A SEMINAR REPORT
ON
PARKING PROBLEM
PARALA MAHARAJA ENGINEERING COLLEGE,
BERHAMPUR
PROF. CHITTARANJAN MOHANTY
(Head Of the Department)
SUBMITTED TO:- SUBMITTED BY:-
Mrs. Nibedita Dalai Pranab Kumar pattnayak
(Asst. professor) Regd. No – 1801109220
Mr. Krushna Ch. Sethi Section - B
(Asst. Professor) 7th
semester,4th
year
CONTENT
S.NO. TITLE PAGE.NO
1 INTRODUCTION
1.1 GENERAL 1
1.2 EFFECT OF PARKING 2-3
1.3 NEED FOR THE STUDY 3-4
1.4 OBJECTIVE 4
1.5 SCOPE OF THE STUDY 4
2 LITRETURE REVIES
2.1 PARKING FACILITIES 5-10
2.2 PERIPHERAL PARKING SCHEMES 10-12
3 PARKING STUDIES
3.1 GENERAL 12
3.2 TYPES OF PARKING STUDIES 13
3.3 TYPES OF PARKING SURVEY 13
3.4 COMPREHENSIVE PARKING STUDIES 14-15
4. LAND USE SURVEY
4.1 GENERAL 16
5 CONCLUSION 17
6 REFERENCES 18
LIST OF FIGURE
SL.NO NAME PAGE.NO
1 TRAFFIC CONGESTIONS 2
2 ROAD ACCIDENT 2
3 OBSTRUCTION TO FIRE FIGHTING VECHILE 3
4 EFFECT ON ENVIRONMENT 3
5 PARKING ACCUMULATION DAIGRAM 5
6 PARALLEL,30,45,60,90 DEGREE PARKING 6-7
7 SURFACE CAR PARKS 9
8 MULTISTOREY CAR PARKS 10
9 ROOF CAR PARKS 10
10 UNDERGROUND CAR PARK 11
ABSTRACT
Today we are facing so many problems. Two of those acute problems is parking problem and traffic congestion.
It has spread its branches like a banyan tree in all directions. We do not have an accurate parking management
in our metro cities and mainly for our developing cities. Managing vehicles in a tactful manner is known as
parking management. This paper focuses on such problems contextual to smart city Bhubaneswar.
Bhubaneswar is an emerging city; it is capital city of odisha. It also comes under the ‘smart city’ project. There
are lots of industries and coaching centres situated in the city that contributes to its economy. Due to this there
is an increment in population and number of vehicles that has resulted in the traffic congestion and parking
problems in this city. Our street space hasn’t increased so far, but population of this city is in seven digit
number. Especially, in our congested markets, good parking spaces for 2 wheeler as well as 4 wheeled vehicles
in the core area of our city is required and still the government not able to resolve our traffic issues and improve
parking spaces.
Keywords: Parking problem; smart city; Traffic congestion; Parking Management
1
1. INTRODUCTION
1.1 General
One of the problems created by road traffic is parking. Not only do vehicles require street space to move about,
but also do they require space to park where the occupants can be loaded an unloaded. The period over which a
car is parked is very great compared with the time it is in motion. The size of average parking space is 14 m2. It
is roughly estimated that out of 8760 hours in a year, the car runs on an average for only 400 hours, leaving
8360 hours when it is parked. Every car owner would wish to park the car as closely as possible to his
destination so as to minimize his walking. This results in a great demand for parking space in the CBD and
other areas where the activities are concentrated. With the growing population of motor vehicles, the problem
of parking has assumed serious proportions.
Parking control has become the chief means available to cities all over the world to limit congestion. It
is the enforcement of laws and regulations. Illegally parked cars are seen almost everywhere. Traffic
congestion is like a malignant disease and due to lack of car parking facilities in the centre of cities, land values
tend to fall. The ideal solution would be to rebuild our cities to the requirements of the motor car age. Such
proposals may be included in a long term plan. But motor vehicles must be accommodated urgently otherwise
the consequences may be very serious resulting in the loss of business and property values.
The provision and citing of car parks should be related to the future traffic flow of the roads that will be
carrying traffic to the city or town. The wise sitting of car parks can make it possible to increase the number of
cars that can be parked in a city centre, without causing congestion. When considering the adaptation of city
centers to accommodate the motor car, the pedestrians must also be considered. While cars are permitted to
circulate our city centers, there must be some regulation control which will give the maximum use of the space
available. This will be to the advantage of everyone concerned. Adequate planned and organize car parking is
essential to the life of our cities. The local authorities must be strong minded on this subject. Car parks are not
likely to make big profits as a business house. But adequate car parking is a necessary part of development in a
city centre and without it trade cannot prosper.
One of the problems created by road traffic is parking. Not only do vehicles require street space to move
about, but also do they require space to park where the occupants can be loaded and unloaded. A systematic
study of the parking characteristics and demand and regulatory measures that are possible for controlling
parking is of great help to a traffic engineer as well as town planner.
2
1.2 Effects of Parking
1.2.1 Congestion
One of the serious ill-effects of parking is the loss of street space and the resulting traffic congestions.
The capacity of the streets is reduced, the journey speed drops down and the journey time and delay increase.
The operational cost of vehicles is thereby increased, causing serious economic loss to the community.
Fig 1 – Traffic congestions
1.2.2 Accidents
The maneuvers associated with parking and unparking are known to cause road accidents. Careless opening of
the doors of parked vehicles, moving out of a parked position and bringing a car to he parking location from
the mainstream of traffic are some of the common causes of parking accidents.
Fig 2 – Road Accidents
1.2.2 Obstruction to Fire Fighting Operations
Parked cars obstruct the movement of fire fighting vehicles and greatly impede their operations. They
block access to hydrants and access to buildings.
3
Fig 3 - Obstruction to Fire Fighting Operations
1.2.1 Effect on Environment
Parked vehicles degrade the environment of the town centre. Stopping and starting of vehicles result in
noise and fumes. Cars parked into every little available space debase the visual aesthetics and “buildings seems
to rise from a plinth of cars”.
In spite of the above ill-effects, parking has to be allowed on the streets or off the streets close to the
user’s destination. The well being of the community and the town centre demands that great thought should be
bestowed with the parking needs and how best to fulfill them.
Fig 4 – Air Pollution on Environment
1.3 Needfor the Study
Uuni-1 market area is one of the most congested locations in Bhubaneswar city. High volume of traffic
consisting of both fast and slow moving vehicles is plying through the road. The growth rates are reflected in
4
the growth of traffic volume on the roads, thus leading to congestion and subsequent reduction in speed. So it
has become necessary to project the future traffic growth and thereby finding out the requirement of increase in
carriage way widths required to carry this traffic. The parking space provided is not sufficient to meet the
parking demand. Hence it is necessary to conduct a detailed analysis of the traffic characteristics and parking
demand of the area.
1.4 Objectives
The objectives of the study are:
1) To study the parking characteristics in Unit-1 market road and to assess whether the demand is met with.
2) Identification of the problems in traffic and parking in Unit-1 market r road.
3) To project the present traffic scenario in Unit-1 market road.
4) To improve the parking facilities utilizing the available infrastructure for meeting the parking demand of
various categories of vehicles.
5) To smoothen the vehicular traffic flow by conducting relevant traffic studies.
1.5 Scope of the study
The scope of the present study is limited to the prediction of traffic volume and parking demand for the
year 2007 for the major roads in Unit-1 market location.
5
2. LITERATURE REVIEWS
2.1 Parking Facilities in General and Some Common Terms
First of all, it is desirable to understand clearly the meanings of certain terms associated with parking.
These terms and their meanings are given below.
1. Parking Accumulation-The total number of vehicles parked in an area at a specified moment. [Fig 5]
Figure 5 - Parking Accumulation Diagram
2. Parking volume - The number of vehicles parked in a particular area over a given period of time. It is
usually measured in vehicles per day.
3. Parking load - The area under the parking accumulation curve during a specified period.
4. Parking duration -The length of time spent in a parking space.
5. Parking index - Percentage of parking bays actually occupied by parked vehicles as compared to the
theoretical number available.
Number of bays occupied x 100
Parking index = ------------------------------------------------------------------
Theoretical number of bays available
6. Parking turn-over - Rate of the usage of the available parking space. Thus if there were 10 parking spaces
used by 100 vehicles in a period of say 12 hours then the parking turnover would be
100 vehicles per space in a period of 12 hours
= -----------------------------------------------------------------------------------
10
6
In shopping centers, public places and localities with offices, there may be shortage of parking facilities. Proper
design of parking facilities is essential in such cases. Parking facilities may be broadly divided into two types:
1. On – street or Kerb Parking
2. Off – street Parking
2.1.1 On-street or Kerb Parking
In this type of parking vehicles are parked on the kerb which may be designed for parking. Kerb parking is
quite convenient for those who could find a suitable space to park their vehicles near to the place they wish to
stop, but for others who could not find a parking space it is a problem and often they may have to park their
vehicles at a far off place you know and walk done to destination. Unless kerb parking facility has been
adequately designed in a dance, it might lead to a lot of inconvenience and congestion due to decreased road
capacity.
Angle parking or parallel parking may allowed in the kerb parking. Angle parking mat be at angles 30, 60
or 90 degrees. Angles parking accommodates more vehicles per unit lengh of kerb and maximum vehicles that
can be parked are with an angle of 90 degrees. The width of road required for parking and unparking maneuver
also is more with angle parking and it increase with the parking angle up to a maximum at 90 degree angle.
Angle parking is more convenient for the motorists than parallel parking, but it produces much more
obstruction to the through traffic resulting in more accidents than the parallel parking. Out of various angles
used in angle parking, 45 degree angle is considered as the best.
1. Parallel Parking
Fig 6 - Parallel Parking
7
2. 30 degree Parking
Fig 7 – 30 degree Parking
3. 45 degree Parking
Fig 8 – 45 degree Parking
4. 60 degree Parking
Fig 9 – 60 degree Parking
8
5. 90 degree Parking
Fig 10 – 90 degree parking
2.1.2 Off-street Parking
On-street parking can only solve a part of the paring problem. For a satisfactory solution various types of
off-street parking facilities are also be considered. The types of off-street facilitates commonly considered are:
 Surface car parks
 Multistoried car parks
 Roof parks
 Mechanical parks
 Underground car parks
A. Surface Car Parks
Surface car parks properly located and developed on a piece of vacant land or surrounding an office
complex or super market is very popular with motorists. Great care is needed in their design and operation. The
overall aesthetics of the area should receive due attention. A stall size of 2.5 x 5m is probably adequate for
Indian conditions, predominated by small size cars,where as for Amerian conditions 2.6 x 5.5m is
recommended. A variety of layouts is possible depending upon the area. If the surface park is to be operated
9
with a free charging system, there should be arrangement for collecting the money. This can be done either
manually by stationing an attendant at the entrance who sells the parking tickets.
Fig 11- Surface car park
B. Multistoreyed Car Parks
Multistoreyed parking garages [Fig. 2.3.2] are restored to when the floor space available for the parking
garage is less and is very costly. It is possible to construct multistorey garages to park a large number of cars at
a time. It is necessary to provide the inter floor travel facility for the vehicles, such as elevators, ramps, etc.
Multistoreyed car parks are designed for a capacity of about 400 to 500 cars. It involves larger capacity
lands to increase the time for unparking a car. Some of the desirable standards for designing of the multistorey
car parks are:
1) Gradient of the ramp: 1 in 10 generally and 1 in 8 for very short ramps
2) Parking stall dimensions: 2.5m x 5m
3) Clear height between floors: 2.1m
4) Inside radius of curves: 7m
5) Width of traffic lane on ramps and entrances: 3.75m
6) Gradient of slopping floors: not steeper than 1 in 20
7) Loading standards: 400 kg/m2
The arrangement of floors and the access ramps needs careful design. Ramps are preferably made on
way. In case of planning a ‘two way’ system, they should be suitably level floors and direct floor to floor ramps.
Another arrangement is with parking floors themselves continuously sloping to gain access from the level to
10
other horizontal floors with separate helical entrance and exit ramps have been found to be efficient. The car
parking floors, the ramps, the entrance and the exit should be well illuminated.
Fig 12 - Multistoreyed Car Parking
C. Roof of Parks
A very popular method of solving the parking problems adopted in many cities is to park the vehicles on
roof tops. Access ramps or mechanical lifts provide the necessary access to roofs. To economies, many roofs
may be linked together served by a single access ramp. In addition to the ramp, extra cost is involved in
designing the roof tops and the structural elements for the parking lots. An extensive system of linked car parks
at roof level, integrated with multi level, integrated with multistorey parking garages is in use.
Fig 13 – Roof car park
11
D.Underground Car Parks
The great advantage of underground car parks [Fig 2.3.4] is the least intrusion they cause to the
aesthetics of a place. These parks can be built in the basement of any multistorey building or below open
spaces. Since the work involves large quantities of excavation, construction of retaining walls, ventilation and
lighting such car parks tend to be very costly.
Fig 14 - Underground Parking
2.2 Peripheral Parking Schemes
Since the center of the town is the worst hit by the parking problem, it is natural to think in terms of providing
parking facilities at the periphery of the town and induce the motorists to park there and travel to the busy town
center by some other mode. There are a number of schemes which have be devised to secure the desired
objectives. They are
1. Park and walk
2. Park and ride
2.2.1 Park and Walk
Under this scheme the motorists are included to park at the outskirts of the town and walk down to the town
Centre. The inducement is in the form of lower parking charges at the periphery than at the town center or no
parking charges at all. The inducement should be rally attractive if the scheme has to succeed.
12
2.2.2 Park and Ride
This scheme provide for peripheral parking facilities and public transport side to the destinations in the town
centre. This is an attractive scheme and has been tried with success in many towns. Since the motorist
voluntarily parks his car at the fringe under these schemes, the scheme should be really appealing to him. For
success, the total travel time including parking time, waiting time at the bus stop and travel time by bus should
not be excessively high to make him look at it with disfavor and decide to bring the car to the town Centre in
spite of the high parking charges there. Also, the cost of peripheral parking plus the charges for to and journey
by bus should be less than the cost of travel by his car plus the charges for parking at the town Centre.
3. PARKING STUDIES
3.1 General
Parking studies usually are prerequisite to developing new or expanded parking programs. The studies should
be designed to:
1) Inventory of existing parking space supply and measure current levels of space usage (accumulation
and space turn over).
2) Identify salient parking characteristics (duration, purpose, trip destination and walking distances to
destination).
3) Qualify demands and needs.
4) Estimate facility capital and operating costs, usage and revenues.
Cost and revenue estimates can then be compared to assess the financial feasibility of an overall parking
improvement program. The feasibility study should determine:
1) How many spaces are needed under present conditions?
2) How many spaces will be needed under future conditions?
3) Where should additional spaces be located?
4) What type of patrons will they serve (short or long term) and what are their characteristics?
5) What parking rates are realistic?
3.2 Types of Parking Studies
13
A parking study may be concerned with an individual trip generator or facility, such as a hospital or office
building, or with the entire CBD. It should determine not only where motorists can and do park, but also where
they would like to park and how there parking practices affect other transportation facilities. Parking studies
provide the data essential to develop programs to meet parking needs.
Full scale, comprehensive parking studies involving extensive data collection through parker interviews and
other means, and detailed analysis provide a sound basis for estimating parking usage and determining
appropriate actions. Comprehensive study generally considered requisite for estimating parking usage and needs
on a block by block basis in large cities. However, parking study costs and complexity can be reduced in
smaller cities where a familiarity with the area and its principal parking generators will often permit reliable
judgments by using a more limited type of study without parking interviews. A limited parking study may rely
on measuring parking usage by hourly accumulation counts of parked vehicles or facility occupancy checks.
3.3 Types of Parking Surveys
The types of parking surveys are usually conducted as follows:
1. Parking Space in inventory
2. Parking Usage Survey by Patrol
3. Questionnaire Type Parking Usage Survey
4. Cordon Count
3.3.1 Parking Space Inventory
The first step in a parking survey is to collect data and amount, type and location of space actually or potentially
available for parking in an area. The area to be surveyed should first delineate. The Central Business District
[CBD] is usually the area where the parking survey is needed. The area surrounding the CBD where the parking
spills over should be included in the survey. The survey area is then subdivided on a street by street basis and
the sub-divisions marked on the map. Sketch plans of the streets are then prepared in advance. The data on
parking facilities should be recorded on the sketch using suitable symbols. The items to be recorded include the
following:
Frequency of patrol: A frequency of half an hour is considered to be satisfactory for On Street Parking
while a frequency of 1 hour could be used Off Street Parking.
Method of Observation: Usually patrols are by foot, but where vehicles are not parked, too close to one
another a moving car may be also used. As an aid a tape recorded may also be used to record the registration
numbers of vehicles.
14
Timing of the survey: The survey should be done on a typical weekday free from factors likely to result
in non representative characteristics.
Equipment and form of recording: Each observer will be equipped with a watch, pencil, supply of
forms, a map of the street and a form.
3.3.2 Questionnaire Type Parking Usage Survey
The questionnaire Type Parking usage survey involves interviews with the drivers who use the parking
facilities. As a result it is possible to collect information on the extend to which existing facilities are being
used, the parking requirements at the process existing at the time of survey, the distribution of demand over the
area and time and journey purposes of car parkers. In this interview of actual parkers, the information collected
should include:
1. Address of origin of trip
2. Address of destination of trip
3. Trip purpose
4. Time of arrival at the parking place
5. Time of departure from the parking place
6. Type of parking space used
7. Type of vehicle used
3.3.3 Cordon Count
In this method, the area to be surveyed is demarcated by a cordon line, which is crossed by the road
emanating from the area. Counting Stations are established at the crossing points and a count is made for all
vehicles entering and leaving the area. The difference between the top traffic gives the number of vehicles
parked and in motion in the area.
3.4 Comprehensive Parking Studies
A comprehensive parking study usually includes interviews to parkers in addition to measurement of
facility usage. The interviews are designed to obtain information on:
 Location where parked
 Trip purpose and frequency
15
 Primary trip destination
 Length of time parked
 Parking fees paid and
 Distance walked from primary space to primary destination
Determining where parkers desire to park requires interviewing parkers at parking facilities or major trip
generators. The location and extent of the interview sample is prime factor in how comprehensive and
expensive the study will be, and the usefulness of the findings. Postcard questionnaires, trip origin destination
studies and license type surveys are sometime used to collect information, although direct parker interviewing is
the most common and reliable method.
Interviews of employees and visitors at major trip generators can provide ancillary information relative
to household characteristics, travel modes and attitudes, and pedestrian flows. They also allow parking and trip
generation to be correlated with particular type of land uses.
The comprehensive parking study is designed to appraise trends in parking space used, identifying any
special parking problems and provide a sound basis for planned actions and feasibility analysis. It normally
provides information on the capacity and use of existing parking facilities, characteristics of parking, location
and extends of parking demand, the influence of major traffic and parking generators, future parking needs,
adequacy of existing laws and ordinances, limitations of administrative responsibility and financial capabilities.
16
4. Land Use Survey
4.1 General
Parking mainly depends upon the land-use pattern. According to the land uses, the parking accumulation
may vary. So, in order to obtain the parking demand model, different land use variables should be considered.
But, these variables vary from place to place.
Shopping centers attract more people towards them than most other land-uses. But, the parking
requirements of different Commercial centers are not the same. They vary from one to one. Some Commercial
Centre attracts more customers to it. Subdivision of Commercial center and offices were taken for the analysis.
Commercial centers are classified into two. They are Customer attractive Commercial centers and Non-
customer attractive Commercial centers.
The nature of the Commercial Centre was decided by making observations at the particular site for 1
hour. Commercial Centre in which more than 5 customers visited within 1 hour was taken as Customer
attractive Commercial Centre; otherwise it was taken as Non-customer attractive Commercial Centre. Shops
like textiles attracted more customers whereas in Beauty Parlous, Printing shops etc. customers were less. The
table 4.1 shows the types of shops considered for this study.
17
CONCLUSION
Our focus should be the solution of parking problem, strong economy and healthy environment of the city. In
Kota, special authority called as Traffic and Transportation authority is required at city level Kota. There are
lots of solutions, some are short term and some are long term basis but we need to work on the basis of long
term plan and at the same time take care of discomforts or problems. We need the authority that can look after
the construction and development of roads, flyovers, intersections, pedestrian facilities etc. The authority should
make master plans for inner, middle and outer roads which will help us in reducing the traffic congestion and
accidents in the central areas. Promoting the use of bicycles in the city, we can comfortably use the bicycle in
travelling. So this mode needs to be promoted in the city among the coaching students. We need to improve our
road maps, zebra crossings, Parking lots, directions, road markings etc.
18
REFERENCES
1. A. Zeenab (2010) Parking Space in Kochi: Issues and Solutions, Centre for Public Policy Research.
2. Michael, Manville and Shoup D. (2005) Parking, People, and Cities. Journal of urban planning and
development 233-245.
3. Banerjee et al. (2003) An overview on common parking issues, parking management options, and
creative solutions report prepared for city of Pasadena department of transportation.
4. H. J. lad, Vibhuti & G. Joshi (2013) Vehicle Parking Management using Embedded System.
International Journal of Engineering Science and Innovative Technology 2(4): 521-527.
5. Z. P. Sandor & C. Csiszar (2013) Development Stages of Intelligent Parking Information Systems for
Trucks. Acta Polytechnica Hugarica 10(4):161-174.
6. K. Mahmud, K. Gope, S. Mustafizur & R. Chowdhury (2012) Possible Causes & Solutions of Traffic
Jam and Their Impact on the Economy of Dhaka City. Journal of Management and Sustainability 2(2):
112-135.
7. D Shoup, D Pickrell Problems with parking requirements in Zoning OrdinanceTraffic Quarterly, Eno
Foundation for Transportation October, p. 545 - 561Posted: 1978
8. Y Liu Metropolis parking problems and Management Planning Solutions for Traffic Operation ,
Effectiveness, Mathematical Problems in Engineering, volume 2012Posted: 2012

More Related Content

What's hot

Parking problems
Parking problemsParking problems
Parking problemsubaidpvkd
 
Accidents studies by ravindra c
Accidents studies by ravindra cAccidents studies by ravindra c
Accidents studies by ravindra cŔąvî Bøňđ
 
report on parking. presentation
report on parking. presentationreport on parking. presentation
report on parking. presentationrajatsharma871
 
Origin and destination survey
Origin and destination surveyOrigin and destination survey
Origin and destination surveyraj balar
 
Chapter 3&4
Chapter 3&4Chapter 3&4
Chapter 3&4EWIT
 
Highway development in India
Highway development in IndiaHighway development in India
Highway development in IndiaRAMPRASAD KUMAWAT
 
Chapter 2 traffic studies
Chapter 2 traffic studiesChapter 2 traffic studies
Chapter 2 traffic studiesAnkit Patel
 
Types of intersection of road and design parameters of road intersection
Types of intersection of road and design parameters of road intersectionTypes of intersection of road and design parameters of road intersection
Types of intersection of road and design parameters of road intersectionwaiseee
 
Chapter 1 traffic characterstics
Chapter 1 traffic charactersticsChapter 1 traffic characterstics
Chapter 1 traffic charactersticsAnkit Patel
 
traffic characteristics
traffic characteristicstraffic characteristics
traffic characteristicskamariya keyur
 
Spot speed studies and speed delay time survey
Spot speed studies and speed delay time surveySpot speed studies and speed delay time survey
Spot speed studies and speed delay time surveySai Santosh Yakkali
 
Highway Cross-sectional Elements
Highway Cross-sectional ElementsHighway Cross-sectional Elements
Highway Cross-sectional ElementsAkshathaBhandary
 
Design principles of traffic signal
Design principles of traffic signalDesign principles of traffic signal
Design principles of traffic signalBhavya Patel
 
Origin & destination survey
Origin & destination surveyOrigin & destination survey
Origin & destination surveyAkash Pandey
 
Highway construction PPT
Highway construction PPTHighway construction PPT
Highway construction PPTVikas Sukhwal
 
automated highways system
automated highways systemautomated highways system
automated highways systemHarish Naicker
 

What's hot (20)

Parking problems
Parking problemsParking problems
Parking problems
 
Accidents studies by ravindra c
Accidents studies by ravindra cAccidents studies by ravindra c
Accidents studies by ravindra c
 
report on parking. presentation
report on parking. presentationreport on parking. presentation
report on parking. presentation
 
Parking study
Parking studyParking study
Parking study
 
Origin and destination survey
Origin and destination surveyOrigin and destination survey
Origin and destination survey
 
Chapter 3&4
Chapter 3&4Chapter 3&4
Chapter 3&4
 
Road construction ppt
Road construction pptRoad construction ppt
Road construction ppt
 
Highway development in India
Highway development in IndiaHighway development in India
Highway development in India
 
Chapter 2 traffic studies
Chapter 2 traffic studiesChapter 2 traffic studies
Chapter 2 traffic studies
 
Types of intersection of road and design parameters of road intersection
Types of intersection of road and design parameters of road intersectionTypes of intersection of road and design parameters of road intersection
Types of intersection of road and design parameters of road intersection
 
Chapter 1 traffic characterstics
Chapter 1 traffic charactersticsChapter 1 traffic characterstics
Chapter 1 traffic characterstics
 
traffic characteristics
traffic characteristicstraffic characteristics
traffic characteristics
 
Spot speed studies and speed delay time survey
Spot speed studies and speed delay time surveySpot speed studies and speed delay time survey
Spot speed studies and speed delay time survey
 
Highway Cross-sectional Elements
Highway Cross-sectional ElementsHighway Cross-sectional Elements
Highway Cross-sectional Elements
 
Pavement failures
Pavement failuresPavement failures
Pavement failures
 
Traffic engineering
Traffic engineeringTraffic engineering
Traffic engineering
 
Design principles of traffic signal
Design principles of traffic signalDesign principles of traffic signal
Design principles of traffic signal
 
Origin & destination survey
Origin & destination surveyOrigin & destination survey
Origin & destination survey
 
Highway construction PPT
Highway construction PPTHighway construction PPT
Highway construction PPT
 
automated highways system
automated highways systemautomated highways system
automated highways system
 

Similar to SEMINAR REPORT ON PARKING PROBLEM AT PARALA MAHARAJA ENGINEERING COLLEGE

Analysis of Parking Demand and Suggesting Alternative for Parking (A Case Stu...
Analysis of Parking Demand and Suggesting Alternative for Parking (A Case Stu...Analysis of Parking Demand and Suggesting Alternative for Parking (A Case Stu...
Analysis of Parking Demand and Suggesting Alternative for Parking (A Case Stu...ijsrd.com
 
IRJET- Design of Parking Area and Traffic Signal for Moodbidri Town based...
IRJET-  	  Design of Parking Area and Traffic Signal for Moodbidri Town based...IRJET-  	  Design of Parking Area and Traffic Signal for Moodbidri Town based...
IRJET- Design of Parking Area and Traffic Signal for Moodbidri Town based...IRJET Journal
 
Studying parking policies and proposing solutions for illegally parked vehicl...
Studying parking policies and proposing solutions for illegally parked vehicl...Studying parking policies and proposing solutions for illegally parked vehicl...
Studying parking policies and proposing solutions for illegally parked vehicl...IRJET Journal
 
Construction of multi storied machanised (semi-automatic) car
Construction of multi storied machanised (semi-automatic) carConstruction of multi storied machanised (semi-automatic) car
Construction of multi storied machanised (semi-automatic) carDar Hilal
 
IRJET- Study of Multilevel Vehicular Parking
IRJET- Study of Multilevel Vehicular ParkingIRJET- Study of Multilevel Vehicular Parking
IRJET- Study of Multilevel Vehicular ParkingIRJET Journal
 
parking problems in metro cities
parking problems in metro citiesparking problems in metro cities
parking problems in metro citiesAditya Singhal
 
Analysis for Maximum Utilization of Parking Area
Analysis for Maximum Utilization of Parking AreaAnalysis for Maximum Utilization of Parking Area
Analysis for Maximum Utilization of Parking Areaijsrd.com
 
Parking Problems in Metro cities and their Effecient Handling
Parking Problems in Metro cities and their Effecient HandlingParking Problems in Metro cities and their Effecient Handling
Parking Problems in Metro cities and their Effecient HandlingHimanshu Rao
 
thesis Prestation design
thesis Prestation designthesis Prestation design
thesis Prestation designSispap1
 
Parking design in front of CE building BUET by Pronob ghosh 1204011
Parking design in front of CE building BUET by Pronob ghosh 1204011Parking design in front of CE building BUET by Pronob ghosh 1204011
Parking design in front of CE building BUET by Pronob ghosh 1204011Pronob Ghosh
 
Car Parking Design in Urban Planning
Car Parking Design in Urban PlanningCar Parking Design in Urban Planning
Car Parking Design in Urban PlanningNzar Braim
 
IRJET- Optimization of Congested Area for the Parking
IRJET- Optimization of Congested Area for the ParkingIRJET- Optimization of Congested Area for the Parking
IRJET- Optimization of Congested Area for the ParkingIRJET Journal
 
Health of Urban Roads - IRF-WRM-14-17-November 2017
Health of Urban Roads - IRF-WRM-14-17-November 2017Health of Urban Roads - IRF-WRM-14-17-November 2017
Health of Urban Roads - IRF-WRM-14-17-November 2017SHRISH VERMA
 
A STUDY ON PROVISION OF PARK AND RIDE FACILITY FOR SMART CITY BELAGAVI
A STUDY ON PROVISION OF PARK AND RIDE FACILITY FOR SMART CITY BELAGAVIA STUDY ON PROVISION OF PARK AND RIDE FACILITY FOR SMART CITY BELAGAVI
A STUDY ON PROVISION OF PARK AND RIDE FACILITY FOR SMART CITY BELAGAVIIRJET Journal
 
Demand assessment of multi level car parking in garuda mall
Demand assessment of multi level car parking in garuda mallDemand assessment of multi level car parking in garuda mall
Demand assessment of multi level car parking in garuda malleSAT Publishing House
 
Appraisal of multilevel car parking facility at kg road cbd area, bengaluru city
Appraisal of multilevel car parking facility at kg road cbd area, bengaluru cityAppraisal of multilevel car parking facility at kg road cbd area, bengaluru city
Appraisal of multilevel car parking facility at kg road cbd area, bengaluru cityeSAT Publishing House
 
IRJET- Study of Parking Space in Surat Railway Station Road and Resolving the...
IRJET- Study of Parking Space in Surat Railway Station Road and Resolving the...IRJET- Study of Parking Space in Surat Railway Station Road and Resolving the...
IRJET- Study of Parking Space in Surat Railway Station Road and Resolving the...IRJET Journal
 
@Sispap,motel.2121
@Sispap,motel.2121@Sispap,motel.2121
@Sispap,motel.2121Sispap1
 
IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...
IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...
IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...IRJET Journal
 

Similar to SEMINAR REPORT ON PARKING PROBLEM AT PARALA MAHARAJA ENGINEERING COLLEGE (20)

Analysis of Parking Demand and Suggesting Alternative for Parking (A Case Stu...
Analysis of Parking Demand and Suggesting Alternative for Parking (A Case Stu...Analysis of Parking Demand and Suggesting Alternative for Parking (A Case Stu...
Analysis of Parking Demand and Suggesting Alternative for Parking (A Case Stu...
 
IRJET- Design of Parking Area and Traffic Signal for Moodbidri Town based...
IRJET-  	  Design of Parking Area and Traffic Signal for Moodbidri Town based...IRJET-  	  Design of Parking Area and Traffic Signal for Moodbidri Town based...
IRJET- Design of Parking Area and Traffic Signal for Moodbidri Town based...
 
Studying parking policies and proposing solutions for illegally parked vehicl...
Studying parking policies and proposing solutions for illegally parked vehicl...Studying parking policies and proposing solutions for illegally parked vehicl...
Studying parking policies and proposing solutions for illegally parked vehicl...
 
Construction of multi storied machanised (semi-automatic) car
Construction of multi storied machanised (semi-automatic) carConstruction of multi storied machanised (semi-automatic) car
Construction of multi storied machanised (semi-automatic) car
 
H615358
H615358H615358
H615358
 
IRJET- Study of Multilevel Vehicular Parking
IRJET- Study of Multilevel Vehicular ParkingIRJET- Study of Multilevel Vehicular Parking
IRJET- Study of Multilevel Vehicular Parking
 
parking problems in metro cities
parking problems in metro citiesparking problems in metro cities
parking problems in metro cities
 
Analysis for Maximum Utilization of Parking Area
Analysis for Maximum Utilization of Parking AreaAnalysis for Maximum Utilization of Parking Area
Analysis for Maximum Utilization of Parking Area
 
Parking Problems in Metro cities and their Effecient Handling
Parking Problems in Metro cities and their Effecient HandlingParking Problems in Metro cities and their Effecient Handling
Parking Problems in Metro cities and their Effecient Handling
 
thesis Prestation design
thesis Prestation designthesis Prestation design
thesis Prestation design
 
Parking design in front of CE building BUET by Pronob ghosh 1204011
Parking design in front of CE building BUET by Pronob ghosh 1204011Parking design in front of CE building BUET by Pronob ghosh 1204011
Parking design in front of CE building BUET by Pronob ghosh 1204011
 
Car Parking Design in Urban Planning
Car Parking Design in Urban PlanningCar Parking Design in Urban Planning
Car Parking Design in Urban Planning
 
IRJET- Optimization of Congested Area for the Parking
IRJET- Optimization of Congested Area for the ParkingIRJET- Optimization of Congested Area for the Parking
IRJET- Optimization of Congested Area for the Parking
 
Health of Urban Roads - IRF-WRM-14-17-November 2017
Health of Urban Roads - IRF-WRM-14-17-November 2017Health of Urban Roads - IRF-WRM-14-17-November 2017
Health of Urban Roads - IRF-WRM-14-17-November 2017
 
A STUDY ON PROVISION OF PARK AND RIDE FACILITY FOR SMART CITY BELAGAVI
A STUDY ON PROVISION OF PARK AND RIDE FACILITY FOR SMART CITY BELAGAVIA STUDY ON PROVISION OF PARK AND RIDE FACILITY FOR SMART CITY BELAGAVI
A STUDY ON PROVISION OF PARK AND RIDE FACILITY FOR SMART CITY BELAGAVI
 
Demand assessment of multi level car parking in garuda mall
Demand assessment of multi level car parking in garuda mallDemand assessment of multi level car parking in garuda mall
Demand assessment of multi level car parking in garuda mall
 
Appraisal of multilevel car parking facility at kg road cbd area, bengaluru city
Appraisal of multilevel car parking facility at kg road cbd area, bengaluru cityAppraisal of multilevel car parking facility at kg road cbd area, bengaluru city
Appraisal of multilevel car parking facility at kg road cbd area, bengaluru city
 
IRJET- Study of Parking Space in Surat Railway Station Road and Resolving the...
IRJET- Study of Parking Space in Surat Railway Station Road and Resolving the...IRJET- Study of Parking Space in Surat Railway Station Road and Resolving the...
IRJET- Study of Parking Space in Surat Railway Station Road and Resolving the...
 
@Sispap,motel.2121
@Sispap,motel.2121@Sispap,motel.2121
@Sispap,motel.2121
 
IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...
IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...
IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...
 

Recently uploaded

办理学位证(NTU证书)新加坡南洋理工大学毕业证成绩单原版一比一
办理学位证(NTU证书)新加坡南洋理工大学毕业证成绩单原版一比一办理学位证(NTU证书)新加坡南洋理工大学毕业证成绩单原版一比一
办理学位证(NTU证书)新加坡南洋理工大学毕业证成绩单原版一比一A SSS
 
办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一
办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一
办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一F dds
 
ARt app | UX Case Study
ARt app | UX Case StudyARt app | UX Case Study
ARt app | UX Case StudySophia Viganò
 
Call Girls Aslali 7397865700 Ridhima Hire Me Full Night
Call Girls Aslali 7397865700 Ridhima Hire Me Full NightCall Girls Aslali 7397865700 Ridhima Hire Me Full Night
Call Girls Aslali 7397865700 Ridhima Hire Me Full Nightssuser7cb4ff
 
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degreeyuu sss
 
VIP Call Girl Amravati Aashi 8250192130 Independent Escort Service Amravati
VIP Call Girl Amravati Aashi 8250192130 Independent Escort Service AmravatiVIP Call Girl Amravati Aashi 8250192130 Independent Escort Service Amravati
VIP Call Girl Amravati Aashi 8250192130 Independent Escort Service AmravatiSuhani Kapoor
 
NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...
NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...
NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...Amil baba
 
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一diploma 1
 
shot list for my tv series two steps back
shot list for my tv series two steps backshot list for my tv series two steps back
shot list for my tv series two steps back17lcow074
 
Call In girls Bhikaji Cama Place 🔝 ⇛8377877756 FULL Enjoy Delhi NCR
Call In girls Bhikaji Cama Place 🔝 ⇛8377877756 FULL Enjoy Delhi NCRCall In girls Bhikaji Cama Place 🔝 ⇛8377877756 FULL Enjoy Delhi NCR
Call In girls Bhikaji Cama Place 🔝 ⇛8377877756 FULL Enjoy Delhi NCRdollysharma2066
 
Design Portfolio - 2024 - William Vickery
Design Portfolio - 2024 - William VickeryDesign Portfolio - 2024 - William Vickery
Design Portfolio - 2024 - William VickeryWilliamVickery6
 
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一F La
 
Housewife Call Girls NRI Layout - Call 7001305949 Rs-3500 with A/C Room Cash ...
Housewife Call Girls NRI Layout - Call 7001305949 Rs-3500 with A/C Room Cash ...Housewife Call Girls NRI Layout - Call 7001305949 Rs-3500 with A/C Room Cash ...
Housewife Call Girls NRI Layout - Call 7001305949 Rs-3500 with A/C Room Cash ...narwatsonia7
 
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝soniya singh
 
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一Fi L
 
Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)
Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)
Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)jennyeacort
 
VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130
VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130
VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130Suhani Kapoor
 
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree 毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree ttt fff
 

Recently uploaded (20)

办理学位证(NTU证书)新加坡南洋理工大学毕业证成绩单原版一比一
办理学位证(NTU证书)新加坡南洋理工大学毕业证成绩单原版一比一办理学位证(NTU证书)新加坡南洋理工大学毕业证成绩单原版一比一
办理学位证(NTU证书)新加坡南洋理工大学毕业证成绩单原版一比一
 
Call Girls in Pratap Nagar, 9953056974 Escort Service
Call Girls in Pratap Nagar,  9953056974 Escort ServiceCall Girls in Pratap Nagar,  9953056974 Escort Service
Call Girls in Pratap Nagar, 9953056974 Escort Service
 
办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一
办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一
办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一
 
ARt app | UX Case Study
ARt app | UX Case StudyARt app | UX Case Study
ARt app | UX Case Study
 
Cheap Rate Call girls Kalkaji 9205541914 shot 1500 night
Cheap Rate Call girls Kalkaji 9205541914 shot 1500 nightCheap Rate Call girls Kalkaji 9205541914 shot 1500 night
Cheap Rate Call girls Kalkaji 9205541914 shot 1500 night
 
Call Girls Aslali 7397865700 Ridhima Hire Me Full Night
Call Girls Aslali 7397865700 Ridhima Hire Me Full NightCall Girls Aslali 7397865700 Ridhima Hire Me Full Night
Call Girls Aslali 7397865700 Ridhima Hire Me Full Night
 
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
 
VIP Call Girl Amravati Aashi 8250192130 Independent Escort Service Amravati
VIP Call Girl Amravati Aashi 8250192130 Independent Escort Service AmravatiVIP Call Girl Amravati Aashi 8250192130 Independent Escort Service Amravati
VIP Call Girl Amravati Aashi 8250192130 Independent Escort Service Amravati
 
NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...
NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...
NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...
 
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一
 
shot list for my tv series two steps back
shot list for my tv series two steps backshot list for my tv series two steps back
shot list for my tv series two steps back
 
Call In girls Bhikaji Cama Place 🔝 ⇛8377877756 FULL Enjoy Delhi NCR
Call In girls Bhikaji Cama Place 🔝 ⇛8377877756 FULL Enjoy Delhi NCRCall In girls Bhikaji Cama Place 🔝 ⇛8377877756 FULL Enjoy Delhi NCR
Call In girls Bhikaji Cama Place 🔝 ⇛8377877756 FULL Enjoy Delhi NCR
 
Design Portfolio - 2024 - William Vickery
Design Portfolio - 2024 - William VickeryDesign Portfolio - 2024 - William Vickery
Design Portfolio - 2024 - William Vickery
 
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
 
Housewife Call Girls NRI Layout - Call 7001305949 Rs-3500 with A/C Room Cash ...
Housewife Call Girls NRI Layout - Call 7001305949 Rs-3500 with A/C Room Cash ...Housewife Call Girls NRI Layout - Call 7001305949 Rs-3500 with A/C Room Cash ...
Housewife Call Girls NRI Layout - Call 7001305949 Rs-3500 with A/C Room Cash ...
 
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝
 
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
 
Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)
Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)
Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)
 
VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130
VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130
VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130
 
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree 毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
 

SEMINAR REPORT ON PARKING PROBLEM AT PARALA MAHARAJA ENGINEERING COLLEGE

  • 1. A SEMINAR REPORT ON PARKING PROBLEM PARALA MAHARAJA ENGINEERING COLLEGE, BERHAMPUR PROF. CHITTARANJAN MOHANTY (Head Of the Department) SUBMITTED TO:- SUBMITTED BY:- Mrs. Nibedita Dalai Pranab Kumar pattnayak (Asst. professor) Regd. No – 1801109220 Mr. Krushna Ch. Sethi Section - B (Asst. Professor) 7th semester,4th year
  • 2. CONTENT S.NO. TITLE PAGE.NO 1 INTRODUCTION 1.1 GENERAL 1 1.2 EFFECT OF PARKING 2-3 1.3 NEED FOR THE STUDY 3-4 1.4 OBJECTIVE 4 1.5 SCOPE OF THE STUDY 4 2 LITRETURE REVIES 2.1 PARKING FACILITIES 5-10 2.2 PERIPHERAL PARKING SCHEMES 10-12 3 PARKING STUDIES 3.1 GENERAL 12 3.2 TYPES OF PARKING STUDIES 13 3.3 TYPES OF PARKING SURVEY 13 3.4 COMPREHENSIVE PARKING STUDIES 14-15 4. LAND USE SURVEY 4.1 GENERAL 16 5 CONCLUSION 17 6 REFERENCES 18 LIST OF FIGURE SL.NO NAME PAGE.NO 1 TRAFFIC CONGESTIONS 2 2 ROAD ACCIDENT 2 3 OBSTRUCTION TO FIRE FIGHTING VECHILE 3 4 EFFECT ON ENVIRONMENT 3 5 PARKING ACCUMULATION DAIGRAM 5 6 PARALLEL,30,45,60,90 DEGREE PARKING 6-7 7 SURFACE CAR PARKS 9 8 MULTISTOREY CAR PARKS 10 9 ROOF CAR PARKS 10 10 UNDERGROUND CAR PARK 11
  • 3. ABSTRACT Today we are facing so many problems. Two of those acute problems is parking problem and traffic congestion. It has spread its branches like a banyan tree in all directions. We do not have an accurate parking management in our metro cities and mainly for our developing cities. Managing vehicles in a tactful manner is known as parking management. This paper focuses on such problems contextual to smart city Bhubaneswar. Bhubaneswar is an emerging city; it is capital city of odisha. It also comes under the ‘smart city’ project. There are lots of industries and coaching centres situated in the city that contributes to its economy. Due to this there is an increment in population and number of vehicles that has resulted in the traffic congestion and parking problems in this city. Our street space hasn’t increased so far, but population of this city is in seven digit number. Especially, in our congested markets, good parking spaces for 2 wheeler as well as 4 wheeled vehicles in the core area of our city is required and still the government not able to resolve our traffic issues and improve parking spaces. Keywords: Parking problem; smart city; Traffic congestion; Parking Management
  • 4.
  • 5. 1 1. INTRODUCTION 1.1 General One of the problems created by road traffic is parking. Not only do vehicles require street space to move about, but also do they require space to park where the occupants can be loaded an unloaded. The period over which a car is parked is very great compared with the time it is in motion. The size of average parking space is 14 m2. It is roughly estimated that out of 8760 hours in a year, the car runs on an average for only 400 hours, leaving 8360 hours when it is parked. Every car owner would wish to park the car as closely as possible to his destination so as to minimize his walking. This results in a great demand for parking space in the CBD and other areas where the activities are concentrated. With the growing population of motor vehicles, the problem of parking has assumed serious proportions. Parking control has become the chief means available to cities all over the world to limit congestion. It is the enforcement of laws and regulations. Illegally parked cars are seen almost everywhere. Traffic congestion is like a malignant disease and due to lack of car parking facilities in the centre of cities, land values tend to fall. The ideal solution would be to rebuild our cities to the requirements of the motor car age. Such proposals may be included in a long term plan. But motor vehicles must be accommodated urgently otherwise the consequences may be very serious resulting in the loss of business and property values. The provision and citing of car parks should be related to the future traffic flow of the roads that will be carrying traffic to the city or town. The wise sitting of car parks can make it possible to increase the number of cars that can be parked in a city centre, without causing congestion. When considering the adaptation of city centers to accommodate the motor car, the pedestrians must also be considered. While cars are permitted to circulate our city centers, there must be some regulation control which will give the maximum use of the space available. This will be to the advantage of everyone concerned. Adequate planned and organize car parking is essential to the life of our cities. The local authorities must be strong minded on this subject. Car parks are not likely to make big profits as a business house. But adequate car parking is a necessary part of development in a city centre and without it trade cannot prosper. One of the problems created by road traffic is parking. Not only do vehicles require street space to move about, but also do they require space to park where the occupants can be loaded and unloaded. A systematic study of the parking characteristics and demand and regulatory measures that are possible for controlling parking is of great help to a traffic engineer as well as town planner.
  • 6. 2 1.2 Effects of Parking 1.2.1 Congestion One of the serious ill-effects of parking is the loss of street space and the resulting traffic congestions. The capacity of the streets is reduced, the journey speed drops down and the journey time and delay increase. The operational cost of vehicles is thereby increased, causing serious economic loss to the community. Fig 1 – Traffic congestions 1.2.2 Accidents The maneuvers associated with parking and unparking are known to cause road accidents. Careless opening of the doors of parked vehicles, moving out of a parked position and bringing a car to he parking location from the mainstream of traffic are some of the common causes of parking accidents. Fig 2 – Road Accidents 1.2.2 Obstruction to Fire Fighting Operations Parked cars obstruct the movement of fire fighting vehicles and greatly impede their operations. They block access to hydrants and access to buildings.
  • 7. 3 Fig 3 - Obstruction to Fire Fighting Operations 1.2.1 Effect on Environment Parked vehicles degrade the environment of the town centre. Stopping and starting of vehicles result in noise and fumes. Cars parked into every little available space debase the visual aesthetics and “buildings seems to rise from a plinth of cars”. In spite of the above ill-effects, parking has to be allowed on the streets or off the streets close to the user’s destination. The well being of the community and the town centre demands that great thought should be bestowed with the parking needs and how best to fulfill them. Fig 4 – Air Pollution on Environment 1.3 Needfor the Study Uuni-1 market area is one of the most congested locations in Bhubaneswar city. High volume of traffic consisting of both fast and slow moving vehicles is plying through the road. The growth rates are reflected in
  • 8. 4 the growth of traffic volume on the roads, thus leading to congestion and subsequent reduction in speed. So it has become necessary to project the future traffic growth and thereby finding out the requirement of increase in carriage way widths required to carry this traffic. The parking space provided is not sufficient to meet the parking demand. Hence it is necessary to conduct a detailed analysis of the traffic characteristics and parking demand of the area. 1.4 Objectives The objectives of the study are: 1) To study the parking characteristics in Unit-1 market road and to assess whether the demand is met with. 2) Identification of the problems in traffic and parking in Unit-1 market r road. 3) To project the present traffic scenario in Unit-1 market road. 4) To improve the parking facilities utilizing the available infrastructure for meeting the parking demand of various categories of vehicles. 5) To smoothen the vehicular traffic flow by conducting relevant traffic studies. 1.5 Scope of the study The scope of the present study is limited to the prediction of traffic volume and parking demand for the year 2007 for the major roads in Unit-1 market location.
  • 9. 5 2. LITERATURE REVIEWS 2.1 Parking Facilities in General and Some Common Terms First of all, it is desirable to understand clearly the meanings of certain terms associated with parking. These terms and their meanings are given below. 1. Parking Accumulation-The total number of vehicles parked in an area at a specified moment. [Fig 5] Figure 5 - Parking Accumulation Diagram 2. Parking volume - The number of vehicles parked in a particular area over a given period of time. It is usually measured in vehicles per day. 3. Parking load - The area under the parking accumulation curve during a specified period. 4. Parking duration -The length of time spent in a parking space. 5. Parking index - Percentage of parking bays actually occupied by parked vehicles as compared to the theoretical number available. Number of bays occupied x 100 Parking index = ------------------------------------------------------------------ Theoretical number of bays available 6. Parking turn-over - Rate of the usage of the available parking space. Thus if there were 10 parking spaces used by 100 vehicles in a period of say 12 hours then the parking turnover would be 100 vehicles per space in a period of 12 hours = ----------------------------------------------------------------------------------- 10
  • 10. 6 In shopping centers, public places and localities with offices, there may be shortage of parking facilities. Proper design of parking facilities is essential in such cases. Parking facilities may be broadly divided into two types: 1. On – street or Kerb Parking 2. Off – street Parking 2.1.1 On-street or Kerb Parking In this type of parking vehicles are parked on the kerb which may be designed for parking. Kerb parking is quite convenient for those who could find a suitable space to park their vehicles near to the place they wish to stop, but for others who could not find a parking space it is a problem and often they may have to park their vehicles at a far off place you know and walk done to destination. Unless kerb parking facility has been adequately designed in a dance, it might lead to a lot of inconvenience and congestion due to decreased road capacity. Angle parking or parallel parking may allowed in the kerb parking. Angle parking mat be at angles 30, 60 or 90 degrees. Angles parking accommodates more vehicles per unit lengh of kerb and maximum vehicles that can be parked are with an angle of 90 degrees. The width of road required for parking and unparking maneuver also is more with angle parking and it increase with the parking angle up to a maximum at 90 degree angle. Angle parking is more convenient for the motorists than parallel parking, but it produces much more obstruction to the through traffic resulting in more accidents than the parallel parking. Out of various angles used in angle parking, 45 degree angle is considered as the best. 1. Parallel Parking Fig 6 - Parallel Parking
  • 11. 7 2. 30 degree Parking Fig 7 – 30 degree Parking 3. 45 degree Parking Fig 8 – 45 degree Parking 4. 60 degree Parking Fig 9 – 60 degree Parking
  • 12. 8 5. 90 degree Parking Fig 10 – 90 degree parking 2.1.2 Off-street Parking On-street parking can only solve a part of the paring problem. For a satisfactory solution various types of off-street parking facilities are also be considered. The types of off-street facilitates commonly considered are:  Surface car parks  Multistoried car parks  Roof parks  Mechanical parks  Underground car parks A. Surface Car Parks Surface car parks properly located and developed on a piece of vacant land or surrounding an office complex or super market is very popular with motorists. Great care is needed in their design and operation. The overall aesthetics of the area should receive due attention. A stall size of 2.5 x 5m is probably adequate for Indian conditions, predominated by small size cars,where as for Amerian conditions 2.6 x 5.5m is recommended. A variety of layouts is possible depending upon the area. If the surface park is to be operated
  • 13. 9 with a free charging system, there should be arrangement for collecting the money. This can be done either manually by stationing an attendant at the entrance who sells the parking tickets. Fig 11- Surface car park B. Multistoreyed Car Parks Multistoreyed parking garages [Fig. 2.3.2] are restored to when the floor space available for the parking garage is less and is very costly. It is possible to construct multistorey garages to park a large number of cars at a time. It is necessary to provide the inter floor travel facility for the vehicles, such as elevators, ramps, etc. Multistoreyed car parks are designed for a capacity of about 400 to 500 cars. It involves larger capacity lands to increase the time for unparking a car. Some of the desirable standards for designing of the multistorey car parks are: 1) Gradient of the ramp: 1 in 10 generally and 1 in 8 for very short ramps 2) Parking stall dimensions: 2.5m x 5m 3) Clear height between floors: 2.1m 4) Inside radius of curves: 7m 5) Width of traffic lane on ramps and entrances: 3.75m 6) Gradient of slopping floors: not steeper than 1 in 20 7) Loading standards: 400 kg/m2 The arrangement of floors and the access ramps needs careful design. Ramps are preferably made on way. In case of planning a ‘two way’ system, they should be suitably level floors and direct floor to floor ramps. Another arrangement is with parking floors themselves continuously sloping to gain access from the level to
  • 14. 10 other horizontal floors with separate helical entrance and exit ramps have been found to be efficient. The car parking floors, the ramps, the entrance and the exit should be well illuminated. Fig 12 - Multistoreyed Car Parking C. Roof of Parks A very popular method of solving the parking problems adopted in many cities is to park the vehicles on roof tops. Access ramps or mechanical lifts provide the necessary access to roofs. To economies, many roofs may be linked together served by a single access ramp. In addition to the ramp, extra cost is involved in designing the roof tops and the structural elements for the parking lots. An extensive system of linked car parks at roof level, integrated with multi level, integrated with multistorey parking garages is in use. Fig 13 – Roof car park
  • 15. 11 D.Underground Car Parks The great advantage of underground car parks [Fig 2.3.4] is the least intrusion they cause to the aesthetics of a place. These parks can be built in the basement of any multistorey building or below open spaces. Since the work involves large quantities of excavation, construction of retaining walls, ventilation and lighting such car parks tend to be very costly. Fig 14 - Underground Parking 2.2 Peripheral Parking Schemes Since the center of the town is the worst hit by the parking problem, it is natural to think in terms of providing parking facilities at the periphery of the town and induce the motorists to park there and travel to the busy town center by some other mode. There are a number of schemes which have be devised to secure the desired objectives. They are 1. Park and walk 2. Park and ride 2.2.1 Park and Walk Under this scheme the motorists are included to park at the outskirts of the town and walk down to the town Centre. The inducement is in the form of lower parking charges at the periphery than at the town center or no parking charges at all. The inducement should be rally attractive if the scheme has to succeed.
  • 16. 12 2.2.2 Park and Ride This scheme provide for peripheral parking facilities and public transport side to the destinations in the town centre. This is an attractive scheme and has been tried with success in many towns. Since the motorist voluntarily parks his car at the fringe under these schemes, the scheme should be really appealing to him. For success, the total travel time including parking time, waiting time at the bus stop and travel time by bus should not be excessively high to make him look at it with disfavor and decide to bring the car to the town Centre in spite of the high parking charges there. Also, the cost of peripheral parking plus the charges for to and journey by bus should be less than the cost of travel by his car plus the charges for parking at the town Centre. 3. PARKING STUDIES 3.1 General Parking studies usually are prerequisite to developing new or expanded parking programs. The studies should be designed to: 1) Inventory of existing parking space supply and measure current levels of space usage (accumulation and space turn over). 2) Identify salient parking characteristics (duration, purpose, trip destination and walking distances to destination). 3) Qualify demands and needs. 4) Estimate facility capital and operating costs, usage and revenues. Cost and revenue estimates can then be compared to assess the financial feasibility of an overall parking improvement program. The feasibility study should determine: 1) How many spaces are needed under present conditions? 2) How many spaces will be needed under future conditions? 3) Where should additional spaces be located? 4) What type of patrons will they serve (short or long term) and what are their characteristics? 5) What parking rates are realistic? 3.2 Types of Parking Studies
  • 17. 13 A parking study may be concerned with an individual trip generator or facility, such as a hospital or office building, or with the entire CBD. It should determine not only where motorists can and do park, but also where they would like to park and how there parking practices affect other transportation facilities. Parking studies provide the data essential to develop programs to meet parking needs. Full scale, comprehensive parking studies involving extensive data collection through parker interviews and other means, and detailed analysis provide a sound basis for estimating parking usage and determining appropriate actions. Comprehensive study generally considered requisite for estimating parking usage and needs on a block by block basis in large cities. However, parking study costs and complexity can be reduced in smaller cities where a familiarity with the area and its principal parking generators will often permit reliable judgments by using a more limited type of study without parking interviews. A limited parking study may rely on measuring parking usage by hourly accumulation counts of parked vehicles or facility occupancy checks. 3.3 Types of Parking Surveys The types of parking surveys are usually conducted as follows: 1. Parking Space in inventory 2. Parking Usage Survey by Patrol 3. Questionnaire Type Parking Usage Survey 4. Cordon Count 3.3.1 Parking Space Inventory The first step in a parking survey is to collect data and amount, type and location of space actually or potentially available for parking in an area. The area to be surveyed should first delineate. The Central Business District [CBD] is usually the area where the parking survey is needed. The area surrounding the CBD where the parking spills over should be included in the survey. The survey area is then subdivided on a street by street basis and the sub-divisions marked on the map. Sketch plans of the streets are then prepared in advance. The data on parking facilities should be recorded on the sketch using suitable symbols. The items to be recorded include the following: Frequency of patrol: A frequency of half an hour is considered to be satisfactory for On Street Parking while a frequency of 1 hour could be used Off Street Parking. Method of Observation: Usually patrols are by foot, but where vehicles are not parked, too close to one another a moving car may be also used. As an aid a tape recorded may also be used to record the registration numbers of vehicles.
  • 18. 14 Timing of the survey: The survey should be done on a typical weekday free from factors likely to result in non representative characteristics. Equipment and form of recording: Each observer will be equipped with a watch, pencil, supply of forms, a map of the street and a form. 3.3.2 Questionnaire Type Parking Usage Survey The questionnaire Type Parking usage survey involves interviews with the drivers who use the parking facilities. As a result it is possible to collect information on the extend to which existing facilities are being used, the parking requirements at the process existing at the time of survey, the distribution of demand over the area and time and journey purposes of car parkers. In this interview of actual parkers, the information collected should include: 1. Address of origin of trip 2. Address of destination of trip 3. Trip purpose 4. Time of arrival at the parking place 5. Time of departure from the parking place 6. Type of parking space used 7. Type of vehicle used 3.3.3 Cordon Count In this method, the area to be surveyed is demarcated by a cordon line, which is crossed by the road emanating from the area. Counting Stations are established at the crossing points and a count is made for all vehicles entering and leaving the area. The difference between the top traffic gives the number of vehicles parked and in motion in the area. 3.4 Comprehensive Parking Studies A comprehensive parking study usually includes interviews to parkers in addition to measurement of facility usage. The interviews are designed to obtain information on:  Location where parked  Trip purpose and frequency
  • 19. 15  Primary trip destination  Length of time parked  Parking fees paid and  Distance walked from primary space to primary destination Determining where parkers desire to park requires interviewing parkers at parking facilities or major trip generators. The location and extent of the interview sample is prime factor in how comprehensive and expensive the study will be, and the usefulness of the findings. Postcard questionnaires, trip origin destination studies and license type surveys are sometime used to collect information, although direct parker interviewing is the most common and reliable method. Interviews of employees and visitors at major trip generators can provide ancillary information relative to household characteristics, travel modes and attitudes, and pedestrian flows. They also allow parking and trip generation to be correlated with particular type of land uses. The comprehensive parking study is designed to appraise trends in parking space used, identifying any special parking problems and provide a sound basis for planned actions and feasibility analysis. It normally provides information on the capacity and use of existing parking facilities, characteristics of parking, location and extends of parking demand, the influence of major traffic and parking generators, future parking needs, adequacy of existing laws and ordinances, limitations of administrative responsibility and financial capabilities.
  • 20. 16 4. Land Use Survey 4.1 General Parking mainly depends upon the land-use pattern. According to the land uses, the parking accumulation may vary. So, in order to obtain the parking demand model, different land use variables should be considered. But, these variables vary from place to place. Shopping centers attract more people towards them than most other land-uses. But, the parking requirements of different Commercial centers are not the same. They vary from one to one. Some Commercial Centre attracts more customers to it. Subdivision of Commercial center and offices were taken for the analysis. Commercial centers are classified into two. They are Customer attractive Commercial centers and Non- customer attractive Commercial centers. The nature of the Commercial Centre was decided by making observations at the particular site for 1 hour. Commercial Centre in which more than 5 customers visited within 1 hour was taken as Customer attractive Commercial Centre; otherwise it was taken as Non-customer attractive Commercial Centre. Shops like textiles attracted more customers whereas in Beauty Parlous, Printing shops etc. customers were less. The table 4.1 shows the types of shops considered for this study.
  • 21. 17 CONCLUSION Our focus should be the solution of parking problem, strong economy and healthy environment of the city. In Kota, special authority called as Traffic and Transportation authority is required at city level Kota. There are lots of solutions, some are short term and some are long term basis but we need to work on the basis of long term plan and at the same time take care of discomforts or problems. We need the authority that can look after the construction and development of roads, flyovers, intersections, pedestrian facilities etc. The authority should make master plans for inner, middle and outer roads which will help us in reducing the traffic congestion and accidents in the central areas. Promoting the use of bicycles in the city, we can comfortably use the bicycle in travelling. So this mode needs to be promoted in the city among the coaching students. We need to improve our road maps, zebra crossings, Parking lots, directions, road markings etc.
  • 22. 18 REFERENCES 1. A. Zeenab (2010) Parking Space in Kochi: Issues and Solutions, Centre for Public Policy Research. 2. Michael, Manville and Shoup D. (2005) Parking, People, and Cities. Journal of urban planning and development 233-245. 3. Banerjee et al. (2003) An overview on common parking issues, parking management options, and creative solutions report prepared for city of Pasadena department of transportation. 4. H. J. lad, Vibhuti & G. Joshi (2013) Vehicle Parking Management using Embedded System. International Journal of Engineering Science and Innovative Technology 2(4): 521-527. 5. Z. P. Sandor & C. Csiszar (2013) Development Stages of Intelligent Parking Information Systems for Trucks. Acta Polytechnica Hugarica 10(4):161-174. 6. K. Mahmud, K. Gope, S. Mustafizur & R. Chowdhury (2012) Possible Causes & Solutions of Traffic Jam and Their Impact on the Economy of Dhaka City. Journal of Management and Sustainability 2(2): 112-135. 7. D Shoup, D Pickrell Problems with parking requirements in Zoning OrdinanceTraffic Quarterly, Eno Foundation for Transportation October, p. 545 - 561Posted: 1978 8. Y Liu Metropolis parking problems and Management Planning Solutions for Traffic Operation , Effectiveness, Mathematical Problems in Engineering, volume 2012Posted: 2012