Monthly Report No.23
Period: (01/06- 30/06)
Project
TRANSMISSION LINE WORKS
Civil contractor HSE statistics as below table
N
O
SUBJECT May 2015 June 2015 Since to Project
1 Total Man - Hours Worked 14.713 9.224 228.312
2 Cumulative No. of Employees 55 41 120
3 Fatality 0 0 0
4 Lost Time Injury (LTI) 0 0 0
5 LTI -Rate 0,0000 0,0000 0,0000
6 Restrcited Work Case (RWC) 0 0 0
7 Medical Treatment Case (MTC) 0 0 0
8 First Aid Case (FAC) 0 0 0
9 Environmental Damage (ED) 0 0 4
10 Material Damage (MD) 0 0 0
11 Motor Vehicle Accident (MVA) 0 0 1
12 Near Miss (NM) 0 0 2
13 Total Recordable Injuries (TRI) 0 0 0
14 TRI - Rate 0,0000 0,0000 0,0000
15 Unwanted Occurences (UO) 0 0 0
16 Reporting of UO - Rate 0,0000 0,0000 0,0000
17 Total No. of Inducted Employees 55 55 95
18 Number of Day 31 30 600
19 Average of Employees 45 35 120
20 Other (incident) 0 0 4
21 Number Of JHA (Job hazard analysis) 0 0 291
22 Total No of HSE inspections 23 23 396
23 Total No of Environmental inspections 0 0 64
24 Total No of Toolbox 0 0 18
25 Total No of Non-conformities 3 0 163
26 Total No of the fuel oil spend (ton) 7.5 3.5 212.5
27 Total No of the water spend (ton) 5.8 2.1 503.9
28 Total No of the garbage spend (ton) 3.1 1.5 27.9
29 Total No of the energy spend (kW) 12.000 5.000 140.486
Author: Arber Dogani Page 1 of 8
Monthly Report No.23
Period: (01/06- 30/06)
Project
TRANSMISSION LINE WORKS
Type of accident /
incident
Description of accident / incident Corrective Actions
N/A N/A N/A
N/A N/A N/A
• HSE inspections have been done by Company HSE department.
• Company HSE department is maintained NON-CONFORMITY register up-to date for all the non-
conformities issues and Corrective actions taken.
• Company has applied weekly to DHP_HSE for the ( PtW Permit to work) for the, Stringing activities and
correction activities at Canyon Area the situation is clear.
• During this month we have finish stringing works at Canyon Area and during next month we purpose to finish
all the project.
• As we have promise to DHP we are sending via e-mail all the information’s of the places that we close the work
activities in order to DHP_HSE to make all the HSE Inspections that they need to do.
• Local employment is being done effectively. You can see chart as below. (Last Updated on 27/06/15)
Company Local employment Total employment % Rate
Company 40 131 %8
Subcontractors 7 112 %6
Total 47 143 %10
Author: Arber Dogani Page 2 of 8
Monthly Report No.23
Period: (01/06- 30/06)
Project
TRANSMISSION LINE WORKS
*Some
HSE
issues
of
Company company during this month as below*
1. Behaviour safety report from Mr.Arber Dogani to Company Company during this month ,he report to Mr.Edison Barhani
for the worker that he wasn’t wear Climbing Helmet during the work at height.His Name: Palani Settu,company has give to
him final warning.
2. Another issue during this month was that one of Erection Group have leaving some garbage at the end of the works. For
this issue during routine HSE Inspections Mr.Arber Dogani HSE Officer has reported to DMP Mr. Edison Barhani this issue
and during this week Company Company has take corrective actions and has leave the place free of Garbage’s at Tower
no:4.
Author: Arber Dogani Page 3 of 8
Monthly Report No.23
Period: (01/06- 30/06)
Project
TRANSMISSION LINE WORKS
Garbage at T4
Corrective actions after HSE Department reported this issue to Project Manager
3.During this mont
Company company has
seen that at Tower No :
77 Joint Box and 40
meters of OPGW was
missing and for this issue we have reported the Police.
Author: Arber Dogani Page 4 of 8
Monthly Report No.23
Period: (01/06- 30/06)
Project
TRANSMISSION LINE WORKS
4.Behaviour email is reported from Company HSE Lead to Project Manager during this week ;
‘’At Tower 64 some workers was working without mandatory PPE.
Author: Arber Dogani Page 5 of 8
Monthly Report No.23
Period: (01/06- 30/06)
Project
TRANSMISSION LINE WORKS
*SOME PHOTOS OF COMPANY HSE
INSPECTION*
Author: Arber Dogani Page 6 of 8
Monthly Report No.23
Period: (01/06- 30/06)
Project
TRANSMISSION LINE WORKS
Author: Arber Dogani Page 7 of 8
Monthly Report No.23
Period: (01/06- 30/06)
Project
TRANSMISSION LINE WORKS
Author: Arber Dogani Page 8 of 8

More Related Content

What's hot

Daily EHS Report Format-Rev 00_MPL (3).pptx
Daily EHS Report Format-Rev 00_MPL (3).pptxDaily EHS Report Format-Rev 00_MPL (3).pptx
Daily EHS Report Format-Rev 00_MPL (3).pptx
sanjeevkumar2911
 
Visitors SHE Induction Presentation 2016
Visitors SHE Induction Presentation 2016Visitors SHE Induction Presentation 2016
Visitors SHE Induction Presentation 2016
Chris Morris
 
Safety commitee meeting
Safety commitee meetingSafety commitee meeting
Safety commitee meeting
sssaravana
 
HIRA TRAINING PPT.pptx
HIRA  TRAINING PPT.pptxHIRA  TRAINING PPT.pptx
HIRA TRAINING PPT.pptx
MoolRaj3
 

What's hot (20)

Daily EHS Report Format-Rev 00_MPL (3).pptx
Daily EHS Report Format-Rev 00_MPL (3).pptxDaily EHS Report Format-Rev 00_MPL (3).pptx
Daily EHS Report Format-Rev 00_MPL (3).pptx
 
Qhse objective & target 2015
Qhse objective & target 2015Qhse objective & target 2015
Qhse objective & target 2015
 
Fire drill report
Fire drill reportFire drill report
Fire drill report
 
Visitors SHE Induction Presentation 2016
Visitors SHE Induction Presentation 2016Visitors SHE Induction Presentation 2016
Visitors SHE Induction Presentation 2016
 
FIRE EXTINGUISHER INSPECTION Form # HSEQ - FEI Rev 4.docx
FIRE EXTINGUISHER INSPECTION Form # HSEQ - FEI Rev 4.docxFIRE EXTINGUISHER INSPECTION Form # HSEQ - FEI Rev 4.docx
FIRE EXTINGUISHER INSPECTION Form # HSEQ - FEI Rev 4.docx
 
29 workplace temporary lighting risk assessment templates
29 workplace temporary lighting risk assessment templates29 workplace temporary lighting risk assessment templates
29 workplace temporary lighting risk assessment templates
 
Safety interview question & answer
Safety interview question & answerSafety interview question & answer
Safety interview question & answer
 
December -15 Daily Observation Report
December -15 Daily Observation ReportDecember -15 Daily Observation Report
December -15 Daily Observation Report
 
Risk assessment for testing & commissioning of cranes
Risk assessment for  testing & commissioning of cranesRisk assessment for  testing & commissioning of cranes
Risk assessment for testing & commissioning of cranes
 
13 toolbox meeting form
13 toolbox meeting form13 toolbox meeting form
13 toolbox meeting form
 
21 confined space working risk assessment templates
21 confined space working risk assessment templates21 confined space working risk assessment templates
21 confined space working risk assessment templates
 
Safety commitee meeting
Safety commitee meetingSafety commitee meeting
Safety commitee meeting
 
HIRA TRAINING PPT.pptx
HIRA  TRAINING PPT.pptxHIRA  TRAINING PPT.pptx
HIRA TRAINING PPT.pptx
 
Emergency spill control drill
Emergency spill control drillEmergency spill control drill
Emergency spill control drill
 
Specific method of statmeents risk assessment -job hazard analysis for land ...
Specific method of statmeents  risk assessment -job hazard analysis for land ...Specific method of statmeents  risk assessment -job hazard analysis for land ...
Specific method of statmeents risk assessment -job hazard analysis for land ...
 
Risk Assessment in a Workplace Transport /Risk assessment for a road haulage ...
Risk Assessment in a Workplace Transport /Risk assessment for a road haulage ...Risk Assessment in a Workplace Transport /Risk assessment for a road haulage ...
Risk Assessment in a Workplace Transport /Risk assessment for a road haulage ...
 
Amn safety induction j 175 - staff rev 4 - s 14
Amn safety induction  j 175 - staff rev 4 - s 14Amn safety induction  j 175 - staff rev 4 - s 14
Amn safety induction j 175 - staff rev 4 - s 14
 
Quarterly QHSE Report Presentation 17 Slides.pptx
Quarterly QHSE Report Presentation 17 Slides.pptxQuarterly QHSE Report Presentation 17 Slides.pptx
Quarterly QHSE Report Presentation 17 Slides.pptx
 
HSE-INDUCTION-TRAINING.ppt
HSE-INDUCTION-TRAINING.pptHSE-INDUCTION-TRAINING.ppt
HSE-INDUCTION-TRAINING.ppt
 
EHS induction Presentation slides
EHS induction Presentation slidesEHS induction Presentation slides
EHS induction Presentation slides
 

Similar to Hse monthly report june 2015. rev.01 by.arber dogani example statistics

Monthly Progress Report Sample
Monthly Progress Report SampleMonthly Progress Report Sample
Monthly Progress Report Sample
Elias Ibrahim
 
Monthly report may 2013 final1
Monthly report may 2013   final1Monthly report may 2013   final1
Monthly report may 2013 final1
vuurenian
 
Summer Internship Presentation
Summer Internship PresentationSummer Internship Presentation
Summer Internship Presentation
Kishore Kumar
 
Presentation by shubham vyas
Presentation by shubham vyasPresentation by shubham vyas
Presentation by shubham vyas
PMI_IREP_TP
 
FM Partners Monthly OHS & E Report JUNE-2023 (1).pptx
FM Partners Monthly OHS & E Report  JUNE-2023 (1).pptxFM Partners Monthly OHS & E Report  JUNE-2023 (1).pptx
FM Partners Monthly OHS & E Report JUNE-2023 (1).pptx
RAPID187OXAGON
 

Similar to Hse monthly report june 2015. rev.01 by.arber dogani example statistics (20)

February Ops Meeting
February  Ops MeetingFebruary  Ops Meeting
February Ops Meeting
 
Project HSE Progress .pptx
Project HSE  Progress  .pptxProject HSE  Progress  .pptx
Project HSE Progress .pptx
 
HSE Leadership Meeting - Jan 2023.pptx
HSE Leadership Meeting - Jan 2023.pptxHSE Leadership Meeting - Jan 2023.pptx
HSE Leadership Meeting - Jan 2023.pptx
 
Monthly Progress Report Sample
Monthly Progress Report SampleMonthly Progress Report Sample
Monthly Progress Report Sample
 
The Strategic Package
The Strategic PackageThe Strategic Package
The Strategic Package
 
WIPAC Monthly - March 2023.pdf
WIPAC Monthly - March 2023.pdfWIPAC Monthly - March 2023.pdf
WIPAC Monthly - March 2023.pdf
 
Assessment of greenhouse gas emission in 2011
Assessment of greenhouse gas emission in 2011Assessment of greenhouse gas emission in 2011
Assessment of greenhouse gas emission in 2011
 
Monthly report may 2013 final1
Monthly report may 2013   final1Monthly report may 2013   final1
Monthly report may 2013 final1
 
Monthly HSE Report March for overall HSE
Monthly HSE Report March for overall HSEMonthly HSE Report March for overall HSE
Monthly HSE Report March for overall HSE
 
WIPAC Monthly July 2019
WIPAC Monthly   July 2019WIPAC Monthly   July 2019
WIPAC Monthly July 2019
 
GHG Target Management Program in Korea
GHG Target Management Program in Korea GHG Target Management Program in Korea
GHG Target Management Program in Korea
 
Project feasibilty report on Pricision Auto pistons aniket kulkarni
Project feasibilty report on Pricision Auto pistons aniket kulkarniProject feasibilty report on Pricision Auto pistons aniket kulkarni
Project feasibilty report on Pricision Auto pistons aniket kulkarni
 
1 erakv 3nd seminar_outline and results of the project
1 erakv 3nd seminar_outline and results of the project1 erakv 3nd seminar_outline and results of the project
1 erakv 3nd seminar_outline and results of the project
 
Step 10 Asset.docx
Step 10 Asset.docxStep 10 Asset.docx
Step 10 Asset.docx
 
OSHA Update
OSHA UpdateOSHA Update
OSHA Update
 
Presentation 95
Presentation 95Presentation 95
Presentation 95
 
Summer Internship Presentation
Summer Internship PresentationSummer Internship Presentation
Summer Internship Presentation
 
Study: Economic Impact of Kinder Morgan Utopia Pipeline Project
Study: Economic Impact of Kinder Morgan Utopia Pipeline ProjectStudy: Economic Impact of Kinder Morgan Utopia Pipeline Project
Study: Economic Impact of Kinder Morgan Utopia Pipeline Project
 
Presentation by shubham vyas
Presentation by shubham vyasPresentation by shubham vyas
Presentation by shubham vyas
 
FM Partners Monthly OHS & E Report JUNE-2023 (1).pptx
FM Partners Monthly OHS & E Report  JUNE-2023 (1).pptxFM Partners Monthly OHS & E Report  JUNE-2023 (1).pptx
FM Partners Monthly OHS & E Report JUNE-2023 (1).pptx
 

More from Arber Dogani

More from Arber Dogani (20)

Risk evaluation template Prepared by A.Dogani 2016(1)
Risk evaluation template Prepared by A.Dogani 2016(1)Risk evaluation template Prepared by A.Dogani 2016(1)
Risk evaluation template Prepared by A.Dogani 2016(1)
 
Vleresimi i riskut per punimet e percjellesit dhe trosit 110k v banje cerri...
Vleresimi  i riskut  per punimet e percjellesit dhe trosit 110k v banje cerri...Vleresimi  i riskut  per punimet e percjellesit dhe trosit 110k v banje cerri...
Vleresimi i riskut per punimet e percjellesit dhe trosit 110k v banje cerri...
 
Vleresimi i riskut montimi i shtyllave 2x110k v ulez shkopet-skuraj) 01.07.2016
Vleresimi i riskut montimi i shtyllave 2x110k v ulez shkopet-skuraj) 01.07.2016Vleresimi i riskut montimi i shtyllave 2x110k v ulez shkopet-skuraj) 01.07.2016
Vleresimi i riskut montimi i shtyllave 2x110k v ulez shkopet-skuraj) 01.07.2016
 
Analiza e rrezikut ne pune montim percjellesi dhe trosi 110k v banje cerrik ...
Analiza e rrezikut ne pune montim percjellesi dhe trosi  110k v banje cerrik ...Analiza e rrezikut ne pune montim percjellesi dhe trosi  110k v banje cerrik ...
Analiza e rrezikut ne pune montim percjellesi dhe trosi 110k v banje cerrik ...
 
'' Plani menaxhimit te cilesise per linja transmetimi tu tm-tl dhe nenstacio...
'' Plani menaxhimit te cilesise  per linja transmetimi tu tm-tl dhe nenstacio...'' Plani menaxhimit te cilesise  per linja transmetimi tu tm-tl dhe nenstacio...
'' Plani menaxhimit te cilesise per linja transmetimi tu tm-tl dhe nenstacio...
 
Hse plan zbatim ''siguria shendeti dhe mjedisi'' 2018.04.11 .rev.03
Hse  plan zbatim  ''siguria shendeti dhe mjedisi'' 2018.04.11 .rev.03Hse  plan zbatim  ''siguria shendeti dhe mjedisi'' 2018.04.11 .rev.03
Hse plan zbatim ''siguria shendeti dhe mjedisi'' 2018.04.11 .rev.03
 
Specific method of statmeents risk assessment -job hazard analysis for land ...
Specific method of statmeents  risk assessment -job hazard analysis for land ...Specific method of statmeents  risk assessment -job hazard analysis for land ...
Specific method of statmeents risk assessment -job hazard analysis for land ...
 
Investigation report 05.12.2017 lifting operation failure during tower erect...
Investigation report 05.12.2017  lifting operation failure during tower erect...Investigation report 05.12.2017  lifting operation failure during tower erect...
Investigation report 05.12.2017 lifting operation failure during tower erect...
 
Risk assessment for soil investigation at towers 5,6,7,8 rev01 a.dogani
Risk assessment for soil investigation at towers 5,6,7,8  rev01  a.doganiRisk assessment for soil investigation at towers 5,6,7,8  rev01  a.dogani
Risk assessment for soil investigation at towers 5,6,7,8 rev01 a.dogani
 
Incident&accident report date 02.08.2014 by arber dogani example for aplic...
Incident&accident  report date 02.08.2014  by arber dogani  example for aplic...Incident&accident  report date 02.08.2014  by arber dogani  example for aplic...
Incident&accident report date 02.08.2014 by arber dogani example for aplic...
 
Hse templates by.arber dogani
Hse templates by.arber doganiHse templates by.arber dogani
Hse templates by.arber dogani
 
Ditar kantieri (formular)
Ditar kantieri (formular)Ditar kantieri (formular)
Ditar kantieri (formular)
 
Raport javor punimesh linja transmetimi format raportimi javor _ arber do...
Raport javor punimesh  linja transmetimi format raportimi javor    _ arber do...Raport javor punimesh  linja transmetimi format raportimi javor    _ arber do...
Raport javor punimesh linja transmetimi format raportimi javor _ arber do...
 
Raport javor siguria shendeti dhe mjedisi Raportim Mujor Statistika Arber Do...
Raport javor siguria shendeti dhe mjedisi  Raportim Mujor Statistika Arber Do...Raport javor siguria shendeti dhe mjedisi  Raportim Mujor Statistika Arber Do...
Raport javor siguria shendeti dhe mjedisi Raportim Mujor Statistika Arber Do...
 
Plan menanxhimi (mjedisi linjat e transmetimit)rev.00 arber dogani
Plan menanxhimi (mjedisi linjat e transmetimit)rev.00  arber doganiPlan menanxhimi (mjedisi linjat e transmetimit)rev.00  arber dogani
Plan menanxhimi (mjedisi linjat e transmetimit)rev.00 arber dogani
 
Plani emergjences linja transmetimit 110k v rev.00 22.07.2015 arber dogani
Plani emergjences linja transmetimit 110k v rev.00 22.07.2015 arber doganiPlani emergjences linja transmetimit 110k v rev.00 22.07.2015 arber dogani
Plani emergjences linja transmetimit 110k v rev.00 22.07.2015 arber dogani
 
Training hse housekeeping albanian mirembajtja e vendit te punes
Training hse housekeeping albanian mirembajtja e vendit te punesTraining hse housekeeping albanian mirembajtja e vendit te punes
Training hse housekeeping albanian mirembajtja e vendit te punes
 
Hse trainings respiratory protection albanian by a.dogani
Hse trainings respiratory protection albanian by a.doganiHse trainings respiratory protection albanian by a.dogani
Hse trainings respiratory protection albanian by a.dogani
 
Manuali i punes ndertimin e linjave dhe nst te tensionit te larte shqip 2018
Manuali i punes ndertimin e linjave dhe nst te tensionit te larte   shqip 2018Manuali i punes ndertimin e linjave dhe nst te tensionit te larte   shqip 2018
Manuali i punes ndertimin e linjave dhe nst te tensionit te larte shqip 2018
 
New hire orientation orientim per punonjesit e rinj linja transmetimi ndertim
New hire orientation orientim per punonjesit e rinj linja transmetimi ndertimNew hire orientation orientim per punonjesit e rinj linja transmetimi ndertim
New hire orientation orientim per punonjesit e rinj linja transmetimi ndertim
 

Recently uploaded

Abortion pills in Doha {{ QATAR }} +966572737505) Get Cytotec
Abortion pills in Doha {{ QATAR }} +966572737505) Get CytotecAbortion pills in Doha {{ QATAR }} +966572737505) Get Cytotec
Abortion pills in Doha {{ QATAR }} +966572737505) Get Cytotec
Abortion pills in Riyadh +966572737505 get cytotec
 
In Riyadh ((+919101817206)) Cytotec kit @ Abortion Pills Saudi Arabia
In Riyadh ((+919101817206)) Cytotec kit @ Abortion Pills Saudi ArabiaIn Riyadh ((+919101817206)) Cytotec kit @ Abortion Pills Saudi Arabia
In Riyadh ((+919101817206)) Cytotec kit @ Abortion Pills Saudi Arabia
ahmedjiabur940
 
Jual obat aborsi Bandung ( 085657271886 ) Cytote pil telat bulan penggugur ka...
Jual obat aborsi Bandung ( 085657271886 ) Cytote pil telat bulan penggugur ka...Jual obat aborsi Bandung ( 085657271886 ) Cytote pil telat bulan penggugur ka...
Jual obat aborsi Bandung ( 085657271886 ) Cytote pil telat bulan penggugur ka...
Klinik kandungan
 
sourabh vyas1222222222222222222244444444
sourabh vyas1222222222222222222244444444sourabh vyas1222222222222222222244444444
sourabh vyas1222222222222222222244444444
saurabvyas476
 
如何办理(WashU毕业证书)圣路易斯华盛顿大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(WashU毕业证书)圣路易斯华盛顿大学毕业证成绩单本科硕士学位证留信学历认证如何办理(WashU毕业证书)圣路易斯华盛顿大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(WashU毕业证书)圣路易斯华盛顿大学毕业证成绩单本科硕士学位证留信学历认证
acoha1
 
Simplify hybrid data integration at an enterprise scale. Integrate all your d...
Simplify hybrid data integration at an enterprise scale. Integrate all your d...Simplify hybrid data integration at an enterprise scale. Integrate all your d...
Simplify hybrid data integration at an enterprise scale. Integrate all your d...
varanasisatyanvesh
 
Abortion pills in Jeddah |+966572737505 | get cytotec
Abortion pills in Jeddah |+966572737505 | get cytotecAbortion pills in Jeddah |+966572737505 | get cytotec
Abortion pills in Jeddah |+966572737505 | get cytotec
Abortion pills in Riyadh +966572737505 get cytotec
 
Abortion Clinic in Kempton Park +27791653574 WhatsApp Abortion Clinic Service...
Abortion Clinic in Kempton Park +27791653574 WhatsApp Abortion Clinic Service...Abortion Clinic in Kempton Park +27791653574 WhatsApp Abortion Clinic Service...
Abortion Clinic in Kempton Park +27791653574 WhatsApp Abortion Clinic Service...
mikehavy0
 

Recently uploaded (20)

Abortion pills in Doha {{ QATAR }} +966572737505) Get Cytotec
Abortion pills in Doha {{ QATAR }} +966572737505) Get CytotecAbortion pills in Doha {{ QATAR }} +966572737505) Get Cytotec
Abortion pills in Doha {{ QATAR }} +966572737505) Get Cytotec
 
DBMS UNIT 5 46 CONTAINS NOTES FOR THE STUDENTS
DBMS UNIT 5 46 CONTAINS NOTES FOR THE STUDENTSDBMS UNIT 5 46 CONTAINS NOTES FOR THE STUDENTS
DBMS UNIT 5 46 CONTAINS NOTES FOR THE STUDENTS
 
ℂall Girls In Navi Mumbai Hire Me Neha 9910780858 Top Class ℂall Girl Serviℂe...
ℂall Girls In Navi Mumbai Hire Me Neha 9910780858 Top Class ℂall Girl Serviℂe...ℂall Girls In Navi Mumbai Hire Me Neha 9910780858 Top Class ℂall Girl Serviℂe...
ℂall Girls In Navi Mumbai Hire Me Neha 9910780858 Top Class ℂall Girl Serviℂe...
 
In Riyadh ((+919101817206)) Cytotec kit @ Abortion Pills Saudi Arabia
In Riyadh ((+919101817206)) Cytotec kit @ Abortion Pills Saudi ArabiaIn Riyadh ((+919101817206)) Cytotec kit @ Abortion Pills Saudi Arabia
In Riyadh ((+919101817206)) Cytotec kit @ Abortion Pills Saudi Arabia
 
RESEARCH-FINAL-DEFENSE-PPT-TEMPLATE.pptx
RESEARCH-FINAL-DEFENSE-PPT-TEMPLATE.pptxRESEARCH-FINAL-DEFENSE-PPT-TEMPLATE.pptx
RESEARCH-FINAL-DEFENSE-PPT-TEMPLATE.pptx
 
DAA Assignment Solution.pdf is the best1
DAA Assignment Solution.pdf is the best1DAA Assignment Solution.pdf is the best1
DAA Assignment Solution.pdf is the best1
 
Jual obat aborsi Bandung ( 085657271886 ) Cytote pil telat bulan penggugur ka...
Jual obat aborsi Bandung ( 085657271886 ) Cytote pil telat bulan penggugur ka...Jual obat aborsi Bandung ( 085657271886 ) Cytote pil telat bulan penggugur ka...
Jual obat aborsi Bandung ( 085657271886 ) Cytote pil telat bulan penggugur ka...
 
Harnessing the Power of GenAI for BI and Reporting.pptx
Harnessing the Power of GenAI for BI and Reporting.pptxHarnessing the Power of GenAI for BI and Reporting.pptx
Harnessing the Power of GenAI for BI and Reporting.pptx
 
Bios of leading Astrologers & Researchers
Bios of leading Astrologers & ResearchersBios of leading Astrologers & Researchers
Bios of leading Astrologers & Researchers
 
SAC 25 Final National, Regional & Local Angel Group Investing Insights 2024 0...
SAC 25 Final National, Regional & Local Angel Group Investing Insights 2024 0...SAC 25 Final National, Regional & Local Angel Group Investing Insights 2024 0...
SAC 25 Final National, Regional & Local Angel Group Investing Insights 2024 0...
 
sourabh vyas1222222222222222222244444444
sourabh vyas1222222222222222222244444444sourabh vyas1222222222222222222244444444
sourabh vyas1222222222222222222244444444
 
Case Study 4 Where the cry of rebellion happen?
Case Study 4 Where the cry of rebellion happen?Case Study 4 Where the cry of rebellion happen?
Case Study 4 Where the cry of rebellion happen?
 
如何办理(WashU毕业证书)圣路易斯华盛顿大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(WashU毕业证书)圣路易斯华盛顿大学毕业证成绩单本科硕士学位证留信学历认证如何办理(WashU毕业证书)圣路易斯华盛顿大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(WashU毕业证书)圣路易斯华盛顿大学毕业证成绩单本科硕士学位证留信学历认证
 
jll-asia-pacific-capital-tracker-1q24.pdf
jll-asia-pacific-capital-tracker-1q24.pdfjll-asia-pacific-capital-tracker-1q24.pdf
jll-asia-pacific-capital-tracker-1q24.pdf
 
Simplify hybrid data integration at an enterprise scale. Integrate all your d...
Simplify hybrid data integration at an enterprise scale. Integrate all your d...Simplify hybrid data integration at an enterprise scale. Integrate all your d...
Simplify hybrid data integration at an enterprise scale. Integrate all your d...
 
Pentesting_AI and security challenges of AI
Pentesting_AI and security challenges of AIPentesting_AI and security challenges of AI
Pentesting_AI and security challenges of AI
 
Abortion pills in Jeddah |+966572737505 | get cytotec
Abortion pills in Jeddah |+966572737505 | get cytotecAbortion pills in Jeddah |+966572737505 | get cytotec
Abortion pills in Jeddah |+966572737505 | get cytotec
 
👉 Tirunelveli Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top Class Call Gir...
👉 Tirunelveli Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top Class Call Gir...👉 Tirunelveli Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top Class Call Gir...
👉 Tirunelveli Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top Class Call Gir...
 
Abortion Clinic in Kempton Park +27791653574 WhatsApp Abortion Clinic Service...
Abortion Clinic in Kempton Park +27791653574 WhatsApp Abortion Clinic Service...Abortion Clinic in Kempton Park +27791653574 WhatsApp Abortion Clinic Service...
Abortion Clinic in Kempton Park +27791653574 WhatsApp Abortion Clinic Service...
 
Identify Customer Segments to Create Customer Offers for Each Segment - Appli...
Identify Customer Segments to Create Customer Offers for Each Segment - Appli...Identify Customer Segments to Create Customer Offers for Each Segment - Appli...
Identify Customer Segments to Create Customer Offers for Each Segment - Appli...
 

Hse monthly report june 2015. rev.01 by.arber dogani example statistics

  • 1. Monthly Report No.23 Period: (01/06- 30/06) Project TRANSMISSION LINE WORKS Civil contractor HSE statistics as below table N O SUBJECT May 2015 June 2015 Since to Project 1 Total Man - Hours Worked 14.713 9.224 228.312 2 Cumulative No. of Employees 55 41 120 3 Fatality 0 0 0 4 Lost Time Injury (LTI) 0 0 0 5 LTI -Rate 0,0000 0,0000 0,0000 6 Restrcited Work Case (RWC) 0 0 0 7 Medical Treatment Case (MTC) 0 0 0 8 First Aid Case (FAC) 0 0 0 9 Environmental Damage (ED) 0 0 4 10 Material Damage (MD) 0 0 0 11 Motor Vehicle Accident (MVA) 0 0 1 12 Near Miss (NM) 0 0 2 13 Total Recordable Injuries (TRI) 0 0 0 14 TRI - Rate 0,0000 0,0000 0,0000 15 Unwanted Occurences (UO) 0 0 0 16 Reporting of UO - Rate 0,0000 0,0000 0,0000 17 Total No. of Inducted Employees 55 55 95 18 Number of Day 31 30 600 19 Average of Employees 45 35 120 20 Other (incident) 0 0 4 21 Number Of JHA (Job hazard analysis) 0 0 291 22 Total No of HSE inspections 23 23 396 23 Total No of Environmental inspections 0 0 64 24 Total No of Toolbox 0 0 18 25 Total No of Non-conformities 3 0 163 26 Total No of the fuel oil spend (ton) 7.5 3.5 212.5 27 Total No of the water spend (ton) 5.8 2.1 503.9 28 Total No of the garbage spend (ton) 3.1 1.5 27.9 29 Total No of the energy spend (kW) 12.000 5.000 140.486 Author: Arber Dogani Page 1 of 8
  • 2. Monthly Report No.23 Period: (01/06- 30/06) Project TRANSMISSION LINE WORKS Type of accident / incident Description of accident / incident Corrective Actions N/A N/A N/A N/A N/A N/A • HSE inspections have been done by Company HSE department. • Company HSE department is maintained NON-CONFORMITY register up-to date for all the non- conformities issues and Corrective actions taken. • Company has applied weekly to DHP_HSE for the ( PtW Permit to work) for the, Stringing activities and correction activities at Canyon Area the situation is clear. • During this month we have finish stringing works at Canyon Area and during next month we purpose to finish all the project. • As we have promise to DHP we are sending via e-mail all the information’s of the places that we close the work activities in order to DHP_HSE to make all the HSE Inspections that they need to do. • Local employment is being done effectively. You can see chart as below. (Last Updated on 27/06/15) Company Local employment Total employment % Rate Company 40 131 %8 Subcontractors 7 112 %6 Total 47 143 %10 Author: Arber Dogani Page 2 of 8
  • 3. Monthly Report No.23 Period: (01/06- 30/06) Project TRANSMISSION LINE WORKS *Some HSE issues of Company company during this month as below* 1. Behaviour safety report from Mr.Arber Dogani to Company Company during this month ,he report to Mr.Edison Barhani for the worker that he wasn’t wear Climbing Helmet during the work at height.His Name: Palani Settu,company has give to him final warning. 2. Another issue during this month was that one of Erection Group have leaving some garbage at the end of the works. For this issue during routine HSE Inspections Mr.Arber Dogani HSE Officer has reported to DMP Mr. Edison Barhani this issue and during this week Company Company has take corrective actions and has leave the place free of Garbage’s at Tower no:4. Author: Arber Dogani Page 3 of 8
  • 4. Monthly Report No.23 Period: (01/06- 30/06) Project TRANSMISSION LINE WORKS Garbage at T4 Corrective actions after HSE Department reported this issue to Project Manager 3.During this mont Company company has seen that at Tower No : 77 Joint Box and 40 meters of OPGW was missing and for this issue we have reported the Police. Author: Arber Dogani Page 4 of 8
  • 5. Monthly Report No.23 Period: (01/06- 30/06) Project TRANSMISSION LINE WORKS 4.Behaviour email is reported from Company HSE Lead to Project Manager during this week ; ‘’At Tower 64 some workers was working without mandatory PPE. Author: Arber Dogani Page 5 of 8
  • 6. Monthly Report No.23 Period: (01/06- 30/06) Project TRANSMISSION LINE WORKS *SOME PHOTOS OF COMPANY HSE INSPECTION* Author: Arber Dogani Page 6 of 8
  • 7. Monthly Report No.23 Period: (01/06- 30/06) Project TRANSMISSION LINE WORKS Author: Arber Dogani Page 7 of 8
  • 8. Monthly Report No.23 Period: (01/06- 30/06) Project TRANSMISSION LINE WORKS Author: Arber Dogani Page 8 of 8