role of IRC in transportation development in indiaRAJPREMANI
this is a review paper on "ROLE OF IRC IN TRANSPORTATION DEVELOPMENT IN INDIA" which is publised in IJIRMF ( INTERNATIONAL JOURNAL FOR INNOVATIVE RESEARCH IN MULTIDISCIPLINARY FIELD" PUBLISHED IN OCTOBER 2016 WITH PAPER ID 201610082
State Farm sponsored lesson: "Road Design and Safety" is a PowerPoint for primary and secondary students that overviews safety on roadways and ways in which engineers incorporate safety when designing roads. It also highlights careers in road design and safety. Additionally, this lesson can be paired with a "Design your own 3D Model of Transportation Effectiveness and Roadway Safety" activity.
role of IRC in transportation development in indiaRAJPREMANI
this is a review paper on "ROLE OF IRC IN TRANSPORTATION DEVELOPMENT IN INDIA" which is publised in IJIRMF ( INTERNATIONAL JOURNAL FOR INNOVATIVE RESEARCH IN MULTIDISCIPLINARY FIELD" PUBLISHED IN OCTOBER 2016 WITH PAPER ID 201610082
State Farm sponsored lesson: "Road Design and Safety" is a PowerPoint for primary and secondary students that overviews safety on roadways and ways in which engineers incorporate safety when designing roads. It also highlights careers in road design and safety. Additionally, this lesson can be paired with a "Design your own 3D Model of Transportation Effectiveness and Roadway Safety" activity.
accident report for cars
form for accident report
blue report for accident
accident reports for nc
the best study method
effective study methods
causes of accidents
factors affecting accidents
how accident data are collected
This topic bearing Seminar Presentation of Advanced Road Transportation System and Its Planning. Its includes Road Plan, Traffic Control and its applications, spot speed, General Instruction and basic role of ARTS, Conclusion.
The spectacular growth of the automobile as one of the most convenient modes of travel has brought in its wake frustrating problems of parking, accidents, delay, congestion, etc. It is no longer sufficient to build roads of adequate structural strength to cater to the needs of vehicles, but it is equally important that the safe, efficient and comfortable movement of traffic and other road user is ensured on these roads. Highway intersections are nodes of road networks and accident - prone locations. They are the places where vehicles coming from different approaches and moving towards different directions interact and conflict with each other. Due to the conflicts from all users, more traffic crashes could happen at unsignalized intersection as compared with roadway segments. This study is fully based on the existing conditions of unsignalized intersection, including geometric design, sight distance, traffic control devices etc. The problems of parking, accidents and delay are also prevailing in the area under our study i.e. intersection at 26th mile. The intersection is an unsignalized one and therefore, the chances of accidents during the peak hours are very high. Since, it is a meeting point of a national highway and a state highway, the variation in the design speed of both roads also interrupts the traffic flow. Our study on the intersection at 26th mile mainly aims at improving the geometrical as well as the safety features of the intersection like accident control by signal installation, incorporation of proper sight distances, uninterrupted traffic flow without causing crashes, delay, etc.
Appraisal of airport roundabout on the antoa road, kumasi ghana using micro s...eSAT Journals
Abstract Roundabouts have become increasingly popular in recent years as an innovative operational and safety solution at both low volume and high volume intersections. Roundabouts have a number of advantages over traffic signals depending on the conditions. They reduce the severity of crashes since head-on and right-angle conflicts are nearly eliminated. They reduce through traffic speeds to provide a “calmer” roadway environment. This study appraised Airport roundabout on the Antoa Road in Kumasi, Ghana using micro simulation model. Traffic and geometric data were collected on the field. The analysis revealed that Airport roundabout was operating at a level of service F, which represented worst conditions. Signalized intersection with 4 approach lanes on the two principal arterials was proposed to control all the movements. Exclusive pedestrian phases were proposed to protect pedestrians. Keywords: Appraisal, Airport roundabout, Capacity analysis, Antoa Road.
IJRET : International Journal of Research in Engineering and Technology is an international peer reviewed, online journal published by eSAT Publishing House for the enhancement of research in various disciplines of Engineering and Technology. The aim and scope of the journal is to provide an academic medium and an important reference for the advancement and dissemination of research results that support high-level learning, teaching and research in the fields of Engineering and Technology. We bring together Scientists, Academician, Field Engineers, Scholars and Students of related fields of Engineering and Technology
International Journal of Engineering Research and Applications (IJERA) is an open access online peer reviewed international journal that publishes research and review articles in the fields of Computer Science, Neural Networks, Electrical Engineering, Software Engineering, Information Technology, Mechanical Engineering, Chemical Engineering, Plastic Engineering, Food Technology, Textile Engineering, Nano Technology & science, Power Electronics, Electronics & Communication Engineering, Computational mathematics, Image processing, Civil Engineering, Structural Engineering, Environmental Engineering, VLSI Testing & Low Power VLSI Design etc.
accident report for cars
form for accident report
blue report for accident
accident reports for nc
the best study method
effective study methods
causes of accidents
factors affecting accidents
how accident data are collected
This topic bearing Seminar Presentation of Advanced Road Transportation System and Its Planning. Its includes Road Plan, Traffic Control and its applications, spot speed, General Instruction and basic role of ARTS, Conclusion.
The spectacular growth of the automobile as one of the most convenient modes of travel has brought in its wake frustrating problems of parking, accidents, delay, congestion, etc. It is no longer sufficient to build roads of adequate structural strength to cater to the needs of vehicles, but it is equally important that the safe, efficient and comfortable movement of traffic and other road user is ensured on these roads. Highway intersections are nodes of road networks and accident - prone locations. They are the places where vehicles coming from different approaches and moving towards different directions interact and conflict with each other. Due to the conflicts from all users, more traffic crashes could happen at unsignalized intersection as compared with roadway segments. This study is fully based on the existing conditions of unsignalized intersection, including geometric design, sight distance, traffic control devices etc. The problems of parking, accidents and delay are also prevailing in the area under our study i.e. intersection at 26th mile. The intersection is an unsignalized one and therefore, the chances of accidents during the peak hours are very high. Since, it is a meeting point of a national highway and a state highway, the variation in the design speed of both roads also interrupts the traffic flow. Our study on the intersection at 26th mile mainly aims at improving the geometrical as well as the safety features of the intersection like accident control by signal installation, incorporation of proper sight distances, uninterrupted traffic flow without causing crashes, delay, etc.
Appraisal of airport roundabout on the antoa road, kumasi ghana using micro s...eSAT Journals
Abstract Roundabouts have become increasingly popular in recent years as an innovative operational and safety solution at both low volume and high volume intersections. Roundabouts have a number of advantages over traffic signals depending on the conditions. They reduce the severity of crashes since head-on and right-angle conflicts are nearly eliminated. They reduce through traffic speeds to provide a “calmer” roadway environment. This study appraised Airport roundabout on the Antoa Road in Kumasi, Ghana using micro simulation model. Traffic and geometric data were collected on the field. The analysis revealed that Airport roundabout was operating at a level of service F, which represented worst conditions. Signalized intersection with 4 approach lanes on the two principal arterials was proposed to control all the movements. Exclusive pedestrian phases were proposed to protect pedestrians. Keywords: Appraisal, Airport roundabout, Capacity analysis, Antoa Road.
IJRET : International Journal of Research in Engineering and Technology is an international peer reviewed, online journal published by eSAT Publishing House for the enhancement of research in various disciplines of Engineering and Technology. The aim and scope of the journal is to provide an academic medium and an important reference for the advancement and dissemination of research results that support high-level learning, teaching and research in the fields of Engineering and Technology. We bring together Scientists, Academician, Field Engineers, Scholars and Students of related fields of Engineering and Technology
International Journal of Engineering Research and Applications (IJERA) is an open access online peer reviewed international journal that publishes research and review articles in the fields of Computer Science, Neural Networks, Electrical Engineering, Software Engineering, Information Technology, Mechanical Engineering, Chemical Engineering, Plastic Engineering, Food Technology, Textile Engineering, Nano Technology & science, Power Electronics, Electronics & Communication Engineering, Computational mathematics, Image processing, Civil Engineering, Structural Engineering, Environmental Engineering, VLSI Testing & Low Power VLSI Design etc.
DESIGN OF TRAFFIC SIGNAL AT S.R.NAGR COMMUNITY HALLSAMADHANA
this ppt is about design of a traffic signal at S.R. Nagar community hall using webster method which is uded to design the time length of red, yellow and green signals.
it was a case study of aurangabad city related to road safety in this ppt there is a deep information of how to conduct road safety audit what are features to be consider while conducting road safety audit blackpot identification and recommendations for better journey & safe travvel
Welcome to WIPAC Monthly the magazine brought to you by the LinkedIn Group Water Industry Process Automation & Control.
In this month's edition, along with this month's industry news to celebrate the 13 years since the group was created we have articles including
A case study of the used of Advanced Process Control at the Wastewater Treatment works at Lleida in Spain
A look back on an article on smart wastewater networks in order to see how the industry has measured up in the interim around the adoption of Digital Transformation in the Water Industry.
Final project report on grocery store management system..pdfKamal Acharya
In today’s fast-changing business environment, it’s extremely important to be able to respond to client needs in the most effective and timely manner. If your customers wish to see your business online and have instant access to your products or services.
Online Grocery Store is an e-commerce website, which retails various grocery products. This project allows viewing various products available enables registered users to purchase desired products instantly using Paytm, UPI payment processor (Instant Pay) and also can place order by using Cash on Delivery (Pay Later) option. This project provides an easy access to Administrators and Managers to view orders placed using Pay Later and Instant Pay options.
In order to develop an e-commerce website, a number of Technologies must be studied and understood. These include multi-tiered architecture, server and client-side scripting techniques, implementation technologies, programming language (such as PHP, HTML, CSS, JavaScript) and MySQL relational databases. This is a project with the objective to develop a basic website where a consumer is provided with a shopping cart website and also to know about the technologies used to develop such a website.
This document will discuss each of the underlying technologies to create and implement an e- commerce website.
About
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Technical Specifications
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
Key Features
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface
• Compatible with MAFI CCR system
• Copatiable with IDM8000 CCR
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
Application
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Immunizing Image Classifiers Against Localized Adversary Attacksgerogepatton
This paper addresses the vulnerability of deep learning models, particularly convolutional neural networks
(CNN)s, to adversarial attacks and presents a proactive training technique designed to counter them. We
introduce a novel volumization algorithm, which transforms 2D images into 3D volumetric representations.
When combined with 3D convolution and deep curriculum learning optimization (CLO), itsignificantly improves
the immunity of models against localized universal attacks by up to 40%. We evaluate our proposed approach
using contemporary CNN architectures and the modified Canadian Institute for Advanced Research (CIFAR-10
and CIFAR-100) and ImageNet Large Scale Visual Recognition Challenge (ILSVRC12) datasets, showcasing
accuracy improvements over previous techniques. The results indicate that the combination of the volumetric
input and curriculum learning holds significant promise for mitigating adversarial attacks without necessitating
adversary training.
Explore the innovative world of trenchless pipe repair with our comprehensive guide, "The Benefits and Techniques of Trenchless Pipe Repair." This document delves into the modern methods of repairing underground pipes without the need for extensive excavation, highlighting the numerous advantages and the latest techniques used in the industry.
Learn about the cost savings, reduced environmental impact, and minimal disruption associated with trenchless technology. Discover detailed explanations of popular techniques such as pipe bursting, cured-in-place pipe (CIPP) lining, and directional drilling. Understand how these methods can be applied to various types of infrastructure, from residential plumbing to large-scale municipal systems.
Ideal for homeowners, contractors, engineers, and anyone interested in modern plumbing solutions, this guide provides valuable insights into why trenchless pipe repair is becoming the preferred choice for pipe rehabilitation. Stay informed about the latest advancements and best practices in the field.
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)MdTanvirMahtab2
This presentation is about the working procedure of Shahjalal Fertilizer Company Limited (SFCL). A Govt. owned Company of Bangladesh Chemical Industries Corporation under Ministry of Industries.
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...Amil Baba Dawood bangali
Contact with Dawood Bhai Just call on +92322-6382012 and we'll help you. We'll solve all your problems within 12 to 24 hours and with 101% guarantee and with astrology systematic. If you want to take any personal or professional advice then also you can call us on +92322-6382012 , ONLINE LOVE PROBLEM & Other all types of Daily Life Problem's.Then CALL or WHATSAPP us on +92322-6382012 and Get all these problems solutions here by Amil Baba DAWOOD BANGALI
#vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore#blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #blackmagicforlove #blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #Amilbabainuk #amilbabainspain #amilbabaindubai #Amilbabainnorway #amilbabainkrachi #amilbabainlahore #amilbabaingujranwalan #amilbabainislamabad
Saudi Arabia stands as a titan in the global energy landscape, renowned for its abundant oil and gas resources. It's the largest exporter of petroleum and holds some of the world's most significant reserves. Let's delve into the top 10 oil and gas projects shaping Saudi Arabia's energy future in 2024.
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Health of Urban Roads - IRF-WRM-14-17-November 2017
1. Health of Urban Roads
Capacity Optimization
S.C.VERMA
M. Tech Highway Safety Engineering
Assistant Engineer
CPWD Govt. of India
shrishverma@rediffmail.com
2. The problem of The traffic congestion in urban areas
is one most significant problem out of two-one traffic
accident and other traffic congestion. The both are at
the alarming state in developing countries.
The road accidents are being observed in full length
of any road at any spot and any time ie. very difficult
to predict.The maximum negative effects of accidents
are visible and almost accountable.
The congestion in urban area is fixed in location and
time.
Due to congestion we are losing, Man-Hours, Fuel
and Temper causing road rage. and increasing Health
Hazards due to Air and Noise Pollution, Vehical
operating cost, Wear and Tear of Roads and a national
grading as a developed country.
3. Perception created about traffic
congestion by Authorities.
• The traffic congestion in urban roads most of the
places before saturation of the road capacity but the
responsible authorities are successfully creating
perception in common man and decision makers,
that the traffic congestion is due to :
• 1-More Number of Vehicles.
• 2-Shortage of Road Facilities. &
• 3- User Behavior.
4. Facts and actual problem
• 1-The More Number of Vehicles- Sign of Growth for Developing
Countries.
• 2-The new road facility is required diversion of funds from other
more essential welfare schemes.
• 3- Scarcity of land as resource.
• 4-User behavior has been developed in a long time along with
available traffic atmosphere created by responsible authorities. and
• witnessed by the different behavior of users in different countries,
cities and also in different placeless with in the city.
5. The problem of traffic congestion in urban areas is
more of traffic management than lack of infrastructure.
1-In increasing number of vehicles and scarcity of
space, optimization of road capacity is an economical
and sustainable solution.
2-The most congested road “VIKAS MARG,- New
Delhi” suitably representing any congested urban road
is taken as example for describe the problem and
solutions.
3-The road is 44.00 m wide, 6 lane divided, raised
footpath with service lanes.
6. .
• 1- The area is converted from unplanned residential
to dense residential, commercial and institutional
without adding any facilities.
• 2-The maximum available road width being utilized
by users in haphazard manner unaware about effect
to traffic operation for pick and drop to passengers
by busses, autos and taxies, parking, loading &
unloading of material by commercial vehicles,
extended shops, electrical transformer, and
unplanned trees etc all with in the road.
7. Severity of problem- Vikas Marg Delhi
Visit stretch through snap shots, video and print media
• News Matter in Print Media
• 1-Plane and Claim of Delhi Government
• 2-Action initiated by executive agencies
• 3-Repidatlly Power utilized By Honorable L.G. of Delhi
• 4-Very strict orders of Honorable supreme court, High court
• 5-Enforcement agency creating wrong perception.
13. Executive unit nothing doing to solve the problem.
When Honorable supreme court, High court and
Lieutenant Governor pressurized over issue the
executive agencies are only pasting posters.
15. Actual condition through
photographs-2013-17 .
• 1-Footpath and Service lane
• 2-Condition of bus lane
• 3-Inter-section management
• 4-Routine driving of buses
• 5-Videos of Intersection..
16. Service Lane
Entry and exit of Service lane
blocked to protect
commercial activity in service lane
26. Movement of busses
Buses occupied all three lanes
pick and drop in middle lane
overtaking through innermost lane
27. Bus box in bus lane
Buses moving in middle and inner lane
28. Inter section
• Signalized intersection
• Traffic waiting in side the intersection
• Traffic personal in middle of intersection
unaware about keep the traffic waiting at
Zebra Crossing/before the signal and provide
free and fast entry exit to green signal traffic.
32. Statues as on 11-11-2017-11.00 Hr
During Week end –Very Thin Traffic
• The order issued by Honorable Supreme Court,
High Court, Lieutenant Governor due to worst
condition time to time taken as a opportunity for
taking short term drive for advertised for there
present and justifying salaries and expenses without
any result till next very strict orders.
• 1-Service lane
• 2- Bus Lane
• 3-Driving buses up to inner most lane
• 4-Engineering unit in bus lane
37. Introduction
Performance of a person is varying in healthy and
unhealthy condition. The similarly the actual capacity
of roads are also depend on operational health of road.
The elements of a healthy road are:
1- Geometrically Designed with Consideration of All
Requirements.
2-Operated as Designed.
3-Synchronized Signaling considering Queuing Theory
4-Enforsable Road Marking.
5-Street Furniture. &
6-Enforcement.
38. Effect of Congestion
• The all effects of congestion are negative,
large in numbers, long in time and very
complicated.
• 1- Economical,
• 2-Environmental,
• 3-Health &
• 4-Social
39. .
• Economical
• 1- Extra fuel Consumption.
• 2- Losing man hours on roads
• 3- Wear & tear of vehicle (Braking and clutch )
• 4-Wear& tear of road (braking and acceleration)
• Environmental
• 1-Generation of fumes by burning extra fuel.
• 2-Unburned fuel in smock.
• 3-Noise Pollution.
• 4- Aesthetic of roads
40. .• Health
• 1- Driving Stress
• 2- Diseases due to air pollutants from vehicles.
• 3- Diseases due to noise pollution-vehicle users and
socity.
• Social
• 1-No route for ambulances and emergency vehicles
• 2-Road rages due to driving stress.
• 3-less outing to meat nearest & dearest.
41. Following points are focused in study
• 1-Traffic Volume on the stretch
• 2-Average Speed of Vehicles
• 3-Traffic Signal Design and Operation
• 4- Space Utilization and Financial Evaluation
42. Methodology
1-Traffic Volume on the Stretch
. The Method adopted for determination of peak
hours classified traffic volume counted by
analyzing video recorded from 06.00 AM to 10.00
PM, 16 hours as per IRC. Recommendation. The
camera stalled on FOB at Laxminagar Metro
Station at suitable location to cover all in and out
traffic of Vikas Marg.
43. 2- The Space Mean Speed: To determine the
space mean speed “moving car method” is
adopted. The time in the total journey from entry
to exit in morning and evening peaks are recorded
with moving car and stop watch. The Entry and
exit time recorded for nine days to reduce the
localized effect of specific activity at particular
time and day. The total length of stretch is divided
by journey time for calculation of journey speed
in m/s. There after the journey speed converted in
Km/Hr. The Table and Graph prepared.
44. 3- Traffic Signal design and operation:
Delhi traffic police responsible for design and
operate all traffic signals, have no traffic data, basic
requirement for design of signals. The signal timing
and phasing for all intersections are fixed by hit and
trial basis and also operated manually at many
places in isolation of adjoining intersection.
Therefore the signals are not related with the traffic
count entering in the intersection from the
individual sides and also not considered the time
spends by the vehicles from one intersection to next
intersection.
45. 4-Space availability and utilization:
The road width is taken from Pre-Metro drawing
procured from PWD, Delhi Govt. and physically
verified. The width of different element of roads are
tabulated and percentage of encroachment evaluated
through visual assessment and photographs taken
during Peak Hours. The percentage of encroached
space are calculated accordingly. The total space
utilized for the purposes other than the traffic
movements is calculated by the multiplying length
of the stretch by encroached width.
46. ……..4.. The monthally rental value of the space
calculated on the basis of rates in Vikas Marg.
47. DATA COLLECTION AND
ANALYSIS
The four different observation have been
taken for data collection.
1- Classified Traffic Volume.
2- Space Mean Speed
3- Signaling and phasing.
4-Space Utilization
48. 1-Classified Traffic Volume
To determine the peak hour volume the Video
recording analyzed, recorded on 30-04-2013 , for
total entry and exit traffic of Vikas Marg from 06-
00AM to 10-00PM as per IRC recommendation,.
The classified traffic counted from the 16.00 Hours
video recording and posted in the table generated for
the purpose for each type of vehicles at 15.00
minutes interval.
The classified traffic data are further converted in to
PCU with consideration of equivalent factor based
on percentage participation of vehicles in the traffic
flow.
49. The aggregate of four rows for one hour added
tabulated in separate table and compared with
theoretical capacity of road as per IRCC-and UK
Standards for Urban Road Capacity.
The converted traffic volume in PCU tabulated and
plotted on graph.
50. ..
Table for counting of
classified traffic
from video analysis
and
convergent in weighted PCU
for
traffic volume /Hr
53. •2-Space Mean Speed
The moving car method is adopted for
determination of Journey time on the section.
The time in the total journey from entry and
exit in morning and evening peak are obtained
with moving car and stop watch. The Entry and
exit time recorded for two times in a day for
Nine days to reduce the localized effect of
specific activity at particular time and day.
54. •.
The total length of stretch (2670 m) is
divided by journey time for calculation
of journey speed in m/s. There after
the journey speed converted in
Km/Hour. The findings are tabulated
and graphically presented
60. Graphical
presentation
of red and Green
Phase at intersection
and time in between
inter section.
Timing to be
supper impose
on graph such
a way vehicle
starting
in green signal
found green signal
When reach the
next all intersection
with permitted
speed
61.
62.
63. 4-Space Utilization
• The design road width is taken from five sections
on different points as per drawing procured from
PWD Delhi Govt. The average width of road
calculated for the stretch. The percentage of road
width encroached approximated as per shown in the
images of Vikas Marg. The total space utilized for
the purposes other than the traffic movements is
calculated by the multiplying length of the stretch
by encroached width. Then the rental value of the
space calculated on the basis of rates in Laxmi
Nagar.
66. Conclusion
• The road under consideration is six lanes, divided
three lane one way urban road. The road is also
provided with footpath and service lanes. The
operating condition of the road in peak hours is
approximately jamming. The jamming condition in
the section occurred due poor condition of road
elements. There are huge encroachment and
commercial activities on the road. No traffic and
regulation enforcement exist on the road.
67. .• The minimum speed in the section is 10.63Km/Hr
when volume is 4213 PCU in morning peak is
approximate double the minimum speed is
5.15Km/ Hr in evening peak with 3400 PCU. The
less speed during less volume is the effect of
more commercial activities on the road in
evening. The agencies are created perception and
sheltering themselves for the road is in jamming
condition due to user behavior and traffic Volume
exceeded to the road capacity.
68. .
• The authorities passing very strict orders for
solution. The agencies are utilizing these orders
as a opportunities for expenditure of funds for
publicity poster and banners, visual and print
media, changing footpaths and Kerb Stones,
celebrating zero tolerance, No Parking weeks
etc. only for time being. No agency exploring
the basic problem of congestion and then act
upon, till result.
69. .
• During the study, it has been established that the
optimum capacity of the road has not been utilized
till now. The congestion on Vikas Marg removed by
• Proper lane markings.
• Operational ability of bus lanes
• , Usability of service lanes
• Designated space for every vehicle
• Layout of intersections
• Design and operation of traffic signals based on
traffic volume, synchronization and queuing theory.
• Further evaluation of effects.
70. The peak hour’s traffic volume on the road is
exceeding by very less for the small period from
recommended traffic volume by IRC-86-1998 and
IRC-106-1990.(Required to be revised with
advanced technological of Modern Vehicles .) too
less than UK slandered(revised in 2005) for Road
capacity. treating all element of road. The
perception of more number of vehicles and user
behavior are reason for jamming condition of road
not stand any more. The road capacity can
optimize by suitably and strictly
71. The optimization of capacity the
main points to be considered
1-Boundaries of road space marked and controlled
by the road owning authorities.
2-Pedestrian paths are marked /constructed along
the building line and keep operational in full
length, checked by “wheel Chair method” in
regular interval.
3-Service lanes between footpaths and main lanes
of 2.5 m width., space for vehicles loading
unloading commercial goods.
72. 4-The space between service lane and main lanes
utilize for pick and drop space and wafting of
drivers with essay entry and exit from and in
Road.
5-The 3.00m width outer serviceable bus lane.
6-2.5 m wide middle car lane and 2.5 m wide
innermost overtaking and emergency Lane.
73. 7-Bell mouths are to be keeping in functional
condition to keep road free from water logging and
provide full width in all weather.
8-The time for execution of work and space of
road to be used for material, machinery and
activities other than under treatment included in
financial bids as monetary benefits.
9-The shop owners (vyapar Mandal)are included
in coordinating comity.
10-The vehicles can be parked in nearer by rented
parking’s and ferry system for pick and drop from
parking to shops and shops to parking to be
managed by Vyapar Mandals enhancing sales.
74. 11-The government agencies to acquire vacant
plots in vicinity and create small modern parking
lots may be with PPP mode.
12-Road marking of intersection layouts with
consideration of usable zebra crossings, isolation
of left turning vehicles, no stoppage of vehicles
with in the 70 to 100 m from intersection.
13-Classified data collection and updating at
regular intervals which is not very expansive now
days.
75. 14-design of signals based on actual traffic volume
and Synchronization of signals.
15-enforcment of all regulations and keep the road
fictional.
16-Moving vehicles on rods are most fossil fuel
energy consuming factor, consumption vary with
smooth traffic and congestion , required to be star
rated.
“Working units of all concern agencies must be
report to one head of comity formed for the
purpose.”
77. • .
Pedestrian path
Cycle Lane
Service Lane
Building Line
Kerb Stone /Physical barrier
3.0
MBus Lane
Car Lane
Out of Lane space for Pick & Drop
1.2 M
1.5 M
3.0 M
3.0 M
2.5 M
2.5 M
78. Overhead Signage
Pedestrian
path
Cycle
Lane
Vehicles
Turning &
waiting
Up To
20Km/Hr
Buses &
commercial
Vehicles
20 - 40
Km/Hr
Fast lane
40-50
Km/Hr
Emergency
&
overtaking
Lane
50-60
Km/Hr
Vehicles
Pick & drop
only on
designated
space
Responsible agencies keep close eye to user self
motivate and follow
81. Change in speed with respect to volume other factors are unchanged
observation during odd-even in Delhi –january-01 to 15 in 2016
Table of findings
1-Distance – 7.40Km
2- Journey Time
A- 1677 second- odd-even
B-1836 second- Normal
3- static time at signal
A-174 seconds- odd-even
B-386 seconds- Normal
Running Speed
A-17.72Km/H- odd-even
B-18.36 Km/H- Normal
Graph plotted from Video recording of section