Risk evaluation template Prepared by A.Dogani 2016(1)
'' Plani menaxhimit te cilesise per linja transmetimi tu tm-tl dhe nenstacione nga 35-400k v (pmc)rev-01_2018.04.18
Hse plan zbatim ''siguria shendeti dhe mjedisi'' 2018.04.11 .rev.03
Specific method of statmeents risk assessment -job hazard analysis for land slide
Specific method of statmeents risk assessment -job hazard analysis for land slide
Investigation report 05.12.2017 lifting operation failure during tower erection investigatigations by ; arber dogani
Incident&accident report date 02.08.2014 by arber dogani example for aplications
Hse monthly report june 2015. rev.01 by.arber dogani example statistics
Hse templates by.arber dogani
Ditar kantieri (formular)
Raport javor punimesh linja transmetimi format raportimi javor _ arber dogani
Raport javor siguria shendeti dhe mjedisi Raportim Mujor Statistika Arber Dogani
Plan menanxhimi (mjedisi linjat e transmetimit)rev.00 arber dogani
Plani emergjences linja transmetimit 110k v rev.00 22.07.2015 arber dogani
Manuali i punes ndertimin e linjave dhe nst te tensionit te larte shqip 2018