Journal for Research| Volume 02 | Issue 07 | September 2016
ISSN: 2395-7549
All rights reserved by www.journalforresearch.org 1
Study on the Road Intersection at 26th Mile,
Kanjirappally
George Mohan Milan Jose Thomas
Assistant Professor UG Student
Department of Computer Engineering Department of Computer Engineering
Amal Jyothi College of Engineering, Kanjirapally Amal Jyothi College of Engineering, Kanjirapally
Navaneeth R Susmin Thomas
UG Student UG Student
Department of Computer Engineering Department of Computer Engineering
Amal Jyothi College of Engineering, Kanjirapally Amal Jyothi College of Engineering, Kanjirapally
Abstract
The spectacular growth of the automobile as one of the most convenient modes of travel has brought in its wake frustrating
problems of parking, accidents, delay, congestion, etc. It is no longer sufficient to build roads of adequate structural strength to
cater to the needs of vehicles, but it is equally important that the safe, efficient and comfortable movement of traffic and other
road user is ensured on these roads. Highway intersections are nodes of road networks and accident - prone locations. They are
the places where vehicles coming from different approaches and moving towards different directions interact and conflict with
each other. Due to the conflicts from all users, more traffic crashes could happen at unsignalized intersection as compared with
roadway segments. This study is fully based on the existing conditions of unsignalized intersection, including geometric design,
sight distance, traffic control devices etc. The problems of parking, accidents and delay are also prevailing in the area under our
study i.e. intersection at 26th mile. The intersection is an unsignalized one and therefore, the chances of accidents during the
peak hours are very high. Since, it is a meeting point of a national highway and a state highway, the variation in the design speed
of both roads also interrupts the traffic flow. Our study on the intersection at 26th mile mainly aims at improving the geometrical
as well as the safety features of the intersection like accident control by signal installation, incorporation of proper sight
distances, uninterrupted traffic flow without causing crashes, delay, etc.
Keywords: Approaches, Conflict, Crashes, Intersection, Sight Distances, Traffic Control Devices
_______________________________________________________________________________________________________
I. INTRODUCTION
An intersection is the junction at grade (that is to say, on the same level) of two or more roads either meeting or crossing. A T-
intersection is a meeting point of three roads either with grade separation or at different grades.
This study involves checking the safety of operation at the intersection. It also involves suggesting suitable measures to reduce
the rate of accidents.
II. SCOPE AND OBJECTIVE
With the advancement of technology in our day to day life, the transportation facilities for the easy conveyance and reliability are
also needed to be provided. It therefore requires proper study on the alignment and geometric principles of road. The project
helps to achieve efficient, free and rapid flow of traffic through the junction, to reduce the rate of accidents at the intersection, to
ensure proper sight distances for vehicles at the intersection, to ensure minimum radius for curves at the junction.
The objective of the project is to study the volume of traffic flow through the intersection, along all the arms, study the rate
and the causes of accidents at the intersection, to check the available sight distances and the turning angle at the curves, to study
the alignment and vertical profile of the intersecting roads, study the speed of the vehicles passing the intersection and to suggest
a permissible speed and to suggest traffic control and regulatory measures.
III. STUDY AREA – ROAD INTERSECTION AT 26TH MILE, KANJIRAPPALLY
The road intersection at 26th
mile is a T-intersection, having 3 roads meeting together – one coming from Erumeli, other from
Kanjirappally and the third from Mundakkayam. It is an at grade intersection where National Highway 183 (NH 183, formerly
known as NH 220) meets the State Highway 44.
The major problems at the intersection are poor visibility for the drivers approaching the junction, lack of warning signs and
traffic signals, uncontrolled flow of vehicles to different directions causing accidents and delays, improper alignment and vertical
profile of the intersecting roads, etc.
Study on the Road Intersection at 26th Mile, Kanjirappally
(J4R/ Volume 02 / Issue 07 / 001)
All rights reserved by www.journalforresearch.org 2
IV. METHODOLOGY
Traffic Volume Count
The traffic volume refers to the number of vehicles passing the road in a given interval of time. It is done to determine the flow
of traffic in the peak hour. The traffic volume count can be used for fixing the signal time during the signal designing for peak
hours. At intersection sites, the traffic on each arm should be counted and recorded separately for each movement.
Three video cameras were installed at the study approach of each arm of the intersection at a distant point so that the vehicles
approaching and leaving the intersection from each arm was analysed. The volume count was taken during the morning peak
hours from 08:45 a.m. to 10:45 a.m. on two consecutive days. From the traffic volume analysis, the peak hour is found to be
09:45 a.m. to 10:45 a.m.
Table - 1
Traffic volume at the intersection
Direction PCU
Erumely to Kanjirappally 366
Erumely to Mundakkayam 113.5
Mundakkayam to Kanjirappally 654
Mundakkayam to Erumely 88
Kanjirappally to Mundakkayam 413.5
Kanjirappally to Erumely 295
Total PCU at the junction 1930 PCU
Total Station Survey
Total station is an electronic device used in modern surveying and building construction. It is used by land surveyors and civil
engineers either to record features as in topographic surveying or to set out roads, houses or boundaries. Based on the survey, the
vertical profile of the road was found.
Collection of Accident History
The records of accidents of past few years help in finding the causes of the majority of accidents at the intersection and to
suggest suitable remedial measures to reduce such accidents. The data of the accidents occurred at the intersection for the past
few years were collected.
Table – 2
Accident History
Year Death Cases Severely Injured Cases
2015 1 8
2014 1 7
2013 0 8
The 26th
mile intersection is one among the 5 major black spots of accidents in the Kanjirappally region. The other black spots
are Petta junction, curve in front of Faby’s Auditorium, parathodu junction and Vellichayani. Most of the accidents occur
between 4 p.m. to 8 p.m. Majority of the accidents are bus accidents in which either pedestrians or the other vehicular passengers
are the victims. The main reason for most of the accidents is the absence of proper channelization.
Spot Speed Study
Spot speed studies are used to determine the speed distribution of a traffic stream at specific location. The spot speed study was
conducted using stop watch method. A distance of 20 meters was marked on each of the approaching arms of the intersection and
the speed of various vehicles to cross the desired distance was recorded.
Table – 3
Speed data
Vehicles Approaching From Mean Speed (Km/Hr) Median Speed (Km/Hr)
Kanjirappally 36.55 33.5
Mundakkayam 38.35 32.5
Erumely 35.90 36.5
The speed limit for the vehicles approaching the intersection is kept to 30 km/hr. But from the analysis, it is clear that the
speed of approaching vehicles is greater than the speed limit. This must be prevented for the safety of the people, by introducing
signals, roundabouts, channelizers, etc.
Study on the Road Intersection at 26th Mile, Kanjirappally
(J4R/ Volume 02 / Issue 07 / 001)
All rights reserved by www.journalforresearch.org 3
V. POSSIBLE IMPROVEMENTS AT THE INTERSECTION
Channelisation
Channelization is the separation or regulation of conflicting traffic movements into definite paths of travel by traffic islands or
pavement marking to facilitate the safe and orderly movements of both vehicles and pedestrians. Divisional islands along with
refuge islands are proposed for lanes from Kanjirappally and Erumely since the refuge islands provide enough space for the
turning vehicles at the intersection without interrupting the flow of straight flowing vehicles. The lane from Mundakkayam does
not need refuge islands because its turning to Erumely is free left turning.
Fig. 1: Proposed channelisers at the intersection
Traffic Signal Installation
Installation of traffic signals reduces the conflicts at the intersection. To ensure controlled movement of vehicles at the
intersection, traffic signalling during peak hours is suggested. The optimum cycle length is 153 s.
 Phase 1: Leg from Kanjirappally
 Phase 2: Leg from Mundakkayam
 Phase 3: Leg from Erumely
Fig. 2: Traffic signal phase diagram
Bus Bay
Bus bays and bus stops are designated places for buses to stop for passengers to board or to get down from a bus. Bus stops must
be minimally 15 m away or ahead from junctions. Bus stops must be located to allow passengers to board and alight safely and
conveniently.
The present bus bays at the intersection are opposite to each other and are located exactly at the meeting point of the
intersection. It causes delay to the moving traffic.
The newly proposed bus bays are staggered and thus it eliminate the problems of delay for the vehicles passing through the
intersection due to the stopped buses. It also ensures the safety of the pedestrians as well as the waiting passengers. Proper
Study on the Road Intersection at 26th Mile, Kanjirappally
(J4R/ Volume 02 / Issue 07 / 001)
All rights reserved by www.journalforresearch.org 4
distance from the intersection is also provided ahead of the bus stop so that the working of the bus bay does not interfere with
turning vehicles.
VI. CONCLUSIONS
From the study the following conclusions can be made:
 From the traffic volume analysis, the peak hour is found to be 09:45 a.m. to 10:45 a.m. The peak hour volume at the
intersection was found to be 1930 PCU/hour.
 The speed limit for the vehicles approaching the intersection is kept to 30 km/hr. But the speed of approaching vehicles is
greater than the speed limit. Thus, speed bumps or other control measures must be taken.
 The curves must therefore be smoothened for the drivers to turn safely at the intersection.
 A minimum visibility distance of 15 meters along the minor road and 8- seconds gap distance on the major road is required
at an intersection. But, at the intersection under study, the buildings are constructed very near to the shoulders. Thus, it
obstructs the visibility criteria for the drivers.
 The intersection offers a rising gradient towards Kanjirappally and falling gradient towards Mundakkayam. The road must
be fairly levelled at the intersection.
 The introduction of roundabout reduces the accidents at the intersection. But, it can only be introduced after the future
expansion of road.
 The proposed channelisers, traffic signals and bus bays can reduce the occurrence of accidents and ensures safety at the
intersection to a possible extent.
REFERENCES
[1] UbaidIllahi, Burhan–Ul-Wafa, Danish Safar Vani and Rakeeb Nabi Khan, “Traffic Flow Analysis and Efficiency of Geometric Design of A T-intersection,
A case study ”,International Journal of Civil Engineering an d Technology(IJICET),7(1),248-259, 2016.
[2] Brandon Fleming , “Traffic Operation and safety comparison between Unsignalized/Signalized offset T-intersections, two-lane roundabout and modified
roundabout”, Environmental and Geometrics Engineering, 2014.
[3] L.R Kadiyali, Traffic Engineering and Transport Planning. 8, 334-371, 2014
[4] HameedAswadh Mohammed, “Study of Traffic Safety Evaluation and Improvements at Unsignalized intersections”, Al-Quadisiya Journal for
Environmental Sciences, 5(2), 150-165, 2012.
[5] L. I.Igbinosunand V.O. Ezugwb (2010),”Road design types, Expected queue size and its relief times”, International Journal of Sciences: Basic and Applied
Research (IJSBAR), 2010.

More Related Content

What's hot

The Effect of Speed Camera Warning Sign on Vehicle Speed in School Zones
The Effect of Speed Camera Warning Sign on Vehicle Speed in School Zones The Effect of Speed Camera Warning Sign on Vehicle Speed in School Zones
The Effect of Speed Camera Warning Sign on Vehicle Speed in School Zones
musuthm
 
Demand assessment of multi level car parking in garuda mall
Demand assessment of multi level car parking in garuda mallDemand assessment of multi level car parking in garuda mall
Demand assessment of multi level car parking in garuda mall
eSAT Publishing House
 
Study on Pedestrian Behaviour near an Ashoka Road
Study on Pedestrian Behaviour near an Ashoka RoadStudy on Pedestrian Behaviour near an Ashoka Road
Study on Pedestrian Behaviour near an Ashoka Road
Journal For Research
 
IRJET - Vehicular Delay at Pedestrian Crossing Due to Non-Synchronized Pedest...
IRJET - Vehicular Delay at Pedestrian Crossing Due to Non-Synchronized Pedest...IRJET - Vehicular Delay at Pedestrian Crossing Due to Non-Synchronized Pedest...
IRJET - Vehicular Delay at Pedestrian Crossing Due to Non-Synchronized Pedest...
IRJET Journal
 
IRJET- GIS based Road Safety Audit of State Highways in Thrissur
IRJET- GIS based Road Safety Audit of State Highways in ThrissurIRJET- GIS based Road Safety Audit of State Highways in Thrissur
IRJET- GIS based Road Safety Audit of State Highways in Thrissur
IRJET Journal
 
Traffic engineering 2
Traffic engineering 2Traffic engineering 2
Traffic engineering 2
ashishcyberzone
 
Necessity of integrated transport system to namma
Necessity of integrated transport system to nammaNecessity of integrated transport system to namma
Necessity of integrated transport system to namma
eSAT Publishing House
 
Impact of Lane Occupancy on Urban Roads
Impact of Lane Occupancy on Urban RoadsImpact of Lane Occupancy on Urban Roads
Impact of Lane Occupancy on Urban Roads
Scientific Review SR
 
He final ppt
He final pptHe final ppt
He final ppt
ShahIshani1996
 
Parking studies
Parking studiesParking studies
Traffic survey student activity janata bazar kolhapur
Traffic survey student activity janata bazar kolhapurTraffic survey student activity janata bazar kolhapur
Traffic survey student activity janata bazar kolhapur
Sachin PatiL
 
Effectiveness Analysis of Travel Time For Mode Alternatife Trnasportation Bec...
Effectiveness Analysis of Travel Time For Mode Alternatife Trnasportation Bec...Effectiveness Analysis of Travel Time For Mode Alternatife Trnasportation Bec...
Effectiveness Analysis of Travel Time For Mode Alternatife Trnasportation Bec...
IJERA Editor
 
Traffic studies of urban mid block section a case study of pragatinagar to ak...
Traffic studies of urban mid block section a case study of pragatinagar to ak...Traffic studies of urban mid block section a case study of pragatinagar to ak...
Traffic studies of urban mid block section a case study of pragatinagar to ak...
eSAT Publishing House
 
Intersection designs ppt
Intersection designs pptIntersection designs ppt
Intersection designs ppt
Sowjanya Gannoju
 
Road accident prone site detection.
Road accident prone site detection.Road accident prone site detection.
Road accident prone site detection.
Mahendra Gupta
 
OPTIMIZED SOLUTIONS FOR RESOLVING TRAFFIC CONGESTION AT UNIVERSITY CIRCLE
OPTIMIZED SOLUTIONS FOR RESOLVING TRAFFIC CONGESTION AT UNIVERSITY CIRCLEOPTIMIZED SOLUTIONS FOR RESOLVING TRAFFIC CONGESTION AT UNIVERSITY CIRCLE
OPTIMIZED SOLUTIONS FOR RESOLVING TRAFFIC CONGESTION AT UNIVERSITY CIRCLE
IAEME Publication
 
Traffic engineering
Traffic engineeringTraffic engineering
Traffic engineering
Aavani Thampi
 
Highway safety for civil engineers
Highway safety for civil engineersHighway safety for civil engineers
Highway safety for civil engineers
Haider Jafferi
 
Traffic management safety six key issues (presentaion 1)
Traffic management safety   six key issues (presentaion 1)Traffic management safety   six key issues (presentaion 1)
Traffic management safety six key issues (presentaion 1)
Shze Hwa Lee
 
Chapter 8
Chapter 8Chapter 8
Chapter 8
EWIT
 

What's hot (20)

The Effect of Speed Camera Warning Sign on Vehicle Speed in School Zones
The Effect of Speed Camera Warning Sign on Vehicle Speed in School Zones The Effect of Speed Camera Warning Sign on Vehicle Speed in School Zones
The Effect of Speed Camera Warning Sign on Vehicle Speed in School Zones
 
Demand assessment of multi level car parking in garuda mall
Demand assessment of multi level car parking in garuda mallDemand assessment of multi level car parking in garuda mall
Demand assessment of multi level car parking in garuda mall
 
Study on Pedestrian Behaviour near an Ashoka Road
Study on Pedestrian Behaviour near an Ashoka RoadStudy on Pedestrian Behaviour near an Ashoka Road
Study on Pedestrian Behaviour near an Ashoka Road
 
IRJET - Vehicular Delay at Pedestrian Crossing Due to Non-Synchronized Pedest...
IRJET - Vehicular Delay at Pedestrian Crossing Due to Non-Synchronized Pedest...IRJET - Vehicular Delay at Pedestrian Crossing Due to Non-Synchronized Pedest...
IRJET - Vehicular Delay at Pedestrian Crossing Due to Non-Synchronized Pedest...
 
IRJET- GIS based Road Safety Audit of State Highways in Thrissur
IRJET- GIS based Road Safety Audit of State Highways in ThrissurIRJET- GIS based Road Safety Audit of State Highways in Thrissur
IRJET- GIS based Road Safety Audit of State Highways in Thrissur
 
Traffic engineering 2
Traffic engineering 2Traffic engineering 2
Traffic engineering 2
 
Necessity of integrated transport system to namma
Necessity of integrated transport system to nammaNecessity of integrated transport system to namma
Necessity of integrated transport system to namma
 
Impact of Lane Occupancy on Urban Roads
Impact of Lane Occupancy on Urban RoadsImpact of Lane Occupancy on Urban Roads
Impact of Lane Occupancy on Urban Roads
 
He final ppt
He final pptHe final ppt
He final ppt
 
Parking studies
Parking studiesParking studies
Parking studies
 
Traffic survey student activity janata bazar kolhapur
Traffic survey student activity janata bazar kolhapurTraffic survey student activity janata bazar kolhapur
Traffic survey student activity janata bazar kolhapur
 
Effectiveness Analysis of Travel Time For Mode Alternatife Trnasportation Bec...
Effectiveness Analysis of Travel Time For Mode Alternatife Trnasportation Bec...Effectiveness Analysis of Travel Time For Mode Alternatife Trnasportation Bec...
Effectiveness Analysis of Travel Time For Mode Alternatife Trnasportation Bec...
 
Traffic studies of urban mid block section a case study of pragatinagar to ak...
Traffic studies of urban mid block section a case study of pragatinagar to ak...Traffic studies of urban mid block section a case study of pragatinagar to ak...
Traffic studies of urban mid block section a case study of pragatinagar to ak...
 
Intersection designs ppt
Intersection designs pptIntersection designs ppt
Intersection designs ppt
 
Road accident prone site detection.
Road accident prone site detection.Road accident prone site detection.
Road accident prone site detection.
 
OPTIMIZED SOLUTIONS FOR RESOLVING TRAFFIC CONGESTION AT UNIVERSITY CIRCLE
OPTIMIZED SOLUTIONS FOR RESOLVING TRAFFIC CONGESTION AT UNIVERSITY CIRCLEOPTIMIZED SOLUTIONS FOR RESOLVING TRAFFIC CONGESTION AT UNIVERSITY CIRCLE
OPTIMIZED SOLUTIONS FOR RESOLVING TRAFFIC CONGESTION AT UNIVERSITY CIRCLE
 
Traffic engineering
Traffic engineeringTraffic engineering
Traffic engineering
 
Highway safety for civil engineers
Highway safety for civil engineersHighway safety for civil engineers
Highway safety for civil engineers
 
Traffic management safety six key issues (presentaion 1)
Traffic management safety   six key issues (presentaion 1)Traffic management safety   six key issues (presentaion 1)
Traffic management safety six key issues (presentaion 1)
 
Chapter 8
Chapter 8Chapter 8
Chapter 8
 

Viewers also liked

Carnaval 2017
Carnaval 2017Carnaval 2017
Carnaval 2017
Loraine
 
OIV ramos, et al, 2011
OIV ramos, et al, 2011OIV ramos, et al, 2011
OIV ramos, et al, 2011
Paulo de Matos Graça Ramos
 
मुलांची वर्तणूक व समस्या
मुलांची वर्तणूक व समस्यामुलांची वर्तणूक व समस्या
मुलांची वर्तणूक व समस्या
Amit Karkare
 
Ammonium Carbonate - Hazardous Substance Fact Sheet
Ammonium Carbonate - Hazardous Substance Fact Sheet Ammonium Carbonate - Hazardous Substance Fact Sheet
Ammonium Carbonate - Hazardous Substance Fact Sheet
v2zq
 
Health & Harmony
Health & HarmonyHealth & Harmony
Health & Harmony
Amit Karkare
 
Ammonium carb
Ammonium carbAmmonium carb
Ammonium carb
Amit Karkare
 
DrupalCon Barcelona 2015 - Drupal Extreme Scaling
DrupalCon Barcelona 2015 - Drupal Extreme ScalingDrupalCon Barcelona 2015 - Drupal Extreme Scaling
DrupalCon Barcelona 2015 - Drupal Extreme Scaling
zekivazquez
 
Porta de giro com corpo em veneziana e bandeira
Porta de giro com corpo em veneziana e bandeiraPorta de giro com corpo em veneziana e bandeira
Porta de giro com corpo em veneziana e bandeira
Ingrid Lorrana Ferreira Sobreira
 
SAMY MAHFAR BRINGS MERIT TO HIS LOWER EAST SIDE TENANTS
SAMY MAHFAR BRINGS MERIT TO HIS LOWER EAST SIDE TENANTSSAMY MAHFAR BRINGS MERIT TO HIS LOWER EAST SIDE TENANTS
SAMY MAHFAR BRINGS MERIT TO HIS LOWER EAST SIDE TENANTS
SMA Equities
 
Análise de Percepção do Museu da Montanha e da Girafa
Análise de Percepção do Museu da Montanha e da GirafaAnálise de Percepção do Museu da Montanha e da Girafa
Análise de Percepção do Museu da Montanha e da Girafa
Ingrid Lorrana Ferreira Sobreira
 
24hrs Camp Per Rome Camp 2008
24hrs Camp  Per Rome Camp 200824hrs Camp  Per Rome Camp 2008
24hrs Camp Per Rome Camp 2008
Camillo Di Tullio
 
TEDxVicenza_2016_Social_Networking_Analysis
TEDxVicenza_2016_Social_Networking_AnalysisTEDxVicenza_2016_Social_Networking_Analysis
TEDxVicenza_2016_Social_Networking_Analysis
Camillo Di Tullio
 
Relatório de estágio - TÉC. EM INFORMÁTICA
Relatório de estágio - TÉC. EM INFORMÁTICARelatório de estágio - TÉC. EM INFORMÁTICA
Relatório de estágio - TÉC. EM INFORMÁTICA
Ingrid Lorrana Ferreira Sobreira
 
SMART MONITORING OF AUTOMOBILE USING IOT
SMART MONITORING OF AUTOMOBILE USING IOTSMART MONITORING OF AUTOMOBILE USING IOT
SMART MONITORING OF AUTOMOBILE USING IOT
Journal For Research
 
Print media analysis January 2017
Print media analysis January 2017 Print media analysis January 2017
Print media analysis January 2017
PakistanAdvertisersSociety
 
HSA Foundation Overview
HSA Foundation OverviewHSA Foundation Overview
HSA Foundation Overview
HSA Foundation
 
OBJECT DETECTION AND RECOGNITION: A SURVEY
OBJECT DETECTION AND RECOGNITION: A SURVEYOBJECT DETECTION AND RECOGNITION: A SURVEY
OBJECT DETECTION AND RECOGNITION: A SURVEY
Journal For Research
 
DESIGN AND ANALYSIS OF COTTON SEED SEPARATION MACHINE BY USING RELIABILITY IN...
DESIGN AND ANALYSIS OF COTTON SEED SEPARATION MACHINE BY USING RELIABILITY IN...DESIGN AND ANALYSIS OF COTTON SEED SEPARATION MACHINE BY USING RELIABILITY IN...
DESIGN AND ANALYSIS OF COTTON SEED SEPARATION MACHINE BY USING RELIABILITY IN...
Journal For Research
 
IMPLEMENTATION OF LEAN MANUFACTURING TOOLS FOR IMPROVING PRODUCTIVITY: A CASE...
IMPLEMENTATION OF LEAN MANUFACTURING TOOLS FOR IMPROVING PRODUCTIVITY: A CASE...IMPLEMENTATION OF LEAN MANUFACTURING TOOLS FOR IMPROVING PRODUCTIVITY: A CASE...
IMPLEMENTATION OF LEAN MANUFACTURING TOOLS FOR IMPROVING PRODUCTIVITY: A CASE...
Journal For Research
 
DISTRIBUTION OF ELECTRIC FIELD ANALYSIS IN 36 KV ROOF TOP BUSHING BY USING FE...
DISTRIBUTION OF ELECTRIC FIELD ANALYSIS IN 36 KV ROOF TOP BUSHING BY USING FE...DISTRIBUTION OF ELECTRIC FIELD ANALYSIS IN 36 KV ROOF TOP BUSHING BY USING FE...
DISTRIBUTION OF ELECTRIC FIELD ANALYSIS IN 36 KV ROOF TOP BUSHING BY USING FE...
Journal For Research
 

Viewers also liked (20)

Carnaval 2017
Carnaval 2017Carnaval 2017
Carnaval 2017
 
OIV ramos, et al, 2011
OIV ramos, et al, 2011OIV ramos, et al, 2011
OIV ramos, et al, 2011
 
मुलांची वर्तणूक व समस्या
मुलांची वर्तणूक व समस्यामुलांची वर्तणूक व समस्या
मुलांची वर्तणूक व समस्या
 
Ammonium Carbonate - Hazardous Substance Fact Sheet
Ammonium Carbonate - Hazardous Substance Fact Sheet Ammonium Carbonate - Hazardous Substance Fact Sheet
Ammonium Carbonate - Hazardous Substance Fact Sheet
 
Health & Harmony
Health & HarmonyHealth & Harmony
Health & Harmony
 
Ammonium carb
Ammonium carbAmmonium carb
Ammonium carb
 
DrupalCon Barcelona 2015 - Drupal Extreme Scaling
DrupalCon Barcelona 2015 - Drupal Extreme ScalingDrupalCon Barcelona 2015 - Drupal Extreme Scaling
DrupalCon Barcelona 2015 - Drupal Extreme Scaling
 
Porta de giro com corpo em veneziana e bandeira
Porta de giro com corpo em veneziana e bandeiraPorta de giro com corpo em veneziana e bandeira
Porta de giro com corpo em veneziana e bandeira
 
SAMY MAHFAR BRINGS MERIT TO HIS LOWER EAST SIDE TENANTS
SAMY MAHFAR BRINGS MERIT TO HIS LOWER EAST SIDE TENANTSSAMY MAHFAR BRINGS MERIT TO HIS LOWER EAST SIDE TENANTS
SAMY MAHFAR BRINGS MERIT TO HIS LOWER EAST SIDE TENANTS
 
Análise de Percepção do Museu da Montanha e da Girafa
Análise de Percepção do Museu da Montanha e da GirafaAnálise de Percepção do Museu da Montanha e da Girafa
Análise de Percepção do Museu da Montanha e da Girafa
 
24hrs Camp Per Rome Camp 2008
24hrs Camp  Per Rome Camp 200824hrs Camp  Per Rome Camp 2008
24hrs Camp Per Rome Camp 2008
 
TEDxVicenza_2016_Social_Networking_Analysis
TEDxVicenza_2016_Social_Networking_AnalysisTEDxVicenza_2016_Social_Networking_Analysis
TEDxVicenza_2016_Social_Networking_Analysis
 
Relatório de estágio - TÉC. EM INFORMÁTICA
Relatório de estágio - TÉC. EM INFORMÁTICARelatório de estágio - TÉC. EM INFORMÁTICA
Relatório de estágio - TÉC. EM INFORMÁTICA
 
SMART MONITORING OF AUTOMOBILE USING IOT
SMART MONITORING OF AUTOMOBILE USING IOTSMART MONITORING OF AUTOMOBILE USING IOT
SMART MONITORING OF AUTOMOBILE USING IOT
 
Print media analysis January 2017
Print media analysis January 2017 Print media analysis January 2017
Print media analysis January 2017
 
HSA Foundation Overview
HSA Foundation OverviewHSA Foundation Overview
HSA Foundation Overview
 
OBJECT DETECTION AND RECOGNITION: A SURVEY
OBJECT DETECTION AND RECOGNITION: A SURVEYOBJECT DETECTION AND RECOGNITION: A SURVEY
OBJECT DETECTION AND RECOGNITION: A SURVEY
 
DESIGN AND ANALYSIS OF COTTON SEED SEPARATION MACHINE BY USING RELIABILITY IN...
DESIGN AND ANALYSIS OF COTTON SEED SEPARATION MACHINE BY USING RELIABILITY IN...DESIGN AND ANALYSIS OF COTTON SEED SEPARATION MACHINE BY USING RELIABILITY IN...
DESIGN AND ANALYSIS OF COTTON SEED SEPARATION MACHINE BY USING RELIABILITY IN...
 
IMPLEMENTATION OF LEAN MANUFACTURING TOOLS FOR IMPROVING PRODUCTIVITY: A CASE...
IMPLEMENTATION OF LEAN MANUFACTURING TOOLS FOR IMPROVING PRODUCTIVITY: A CASE...IMPLEMENTATION OF LEAN MANUFACTURING TOOLS FOR IMPROVING PRODUCTIVITY: A CASE...
IMPLEMENTATION OF LEAN MANUFACTURING TOOLS FOR IMPROVING PRODUCTIVITY: A CASE...
 
DISTRIBUTION OF ELECTRIC FIELD ANALYSIS IN 36 KV ROOF TOP BUSHING BY USING FE...
DISTRIBUTION OF ELECTRIC FIELD ANALYSIS IN 36 KV ROOF TOP BUSHING BY USING FE...DISTRIBUTION OF ELECTRIC FIELD ANALYSIS IN 36 KV ROOF TOP BUSHING BY USING FE...
DISTRIBUTION OF ELECTRIC FIELD ANALYSIS IN 36 KV ROOF TOP BUSHING BY USING FE...
 

Similar to STUDY ON INTERSECTION AT 26TH MILE, KANJIRAPPALLY

A study on gap acceptance of unsignalized intersection under mixed traffic co...
A study on gap acceptance of unsignalized intersection under mixed traffic co...A study on gap acceptance of unsignalized intersection under mixed traffic co...
A study on gap acceptance of unsignalized intersection under mixed traffic co...
eSAT Publishing House
 
Road Safety Auditing of Koratty Intersection
Road Safety Auditing of Koratty IntersectionRoad Safety Auditing of Koratty Intersection
Road Safety Auditing of Koratty Intersection
IRJET Journal
 
Traffic census and analysis (a case study)
Traffic census and analysis (a case study)Traffic census and analysis (a case study)
Traffic census and analysis (a case study)
eSAT Journals
 
IRJET- Traffic Congestion Analysis: A Case Study of Kacherithazham -Muvattupu...
IRJET- Traffic Congestion Analysis: A Case Study of Kacherithazham -Muvattupu...IRJET- Traffic Congestion Analysis: A Case Study of Kacherithazham -Muvattupu...
IRJET- Traffic Congestion Analysis: A Case Study of Kacherithazham -Muvattupu...
IRJET Journal
 
road safety audit of Aurangabad
 road safety audit of Aurangabad road safety audit of Aurangabad
road safety audit of Aurangabad
hemalatha821568
 
Identification of vehicular growth and its management on nh 202 in ranga redd...
Identification of vehicular growth and its management on nh 202 in ranga redd...Identification of vehicular growth and its management on nh 202 in ranga redd...
Identification of vehicular growth and its management on nh 202 in ranga redd...
EditorIJAERD
 
Chapter 3.pptx highway one civil engineering
Chapter 3.pptx highway one civil engineeringChapter 3.pptx highway one civil engineering
Chapter 3.pptx highway one civil engineering
abdi beder
 
traffic traffic egg.
 traffic traffic egg. traffic traffic egg.
traffic traffic egg.
anuj110
 
Unit 3
Unit 3Unit 3
Theoritical framework
Theoritical frameworkTheoritical framework
Theoritical framework
Isha Kirti
 
Study of Road Safety Audit in Municipal Area’s
Study of Road Safety Audit in Municipal  Area’sStudy of Road Safety Audit in Municipal  Area’s
Study of Road Safety Audit in Municipal Area’s
IRJET Journal
 
Designing of a Traffic Signaling System at T-Intersection
Designing of a Traffic Signaling System at T-IntersectionDesigning of a Traffic Signaling System at T-Intersection
Designing of a Traffic Signaling System at T-Intersection
IJERA Editor
 
Necessity of integrated transport system to namma metro at byapanahalli – a s...
Necessity of integrated transport system to namma metro at byapanahalli – a s...Necessity of integrated transport system to namma metro at byapanahalli – a s...
Necessity of integrated transport system to namma metro at byapanahalli – a s...
eSAT Journals
 
Study on road safety improvement in india
Study on road safety improvement in indiaStudy on road safety improvement in india
Study on road safety improvement in india
eSAT Publishing House
 
839- Health of Urban Road -Digitaly Published Paper IRF 2017
839- Health of Urban Road -Digitaly Published Paper IRF 2017839- Health of Urban Road -Digitaly Published Paper IRF 2017
839- Health of Urban Road -Digitaly Published Paper IRF 2017
SHRISH VERMA
 
IMPROVEMENT OF TRAFFIC FLOW THROUGH PLANNING INTERVENTIONS: CASE OF FAIZABAD ...
IMPROVEMENT OF TRAFFIC FLOW THROUGH PLANNING INTERVENTIONS: CASE OF FAIZABAD ...IMPROVEMENT OF TRAFFIC FLOW THROUGH PLANNING INTERVENTIONS: CASE OF FAIZABAD ...
IMPROVEMENT OF TRAFFIC FLOW THROUGH PLANNING INTERVENTIONS: CASE OF FAIZABAD ...
IRJET Journal
 
EMBARQ Türkiye Yol Güvenliği Laboratuvarı-RSLab Projesi (EMBARQ Turkey Road S...
EMBARQ Türkiye Yol Güvenliği Laboratuvarı-RSLab Projesi (EMBARQ Turkey Road S...EMBARQ Türkiye Yol Güvenliği Laboratuvarı-RSLab Projesi (EMBARQ Turkey Road S...
EMBARQ Türkiye Yol Güvenliği Laboratuvarı-RSLab Projesi (EMBARQ Turkey Road S...
WRI Ross Center for Sustainable Cities
 
Design of traffic signal on NH-12 near Barkatullah University, Bhopal Distric...
Design of traffic signal on NH-12 near Barkatullah University, Bhopal Distric...Design of traffic signal on NH-12 near Barkatullah University, Bhopal Distric...
Design of traffic signal on NH-12 near Barkatullah University, Bhopal Distric...
IRJET Journal
 
ATE - U-I.pptx
ATE - U-I.pptxATE - U-I.pptx
ATE - U-I.pptx
Civilhod15
 
Study the Effects of Traffic Situation on Driver’s Mood and Root Choice Decis...
Study the Effects of Traffic Situation on Driver’s Mood and Root Choice Decis...Study the Effects of Traffic Situation on Driver’s Mood and Root Choice Decis...
Study the Effects of Traffic Situation on Driver’s Mood and Root Choice Decis...
ijtsrd
 

Similar to STUDY ON INTERSECTION AT 26TH MILE, KANJIRAPPALLY (20)

A study on gap acceptance of unsignalized intersection under mixed traffic co...
A study on gap acceptance of unsignalized intersection under mixed traffic co...A study on gap acceptance of unsignalized intersection under mixed traffic co...
A study on gap acceptance of unsignalized intersection under mixed traffic co...
 
Road Safety Auditing of Koratty Intersection
Road Safety Auditing of Koratty IntersectionRoad Safety Auditing of Koratty Intersection
Road Safety Auditing of Koratty Intersection
 
Traffic census and analysis (a case study)
Traffic census and analysis (a case study)Traffic census and analysis (a case study)
Traffic census and analysis (a case study)
 
IRJET- Traffic Congestion Analysis: A Case Study of Kacherithazham -Muvattupu...
IRJET- Traffic Congestion Analysis: A Case Study of Kacherithazham -Muvattupu...IRJET- Traffic Congestion Analysis: A Case Study of Kacherithazham -Muvattupu...
IRJET- Traffic Congestion Analysis: A Case Study of Kacherithazham -Muvattupu...
 
road safety audit of Aurangabad
 road safety audit of Aurangabad road safety audit of Aurangabad
road safety audit of Aurangabad
 
Identification of vehicular growth and its management on nh 202 in ranga redd...
Identification of vehicular growth and its management on nh 202 in ranga redd...Identification of vehicular growth and its management on nh 202 in ranga redd...
Identification of vehicular growth and its management on nh 202 in ranga redd...
 
Chapter 3.pptx highway one civil engineering
Chapter 3.pptx highway one civil engineeringChapter 3.pptx highway one civil engineering
Chapter 3.pptx highway one civil engineering
 
traffic traffic egg.
 traffic traffic egg. traffic traffic egg.
traffic traffic egg.
 
Unit 3
Unit 3Unit 3
Unit 3
 
Theoritical framework
Theoritical frameworkTheoritical framework
Theoritical framework
 
Study of Road Safety Audit in Municipal Area’s
Study of Road Safety Audit in Municipal  Area’sStudy of Road Safety Audit in Municipal  Area’s
Study of Road Safety Audit in Municipal Area’s
 
Designing of a Traffic Signaling System at T-Intersection
Designing of a Traffic Signaling System at T-IntersectionDesigning of a Traffic Signaling System at T-Intersection
Designing of a Traffic Signaling System at T-Intersection
 
Necessity of integrated transport system to namma metro at byapanahalli – a s...
Necessity of integrated transport system to namma metro at byapanahalli – a s...Necessity of integrated transport system to namma metro at byapanahalli – a s...
Necessity of integrated transport system to namma metro at byapanahalli – a s...
 
Study on road safety improvement in india
Study on road safety improvement in indiaStudy on road safety improvement in india
Study on road safety improvement in india
 
839- Health of Urban Road -Digitaly Published Paper IRF 2017
839- Health of Urban Road -Digitaly Published Paper IRF 2017839- Health of Urban Road -Digitaly Published Paper IRF 2017
839- Health of Urban Road -Digitaly Published Paper IRF 2017
 
IMPROVEMENT OF TRAFFIC FLOW THROUGH PLANNING INTERVENTIONS: CASE OF FAIZABAD ...
IMPROVEMENT OF TRAFFIC FLOW THROUGH PLANNING INTERVENTIONS: CASE OF FAIZABAD ...IMPROVEMENT OF TRAFFIC FLOW THROUGH PLANNING INTERVENTIONS: CASE OF FAIZABAD ...
IMPROVEMENT OF TRAFFIC FLOW THROUGH PLANNING INTERVENTIONS: CASE OF FAIZABAD ...
 
EMBARQ Türkiye Yol Güvenliği Laboratuvarı-RSLab Projesi (EMBARQ Turkey Road S...
EMBARQ Türkiye Yol Güvenliği Laboratuvarı-RSLab Projesi (EMBARQ Turkey Road S...EMBARQ Türkiye Yol Güvenliği Laboratuvarı-RSLab Projesi (EMBARQ Turkey Road S...
EMBARQ Türkiye Yol Güvenliği Laboratuvarı-RSLab Projesi (EMBARQ Turkey Road S...
 
Design of traffic signal on NH-12 near Barkatullah University, Bhopal Distric...
Design of traffic signal on NH-12 near Barkatullah University, Bhopal Distric...Design of traffic signal on NH-12 near Barkatullah University, Bhopal Distric...
Design of traffic signal on NH-12 near Barkatullah University, Bhopal Distric...
 
ATE - U-I.pptx
ATE - U-I.pptxATE - U-I.pptx
ATE - U-I.pptx
 
Study the Effects of Traffic Situation on Driver’s Mood and Root Choice Decis...
Study the Effects of Traffic Situation on Driver’s Mood and Root Choice Decis...Study the Effects of Traffic Situation on Driver’s Mood and Root Choice Decis...
Study the Effects of Traffic Situation on Driver’s Mood and Root Choice Decis...
 

More from Journal For Research

Design and Analysis of Hydraulic Actuator in a Typical Aerospace vehicle | J4...
Design and Analysis of Hydraulic Actuator in a Typical Aerospace vehicle | J4...Design and Analysis of Hydraulic Actuator in a Typical Aerospace vehicle | J4...
Design and Analysis of Hydraulic Actuator in a Typical Aerospace vehicle | J4...
Journal For Research
 
Experimental Verification and Validation of Stress Distribution of Composite ...
Experimental Verification and Validation of Stress Distribution of Composite ...Experimental Verification and Validation of Stress Distribution of Composite ...
Experimental Verification and Validation of Stress Distribution of Composite ...
Journal For Research
 
Image Binarization for the uses of Preprocessing to Detect Brain Abnormality ...
Image Binarization for the uses of Preprocessing to Detect Brain Abnormality ...Image Binarization for the uses of Preprocessing to Detect Brain Abnormality ...
Image Binarization for the uses of Preprocessing to Detect Brain Abnormality ...
Journal For Research
 
A Research Paper on BFO and PSO Based Movie Recommendation System | J4RV4I1016
A Research Paper on BFO and PSO Based Movie Recommendation System | J4RV4I1016A Research Paper on BFO and PSO Based Movie Recommendation System | J4RV4I1016
A Research Paper on BFO and PSO Based Movie Recommendation System | J4RV4I1016
Journal For Research
 
IoT based Digital Agriculture Monitoring System and Their Impact on Optimal U...
IoT based Digital Agriculture Monitoring System and Their Impact on Optimal U...IoT based Digital Agriculture Monitoring System and Their Impact on Optimal U...
IoT based Digital Agriculture Monitoring System and Their Impact on Optimal U...
Journal For Research
 
A REVIEW PAPER ON BFO AND PSO BASED MOVIE RECOMMENDATION SYSTEM | J4RV4I1015
A REVIEW PAPER ON BFO AND PSO BASED MOVIE RECOMMENDATION SYSTEM | J4RV4I1015A REVIEW PAPER ON BFO AND PSO BASED MOVIE RECOMMENDATION SYSTEM | J4RV4I1015
A REVIEW PAPER ON BFO AND PSO BASED MOVIE RECOMMENDATION SYSTEM | J4RV4I1015
Journal For Research
 
HCI BASED APPLICATION FOR PLAYING COMPUTER GAMES | J4RV4I1014
HCI BASED APPLICATION FOR PLAYING COMPUTER GAMES | J4RV4I1014HCI BASED APPLICATION FOR PLAYING COMPUTER GAMES | J4RV4I1014
HCI BASED APPLICATION FOR PLAYING COMPUTER GAMES | J4RV4I1014
Journal For Research
 
A REVIEW ON DESIGN OF PUBLIC TRANSPORTATION SYSTEM IN CHANDRAPUR CITY | J4RV4...
A REVIEW ON DESIGN OF PUBLIC TRANSPORTATION SYSTEM IN CHANDRAPUR CITY | J4RV4...A REVIEW ON DESIGN OF PUBLIC TRANSPORTATION SYSTEM IN CHANDRAPUR CITY | J4RV4...
A REVIEW ON DESIGN OF PUBLIC TRANSPORTATION SYSTEM IN CHANDRAPUR CITY | J4RV4...
Journal For Research
 
A REVIEW ON LIFTING AND ASSEMBLY OF ROTARY KILN TYRE WITH SHELL BY FLEXIBLE G...
A REVIEW ON LIFTING AND ASSEMBLY OF ROTARY KILN TYRE WITH SHELL BY FLEXIBLE G...A REVIEW ON LIFTING AND ASSEMBLY OF ROTARY KILN TYRE WITH SHELL BY FLEXIBLE G...
A REVIEW ON LIFTING AND ASSEMBLY OF ROTARY KILN TYRE WITH SHELL BY FLEXIBLE G...
Journal For Research
 
LABORATORY STUDY OF STRONG, MODERATE AND WEAK SANDSTONES | J4RV4I1012
LABORATORY STUDY OF STRONG, MODERATE AND WEAK SANDSTONES | J4RV4I1012LABORATORY STUDY OF STRONG, MODERATE AND WEAK SANDSTONES | J4RV4I1012
LABORATORY STUDY OF STRONG, MODERATE AND WEAK SANDSTONES | J4RV4I1012
Journal For Research
 
DESIGN ANALYSIS AND FABRICATION OF MANUAL RICE TRANSPLANTING MACHINE | J4RV4I...
DESIGN ANALYSIS AND FABRICATION OF MANUAL RICE TRANSPLANTING MACHINE | J4RV4I...DESIGN ANALYSIS AND FABRICATION OF MANUAL RICE TRANSPLANTING MACHINE | J4RV4I...
DESIGN ANALYSIS AND FABRICATION OF MANUAL RICE TRANSPLANTING MACHINE | J4RV4I...
Journal For Research
 
AN OVERVIEW: DAKNET TECHNOLOGY - BROADBAND AD-HOC CONNECTIVITY | J4RV4I1009
AN OVERVIEW: DAKNET TECHNOLOGY - BROADBAND AD-HOC CONNECTIVITY | J4RV4I1009AN OVERVIEW: DAKNET TECHNOLOGY - BROADBAND AD-HOC CONNECTIVITY | J4RV4I1009
AN OVERVIEW: DAKNET TECHNOLOGY - BROADBAND AD-HOC CONNECTIVITY | J4RV4I1009
Journal For Research
 
LINE FOLLOWER ROBOT | J4RV4I1010
LINE FOLLOWER ROBOT | J4RV4I1010LINE FOLLOWER ROBOT | J4RV4I1010
LINE FOLLOWER ROBOT | J4RV4I1010
Journal For Research
 
CHATBOT FOR COLLEGE RELATED QUERIES | J4RV4I1008
CHATBOT FOR COLLEGE RELATED QUERIES | J4RV4I1008CHATBOT FOR COLLEGE RELATED QUERIES | J4RV4I1008
CHATBOT FOR COLLEGE RELATED QUERIES | J4RV4I1008
Journal For Research
 
AN INTEGRATED APPROACH TO REDUCE INTRA CITY TRAFFIC AT COIMBATORE | J4RV4I1002
AN INTEGRATED APPROACH TO REDUCE INTRA CITY TRAFFIC AT COIMBATORE | J4RV4I1002AN INTEGRATED APPROACH TO REDUCE INTRA CITY TRAFFIC AT COIMBATORE | J4RV4I1002
AN INTEGRATED APPROACH TO REDUCE INTRA CITY TRAFFIC AT COIMBATORE | J4RV4I1002
Journal For Research
 
A REVIEW STUDY ON GAS-SOLID CYCLONE SEPARATOR USING LAPPLE MODEL | J4RV4I1001
A REVIEW STUDY ON GAS-SOLID CYCLONE SEPARATOR USING LAPPLE MODEL | J4RV4I1001A REVIEW STUDY ON GAS-SOLID CYCLONE SEPARATOR USING LAPPLE MODEL | J4RV4I1001
A REVIEW STUDY ON GAS-SOLID CYCLONE SEPARATOR USING LAPPLE MODEL | J4RV4I1001
Journal For Research
 
IMAGE SEGMENTATION USING FCM ALGORITM | J4RV3I12021
IMAGE SEGMENTATION USING FCM ALGORITM | J4RV3I12021IMAGE SEGMENTATION USING FCM ALGORITM | J4RV3I12021
IMAGE SEGMENTATION USING FCM ALGORITM | J4RV3I12021
Journal For Research
 
USE OF GALVANIZED STEELS FOR AUTOMOTIVE BODY- CAR SURVEY RESULTS AT COASTAL A...
USE OF GALVANIZED STEELS FOR AUTOMOTIVE BODY- CAR SURVEY RESULTS AT COASTAL A...USE OF GALVANIZED STEELS FOR AUTOMOTIVE BODY- CAR SURVEY RESULTS AT COASTAL A...
USE OF GALVANIZED STEELS FOR AUTOMOTIVE BODY- CAR SURVEY RESULTS AT COASTAL A...
Journal For Research
 
UNMANNED AERIAL VEHICLE FOR REMITTANCE | J4RV3I12023
UNMANNED AERIAL VEHICLE FOR REMITTANCE | J4RV3I12023UNMANNED AERIAL VEHICLE FOR REMITTANCE | J4RV3I12023
UNMANNED AERIAL VEHICLE FOR REMITTANCE | J4RV3I12023
Journal For Research
 
SURVEY ON A MODERN MEDICARE SYSTEM USING INTERNET OF THINGS | J4RV3I12024
SURVEY ON A MODERN MEDICARE SYSTEM USING INTERNET OF THINGS | J4RV3I12024SURVEY ON A MODERN MEDICARE SYSTEM USING INTERNET OF THINGS | J4RV3I12024
SURVEY ON A MODERN MEDICARE SYSTEM USING INTERNET OF THINGS | J4RV3I12024
Journal For Research
 

More from Journal For Research (20)

Design and Analysis of Hydraulic Actuator in a Typical Aerospace vehicle | J4...
Design and Analysis of Hydraulic Actuator in a Typical Aerospace vehicle | J4...Design and Analysis of Hydraulic Actuator in a Typical Aerospace vehicle | J4...
Design and Analysis of Hydraulic Actuator in a Typical Aerospace vehicle | J4...
 
Experimental Verification and Validation of Stress Distribution of Composite ...
Experimental Verification and Validation of Stress Distribution of Composite ...Experimental Verification and Validation of Stress Distribution of Composite ...
Experimental Verification and Validation of Stress Distribution of Composite ...
 
Image Binarization for the uses of Preprocessing to Detect Brain Abnormality ...
Image Binarization for the uses of Preprocessing to Detect Brain Abnormality ...Image Binarization for the uses of Preprocessing to Detect Brain Abnormality ...
Image Binarization for the uses of Preprocessing to Detect Brain Abnormality ...
 
A Research Paper on BFO and PSO Based Movie Recommendation System | J4RV4I1016
A Research Paper on BFO and PSO Based Movie Recommendation System | J4RV4I1016A Research Paper on BFO and PSO Based Movie Recommendation System | J4RV4I1016
A Research Paper on BFO and PSO Based Movie Recommendation System | J4RV4I1016
 
IoT based Digital Agriculture Monitoring System and Their Impact on Optimal U...
IoT based Digital Agriculture Monitoring System and Their Impact on Optimal U...IoT based Digital Agriculture Monitoring System and Their Impact on Optimal U...
IoT based Digital Agriculture Monitoring System and Their Impact on Optimal U...
 
A REVIEW PAPER ON BFO AND PSO BASED MOVIE RECOMMENDATION SYSTEM | J4RV4I1015
A REVIEW PAPER ON BFO AND PSO BASED MOVIE RECOMMENDATION SYSTEM | J4RV4I1015A REVIEW PAPER ON BFO AND PSO BASED MOVIE RECOMMENDATION SYSTEM | J4RV4I1015
A REVIEW PAPER ON BFO AND PSO BASED MOVIE RECOMMENDATION SYSTEM | J4RV4I1015
 
HCI BASED APPLICATION FOR PLAYING COMPUTER GAMES | J4RV4I1014
HCI BASED APPLICATION FOR PLAYING COMPUTER GAMES | J4RV4I1014HCI BASED APPLICATION FOR PLAYING COMPUTER GAMES | J4RV4I1014
HCI BASED APPLICATION FOR PLAYING COMPUTER GAMES | J4RV4I1014
 
A REVIEW ON DESIGN OF PUBLIC TRANSPORTATION SYSTEM IN CHANDRAPUR CITY | J4RV4...
A REVIEW ON DESIGN OF PUBLIC TRANSPORTATION SYSTEM IN CHANDRAPUR CITY | J4RV4...A REVIEW ON DESIGN OF PUBLIC TRANSPORTATION SYSTEM IN CHANDRAPUR CITY | J4RV4...
A REVIEW ON DESIGN OF PUBLIC TRANSPORTATION SYSTEM IN CHANDRAPUR CITY | J4RV4...
 
A REVIEW ON LIFTING AND ASSEMBLY OF ROTARY KILN TYRE WITH SHELL BY FLEXIBLE G...
A REVIEW ON LIFTING AND ASSEMBLY OF ROTARY KILN TYRE WITH SHELL BY FLEXIBLE G...A REVIEW ON LIFTING AND ASSEMBLY OF ROTARY KILN TYRE WITH SHELL BY FLEXIBLE G...
A REVIEW ON LIFTING AND ASSEMBLY OF ROTARY KILN TYRE WITH SHELL BY FLEXIBLE G...
 
LABORATORY STUDY OF STRONG, MODERATE AND WEAK SANDSTONES | J4RV4I1012
LABORATORY STUDY OF STRONG, MODERATE AND WEAK SANDSTONES | J4RV4I1012LABORATORY STUDY OF STRONG, MODERATE AND WEAK SANDSTONES | J4RV4I1012
LABORATORY STUDY OF STRONG, MODERATE AND WEAK SANDSTONES | J4RV4I1012
 
DESIGN ANALYSIS AND FABRICATION OF MANUAL RICE TRANSPLANTING MACHINE | J4RV4I...
DESIGN ANALYSIS AND FABRICATION OF MANUAL RICE TRANSPLANTING MACHINE | J4RV4I...DESIGN ANALYSIS AND FABRICATION OF MANUAL RICE TRANSPLANTING MACHINE | J4RV4I...
DESIGN ANALYSIS AND FABRICATION OF MANUAL RICE TRANSPLANTING MACHINE | J4RV4I...
 
AN OVERVIEW: DAKNET TECHNOLOGY - BROADBAND AD-HOC CONNECTIVITY | J4RV4I1009
AN OVERVIEW: DAKNET TECHNOLOGY - BROADBAND AD-HOC CONNECTIVITY | J4RV4I1009AN OVERVIEW: DAKNET TECHNOLOGY - BROADBAND AD-HOC CONNECTIVITY | J4RV4I1009
AN OVERVIEW: DAKNET TECHNOLOGY - BROADBAND AD-HOC CONNECTIVITY | J4RV4I1009
 
LINE FOLLOWER ROBOT | J4RV4I1010
LINE FOLLOWER ROBOT | J4RV4I1010LINE FOLLOWER ROBOT | J4RV4I1010
LINE FOLLOWER ROBOT | J4RV4I1010
 
CHATBOT FOR COLLEGE RELATED QUERIES | J4RV4I1008
CHATBOT FOR COLLEGE RELATED QUERIES | J4RV4I1008CHATBOT FOR COLLEGE RELATED QUERIES | J4RV4I1008
CHATBOT FOR COLLEGE RELATED QUERIES | J4RV4I1008
 
AN INTEGRATED APPROACH TO REDUCE INTRA CITY TRAFFIC AT COIMBATORE | J4RV4I1002
AN INTEGRATED APPROACH TO REDUCE INTRA CITY TRAFFIC AT COIMBATORE | J4RV4I1002AN INTEGRATED APPROACH TO REDUCE INTRA CITY TRAFFIC AT COIMBATORE | J4RV4I1002
AN INTEGRATED APPROACH TO REDUCE INTRA CITY TRAFFIC AT COIMBATORE | J4RV4I1002
 
A REVIEW STUDY ON GAS-SOLID CYCLONE SEPARATOR USING LAPPLE MODEL | J4RV4I1001
A REVIEW STUDY ON GAS-SOLID CYCLONE SEPARATOR USING LAPPLE MODEL | J4RV4I1001A REVIEW STUDY ON GAS-SOLID CYCLONE SEPARATOR USING LAPPLE MODEL | J4RV4I1001
A REVIEW STUDY ON GAS-SOLID CYCLONE SEPARATOR USING LAPPLE MODEL | J4RV4I1001
 
IMAGE SEGMENTATION USING FCM ALGORITM | J4RV3I12021
IMAGE SEGMENTATION USING FCM ALGORITM | J4RV3I12021IMAGE SEGMENTATION USING FCM ALGORITM | J4RV3I12021
IMAGE SEGMENTATION USING FCM ALGORITM | J4RV3I12021
 
USE OF GALVANIZED STEELS FOR AUTOMOTIVE BODY- CAR SURVEY RESULTS AT COASTAL A...
USE OF GALVANIZED STEELS FOR AUTOMOTIVE BODY- CAR SURVEY RESULTS AT COASTAL A...USE OF GALVANIZED STEELS FOR AUTOMOTIVE BODY- CAR SURVEY RESULTS AT COASTAL A...
USE OF GALVANIZED STEELS FOR AUTOMOTIVE BODY- CAR SURVEY RESULTS AT COASTAL A...
 
UNMANNED AERIAL VEHICLE FOR REMITTANCE | J4RV3I12023
UNMANNED AERIAL VEHICLE FOR REMITTANCE | J4RV3I12023UNMANNED AERIAL VEHICLE FOR REMITTANCE | J4RV3I12023
UNMANNED AERIAL VEHICLE FOR REMITTANCE | J4RV3I12023
 
SURVEY ON A MODERN MEDICARE SYSTEM USING INTERNET OF THINGS | J4RV3I12024
SURVEY ON A MODERN MEDICARE SYSTEM USING INTERNET OF THINGS | J4RV3I12024SURVEY ON A MODERN MEDICARE SYSTEM USING INTERNET OF THINGS | J4RV3I12024
SURVEY ON A MODERN MEDICARE SYSTEM USING INTERNET OF THINGS | J4RV3I12024
 

Recently uploaded

ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
PECB
 
Digital Artefact 1 - Tiny Home Environmental Design
Digital Artefact 1 - Tiny Home Environmental DesignDigital Artefact 1 - Tiny Home Environmental Design
Digital Artefact 1 - Tiny Home Environmental Design
amberjdewit93
 
Digital Artifact 1 - 10VCD Environments Unit
Digital Artifact 1 - 10VCD Environments UnitDigital Artifact 1 - 10VCD Environments Unit
Digital Artifact 1 - 10VCD Environments Unit
chanes7
 
MARY JANE WILSON, A “BOA MÃE” .
MARY JANE WILSON, A “BOA MÃE”           .MARY JANE WILSON, A “BOA MÃE”           .
MARY JANE WILSON, A “BOA MÃE” .
Colégio Santa Teresinha
 
Life upper-Intermediate B2 Workbook for student
Life upper-Intermediate B2 Workbook for studentLife upper-Intermediate B2 Workbook for student
Life upper-Intermediate B2 Workbook for student
NgcHiNguyn25
 
Executive Directors Chat Leveraging AI for Diversity, Equity, and Inclusion
Executive Directors Chat  Leveraging AI for Diversity, Equity, and InclusionExecutive Directors Chat  Leveraging AI for Diversity, Equity, and Inclusion
Executive Directors Chat Leveraging AI for Diversity, Equity, and Inclusion
TechSoup
 
How to Add Chatter in the odoo 17 ERP Module
How to Add Chatter in the odoo 17 ERP ModuleHow to Add Chatter in the odoo 17 ERP Module
How to Add Chatter in the odoo 17 ERP Module
Celine George
 
Azure Interview Questions and Answers PDF By ScholarHat
Azure Interview Questions and Answers PDF By ScholarHatAzure Interview Questions and Answers PDF By ScholarHat
Azure Interview Questions and Answers PDF By ScholarHat
Scholarhat
 
Advanced Java[Extra Concepts, Not Difficult].docx
Advanced Java[Extra Concepts, Not Difficult].docxAdvanced Java[Extra Concepts, Not Difficult].docx
Advanced Java[Extra Concepts, Not Difficult].docx
adhitya5119
 
How to Build a Module in Odoo 17 Using the Scaffold Method
How to Build a Module in Odoo 17 Using the Scaffold MethodHow to Build a Module in Odoo 17 Using the Scaffold Method
How to Build a Module in Odoo 17 Using the Scaffold Method
Celine George
 
Your Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective UpskillingYour Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective Upskilling
Excellence Foundation for South Sudan
 
writing about opinions about Australia the movie
writing about opinions about Australia the moviewriting about opinions about Australia the movie
writing about opinions about Australia the movie
Nicholas Montgomery
 
Introduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp NetworkIntroduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp Network
TechSoup
 
Types of Herbal Cosmetics its standardization.
Types of Herbal Cosmetics its standardization.Types of Herbal Cosmetics its standardization.
Types of Herbal Cosmetics its standardization.
Ashokrao Mane college of Pharmacy Peth-Vadgaon
 
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptxC1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
mulvey2
 
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptxChapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
Mohd Adib Abd Muin, Senior Lecturer at Universiti Utara Malaysia
 
Liberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdfLiberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdf
WaniBasim
 
DRUGS AND ITS classification slide share
DRUGS AND ITS classification slide shareDRUGS AND ITS classification slide share
DRUGS AND ITS classification slide share
taiba qazi
 
PIMS Job Advertisement 2024.pdf Islamabad
PIMS Job Advertisement 2024.pdf IslamabadPIMS Job Advertisement 2024.pdf Islamabad
PIMS Job Advertisement 2024.pdf Islamabad
AyyanKhan40
 
RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3
RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3
RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3
IreneSebastianRueco1
 

Recently uploaded (20)

ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
 
Digital Artefact 1 - Tiny Home Environmental Design
Digital Artefact 1 - Tiny Home Environmental DesignDigital Artefact 1 - Tiny Home Environmental Design
Digital Artefact 1 - Tiny Home Environmental Design
 
Digital Artifact 1 - 10VCD Environments Unit
Digital Artifact 1 - 10VCD Environments UnitDigital Artifact 1 - 10VCD Environments Unit
Digital Artifact 1 - 10VCD Environments Unit
 
MARY JANE WILSON, A “BOA MÃE” .
MARY JANE WILSON, A “BOA MÃE”           .MARY JANE WILSON, A “BOA MÃE”           .
MARY JANE WILSON, A “BOA MÃE” .
 
Life upper-Intermediate B2 Workbook for student
Life upper-Intermediate B2 Workbook for studentLife upper-Intermediate B2 Workbook for student
Life upper-Intermediate B2 Workbook for student
 
Executive Directors Chat Leveraging AI for Diversity, Equity, and Inclusion
Executive Directors Chat  Leveraging AI for Diversity, Equity, and InclusionExecutive Directors Chat  Leveraging AI for Diversity, Equity, and Inclusion
Executive Directors Chat Leveraging AI for Diversity, Equity, and Inclusion
 
How to Add Chatter in the odoo 17 ERP Module
How to Add Chatter in the odoo 17 ERP ModuleHow to Add Chatter in the odoo 17 ERP Module
How to Add Chatter in the odoo 17 ERP Module
 
Azure Interview Questions and Answers PDF By ScholarHat
Azure Interview Questions and Answers PDF By ScholarHatAzure Interview Questions and Answers PDF By ScholarHat
Azure Interview Questions and Answers PDF By ScholarHat
 
Advanced Java[Extra Concepts, Not Difficult].docx
Advanced Java[Extra Concepts, Not Difficult].docxAdvanced Java[Extra Concepts, Not Difficult].docx
Advanced Java[Extra Concepts, Not Difficult].docx
 
How to Build a Module in Odoo 17 Using the Scaffold Method
How to Build a Module in Odoo 17 Using the Scaffold MethodHow to Build a Module in Odoo 17 Using the Scaffold Method
How to Build a Module in Odoo 17 Using the Scaffold Method
 
Your Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective UpskillingYour Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective Upskilling
 
writing about opinions about Australia the movie
writing about opinions about Australia the moviewriting about opinions about Australia the movie
writing about opinions about Australia the movie
 
Introduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp NetworkIntroduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp Network
 
Types of Herbal Cosmetics its standardization.
Types of Herbal Cosmetics its standardization.Types of Herbal Cosmetics its standardization.
Types of Herbal Cosmetics its standardization.
 
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptxC1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
 
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptxChapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
 
Liberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdfLiberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdf
 
DRUGS AND ITS classification slide share
DRUGS AND ITS classification slide shareDRUGS AND ITS classification slide share
DRUGS AND ITS classification slide share
 
PIMS Job Advertisement 2024.pdf Islamabad
PIMS Job Advertisement 2024.pdf IslamabadPIMS Job Advertisement 2024.pdf Islamabad
PIMS Job Advertisement 2024.pdf Islamabad
 
RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3
RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3
RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3
 

STUDY ON INTERSECTION AT 26TH MILE, KANJIRAPPALLY

  • 1. Journal for Research| Volume 02 | Issue 07 | September 2016 ISSN: 2395-7549 All rights reserved by www.journalforresearch.org 1 Study on the Road Intersection at 26th Mile, Kanjirappally George Mohan Milan Jose Thomas Assistant Professor UG Student Department of Computer Engineering Department of Computer Engineering Amal Jyothi College of Engineering, Kanjirapally Amal Jyothi College of Engineering, Kanjirapally Navaneeth R Susmin Thomas UG Student UG Student Department of Computer Engineering Department of Computer Engineering Amal Jyothi College of Engineering, Kanjirapally Amal Jyothi College of Engineering, Kanjirapally Abstract The spectacular growth of the automobile as one of the most convenient modes of travel has brought in its wake frustrating problems of parking, accidents, delay, congestion, etc. It is no longer sufficient to build roads of adequate structural strength to cater to the needs of vehicles, but it is equally important that the safe, efficient and comfortable movement of traffic and other road user is ensured on these roads. Highway intersections are nodes of road networks and accident - prone locations. They are the places where vehicles coming from different approaches and moving towards different directions interact and conflict with each other. Due to the conflicts from all users, more traffic crashes could happen at unsignalized intersection as compared with roadway segments. This study is fully based on the existing conditions of unsignalized intersection, including geometric design, sight distance, traffic control devices etc. The problems of parking, accidents and delay are also prevailing in the area under our study i.e. intersection at 26th mile. The intersection is an unsignalized one and therefore, the chances of accidents during the peak hours are very high. Since, it is a meeting point of a national highway and a state highway, the variation in the design speed of both roads also interrupts the traffic flow. Our study on the intersection at 26th mile mainly aims at improving the geometrical as well as the safety features of the intersection like accident control by signal installation, incorporation of proper sight distances, uninterrupted traffic flow without causing crashes, delay, etc. Keywords: Approaches, Conflict, Crashes, Intersection, Sight Distances, Traffic Control Devices _______________________________________________________________________________________________________ I. INTRODUCTION An intersection is the junction at grade (that is to say, on the same level) of two or more roads either meeting or crossing. A T- intersection is a meeting point of three roads either with grade separation or at different grades. This study involves checking the safety of operation at the intersection. It also involves suggesting suitable measures to reduce the rate of accidents. II. SCOPE AND OBJECTIVE With the advancement of technology in our day to day life, the transportation facilities for the easy conveyance and reliability are also needed to be provided. It therefore requires proper study on the alignment and geometric principles of road. The project helps to achieve efficient, free and rapid flow of traffic through the junction, to reduce the rate of accidents at the intersection, to ensure proper sight distances for vehicles at the intersection, to ensure minimum radius for curves at the junction. The objective of the project is to study the volume of traffic flow through the intersection, along all the arms, study the rate and the causes of accidents at the intersection, to check the available sight distances and the turning angle at the curves, to study the alignment and vertical profile of the intersecting roads, study the speed of the vehicles passing the intersection and to suggest a permissible speed and to suggest traffic control and regulatory measures. III. STUDY AREA – ROAD INTERSECTION AT 26TH MILE, KANJIRAPPALLY The road intersection at 26th mile is a T-intersection, having 3 roads meeting together – one coming from Erumeli, other from Kanjirappally and the third from Mundakkayam. It is an at grade intersection where National Highway 183 (NH 183, formerly known as NH 220) meets the State Highway 44. The major problems at the intersection are poor visibility for the drivers approaching the junction, lack of warning signs and traffic signals, uncontrolled flow of vehicles to different directions causing accidents and delays, improper alignment and vertical profile of the intersecting roads, etc.
  • 2. Study on the Road Intersection at 26th Mile, Kanjirappally (J4R/ Volume 02 / Issue 07 / 001) All rights reserved by www.journalforresearch.org 2 IV. METHODOLOGY Traffic Volume Count The traffic volume refers to the number of vehicles passing the road in a given interval of time. It is done to determine the flow of traffic in the peak hour. The traffic volume count can be used for fixing the signal time during the signal designing for peak hours. At intersection sites, the traffic on each arm should be counted and recorded separately for each movement. Three video cameras were installed at the study approach of each arm of the intersection at a distant point so that the vehicles approaching and leaving the intersection from each arm was analysed. The volume count was taken during the morning peak hours from 08:45 a.m. to 10:45 a.m. on two consecutive days. From the traffic volume analysis, the peak hour is found to be 09:45 a.m. to 10:45 a.m. Table - 1 Traffic volume at the intersection Direction PCU Erumely to Kanjirappally 366 Erumely to Mundakkayam 113.5 Mundakkayam to Kanjirappally 654 Mundakkayam to Erumely 88 Kanjirappally to Mundakkayam 413.5 Kanjirappally to Erumely 295 Total PCU at the junction 1930 PCU Total Station Survey Total station is an electronic device used in modern surveying and building construction. It is used by land surveyors and civil engineers either to record features as in topographic surveying or to set out roads, houses or boundaries. Based on the survey, the vertical profile of the road was found. Collection of Accident History The records of accidents of past few years help in finding the causes of the majority of accidents at the intersection and to suggest suitable remedial measures to reduce such accidents. The data of the accidents occurred at the intersection for the past few years were collected. Table – 2 Accident History Year Death Cases Severely Injured Cases 2015 1 8 2014 1 7 2013 0 8 The 26th mile intersection is one among the 5 major black spots of accidents in the Kanjirappally region. The other black spots are Petta junction, curve in front of Faby’s Auditorium, parathodu junction and Vellichayani. Most of the accidents occur between 4 p.m. to 8 p.m. Majority of the accidents are bus accidents in which either pedestrians or the other vehicular passengers are the victims. The main reason for most of the accidents is the absence of proper channelization. Spot Speed Study Spot speed studies are used to determine the speed distribution of a traffic stream at specific location. The spot speed study was conducted using stop watch method. A distance of 20 meters was marked on each of the approaching arms of the intersection and the speed of various vehicles to cross the desired distance was recorded. Table – 3 Speed data Vehicles Approaching From Mean Speed (Km/Hr) Median Speed (Km/Hr) Kanjirappally 36.55 33.5 Mundakkayam 38.35 32.5 Erumely 35.90 36.5 The speed limit for the vehicles approaching the intersection is kept to 30 km/hr. But from the analysis, it is clear that the speed of approaching vehicles is greater than the speed limit. This must be prevented for the safety of the people, by introducing signals, roundabouts, channelizers, etc.
  • 3. Study on the Road Intersection at 26th Mile, Kanjirappally (J4R/ Volume 02 / Issue 07 / 001) All rights reserved by www.journalforresearch.org 3 V. POSSIBLE IMPROVEMENTS AT THE INTERSECTION Channelisation Channelization is the separation or regulation of conflicting traffic movements into definite paths of travel by traffic islands or pavement marking to facilitate the safe and orderly movements of both vehicles and pedestrians. Divisional islands along with refuge islands are proposed for lanes from Kanjirappally and Erumely since the refuge islands provide enough space for the turning vehicles at the intersection without interrupting the flow of straight flowing vehicles. The lane from Mundakkayam does not need refuge islands because its turning to Erumely is free left turning. Fig. 1: Proposed channelisers at the intersection Traffic Signal Installation Installation of traffic signals reduces the conflicts at the intersection. To ensure controlled movement of vehicles at the intersection, traffic signalling during peak hours is suggested. The optimum cycle length is 153 s.  Phase 1: Leg from Kanjirappally  Phase 2: Leg from Mundakkayam  Phase 3: Leg from Erumely Fig. 2: Traffic signal phase diagram Bus Bay Bus bays and bus stops are designated places for buses to stop for passengers to board or to get down from a bus. Bus stops must be minimally 15 m away or ahead from junctions. Bus stops must be located to allow passengers to board and alight safely and conveniently. The present bus bays at the intersection are opposite to each other and are located exactly at the meeting point of the intersection. It causes delay to the moving traffic. The newly proposed bus bays are staggered and thus it eliminate the problems of delay for the vehicles passing through the intersection due to the stopped buses. It also ensures the safety of the pedestrians as well as the waiting passengers. Proper
  • 4. Study on the Road Intersection at 26th Mile, Kanjirappally (J4R/ Volume 02 / Issue 07 / 001) All rights reserved by www.journalforresearch.org 4 distance from the intersection is also provided ahead of the bus stop so that the working of the bus bay does not interfere with turning vehicles. VI. CONCLUSIONS From the study the following conclusions can be made:  From the traffic volume analysis, the peak hour is found to be 09:45 a.m. to 10:45 a.m. The peak hour volume at the intersection was found to be 1930 PCU/hour.  The speed limit for the vehicles approaching the intersection is kept to 30 km/hr. But the speed of approaching vehicles is greater than the speed limit. Thus, speed bumps or other control measures must be taken.  The curves must therefore be smoothened for the drivers to turn safely at the intersection.  A minimum visibility distance of 15 meters along the minor road and 8- seconds gap distance on the major road is required at an intersection. But, at the intersection under study, the buildings are constructed very near to the shoulders. Thus, it obstructs the visibility criteria for the drivers.  The intersection offers a rising gradient towards Kanjirappally and falling gradient towards Mundakkayam. The road must be fairly levelled at the intersection.  The introduction of roundabout reduces the accidents at the intersection. But, it can only be introduced after the future expansion of road.  The proposed channelisers, traffic signals and bus bays can reduce the occurrence of accidents and ensures safety at the intersection to a possible extent. REFERENCES [1] UbaidIllahi, Burhan–Ul-Wafa, Danish Safar Vani and Rakeeb Nabi Khan, “Traffic Flow Analysis and Efficiency of Geometric Design of A T-intersection, A case study ”,International Journal of Civil Engineering an d Technology(IJICET),7(1),248-259, 2016. [2] Brandon Fleming , “Traffic Operation and safety comparison between Unsignalized/Signalized offset T-intersections, two-lane roundabout and modified roundabout”, Environmental and Geometrics Engineering, 2014. [3] L.R Kadiyali, Traffic Engineering and Transport Planning. 8, 334-371, 2014 [4] HameedAswadh Mohammed, “Study of Traffic Safety Evaluation and Improvements at Unsignalized intersections”, Al-Quadisiya Journal for Environmental Sciences, 5(2), 150-165, 2012. [5] L. I.Igbinosunand V.O. Ezugwb (2010),”Road design types, Expected queue size and its relief times”, International Journal of Sciences: Basic and Applied Research (IJSBAR), 2010.