AMANA Contracting & Steel Building Co.
HSE Report for Safety Evaluation
A. Accident
Lost Time Accident
B. Proactive Safety
Management
B-1. Safety Policy statement &
Plan
B-2. Risk Assessment or JHA
B-3. Safety Method Statement or
PCM
B-4. Management of work permit
B-5. Participation in TBM
C. Safety Activity
C-1. Color Coding & Construction
Equipment
C-2. Corrective Actions of Patrol
results by HSE Manager or third
party
C-3. Attendance of regular site
inspection & Meeting
C-4. Feedback for self safety
patrol
C-5. Health Management
C-6. PPE Management
D. Field Safety
Facilities
D-1. Working at height (Fall
protection / Falling materials)
D-2. Scaffolds and Ladders
D-3. Collapse
D4-. Mobile Plant and
equipments
D-5. Confined spaces
D6. Temporary Electricity
D7. ARC / Gas Welding / cutting
D8. Electrical Tools
D-9. Disposal of waste and
housekeeping
A. Accident
Lost Time Accident
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
ZERO
Lost Time Accident
till Date (3rd November 2010)
Number of Staff Number Non Staff Total (AVG) / Day
25 450 475
Total Accident Free Man Hours (Till 3rd November 2010)
379,502
(Three Hundred seventy nine thousand & Five Hundred two)
Average Man Hours worked / Day 4750
Average Man hours worked / Month 123,500
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
B. Proactive Safety
Management
B-1. Safety Policy
statement & Plan
Display of Safety Policy
Communication through Safety
Training
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
B. Proactive Safety
Management
B-2. Risk Assessment or
JHA
Weekly Risk Assessment
Risk
Assessment
being
communicated
to workers
through TBM -
Dated 24-07-
2010
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
B. Proactive Safety
Management
B-3. Safety Method
Statement or PCM
PCM has been conducted as and when required
Method Statement being submitted
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
B. Proactive Safety
Management
PTW is being observed regularly
Hot work permit is
complied with
B-4. Management of
work permit
Lifting work complied
with
Work at height
complied with
HOT WORKWork at Height
ExcavationLifting Work
Excavation permit
complied with
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
B. Proactive Safety
Management
B-5. Participation in TBM
Number of TBM Program Number of Days Total No. of Attendees
177 167 (20 May to 3 Nov) 33652
Night Shift TBM
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
B. Proactive Safety
Management
B-5. Participation in TBM
Types of Training No. of Programs No of Attendees
Safety Induction 98 834
Special Safety Training 15 971
External Training 3 15
SAFETY TRAINING
Safety
Induction
Special Safety
Trainings
HSE Training for all
Site staff – 25.09.10
Work at height –
16.08.10
Grinder operating –
07.07.10
Heat Stress Training –
20.05.10
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
C. Safety Activity
C-1. Color Coding &
Construction Equipment
All Power tools & Equipments are being
inspected regularly
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
C. Safety Activity
C-2. Corrective Actions
of Patrol results by HSE
Manager or third party
CORRECTIVE ACTIONS - SCAR
Recorded
(Nos.)
Corrected (Nos.) Outstanding (Nos.)
Previous 212 212 0
Current (28th
Oct 10 to 3rd
Nov 10) 5 5 0
Total 217 217 0
100%
Compliance of S-
CARS.
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
C. Safety Activity
C-3. Attendance of
regular site inspection &
Meeting
Weekly HSE Meeting Presentation
Regular Site Inspection
Regular Site inspection being carried out by all site safety team, resulting
control over unsafe actions and unsafe conditions and therefore we have
achieved numbers of Best Practices.
100% attendance in SAMSUNG HSE Meetings & Trainings
Weekly
Presentation
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
C. Safety Activity
Inspection Reports are made in prescribed formats and
being reported to Sr. Project Manager for Corrective and
preventive actions.
Every hazardous activity such as cladding work,
formwork etc are supervised by dedicated safety
officers to enforce safety rules and precautions during
the operation.
C-4. Feedback for self
safety patrol
 Self Safety Inspection is being
carried out by Safety Department and
Spot corrections are preferred if
unsafe actions or condition observed.
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
C. Safety Activity
1. First Aid Clinic – Well equipped first
clinic available at the project.C-5. Health Management
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
C. Safety Activity 3. Management of Heat Stress
C-5. Health Management
Air conditioned Rest Area
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
C. Safety Activity 4. Hygiene Management
C-5. Health Management
b- Hand wash facility
a- Adequate numbers of Toilets & urinals with ablution facilities
c- Safety Training on hand hygiene
d- Safe Drinking water with provision of cleaned water filters.
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
C. Safety Activity PPE Management -
 Specific requirements of PPE – Face shields etc
 Mandatory PPE – Safety Shoes, Safety
Helmet & Safety Goggles are used by all
employees including site staff.
 100% employees are using safety
harness while work at height
C-6. PPE Management
 Life line to ensure 100%
tie – off during erection of
work platform and other
height work
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
Fall Protection-D. Field Safety
Facilities
D-1. Working at height
(Fall protection / Falling
materials)
We followed 3 E’s Concept for Fall Protection-
1E – Education –Training (Special & TBT) on Work at height for
Staff and Non Staff being conducted on regular basis.
2E – Engineering Control – Safe & Approved scaffold, Fully boarded & Guarded work
platform, Safe means of access & egress, 100% Edge protection for leading edges,
MEP openings, Fall protection (Collective & Personal) protection – Twin Lanyard, Life
line etc observed at all the time while working at height.
1. Safe & Approved scaffold
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
Fall Protection-D. Field Safety
Facilities
D-1. Working at height
(Fall protection / Falling
materials)
We followed 3 E’s Concept for Fall Protection-
2. Fully Boarded & Guarded work platform for work at height -
During slab decking work
While Shuttering While Concrete pouringWhile Rebar binding
Safe work platform
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
Fall Protection-D. Field Safety
Facilities
D-1. Working at height
(Fall protection / Falling
materials)
We followed 3 E’s Concept for Fall Protection-
3. Safe means of access & egress for each point of work-
Foot bridge
Step stair to current slab
with overhead protection
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
Fall Protection-D. Field Safety
Facilities
D-1. Working at height
(Fall protection / Falling
materials)
We followed 3 E’s Concept for Fall Protection-
4. 100% edge protection for leading edges-
While Excavation
Suitable edge protection for each point of work
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
Fall Protection-D. Field Safety
Facilities
D-1. Working at height
(Fall protection / Falling
materials)
We followed 3 E’s Concept for Fall Protection-
5. Fall protection (Collective & Personal) protection
Usage of twin lanyard
& life line
Suitable PFAS (Personal Fall Arrest system) Safety harness for each type of work at height
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
Falling Materials – being arrested by use of suitable edge protection and fall
protection fans
D. Field Safety
Facilities
D-1. Working at height
(Fall protection / Falling
materials)
1. Suitable Edge protection with toe guards
2. Protection FAN / Green Nets to arrest falling materials
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
Scaffolds – Scaffolds are being Erected by competent person with sound
materials under the supervision of experts in scaffold erection.
D. Field Safety
Facilities
D-2. Scaffolds & Ladders
3. Safe Scaffold Erection Method
Foundation-Mud Sill, Base Plate
Platform - Fully Boarded &
Guarded platform (Top & Mid Rail,
Toe guards)
Secure- tie and bracing, Out
riggers
Access-Means of Access to each
work platform
2. Approved and
Sound scaffold
materials
1. Trained Scaffolds Erectors
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
Ladders– Good quality of aluminum ladders are used as a means of access,
Also regular inspection is being done and we ensure the ladders are suitably
secured.
D. Field Safety
Facilities
D-2. Scaffolds & Ladders
2. Approved
Ladders used
1. Ladder Identification &
Inspection
3. Not allowed as
work platform
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
D. Field Safety
Facilities
D-3. Collapse
2.Approved
FormworkMaterial
used
1. Scaffold erected with
ties and bracing with
adequate foundation
3. Approval from
SAMSUNG &
Formwork Supplier (if
required) Prior to work
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
D. Field Safety
Facilities
D-4. Mobile Plant and
Equipment (Crane,
Rope, Chain)
2. Trained operators for each
Mobile Plant
1. Register for All Mobile equipment is maintained for their
3rd party certificates, other required documents & Equipment
Conditions
3. Approval from SAMSUNG &
Self Inspection
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
D. Field Safety
Facilities
D-6. Temporary
Electricity
2. Suitable Warning Signs
1. Competent Electricians are deputed at site
3.DGswithBundwall&
Earthing
4. Fire Protection & Cable routing
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
D. Field Safety
Facilities
D-7. ARC / GAS Welding
/ Cutting
Flash back arrestor & Pressure Gauge
Competent Welders are deputed at site
FollowupofHotWork
Permit(SAMSUNG)
Secured Gas Cylinders
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
D. Field Safety
Facilities
D-8. Electrical Tools
Electrical Power Tools Management - Once we receive power
tools, it is being inspected by us and then operators are given training . Also
AMANA inspection stickers are provided to tools. Finally the tools are being
sent for SAMSUNG HSE approval and color code
Inspection of Tools
Inspection Sticker for the
evidence
Training for the Operator
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
D. Field Safety
Facilities
D-9. Disposal of Waste &
Housekeeping
Housekeeping-
Everyday we do housekeeping before and at the end of work.
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
Signages
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
SMOKING ZONE
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
Note: Hand gloves should not be used while operating tools with abrasive
wheel as it may cause entanglement.
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
Environmental Safety
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
Environmental Safety
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
AMANA HSE
CEREMONY
23rd July 2010
Mustafa
Javed
Surinder
Leela
Ram
Prodip
4 CRITERIA TO WIN
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
AMANA HSE
CEREMONY
23rd July 2010
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
BOOKLET DISDRIBUTION- Samsung (Hindi) and AMANA(Multi lingual) booklets are
distributed among workers
HSE Report for Safety EvaluationHSE Report for Safety Evaluation
“Start Safe – Stay Safe”

More Related Content

What's hot

What's hot (20)

EHS induction Presentation slides
EHS induction Presentation slidesEHS induction Presentation slides
EHS induction Presentation slides
 
Safeworkpmits
SafeworkpmitsSafeworkpmits
Safeworkpmits
 
Hse plan
Hse planHse plan
Hse plan
 
Working at height slides
Working at height slidesWorking at height slides
Working at height slides
 
Hot Work
Hot WorkHot Work
Hot Work
 
Hot Work Permits Training by ELCOSH
Hot Work Permits Training by ELCOSHHot Work Permits Training by ELCOSH
Hot Work Permits Training by ELCOSH
 
Staff safety hand book
Staff   safety hand bookStaff   safety hand book
Staff safety hand book
 
Confined space
Confined spaceConfined space
Confined space
 
training near miss program
training near miss programtraining near miss program
training near miss program
 
Working at-height
Working at-height Working at-height
Working at-height
 
HEALTH, SAFETY AND ENVIRONMENTAL MANUAL
HEALTH, SAFETY AND ENVIRONMENTAL  MANUALHEALTH, SAFETY AND ENVIRONMENTAL  MANUAL
HEALTH, SAFETY AND ENVIRONMENTAL MANUAL
 
Fire watch man training
Fire watch man trainingFire watch man training
Fire watch man training
 
Confined Space Presentation University of Technology,Mauritius
Confined Space Presentation University of Technology,MauritiusConfined Space Presentation University of Technology,Mauritius
Confined Space Presentation University of Technology,Mauritius
 
Health & Safety Induction Training
Health & Safety Induction TrainingHealth & Safety Induction Training
Health & Safety Induction Training
 
Safety awareness on near miss
Safety awareness on near missSafety awareness on near miss
Safety awareness on near miss
 
Work At Height
Work At HeightWork At Height
Work At Height
 
Man and machine interface
Man and machine interfaceMan and machine interface
Man and machine interface
 
General Safety Presentationupdated 04842993 1
General Safety Presentationupdated 04842993 1General Safety Presentationupdated 04842993 1
General Safety Presentationupdated 04842993 1
 
Step 6 hot work permit
Step 6 hot work permitStep 6 hot work permit
Step 6 hot work permit
 
PPT ON PERMIT TO WORK, by Ekemezie E
PPT ON PERMIT TO WORK, by Ekemezie EPPT ON PERMIT TO WORK, by Ekemezie E
PPT ON PERMIT TO WORK, by Ekemezie E
 

Viewers also liked

Nebosh important q&a
Nebosh important q&aNebosh important q&a
Nebosh important q&ahijaziosama
 
Overview of Safety Evaluation & Standards for Food Packaging Materials in Chi...
Overview of Safety Evaluation & Standards for Food Packaging Materials in Chi...Overview of Safety Evaluation & Standards for Food Packaging Materials in Chi...
Overview of Safety Evaluation & Standards for Food Packaging Materials in Chi...Asian Food Regulation Information Service
 
Industrial safetY of height works
Industrial safetY of height worksIndustrial safetY of height works
Industrial safetY of height worksPavan Noel
 
Safety harness - fall protection - Wessam Atif
Safety harness - fall protection - Wessam AtifSafety harness - fall protection - Wessam Atif
Safety harness - fall protection - Wessam AtifWessam Atif
 
Hse presentation general rev.00 may 2014
Hse presentation general rev.00 may 2014Hse presentation general rev.00 may 2014
Hse presentation general rev.00 may 2014Fitri Ifony
 
Health & Safety Induction Training
Health & Safety Induction Training Health & Safety Induction Training
Health & Safety Induction Training Claire
 
Identifikasi Bahaya - K3
Identifikasi Bahaya - K3Identifikasi Bahaya - K3
Identifikasi Bahaya - K3Al Marson
 

Viewers also liked (20)

Session 2 General Safety Requirements
Session 2   General Safety RequirementsSession 2   General Safety Requirements
Session 2 General Safety Requirements
 
SESSION : 1 Health & Safety Management : An overview
SESSION : 1 Health & Safety Management : An overview SESSION : 1 Health & Safety Management : An overview
SESSION : 1 Health & Safety Management : An overview
 
Nebosh unit ib questions ans matrix
Nebosh unit ib questions ans matrixNebosh unit ib questions ans matrix
Nebosh unit ib questions ans matrix
 
Waste bin signs
Waste bin signsWaste bin signs
Waste bin signs
 
Worker safety hand book
Worker    safety hand bookWorker    safety hand book
Worker safety hand book
 
Safety_induction
Safety_inductionSafety_induction
Safety_induction
 
Nebosh important q&a
Nebosh important q&aNebosh important q&a
Nebosh important q&a
 
Overview of Safety Evaluation & Standards for Food Packaging Materials in Chi...
Overview of Safety Evaluation & Standards for Food Packaging Materials in Chi...Overview of Safety Evaluation & Standards for Food Packaging Materials in Chi...
Overview of Safety Evaluation & Standards for Food Packaging Materials in Chi...
 
Nebosh unit ia questions matrix - ans
Nebosh unit ia questions matrix - ansNebosh unit ia questions matrix - ans
Nebosh unit ia questions matrix - ans
 
Safety Best practice new 2015
Safety Best practice new 2015Safety Best practice new 2015
Safety Best practice new 2015
 
Nebosh unit ia questions matrix - ans
Nebosh unit ia questions matrix - ansNebosh unit ia questions matrix - ans
Nebosh unit ia questions matrix - ans
 
Nebosh unit ic questions matrix - ans
Nebosh unit ic questions matrix - ansNebosh unit ic questions matrix - ans
Nebosh unit ic questions matrix - ans
 
Haad height aware - eng
Haad   height aware - engHaad   height aware - eng
Haad height aware - eng
 
Industrial safetY of height works
Industrial safetY of height worksIndustrial safetY of height works
Industrial safetY of height works
 
Eta Scaffold Training
Eta Scaffold TrainingEta Scaffold Training
Eta Scaffold Training
 
Safety harness - fall protection - Wessam Atif
Safety harness - fall protection - Wessam AtifSafety harness - fall protection - Wessam Atif
Safety harness - fall protection - Wessam Atif
 
Hse presentation general rev.00 may 2014
Hse presentation general rev.00 may 2014Hse presentation general rev.00 may 2014
Hse presentation general rev.00 may 2014
 
Ebook - 7 Pola Struktur K3LH Safety Toon
Ebook - 7 Pola Struktur K3LH Safety ToonEbook - 7 Pola Struktur K3LH Safety Toon
Ebook - 7 Pola Struktur K3LH Safety Toon
 
Health & Safety Induction Training
Health & Safety Induction Training Health & Safety Induction Training
Health & Safety Induction Training
 
Identifikasi Bahaya - K3
Identifikasi Bahaya - K3Identifikasi Bahaya - K3
Identifikasi Bahaya - K3
 

Similar to Safety evaluation Best practices-04.11.10

MohamedFarouk CV 2 ...
MohamedFarouk  CV 2 ...MohamedFarouk  CV 2 ...
MohamedFarouk CV 2 ...Mohamed Farouk
 
SECONDARY PIPE RACK AND PIG LAUNCHER.docx
SECONDARY PIPE RACK AND PIG LAUNCHER.docxSECONDARY PIPE RACK AND PIG LAUNCHER.docx
SECONDARY PIPE RACK AND PIG LAUNCHER.docxferielvpk
 
Safe work procedure1
Safe work procedure1Safe work procedure1
Safe work procedure1Jahanzeb Khan
 
Safety & Quality Aspects in '3-S' System of Construction
Safety & Quality Aspects in '3-S' System of ConstructionSafety & Quality Aspects in '3-S' System of Construction
Safety & Quality Aspects in '3-S' System of ConstructionSandeep Jain
 
Tower Project HSE Presentation
Tower Project HSE PresentationTower Project HSE Presentation
Tower Project HSE PresentationIshtiaq Hashmi
 
HEALTH AND SAFETY REPORT FOR STELL AND TUBE INDUSTRIES NAMAMVE 1
HEALTH AND SAFETY REPORT FOR STELL AND TUBE INDUSTRIES NAMAMVE 1HEALTH AND SAFETY REPORT FOR STELL AND TUBE INDUSTRIES NAMAMVE 1
HEALTH AND SAFETY REPORT FOR STELL AND TUBE INDUSTRIES NAMAMVE 1Gilbert Okorobe
 
Fy2006 Mfc Construction
Fy2006 Mfc ConstructionFy2006 Mfc Construction
Fy2006 Mfc ConstructionPaul Melton
 
Boom Lift - working from_2.docx
Boom Lift - working from_2.docxBoom Lift - working from_2.docx
Boom Lift - working from_2.docxolorunyomi wale
 
Darren Bergin C.V. April 2016
Darren Bergin C.V.  April 2016Darren Bergin C.V.  April 2016
Darren Bergin C.V. April 2016Darren Bergin
 
Fy2006 Mfc General Industry
Fy2006 Mfc General IndustryFy2006 Mfc General Industry
Fy2006 Mfc General IndustryPaul Melton
 
Assignment front sheet assignment 2
Assignment front sheet assignment 2Assignment front sheet assignment 2
Assignment front sheet assignment 2NeilOw87
 
Swp working safely at height
Swp working safely at heightSwp working safely at height
Swp working safely at heightjohnbarsellona
 
NS ARCUS. safety plan
NS ARCUS. safety planNS ARCUS. safety plan
NS ARCUS. safety planNS ARCUS
 

Similar to Safety evaluation Best practices-04.11.10 (20)

MohamedFarouk CV 2 ...
MohamedFarouk  CV 2 ...MohamedFarouk  CV 2 ...
MohamedFarouk CV 2 ...
 
SECONDARY PIPE RACK AND PIG LAUNCHER.docx
SECONDARY PIPE RACK AND PIG LAUNCHER.docxSECONDARY PIPE RACK AND PIG LAUNCHER.docx
SECONDARY PIPE RACK AND PIG LAUNCHER.docx
 
Safe work procedure1
Safe work procedure1Safe work procedure1
Safe work procedure1
 
Safety & Quality Aspects in '3-S' System of Construction
Safety & Quality Aspects in '3-S' System of ConstructionSafety & Quality Aspects in '3-S' System of Construction
Safety & Quality Aspects in '3-S' System of Construction
 
Tower Project HSE Presentation
Tower Project HSE PresentationTower Project HSE Presentation
Tower Project HSE Presentation
 
HEALTH AND SAFETY REPORT FOR STELL AND TUBE INDUSTRIES NAMAMVE 1
HEALTH AND SAFETY REPORT FOR STELL AND TUBE INDUSTRIES NAMAMVE 1HEALTH AND SAFETY REPORT FOR STELL AND TUBE INDUSTRIES NAMAMVE 1
HEALTH AND SAFETY REPORT FOR STELL AND TUBE INDUSTRIES NAMAMVE 1
 
Fy2006 Mfc Construction
Fy2006 Mfc ConstructionFy2006 Mfc Construction
Fy2006 Mfc Construction
 
Muhammad Resume
Muhammad ResumeMuhammad Resume
Muhammad Resume
 
Boom Lift - working from_2.docx
Boom Lift - working from_2.docxBoom Lift - working from_2.docx
Boom Lift - working from_2.docx
 
Darren Bergin C.V. April 2016
Darren Bergin C.V.  April 2016Darren Bergin C.V.  April 2016
Darren Bergin C.V. April 2016
 
MUSADDIQ UPDATED CV
MUSADDIQ UPDATED CVMUSADDIQ UPDATED CV
MUSADDIQ UPDATED CV
 
AHU.pdf
AHU.pdfAHU.pdf
AHU.pdf
 
update 20feb1
update 20feb1update 20feb1
update 20feb1
 
Fy2006 Mfc General Industry
Fy2006 Mfc General IndustryFy2006 Mfc General Industry
Fy2006 Mfc General Industry
 
Assignment front sheet assignment 2
Assignment front sheet assignment 2Assignment front sheet assignment 2
Assignment front sheet assignment 2
 
Swp working safely at height
Swp working safely at heightSwp working safely at height
Swp working safely at height
 
ARSHAD.CV
ARSHAD.CVARSHAD.CV
ARSHAD.CV
 
CURRECULUM VITAE
CURRECULUM VITAECURRECULUM VITAE
CURRECULUM VITAE
 
Construction safety at 071C20R new
Construction  safety at 071C20R newConstruction  safety at 071C20R new
Construction safety at 071C20R new
 
NS ARCUS. safety plan
NS ARCUS. safety planNS ARCUS. safety plan
NS ARCUS. safety plan
 

Recently uploaded

Scientific Writing :Research Discourse
Scientific  Writing :Research  DiscourseScientific  Writing :Research  Discourse
Scientific Writing :Research DiscourseAnita GoswamiGiri
 
4.9.24 School Desegregation in Boston.pptx
4.9.24 School Desegregation in Boston.pptx4.9.24 School Desegregation in Boston.pptx
4.9.24 School Desegregation in Boston.pptxmary850239
 
CHEST Proprioceptive neuromuscular facilitation.pptx
CHEST Proprioceptive neuromuscular facilitation.pptxCHEST Proprioceptive neuromuscular facilitation.pptx
CHEST Proprioceptive neuromuscular facilitation.pptxAneriPatwari
 
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITW
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITWQ-Factor HISPOL Quiz-6th April 2024, Quiz Club NITW
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITWQuiz Club NITW
 
Sulphonamides, mechanisms and their uses
Sulphonamides, mechanisms and their usesSulphonamides, mechanisms and their uses
Sulphonamides, mechanisms and their usesVijayaLaxmi84
 
How to Make a Duplicate of Your Odoo 17 Database
How to Make a Duplicate of Your Odoo 17 DatabaseHow to Make a Duplicate of Your Odoo 17 Database
How to Make a Duplicate of Your Odoo 17 DatabaseCeline George
 
Reading and Writing Skills 11 quarter 4 melc 1
Reading and Writing Skills 11 quarter 4 melc 1Reading and Writing Skills 11 quarter 4 melc 1
Reading and Writing Skills 11 quarter 4 melc 1GloryAnnCastre1
 
Using Grammatical Signals Suitable to Patterns of Idea Development
Using Grammatical Signals Suitable to Patterns of Idea DevelopmentUsing Grammatical Signals Suitable to Patterns of Idea Development
Using Grammatical Signals Suitable to Patterns of Idea Developmentchesterberbo7
 
Oppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and FilmOppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and FilmStan Meyer
 
CLASSIFICATION OF ANTI - CANCER DRUGS.pptx
CLASSIFICATION OF ANTI - CANCER DRUGS.pptxCLASSIFICATION OF ANTI - CANCER DRUGS.pptx
CLASSIFICATION OF ANTI - CANCER DRUGS.pptxAnupam32727
 
Q-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITWQ-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITWQuiz Club NITW
 
Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4JOYLYNSAMANIEGO
 
MS4 level being good citizen -imperative- (1) (1).pdf
MS4 level   being good citizen -imperative- (1) (1).pdfMS4 level   being good citizen -imperative- (1) (1).pdf
MS4 level being good citizen -imperative- (1) (1).pdfMr Bounab Samir
 
Expanded definition: technical and operational
Expanded definition: technical and operationalExpanded definition: technical and operational
Expanded definition: technical and operationalssuser3e220a
 
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxQ4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxlancelewisportillo
 
Tree View Decoration Attribute in the Odoo 17
Tree View Decoration Attribute in the Odoo 17Tree View Decoration Attribute in the Odoo 17
Tree View Decoration Attribute in the Odoo 17Celine George
 
ESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnv
ESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnvESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnv
ESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnvRicaMaeCastro1
 
Narcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfNarcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfPrerana Jadhav
 

Recently uploaded (20)

Scientific Writing :Research Discourse
Scientific  Writing :Research  DiscourseScientific  Writing :Research  Discourse
Scientific Writing :Research Discourse
 
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptxINCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
 
4.9.24 School Desegregation in Boston.pptx
4.9.24 School Desegregation in Boston.pptx4.9.24 School Desegregation in Boston.pptx
4.9.24 School Desegregation in Boston.pptx
 
CHEST Proprioceptive neuromuscular facilitation.pptx
CHEST Proprioceptive neuromuscular facilitation.pptxCHEST Proprioceptive neuromuscular facilitation.pptx
CHEST Proprioceptive neuromuscular facilitation.pptx
 
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITW
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITWQ-Factor HISPOL Quiz-6th April 2024, Quiz Club NITW
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITW
 
Sulphonamides, mechanisms and their uses
Sulphonamides, mechanisms and their usesSulphonamides, mechanisms and their uses
Sulphonamides, mechanisms and their uses
 
How to Make a Duplicate of Your Odoo 17 Database
How to Make a Duplicate of Your Odoo 17 DatabaseHow to Make a Duplicate of Your Odoo 17 Database
How to Make a Duplicate of Your Odoo 17 Database
 
Reading and Writing Skills 11 quarter 4 melc 1
Reading and Writing Skills 11 quarter 4 melc 1Reading and Writing Skills 11 quarter 4 melc 1
Reading and Writing Skills 11 quarter 4 melc 1
 
Using Grammatical Signals Suitable to Patterns of Idea Development
Using Grammatical Signals Suitable to Patterns of Idea DevelopmentUsing Grammatical Signals Suitable to Patterns of Idea Development
Using Grammatical Signals Suitable to Patterns of Idea Development
 
Oppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and FilmOppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and Film
 
CLASSIFICATION OF ANTI - CANCER DRUGS.pptx
CLASSIFICATION OF ANTI - CANCER DRUGS.pptxCLASSIFICATION OF ANTI - CANCER DRUGS.pptx
CLASSIFICATION OF ANTI - CANCER DRUGS.pptx
 
Q-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITWQ-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITW
 
Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4
 
MS4 level being good citizen -imperative- (1) (1).pdf
MS4 level   being good citizen -imperative- (1) (1).pdfMS4 level   being good citizen -imperative- (1) (1).pdf
MS4 level being good citizen -imperative- (1) (1).pdf
 
Expanded definition: technical and operational
Expanded definition: technical and operationalExpanded definition: technical and operational
Expanded definition: technical and operational
 
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxQ4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
 
prashanth updated resume 2024 for Teaching Profession
prashanth updated resume 2024 for Teaching Professionprashanth updated resume 2024 for Teaching Profession
prashanth updated resume 2024 for Teaching Profession
 
Tree View Decoration Attribute in the Odoo 17
Tree View Decoration Attribute in the Odoo 17Tree View Decoration Attribute in the Odoo 17
Tree View Decoration Attribute in the Odoo 17
 
ESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnv
ESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnvESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnv
ESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnv
 
Narcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfNarcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdf
 

Safety evaluation Best practices-04.11.10

  • 1. AMANA Contracting & Steel Building Co.
  • 2. HSE Report for Safety Evaluation A. Accident Lost Time Accident B. Proactive Safety Management B-1. Safety Policy statement & Plan B-2. Risk Assessment or JHA B-3. Safety Method Statement or PCM B-4. Management of work permit B-5. Participation in TBM C. Safety Activity C-1. Color Coding & Construction Equipment C-2. Corrective Actions of Patrol results by HSE Manager or third party C-3. Attendance of regular site inspection & Meeting C-4. Feedback for self safety patrol C-5. Health Management C-6. PPE Management D. Field Safety Facilities D-1. Working at height (Fall protection / Falling materials) D-2. Scaffolds and Ladders D-3. Collapse D4-. Mobile Plant and equipments D-5. Confined spaces D6. Temporary Electricity D7. ARC / Gas Welding / cutting D8. Electrical Tools D-9. Disposal of waste and housekeeping
  • 3. A. Accident Lost Time Accident HSE Report for Safety EvaluationHSE Report for Safety Evaluation ZERO Lost Time Accident till Date (3rd November 2010) Number of Staff Number Non Staff Total (AVG) / Day 25 450 475 Total Accident Free Man Hours (Till 3rd November 2010) 379,502 (Three Hundred seventy nine thousand & Five Hundred two) Average Man Hours worked / Day 4750 Average Man hours worked / Month 123,500
  • 4. HSE Report for Safety EvaluationHSE Report for Safety Evaluation B. Proactive Safety Management B-1. Safety Policy statement & Plan Display of Safety Policy Communication through Safety Training
  • 5. HSE Report for Safety EvaluationHSE Report for Safety Evaluation B. Proactive Safety Management B-2. Risk Assessment or JHA Weekly Risk Assessment Risk Assessment being communicated to workers through TBM - Dated 24-07- 2010
  • 6. HSE Report for Safety EvaluationHSE Report for Safety Evaluation B. Proactive Safety Management B-3. Safety Method Statement or PCM PCM has been conducted as and when required Method Statement being submitted
  • 7. HSE Report for Safety EvaluationHSE Report for Safety Evaluation B. Proactive Safety Management PTW is being observed regularly Hot work permit is complied with B-4. Management of work permit Lifting work complied with Work at height complied with HOT WORKWork at Height ExcavationLifting Work Excavation permit complied with
  • 8. HSE Report for Safety EvaluationHSE Report for Safety Evaluation B. Proactive Safety Management B-5. Participation in TBM Number of TBM Program Number of Days Total No. of Attendees 177 167 (20 May to 3 Nov) 33652 Night Shift TBM
  • 9. HSE Report for Safety EvaluationHSE Report for Safety Evaluation B. Proactive Safety Management B-5. Participation in TBM Types of Training No. of Programs No of Attendees Safety Induction 98 834 Special Safety Training 15 971 External Training 3 15 SAFETY TRAINING Safety Induction Special Safety Trainings HSE Training for all Site staff – 25.09.10 Work at height – 16.08.10 Grinder operating – 07.07.10 Heat Stress Training – 20.05.10
  • 10. HSE Report for Safety EvaluationHSE Report for Safety Evaluation C. Safety Activity C-1. Color Coding & Construction Equipment All Power tools & Equipments are being inspected regularly
  • 11. HSE Report for Safety EvaluationHSE Report for Safety Evaluation C. Safety Activity C-2. Corrective Actions of Patrol results by HSE Manager or third party CORRECTIVE ACTIONS - SCAR Recorded (Nos.) Corrected (Nos.) Outstanding (Nos.) Previous 212 212 0 Current (28th Oct 10 to 3rd Nov 10) 5 5 0 Total 217 217 0 100% Compliance of S- CARS.
  • 12. HSE Report for Safety EvaluationHSE Report for Safety Evaluation C. Safety Activity C-3. Attendance of regular site inspection & Meeting Weekly HSE Meeting Presentation Regular Site Inspection Regular Site inspection being carried out by all site safety team, resulting control over unsafe actions and unsafe conditions and therefore we have achieved numbers of Best Practices. 100% attendance in SAMSUNG HSE Meetings & Trainings Weekly Presentation
  • 13. HSE Report for Safety EvaluationHSE Report for Safety Evaluation C. Safety Activity Inspection Reports are made in prescribed formats and being reported to Sr. Project Manager for Corrective and preventive actions. Every hazardous activity such as cladding work, formwork etc are supervised by dedicated safety officers to enforce safety rules and precautions during the operation. C-4. Feedback for self safety patrol  Self Safety Inspection is being carried out by Safety Department and Spot corrections are preferred if unsafe actions or condition observed.
  • 14. HSE Report for Safety EvaluationHSE Report for Safety Evaluation C. Safety Activity 1. First Aid Clinic – Well equipped first clinic available at the project.C-5. Health Management
  • 15. HSE Report for Safety EvaluationHSE Report for Safety Evaluation C. Safety Activity 3. Management of Heat Stress C-5. Health Management Air conditioned Rest Area
  • 16. HSE Report for Safety EvaluationHSE Report for Safety Evaluation C. Safety Activity 4. Hygiene Management C-5. Health Management b- Hand wash facility a- Adequate numbers of Toilets & urinals with ablution facilities c- Safety Training on hand hygiene d- Safe Drinking water with provision of cleaned water filters.
  • 17. HSE Report for Safety EvaluationHSE Report for Safety Evaluation C. Safety Activity PPE Management -  Specific requirements of PPE – Face shields etc  Mandatory PPE – Safety Shoes, Safety Helmet & Safety Goggles are used by all employees including site staff.  100% employees are using safety harness while work at height C-6. PPE Management  Life line to ensure 100% tie – off during erection of work platform and other height work
  • 18. HSE Report for Safety EvaluationHSE Report for Safety Evaluation Fall Protection-D. Field Safety Facilities D-1. Working at height (Fall protection / Falling materials) We followed 3 E’s Concept for Fall Protection- 1E – Education –Training (Special & TBT) on Work at height for Staff and Non Staff being conducted on regular basis. 2E – Engineering Control – Safe & Approved scaffold, Fully boarded & Guarded work platform, Safe means of access & egress, 100% Edge protection for leading edges, MEP openings, Fall protection (Collective & Personal) protection – Twin Lanyard, Life line etc observed at all the time while working at height. 1. Safe & Approved scaffold
  • 19. HSE Report for Safety EvaluationHSE Report for Safety Evaluation Fall Protection-D. Field Safety Facilities D-1. Working at height (Fall protection / Falling materials) We followed 3 E’s Concept for Fall Protection- 2. Fully Boarded & Guarded work platform for work at height - During slab decking work While Shuttering While Concrete pouringWhile Rebar binding Safe work platform
  • 20. HSE Report for Safety EvaluationHSE Report for Safety Evaluation Fall Protection-D. Field Safety Facilities D-1. Working at height (Fall protection / Falling materials) We followed 3 E’s Concept for Fall Protection- 3. Safe means of access & egress for each point of work- Foot bridge Step stair to current slab with overhead protection
  • 21. HSE Report for Safety EvaluationHSE Report for Safety Evaluation Fall Protection-D. Field Safety Facilities D-1. Working at height (Fall protection / Falling materials) We followed 3 E’s Concept for Fall Protection- 4. 100% edge protection for leading edges- While Excavation Suitable edge protection for each point of work
  • 22. HSE Report for Safety EvaluationHSE Report for Safety Evaluation Fall Protection-D. Field Safety Facilities D-1. Working at height (Fall protection / Falling materials) We followed 3 E’s Concept for Fall Protection- 5. Fall protection (Collective & Personal) protection Usage of twin lanyard & life line Suitable PFAS (Personal Fall Arrest system) Safety harness for each type of work at height
  • 23. HSE Report for Safety EvaluationHSE Report for Safety Evaluation Falling Materials – being arrested by use of suitable edge protection and fall protection fans D. Field Safety Facilities D-1. Working at height (Fall protection / Falling materials) 1. Suitable Edge protection with toe guards 2. Protection FAN / Green Nets to arrest falling materials
  • 24. HSE Report for Safety EvaluationHSE Report for Safety Evaluation Scaffolds – Scaffolds are being Erected by competent person with sound materials under the supervision of experts in scaffold erection. D. Field Safety Facilities D-2. Scaffolds & Ladders 3. Safe Scaffold Erection Method Foundation-Mud Sill, Base Plate Platform - Fully Boarded & Guarded platform (Top & Mid Rail, Toe guards) Secure- tie and bracing, Out riggers Access-Means of Access to each work platform 2. Approved and Sound scaffold materials 1. Trained Scaffolds Erectors
  • 25. HSE Report for Safety EvaluationHSE Report for Safety Evaluation Ladders– Good quality of aluminum ladders are used as a means of access, Also regular inspection is being done and we ensure the ladders are suitably secured. D. Field Safety Facilities D-2. Scaffolds & Ladders 2. Approved Ladders used 1. Ladder Identification & Inspection 3. Not allowed as work platform
  • 26. HSE Report for Safety EvaluationHSE Report for Safety Evaluation D. Field Safety Facilities D-3. Collapse 2.Approved FormworkMaterial used 1. Scaffold erected with ties and bracing with adequate foundation 3. Approval from SAMSUNG & Formwork Supplier (if required) Prior to work
  • 27. HSE Report for Safety EvaluationHSE Report for Safety Evaluation D. Field Safety Facilities D-4. Mobile Plant and Equipment (Crane, Rope, Chain) 2. Trained operators for each Mobile Plant 1. Register for All Mobile equipment is maintained for their 3rd party certificates, other required documents & Equipment Conditions 3. Approval from SAMSUNG & Self Inspection
  • 28. HSE Report for Safety EvaluationHSE Report for Safety Evaluation D. Field Safety Facilities D-6. Temporary Electricity 2. Suitable Warning Signs 1. Competent Electricians are deputed at site 3.DGswithBundwall& Earthing 4. Fire Protection & Cable routing
  • 29. HSE Report for Safety EvaluationHSE Report for Safety Evaluation D. Field Safety Facilities D-7. ARC / GAS Welding / Cutting Flash back arrestor & Pressure Gauge Competent Welders are deputed at site FollowupofHotWork Permit(SAMSUNG) Secured Gas Cylinders
  • 30. HSE Report for Safety EvaluationHSE Report for Safety Evaluation D. Field Safety Facilities D-8. Electrical Tools Electrical Power Tools Management - Once we receive power tools, it is being inspected by us and then operators are given training . Also AMANA inspection stickers are provided to tools. Finally the tools are being sent for SAMSUNG HSE approval and color code Inspection of Tools Inspection Sticker for the evidence Training for the Operator
  • 31. HSE Report for Safety EvaluationHSE Report for Safety Evaluation D. Field Safety Facilities D-9. Disposal of Waste & Housekeeping Housekeeping- Everyday we do housekeeping before and at the end of work.
  • 32. HSE Report for Safety EvaluationHSE Report for Safety Evaluation Signages
  • 33. HSE Report for Safety EvaluationHSE Report for Safety Evaluation
  • 34. HSE Report for Safety EvaluationHSE Report for Safety Evaluation
  • 35. HSE Report for Safety EvaluationHSE Report for Safety Evaluation
  • 36. HSE Report for Safety EvaluationHSE Report for Safety Evaluation SMOKING ZONE
  • 37. HSE Report for Safety EvaluationHSE Report for Safety Evaluation
  • 38. HSE Report for Safety EvaluationHSE Report for Safety Evaluation Note: Hand gloves should not be used while operating tools with abrasive wheel as it may cause entanglement.
  • 39. HSE Report for Safety EvaluationHSE Report for Safety Evaluation
  • 40. HSE Report for Safety EvaluationHSE Report for Safety Evaluation Environmental Safety
  • 41. HSE Report for Safety EvaluationHSE Report for Safety Evaluation Environmental Safety
  • 42. HSE Report for Safety EvaluationHSE Report for Safety Evaluation
  • 43. HSE Report for Safety EvaluationHSE Report for Safety Evaluation AMANA HSE CEREMONY 23rd July 2010 Mustafa Javed Surinder Leela Ram Prodip 4 CRITERIA TO WIN
  • 44. HSE Report for Safety EvaluationHSE Report for Safety Evaluation AMANA HSE CEREMONY 23rd July 2010
  • 45. HSE Report for Safety EvaluationHSE Report for Safety Evaluation BOOKLET DISDRIBUTION- Samsung (Hindi) and AMANA(Multi lingual) booklets are distributed among workers
  • 46. HSE Report for Safety EvaluationHSE Report for Safety Evaluation “Start Safe – Stay Safe”