVocational training report l&t
Vocational training report l&tNishant Pandey
 
Tiêu Chuẩn BS 8536 2_2016
Tiêu Chuẩn BS 8536 2_2016Tiêu Chuẩn BS 8536 2_2016
Tiêu Chuẩn BS 8536 2_2016Huytraining
 
Fall Accidents Caused By Accidents
Fall Accidents Caused By AccidentsFall Accidents Caused By Accidents
Fall Accidents Caused By AccidentsAnn Johnson
 

Similar to Hse apex manual (20)

REDECO Profile 1394.11.21 Eng
REDECO Profile 1394.11.21 EngREDECO Profile 1394.11.21 Eng
REDECO Profile 1394.11.21 Eng
 
Resume a.lakshmi narayanan-ehsq expert
Resume a.lakshmi narayanan-ehsq expertResume a.lakshmi narayanan-ehsq expert
Resume a.lakshmi narayanan-ehsq expert
 
Final Project
Final ProjectFinal Project
Final Project
 
construction quality improvement- Presentation
construction quality improvement- Presentationconstruction quality improvement- Presentation
construction quality improvement- Presentation
 
Internship Report_Zealcon_By_Ajmad_Mehmood_and_Muddassir_Raza
Internship Report_Zealcon_By_Ajmad_Mehmood_and_Muddassir_RazaInternship Report_Zealcon_By_Ajmad_Mehmood_and_Muddassir_Raza
Internship Report_Zealcon_By_Ajmad_Mehmood_and_Muddassir_Raza
 
ajay jain FINAL REPORT
ajay jain FINAL REPORTajay jain FINAL REPORT
ajay jain FINAL REPORT
 
STI Group Brochure
STI Group BrochureSTI Group Brochure
STI Group Brochure
 
Quality references or standard
Quality references or standardQuality references or standard
Quality references or standard
 
Auspicious_Profile_Teletalk(DT)_technical _Proposal
Auspicious_Profile_Teletalk(DT)_technical _ProposalAuspicious_Profile_Teletalk(DT)_technical _Proposal
Auspicious_Profile_Teletalk(DT)_technical _Proposal
 
Pm only
Pm onlyPm only
Pm only
 
Pm only
Pm onlyPm only
Pm only
 
A project report on DLW export procedure to non railway customer by Anand kum...
A project report on DLW export procedure to non railway customer by Anand kum...A project report on DLW export procedure to non railway customer by Anand kum...
A project report on DLW export procedure to non railway customer by Anand kum...
 
RESUME - Vikram Panwar - CE
RESUME - Vikram Panwar - CERESUME - Vikram Panwar - CE
RESUME - Vikram Panwar - CE
 
descon internship report
descon internship  reportdescon internship  report
descon internship report
 
Occupational health and safety management system
Occupational health and safety management systemOccupational health and safety management system
Occupational health and safety management system
 
Occupational health and safety management system (ohsms) model for constructi...
Occupational health and safety management system (ohsms) model for constructi...Occupational health and safety management system (ohsms) model for constructi...
Occupational health and safety management system (ohsms) model for constructi...
 
Training report of Elin Electronics Ltd.
Training report  of Elin Electronics Ltd.Training report  of Elin Electronics Ltd.
Training report of Elin Electronics Ltd.
 
Vocational training report l&t
Vocational training report l&tVocational training report l&t
Vocational training report l&t
 
Tiêu Chuẩn BS 8536 2_2016
Tiêu Chuẩn BS 8536 2_2016Tiêu Chuẩn BS 8536 2_2016
Tiêu Chuẩn BS 8536 2_2016
 
Fall Accidents Caused By Accidents
Fall Accidents Caused By AccidentsFall Accidents Caused By Accidents
Fall Accidents Caused By Accidents
 

More from Abid Iqbal

Ras laffan ohs management system 5 june.2011
Ras laffan ohs management system 5 june.2011Ras laffan ohs management system 5 june.2011
Ras laffan ohs management system 5 june.2011Abid Iqbal
 
Ohsas 18001 manual nsls
Ohsas 18001 manual   nslsOhsas 18001 manual   nsls
Ohsas 18001 manual nslsAbid Iqbal
 
Mc phillips integrated management system manual
Mc phillips integrated management system manualMc phillips integrated management system manual
Mc phillips integrated management system manualAbid Iqbal
 
Mc phillips integrated management system manual (1)
Mc phillips integrated management system manual (1)Mc phillips integrated management system manual (1)
Mc phillips integrated management system manual (1)Abid Iqbal
 
Iso 18001 health_and_safety_manual
Iso 18001 health_and_safety_manualIso 18001 health_and_safety_manual
Iso 18001 health_and_safety_manualAbid Iqbal
 
Ims iso-9001-iso-14001-ohsas-18001-documentation-package
Ims iso-9001-iso-14001-ohsas-18001-documentation-packageIms iso-9001-iso-14001-ohsas-18001-documentation-package
Ims iso-9001-iso-14001-ohsas-18001-documentation-packageAbid Iqbal
 
Dalair limited health_and_safety_manual_2011
Dalair limited health_and_safety_manual_2011Dalair limited health_and_safety_manual_2011
Dalair limited health_and_safety_manual_2011Abid Iqbal
 
Campus services healthandsafetymanual
Campus services healthandsafetymanualCampus services healthandsafetymanual
Campus services healthandsafetymanualAbid Iqbal
 

More from Abid Iqbal (9)

Ras laffan ohs management system 5 june.2011
Ras laffan ohs management system 5 june.2011Ras laffan ohs management system 5 june.2011
Ras laffan ohs management system 5 june.2011
 
Ohsas 18001 manual nsls
Ohsas 18001 manual   nslsOhsas 18001 manual   nsls
Ohsas 18001 manual nsls
 
Mc phillips integrated management system manual
Mc phillips integrated management system manualMc phillips integrated management system manual
Mc phillips integrated management system manual
 
Mc phillips integrated management system manual (1)
Mc phillips integrated management system manual (1)Mc phillips integrated management system manual (1)
Mc phillips integrated management system manual (1)
 
Iso 18001 health_and_safety_manual
Iso 18001 health_and_safety_manualIso 18001 health_and_safety_manual
Iso 18001 health_and_safety_manual
 
Ims iso-9001-iso-14001-ohsas-18001-documentation-package
Ims iso-9001-iso-14001-ohsas-18001-documentation-packageIms iso-9001-iso-14001-ohsas-18001-documentation-package
Ims iso-9001-iso-14001-ohsas-18001-documentation-package
 
Dalair limited health_and_safety_manual_2011
Dalair limited health_and_safety_manual_2011Dalair limited health_and_safety_manual_2011
Dalair limited health_and_safety_manual_2011
 
Campus services healthandsafetymanual
Campus services healthandsafetymanualCampus services healthandsafetymanual
Campus services healthandsafetymanual
 
G4 s csrr12
G4 s csrr12G4 s csrr12
G4 s csrr12
 

Recently uploaded

Mumbai Call Girls, 💞 Prity 9892124323, Navi Mumbai Call girls
Mumbai Call Girls, 💞  Prity 9892124323, Navi Mumbai Call girlsMumbai Call Girls, 💞  Prity 9892124323, Navi Mumbai Call girls
Mumbai Call Girls, 💞 Prity 9892124323, Navi Mumbai Call girlsPooja Nehwal
 
Air pollution soli pollution water pollution noise pollution land pollution
Air pollution soli pollution water pollution noise pollution land pollutionAir pollution soli pollution water pollution noise pollution land pollution
Air pollution soli pollution water pollution noise pollution land pollutionrgxv72jrgc
 
See How do animals kill their prey for food
See How do animals kill their prey for foodSee How do animals kill their prey for food
See How do animals kill their prey for fooddrsk203
 
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170simranguptaxx69
 
Hi FI Call Girl Ahmedabad 7397865700 Independent Call Girls
Hi FI Call Girl Ahmedabad 7397865700 Independent Call GirlsHi FI Call Girl Ahmedabad 7397865700 Independent Call Girls
Hi FI Call Girl Ahmedabad 7397865700 Independent Call Girlsssuser7cb4ff
 
办理(Victoria毕业证书)维多利亚大学毕业证成绩单原版一比一
办理(Victoria毕业证书)维多利亚大学毕业证成绩单原版一比一办理(Victoria毕业证书)维多利亚大学毕业证成绩单原版一比一
办理(Victoria毕业证书)维多利亚大学毕业证成绩单原版一比一z xss
 
VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130
VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130
VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130Suhani Kapoor
 
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...ranjana rawat
 
Soil pollution causes effects remedial measures
Soil pollution causes effects remedial measuresSoil pollution causes effects remedial measures
Soil pollution causes effects remedial measuresvasubhanot1234
 
Poly-film-Prefab cover agricultural greenhouse-polyhouse structure.pptx
Poly-film-Prefab cover agricultural greenhouse-polyhouse structure.pptxPoly-film-Prefab cover agricultural greenhouse-polyhouse structure.pptx
Poly-film-Prefab cover agricultural greenhouse-polyhouse structure.pptxAgrodome projects LLP
 
Dwarka Call Girls 9643097474 Phone Number 24x7 Best Services
Dwarka Call Girls 9643097474 Phone Number 24x7 Best ServicesDwarka Call Girls 9643097474 Phone Number 24x7 Best Services
Dwarka Call Girls 9643097474 Phone Number 24x7 Best Servicesnajka9823
 
Low Rate Call Girls Bikaner Anika 8250192130 Independent Escort Service Bikaner
Low Rate Call Girls Bikaner Anika 8250192130 Independent Escort Service BikanerLow Rate Call Girls Bikaner Anika 8250192130 Independent Escort Service Bikaner
Low Rate Call Girls Bikaner Anika 8250192130 Independent Escort Service BikanerSuhani Kapoor
 
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...Cluster TWEED
 
Joint GBIF Biodiversa+ symposium in Helsinki on 2024-04-16
Joint GBIF Biodiversa+ symposium in  Helsinki on 2024-04-16Joint GBIF Biodiversa+ symposium in  Helsinki on 2024-04-16
Joint GBIF Biodiversa+ symposium in Helsinki on 2024-04-16Dag Endresen
 
(RIYA) Kalyani Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(RIYA) Kalyani Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(RIYA) Kalyani Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(RIYA) Kalyani Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Call Girls Ahmedabad 7397865700 Ridhima Hire Me Full Night
Call Girls Ahmedabad 7397865700 Ridhima Hire Me Full NightCall Girls Ahmedabad 7397865700 Ridhima Hire Me Full Night
Call Girls Ahmedabad 7397865700 Ridhima Hire Me Full Nightssuser7cb4ff
 

Recently uploaded (20)

Mumbai Call Girls, 💞 Prity 9892124323, Navi Mumbai Call girls
Mumbai Call Girls, 💞  Prity 9892124323, Navi Mumbai Call girlsMumbai Call Girls, 💞  Prity 9892124323, Navi Mumbai Call girls
Mumbai Call Girls, 💞 Prity 9892124323, Navi Mumbai Call girls
 
Air pollution soli pollution water pollution noise pollution land pollution
Air pollution soli pollution water pollution noise pollution land pollutionAir pollution soli pollution water pollution noise pollution land pollution
Air pollution soli pollution water pollution noise pollution land pollution
 
See How do animals kill their prey for food
See How do animals kill their prey for foodSee How do animals kill their prey for food
See How do animals kill their prey for food
 
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170
 
Hi FI Call Girl Ahmedabad 7397865700 Independent Call Girls
Hi FI Call Girl Ahmedabad 7397865700 Independent Call GirlsHi FI Call Girl Ahmedabad 7397865700 Independent Call Girls
Hi FI Call Girl Ahmedabad 7397865700 Independent Call Girls
 
Sexy Call Girls Patel Nagar New Delhi +918448380779 Call Girls Service in Del...
Sexy Call Girls Patel Nagar New Delhi +918448380779 Call Girls Service in Del...Sexy Call Girls Patel Nagar New Delhi +918448380779 Call Girls Service in Del...
Sexy Call Girls Patel Nagar New Delhi +918448380779 Call Girls Service in Del...
 
办理(Victoria毕业证书)维多利亚大学毕业证成绩单原版一比一
办理(Victoria毕业证书)维多利亚大学毕业证成绩单原版一比一办理(Victoria毕业证书)维多利亚大学毕业证成绩单原版一比一
办理(Victoria毕业证书)维多利亚大学毕业证成绩单原版一比一
 
VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130
VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130
VIP Call Girls Service Chaitanyapuri Hyderabad Call +91-8250192130
 
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
 
Green Banking
Green Banking Green Banking
Green Banking
 
Soil pollution causes effects remedial measures
Soil pollution causes effects remedial measuresSoil pollution causes effects remedial measures
Soil pollution causes effects remedial measures
 
Poly-film-Prefab cover agricultural greenhouse-polyhouse structure.pptx
Poly-film-Prefab cover agricultural greenhouse-polyhouse structure.pptxPoly-film-Prefab cover agricultural greenhouse-polyhouse structure.pptx
Poly-film-Prefab cover agricultural greenhouse-polyhouse structure.pptx
 
Dwarka Call Girls 9643097474 Phone Number 24x7 Best Services
Dwarka Call Girls 9643097474 Phone Number 24x7 Best ServicesDwarka Call Girls 9643097474 Phone Number 24x7 Best Services
Dwarka Call Girls 9643097474 Phone Number 24x7 Best Services
 
Low Rate Call Girls Bikaner Anika 8250192130 Independent Escort Service Bikaner
Low Rate Call Girls Bikaner Anika 8250192130 Independent Escort Service BikanerLow Rate Call Girls Bikaner Anika 8250192130 Independent Escort Service Bikaner
Low Rate Call Girls Bikaner Anika 8250192130 Independent Escort Service Bikaner
 
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
 
Joint GBIF Biodiversa+ symposium in Helsinki on 2024-04-16
Joint GBIF Biodiversa+ symposium in  Helsinki on 2024-04-16Joint GBIF Biodiversa+ symposium in  Helsinki on 2024-04-16
Joint GBIF Biodiversa+ symposium in Helsinki on 2024-04-16
 
Call Girls In R.K. Puram 9953056974 Escorts ServiCe In Delhi Ncr
Call Girls In R.K. Puram 9953056974 Escorts ServiCe In Delhi NcrCall Girls In R.K. Puram 9953056974 Escorts ServiCe In Delhi Ncr
Call Girls In R.K. Puram 9953056974 Escorts ServiCe In Delhi Ncr
 
(RIYA) Kalyani Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(RIYA) Kalyani Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(RIYA) Kalyani Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(RIYA) Kalyani Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Gandhi Nagar (Delhi) 9953330565 Escorts, Call Girls Services
Gandhi Nagar (Delhi) 9953330565 Escorts, Call Girls ServicesGandhi Nagar (Delhi) 9953330565 Escorts, Call Girls Services
Gandhi Nagar (Delhi) 9953330565 Escorts, Call Girls Services
 
Call Girls Ahmedabad 7397865700 Ridhima Hire Me Full Night
Call Girls Ahmedabad 7397865700 Ridhima Hire Me Full NightCall Girls Ahmedabad 7397865700 Ridhima Hire Me Full Night
Call Girls Ahmedabad 7397865700 Ridhima Hire Me Full Night
 

Hse apex manual

  • 1. Consolidated Construction Consortium Ltd. HSE MANAGEMENT MANUAL Chennai DOC. NO. : CCCL/HSE/001 DATE : 02-09-2011 REV. NO. : 2 HEALTH, SAFETY & ENVIRONMENTAL MANAGEMENT MANUAL HHEEAALLTTHH,, SSAAFFEETTYY AANNDD EENNVVIIRROONNMMEENNTTAALL MMAANNAAGGEEMMEENNTT MMAANNUUAALL CCoonnssoolliiddaatteedd CCoonnssttrruuccttiioonn CCoonnssoorrttiiuumm LLttdd IInn CCoommpplliiaannccee wwiitthh OOHHSSAASS 1188000011:: 22000077 && IISSOO 1144000011::22000044
  • 2. Consolidated Construction Consortium Ltd. HSE MANAGEMENT MANUAL Chennai DOC. NO. : CCCL/HSE/001 DATE : 02-09-2011 REV. NO. : 2 HEALTH, SAFETY & ENVIRONMENTAL MANAGEMENT MANUAL Page: 1 of 1 0.1 MANUAL CONTROL PAGE HHEEAALLTTHH,, SSAAFFEETTYY AANNDD EENNVVIIRROONNMMEENNTTAALL MMAANNAAGGEEMMEENNTT MMAANNUUAALL HSE MANUAL Rev. No. 2 Date : 02-09-2011 ISSUED BY HEAD – HSE ISSUED TO
  • 3. Consolidated Construction Consortium Ltd. HSE MANAGEMENT MANUAL Chennai DOC. NO. : CCCL/HSE/001 DATE : 02-09-2011 REV. NO. : 2 HEALTH, SAFETY & ENVIRONMENTAL MANAGEMENT MANUAL Page 1 of 1 0.2 TABLE OF CONTENTS Revision Status HSE Manual Ref. Title Rev. No. Date 0.1 Manual Control Page 2 02-09-2011 0.2 Table of Contents 2 02-09-2011 0.3 Record of Revisions 2 02-09-2011 0.4 Organization Profile 0 16-04-2008 0.5 Adequacy Matrix 1 02-09-2011 1.0 Scope 0 16-04-2008 2.0 References 0 16-04-2008 3.0 Terms & Definitions 0 16-04-2008 4.0 HSE Management System 0 16-04-2008 4.1 HSE Management System at CCCL 0 16-04-2008 4.2 HSE Policy 0 16-04-2008 4.3 HSE Planning 2 02-09-2011 4.4 Implementation & Operation 1 20-03-2009 4.5 Checking & Corrective Action 0 16-04-2008 4.6 Management Review 0 16-04-2008
  • 4. Consolidated Construction Consortium Ltd. HSE MANAGEMENT MANUAL Chennai DOC. NO. : CCCL/HSE/001 DATE : 02-09-2011 REV. NO. : 2 HEALTH, SAFETY & ENVIRONMENTAL MANAGEMENT MANUAL Page 1 of 1 Back to Table of Contents 0.3 RECORD OF REVISIONS HSE Manual Section Ref. Rev. No. Date Brief Record of Revision 4.4 (Implementation and Operation) 1 20-03-2009 In section 4.4 for positions, accountability included. 4.3 HSE Planning 1 10-03-2010 In section 4.3.3 for Objectives and Targets 4.3 HSE Planning 2 02-09-2011 Earlier section 4.3.1A and 4.3.1B combined as 4.3.1
  • 5. Consolidated Construction Consortium Ltd. HSE MANAGEMENT MANUAL Chennai DOC. NO. : CCCL/HSE/001 DATE : 16-04-2008 REV. NO. : 0 HEALTH, SAFETY & ENVIRONMENTAL MANAGEMENT MANUAL Page 1 of 3 Back to Table of Contents 0.4 ORGANIZATION PROFILE CCCL is a professionally managed civil construction company started in 1997 by young and highly talented engineering professionals. The company is managed by highly dedicated young technical and commercial team backed by a strong dynamic leadership of Mr. S. Sivaramakrishnan, Managing Director under the able guidance and support of Mr. R. Sarabeswar, Chairman & CEO. The CCCL team has professionals in all the key areas of construction as follows. • Design • Project Management Services • Execution of Projects a) Major Housing Complexes b) Industrial Structures c) Commercial Complexes d) Airport Complexes e) Waste water treatment plants f) Long span Pre-cast Concrete Structures g) Retro fitting Execution of Pre-engineered buildings CCCL has every capability to undertake large turnkey projects. Besides on-site computerized monitoring, a comprehensive control over all projects through link-up with a central server at regional centre guarantees fluent progress of projects at all times. In last 10 years CCCL has built more than 300 buildings and structures for various clients in different part of India which are monuments and stand as testimony to the ability of CCCL. A few of the technical achievement of CCCL are given in below : • Largest Post Tensioned Structure in India • Longest Portal Frame Structure in India • Best of its class in Large Turnkey Operations
  • 6. Consolidated Construction Consortium Ltd. HSE MANAGEMENT MANUAL Chennai DOC. NO. : CCCL/HSE/001 DATE : 16-04-2008 REV. NO. : 0 HEALTH, SAFETY & ENVIRONMENTAL MANAGEMENT MANUAL Page 2 of 3 Back to Table of Contents • First International Convention Center in Mangalore • Biggest Dome Structure in Asia and Second Largest in the World • Largest Single Shell Hyperbolic Parabolic Structure in India • First Platinum Rated Green Building in the World by the US green Building Council CCCL has received many accolades and has been conferred with many awards for its stellar performance in building industry from various Government agencies & corporate clients. CCCL has been awarded ISO 9001-2000 certification by BVCI for implementation of the Quality Management System to meet the high standards of quality and enhance customer satisfaction. CCCL has emphasized safety of all its employees and others working in the project sites by framing the HSE policy and is fully committed to address all areas to provide and maintain healthy and safe working environment to its employees and others working in project sites. THE PRODUCT DIVISIONS Mechanical and Electrical Division Our M&E Division is primarily responsible for the management and execution of electrical, mechanical, plumbing, heating, ventilation and air-conditioning works at project locations. This division has been providing its services for projects that we construct and is proposing to commence the provision of services for projects which it tenders independently. This division also provides consultancy and execution services for various contract works. These services are typically provided at a fixed rate per square foot. In addition to providing and implementing electrical, mechanical, plumbing and air- conditioning works, the M&E division also provides design, estimation and procurement services. Consolidated Interiors Limited (CIL) Our Subsidiary, CIL is engaged in the provision of interior contracting and fit out services for our own projects and to a range of third party public and private sector clients. It was formed as a result of a goodwill agreement entered into between our Company and Trendtech CDAC, an entity engaged in providing interior contracting services.
  • 7. Consolidated Construction Consortium Ltd. HSE MANAGEMENT MANUAL Chennai DOC. NO. : CCCL/HSE/001 DATE : 16-04-2008 REV. NO. : 0 HEALTH, SAFETY & ENVIRONMENTAL MANAGEMENT MANUAL Page 3 of 3 Back to Table of Contents Building Products Division Our Building Products Division consists of batching plant for production of ready mixed concrete and manufacturing facility for production of building blocks. We have 12 batching plants engaged in the production of various grades of ready mixed concrete at various locations in India. Our batching plants are located to our various project locations depending on demand and have operated in locations like Tamil Nadu, Karnataka, Andhra Pradesh, Maharashtra and Chandigarh. Software Designs Department (Yuga Design) Yuga Design is our in house software design division which provides integrated software based engineering design services to a variety of domestic and international clients including large engineering companies and to prominent architects. Glazing Solutions To date we have been providing glazing solutions as part of our turn-key construction services to various clients through third party service providers. In order to improve our scheme of concentric integration we have begun the process of incorporating Noble Consolidated Glazings Limited with the object of providing glazing solutions in-house. The key factors for success of the company lies in three values of being Creative, Committed and Customer Focused. To respond quickly and cater to customer requirements, CCCL has expanded its business and has set up regional offices at Chennai, Bangalore, Hyderabad, New Delhi, Pune, Kolkatta and Thiruvananthapuram.
  • 8. Consolidated Construction Consortium Ltd. HSE MANAGEMENT MANUAL Chennai DOC. NO. : CCCL/HSE/001 DATE : 02-09-2011 REV. NO. : 1 HEALTH, SAFETY & ENVIRONMENTAL MANAGEMENT MANUAL Page 1 of 2 Back to Table of Contents 0.5 ADEQUACY MATRIX OHSAS 18001 & ISO 14001 Cl. Ref HSEM Ref. Title 2nd Level Documents - 0.1 Manual Control Page - - 0.2 Table of contents - 0.3 Records of Revisions - 0.4 Organization Profile - - 0.5 Adequacy Matrix - 1.0 1.0 Scope - 2.0 2.0 References - 3.0 3.0 Terms and definitions - 3.1 Glossary of Terms - 3.2 Abbreviations - 4.0 4.0 Health, Safety & Environmental Management System - 4.1 4.1 General Requirements: Scope of Health, Safety & Environmental Management System at CCCL - 4.2 4.2 Health, Safety & Environmental Policy - 4.3 4.3 HSE Planning - 4.3.1 4.3.1 Procedure for Identification of Environmental Aspects, Hazards, Evaluation of Impacts, Risks & Determination of Control Measures CSP-4.3.1 4.3.2 4.3.2 Legal & Other Requirements CSP-4.3.2 4.3.3 4.3.3 HSE Objectives & Targets and Management Program CSP-4.3.3A CSP-4.3.3B 4.4 4.4 Implementation & Operation - 4.4.1 4.4.1 HSE Organization Structure: Resources, Roles, Responsibility, Authority & Accountability -
  • 9. Consolidated Construction Consortium Ltd. HSE MANAGEMENT MANUAL Chennai DOC. NO. : CCCL/HSE/001 DATE : 02-09-2011 REV. NO. : 1 HEALTH, SAFETY & ENVIRONMENTAL MANAGEMENT MANUAL Page 2 of 2 Back to Table of Contents OHSAS 18001 & ISO 14001 Cl. Ref HSEM Ref Title 2nd Level Documents 4.4.2 4.4.2 Competence, Training and Awareness CSP-4.4.2 4.4.3 4.4.3 Consultation, Participation & Communication CSP- 4.4.3 4.4.4 4.4.4 HSE Documentation - 4.4.5 4.4.5 Control of Documents CSP- 4.4.5 4.4.6 4.4.6 Operational Control CSP- 4.4.6 4.4.7 4.4.7 Emergency Preparedness and Response CSP- 4.4.7 4.5 4.5 Checking & Corrective Action - 4.5.1 4.5.1 Performance measurement & monitoring CSP- 4.5.1 4.5.2 4.5.2 Evaluation of Compliance CSP- 4.5.2 4.5.3 4.5.3 Incident Investigations, Non Conformity, Corrective Action & Preventive Action CSP- 4.5.3 4.5.4 4.5.4 Control of Records CSP-4.5.4 4.5.5 4.5.5 Internal Audit CSP-4.5.5 4.6 4.6 Management Review -
  • 10. Consolidated Construction Consortium Ltd. HSE MANAGEMENT MANUAL Chennai DOC. NO. : CCCL/HSE/001 DATE : 16-04-2008 REV. NO. : 0 HEALTH, SAFETY & ENVIRONMENTAL MANAGEMENT MANUAL Page 1 of 2 Back to Table of Contents 1.0 SCOPE Health, Safety and Environmental Manual details the Health, Safety and Environmental management system of Consolidated Construction Consortium Limited in meeting the requirements of: OHSAS 18001: 2007 Occupational Health and Safety Management Systems – Requirements ISO: 14001: 2004 Environmental Management Systems – Requirements with guidance for use. CCCL Management has opted for Third Party Certification process and towards this the documentation has been prepared for compliance. The effective date of implementation of this manual is from 16-04-2008.
  • 11. Consolidated Construction Consortium Ltd. HSE MANAGEMENT MANUAL Chennai DOC. NO. : CCCL/HSE/001 DATE : 16-04-2008 REV. NO. : 0 HEALTH, SAFETY & ENVIRONMENTAL MANAGEMENT MANUAL Page 2 of 2 Back to Table of Contents 1.1 Safety and Health Guidelines Work safety, improvement of health, and environmental protection matters are important aspects of our entrepreneurial business activities. Consequently the Board of Directors supports all measures to upgrade work safety and the health of our workforce. Accidents and health risks can be totally or at least partially avoided if risks and dangers will be managed and countered by an organised implementation of safety measures. These include in particular: a) a clear assignment of authorities, responsibilities and accountabilities. b) full attention, without any compromise, to safety & Environmental standards, the use of technical safety installations and personal protective equipment by our employees and c) continuous on the job training of all personnel To promote work health, safety & environmental improvement is one of the predominant tasks of each Manager. The prevention of accidents on the basis of efficient safety measures is an indispensable proof of qualification. It is, however, only through planned co-operation of all group and company employees that these guidelines can be successfully applied in practice in order to further enhance work safety and health issues of our workforce. The Board of Directors of CCCL considers health, safety & environment a decisive prerequisite and to also improve our company's financial performance.
  • 12. Consolidated Construction Consortium Ltd. HSE MANAGEMENT MANUAL Chennai DOC. NO. : CCCL/HSE/001 DATE : 16-04-2008 REV. NO. : 0 HEALTH, SAFETY & ENVIRONMENTAL MANAGEMENT MANUAL Page 1 of 1 Back to Table of Contents 2.0 REFERENCES OHSAS 18001:2007 - Occupational, Health and Safety Management Systems – Requirements. OHSAS 18002:2000 - Occupational, Health & Safety Management Systems - Guidelines for the implementation of OHSAS 18001. ISO 14001 - 2004 - Environmental Management Systems - Requirements with guidance for use. ISO 14004-2004 - Environmental management systems – General guidelines on principles, systems and supporting techniques. Laws and Regulations related to HSE (Detailed in Register of Regulations)
  • 13. Consolidated Construction Consortium Ltd. HSE MANAGEMENT MANUAL Chennai DOC. NO. : CCCL/HSE/001 DATE : 16-04-2008 REV. NO. : 0 HEALTH, SAFETY & ENVIRONMENTAL MANAGEMENT MANUAL Page 1 of 2 Back to Table of Contents 3.0 TERMS & DEFINITIONS 3.1 Glossary of Terms As described in OHSAS 18001: 2007 and in ISO 14001: 2004 Standards 3.2 Abbreviations CCCL - Consolidated Construction Consortium Ltd CEO - Chief Executive Officer CSF - CCCL Safety Format CSP - CCCL Safety Procedure DO - Director – Operations DMR - Deputy Management Representative EMP - Environmental Management Program HO - Head Office HSE - Health, Safety and Environment HSEM - Health, Safety and Environmental Manual HSEMS - Health, Safety and Environmental Management System HOD - Head of the Department HSMP - Health & Safety Management Programme IA - Internal Audit ISO - International Organization for Standardization LC - Legal Concern MD - Managing Director MR - Management Representative NCR - Non Conformity Report OCP - Operational Control Procedure OH&S - Occupational Health & Safety PC - Project Coordinator PIC - Project In-charge
  • 14. Consolidated Construction Consortium Ltd. HSE MANAGEMENT MANUAL Chennai DOC. NO. : CCCL/HSE/001 DATE : 16-04-2008 REV. NO. : 0 HEALTH, SAFETY & ENVIRONMENTAL MANAGEMENT MANUAL Page 2 of 2 Back to Table of Contents PM - Project Manager PPE - Personal Protective Equipment RM - Regional Manager RO - Regional Office ROR - Register of Regulations RSH - Regional Sector Heads RSC - Regional Safety Coordinator SE - Safety Engineer SH - Sector Heads SS - Safety Supervisor SSC - Sector Safety Coordinator
  • 15. Consolidated Construction Consortium Ltd. HSE MANAGEMENT MANUAL Chennai DOC. NO. : CCCL/HSE/001 DATE : 16-04-2008 REV. NO. : 0 HEALTH, SAFETY & ENVIRONMENTAL MANAGEMENT MANUAL Page 1 of 1 Back to Table of Contents 4.0 HEALTH, SAFETY ENVIRONMENTAL MANAGEMENT SYSTEM 4.1 General Requirements: Scope of Health, Safety Environmental Management System at CCCL The scope covers “All activities related to Engineering, Procurement and Construction services for Buildings, Industrial Structures and Infrastructure projects” This system encompasses all activities performed at Head Office, Regional offices and Construction Project Sites connected with Regional Offices. This HSE management system aims to eliminate or minimize impacts/risks associated with its activities and covers all employees (Including employees engaged by sub-contractors) and other interested parties. The activities are systematized with respect to OHSAS: 18001-2007 & ISO 14001:2004, this HSE Manual is prepared and implemented for achieving continual improvement on 'Health and Safety Management System performance'.
  • 16. Consolidated Construction Consortium Ltd. HSE MANAGEMENT MANUAL Chennai DOC. NO. : CCCL/HSE/001 DATE : 16-04-2008 REV. NO. : 0 HEALTH, SAFETY & ENVIRONMENTAL MANAGEMENT MANUAL Page 1 of 1 Back to Table of Contents 4.2 HSE POLICY
  • 17. Consolidated Construction Consortium Ltd. HSE MANAGEMENT MANUAL Chennai DOC. NO. : CCCL/HSE/001 DATE : 02-09-2011 REV. NO. : 2 HEALTH, SAFETY & ENVIRONMENTAL MANAGEMENT MANUAL Page 1 of 3 Back to Table of Contents 4.3 HSE PLANNING 4.3.1 Identification of Environmental Aspects, Hazards, Evaluation of Impacts, Risks & Determination of Control Measures Significant Aspects and Major Risks associated with the activities at all construction project sites, Head Office and Regional Office are identified considering • Emissions to air • Releases to water • Waste Management • Land Contamination • Raw materials usage & natural resources and covering • Routine & Non routine Activities • Activities of all personnel having access to work place Viz. Workers of sub- contractors and visitors • Facilities provided and • Procurement of Equipment and Materials The impacts are evaluated based on their Quantum, Severity, and Probability & Duration, Resource Conservation Potential, Legal & Other Requirements, Interested Party Concern and Emergency. The risk assessment associated with the identified hazards is carried out based on probability of occurrence & severity of the hazard impact Refer CSP-4.3.1 “Procedure for Identification of Environmental Aspects, Hazards, Evaluation of Impacts, Risks & Determination of Control Measures.” Head - HSE management ensures to consider the information as a result of identification of aspects having significant impact and identification of hazards based on risk assessment in setting up “Objectives & Targets“ for Occupational Health & Safety Performance. 4.3.2 Legal & Other Requirements CCCL considers the following for identifying Legal and Other Requirements applicable, for Safety, Health and Environmental Management. • Site-specific requirements such as operating permits.
  • 18. Consolidated Construction Consortium Ltd. HSE MANAGEMENT MANUAL Chennai DOC. NO. : CCCL/HSE/001 DATE : 02-09-2011 REV. NO. : 2 HEALTH, SAFETY & ENVIRONMENTAL MANAGEMENT MANUAL Page 2 of 3 Back to Table of Contents • Industry specific requirements • Applicable Legal & Other requirements • Any other requirements basedon authorizations, agreements, Contracts and permits • CCCL Policy guidelines. CCCL identifies, updates and communicates these “Legal & Other Requirements” as per “Procedure for Identification of Legal & Other Requirements”. Refer CSP- 4.3.2 “Procedure For Identification of Legal & Other Requirements.” 4.3.3 HSE Objectives & Targets and Management Programmes CCCL considers the following for setting “Objectives and Targets” a) Legal requirements b) Risks associated with Occupational Health & Safety Hazards. c) Significant Environmental Aspects & Impacts d) Views of Interested Parties. e) CCCL-HSE Policy Guidelines (Other Requirements). f) Financial / Operational / Business related / Technological options. CCCL sets these objectives & targets consistent with HSE policy. Refer CSP-4.3.3A “Procedure for Setting Objectives and Targets” Company – wide objectives and targets are a) Power consumption reduction 2% every year b) Frequency Rate reduction 5% every year c) Shuttering/Scaffolding Material damage reduction 2% every year d) Steel scrap reduction 2% every year. e) Cement wastage reduction 2% every year. f) Achieve safety training coverage to 20% of total manpower in a year.
  • 19. Consolidated Construction Consortium Ltd. HSE MANAGEMENT MANUAL Chennai DOC. NO. : CCCL/HSE/001 DATE : 02-09-2011 REV. NO. : 2 HEALTH, SAFETY & ENVIRONMENTAL MANAGEMENT MANUAL Page 3 of 3 Back to Table of Contents Management Programmes CCCL Site management prepares Health & Safety Management Programme (HSMP) and Environmental Management Program (EMP) for achieving its ”Objectives & Targets” set for Occupational Health & Safety Performance at respective sites. These programs indicate responsibility, resources needed and time frame by which these are to be achieved. CCCL prepares new HSMP / EMP to meet the new development or modified activities specific to the project sites Refer CSP-4.3.3B “Procedure for Health & Safety Management Programme and Environmental Management Program” The Overall HSE Planning is detailed in the flow diagram below HSE Policy Objectives & Targets Health & Safety Management Programmes Company HSE Committee Site HSE Committee Legal Compliance Significant Aspects Significant Hazards View of Interested Parties Business Concern Monitor, Review and set new objectives & targets for continual improvement
  • 20. Consolidated Construction Consortium Ltd. HSE MANAGEMENT MANUAL Chennai DOC. NO. : CCCL/HSE/001 DATE : 20-03-2009 REV. NO. : 1 HEALTH, SAFETY & ENVIRONMENTAL MANAGEMENT MANUAL Page 1 of 13 Back to Table of Contents 4.4 IMPLEMENTATION & OPERATIONS 4.4.1 HSE Organization Structure: Resources, Roles, Responsibility, Authority and Accountability CCCL has set up an organization structure for implementing and to continually improve HSE performance
  • 21. Consolidated Construction Consortium Ltd. HSE MANAGEMENT MANUAL Chennai DOC. NO. : CCCL/HSE/001 DATE : 20-03-2009 REV. NO. : 1 HEALTH, SAFETY & ENVIRONMENTAL MANAGEMENT MANUAL Page 2 of 13 Back to Table of Contents RESPONSIBILITIES , AUTHORITIES AND ACCOUNTABILITIES Responsibilities, authorities of personnel who manage, perform and verify HSE activities are as detailed below. Managing Director MD is the Chairman of the Company HSE Management Committee and is responsible for periodical reviews of company level HSE management and to provide necessary resources. Regional Manager/Regional Sector Manager RM/RSH is the member of the Company HSE Management Committee is responsible and accountable for review and implementation of HSE management for all the sites under his control and provides necessary resources. Head - HSE Head – HSE is the Management Representative (MR) is overall responsible, and assisted by Deputy Management Representative (DMR), for: a) Ensures the HSE management system requirements are established, implemented and maintained b) Conduct Company HSE Management Committee meetings periodically. c) Presents the summary of performance on HSE management at sites to HSE management committee, including recommendations for improvement. d) Communicates the Health, Safety and Environmental policies to all employees. e) Issue necessary directives to Regional Safety coordinators and render advice to the Project manager, as required. f) Monitor and assess HSE measures of Sites/Region and fix accountability on Sector Heads, Project in Charges towards non- compliance of HSE requirement and HSE performance. g) Compile Corporate Accident Statistics.
  • 22. Consolidated Construction Consortium Ltd. HSE MANAGEMENT MANUAL Chennai DOC. NO. : CCCL/HSE/001 DATE : 20-03-2009 REV. NO. : 1 HEALTH, SAFETY & ENVIRONMENTAL MANAGEMENT MANUAL Page 3 of 13 Back to Table of Contents Regional Safety Coordinator a) Ensures the HSE management system requirements are implemented and maintained b) Conduct Company Regional HSE Management Committee meetings periodically. c) Presents the summary of performance on HSE management at sites to Regional HSE management committee, including recommendations for improvement. d) Communicates the Health, Safety and Environmental policies to all employees. e) Render assistance to the Regional Managers in formulating and adhering to the client's contract health, safety and environmental plan, in line with the HSE policy of CCCL and the requirements of the activities of the contract. f) Issue necessary directives to Safety Engineers and render advice to the Project manager/Project In-Charges, as required. g) Monitor and assess HSE measures of the Sites and fix accountability to the Project in-charges/Project Engineers for the non-compliance of HSE requirement. h) Investigating all serious accidents to reinforce the safety programme or the code of practice itself. i) Formulate new safety measures required for the Project. j) Compile Regional Accident Statistics. Safety Engineer / Supervisor a) Ensure that supervisors and workers have received the necessary / required HSE Induction training. b) Conduct regular HSE inspection at sites. c) Monitor Toolbox talks conducted by Project Engineer/ Supervisor
  • 23. Consolidated Construction Consortium Ltd. HSE MANAGEMENT MANUAL Chennai DOC. NO. : CCCL/HSE/001 DATE : 20-03-2009 REV. NO. : 1 HEALTH, SAFETY & ENVIRONMENTAL MANAGEMENT MANUAL Page 4 of 13 Back to Table of Contents d) Conduct Toolbox meetings at area level. (Tool Box Talk review on other activities.) e) Take part in investigations of accidents (incidents’ including near misses). f) Gathering and compiling of safety data. g) Interact with Project Manager, Resident Engineer, Supervisors and Workers. h) Interact with Client's HSE Department. i) Perform safety audits as per specific instructions. j) Identify the areas of environmental protection requirements. k) Discuss with Management on training requirements and implement education of the workforce. l) Improve HSE awareness amongst all CCCL personnel by using standard training aids such as videos, posters, films, handouts, etc. m) Monitor the activities involving potential environmental damage and advise the Project Manager on corrective actions. n) Take part in Client's : - HSE meetings - HSE audit o) Discuss with the Project Manager/ Project In-Charge on the effectiveness of the HSE monitoring programme. p) Monitor First aid facilities. q) Notify RSC on the HSE non-compliance and person responsible for that. Project Coordinator Project Coordinator is overall responsible and accountable for the HSE Management related to persons working at the project sites with him. a) PC with the help of Regional Safety Coordinator prepares project specific safety instructions taking into consideration the local applicable legal
  • 24. Consolidated Construction Consortium Ltd. HSE MANAGEMENT MANUAL Chennai DOC. NO. : CCCL/HSE/001 DATE : 20-03-2009 REV. NO. : 1 HEALTH, SAFETY & ENVIRONMENTAL MANAGEMENT MANUAL Page 5 of 13 Back to Table of Contents requirements, in addition to the relevant portions of Safety Instructions of company. b) PC will ensure that a site specific HSE committee is formed by Project Manager within 30 days of job starting. c) PC will monitor the site safety performance Project Manager / Project in Charge The Project Manager / Project in charge will be fully responsible and accountable for all activities of the work site. His detailed responsibilities include the following: a) Implement CCCL and Client HSE Policy and HSE Plan. b) Ensure the provision and use of suitable safety equipment and protective clothing. c) Ensure that plant, vehicles and equipment are suitable, regularly maintained, correctly operated and not misused. d) Ensure that all accidents are reported and investigated. e) Initiate action to rectify the unsafe conditions and practices. f) Ascertain that all 'First Aid' facilities are kept available and maintained. g) Ensure that provision of a tidy and well-organised working environment. h) Ensure that the employees, under his control, are adequately trained for the work in hand. i) Issue clear, specific and regular instructions on HSE requirements, when directing operations. j) Consult the Head-HSE / Regional HSE Coordinator / Site HSE Personnel / P & M Manager on safety aspects related to particular activity / plant or machinery. k) Conduct site HSE meetings. l) Liaise and communicate with Client's HSE Department.
  • 25. Consolidated Construction Consortium Ltd. HSE MANAGEMENT MANUAL Chennai DOC. NO. : CCCL/HSE/001 DATE : 20-03-2009 REV. NO. : 1 HEALTH, SAFETY & ENVIRONMENTAL MANAGEMENT MANUAL Page 6 of 13 Back to Table of Contents m) Set and maintain a personal example at all times. n) Take part in : - The Investigation and reporting of incidents. - Site HSE Audits - Site Hygiène inspections - All HSE meetings. P & M Engineer The P & M Engineer shall be conversant with relevant rules and regulations of the CCCL HSE policy. His responsibilities/accountabilities will include: a) Responsibility that HSE Standards are being followed by Technicians and visitors at all times. b) Ensure that employees are given adequate information, instructions, supervision and training to enable them to carryout the duties and activities safely as required by CCCL / Client HSE Management System. c) Ensure that suitable Personal Protective Equipment such as Protective Clothing, Safety Helmet, Safety Belt, etc. is provided and used. d) Ensure that vehicles, plant and equipment are adequately maintained in an efficient, safe condition and comply with the relevant laws of the country and licensing requirements. e) Ensure that the lifting equipment displays SWL and is thoroughly inspected (by a third party) every 12 months. Records of such inspections must be kept at site. f) Ensure that only trained, competent / experienced operators operate the vehicles, plants and machines. g) Ensure that fixed, portable electrical installation and equipment are regularly checked by competent electrical staff. h) Ensure that all accidents and dangerous occurrences are reported and the more serious ones thoroughly investigated. i) Ensure the safe storage, transport and use of flammable and compressed gas cylinders. j) Set a personal example at all times.
  • 26. Consolidated Construction Consortium Ltd. HSE MANAGEMENT MANUAL Chennai DOC. NO. : CCCL/HSE/001 DATE : 20-03-2009 REV. NO. : 1 HEALTH, SAFETY & ENVIRONMENTAL MANAGEMENT MANUAL Page 7 of 13 Back to Table of Contents Project Engineers / Supervisors / Foremen Since the Site Engineers / Supervisors / Foreman are responsible and accountable for providing a safe work environment to their workforce, the primary safety inspections are their responsibility. As they spend most of their time in respective construction sections it is their task to continuously monitor working conditions. Their qualifications include awareness of accident potential, application of HSE measures to their areas, ability to make intelligent decisions regarding corrective actions, diplomacy in handling personnel and situations. Their responsibilities include: a) To be aware of the hazards of their activities and the necessary controls to prevent incidents. b) To ensure that all personnel on site have undergone the mandatory HSE Induction training courses prior to mobilising to site. c) To ensure that all employees are provided with necessary Personal Protective Equipment. d) To implement and promote awareness of safe working practices on job sites. e) To ensure that only trained and competent persons shall operate vehicles, plants and equipment. f)To ensure that cranes and lifting equipment have valid test certificates. g) To ensure that all employees are given adequate information, instructions and supervision to enable them to work safely. As a part of this, they will conduct the daily Tool Box Talks. h) Take part in the investigation of incidents and the dissemination of learning points to their workforce. i) Take part in the HSE meetings.
  • 27. Consolidated Construction Consortium Ltd. HSE MANAGEMENT MANUAL Chennai DOC. NO. : CCCL/HSE/001 DATE : 20-03-2009 REV. NO. : 1 HEALTH, SAFETY & ENVIRONMENTAL MANAGEMENT MANUAL Page 8 of 13 Back to Table of Contents Sub-Contractor / Supervisor The Sub-contractor and his supervisors are responsible and accountable for the safety of workers engaged by them and also they are held responsible if any of their activity/ worker causes danger to other workers/ activity. a) Sub-contractor shall ensure that all their workers attend safety induction conducted by company's Safety Engineer/Supervisor before engaging them on the job at site. b) Sub-contractor and their supervisor are responsible to provide all personal safety and protective equipment required, to perform the job as suggested by site Safety Officer / Safety In charge. c) Sub-contractor or his supervisor should take part in site HSE committee and communicate the HSE committee proceedings to his workmen. d) Sub-contractor or his supervisor should spare the workmen representatives selected by company for attending Site HSE committee meetings, safety audit and enquiries whenever required. e) Sub-contractor shall provide clean drinking water, wash rooms and canteen facilities and maintain the facilities in hygiene condition. f)Sub-contractor shall provide equipment and lifting appliances, which conform to specified requirements under rules. g) Sub-contractor shall arrange safety talk for 30 min. at least once in every week before starting the work, with the help of company's Safety Engineer/Supervisor/Project Engineer h) Sub-contractor or his supervisor should ensure that all the observations/ nonconformities given by Safety Audit Team are complied with in stipulated time period. i) Sub-contractor should make provisions for first aid and medical facilities to his employees.
  • 28. Consolidated Construction Consortium Ltd. HSE MANAGEMENT MANUAL Chennai DOC. NO. : CCCL/HSE/001 DATE : 20-03-2009 REV. NO. : 1 HEALTH, SAFETY & ENVIRONMENTAL MANAGEMENT MANUAL Page 9 of 13 Back to Table of Contents Workforce General responsibilities and accountabilities for the workers will be as follows: a) Every worker should/wear use personal Protective equipment provided to them. b) Every worker should follow all safety rules/ precautions such that the work practices do not cause injury to themselves or co-workers. c) Every worker is individually duty bound to take active interest in safety measures and observe safety precautions. In the same way Supervisors are responsible and accountable for the safety of their personnel and all safety requirements in their area of activity. d) All injuries occurred at Site - Major or Minor MUST BE reported to First Aid Centre and to the immediate Supervisor. e) Any unsafe condition/hazards observed affecting men, material or equipments must be reported to immediate Supervisor and Safety officer/ site safety in charge. f) Actively participate in Tool Box Talks. Management Representative Head – HSE is appointed as “Management Representative” and is given full authority and organizational freedom for ensuring that the requirements of HSE systems described in this manual are implemented and maintained. Management Representative shall have the following responsibilities. a) To ensure that Procedures needed for the HSE Management System of the company are established, implemented and maintained in accordance with the OHSAS 18001:2007 & ISO 14000: 2004. b) To report to 'Top-Management’ on the performance of HSE Management System'. Further he will: • Convene Company HSE Management Committee meetings periodically. • Present the summary of performance on HSE management at sites to Company HSE Committee
  • 29. Consolidated Construction Consortium Ltd. HSE MANAGEMENT MANUAL Chennai DOC. NO. : CCCL/HSE/001 DATE : 20-03-2009 REV. NO. : 1 HEALTH, SAFETY & ENVIRONMENTAL MANAGEMENT MANUAL Page 10 of 13 Back to Table of Contents • Communicate the Health, Safety and Environmental policies to all employees. • Plan and organize HSE Audits • Ensure corrective actions on system non-conformities through follow-up audits • Liaison with external parties on matters relating to HSE Management System of the Company In all matters pertaining to HSE, the decision of Head - HSE shall be final. He will have the authority to stop any work, which in his opinion does not conform to HSE – Management System requirements. 4.4.2 Competence, Training & Awareness a) Competency requirement for operating personnel whose work can cause significant environmental impact / occupation health and safety risk are identified as per CSP-4.4.2 Procedure for competency mapping, training and awareness. b) CCCL identifies training needs and provides necessary training. i) SE/SS to conduct awareness programmes to Construction Engineers /Supervisors at project site on HSE procedures/ instructions/ check lists/ formats. ii) SE/SS to conduct safety induction training to all contractor’s supervisors and workmen. iii) SE/SS/PE to conduct safety talks to contractors’ supervisors and workers once in a week on safety issues for a duration of 30 minutes. iv) The training shall be imparted taking into account the ability, literacy levels, the language comprehension and risk levels of the personnel to be trained. c) Awareness with respect to HSE policy and procedures. d) Awareness of safety precautions related to their activities as detailed in “Operational Control Procedures”. e) Emergency preparedness and response requirements specific to site. f) Benefits of HSE performance improvement
  • 30. Consolidated Construction Consortium Ltd. HSE MANAGEMENT MANUAL Chennai DOC. NO. : CCCL/HSE/001 DATE : 20-03-2009 REV. NO. : 1 HEALTH, SAFETY & ENVIRONMENTAL MANAGEMENT MANUAL Page 11 of 13 Back to Table of Contents g) Consequences of departure from operating procedures. Refer:CSP-4.4.2 “Procedure for competency mapping, & training and awareness”. 4.4.3 Consultation, Participation & Communication CCCL communicates HSE-Policy to all employees through: Training Display of Posters at prominent locations at the offices & sites Bulletins New recruits are provided orientation with respect to HSE-Policy during their induction training. CCCL communicates with respect to Environmental, Occupational Health & Safety information to Employees at various levels and functions through internal correspondence, meetings, circulars etc. and Interested Parties through pre-contract reviews, feedback sessions, notifications etc Company HSE Committee and Site HSE-Committees are constituted in order to involve employees in the HSE Programs implementation through consultation and participation mechanisms. CCCL consults employees through these committees and ensures their involvement in the areas of Development and review of policies & procedures to manage risk; Changes that affect work place health and safety. CCCL informs employees and interested parties with respect to matters relating to Environmental, Health & Safety Concerns through Head - HSE management. Refer : CSP-4.4.3 “Procedure for Consultation, Participation and Communication”
  • 31. Consolidated Construction Consortium Ltd. HSE MANAGEMENT MANUAL Chennai DOC. NO. : CCCL/HSE/001 DATE : 20-03-2009 REV. NO. : 1 HEALTH, SAFETY & ENVIRONMENTAL MANAGEMENT MANUAL Page 12 of 13 Back to Table of Contents 4.4.4 HSE Documentation The Health, Safety & Environmental Management System documentation in CCCL includes the following: "HSE Policy" and "HSE Objectives". HSE Manual - First level HSE Procedures (CSPs) - Second level Operational Control Procedures (OCPs) – Third level Formats and Records – Fourth Level The fourth level documents will consist of records and other formats used for maintaining the Health, Safety & Environmental Management System. DOCUMENTATION PYRAMID . 3 4 The HSE Procedures supporting the HSE management system are listed in the adequacy matrix. Refer : HSEM 0.5 –“Adequacy Matrix” Ist Level 2nd Level 3rd Level 4th Level HSE Manual HSE Procedures OCPs Formats & Records 1 2 1
  • 32. Consolidated Construction Consortium Ltd. HSE MANAGEMENT MANUAL Chennai DOC. NO. : CCCL/HSE/001 DATE : 20-03-2009 REV. NO. : 1 HEALTH, SAFETY & ENVIRONMENTAL MANAGEMENT MANUAL Page 13 of 13 Back to Table of Contents 4.4.5 Control of Documents The procedure for ensuring availability of pertinent issues of appropriate documents to the users shall be as per: Refer : CSP-4.4.5 “Procedure for Control of Documents” 4.4.6 Operational Control CCCL identifies and carries out operations under specified conditions, which are Associated with significant environmental aspects & Associated with significant risks/major risks. Specific operating instructions in the form of “Operating Control Procedures” are developed for these activities, where their absence could lead to deviations from HSE management system requirements, HSE-Policy and objectives & targets. Refer : CSP-4.4.6 ” Preparation and issue of Operational control procedures” 4.4.7 Emergency Preparedness & Response CCCL identifies situations having potential for incidents/accidents and prepares emergency preparedness plan & response for preventing / mitigating. a) Likely illness / injuries / property damage. b) Environmental impacts associated with them. CCCL reviews & revises (if necessary) it’s emergency preparedness & response procedures after the occurrence of incidents/accidents or emergency situations. CCCL organizes mock drills/ test periodically (where practicable). Refer : CSP-4.4.7 “Procedure For Emergency Preparedness & Response”
  • 33. Consolidated Construction Consortium Ltd. HSE MANAGEMENT MANUAL Chennai DOC. NO. : CCCL/HSE/001 DATE : 16-04-2008 REV. NO. : 0 HEALTH, SAFETY & ENVIRONMENTAL MANAGEMENT MANUAL Page 1 of 2 Back to Table of Contents 4.5 CHECKING & CORRECTIVE ACTION 4.5.1 Performance measurement and monitoring The operations having significant risks are controlled and monitored through “Operation Control Procedures” (OCPs). CCCL monitors the operations through implementation of these OCPs while carrying out various site operations. CCCL monitors accidents, ill health, and incidents (including near misses) The measuring and monitoring equipment are calibrated and records maintained. CCCL monitors the HSMPs for implementation and maintains progress reports. CCCL evaluates and ensures compliance with relevant environmental health and safety legislations. Refer CSP- 4.5.1 procedure for “Performance Measurement & Monitoring” 4.5.2 Evaluation of Compliance CCCL periodically evaluates its compliance with applicable legal and other requirements to which it subscribes and maintains records as per CSP 4.5.2 - “Procedure for Evaluation of Compliance” 4.5.3 Incident Investigations, Nonconformities, corrective actions and preventive actions CCCL established a procedure for Handling Investigation of incidents and Nonconformities. CCCL takes needed corrective / preventive action as per the procedure to eliminate causes of actual and potential nonconformities and are appropriate to the magnitude and commensurate with Environmental Impacts /OH&S risks encountered. CCCL implements and records changes to procedures resulting from Corrective/Preventive action.
  • 34. Consolidated Construction Consortium Ltd. HSE MANAGEMENT MANUAL Chennai DOC. NO. : CCCL/HSE/001 DATE : 16-04-2008 REV. NO. : 0 HEALTH, SAFETY & ENVIRONMENTAL MANAGEMENT MANUAL Page 2 of 2 Back to Table of Contents Refer CSP – 4.5.3 Procedure for Handling Incident Investigations, Nonconformity, Corrective Action & Preventive Action. 4.5.4 Control of Records Records are established and maintained: a) To provide evidence of conformity to requirements; b) To demonstrate the effective operation of HSE management system. A documented procedure has been established for Identification, Storage, Protection & retrieval indicating the retention period and disposition of records. Refer CSP - 4.5.4 “Procedure for Control of Records” 4.5.5 Internal Audit CCCL establishes and maintains a procedure for conducting HSE-system internal audits. The internal audit schedules are issued twice a year by Head - HSE management. Head - HSE management considers HSE performance while preparing audit schedules. The schedules are based on the Environmental importance and results of risk assessments carried out. Refer : CSP- 4.5.5 “Procedure for Internal Audits.”
  • 35. Consolidated Construction Consortium Ltd. HSE MANAGEMENT MANUAL Chennai DOC. NO. : CCCL/HSE/001 DATE : 16-04-2008 REV. NO. : 0 HEALTH, SAFETY & ENVIRONMENTAL MANAGEMENT MANUAL Page 1 of 2 Back to Table of Contents 4.6 MANAGEMENT REVIEW Management review is conducted by the Company’s HSE Management Committee. The HSE Management Committee is the apex level committee to oversee the overall effectiveness of company's HSE policies, procedures. The committee meet at least twice in a year preferably after completing internal audits for reviewing the HSE management system performance. 4.6.1 Company HSE Management Committee Constitution and responsibilities of various HSE committee members is detailed in clause no. 4.4.1. Head - HSE management organises to maintain record of minutes of HSE Management Committee meetings. The structure of the HSE management committee is as follows Chairman: MD Facilitator: Head - HSE management Members: RM, RSH, SH, HOD Periodicity: Twice in a year HSE - Management Committee will review HSE-performance as per the ‘Agenda’ for ensuring that HSE management system continues to be suitable, adequate and effective is continually improving. The HSE - Management Committee ‘Agenda’ shall include the feedback from project sites HSE committees on the following points. a) Status of Legal and regulatory compliance b) Review of incidents and accidents c) Review of external interested party complaints d) Review of the results of Mock drills e) Results of Internal Audits and System Audits f)Status of corrective & preventive actions g) Review HSE Objectives & Targets and HSE performance of the organisation h) Review of HSE Policy i) Changes in legal and other requirements relating to environmental aspects and occupational healthy and safety j) Resources adequacy k) Follow up action of previous Management Reviews l) Recommendation for improvement
  • 36. Consolidated Construction Consortium Ltd. HSE MANAGEMENT MANUAL Chennai DOC. NO. : CCCL/HSE/001 DATE : 16-04-2008 REV. NO. : 0 HEALTH, SAFETY & ENVIRONMENTAL MANAGEMENT MANUAL Page 2 of 2 Back to Table of Contents The committee will deliberate and take appropriate decisions for time bound implementation. Head - HSE management to record the decisions taken in the HSE committee meeting and communicate to all concerned. Head - HSE management to review the implementation of the decisions and report to top management on the status. 4.6.2 Site HSE Committees The site HSE committee consists of the following members: Project Manager (PM)/ Project in charge – Chairman cum Convenor Safety Engineer/ Safety Supervisor– Secretary Project Engineers (Civil / Mech. / Elec. etc), Sub-contractor’s representatives & Workers representatives Note: No. of worker representatives should not be less than management representatives. The site HSE committee meetings are conducted once in a quarter with the following agenda points and the feedback is sent to HO / Head - HSE for review and to include after compiling in the company’s HSE - management committee meetings. a) Safety audit results. b) Accident investigation reports, if any. c) Compliance to safety audit observations. d) Compliance to system audit observations. e) Awareness, training and adequacy of displays and posters. f) Provision, use and quality of Personal Protective Equipment (PPE). g) Observations/inputs from workers representative. h) Adequacy of emergency preparedness and ensuring Emergency Response is current with the needs. Review of the results of Mock-drill. i) Review of previous minutes of meeting j) Review of forthcoming activities at the site and precautions to be taken against potential hazards. k) Review of Environmental Management Programmes (EMPs) and Health & Safety Management Programmes (HSMPs). l) Others, if any. Note: Special site HSE Committee Meeting may be held any time as required.